Notification Notice of Station Road works, Quainton September 2020 | www.hs2.org.uk High Speed Two (HS2) is the new high speed railway for Britain. We are Duration of works continually reviewing the works on our construction sites in line with Government and Public Health England (PHE) advice on dealing with COVID-19. The Government’s current strategy makes it clear that Station Road construction activity can continue if it complies with this guidance. improvement works: Please be assured that only sites that can operate within the guidelines Surfacing, creation of are operational. All sites will remain under constant review. We have passing bays A41 postponed all face-to-face engagement events and meetings and have put in place several channels to communicate with communities, such junction improvement as letters and phone calls, as well as updates and alerts from each of works October 2020 the local community websites. You can sign up for regular updates in until summer 2021 your local area at www.hs2inbucksandox.co.uk What to expect What will we be doing? As part of our continuing works ahead of the construction of the railway Full road closure of Station Road and we need to undertake highway improvement works to Station Road implementation of between the A41 and the Buckinghamshire Railway Centre at Quainton. diversion route As part of this scheme of works we are also upgrading the junction of Station Road with the A41. These works are required as the section of Night working Station Road approaching the Railway Centre from the A41 forms part Some additional traffic of the HS2 lorry route for the main construction phase. Once we have on local roads. Some completed these highway works the road will be reopened for public noise from equipment use. These works will consist of four phases of work: used for the works. Site storage and welfare • Phase 1: Closure and diversion route of Station Road between vehicles. Site operated the A41 and the Quainton Road / Fiddlers Field crossroads with 24hour security • Phase 2: Station Road repair and resurfacing. Six passing bays and temporary flood will also be constructed lighting • Phase 3: Station Road and A41 Junction improvement works What we will do • Phase 4: Reopening of Station Road and completion of the A41 Manage any impacts, junction such as traffic and If you have a question about HS2 or our works, please noise with the aim of contact our HS2 Helpdesk team on 08081 434 434 reducing or removing or email [email protected] them Call our HS2 Helpdesk team on 08081 434 434 Notice of Station Road Notification works, Quainton www.hs2.org.uk Phase 1: Road diversion, Station Road closure and site establishment: (Monday 19 October to Friday 23 October) Subject to final consents and approvals the closure of Station Road and the introduction of the traffic diversion route will take place on Monday 19 October 2020. The extent of the Station Road closure and the signposted diversion routes are detailed on the enclosed plans. During this first phase of works - 19 October to 23 October - Station Road will be closed to complete remaining surveys and for material deliveries from the A41. These HGV lorry deliveries are for our new access road that is currently being constructed between Quainton and Calvert. The notice for this access road works was communicated in July and can be found at www.hs2inbucksandox.co.uk. The closure is also required to deliver the materials safely by lorry without the safety risk of public traffic interfacing with the HS2 lorries. During phase 1 Station Road will be closed between the following periods of time: • Monday 19 October to Friday 23 October: (daily between 7am and 5pm) • Outside of the above times Station Road will be open as normal Phase 1 also includes the closure of the existing A41 layby close to the junction with Station Road. This layby is to be used as small works compound with a small storage area, welfare facilities and a vehicle holding area. A larger compound is being established to provide support activities for these works near Fleet Marston on the A41. The layby compound site will be secured with 24/7 security and have temporary low-level lighting. The A41 bus stop located at the opposite side of the junction will remain operational during the first two phases of works. Field access to farmland affected by the Station Road closure will be provided during this phase of works. Emergency Services access along Station Road will also be provided at all times throughout Phase 1. The bus service that passes along the closed section of Station Road will be diverted throughout Phase 1 and Phase 2. Contact our HS2 Helpdesk team on 08081 434 434 Phase 2: Station Road closure, diversion, improvement works and daytime material deliveries (Monday 26 October to Saturday 19 December 2020) Station Road requires improvement before the main construction works of the new railway commence. A new asphalt surface overlay and 6 lorry sized passing bays will be created. This work is required to ensure the road is safe for public users of the highway and construction traffic during the construction of HS2. At the start of Phase 2 Station Road will be closed for the following periods between the 26 October and 19 December: • Full time closure each week between Monday 9am and remaining closed until Saturday 7am • Station Road will be open as normal each weekend outside of these times For this phase of works Station Road needs to be closed to allow for material deliveries to be made by day and for Station Road to be constructed by night. Each week a section of Station Road will be repaired, resurfaced and opened again to the public by 7am the following Saturday morning. The A41 will not be affected by these works during this phase of works, being maintained as two-way flow. The signposted diversion used in phase 1 will remain in place, please see the attached map. The bus service will continue to be diverted to avoid the closed section of Station Road. During the phase 2 works emergency services and farmer field access along Station Road will not be permitted during weekday nights between 9pm and 6am. During these periods the diversion route will have to be used. To complete the works, we will need to; • Construct 6 passing bays along the length of Station Road • Improve highway drainage • Repair the road surface and overlay with new asphalt for the full width and length of the Station Road closure • Install new road signage and complete road line marking The overlay surfacing and passing bay works will begin on 26 October 2020. We are working towards completing this phase of work before the December holiday period. Depending upon progress we may have to fully complete this phase of work in the new year. Station Road will be temporarily reopened to public traffic by 19 December 2020 for the holiday period. A further closure in the new year will be required to complete phase 2, if required, and then to undertake phase 3. Contact our HS2 Helpdesk team on 08081 434 434 Notice of Station Road Notification works, Quainton www.hs2.org.uk Phase 3: Station Road junction improvement works at the A41, road closure and diversion (Early January 2021 to summer 2021 opening) To improve safety and capacity of the existing Station Road junction with the A41, improvement works are required ahead of the main construction period of HS2. To construct this junction we will require traffic management control on the A41 and the continued closure of Station Road. We are undertaking this junction upgrade after the completion of the phase 2 works as access restrictions prevent this being undertaken at the same time. Subject to consents and approvals Station Road will again be closed for the following periods between early January and Summer 2021. • Full time closure each week between Monday 9am and remaining closed until Saturday 7am • Station Road will be open as normal outside of these times To complete the junction works we will need to: • Install temporary traffic lights at the junction of Station Road and the A41 to allow widening works to take place • Complete underground and over ground utility diversions • Widen the existing carriageway including the addition of a new right-hand turn waiting lane to allow the safe crossing of the A41 into Station Road • Install new road drainage, kerbs and traffic islands • Install 3-way traffic lights that will be operational throughout the HS2 construction programme • Road construction including asphalt surfacing • Install new road signage and complete road line marking We are continuing to develop our programme of works for this phase of works (phase 3) and we will seek, whenever possible, to open Station Road for weekday public access at times during phase 3. We will write to you later this year to provide further details for this phase of construction ahead of the works commencing in January 2021. The highway works constructed during phases 2 and 3 are subject to further discussion with the council regarding the possible retention of these improvements following HS2 construction. Contact our HS2 Helpdesk team on 08081 434 434 Notice of Station Road Notification works, Quainton www.hs2.org.uk Virtual Exhibition Due to COVID-19 we are not currently able to hold face-to face public events. Instead we are also providing a Virtual Exhibition of these works. This exhibition can be found at www.hs2inbucksandox.co.uk and will be open from the 5 October for the duration of the works.