ASSEMBLY QUESTION Name of Department Jal Shakti Vibhag Starred Question No. 3711 Fixed for 15/03/2021 Subject Funds Allocation Asked by Sh
Total Page:16
File Type:pdf, Size:1020Kb
ASSEMBLY QUESTION Name of Department Jal Shakti Vibhag Starred Question No. 3711 Fixed For 15/03/2021 Subject Funds Allocation Asked by Sh. Vikramaditya Singh(Shimla Rural) Sh. Virbhadra Singh (Arki) Concerned Minister Jal Shkati Minister Question Reply during last three years upto 31.01.2021, how much funds have been allocated to various Reply is laid on the Table of schemes in Jal Shakti Divisions the House Arki, Rampur, Shimla Rural, Rohru, Sunni & Kasumpti; details be given scheme-wise? Reply in respect of Starred Assembly Question 3711 asked by Sh. Vikramaditya Singh, (Shimla Rural) and Sh. Virbhadra Singh, (Arki) During the last three years upto 31-01-2021, Rs 30726.76 lakh have been allocated to various water supply, Irrigation, Sewerage and Flood control Schemes of Jal Shakti Division Arki, Rampur, Rohru, Sunni and Kasumpti. Whereas, Sunni division is also known as Shimla Rural Division. Division wise detail is as under:- (Rs. in lakhs) Name of Division Funds allocated Arki 3361.19 Rampur 3711.40 Rohru 7999.01 Sunni 9666.82 Kasumpti 5988.34 Total:- 30726.76 Scheme wise detail is given at Annexure-A. Annexure-A DIVISION WISE AND SCHEME WISE DETAIL OF FUNDS ALLOCATED TO VARIOUS SCHEMES OF JAL SHAKTI DIVISIONS ARKI, RAMPUR, ROHRU, SUNNI AND KASUMPI DURING LAST THREE YEARS UPTO 31-01-2021 Head of account Name of scheme A/A&E/S No. date & amount Financial year Total Status of the Scheme 2017-18 2018-19 2019-20 2020-21 (Upto 31-01- 2021) Arki Divison 4215-01-102-01- Extension of LWSS Arki & 0.25 0.25 2.00 5.00 7.50 SE letter No. 1144-52 dated SOONM replacement of old pipes in Completed 18.6.2018 Rs. 6.46 Lakh. LWSS Chaiyina LWSS Tepra Sanyari More 3.00 55.00 6.00 0.00 64.00 CE letter No. 667-74 dated GP Sanyari More Completed 4.3.2014 Rs. 64.50 Lakh. C/o storage tank Flow WSS 0.00 1.00 0 1.00 2.00 SE letter No. 6503-10 dated Vill. Madm in G.p. Completed Basantpur 22.1.2019 for Rs. 99360/- 0.00 6.00 1.00 2.51 9.51 C/o storage tank at Batal (200000 Ltr Capisity), 1 no Storage tank at vill Gahar(100000 ltr Capicity) SE letter No. 6139-46 dated 75% Comp. and 1 no storage tank vill. 26.11.2019 for Rs. 9.99 lakh Rehd Pokhtu (100000 ltr capisity)near college in tehsil Arki Aug. Of LWSS Darwa in 3.60 35.00 0 0.00 38.60 CE letter No.1353-59 dated Teh. Kasauli Completed. 30.5.2006 Rs.39.33 Lakh. Provide storage tank at vill. 0 8.00 0 1.00 9.00 Pahter in G.P. Surajpur from SE letter No. 8974-81 dated W/E to be prepared. Water supply scheme 5.3.2021for Rs. 998600/- Rachkara sohakar 0 8.00 0 1.00 9.00 Replacement of Old pipe SE letter No. 4940-47 dated 50% Comp. line to village Sehbar. 30.9-2020 Rs. 993803/- Rural Water supply 0 24.50 0 0.00 24.50 The budget utilized in Schemes in IpH Divn Arki - C/o LWSS to NC/PC Arki Constituency Prov. WSS to village 0 6.00 1.25 2.00 9.25 Scheme is SE Letter No. 796-803 dated Simmu, Chhamari, Kunni, commissioned but the 07-02-2018 for Rs. 66.14 Reota, Khali Chandpur etc liabilities are yet be Lakh from Gambhar Khad cleared. Remodeling of WSS Village 0 5.75 2.52 2.00 10.27 The DPR/Estimate is - Tikker Harthu Puriyana under preperation. Remodelling of GWSS to 0 7.00 2.00 1.00 10.00 The DPR/Estimate has village Kotlu been prepared and will - be submitted at the earliest. C/o LWSS to Vill. Khatnalli 0 7.00 2.00 2.00 11.00 The scheme is in G.P. Hatkot in Tehsil - infeasible due to less Arki discharge. C/O AE residence at 0 7.00 3.00 5.00 15.00 The DPR is submitted Subathu. - to Chief Engineer (SZ) and approval is awaited. Replacement of old pipes 0 7.00 4.00 0.00 11.00 and c/o a water storage tank The DPR/Estimate is - at vill Batal from Lade ki under preperation. Bain Aug. Of WSS Bagail, 0 4.49 5.00 5.00 14.49 The DPR/Estimate is - Bagain, Brogi GP Deeb. under preperation. Total 6.85 181.99 28.77 27.51 245.12 4215--01--102-08- Installation of 100 Nos. 18.15 52.98 12.12 0 83.25 Hand Pumps- H/Pumps in Arki Work is completed. SOONM Constituency. Total 18.15 52.98 12.12 0.00 83.25 4215--01-102--16- Renv. Of old Distribution 0 0.25 0.25 1.00 1.50 The DPR/Estimate is SOON-RWSS network WSS Darlaghat in - under preperation. NBARD Tehsil Arki Aug. of LWSS Behli Bagain 0 - 2.00 2.00 The DPR/Estimate is to GP Didu & Aug. of - under preperation. Saryanj 50.50 175.00 170.00 2.00 397.50 Prov.LWSS Multi NC/PC Principal Secy.IPH No. IPH- Hab.Arki Const.from B(F)3-2/2004 dt. 31.3.2010 Scheme completed. Gambhar Khad Rs. 2979.90 Replacement of old 0 0.00 5.00 0 5.00 DPR submitted to Pumping Machinery under - higher office and IPH Divn. Arki approval is awaited. 20.00 87.00 70.00 177.00 LWSS Neri Plata to G.P. E-in-C No. 2336-41 dt. Scheme completed. Danoghat 13.9.2012 Rs. 199.61 lacs 0 45.00 20.00 5.00 70.00 E-in-C No. `1712-32 dt. Prov. LWSS Dhar Rudhal 50% completed. 24.8.2016 Rs. 61.51 lacs 0 90.00 15.20 2.00 107.20 Principal Secy.IPH No. IPH- Prov. LWSS to vill. Sanog B(F)5-9/2011 dt. 30.4.2012 Scheme completed. Bajjholu Rs. 127.90 0 5.00 10.00 0 15.00 Under Sec. (JSV) to the The scheme has been Aug. LWSS Hanuman Govt. of HP Letter No. IPH- approved under NABARD and TS Badog & Surajpur C(5-13)/2018 Dated 11-09- estimate is being 2020 for Rs. 451.49 Lakh. prepared. Improvement LWSS Palog, 0 0 5.00 1.00 6.00 DPR submitted to Palania, , Kotli, Saryanj, - higher NABARD and Bakhlag & Kunihar approval is awaited. Aug. LWSS Gambhar Khad 0 5.00 5.00 DPR/Estimate is under - to Kunihar preperation. 37.00 183.25 97.54 0 317.79 C/O of LWSS to Chandi Prinicipal Secy.No. IPH-B- Scheme has been area from Gamber Khad (F)5-9/2011 dt.10.6.2011 Rs. transferred to Nalaghar tehsil Kasauli 2169 lacs Divn. 0 0 0 3.00 3.00 Secy. No. JS No. IPH-B5- Aug. of LWSS Dusseran , Working estimate to be 13/2018 dt.11.9.2020 Rs. Hanuman Badog. prepared. 451.49 lacs Providing LWSS 0 0 0 2.00 2.00 DPR submitted to Dadogi,Kotli,Saryanj, - higher NABARD and Bakhalag and Kunihar approval is awaited. 0 0 0 2.00 2.00 DPR/Estimate is under Aug. of LWSS to Kunihar - preperation. Replacement of Pumping 0 0 0 5.00 5.00 DPR submitted to Machinery in Arki Consty. - higher office and And Ramshehar approval is awaited. Provision of pipe line from 0 0 0 1.55 1.55 Ghanagughat Tank to vill. The DPR/Estimate is Dhyanpur from LWSS - under preperation. NC/PC Hab. In Arki Const. from Gamber Khad Lift Water supply schemes 0 0 0 5.00 5.00 to village Palog, DPR submitted to Jalana,Dadogi , Kotli, - higher NABARD and Saryanj , Bakahalag and approval is awaited. Kunihar area. Total 107.50 585.50 399.99 29.55 1122.54 JJM 1)Providing LWSS to PC 0 0 7.22 1046.67 1053.89 Habitation in Arki Special Secretary (IPH) to constituency from Gambar the Govt. of HP Letter No. khad in Tehsil Arki Distt. IPH-B (F)-3/2/ 2019 dt. 21- 65% Solan(HP) 09-2019 For Rs 2248.00 Lacs. 2)Providing retrofitting to 0 0 0 1.86 1.86 LWSS Neri Palata in GP SE letter No. 9190-97 dt.13- Danoghat to provide FHTC 80% 3-2020 for Rs 41.45 Lacs under JJM in Tehsil Arki District Solan (HP) 3)Providing retrofitting to 0 0 0.00 3.02 3.02 LWSS Tepra Sanyari Mour SE letter No. 9182-89 dt. in G.P Sanyardimore to 13.03.2020.For Rs 41.46 90% provide FHTC under JJM in Lacs Tehsil Arki Distt. Solan(HP) 4) Providing retrofitting to 0 0 0 35.28 35.28 LWSS NC/PC habitations in Arki constituency from Se letter No. 997-1004 dt. Ghamber Khad to provide 15-06-2020. For Rs 83.30 75% FHTC under JJM in Tehsil Lacs Arki District Solan (HP) under IPH Sub-Division Arki.. 0 0 0.00 10.64 10.64 5)Providing retrofitting to LWSS NC/PC habitations in Arki constituency from Ghamber Khad to provide SE letter No. 989-96 dt. 15- 70% FHTC under JJM in Tehsil 06-2020. for Rs 39.75 Lacs. Arki District Solan (HP) under IPH Sub-Division Darlaghat. 0 0 0.000 0.93 0.93 6)Providing retrofitting to LWSS NC/PC habitations in Arki constituency from Ghamber Khad to provide SE letter No.