Ahmedabad Urban Development Authority AUDA EWS II Zundal

Ahmedabad Urban Development Authority AUDA EWS II Zundal

Ahmedabad Urban Development AUDA EWS II Zundal Form 1 Authority APPENDIX I (See paragraph – 6) FORM 1 (I) Basic Information Sr. Item Details No 1 Name of the Project AUDA EWS II Zundal 2 S. number in schedule 8(a) Proposed capacity/area/length/tonnage to be 2 Land area: 38,123 m 3 handled/command area/lease area/number of 2 Built up area: 96,141.77 m well to be drilled 4 New/expansion/modernization New 5 Existing capacity/area etc. No 6 Category of project i.e. “A” or “B” ‘B’ Does it attract the general condition? If yes 7 No please specify Does it attract the specific condition? If yes 8 No please specify Location Zundal Plot/Survey/Khasra No F.P. No:123, T.P.S: 72, Zundal, Gandhinagar Village Zundal 9 Tehsil Gandhinagar District Gandinagar State Gujarat Nearest railway station/airport along with Sabarmati Railway Station is ~3.3Km in S Direction 10 distance in Kms. Ahmedabad Airport is ~8.3 Km in SE Direction Nearest town, city, district headquarter along Gandhinagar city, it’s a Headquarter of District 11 with distance in Kms. and project is developed in AUDA limit Ahmedabad Urban Development Authority Village Panchayat, Zila Parishad, Municipal (AUDA), Sardar Vallabhbhai Patel Sankul, 12 Corporation, local body (Complete postal Usmanpura, Ashram Road, Ahmedabad – address with telephone nos to be given) 380014, Telephone no: 079-27545051 to 54 13 Name of the applicant Ahmedabad Urban Development Authority Sardar Vallabhbhai Patel Bhavan, Usmanpura, 14 Registered address Ashram Road, Ahmedabad - 380 014 Sardar Vallabhbhai Patel Bhavan, Usmanpura, 15 Address for correspondence Ashram Road, Ahmedabad - 380 014 Name Mr. A.K. Pathak Designation Executive Engineer- Engineering Branch Sardar Vallabhbhai Patel Bhavan, Usmanpura, Address Ashram Road, Ahmedabad - 380 014 Pin code 380014 E-mail [email protected] Telephone 9825300337 Fax No - Details of alternative sites examined, if any. No 16 Location of these sites should be shown on a Location of Site shown on Topo sheet is given in topo sheet Annexure 1. 17 Interlinked Project No Whether separate application for interlinked 18 No project has been submitted? 19 If yes date of submission - 20 If no reason Individual project 1 Ahmedabad Urban Development AUDA EWS II Zundal Form 1 Authority Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given 21 No The Forest (Conservation) Act, 1980 The Wildlife (Protection) Act, 1972 The CRZ Notification 1991 Whether there is any Government order/policy 22 No relevant/ relating to site 23 Forest Land involved? No Whether there is any litigation pending against the project and / or land in which the project is propose to be set up 24 Name of court No litigation pending Case no Order/directions of the court, if any and its relevance with the proposed project. Capacity corresponding to sectoral activity (such as production capacity for manufacturing, mining lease area and production capacity for mineral production, area for mineral exploration, length for linear transport infrastructure, generation capacity for power generation etc.,) (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. Information/Checklist Yes/ Details thereof (with approximate quantities /rates, No. confirmation No wherever possible) with source of information data 1.1 Permanent or temporary change in Yes The project will change the land use, land cover or land use, land cover or topography topography with respect to local landuse. The project including increase in intensity of will be developed as a EWS units (Residential cum land use (with respect to local land commercial units). use plan) 1.2 Clearance of existing land, Yes Some Vegetation may be required to be cut before vegetation and buildings? construction work. 1.3 Creation of new land uses? Yes Residential cum Commercial units will be developed as per AUDA approved plan. 1.4 Pre-construction investigations e.g. Yes Soil testing report is attached vide Annexure 2. bore houses, soil testing? 1.5 Construction works? Yes There is construction of Residential cum commercial units and two community hall. (Total 1120 No. of Flats & 12 No. of Shops) 1.6 Demolition works? No Not Applicable. 1.7 Temporary sites used for No Not Applicable. construction works or housing of construction workers? 1.8 Above ground buildings, structures Yes There is a construction of G/HP+ 7 floors or earthworks including linear structures, cut and fill or excavations 1.9 Underground works including No Not applicable. mining or tunneling? 1.10 Reclamation works? No Not applicable. 2 Ahmedabad Urban Development AUDA EWS II Zundal Form 1 Authority S. Information/Checklist Yes/ Details thereof (with approximate quantities /rates, No. confirmation No wherever possible) with source of information data 1.11 Dredging? No Not applicable. 1.12 Offshore structures? No Not applicable. 1.13 Production and manufacturing No Not applicable. processes? 1.14 Facilities for storage of goods or Yes Construction Phase: materials? Minimum bulk material for construction would be brought as and when required and would be temporarily stored at site. Proper arrangement of storage with proper cover would be done. 1.15 Facilities for treatment or disposal Yes Solid Wastes: of solid waste or liquid effluents? Solid waste generated in Project area will be mainly of domestic nature. The 3.2 ton/day of solid wastes generated will be segregated into biodegradable and non-biodegradable wastes and collected in separate bins. The non-biodegradable wastes will be sold to recyclers and the biodegradable wastes will be collected and convert into compost. Liquid Effluent: On site sanitation facilities will be provided for proper disposal during the construction phase. It is estimated that about 551.18 kld of wastewater will be generated from the project during operation phase; partly wastewater will be treated into 300 KLD STP. Treated wastewater will be reused for flushing and gardening purpose. Balance wastewater will be disposed into Sewer line with prior permission. 1.16 Facilities for long term housing of No Not applicable. operational workers? 1.17 New road, rail or sea traffic during No Not applicable. construction or operation? 1.18 New road, rail, air, waterborne or No Not applicable. other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not applicable. transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines No Not applicable. or pipelines? 1.21 Impoundment, damming, culverting, No Not applicable. realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No Not applicable. 1.23 Abstraction or transfers of water Yes Construction Phase: from ground or surface waters? During construction phase fresh water requirement 17.5 kld will be met through the tankers Operation Phase: 3 Ahmedabad Urban Development AUDA EWS II Zundal Form 1 Authority S. Information/Checklist Yes/ Details thereof (with approximate quantities /rates, No. confirmation No wherever possible) with source of information data During operational phase fresh water requirement of 456.58 kld will be met through AUDA 1.24 Changes in water bodies or the No Not applicable. land surface affecting drainage or run-off? 1.25 Transport of personnel or materials Yes Transport of personnel and materials will be required for construction, operation or for both construction and operation phases. decommissioning? 1.26 Long-term dismantling or No Not applicable. decommissioning or restoration works? 1.27 Ongoing activity during No Not applicable. decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes During construction phase, about 100 workers would temporarily or permanently? be employed temporarily and hired from local area. During the operational phase, there will be influx of more than 5564 (5064 permanent, 500 visitors) people. 1.29 Introduction of alien species? No Not applicable. 1.30 Loss of native species or genetic No Not applicable. diversity? 1.31 Any other actions? No Not applicable. 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S. Information/checklist Yes/ Details thereof (with approximate quantities /rates, No. confirmation No wherever possible) with source of information data 2.1 Land especially undeveloped or No Not applicable. agricultural land (ha) 2.2 Water (expected source & Yes Water demand will be as follows: competing users) unit: kld Construction phase Maximum Quantity:17.5 ( kld ) Source: Tankers Operation phase Maximum Quantity:456.58 ( kld) Source: AUDA 2.3 Minerals (MT) No Not applicable. 2.4 Construction material – stone, Yes Construction materials such as stone, cement, sand, aggregates, sand / soil (expected bricks, marble, paints, tiles, electric ware, sanitary ware, source – MT) glass would be used. All the above materials would be purchased from the local market and from nearest approved quarries, as and when required. It would be stored temporarily at the site. 2.5 Forests and timber (source – MT) No Not applicable 2.6 Energy including electricity and Source: UGVCL fuels (source, competing users) Yes Expected Demand : 4000 KVA Unit: fuel (MT), energy (MW) D.G. set: 40 KVA in case of power failure (only for fire pump) 4 Ahmedabad Urban Development AUDA EWS II Zundal Form 1 Authority S. Information/checklist Yes/ Details thereof (with approximate quantities /rates, No. confirmation No wherever possible) with source of information data Fuel : HSD, 10 l/hr 2.7 Any other natural resources (use No Not applicable appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    10 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us