HAMPTON ROADS CLOSURES on WATER CROSSINGS, INTERSTATES and OTHER NOTABLE DETOURS for the Week of Jan
Total Page:16
File Type:pdf, Size:1020Kb
RELEASE: IMMEDIATE Dec. 31, 2020 CONTACT: Media Line: 757-956-3032 [email protected] HAMPTON ROADS CLOSURES ON WATER CROSSINGS, INTERSTATES AND OTHER NOTABLE DETOURS For the week of Jan. 3-9 NOTE: This list covers full closures of interstates, ramps, bridges and primary roads, and lane closures at the bridge-tunnels and the Berkley, Coleman, High Rise and James River bridges. *Scheduled closures are subject to change based on weather conditions and other factors.* For information on the many other lane closures necessary for maintenance and construction throughout Hampton Roads, visit 511Virginia.org, download the 511VA smartphone app, or dial 511. Bridges & Tunnels: Monitor-Merrimac Memorial Bridge-Tunnel, I-664: Single-lane closures northbound on Jan. 4-5 as early as 8 p.m. to 5 a.m. Single-lane closures southbound on Jan. 4-7 as early as 8 p.m. to 5 a.m. Alternating, mobile, single-lane closures northbound on Jan. 6 from 9 p.m. to 5 a.m. James River Bridge, Route 17: Single-lane closures in both directions on Jan. 4 from noon to 3 p.m. and on Jan. 5-8 from 9 a.m. to 3 p.m. HRBT Expansion Project: For lane closures and project updates related to the HRBT Expansion Project, visit HRBTExpansion.org. Elizabeth River Tunnels (Downtown/Midtown Tunnels): Go to Elizabeth River Tunnels for maintenance schedules on the Downtown Tunnel (I-264), Midtown Tunnel (U.S. 58) and MLK Expressway (Route 164). I-64 Widening Segment III Project, York County: Lane closures under flagger control on Lakeshead Drive at the I-64 overpasses on Jan. 4 from noon to 4 p.m. and Jan. 5-7 from 8 a.m. to 4 p.m. A consecutive, long-term full ramp closure and diversion on the existing Route 199 west on-ramp to I-64 west in Lightfoot continues. Westbound traffic on Route 199 follow detour signage in place directing motorists to a new temporary median crossover to access the Route 199 east on-ramp to I-64 west during the closure. A consecutive, long-term lane closure under traffic signal control on Colonial Parkway at the I-64 overpass continues. A consecutive, long-term full ramp closure on Route 143/Merrimac Trail north to I-64 west continues. Traffic will follow detour signage in place directing motorists to the Route 143 south on-ramp to I-64 west during the closure. I-64 Express Lanes, Norfolk: Full closure of the I-64 Express Lanes in both directions on Jan. 9-10 from 7 a.m. to 9 p.m. I-64, Southside Widening, High Rise Bridge Expansion: For a full list of on-going traffic impacts and lane closures, visit the project traffic alerts page: 64highrise.org/news_and_traffic_alerts/lane_closures.asp Alternating, single-lane closures on I-64 in both directions between South Military Highway (exit 297) and Greenbrier Parkway (exit 289): Jan. 5-7 from 7 p.m. to 5 a.m. Jan. 8 from 9 p.m. to 7 a.m. Jan. 9 from 8 p.m. to 5 a.m. Jan. 10 from 8 p.m. to 5 a.m. Closure with detour of Bainbridge Boulevard at the I-64 overpass from 8 a.m. to 4 p.m. each day, from Jan. 4-8. Click here for the full traffic alert: conta.cc/3pC0vAp I-64 / I-264 Interchange Improvements Project, Norfolk/Virginia Beach: Alternating, multi-lane closures in both directions of I-264 between Newtown Road (exit 15) and Witchduck Road (exit 16) on Jan. 4-10, starting as early as 7 p.m. including: Multi-lane closures with brief, intermittent slow rolls overnight in both directions of I-264 on Jan. 9, starting as early as 9 p.m. to 5 a.m. Consecutive single right-lane and shoulder closure on I-264 east starting 7 a.m. on Jan. 8 through 5 a.m. on Jan. 11. Click Here to View as Webpage .