For the Proposed Rough Stone and Gravel Quarry Project- 4.90.0Ha S.F.No: 202/1(P), 202/2(P) and 203/2, Ekkattampalayam Village, Perundurai Taluk
Total Page:16
File Type:pdf, Size:1020Kb
Form-1 (As per EIA Notification 2006) For the Proposed Rough stone and Gravel Quarry Project- 4.90.0Ha S.F.No: 202/1(P), 202/2(P) and 203/2, Ekkattampalayam Village, Perundurai Taluk, Erode District, Tamilnadu Proposed by P. Mahendran Application Form for Obtaining Environmental Clearance from State Level Environmental Impact Assessment Authority (SEIAA) Tamilnadu FORM I (I) BASIC INFORMATION S. No Item Details 1 Name of the project/s Ekkattampalayam Rough stone and Gravel quarry project 2 S. No. in the schedule 1(a) 3 Proposed capacity/ The proposed quantity of reserves is 622613m3 of Rough area/length/tonnage to be stone and 51040m3 of Gravel for a period of Five years. handled/command area/lease Area =4.90.0Ha. area/number of wells to be drilled The command area =4.52.0Ha (effective quarrying area after leaving safety distance). It is a shallow open cast quarry. The Massive Charnockite formation is noticed and followed by the Gravel formation. Hence no wells are proposed or not drilled. It is a Rough stone and Gravel quarry project in 4 New/Expansion/ Modernization Ekkattampalayam Village. Existing capacity/Area etc. The proposed quantity of reserves is 622613m3 (or) 110002 Lorry Loads of Rough stone up to a depth of 27m below the ground level for a period of Five years only. Rough stone Gravel 5 Description in m3 in m3 Geological Resources 1256325 746700 Available Mineable reserves 622613 51040 Five years plan period As in 622613 51040 the approved mining plan 6 Category of project i.e. `A’ or ‘B’ Category – B2. Does it attract the general condition? 7.5m safety distance from the adjacent patta lands and 7 If yes, please specify. Bench loss in the lease area. Does it attract the specify condition? 8 If yes, please specify. 10m safety distance from the cart track in the lease area. Location Topo Sheet No. 58 E/12 9 11°08'52.02''N to 11°09'01.12''N 77°34'09.11''E to 77°34'17.72''E Plot/ Survey/ Khasra No. 202/1(P), 202/2(P) and 203/2 Village Ekkattampalayam Taluk Perundurai District Erode State Tamilnadu Nearest railway station/ airport along Ingur Railway station - 8.5kms - N 10 with distance in kms Coimbatore Airport - 58kms - SW Nearest Town, city, District Town - Perundurai - 13kms - NE 11 Headquarters along with distance in Nearest City - Erode - 26kms - NE kms District - Erode - 26kms - NE Village Panchayats, ZilaParishad, Village – Ekkattampalayam Municipal Corporation, Local body Panchayat union – Perundurai 12 (complete postal addresses with Taluk – Perundurai telephone nos. to be given) District – Erode 13 Name of the applicant P. Mahendran S/o. V.K. Palanisamy, 11/32, Vettukattu valasu, 14 Registered Address Engur, Perundurai Taluk, Erode District. Address for correspondence: Name P. Mahendran Designation (Owner/Partner/CEO) Proprietor / Owner Address S/o. V.K. Palanisamy, 11/32, Vettukattu valasu, 15 Engur, Perundurai Taluk, Erode District. Pin code No 638058 E-mail [email protected] Mobile No. 9842721388 Fax No. - Details of Alternative Sites There is no alternative sites are examined. The project is examined, if any. Location of these site specific. 16 sites should be shown on a Topo sheet. 17 Interlinked Projects There is no interlinked project. Whether separate application of As there is no interlinked project, no application has been 18 interlinked project has been submitted. submitted? As there is no interlinked project, no application has been 19 If yes, date of submission submitted. 20 If no, reason The project involves Rough stone and Gravel Quarry only. Whether the proposal involves approval/ clearance under: if yes, (a) The project does not attract the Forest (Conservation) details of the same and their status to Act 1980. be given. (b) There is no wild life in the project site area under the 21 (a) The Forest (Conservation) Act, Wildlife (protection) Act 1972. 1980? (C) The project area does not fall the C.R.Z Notification, (b) The Wildlife (Protection) Act, 1991. 1972? (c) The C. R. Z. Notification, 1991? The precise area Communication letter was received from the District Collector, Erode vide Rc.No.17505/2016/X-1 Dated: 22.11.2016. 22 Whether there is any Government Order/ Policy relevant/ relating to the The Mining Plan was got approval by the Deputy Director, site? Department of Geology and Mining, Erode vide Rc. No. 17505/2016/X-1 Dated: 27.12.2016 Forest land involved (hectares) 23 No forest land is involved lease area. Whether there is any litigation pending against the project and/ or land in which the project is propose There is no court case pending, litigations relating to the to be set up? project directly and indirectly. 24 (a) Name of the Court (b) Case No. (c) Orders/ directions of the Court, if any and its relevance with the proposed project. (II) Activity 1. Construction operation or decommissioning of the project involving actions, which will cause physical changes in the locality (topography, land use changes in water bodies, etc.) Details thereof (with approximate Information/Checklist S. No Yes/No quantities/rates, wherever possible) with sources confirmation of information data The lease applied area is almost plain topography, will be changed after the quarrying of Rough stone and Gravel as per the Mining plan, Conventional Open cast Semi Mechanized Mining with 5.0 meter vertical bench with a bench width of 5.0 meter is being proposed. The ultimate pit dimensions are given below. Topography will change in respect to overburden excavation. However, measures will be Permanent or temporary change in implemented as per mining Plan. land use, land cover or topography As the area of the quarry remains the same, 1.1 including increase in intensity of Yes there will not be any increase in intensity of local land use. land use (with respect to local land use plan) Area at the Present area Description end of lease in (Ha) period (Ha.) Area Under Quarrying 1.38.5 4.05.0 Infrastructure Nil 0.01.0 Roads 0.01.0 0.02.0 Green belt Nil 0.44.0 Unutilized 3.50.5 0.38.0 Grand Total 4.90.0 4.90.0 There is no vegetation and building in this project Clearance of existing land, area, hence there is no requirement of clearing the 1.2 vegetation and building? No vegetation and building. There is an existing road leads to the quarry. This has 5mts carriage way width. The total quarrying activity is proposed to carry out within the quarry lease area. Hence, there is no proposal for creating of new land uses. Temporary approach road within the project area will be form Creation of new land uses? No 1.3 for the easy access of men and machinery which will be well maintained. The tippers will transport the Rough stone to the needy crushers by existing road. Pre-construction investigations e.g. Hence pre-construction investigation and soil testing 1.4 No bore houses, soil testing? is not proposed before quarrying operation. There will be no major civil works, other than the following infrastructure: office building, storeroom, 1.5 Construction works? Yes toilet and first aid room will be provided on permanent structures within the quarry lease area in the safety barrier. After the grant of lease. There are no existing building within the quarry 1.6 Demolition works? No lease area hence no demolition work is involved. Temporary sites used for Sites service on permanent structure will be 1.7 construction works or housing of Yes constructed only after grant of quarry lease within construction workers? 10m safety barrier. Above ground buildings, structures There are no tall buildings or linear structure found or earth works including linear 1.8 No within the quarry site. There is no requirement of structures, cut and fill or cutting and filling in the site. excavations Conventional open cast semi mechanized quarrying Underground works including 1.9 No will be adopted. No underground mining or mining or tunneling? tunneling is proposed. There is no reclamation works is proposed. In the proposed mining plan only 27m below the ground level depth has been envisaged as workable depth for safe & economic mining during the lease period. 1.10 Reclamation works? No Hence, after quarry reaches ultimate pit limit (for this lease period) of 27m depth fencing will be constructed around the quarried pits to prevent inherent entry of the public and cattle. There is no such type of activities involved in this 1.11 Dredging? No opencast quarrying operation. There is no such type of activities involved; It is an 1.12 Offshore structures? No inland quarrying project. No production or manufacturing is involved in this Production and manufacturing Rough stone and Gravel quarrying. The Rough 1.13 No processes? stone is liberated from the parent rock loading the Rough stone from pithead to the needy crushers. There is no proposal for storage of material within Facilities for storage of goods or the quarry lease area. The Rough stone will be 1.14 No materials? loading the Rough stone from pithead to the needy crushers. The entire quarried Rough stone will be consumed. The anticipated waste will be very negligible the entire Rough stone irrespective of size has a good commercial market at present market scenario. Domestic waste water will be treated in Septic Tank 1.15 Facilities for treatment or disposal No followed by soak pit. The manure will be treated and of solid waste or liquid effluents? used for green belt development. The Rough stone will not produce toxic effluence in the form of solid, liquid or gas. No waste water will be discharged by quarry operation.