Approved Schemes - In Progress

Scheme Key Completed Cancelled Update

Ref. CMA Scheme Allocated Task Name Parish Finish Cost Code Works Description Comments No. Approved Type Budget 2013/14 Approved

Phase 1 - RAB signs/lines March Chelmsford Traffic 1 Parkway A1060 Odeon RAB Aug 2016 10/07/2013 LCHE132022 Traffic Management Improvements (TMI) £41,000 2016, Phase 2 - Variable Message non Parished Management and Car Park signs August 2016

O/s Grange, Chelmsford Traffic 2 Feb 2016 04/02/2014 LCHE132071 Raise kerbing/add bollards/pave area £12,500 Completed London Road, Chelmsford non Parished Management Main Road (at southern Chelmsford Traffic On going liaison with Parish Council 3 Broomfield Parish Mar 2016 18/03/2014 LCHE142001 Village gateway treatment - design £5,000 non Parished Management over gateway sign design boundary), Broomfield Parish Council have agreed for Main Road (at northern Chelmsford Traffic scheme to be On Hold until any 4 Broomfield Parish Mar 2016 18/03/2014 LCHE142002 Village gateway treatment - design £5,000 non Parished Management changes to RAB are finalised. Moved boundary), Broomfield back to Potential Schemes List

Following Prioritisation meeting - Main Rd nr j/w Church Rd, East Traffic Suggestion is to complete Design 5 Mar 2016 04/02/2014 LCHE132068 Create walkable verge £11,500 Hanningfield Management works (£3k) and move implementation (£8.5K) to Potential Schemes List

Watchouse Road (Skinners Traffic On going liaison with Parish Council 6 Lane to Pipers Tye), Jun 2016 18/03/2014 LCHE142003 Speed reduction measures - VAS sign £10,000 Management on VAS options Galleywood Following Prioritisation meeting - Continuation of footway from Village to Heritage Centre - Civil Suggestion is to progress Road, 7 Galleywood Aug 2016 12/09/2013 LCHE003001 Walking Works £88k, Legal/Design Costs £31k. Panel wish to use £124,000 Legal/Design works (£31k) and move Galleywood unspent budget from 2012/13 implementation(£88k) to Potential Schemes List Five entry point to Traffic 8 Galleywood Dec 2015 04/02/2014 LCHE132016 Install five Village gateway features £12,500 Completed Galleywood Management 2014/15 Approved

Was Mar 2016, scheme slipped due to O/s 140-147 Forest Drive Chelmsford Traffic issues around disabled parking bay 9 Sep 2016 02/06/2014 LCHE142004 To construct lay-by within available verge £25,000 Chelmsford non Parished Management and statutory undertakers apparatus. See design in Appendix 1

Phase 1 - Grass paver lay-bys, Parking Improvements along whole length of road (1377m) - footways and bus stops starting Jan Chelmsford Traffic 10 Avon Road, Chelmsford Apr 2016 02/06/2014 LCHE142031 measures to prevent parking on verges combined with creation £228,923 2016 for nine weeks , Phase 2 - timber non Parished Management of parking laybys bollards/fencing top up £44k agreed January 2016 Panel meeting.

Ten Entry points to Chelmsford Traffic Improved City nameplate signage, to include image of area of 11 Dec 2016 09/07/2014 LCHE142023 £40,000 Chelmsford City non Parished Management interest within City, will require DfT approval Dyers Hall to Cricket Traffic 12 Ground, Road, Chignal Mar 2016 02/06/2014 LCHE142032 Creation of three passing places on narrow road £59,700 Management Chignal Sandon Hill, Ford End Traffic Provision of 30mph count down signs at either end of Village ( Awaiting approval from Department of 13 Ford End Sep 2016 24/04/2014 LCHE142016 £4,000 30mph signs Management will require DfT approval) Transport for sign design

Traffic management improvements through Village - Speed Traffic 14 Sandon Hill, Ford End Ford End May 2016 24/04/2014 LCHE142017 terminal signs at village gateways, VAS's, Improved bend £58,500 CMA signed to allow mini-RAB Management signage, mini-RAB, improved school signage

Scheme is a result of a Road Safety A1060 Maldon Road j/w Traffic Remedial works to Section 278 highway works - Audit, no other source of funding 15 Sandon Sep 2016 02/06/2014 LCHE142021 £10,000 Molrams Lane, Sandon Management signing/lining/lighting improvements available to implement resulting works required. Was Mar 2016

A132/B1012 (Shaw Farm South Following Prioritisation meeting - Traffic Improved Goods Vehicle Signage to keep vehicles on Priority 16 RAB and B1012/B1418, Woodham May 2016 09/07/2014 LCHE142041 £7,500 suggestion to move implementation to Management Route and not diverting through Ferrers Potential Schemes List

Following Prioritisation meeting - Suggestion is to progress Chelmer Retail Park, Phase 2 of scheme to rebuild and widen northern access ramp 17 Springfield Jul 2016 24/04/2014 LCHE144006 Cycling £40,000 Legal/Design works at £10k and move Springfield to retail park implementation at £30k to Potential Schemes List 2015/16 Approved Traffic 20 Priory Road, Bicknacre Feb 2016 17/06/2015 LCHE152058 Bend warning signs £1,000 Completed Management Hammonds Road/Church Traffic Flood Gauges/Flood Sensors/Verge Marker Posts, Upgraded 21 Road, Little Oct 2016 17/06/2015 LCHE152010 £25,000 Management Signs/Ditch and Vegetation works. Baddow/Boreham Pedestrian Countdown timers for pedestrian crossing - To show Parkway/Moulsham Street Chelmsford Countdown immediately after end of Green Man to show time 22 Mar 2016 22/04/2015 LCHE151010 Safer Roads £60,000 Completed Pedestrian Crossing Non Parished left before Red Man appears (Was part of reference LCHE151007) 20 mph zone/limit - Moulsham Drive/Lady Lane/Hamlet Road/St Chelmsford Traffic 23 Old Moulsham Oct 2016 22/04/2015 LCHE152057 Johns Road/Vicarage Road/Moulsham Street - (Was reference £26,500 Non Parished Management LCHE132057)

Improvements to existing 20 mph signage/roundel road Chelmsford Traffic 24 Springfield Allied Estate Aug 2016 22/04/2015 LCHE152069 markings - (Sandford Road/Chelmer Road/Springfield Road/Hill £3,000 Non Parished Management Road/Navigation Road) (Was reference LCHE142069)

Chelmsford Improved cycle crossing point and continuity of cycle network to 25 Lawn Lane/Waveney Drive Mar 2016 22/04/2015 LCHE154001 Cycling £5,000 Non Parished Springfield

Chelmsford Scheme CH17 - convert southern footway to cycleway/footway See Appendix 1 for design, possible 26 Melbourne Avenue Aug 2016 22/04/2015 LCHE154007 Cycling £25,000 Non Parished (Chignal Road to North Avenue) (Was reference LCHE134006) top up £41,593 required

Phase between Moulsham Junior Chelmsford Scheme CH34 - convert and widen footway (opposite School to Chelmsford College planned 27 Princes Road Aug 2016 22/04/2015 LCHE154009 Cycling £95,000 Non Parished Moulsham School to Lidl) (was reference LCHE134009) for Summer Holidays 2016. See Appendix 1 for design.

County High School, Chelmsford Traffic 28 Broomfield Road, Feb 2016 17/06/2015 LCHE152063 Pedestrian guard rail outside exit of school £3,000 Completed Non Parished Management Chelmsford

Page 1 of 2 Chelmsford City Local Highways Panel - Approved Works Programme (March 2016)

2015/16 Approved (Continued)

Our Lady Immaculate Chelmsford Traffic 29 School, New London Road, Feb 2016 17/06/2015 LCHE152051 Pedestrian guard rail and raise kerbs £7,500 Completed Non Parished Management Chelmsford -

A414 Three Mile Hill j/w A12 Chelmsford 30 Mar 2016 17/06/2015 LCHE151005 Safer Roads Signage/lighting improvements £25,000 Completed junction 15, Chelmsford Non Parished

Melbourne Avenue RAB j/w Chelmsford School 31 Feb 2016 17/06/2015 LCHE156001 Pedestrian guard rail at raised pavement and tactile paving £11,500 Completed West Avenue/North Avenue Non Parished Crossing Patrol

Kings Road Primary School, Chelmsford School 32 Feb 2016 17/06/2015 LCHE156002 Dropped kerbs and tactile paving for school crossing patrol £8,000 Completed Kings Road, Chelmsford Non Parished Crossing Patrol

Following initial design works scheme Beehive Lane nr Honeypots, Chelmsford School Dropped kerbs and tactile paving to allow school crossing patrol 33 Feb 2016 17/06/2015 LCHE156004 £3,500 not feasible due to existing driveway Chelmsford Non Parished Crossing Patrol top relocate. dropped kerbs.

Following Prioritisation meeting - Footway to link two parts of Danbury - Penny Royal Road Suggestion is to complete Design 34 Penny Royal Road Danbury Aug 2016 22/04/2015 LCHE153002 Walking (Mayes Lane to Woodhill Road) (Was reference £66,000 works £3k and move implementation LCHE143001) £63k to Potential Schemes List

A414 Main Road near Griffin 35 Danbury Jan 2016 17/06/2015 LCHE151006 Safer Roads Signing and Lining works £7,400 Completed Public House, Danbury Improvements to bend ahead warning signs and investigate B1008 Chelmsford Road 36 Ford End Feb 2016 17/06/2015 LCHE151008 Safer Roads carriageway widening - Ford End to Barnston (Was reference £33,000 Ford End to Barnston LCHE141005) Paper Mill Bridge, North Traffic Flood Gauges/Flood Sensors/Verge Marker Posts, Upgraded 37 Hill/Moden Hall Lane, Little Oct 2016 17/06/2015 LCHE152003 £25,000 Management Signs/Ditch and Vegetation works. Baddow

PRoW Footpath 33, South Public right of Surface improvements - laying road planings - 270m length with 38 Downham Road, South Mar 2016 17/06/2015 LCHE158009 £5,000 PRoW works weather dependent Hanningfield Way a width 1.0m to 1.5 m Hanningfield South Traffic Extension of 40 mph speed limit, reposition Town nameplate, Traffic regulation order being 39 A132 Burnham Road Woodham Jan 2017 22/04/2015 LCHE152079 £10,000 Management SLOW road markings (Was reference LCHE142079) progressed Ferrers

Traffic Was Apr 2015, see design in 40 Bridge, Stock Stock Sep 2016 17/06/2015 LCHE152080 Traffic Management Improvements at bridge £17,700 Management Appendix 1

2015/16 Revenue Schemes

To date twenty-eight ATC's and three Traffic Ad Hoc Survey Works - Automatic Traffic Counts/Degree of 41 Survey Works Various TBC TBC 22/04/2015 LCHE152007 £10,000 PV² surveys have been carried out - Management Pedestrian Conflict Surveys/Road Safety Assessments total cost £9,700.

Page 2 of 2 Chelmsford City Local Highways Panel - Approved Works Programme (March 2016)

Approved Schemes - Designs & Feasibility Studies

Scheme Key Completed Cancelled Update

Ref. CMA Scheme Allocated Task Name Parish Finish Cost Code Works Description Comments No. Approved Type Budget

2013/14 Approved

Melbourne Avenue, Chelmsford 1 Mar 2016 12/09/2013 LCHE134006 Cycling CH17 - Design only of cycling scheme (£25k) £3,000 See Appendix 1 for design Chelmsford non Parished 2014/15 Approved

Chelmsford Public right of Investigation into installing drainage in existing surfaced city 2 PROW Ftp 95 Chelmsford Mar 2016 24/04/2014 LCHE148002 £5,000 non Parished way centre footpath

Meetings held with Chelmsford Feasibility study to consider a cycle route through Chelmsford 3 High Street Mar 2016 18/11/2014 LCHE144011 Cycling £5,000 representative from cycling non Parished on a south - north alignment but avoiding the High Street. group to feed into design works

Public right of Investigation into revetment between River Can and existing 4 PROW Ftp 13 Good Easter Mar 2016 24/04/2014 LCHE148001 £5,000 way footpath

Route enhancement study to consider footway/carriageway Phase 1 - Route Enhancement Ongar Rd/Lordship Rd, Traffic 5 Mar 2016 24/04/2014 LCHE142014 surfacing, lining, signing, lighting, also construction of lay-by £32,500 Study Completed, Phase 2 - Writtle Management neat Doctors surgery Layby

2015/16 Approved

Traffic 6 Lodge Road Bicknacre Mar 2016 22/04/2015 LCHE152025 Detailed design of passing bays £3,000 See Appendix 1 for design Management

Plantation Road, Main Road Traffic 7 Boreham Mar 2016 17/06/2015 LCHE152022 Feasibility study into traffic management improvements £5,000 and Church Road, Boreham Management Detailed design of junction improvements at Waterhouse Lane Chelmsford Traffic 8 Waterhouse Lane Mar 2016 22/04/2015 LCHE152075 j/w Beeches Drive & Forest Drive (Was reference £3,000 Non Parished Management LCHE142075)

Chelmer Park Cycle Route, Study/Design of cycleway/footway - Between Skinners Lane See Appendix 1 for 9 Galleywood Jan 2016 22/04/2015 LCHE154002 Cycling £5,000 Beehive Lane and Chelmer Car Park Study/Design Options

South Was Feb 2016, very complex Opposite the Railway Bus stop Design of raised kerbs -Stop ID IM2262b (Was reference 10 Woodham Apr 2016 22/04/2015 LCHE155013 £5,000 site referred back to partnering Station improvement 145013) Ferrers consultant Springfield Green/Timson's Feasibility study to consider connection of existing cycle routes - Scheme being progressed 11 Springfield Mar 2016 22/04/2015 LCHE154004 Cycling £5,000 Lane Eastern ends of Springfield Green/Timson's Lane through partnering consultant At present this study will be Tyrells School - Tavistock completed in financial year Traffic 12 Road, Bodmin Road, Springfield Jun 2016 17/06/2015 LCHE152066 Feasibility study into 20mph zone/limit £5,000 2016/17 - design engineer Management Taunton Road, Springfield asked to bring completion date forward

Page 1 of 1 Chelmsford City Local Highways Panel March 2016

Appendix 1 – Approved Works Programme Updates

a. Feasibility and Designs

Page 2 to 3 – LCHE134006 – Melbourne Avenue, Chelmsford

Design of cycling scheme CH17

Page 4 to 5 – LCHE152025 – Lodge Road, Bicknacre

Design of passing bays

Page 6 to 27 - LCHE154002 – Chelmer Cycle Route – Beehive Lane, Galleywood

Feasibility Study and Design options are attached for the information of the Panel.

b. Schemes In Progress

Page 28 – LCHE142004 – O/s 140-147 Forest Drive, Chelmsford

Design of parking bays in verge

Page 29 - LCHE154009 – Princes Road, Chelmsford

Design attached for the information of the Panel.

Page 30 to 31 – LCHE152080 – Buttsbury Bridge, Stock

Design of traffic management improvements at bridge

Page 1 of 31 Page 2 of 31 Page 3 of 31 Page 4 of 31 Page 5 of 31 Page 6 of 31 Page 7 of 31 Page 8 of 31 Page 9 of 31 Page 10 of 31 Page 11 of 31 Page 12 of 31 Page 13 of 31 Page 14 of 31 Page 15 of 31 Page 16 of 31 Page 17 of 31 Page 18 of 31 Page 19 of 31 Page 20 of 31 Page 21 of 31 Page 22 of 31 Page 23 of 31 Page 24 of 31 Page 25 of 31 Page 26 of 31 Page 27 of 31 Page 28 of 31 Page 29 of 31 Page 30 of 31 Page 31 of 31 CHELMSFORD CITY LOCAL HIGHWAYS PANEL POTENTIAL SCHEMES LIST (Version 27)

As part of the County Council 2016/17 budget, which was agreed at Full Council on 9 February 2016, it was announced that the budget for Local Highways Panels (LHP) would be halved. This means for Chelmsford City LHP the available 2016/17 capital funding will be £500,000. It is recommended in 2016/17 that the panel make further scheme funding recommendations to create an £800,000 rolling programme of works.

This Potential Scheme List identifies all of the scheme requests which have been received for the consideration of the Chelmsford City Local Highways Panel. The Panel are asked to review the schemes on the attached Potential Scheme List, making funding recommendations against those they wish to see implemented and remove any schemes the Panel would not wish to consider for future funding.

At the Panel meeting held on 26 January 2016 it was agreed that a small group of Panel members and officers should meet to review the Potential Schemes List and prioritise schemes for a funding recommendation in 2016/17. This meeting was held on 16 February 2016 and a Scheme Priority column has now been added to the following Potential Schemes List, with a P to indicate the priority schemes. This meeting also recommended that a £50,000 pot of monies was ring fenced to allow existing schemes to progress where there may be an increase in the estimated costing.

2016/17 Budget Summary Item Amount Programmed Works (on Approved Works Programme, re-profiled into 2016/17) £293,325 Priority Schemes (as shown on Potential Scheme List V.27 ) £196,750 Monies recommended for scheme Top-Ups £50,000 Sub-total £540,075

Less Section 106 Contributions £14,883 Grand total £525,192

Less recommended Rolling Programme budget 2016/17 £800,000 Amount available for the LHP to allocate to additional schemes 2016/17 £274,808

Page 1 of 23 CHELMSFORD CITY LOCAL HIGHWAYS PANEL POTENTIAL SCHEMES LIST (Version 27)

There are currently potential schemes with an estimated cost of £1,514,276 as shown in the summary below:

Potential Schemes List (Version 27) Scheme Type Total Estimated Costs Traffic Management £408,536 Walking £30,000 Quiet Lane £3,000 Passenger Transport £45,000 School Crossing Patrol £3,000 Public Rights of Way £157,000 Cycling £590,140 Safer Roads £277,600 £1,514,276

On the Potential Schemes List the RAG column acknowledges the status of the scheme request as shown below:

RAG Status Description of RAG status G A higher priority feasible scheme against strategic criteria A A lower priority feasible scheme against strategic criteria or may require additional Cabinet Member approval R A scheme which is against policy or where there is no appropriate engineering solution

A scheme pending validation

Page 2 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Traffic Management `

Total Value of £408,536 schemes

2016/17 Scheme Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments Priority RAG Category Scheme

Provision of passing bays - Option 2 - Formalise Narrow road problems when Lodge Road, existing parking near Traffic 1 two vehicles try to pass Bicknacre Implementation LCHE132025 £23,036 See design in Appendix 2 P G Bicknacre Leighams Road initial Management each other estimate £4,500 next stage detailed design

Validation - Speed reduction to 40mph not recommended as average speeds too high. Church Road - Southbound -42.5mph & Hammonds Traffic Management Northbound 43.8mph, Hammonds Road Road/Church Road, improvements - vehicle Traffic (north) Eastbound 47.3mph & Westbound 2 Speed of traffic Boreham Design LCHE142055 £3,000 P G Little Baddow to routinely leaving road into Management 38.5mph and Hammonds Road (South) Boreham fields Southbound 46.6mph & Northbound 47.8mph. Recommendation is to proceed with design of bend improvement signage (Chevron/bend warning signs)

Validation - Passing Places signs would be Vehicles routinely park in Brick House Lane, Passing Bay signage to Traffic suitable will require some vegetation to be 3 passing bay causing an Boreham Total Scheme LCHE152014 £2,000 G Boreham identify passing bay Management cut back. Scheme to included sign, design obstruction and installation

Signal upgrade to allow left Patching Hall Lane turn out/right turn in phase Improvements at permanent Traffic Validation waiting on ITS and developers 4 jw B1008 Broomfield Broomfield Total scheme LCHE132069 TBC and extension of two lane signals Management works Road, Broomfield section Road Safety Assessment - Option 1 Signalise Crossing point - estimated cost Main Road nr jw £140k, Option 2 (recommended by Improvements to pedestrian Consideration of pedestrian Traffic 5 Erick Avenue, Broomfield Design LCHE142081 £5,000 assessment) upgrade crossing point - P G crossing crossing improvements Management Broomfield estimated cost - £30k. Next stage detailed design Option 1 -£10k Option 2 - £5k (recommended)

Difference in level between Cooper's Row j/w Improvements to Traffic 6 carriageway and access Broomfield Total scheme LCHE152018 TBC In validation Broomfield Road carriageway/kerb Management ramp to Church

Page 3 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Traffic Management `

Total Value of £408,536 schemes

2016/17 Scheme Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments Priority RAG Category Scheme

Validation - speed data 30mph limit - East bound 27.4mph West Bound 28.1mph. Speeds drop significantly at school times, Broomfield Primary Traffic management morning 16.7 mph to 25.4mph and afternoon Speed of traffic and vehicles Traffic 7 School, School improvements outside Broomfield Total scheme LCHE152021 NA 14.9mph to 25.5mp[h. Good compliance with R parking on footways Management Road, Broomfield school existing speed limit. Narrow footway so bollards not feasible. Parking Restrictions would be remit of Parking Partnership. School could raise issue with Parents.

Broomfield Footway improvement Lack of footway and Traffic 8 Parade/Pentland Broomfield Total scheme LCHE152111 TBC In Validation measure/bollards vehicles obstructing footway Management Avenue, Broomfield

Main Road (at Lack of Village Gateway Parish Council has agreed for scheme to be northern Broomfield Traffic 9 Village Gateway Treatment feature to define entry to Broomfield Total scheme LCHE142002 £5,000 considered once any changes at adjacent A Parish boundary), Management Broomfield roundabout have been finalised Broomfield

Gunson Gate off Two bus stops opposite Improvements to bus Chelmsford Non Traffic 10 Loftin Road, each other causing Total scheme LCHE142064 TBC In validation gateway and bus stops Parished Management Chelmsford problems

Flood alleviation works - study into ground Danbury Vale, Chelmsford Non Traffic 11 investigation/infiltration Flooding Feasibility LCHE142052 £7,500 Validation - feasibility study recommended G Danbury Parished Management testing to determine number of soak ways and size

West End of Signage improvements to Chelmsford Non Traffic 12 Lack of signs to West End Total scheme LCHE132056 TBC In design P Chelmsford West End Parished Management

Technical Note previously shared with Panel Footway widening works - March 2015 - Validation review - Highway Railway Bridge, recommendation to cut back Narrow footway for Chelmsford Non Traffic Rangers to open up full width of footway and 13 Arbour Lane, Feasibility LCHE142045 TBC vegetation and improve pedestrians Parished Management clear vegetation. Maintenance team to Chelmsford footway surface condition consider footway resurfacing/replacing kerbs over bridge.

Signage improvements to (1) vehicular access to ERO Essex Records Chelmsford Non Traffic Validation - Site (2) agreed and Site (1) not 14 on Navigation Road and (2) Lack of signage Total scheme LCHE142085 £500 G Office, Chelmsford Parished Management necessary as building visible from location outside pedestrian entrance to ERO

Page 4 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Traffic Management `

Total Value of £408,536 schemes

2016/17 Scheme Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments Priority RAG Category Scheme

Validation - PV² carried out, results Wood Street, 0.821x10^8. This is a complex site and a Pedestrian crossing lack of pedestrian crossing Chelmsford Non Traffic 15 Chelmsford Nr Feasibility LCHE142091 £10,000 Feasibility/Design is recommended to P G improvements facilities Parished Management parade of shops consider crossing options feeding into validation

Validation - speed data near Burghley Way SE 20.4mph and NW 18.7mph, near Chislett Traffic management Waterson Vale, Chelmsford Non Traffic Row S 1839 mph and N18.4 mph. good 16 improvements to enforce Speed of traffic Total scheme LCHE142093 £1,500 G Chelmsford Parished Management compliance. Suggestion of 20 mph speed 20mph zone roundels at start of 20 mph limit and signage improvements

Westway j/w vehicles turning obstruct Chelmsford Non Traffic 17 Robjohns Road, Yellow box junction Total scheme LCHE142053 £5,000 Validation - recommends box junction G junction Parished Management Chelmsford

Cars park on one side of Cars mounting pavement Park Avenue, road and when two vehicles Chelmsford Non Traffic 18 causing conflict with Total Scheme LCHE152016 TBC In Validation Chelmsford try to pass, they routinely Parished Management pedestrians mount the pavement

Validation - PV^2 survey data 0.771x10^8, North Avenue, Pedestrian crossing Difficult for pedestrians to Chelmsford Non Traffic crossing warranted. Recommendation for 19 Feasibility LCHE142059 £5,000 G Chelmsford improvements cross road. Parished Management feasibility study/design due to complexities of site, may require signalised junction.

King Edward VI Grammar School Validation - recommends Road Safety and Chelmsford Traffic Management Speed of traffic at Chelmsford Non Traffic 20 Total scheme LCHE152020 £3,000 Assessment at location and if necessary P G County High School Improvements pedestrians crossings Parished Management design for Girls, Broomfield Road, Chelmsford

Validation - suggests that if echelon parking O/s Parade of shops, were introduced this could increase available Parking improvements - Chelmsford Non Traffic 21 90-106 Kings Road, Lack of parking for shops Design LCHE152004 £2,000 parking by 10 spaces though scheme costs G echelon parking Parished Management Chelmsford could be high, recommendation for detailed design which will also provide target costs.

Delivery vehicles driving Old Moulsham, 7.5T environmental weight through residential Old Chelmsford Non Traffic Validation recommends feasibility study and 22 Feasibility LCHE152091 £10,000 G Chelmsford limit Moulsham to Moulsham Parished Management traffic surveys Street

Page 5 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Traffic Management `

Total Value of £408,536 schemes

2016/17 Scheme Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments Priority RAG Category Scheme

Validation - Possible to resurface 3m x 3m Regency Close, Tree removed some time Chelmsford Non Traffic tree pit to footway standard or Highway 23 Resurface over old tree pit Total scheme LCHE152092 £10,000 G Chelmsford ago Parished Management Rangers could cut back vegetation/dig over tree pit

Validation -possible to install a parking area 174-193 Forest Chelmsford Non Traffic 24 Improved parking Lack of residents parking Total scheme LCHE152094 £60,000 21m x 4.5m but depending on full statutory A Drive, Chelmsford Parished Management undertakers apparatus survey

Validation - Option to encourage residents to 29-59 North Avenue, Chelmsford Non Traffic apply for dropped kerbs and park on their 25 Improved parking Lack of residents parking Total scheme LCHE152095 £5,000 G Chelmsford Parished Management frontage for Feasibility Study/Design into creating parking within adjacent green area.

Goldlay Avenue nr jw Footway bollard to stop Reports that following Request to reinforce prohibition of traffic Chelmsford Non Traffic 26 Burwood Court, vehicles driving over prohibition of traffic, cars Total scheme LCHE152102 £2,000 measures installed under Section 106 G Parished Management Chelmsford footway driving over footway funding

Validation - recommends feasibility study Delivery vehicles for into 7.5t environmental weight limit, to Old Moulsham, 7.5tonne environmental Moulsham Street routinely Chelmsford Non Traffic 27 Feasibility LCHE152091 £10,000 include HGV traffic surveys and details of G Chelmsford weight limit driving through Old Parished Management any delivery vehicles using Old Moulsham to Moulsham access Moulsham Street shops

Validation - suggestion is to improve Signage to show service Several narrow service Waterhouse Street Chelmsford Non Traffic signage at Waterhouse Street j/w Writtle 28 roads unsuitable for larger roads only accessible to Total scheme LCHE152100 £1,500 G Chelmsford Parished Management Road to show cul de sac and Unsuitable for vehicles cars/smaller vehicles HGV's

Admirals Park Chelmsford Non Traffic In validation - will require 30 automatic traffic 29 20mph zone Speed of vehicles Total scheme LCHE152115 TBC Estate, Chelmsford Parished Management counts costing £7,500

The Rising Sun P/h Validation - Dropped kerbs can be installed Lack of dropped kerbs Chelmsford Non Traffic 30 New London Road, Dropped kerbs Total Scheme LCHE152098 £2,500 to improve access across frontage of Public G across fore court Parished Management Chelmsford House

78-88 Road, TMI to reinforce 30mph Chelmsford Non Traffic 31 Speed of traffic Total scheme LCHE152116 TBC In validation Chelmsford speed limit Parished Management

Page 6 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Traffic Management `

Total Value of £408,536 schemes

2016/17 Scheme Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments Priority RAG Category Scheme

Validation - Recommended not to progress a lay-by, possible conflict with vehicles leaving adjacent service road and any lay-by, also S/O78a Kings Road appears to be utility apparatus within verge Convenience Store, Verge improvements to Vehicles routinely damaging Chelmsford Non Traffic 32 Total scheme LCHE152108 £6,500 which would significantly affect costs. It G King's Road, prevent parking the verge Parished Management appears bollards have been installed on the Chelmsford verge to prevent parking and the scheme suggestion is to also cover the verge to east of the shop.

Validation - recommendation is that Duke Street near its Measures to resolve pedestrian guard rail cannot be installed on Pedestrians crossing away Chelmsford Non Traffic 33 junction with Tindal pedestrian/cyclist conflict at Total scheme LCHE152107 NA north-east side of pedestrian crossing as the R from pedestrian crossing Parished Management Square, Chelmsford pedestrian crossing footway is to narrow and there is a pinch point.

Traffic management O/s 78 to 88 Roxwell Chelmsford Non Traffic 34 measures to enforce 30mph Speed of traffic Total scheme LCHE152116 TBC In validation Road, Chelmsford Parished Management speed limit

Validation - speed survey data mean average speeds east bound 23.8mph and First Avenue, Traffic management Chelmsford Non Traffic West bound 24.1mph. Majority of drivers 35 Speed of traffic Total scheme LCHE152120 NA R Chelmsford improvements Parished Management understand and comply with the speed limit. Any drivers that exceed speed limit would be an enforcement issue.

Longmead Avenue Parking and traffic Chelmsford Non Traffic 36 j/w Meadgate Parking issues Total scheme LCHE152121 TBC In validation management improvements Parished Management Avenue, Chelmsford

Chignal Hall Lane jw Existing verge being Traffic Validation - Feasibility/design recommended 37 Mashbury Road, Remove bennet junction overrun dragging mud onto Chignal Smealy Feasibility LCHE152093 £3,000 G Management into junction improvement options. Chignal Smealy road

Width restriction on road, to Sporhams Lane, Traffic 38 prevent goods vehicles Vehicles damaging verges Danbury Total scheme LCHE142092 TBC In validation Danbury Management damaging verges

Page 7 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Traffic Management `

Total Value of £408,536 schemes

2016/17 Scheme Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments Priority RAG Category Scheme

Validation - request for one-way system is feasible but proposal requires swept path Well Lane to The Vehicles routinely Traffic analysis to ensure larger vehicles such as 39 Heights - Service One-way road parking/blocking service Danbury Feasibility LCHE152104 £2,000 G Management fire engines can make the turning into the Road, Danbury road Heights. Feasibility will also cover design and costs.

Bicknacre Road, Lack of walkable verge for Traffic 40 Overshot Bridge to Walkable verge Danbury Total scheme LCHE152110 TBC In validation pedestrians Management Poplar Farm

Validation - recommends feasibility study The Common, East Traffic Management Traffic 41 Speed of traffic East Hanningfield Feasibility LCHE142022 £5,000 into traffic calming and pedestrian video G Hanningfield Improvements Management survey

Validation - feasibility study into footway S/o Vita Bella, The Footway widening works - Narrow footway for Traffic widening to consider extent of highway, 42 Tye, East kerbing/resurfacing to open East Hanningfield Feasibility LCHE152105 £3,000 G pedestrians Management statutory undertakers apparatus and fully Hanningfield up full width cost any scheme proposal

Validation review - Does not meet DfT Stock Road/ Traffic Guidance on Sign Clutter, would need 43 Watchouse Road, Signs to heritage centre Lack of signs Galleywood Total scheme LCHE142067 £1,500 A Management specific Cabinet Member Approval to Galleywood proceed

The Street jw Stock Junction protection parking Traffic 44 Parking improvements Galleywood Total scheme LCHE142098 TBC In validation P Road, Galleywood restrictions Management

Validation - speed survey near schools 20 mph speed limit, Northbound 25.3mph Southbound 24.2mph. Speed of traffic following Barnard Road, especially o/s St Michael’s Traffic Good speed compliance 20mph limit not 45 installation of recent parking Galleywood Total Scheme LCHE152013 NA R Galleywood CE Junior and Galleywood Management recommended also scheme costs for a restrictions Infants schools 20mph would be around £113k due to 13 junctions requiring lit terminal signs.

Watchouse Road, Road routinely floods Traffic 46 Flood warning signs Galleywood Total scheme LCHE152083 TBC In Validation Galleywood affecting adjacent properties Management

Page 8 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Traffic Management `

Total Value of £408,536 schemes

2016/17 Scheme Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments Priority RAG Category Scheme

Validation - Speed/volume data shows Goods vehicle using route HGV's are not using this road. Unsuitable for School Road, Good 7.5T environmental weight Traffic 47 as an alternative route Good Easter Total scheme LCHE152017 NA HGV signage considered as unsuitable as R Easter limit Management damaging road this road is similar to others ion the vicinity and could lead to excessive blue signs.

Validation - Titus Well Lane j/w School Road signed to show Ford and Unsuitable for Titus Well Lane, Measures to enforce Larger vehicles using lane Traffic 48 Good Easter Total scheme LCHE152117 NA Motor Vehicles. Physical measures could R Good Easter Protected Lane status and causing damage Management affect deliveries to Residents and Farm vehicles.

Validation - Does not meet DfT guidance on Essex Healthcare Directional signs to health Traffic sign clutter so will need Cabinet Member 49 Lack of signs to clinic Total scheme LCHE152097 £1,500 A Park, Great Baddow clinic Management Approval to proceed. Also possible Third Party funding for scheme

Church Street, Great Traffic calming/wider Traffic 50 Speed of traffic Great Baddow Total scheme LCHE152099 TBC In validation Baddow footways Management

Validation - Speed survey results - Brickbarns South bound - 12.7mph & North bound - 13.3mph, Castlefield East bound Glovers Estate - 11.3mph & West bound 10.3mph, Glovers (Brickbarns, Northeast bound - 14.3mph & Southwest Traffic 51 Castlefield, Glovers, 20 mph speed limit Speed of traffic Total scheme LCHE142078 £12,000 bound - 15.6mph, Permains Southeast G Management Permains), Great bound - 12.2mph & Northwest bound - Leighs 13.3mph. all speeds below necessary 24mph average speed for a 20mph change but very good compliance with existing 30mph limit. O/s 50-62 Cars frequently blocked in Traffic 52 Shimbrooks, Great Parking improvements Great Leighs Total scheme LCHE152114 TBC In Validation and cannot get out Management Leighs Validation - Improvements to pedestrian crossing being dealt with by S.106 funding. Measures to stop School Lane, Great Crossing point Traffic Improvement to School Lane would be 53 cyclists/pedestrians going Great Leighs Total scheme LCHE152015 £12,000 G Leighs improvements Management speed limit repeater signs along road to straight into road advise traffic of speed limit when driving along road. Validation - posted speed limit 30 mph, mean average speed south-east bound Main Road, Howe Traffic 54 SID socket/pole Speed of traffic Total scheme LCHE142070 £500 36.7mph, north-west bound 36.1mph. Mean P G Street Management average speed +5mph over posted speed limit

Page 9 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Traffic Management `

Total Value of £408,536 schemes

2016/17 Scheme Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments Priority RAG Category Scheme

Validation - speed compliance good, some speeding in early hours. If SID taken forward Chelmsford Road, Traffic will require specific Cabinet Member 55 SID socket/pole Speed of traffic Great Waltham Total scheme LCHE142071 £750 P A Minnow End Management Approval. Parish Council has confirmed they have a SID which is rotated within Parish and only require an additional pole.

Validation suggests staggered guard rail on South Street, Great Pedestrian guard rail at Traffic 56 Lack of pedestrian guard rail Great Waltham Total scheme LCHE142072 £3,000 footpath. Possible S.106 contribution for the A Waltham footpath/carriageway Management works.

Validation - recorded speeds NE bound Speed Indicator Device pole South Street, Great Traffic 31.8mph & SW bound 32.0 mph, with 57 to allow rotation of existing Speed of traffic Great Waltham Total Scheme LCHE142073 £750 A Waltham Management evidence of speeding. Recommend SID pole unit installed Traffic management improvements - Remove Highwood Road, centre white line/renew Traffic Technical Note previously shared with Panel 58 Loves Green, SLOW road markings/build Speed of traffic Highwood Design LCHE142038 £3,000 G Management March 2015 Highwood outs at school with priority flow, estimated cost £8,500 next stage detailed design

Traffic management improvements - Remove centre white line/renew Highwood Road, SLOW road markings/build Traffic Technical Note previously shared with Panel 59 Speed of traffic Highwood Design LCHE142039 £3,000 G Edney Common outs at play ground/public Management March 2015 house with priority flow, estimated cost £8,500 next stage detailed design

Pedestrian footway- 1.2m Highwood Road walkable verge, crossing Edney Common to point at Highwood Road and Lack of footway/walkable Traffic Technical Note previously shared with Panel 60 Loves Green, removal of informal layby at Highwood Design LCHE142040 £3,500 G verge Management March 2015 including St Peter St Peters Church, estimated Church cost £105,000 next stage detailed design The Ridge jw Runsell Speed Indictor Poles (x3) Lane and Fir Tree To remind traffic of 30 mph Traffic 61 and Speed Indicator Device Little Baddow Total scheme LCHE152084 TBC In Validation Lane and Holybread speed limit Management on rotation Lane, Little Baddow

Page 10 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Traffic Management `

Total Value of £408,536 schemes

2016/17 Scheme Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments Priority RAG Category Scheme

Validation - good speed compliance, Speed survey results - B1008 Main Road 40mph limit NE bound 40.3mph a& SW bound B1002 Main Road, Reduction from 40 mph to Traffic 35.7mph, Writtle Road 60mph limit BN 62 Wantz Road/Writtle Speed of traffic Margaretting Total scheme LCHE132059 NA R 30 mph Management bound 30.3mph & S bound 35.7 mph. Roads Road, Margaretting considered & reviewed under Speed Limit Review, speeds found to be appropriate & driver unlikely to adhere to a lower limit.

Wantz Road/Roman Speed of traffic entering Traffic 63 Road/Main Road, Village gateway treatments Margaretting Total scheme LCHE152118 £15,000 Validated by Third Party Works team G Village Management Margaretting

Validation - good compliance with 70mph speed limit, speed data (a) A414 North end - South 46.3mph & North 58.9mph, (b) A414 Middle - South 55.8mph & North 57.1mph, (c) A414 South end - South 53.8mph & Speed of traffic and North 49.9mph. Road is high speed dual A414 Three Mile Traffic management pedestrians trying to cross Traffic carriageway and is not suitable for a 40mph 64 Hill/London Road, improvements or 40mph Margaretting Total scheme LCHE152119 NA R from PRoW at Private Management limit, as would not be self-explanatory and Margaretting speed limit Road to Hylands House compliance could be expected to be low. If pedestrian crossing is a problem PV² survey required. Could lead to controlled crossing or footbridge (very high costs, likely to exceed the budget of the Panel). This would need to be treated as a Major Scheme.

Lane marking on RAB - Option 1 - Guidance lane A1245/A132 marking on RAB and Improvements to lane Traffic Technical Note previously shared with Panel 65 Roundabout, Total scheme LCHE142019 £17,500 G additional signs on A132 markings Management March 2015 Rettendon Option 2 - As option 1 but with lead in road markings

Validation - speed data West location 40 Traffic management mph limit Eastbound 17.5mph & Westbound Maltings Road, Traffic 66 improvements to single Speed of traffic Rettendon Total scheme LCHE142084 NA 16.8mph. East location 40mph limit R Rettendon Management track road Northeast bound 22.8mph & Southwest bound 20.4mph. Good speed compliance.

Validation - Signalisation of bridge could Frequently two cars try to cost £160k, it is first advised to carry out Bridge over River Signalisation of priority cross bridge at same time Traffic Road Safety Assessment of proposal to 67 Crouch, Hawk Hill, Rettendon Feasibility LCHE152001 £2,000 G working over bridge causing a "face to face" Management address any safety concerns/risks of Battlesbridge stand off in middle of bridge signalisation. Also existing scheme LCHE142030 to improve signage on bridge.

Page 11 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Traffic Management `

Total Value of £408,536 schemes

2016/17 Scheme Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments Priority RAG Category Scheme

The Street j/w Traffic management Speed of traffic on narrow Traffic 68 Vicarage Road Roxwell Total scheme LCHE152109 TBC In Validation improvements road with sharp bend Management Roxwell

Junction of Green Concerns around bennett Traffic Validation recommends re-designing 69 Lane with Vicarage Junction Improvements Roxwell Total scheme LCHE152112 £2,000 G junction Management junction road markings. Road, Roxwell

Woodhill Road (S/O Validation - bollards/footway improvements Bollards to prevent verge Traffic 70 Sandon School), vehicles parking on footway Sandon Total scheme LCHE142065 £10,500 though this could relocate parking problem G parking Management Sandon further down the road towards a bend Mayes Lane, Sporhams Lane & Speed of traffic on routes Traffic Validation recommends signage 71 Horse & Rider signs Sandon Total scheme LCHE152081 £3,000 G Butts Green Road, used by Horses Management improvements Sandon Mayes Lack of driver awareness of Validation - recommends signs/posts at Lane/Sporhams Traffic 72 Horse & Rider warning signs horse & riders within the Sandon Total scheme LCHE152081 £3,000 three locations - j/w East Hanningfield Rd, G Lane/Butts Green Management Parish j/w Woodhill Rd and vicinity nr j/w Blind Lane Road, Sandon King Edwards Road, Traffic management Study does not support any form of traffic South Woodham Traffic 73 South Woodham improvements suitable for Speed of traffic Total scheme LCHE142013 NA calming without severe implications for local R Ferrers Management Ferrers bus service residents Validation - results of seven day automatic Ferrers Road traffic count 40mph speed limit Northeast Speed of traffic in 40mph (Inchbonnie Road to Traffic management bound 30.4mph & Southwest bound limit and conflict with South Woodham Traffic 74 Creekveiw Road) improvements/30 mph Total scheme LCHE152106 NA 33.2mph. Good speed compliance with R adjacent side Ferrers Management South Woodham speed limit existing 40mph limit, a 30mph limit would roads/accesses Ferrers have little effect on driver behaviour. Road environment not typical for a 30mph limit. Hamberts Road and Validation - site visit found little evidence of Vehicles parking on highway South Woodham Traffic 75 The Chase, South Verge protection measures Implementation LCHE152127 NA verge damage, appears to be an occasional verges Ferrers Management Woodham Ferrers problem. More evidence of problem needed. Validation - PV² data 0.249x10^8, therefore Springfield Green, Lack of pedestrian crossing Traffic 76 Pedestrian crossing facility Springfield Total scheme LCHE142060 £40,000 upgrade to zebra crossing, will need lighting G Springfield facilities Management design Validation - good compliance with 30mph Pollards Green, Traffic limit speed too high for 20mph, properties 77 20 mph speed limit Speed of traffic Springfield Total scheme LCHE132064 NA R Springfield Management very close to c/way so physical calming not advised Measures to prevent Chancellor Avenue Validation - feasibility study into re-profiling vehicles loosing control on Vehicles loosing control on Traffic 78 j/w Springfield Feasibility Study LCHE152009 £5,000 camber of roundabout, though no personal G roundabout and hitting roundabout Management Way, Springfield injury accidents at this location adjacent wall

Page 12 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Traffic Management `

Total Value of £408,536 schemes

2016/17 Scheme Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments Priority RAG Category Scheme

Lawn Lane near In validation - degree of pedestrian conflict Improved pedestrian Pedestrians having Traffic 79 junction with Orford Springfield Total scheme LCHE152002 TBC survey carried out results 0.482x10^8 crossing facilities difficulties crossing Management Crescent, Springfield feeding into validation process.

Signage to Library - Three Springfield Library, locations (White Hart Lane, Lack of directional signs to Traffic 80 New Bowers Way, Springfield Total scheme LCHE152056 £5,000 Validation - scheme could progress G New Bowers Way, Library Management Springfield Beardsley Drive) Validation - in 60mph limit, mean average speeds north/northeast bound Honeypot Lane, Speed reduction 60mph to Traffic 29.7mph/25.1mph and south/south-east 81 Speed of traffic Stock Total scheme LCHE142056 £8,000 A Stock 40mph Management bound 31.7 mph/26.7mph. Speeds below 40 mph, due to embankment locating repeater signs could be problematic Traffic Study suggested following request for 20 82 High Street, Stock Route enhancement study Speed of traffic Stock Feasibility LCHE132043 £3,000 G Management mph speed limit/average speed camera

Validation - speed surveys NE Golf Club Northeast bound 42.9mph & Southwest bound 44.4mph, SW Downham Road Northeast bound - 49.8mph & Southwest bound -47.4mph. 30mph speed limit not B1007 east of jw Speed reduction from 60 Traffic appropriate for road as few properties 83 Downham Road, Speed of traffic Stock Total scheme LCHE142087 NA R mph to 30mph Management fronting onto road and most set back does Stock not give drivers impression the road is inhabited. It could be possible to install a 40mph buffer but this would be for such a short distance it might not change driver behaviour. Could only go up to Golf Club. Validation - speed survey east 33.7mph and Mill Road to jw Speed reduction from Traffic north-west 34.7mph, good compliance with 84 Downham Road, Speed of traffic Stock Total scheme LCHE142088 £15,000 P A 60mph to 40mph Management so a 40mph speed limit would make little Stock difference

Validation - Option 1 approach Parking partnership for junction protection parking Brookmans Road jw Bollards on verge to prevent Traffic 85 Vehicles damaging verge Stock Total scheme LCHE142089 £25,000 restrictions, Option 2 reduce width of verge, G Back Lane, Stock verge damage Management install HGV overrun to allow easier turning for larger vehicles

Validation - recent Safer Roads scheme St Marys Church, Traffic carried out, could install Chevron sign on 86 Ingatestone Road, Bend improvements Bend needs highlighting Stock Total scheme LCHE142090 £2,000 G Management island to warn drivers of bend travelling Buttsbury south

Page 13 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Traffic Management `

Total Value of £408,536 schemes

2016/17 Scheme Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments Priority RAG Category Scheme

Bus Stop Opposite Hyland's School, Pedestrian crossing lack of pedestrian crossing Traffic 87 Writtle Total Scheme LCHE152008 TBC In validation Chelmsford Road, improvements facilities Management Writtle Feasibility study into Ongar Road j/w Recommendation from Traffic Feasibility study recommended by Route 88 junction carriageway Writtle Feasibility LCHE152085 £3,000 G Eastview, Writtle Route Enhancement Study Management Enhancement Study improvement Lordship Road/Ongar Road/The Feasibility study into Recommendation from Traffic Recommendation from Route Enhancement 89 Writtle Feasibility LCHE152086 £5,000 G Green/Mayfield junction improvement Route Enhancement Study Management Study Road/Orchard Close, Writtle

Lordship Road j/w Feasibility study into Recommendation from Route Enhancement Recommendation from Traffic 90 Fox Burrows Lane, junction/carriageway Writtle Feasibility LCHE152088 £5,000 Study, suggestion is to await results of any G Route Enhancement Study Management Writtle improvement future development on Fox Burrows Lane Feasibility study into Writtle College Main carriageway/footway Recommendation from Traffic Recommendation from Route Enhancement 91 Access, Lordship Writtle Feasibility LCHE152089 £5,000 G /signing/lining/street Route Enhancement Study Management Study Road, Writtle lighting/verge improvements

Page 14 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Walking `

Total Value of schemes £30,000

2016/17 Scheme Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments Priority RAG Category Scheme

Validation recommends - O/s 148, Kings Pedestrian footway Chelmsford Non dropped kerb/tactile 1 Footway crossing verge Walking Total scheme LCHE153001 £10,000 P G Road, Chelmsford improvements Parished paving on both sides of road.

B1008, The Street, Validation -recommends Lack of dropped kerbs to Dropped kerbs/Tactile dropped 2 causing issues in accessing Little Waltham Walking Total scheme LCHE153003 £20,000 P G Hospital Approach, paving crossings/tactile paving Hospital Broomfield at six locations

Page 15 of 23 Quiet Lanes

Total Value of schemes £3,000

2016/17 Scheme Ref Location Description Problem Parish Scheme stage Cost Code cost estimate Comments Priority RAG Category Scheme

Sporhams Lane, Suggestion to be classified Narrow lane, often used as a 1 Sandon Quiet Lanes Total Scheme LCHE152012 TBC In validation Sandon as a Quiet Lane "rat run" or short cut

Validation - Speed/volume data average daily volume count is below 1000 vehicles. speeds fall below the 35mph Swan Lane between average speeds as required by the 2 Stock and Quiet Lane Speed of traffic Stock Quiet Lanes Total scheme LCHE152005 £3,000 policy. Though speeds not a self - G Margaretting enforcing 20mph limit but South - 26.5mph & North 27.4mph. Recommended to proceed with Quiet Lane status.

Page 16 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Passenger Transport `

Total Value of schemes £45,000

2016/17 Scheme Estimated Ref Location Description Problem Parish Scheme stage Cost Code Comments Priority RAG Category cost Scheme

Validated by Passenger Stop Name Chelmsford Transport team - This is a top Real time passenger Lack of Real time Chelmsford Non Passenger 1 Prison, Springfield Total scheme LCHE155028 £6,000 up request to existing £8k G information passenger information Parished Transport Road, Chelmsford Section 106 funding of this scheme

Stop Name Galleywood Passenger Validated By Passenger 2 New wooden bus stop Replace bus stop Galleywood Total scheme LCHE155027 £10,000 G Common, Galleywood Transport Transport Team

Validation recommends feasibility study into junction Beehive Lane jw Improvements to junction to Larger buses are Passenger improvements. Possible 3 Great Baddow Feasibility LCHE155019 £3,000 A Firecrest, Chelmsford allow larger busses to use it damaging the junction Transport Section 106 funding available from Marconi Site CHL/2419/04 To relocate bus stop (stop Will require consultation with ID AA151Y) from narrow Havengore, (S/O 2 residents, removing existing footpath at S/O 2 Wallasea Waiting passengers Wallasea Gardens to Passenger raised kerbs/pole and making 4 Gardens to area of can block narrow Springfield Total scheme LCHE155020 £16,000 G S/O 104 Falmouth Transport good. Then installing new footpath/verge at S/O 104 footpath Road) Springfield raised kerbs and hard Falmouth Road which will stand/shelter also allow for a shelter Stop Name Woodham Woodham Passenger Validated By Passenger 5 Hall, Main Road, New wooden bus stop Replace bus stop Total scheme LCHE155026 £10,000 G Ferrers Transport Transport Team Woodham Ferrers

Page 17 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

School Crossing Patrols `

Total Value of schemes £3,000

2016/17 Requested Scheme Estimated Ref Location Description Problem Parish Scheme stage Cost Code Priority RAG by Category cost Scheme Kings Road Bollards on service road to School School Primary School on Crossing Patrol Chelmsford Non 1 be relocated to prevent Crossing Crossing Total scheme LCHE146003 £3,000 G Corporation Road, improvement Parished parking Patrol team Patrols Chelmsford Victoria Road, near Standing water after rainfall School School Drainage improvements Chelmsford Non 2 Riverside Leisure affecting operation of school Crossing Crossing Total scheme LCHE156006 TBC dropped kerbs Parished Centre, Chelmsford crossing patrol team Patrol team Patrols

Page 18 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Public Rights of Way `

Total Value of schemes £157,000

2016/17 Scheme Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments Priority RAG Category Scheme

Investigation on-going into Public PROW Footpath 95 installing drainage in Chelmsford Non Validated by Prow 1 PROW improvement Rights of Total scheme LCHE148002 TBC Chelmsford existing surfaced city centre Parished team Way footpath

Investigation on-going into Public PROW Footpath 13 Validated by Prow 2 revetment between River PROW improvement Good Easter Rights of Total scheme LCHE148001 TBC Good Easter team Can and existing footpath Way

Unsurfaced paths now well Clear blocked Great Baddow used urban footpaths Public ditches/culverts, removed Validated by Prow 3 Footpaths 11, 12 & within housing estates, Great Baddow Rights of Total scheme LCHE158008 £22,000 P G vegetation, level/edge and team 67 provides access to Way lay all weather surfacing schools/shops/bus routes. More signs to keep walkers PRoW network, Improvement measures to on PRoW network and Public Validated by Prow 4 Great & Little PRoW signage and 18 bridge improvement to Great Leighs Rights of Total scheme LCHE158005 £14,000 G team Leighs bridge improvements British Accessibility Way Standards

Great Leighs Water meadow/natural Public Surfacing and Drainage Validated by Prow 5 Footpath 41 (Part springs affecting use of Great Leighs Rights of Total scheme LCHE158006 £28,000 G improvements team of The Essex Way) well used PRoW Way

Surfacing and Drainage Public Little Waltham improvements - 365m Path is routinely very Validated by Prow 6 Rights of Total scheme LCHE158007 £21,000 G Footpath 28 length and average 2m muddy throughout the year team Way width

To create a link between Public Bridleway 11 Validated by Prow 7 Bridleway 11 and Bridleway Bridleway 11 cut off by A12 Margaretting Rights of Total scheme LCHE158004 £35,000 G Margaretting team 44/54 Way

Public Footpath 63, Footpath surface Footpath surface in need South Validated by Prow 8 Rights of Total scheme LCHE158010 £7,000 G improvements with planings of improvement Hanningfield team Way

Page 19 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Public Rights of Way `

Total Value of schemes £157,000

2016/17 Scheme Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments Priority RAG Category Scheme

80m plastic High water table making Public Footpath 30 Stock, Validated by Prow 9 boardwalk/vegetation part of the route very Stock Rights of Total scheme LCHE158009 £15,000 G Chelmsford team clearance boggy Way

Boggy and uneven surface Bridleway 10, Mill Bridleway 10 West Public in sections makes West Validated by Prow 10 Lane Ramsden Hanningfield Surface Rights of Total scheme LCHE158003 £15,000 G bridleway a difficult route to Hanningfield team Heath Improvements Way follow for some users

Page 20 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Cycling `

Total Value of schemes £590,140

2016/17 Scheme Ref Location Description Problem Parish Scheme stage Cost Code Estimated cost Comments Priority RAG Category Scheme

CH35 - Off Road route on western Chelmsford Cycling team looking at Westway, 1 footway between A141 and Writtle Cycling route improvement Non Cycling Total scheme LCHE144009 £150,000 sources of funding. Design G Chelmsford Road - design previously funded Parished previously shared with Panel

Panel has funded feasibility study Chelmsford High Street, into south-north cycling through Awaiting results of feasibility 2 Cycling route improvement Non Cycling Total scheme LCHE144011 TBC Chelmsford Chelmsford avoiding High Street - study Parished study results awaited

Longstomps Improvements to National Cycle Chelmsford 3 Cycleway, Create shared footway/cycleway Route 13, along busy section of Non Cycling Total scheme LCHE154003 £100,000 G Chelmsford Longstomps Parished

Design of replacement footbridge Chelmsford West Park, Install a 3.5m replacement bridge currently not part of Highways 4 Non Cycling Design LCHE154006 £65,000 G Chelmsford on existing alignment Network, which would need to be Parished addressed Lawn Lane/ Unsegregated shared Chelmsford Lack of connectivity/ continuity of 5 Waveney Drive, footway/cycleway & advisory cycle Non Cycling Implementation LCHE154010 £40,000 G cycle network into Springfield Chelmsford lane Parished New London Road Chelmsford Scheme to be considered as Subway at Scheme to allow cyclists to cross 6 Subway not suitable for cyclists Non Cycling Total scheme LCHE154011 NA part of Chelmsford Cycling Parkway, Parkway Parished Action Plan Chelmsford Feasibility study - Option 1 - 3m wide shared use footway Chelmer Park Cycle Shared footway/cycleway on (£227,000), Option 2 - 3m Lack of cycle network connectivity 7 Route, Beehive Beehive Lane between Skinners Galleywood Cycling Design LCHE154002 £227,000 wide unbound cycle track G to Galleywood Lane, Galleywood Lane and Chelmer Car Park (£75,000) but will require Land Acquisition and any costs associated with it

Writtle Route, 8 Solar lights/studs at 10m intervals Mainly rural unlit route Writtle Cycling Total scheme LCHE154005 £8,140 G Writtle

Page 21 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Safer Roads `

Total Value of schemes £277,600

2016/17 Scheme Scheme Allocated Ref Location Description Parish Cost Code Comments Priority RAG Category stage Budget Scheme

Review of speed limits and study into Draft design available in B1137 Main Road j/w Church Total 1 traffic calming/speed reduction Boreham Safer Roads LCHE151011 £90,000 Appendix 2, estimated G Road Boreham scheme measures cost. %FYRR136

A1060 Parkway/Odeon RAB Improvements to cycle/pedestrian Chelmsford Non Total See Appendix 2 for Draft 2 (j/w High Bridge Road), Safer Roads LCHE151013 £14,000 P G facility at RAB Parished scheme Design. %FYRR 307 Chelmsford

See Appendix 2 for Draft Design. Recommended to A131 Braintree Road, RAB consider Option 1 to Review/improvement of The Crescent Main Total improve road markings to 3 approach/departure carriageway Great Leighs Safer Roads LCHE151014 £1,500 G Road/Goodmans Lane, Great scheme help circulatory/lane lining/signing Leighs discipline £1,500%FYRR 73 Option 2 investigate road widening £30,0000.

See Appendix 2 - Draft Design - On going maintenance would be supported by Essex Safety A132 Road j/w A130 Red light camera on north-east Total Camera Partnership, 4 Runwell Safer Roads LCHE151015 £83,000 G on/off slip, Runwell approach to signals scheme Camera - £18k, but if required Maintenance hard standing £25k and Vehicle Restraint System £40k. %FYRR101

Page 22 of 23 Chelmsford City Local Highways Panel - Potential Schemes List (Version 27)

Safer Roads `

Total Value of schemes £277,600

2016/17 Scheme Scheme Allocated Ref Location Description Parish Cost Code Comments Priority RAG Category stage Budget Scheme

Scheme in design, original estimate £58k - Panel Church Lane junction with Investigate cycle link improvements and Total agreed this as a Priority 5 Springfield Safer Roads LCHE151003 £58,000 P G Lawn Lane, Springfield junction design scheme Scheme for 2016/17 at their September 2015 meeting

B1007 High Street near Investigate widening footway and Total Scheme design previously 6 junction with Common Road, Stock Safer Roads LCHE151004 £30,000 P G clearing vegetation scheme shared with Panel. Stock

Report previously shared with Panel in January 2016 Total 7 Lordship Road, Writtle Signage for College and tea rooms Writtle Safer Roads LCHE151016 £1,100 - Signage improvements G scheme on northbound direction. %FYRR106

Page 23 of 23 Chelmsford City Local Highways Panel March 2016

Appendix 2 –Potential Schemes

Safer Roads Schemes

Page 2 - LCHE151011 – B1137 Main Road, j/w Church Road, Boreham Safer Roads Schemes 2016/17- Proposed Speed limit and traffic calming review Draft design

Page 3 - LCHE151013 – A1060 Parkway/Odeon Roundabout, Chelmsford Safer Roads Schemes 2016/17 - Proposed Cycling Improvements Draft Design

Page 5 - LCHE151014 – A131 Braintree Road Roundabout with The Crescent, Main Road, Goodmans Lane Great Leighs Safer Roads Schemes 2016/17 - Proposed Survey work and review of approach/departure signing/lining Draft Design

Page 6 – LCHE151001 – A132 Runwell Road j/w A130 Northbound On slip, Runwell Safer Roads Schemes 2016/17 – Red light camera on north-east approach to signals Draft Design

Page 1 of 6 0DMHVW\¶V6WDWLRQHU\2IILFH‹&URZQ&RS\ULJKW8QDXWKRULVHG or civil proceedings. Essex County Council, 100019602, 2015 reproduction infringes Crown Copyright and may lead to prosecution permission of Ordnance Survey on behalf the Controller Her

This map is reproduced from Ordnance Survey material with the

cover based post with 0.8 x 0.8 x 0.8 x 0.8 x 0.8 with post based

mounted on 1 x 76 wide 76 x 1 on mounted ST5 foundation with 150 with foundation ST5

gateway facing SW and SW facing gateway diag.511 'Reduce speed now' speed 'Reduce diag.511 Diag.516 (750) 'Road narrows 'Road (750) Diag.516

to be sited 80m in advance of advance in 80m sited be to on both sides ahead' and ahead' sides both on A

A

lane Proposed 2m wide right turn right wide 2m Proposed

line

min 1200mm deep across full width of width full across deep 1200mm min

footway/cycleway following change of kerb of change following footway/cycleway Take up existing tactile paving and relay and paving tactile existing up Take

Villiers Place Villiers

Inn" signs to rear of new of rear to signs Inn"

Relocate existing "The Lion "The existing Relocate

footway

markings Hatch markings to tie in with in tie to markings Hatch

existing edge of carriageway of edge existing

Hatch markings offset from edge of edge from offset markings Hatch

Diag.1040.2 , 150mm , Diag.1040.2 traffic island by 150mm by island traffic

G

G

extended at rear to cater for new for cater to rear at extended carriageway kerb alignment kerb carriageway

3m wide shared footway / cycleway / footway shared wide 3m

Diag. 1040.3, 200mm 1040.3, Diag.

Install new pedestrian refuge pedestrian new Install north side of carriageway of side north

inline with tactile paving on paving tactile with inline

remain insitu remain Existing tactile paving to paving tactile Existing

1.9m 30.0m

0.8m

4.6m

Mount existing combined 40mph combined existing Mount

and village signs to new gateway new to signs village and facing SW facing

1.6m

Diag. 1065, 7500mm 1065, Diag.

40mph roundel 40mph

2.5m

mast beacon and keep left signs. left keep and beacon mast

illuminated bollards illuminated existing electrical connection for high for connection electrical existing Construct new wider island reusing island wider new Construct

Remove existing refuge island and island refuge existing Remove make safe connection to internally to connection safe make

kerb line kerb Diag.1018.1 to suit new suit to Diag.1018.1

10.0m

Page 2 of 6 6.0m

clear of, existing footways existing of, clear

Gateway features are to be to are features Gateway erected at the rear of, and be and of, rear the at erected lane widths to 3.0m to widths lane

Build-outs to be provided on both on provided be to Build-outs

sides of carriageway to reduce to carriageway of sides remain insitu remain

Start of 40mph speed limit to limit speed 40mph of Start

Diag.1004, 150mm Diag.1004,

11.5m

mounted on new 76mm post with post 76mm new on mounted Existing national speed limit signs limit speed national Existing

0.75m foundation ST5 600 x 600 x 600 facing NE facing

2.5m

Hatch marking replaced with replaced marking Hatch

diag. 1009, 150mm 1009, diag. Existing 2.5m right turn lane into Church Road Church into lane turn right 2.5m Existing

WORKING COPY

Existing double white line system line white double Existing extended to meet start of hatch of start meet to extended

30.0m

Church Road Church

Diag. 1009, 150mm 1009, Diag.

1014, 4500mm 1014,

Edge markings and associated and markings Edge diagonals replaced with diag. with replaced diagonals

40m

beacon heads so only visible to visible only so heads beacon

oncoming traffic oncoming

Shield added to rear of belisha of rear to added Shield Provide new electrical connection electrical new Provide

Proposed belisha beacons to be to beacons belisha Proposed located on centre island centre on located

from existing Essex supply Essex existing from

UKPN

network connected by connected network Proposed mini pillar to LV to pillar mini Proposed

install new mini pillar and pillar mini new install connect high mast beacon mast high connect Diag. 1012.1, 150mm 1012.1, Diag. and sign lighting sign and

Contractor to provide and provide to Contractor

Diag. 1040, 150mm 1040, Diag.

1.2m

150mm

Hatch markings offset from offset markings Hatch

Install new traffic island traffic new Install edge of traffic island by island traffic of edge

2.0m

6.9m

A

A

lane Proposed 2m wide right turn right wide 2m Proposed Rev. DRAWING No. DRAWING UNITS U.N.O. DATE DESIGNED DRAWING TITLE SCHEME TITLE DRAWING STATUS Mark Rowe, Service Director, Highways County Hall A2 Annex, Chelmsford. CM1 1QH Tel: 0845 6037631 1. Notes 7. 6. 5. 3. 2. 4. DIMENSIONS IN MILLIMETRES LEVELS IN METRES Key XXX 15 SLS Date Regulations and General Directions 2002' any amendment thereafter. Do not scale. be provided 50m in advance of works for a period 3-months. underground utilities. Refer to statutory undertakers' plant returns. Before Care must be taken during Signs to be mounted at 2.1m above finished surface unless otherwise Conflicting road markings removed as directed by project engineer. 'New Road Layout Ahead' signs with a 50mm x height to diagram 7014 alignment. commencing work, mark out all plant to avoid conflict with proposed stated. carriageway. All street furniture is to have lateral clearance of 450 edge All road markings within extent of general arrangement to be refreshed. All signs and road markings to be in accordance with the 'Traffic Signs G G CHECK PRINT CHECK PRINT GENERAL ARRANGEMENT 2016/17 CRS ADV. DESIGN MAIN ROAD, BOREHAM 1338 laid on 30mm sharp sand to BS EN 12620; 150mm Type 1 100mm AC20 dense bin 100/150; and 150 Type 1 granular Proposed red uni directional stick on road studs at 5m centres mounted back-to-back diag. 610 'Keep left' signs (450mm) Proposed refuge beacon with externally illuminated high be retro-reflective Pudsey Diamond Solaboll or similar approved; rear of bollard to Proposed internally illuminated keep left bollard (diag. 610) to be L-shaped Model Proposed Glasdon Gateway (white) 1.5m wide, 2.3m high - 3URSRVHG‘URDGJXOOH\‘FRQQHFWLRQZLWKW\SH= Existing gulley removed and back-filled with ST2; existing Buff colour tactile paving (400 x 400 63) on 30mm sand EB105 and backfilled with ST3 concrete (brushed finish Reinstatement following ducting PSV55; 60mm AC20 bin 40/60; 200mm AC32 HDM base 40/60 New carriageway construction - 40mm AC20 close surf 100/150 material (to BS EN 13108-01) New footway construction - 25mm AC6 dense surf 100/150; ECC folio dwg. EB105 upstand to match existing) set into existing pavement as per Replace existing kerb with PCC square (255 x 125 PCC flat top edging (150 x 50) as per ECC folio dwg. EB105 PCC BN kerb (255 x 125 with 0-6mm face including droppers pavement as per ECC folio dwg. EB105 PCC HB2 kerb (255 x 125 with 125mm face) set into existing connection reused for new gulley crossing point) cement mix (max 1:20 gradient where provided at pedestrian Gateway build-out construction - 80mm concrete block to BS EN (to BS EN 13108-01); and min 200mm Type 1 granular material surround arris trowel edges) quadrants) set into existing pavement as per ECC folio dwg Traffic island construction to be HB2 kerbs (straight and 305 granular material to Clause 803 to Clause 803 dwg. EB105 ACO drain set into existing pavement where appropriate) set into existing pavement as per ECC folio PRELIMINARY DESIGN DATE DRAWN HI-4331-00-001 XXX 15 SLS Description of revision LCHE141004 DATE CHECKED all XXX 15 excavations due to the presence of PN SCALE AT A1 (841X594mm) DATE REVIEWED XXX 15 Drawn SLS ‹ 1:250 Essex County Council Checked DATE APPROVED Review'd XXX 15 REV. MBS - Approv'd N Notes 1. Do not scale.

2. All diagram numbers refer to the Traffic Signs Regulations and General Directions 2002, and any amendment thereafter.

3. Mounting height to be a minimum of 2.4m to underside of sign.

4. All signs to have minimum clearance of 450mm to edge of carriageway.

Key

New post or sign

Existing post and sign

New road marking Erect new sign TS3 on to existing LC facing towards subway Existing pedestrian guardrail Remove existing SW facing signs and replace with new sign TS4 pointing Off carriageway cycle route towards subway

Drawing set

1. HI-4327-100-001 - Location Plan

2. HI-4327-000-001 - Odeon Rab North General Arrangement

3. HI-4327-000-002 - Odeon Rab South General Arrangement

4. HI-4327-1200-001 - Sign Schedule

Existing Diag 1038

Diag 1057 750 wide

Diag 1059 1000 1000 high

Rev. Date Description of revision Drawn Checked Review'd Approv'd

Rotate existing signs to match Start of diagram 1049 RM (150 footway / cycleway facility alignment wide) to be offset from lane arrow DRAWING STATUS marking to diagram 1038 by 1.5m DETAILED DESIGN

Mark Rowe, Service Director, Highways County Hall A2 Annex, Chelmsford. CM1 1QH Tel: 0845 6037631 ‹ Essex County Council

SCHEME TITLE A1060 PARKWAY, CHELMSFORD 2016/17 CRS ADV. DESIGN LCHE141004

DRAWING TITLE

ODEON RAB NORTH GENERAL ARRANGEMENT

DESIGNED DRAWN CHECKED REVIEWED APPROVED SLS SLS JAL SLS MBS

DATE DATE DATE DATE DATE NOV 15 NOV 15 NOV 15 NOV 15 NOV 15

DRAWING UNITS U.N.O. SCALE AT A3 (420x297mm) DIMENSIONS IN MILLIMETRES 1:250 LEVELS IN METRES This map is reproduced from Ordnance Survey material with the DRAWING No. REV. permission of Ordnance Survey on behalf of the Controller of Her 0DMHVW\¶V6WDWLRQHU\2IILFH‹&URZQ&RS\ULJKW8QDXWKRULVHG reproduction infringes Crown Copyright and may lead to prosecution or HI-4327-000-001 - civil proceedings. Essex County Council, 100019602, 2015 Page 3 of 6 Notes Mount new sign TS6 on to Remove existing sign and Drawing set existing LC facing SSE and replace with new sign TS2 1. Do not scale. N pointing towards Rochford facing SW and pointing towards 1. HI-4327-100-001 - Location Plan Road subway 2. All diagram numbers refer to the Traffic Signs Regulations and General Directions 2002, and 2. HI-4327-000-001 - Odeon Rab North General Increase mounting height of Arrangement any amendment thereafter. existing segregated cycleway sign to 2.4m 3. HI-4327-000-002 - Odeon Rab South General 3. Mounting height to be a minimum of 2.4m to Arrangement underside of sign. Remove existing Tile 4. HI-4327-1200-001 - Sign Schedule 4. All signs to have minimum clearance of 450mm Kiln cycle sign to tip to edge of carriageway. Erect new square post and sign TS5 facing NEE 5. Orientation of signs to be agreed on site with Project Engineer.

6. Post foundations to be 600 x 600 x 600 ST5 concrete with 150mm cover. Remove existing post and sign removed to tip 7. All posts to be cut and capped to 50mm of top Relocate cycle sign to sign face. opposite side of existing post facing NW 8. Verge to be made good with top soil and seed. Footway/carriageway to be made good with similar material to existing.

9. Where referenced permission is to be obtained Clover leaf cover taken up, frame from BT or ECC Street Lighting Team before cleared and cover reseated so is level mounting signs on to existing TP or LC with top of frame. respectively.

Otherwise, existing removed to tip and Key replaced with D400 frame and cover. PCC kerb to include droppers and BN (255 x 125 with 0-6mm face) set into Carriageway patched to suit level of existing pavement as per ECC folio QHZH[LVWLQJFRYHUV DSSUR[Pð drawing EB105 area). New post or sign Covers located in centre of carriageway between number 21 and Existing post or sign to be removed to tip 21a Rochford Road. New road marking

Existing pedestrian guardrail

Off carriageway cycle route Remove existing signs to tip. Erect new sign TS1 On carriageway cycle route facing south pointing towards Rochford Road 2600 Erect new sign TS7 facing Rev. Date Description of revision Drawn Checked Review'd Approv'd SW and pointing towards Army & Navy Rab Relocate existing post and signs DRAWING STATUS

Erect new sign TS2 to existing DETAILED DESIGN TP facing NE and pointing towards Rochford Road

TP DP738

Erect new sign TS6 to existing G Mark Rowe, Service Director, Highways County Hall A2 Annex, Chelmsford. CM1 1QH TP facing NW and pointing Tel: 0845 6037631 ‹ Essex County Council

towards Parkway SCHEME TITLE A1060 PARKWAY, CHELMSFORD 2016/17 CRS ADV. DESIGN LCHE141004

DRAWING TITLE Diag 1049 150 wide ODEON RAB SOUTH GENERAL ARRANGEMENT Diag 1059 1000 high DESIGNED DRAWN CHECKED REVIEWED APPROVED 4600 SLS SLS JAL SLS MBS

DATE DATE DATE DATE DATE Diag 1057 NOV 15 NOV 15 NOV 15 NOV 15 NOV 15

G 750 wide DRAWING UNITS U.N.O. SCALE AT A3 (420x297mm) 1000 DIMENSIONS IN MILLIMETRES 1:250 LEVELS IN METRES This map is reproduced from Ordnance Survey material with the Breaker to start NW of G DRAWING No. REV. permission of Ordnance Survey on behalf of the Controller of Her 0DMHVW\¶V6WDWLRQHU\2IILFH‹&URZQ&RS\ULJKW8QDXWKRULVHG double gulley reproduction infringes Crown Copyright and may lead to prosecution or HI-4327-000-002 - civil proceedings. Essex County Council, 100019602, 2015 Page 4 of 6 0DMHVW\¶V6WDWLRQHU\2IILFH‹&URZQ&RS\ULJKW8QDXWKRULVHG civil proceedings. Essex County Council, 100019602, 2015 reproduction infringes Crown Copyright and may lead to prosecution or permission of Ordnance Survey on behalf the Controller Her This map is reproduced from Ordnance Survey material with the LOCATION PLAN SCALE 1:10,000

GENERAL ARRANGEMENT SCALE 1:500 The Crescent Main Road Main Crescent The

N

Main Road Main The Crescent The

A131 Braintree Road

A131 Goodmans Lane Goodmans

Main Road Great Leighs

3.5m

A131 Braintree Road

Page 5 of 6 A131

Main Road N Rev. DRAWING No. LEVELS IN METRES DIMENSIONS IN MILLIMETRES DRAWING UNITS U.N.O. DATE DESIGNED DRAWING TITLE SCHEME TITLE DRAWING STATUS County Hall A2 Annex, Chelmsford. CM1 1QH Mark Rowe, Service Director, Highways Tel: 0845 6037631 DEC 15 1. Key Notes 3. 2. 4. SLS Date CHECK PRINT Do not scale. refreshed within extent of General Circulatory road markings to align with existing. TSRGD 2002 and subsequent amendments. Arrangement. All lane, hazard and give-way markings to be All road markings are to be in accordance with GOODMANS LN, GT LEIGHS DATE DRAWN 2016/17 CRS ADV. DESIGN A131 BRAINTREE RD J/W HI-4329-12-001 DEC 15 DETAILED DESIGN ROAD MARKINGS 150mm wide SLS New marking to diag. 1038 - Lane New marking to diag. 1004.1 - Hazard Existing road markings positioned centrally within lane arrow - 6m in length markings to be warning line - 6m mark, 3m gap, Area of interest Description of revision LCHE141004 DATE CHECKED DEC 15 PN DATE REVIEWED DEC 15 SCALE AT A3 (420x297mm) Drawn SLS AS SHOWN ‹ Essex County Council Checked DATE APPROVED Review'd DEC 15 REV. MBS - Approv'd 0DMHVW\¶V6WDWLRQHU\2IILFH‹&URZQ&RS\ULJKW8QDXWKRULVHG civil proceedings. Essex County Council, 100019602, 2015 reproduction infringes Crown Copyright and may lead to prosecution or permission of Ordnance Survey on behalf the Controller Her This map is reproduced from Ordnance Survey material with the A132 Runwell Road Location Plan Scale 1:10,000 General Arrangement Scale 1:250

N A130

16m P4 terminal

A132 Runwell Road A130

A1245 Main Road

Woodham Road Hawk Hill Hawk Road A132 Burnham N

43m N2W2 VRS 150mm behind rear of PCC edging Subbase to extend necessary Grass verge made good as Scale NTS Section A-A lighting supply by contractor New mini pillar provided and connected to existing ECC street Page 6 of edging 250mm flat top blind 20mm sharp sand seed filled with top soil and Voids between blocks Existing ITS cover lowered to suit new level

2.5m ST1 bed and backing

ST1 concrete 6.5m

3m 2.2m laid on preformed (200x200x7mm dia.) concrete formers spacers within A193 mesh 6m P2 terminal 18m compacted layers in Tensec Triax for drainage blanket wrapped in 40m single sized granular material wrap with sub base above

subbase 200mm Type 1 granular 5m BN kerb with 20mm face 150mm kerb bed and 200mm backing in ST1 Existing road good as necessary construction made Rev. DRAWING No. LEVELS IN METRES DIMENSIONS IN MILLIMETRES DRAWING UNITS U.N.O. DATE DESIGNED DRAWING TITLE SCHEME TITLE DRAWING STATUS County Hall A2 Annex, Chelmsford. CM1 1QH Mark Rowe, Service Director, Highways Tel: 0845 6037631 1. Notes 2. 290216 Key SLS A132 RUNWELL ROAD J/W A130 Date Do not scale. CBR<2% 300+mm thick CBR 2-4% 250-200mm thick CBR 4%+ 150mm thick CBR test to be conducted on formation establish depth of drainage blanket required. GENERAL ARRANGEMENT 2016/17 CRS ADV. DESIGN DATE DRAWN HI-4328-00-001 290216 SLS OUTLINE DESIGN Existing traffic signal Existing ITS chamber Existing lamp column Proposed bollard (Glasdon Admiral or Proposed safety camera (to be installed N2W2 Vehicle Restraint System incl. 1 PCC BN Kerb (255x125) with 20mm PCC 250 flat top edging (approx. 34.5m) Grass Concrete Limited (GC1) or Site location similar approved) x 3 at 1.5m centres and calibrated by Serco/Cubic) ends VLPLODUDSSURYHGDSSUR[Pð x P4 (16m) and 1 P2 (6m) terminal face including droppers (approx. 13m) Description of revision LCHE151001 N/B ONSLIP DATE CHECKED 010316 PN DATE REVIEWED 010316 SCALE AT A3 (420x297mm) Drawn SLS ‹ Essex County Council AS SHOWN Checked DATE APPROVED Review'd 010316 REV. MBS - Approv'd Chelmsford City Highway Rangers - Works Summary February 2016 Ref. ECC Date Parish Street Works Date Completed No. Job 1 CCC Park Lane Street furniture maintenance 01/12/2015 2 CCC Chelmsford High Street Street furniture maintenance 01/12/2015 3 No Highway Rangers 02 to 04/12/2015 4 CCC Sandon Whole Parish Sign maintenance - Clean/Align /Tighten signs 07/12/2015 5 CCC Little Baddow Whole Parish Sign maintenance - Clean/Align /Tighten signs 07/12/2015 6 CCC Chelmsford Depot Depot maintenance on equipment 08/12/2015 7 CCC Broomfield 65 School Lane Repair damaged grassed area 09/12/2015 8 CCC Springfield Havengore Sign maintenance - Clean/Align /Tighten signs 09/12/2105 9 CCC Chelmsford Lawn Lane Cut back vegetation from footway 10/12/2015 10 CCC Springfield Henniker Gate Remove branches overgrown on footway 10/12/2015 11 CCC Great Baddow Noakes Place Remove fly posters 11/12/2015 12 CCC Chelmsford Danbury Remove dead deer 11/12/2015 13 CCC Chelmsford Brookhurst Close Cut back overhanging vegetation allow for sweeper 11/12/2015 14 CCC Writtle Lodge Road Cut back around street furniture and signs 11/12/2015 15 CCC Clacton Stephenson Road Disposal of fly-tipped tyres x 2 loads 14/12/2015 16 Highway Rangers on leave 15/12/2015 17 CCC Springfield Golden Acres Cut back brambles/overgrown vegetation from footway 16/12/2015 18 CCC Bicknacre Leighams Road Cut back vegetation from footway 16/12/2015 19 CCC South Woodham Ferrers Tanner Way/Station Approach Cleared footway leaves & sweeper attended 17/12/2015 20 566 17/12/2015 Ramsden Heath 2 Bird Close Reset kerb 18/12/2015 21 CCC Chelmsford Depot - Freighter House Depot training on equipment 18/12/2015 22 CCC Chelmsford Stump Lane Install street furniture 21/12/2015 23 CCC Springfield Harness Close Cut back vegetation from footway 21/12/2015 24 CCC Springfield Golden Acres Cut back brambles/vegetation from footway 21/12/2015 25 CCC Chelmsford Tamar Rise Install no fly tipping sign 22/12/2015 26 CCC Chelmsford Church Lane/Lawn Lane Install street furniture 22/12/2015 27 CCC Chelmsford Springfield Green Install street furniture 22/12/2015

Page 1 of 4 Chelmsford City Highway Rangers - Works Summary February 2016 Ref. ECC Date Parish Street Works Date Completed No. Job 28 CCC Chelmsford Springfield Green Relocate litter bin to entrance of park 22/12/2015 29 CCC Great Waltham Maldon Rd/Mashbury Rd/Chatham Hall Lane Clear fly tips 23/12/2015 30 CCC Chelmsford Braemar Avenue Sign maintenance - Clean/Align /Tighten signs 24/12/2015 31 CCC Chelmsford Depot - Freighter House Clean down/ repairs machinery, equipment 24/12/2015 32 CHRISTMAS DAY 25/12/2015 33 BOXING DAY 26/12/2015 34 CCC East Hanningfield East Hanningfield Clean list of signs requested by parish council 29/12/2015 35 CCC Springfield Saddle Rise Cut back overgrown vegetation from footway 30/12/2015 36 CCC Chelmsford Various Clear out acco drains 31/12/2015 37 CCC Writtle Ongar Road Cut back vegetation from footway 04/01/2015 38 CCC Springfield Begonia Close Sign maintenance - Clean/Align /Tighten signs 05/01/2016 39 CCC Springfield Begonia Close Sign maintenance - Clean/Align /Tighten signs 05/01/2016 40 Highway Rangers on Annual Leave 06 to 21/01/2016 41 CCC Boreham Drovers Way Machinery / equipment check repairs 22/01/2016 42 CCC South Woodham Ferrers B1012 Burnham Road Cut back vegetation from footway, reclaim footway 25/01/2016 43 CCC South Woodham Ferrers B1012 Burnham Road Cut back vegetation from footway, reclaim footway 26/01/2016 44 CCC South Woodham Ferrers B1012 Burnham Road Cut back vegetation from footway, reclaim footway 27/01/2016 45 CCC Bicknacre Bicknacre Road north of j/w Peartree Lane Cut back soil grass from footway, reclaim footway 28/01/2016 46 CCC Galleywood Opp 40 Markland Close Cut back hedge, sweep 28/01/2016 47 CCC South Woodham Ferrers Inchbonnie Rd/Marsh Farm Street furniture maintenance 29/01/2016 48 CCC Sandon Maldon Road Cut back vegetation from footpath 29/01/2016 49 CCC Sandon Maldon Road Opp 156 Cut back overgrowing vegetation, side footway 01/02/2016 50 CCC Great Baddow Maltings Road Side/edge/cut back the footway 01/02/2016 51 CCC Highwood Highwood Road Cut back footway, clear moss 01 to 02/02/2016 52 CCC South Woodham Ferrers Chadwick Road Cut back hedge, bushes, litter pick 02/02/2016 53 CCC Rettendon Various Cut back, dig & clear cycle path 03 to 05/02/2016 54 CCC Howe Green Various Remove fly posters 05/02/2016

Page 2 of 4 Chelmsford City Highway Rangers - Works Summary February 2016 Ref. ECC Date Parish Street Works Date Completed No. Job 55 CCC Galleywood Various Remove fly posters 05/02/2016 56 CCC Rettendon Various Remove fly posters 05/02/2016 57 CCC Springfield Belmonde Drive Cut Back Hedge sweeper unable to get through f/way 05/02/2016 58 CCC Rettendon Rettendon Cut back vegetation and dig back cycle path 08/02/2016 59 CCC Stock Swan Lane Pasture Cut back vegetation overhanging footway 09/02/2016 60 CCC Bures Hamlet Cambridge Way Cut back bushes blocking car park entrance 09/02/2016 61 CCC Rettendon Rettendon Cut back, dig & clear cycle path 10/02/2016 62 CCC Chelmsford Thames Avenue Clear bus stop glass make safe 10/02/2016 63 CCC Rettendon Rettendon Cut back, dig & clear cycle way 11/02/2016 64 CCC South Woodham Ferrers Brent Avenue Cut back overhanging vegetation from footway 12/02/2016 65 CCC Chelmsford Essex Regiment Way Help with tanker work 15/02/2016 66 CCC Chelmsford Forest Drive Shops Remove metal stud from pavement trip hazard 16/02/2016 67 CCC Chelmsford Barnfield Mews Make safe brick wall 16/02/2016 68 CCC Springfield Paddock Drive Scrape clean & cut back alleyway 16/02/2016 69 CCC Writtle Various Street furniture maintenance 17/02/2016 70 CCC Chelmsford Heath Drive Street furniture maintenance 17/02/2016 71 CCC Chelmsford Hylands Park Help with tanker work 18/02/2016 72 CCC Chelmsford Wharf Road Car Park clear up/litter pick, sweep, remove waste 19/02/2016 73 CCC Chelmsford Lyon Mead Help with tanker work 22/02/2016 74 CCC Great Waltham Various Remove Car park signs for village hall 23/02/2016 75 CCC Stock Stock Road Cut back vegetation from footway 23/02/2016 76 CCC Howe Green Various Cut back cycle way vegetation clean channels 24/02/2016 77 CCC Howe Green Various Cut back vegetation and mud and around bus stop. 25/02/2016 78 CCC Springfield Brackenden Drive Cut back vegetation from footway 25/02/2016 79 CCC Springfield Springfield Bypass Cut back ,litter pick verge 26/02/2016 80 CCC Little Baddow Chapel Lane Street furniture maintenance 29/02/2016 81 CCC East Hanningfield Old Church Road Street furniture maintenance 29/02/2016

Page 3 of 4 Chelmsford City Highway Rangers - Works Summary February 2016 Ref. ECC Date Parish Street Works Date Completed No. Job 82 CCC Woodham Ferrers Workhouse Lane Street furniture maintenance 29/02/2016 83 CCC Galleywood Galleywood Hill Install no Fly tipping Sign 29/02/2016

Page 4 of 4