Ahmedabad Urban Development AUDA EWS II Zundal Form 1 Authority

APPENDIX I (See paragraph – 6) FORM 1

(I) Basic Information

Sr. Item Details No 1 Name of the Project AUDA EWS II Zundal 2 S. number in schedule 8(a) Proposed capacity/area/length/tonnage to be 2 Land area: 38,123 m 3 handled/command area/lease area/number of 2 Built up area: 96,141.77 m well to be drilled 4 New/expansion/modernization New 5 Existing capacity/area etc. No 6 Category of project i.e. “A” or “B” ‘B’ Does it attract the general condition? If yes 7 No please specify Does it attract the specific condition? If yes 8 No please specify Location Zundal Plot/Survey/Khasra No F.P. No:123, T.P.S: 72, Zundal, Gandhinagar Village Zundal 9 Tehsil Gandhinagar District Gandinagar State Nearest railway station/airport along with Railway Station is ~3.3Km in S Direction 10 distance in Kms. Airport is ~8.3 Km in SE Direction Nearest town, city, district headquarter along Gandhinagar city, it’s a Headquarter of District 11 with distance in Kms. and project is developed in AUDA limit Ahmedabad Urban Development Authority Village Panchayat, Zila Parishad, Municipal (AUDA), Sardar Vallabhbhai Patel Sankul, 12 Corporation, local body (Complete postal Usmanpura, , Ahmedabad – address with telephone nos to be given) 380014, Telephone no: 079-27545051 to 54 13 Name of the applicant Ahmedabad Urban Development Authority Sardar Vallabhbhai Patel Bhavan, Usmanpura, 14 Registered address Ashram Road, Ahmedabad - 380 014 Sardar Vallabhbhai Patel Bhavan, Usmanpura, 15 Address for correspondence Ashram Road, Ahmedabad - 380 014 Name Mr. A.K. Pathak Designation Executive Engineer- Engineering Branch Sardar Vallabhbhai Patel Bhavan, Usmanpura, Address Ashram Road, Ahmedabad - 380 014 Pin code 380014 E-mail [email protected] Telephone 9825300337 Fax No - Details of alternative sites examined, if any. No 16 Location of these sites should be shown on a Location of Site shown on Topo sheet is given in topo sheet Annexure 1. 17 Interlinked Project No Whether separate application for interlinked 18 No project has been submitted? 19 If yes date of submission - 20 If no reason Individual project

1

Ahmedabad Urban Development AUDA EWS II Zundal Form 1 Authority

Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given 21 No The Forest (Conservation) Act, 1980 The Wildlife (Protection) Act, 1972 The CRZ Notification 1991 Whether there is any Government order/policy 22 No relevant/ relating to site 23 Forest Land involved? No Whether there is any litigation pending against the project and / or land in which the project is propose to be set up 24 Name of court No litigation pending Case no Order/directions of the court, if any and its relevance with the proposed project.

 Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,)

(II) Activity

1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

S. Information/Checklist Yes/ Details thereof (with approximate quantities /rates, No. confirmation No wherever possible) with source of information data 1.1 Permanent or temporary change in Yes The project will change the land use, land cover or land use, land cover or topography topography with respect to local landuse. The project including increase in intensity of will be developed as a EWS units (Residential cum land use (with respect to local land commercial units). use plan) 1.2 Clearance of existing land, Yes Some Vegetation may be required to be cut before vegetation and buildings? construction work. 1.3 Creation of new land uses? Yes Residential cum Commercial units will be developed as per AUDA approved plan. 1.4 Pre-construction investigations e.g. Yes Soil testing report is attached vide Annexure 2. bore houses, soil testing? 1.5 Construction works? Yes There is construction of Residential cum commercial units and two community hall. (Total 1120 No. of Flats & 12 No. of Shops) 1.6 Demolition works? No Not Applicable. 1.7 Temporary sites used for No Not Applicable. construction works or housing of construction workers? 1.8 Above ground buildings, structures Yes There is a construction of G/HP+ 7 floors or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including No Not applicable. mining or tunneling? 1.10 Reclamation works? No Not applicable. 2

Ahmedabad Urban Development AUDA EWS II Zundal Form 1 Authority

S. Information/Checklist Yes/ Details thereof (with approximate quantities /rates, No. confirmation No wherever possible) with source of information data 1.11 Dredging? No Not applicable. 1.12 Offshore structures? No Not applicable. 1.13 Production and manufacturing No Not applicable. processes? 1.14 Facilities for storage of goods or Yes Construction Phase: materials? Minimum bulk material for construction would be brought as and when required and would be temporarily stored at site. Proper arrangement of storage with proper cover would be done. 1.15 Facilities for treatment or disposal Yes Solid Wastes: of solid waste or liquid effluents? Solid waste generated in Project area will be mainly of domestic nature. The 3.2 ton/day of solid wastes generated will be segregated into biodegradable and non-biodegradable wastes and collected in separate bins. The non-biodegradable wastes will be sold to recyclers and the biodegradable wastes will be collected and convert into compost. Liquid Effluent: On site sanitation facilities will be provided for proper disposal during the construction phase. It is estimated that about 551.18 kld of wastewater will be generated from the project during operation phase; partly wastewater will be treated into 300 KLD STP. Treated wastewater will be reused for flushing and gardening purpose. Balance wastewater will be disposed into Sewer line with prior permission. 1.16 Facilities for long term housing of No Not applicable. operational workers? 1.17 New road, rail or sea traffic during No Not applicable. construction or operation? 1.18 New road, rail, air, waterborne or No Not applicable. other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not applicable. transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines No Not applicable. or pipelines? 1.21 Impoundment, damming, culverting, No Not applicable. realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not applicable. 1.23 Abstraction or transfers of water Yes  Construction Phase: from ground or surface waters? During construction phase fresh water requirement 17.5 kld will be met through the tankers  Operation Phase: 3

Ahmedabad Urban Development AUDA EWS II Zundal Form 1 Authority

S. Information/Checklist Yes/ Details thereof (with approximate quantities /rates, No. confirmation No wherever possible) with source of information data During operational phase fresh water requirement of 456.58 kld will be met through AUDA 1.24 Changes in water bodies or the No Not applicable. land surface affecting drainage or run-off? 1.25 Transport of personnel or materials Yes Transport of personnel and materials will be required for construction, operation or for both construction and operation phases. decommissioning? 1.26 Long-term dismantling or No Not applicable. decommissioning or restoration works? 1.27 Ongoing activity during No Not applicable. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes During construction phase, about 100 workers would temporarily or permanently? be employed temporarily and hired from local area. During the operational phase, there will be influx of more than 5564 (5064 permanent, 500 visitors) people. 1.29 Introduction of alien species? No Not applicable. 1.30 Loss of native species or genetic No Not applicable. diversity? 1.31 Any other actions? No Not applicable.

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

S. Information/checklist Yes/ Details thereof (with approximate quantities /rates, No. confirmation No wherever possible) with source of information data 2.1 Land especially undeveloped or No Not applicable. agricultural land (ha) 2.2 Water (expected source & Yes Water demand will be as follows: competing users) unit: kld Construction phase Maximum Quantity:17.5 ( kld ) Source: Tankers Operation phase Maximum Quantity:456.58 ( kld) Source: AUDA 2.3 Minerals (MT) No Not applicable. 2.4 Construction material – stone, Yes Construction materials such as stone, cement, sand, aggregates, sand / soil (expected bricks, marble, paints, tiles, electric ware, sanitary ware, source – MT) glass would be used. All the above materials would be purchased from the local market and from nearest approved quarries, as and when required. It would be stored temporarily at the site. 2.5 Forests and timber (source – MT) No Not applicable 2.6 Energy including electricity and Source: UGVCL fuels (source, competing users) Yes Expected Demand : 4000 KVA Unit: fuel (MT), energy (MW) D.G. set: 40 KVA in case of power failure (only for fire pump) 4

Ahmedabad Urban Development AUDA EWS II Zundal Form 1 Authority

S. Information/checklist Yes/ Details thereof (with approximate quantities /rates, No. confirmation No wherever possible) with source of information data Fuel : HSD, 10 l/hr 2.7 Any other natural resources (use No Not applicable appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, No. confirmation No wherever possible) with source of information data 3.1 Use of substances or materials, which are hazardous (as per Yes MSIHC rules) to human health or Only HSD will be stored at site for DG set. the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease No Suitable drainage and waste management measures will or affect disease vectors (e.g. be adopted in both construction and operational phase, insect or water borne diseases) which will restrict stagnation of water or accumulation of waste. This will effectively restrict the growth and reproduction of disease vectors. 3.3 Affect the welfare of people e.g. by No Not applicable changing living conditions? 3.4 Vulnerable groups of people who No Not applicable could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No Not applicable.

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

S. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. confirmation No wherever possible) with source of information data 4.1 Soil, overburden or mine wastes Yes Excavated surplus earth will be refilled in the project premises. Top soil will be used for development of greenbelt. Balance earth will be disposed to nearby other projects.

4.2 Municipal waste (domestic and or Yes The municipal solid wastes generated during commercial wastes) operation phase will consist of: Organic waste Waste vegetables and foods

Inorganic waste Papers, cartons, Thermocol, plastics, polythene bags, Glass, etc. Solid waste storage location will be incorporated in the design itself. Adequate number of collection bins, separately for biodegradable and non-biodegradable waste will be provided as per Municipal Solid Waste Management Rule, 2016. Waste from such bins will be collected separately on daily basis. The quantity of solid wastes generated will be approximately 3.2 ton/ day. The recyclable waste 5

Ahmedabad Urban Development AUDA EWS II Zundal Form 1 Authority

S. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. confirmation No wherever possible) with source of information data will be disposed to recyclers. The biodegradable waste will be collected in bins and will be convert into compost 4.3 Hazardous wastes (as per Yes Only used oil (category 5.1) will be generated and Hazardous Waste Management collected and will be handed over to authorized recyclers Rules) 4.4 Other industrial process wastes No Not applicable. 4.5 Surplus product No Not applicable. 4.6 Sewage sludge or other sludge Yes Sludge will be convert into compost from effluent treatment 4.7 Construction or demolition wastes Yes The construction waste consists of construction debris along with cement bags, steel, insulating and packaging materials etc. Cement bags, waste paper and cardboard packing material will be sold off to recyclers. Unusable steel scrap will also be collected at site and sold to recyclers. 4.8 Redundant machinery or equipment No Not applicable. 4.9 Contaminated soils or other materials No Not applicable. 4.10 Agricultural wastes No Not applicable. 4.11 Other solid wastes No Not applicable.

5. Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr)

S. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, No. confirmation No wherever possible) with source of information data 5.1 Emissions from combustion of Yes The operation of proposed project does not envisage fossil fuels from stationary or mobile any major air pollutant generating sources except sources vehicular movement. 5.2 Emissions from production processes No Not applicable. 5.3 Emissions from materials handling Yes At the time of transportation, dust would be generated including storage or transport but this would be restricted to the construction phase and to the construction site only. 3 m peripheral barrier will be provided. 5.4 Emissions from construction Yes At the time of transportation & construction, dust activities including plant and would be generated. Water sprinkling is carried out to equipment minimize dust suppression. 5.5 Dust or odours from handling of Yes Construction Phase: materials including construction Dust would be generated during construction activity. materials, sewage and waste Water sprinkling would be carried out to minimize dust suppression. On site sanitation facilities (septic tank) will be provided during the construction phase. Temporary Solid waste storage would be provided at site and recyclable material sold off to recyclers. Operation Phase: It is estimated that about 551.18 kld of wastewater will be generated from the project during operation phase; partly wastewater will be treated into 300 KLD STP. Treated wastewater will be reused for flushing and gardening purpose. Balance wastewater will be 6

Ahmedabad Urban Development AUDA EWS II Zundal Form 1 Authority

S. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, No. confirmation No wherever possible) with source of information data disposed into Sewer line with prior permission. 5.6 Emissions from incineration of waste No Not applicable 5.7 Emissions from burning of waste in No Not applicable open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources No Not applicable 6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, No. confirmation No wherever possible) with source of information data 6.1 From operation of equipment e.g. Yes During construction, the machinery used for engines, ventilation plant, crushers construction would be of high standard from reputed brands with appropriate work standards. These standards ensure better noise pollution control/vibration control and air emission control. Hence, insignificant impacts due to construction machinery are envisaged. Apart from this, the construction activities would be restricted to daytime only. 6.2 From industrial or similar processes No Not applicable 6.3 From construction or demolition Yes Due to various construction activities, there would be short term noise impacts in the immediate vicinity of the project site. 6.4 From blasting or piling No Not applicable 6.5 From construction or operational Yes During construction noise would be generated due to traffic construction activity but would be for short term only. During operation phase noise will be generated due to traffic. Noise level monitoring was carried out to evaluate the impact. 6.6 From lighting or cooling systems Yes Only lighting system required 6.7 From any other sources No Not applicable.

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. confirmation No wherever possible) with source of information data 7.1 From handling, storage, use or No Not applicable spillage of hazardous materials 7.2 From discharge of sewage or other No It is estimated that about 551.18 kld of wastewater will effluents to water or the land be generated from the project during operation phase; (expected mode and place of partly wastewater will be treated into 300 KLD STP. discharge) Treated wastewater will be reused for flushing and gardening purpose. Balance wastewater will be disposed into Sewer line with prior permission. 7.3 By deposition of pollutants emitted No Not applicable. to air into the land or into water 7.4 From any other sources No Not applicable. 7.5 Is there a risk of long term build up No Not applicable. of pollutants in the environment 7

Ahmedabad Urban Development AUDA EWS II Zundal Form 1 Authority

S. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. confirmation No wherever possible) with source of information data from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. confirmation No wherever possible) with source of information data 8.1 From explosions, spillages, fires etc Yes Small quantity of HSD will be stored. HSD will be used from storage, handling, use or for DG sets in case of power failure. Maximum production of hazardous quantity is 350 litre. substances 8.2 From any other causes Yes During Construction phase there may be possibilities of accidents, fall from height from scaffold and temporary stairs, Cut or Burn injuries during cutting and welding activities, and electrocution during electrical fitting works. During operation phase possibility of accidents due to electrical fire hazard may occur. 8.3 Could the project be affected by Yes Project area is categorized in the seismic zone III, natural disasters causing which is classified as having a moderate seismic environmental damage (e.g. floods, intensity. The structure Design is as per Codes to earthquakes, landslides, cloudburst negate the threat of environmental and other etc)? damages.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S. Information/Checklist Yes/ Details thereof (with approximate quantities/ rates, No. confirmation No wherever possible) with source of information data 9.1 Lead to development of supporting. Yes The project site falls in AUDA limits therefore any further facilities, ancillary development or development of infrastructure is not required. development stimulated by the Negligible impact on supporting infrastructure project which could have impact on the environment e.g.: • Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) • Housing development No No additional demand for housing • Extractive industries No No additional demand for industries • Supply industries Yes Transport facilities • Others Yes General infrastructure facilities

9.2 Lead to after-use of the site, which Yes Negligible increase in traffic and there will be positive could have an impact on the impact on socio- economic environment. environment 9.3 Set a precedent for later Yes The project will lead to development of Residential units developments along with commercial units which will contribute in improving living standard in locality. 9.4 Have cumulative effects due to Yes As above proximity to other existing or planned projects with similar effects

8

Ahmedabad Urban Development AUDA EWS II Zundal Form 1 Authority

(III) Environmental Sensitivity

S. Name/ Aerial distance (within 15 km.) from Proposed Areas No. Identity project location boundary 1 Areas protected under international No Not applicable conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or Yes is ~5.2 km in SE direction sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by protected, important No Not applicable or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or No Not applicable underground waters 5 State, National boundaries No Not applicable 6 Routes or facilities used by the Yes Sabarmati Railway Station is ~3.3Km in S Direction public for access to recreation or Ahmedabad Airport is ~8.3 Km in SE Direction other tourist, pilgrim areas S.P. Ring road is ~0.5 km in N Direction 7 Defence installations No Not applicable 8 Densely populated or built-up area Yes Ahmedabad 9 Areas occupied by sensitive man- Yes Ahmedabad City made land uses (hospitals, schools, places of worship, community facilities) 10 Areas containing important, high No Not applicable quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution No Not applicable or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard Yes Project area is categorized in the seismic zone III, which could cause the project to which is classified as having a moderate seismic present environmental problems intensity. The structure Design is as per Codes to (earthquakes, subsidence, negate the threat of environmental and other landslides, erosion, flooding or damages. extreme or adverse climatic conditions)

9