Strategic Housing Land Availability Assessment (SHLAA) 2016 Volume 2: Site Schedules Final Report
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
160314 07Bii HIWP 2016&17 and FWP 2017&18 Appendix B
INDEX: Programme Summary: 2016-2017 Cabinet IWP Broxbourne ┌ count of other Divisions for project CC Division / /Sub Area, Town Project Name Start Year Status IWP Number 01 Cheshunt Central Cheshunt Beltona Gardens Thin Surfacing2016-2017 S CWY151387 Brookfield Lane Easts Thin Surfacing2016-2017 SCWY161931 CheshuntWash/NrCunninghamRdS390Signal2016-2017 S TIS16011 Refurbishment 1 College Rd/Nr Manorcroft Parade S160 Signal2016-2017 S TIS16003 Refurbishment CollegeRoadResurfacing2016-2017 M MEM16317 Craigs walk Thin Surfacing2016-2017 M MEM16102 1 GreatCambridgeRoadMajorPatching2016-2017 C ARP15247 HalfhideLaneMajorPatching/LocalResurface2016-2017 S CWY17340 HalfhideLaneMajorPatching/LocalResurfacing2016-2017 S CWY17087 1 HalfhideLaneMajorPatching/Localised2016-2017 S CWY161093 Resurfacing Hillview Gardens Thin Surfacing2016-2017 M MEM16103 MartinsDriveFootwayReconstruction2016-2017 M MEM16106 MillLaneThinSurfacing2016-2017 C CWY15041 1 RowlandsCloseFootwaySurfaceTreatment2016-2017 M MEM16105 Turners Hill Resurfacing2016-2017 M MEM16151 Flamstead End, Cheshunt 1 Longfiel/Brookfield/Flamsteadr'btLocalResurfacing2016-2017 S CWY161522 Turnford 2 Great Cambridge Road Surface Dressing2016-2017 WARP15210 02 Flamstead End And Turnford Cheshunt Appleby Street Surface Dressing2016-2017 C CWY15300 Beaumont Road Surface Dressing2016-2017 C CWY151808 Cardinal Close Thin Surfacing2016-2017 M MEM16093 Furzerfield Footway Surface Treatment2016-2017 M MEM16089 Furzerfield Thin Surfacing2016-2017 M MEM16090 1 HalfhideLaneMajorPatching/Localised2016-2017 -
Three Week Period Expires 31St October 2014 (Councillor Call-In Period)
ST ALBANS DISTRICT COUNCIL PLANNING APPLICATIONS REGISTERED WEEK ENDING 10TH OCTOBER 2014 THREE WEEK PERIOD EXPIRES 31ST OCTOBER 2014 (COUNCILLOR CALL-IN PERIOD) Information regarding Councillor call-in period and procedure for public consultation. Comments and call-ins may be made on any Advertisement Consent, Listed Building, Conservation Area, Householder, Certificate of Lawfulness (existing), Telecommunication and Planning Applications please e.mail: [email protected] (Please include the Application No (e.g. "5/2009/1234") in the title of the e.mail) Application No 5/2014/2683 Ward: Ashley Area: C Proposal: Advertisement Consent - Display of eight non illuminated fascia signs at Unit 11 Brick Knoll Park St Albans Hertfordshire AL1 5UG Applicant: Agent: Travis Perkins Plc Lodge Way Northampton Signs Mr Dale Gasson Unit 5 House Lodge Way Harlestone Road Stour Road Ross Road Industry Northampton NN5 7UG Northampton NN5 5AA http://planning.stalbans.gov.uk/Planning/lg/dialog.page?org.apache.shale.dialog.DIALOG_NAME=gfplanningsearch&Param=lg.Planning&ref_no=5/2014/2683 ------------------------------------------------------------------------------------------------------------------- Application No 5/2014/2530 Ward: Clarence Area: C Proposal: Change of use to include Class A3 (restaurant and cafe) and Class A5 (hot food takeaway) use, retention of flue and bin store (retrospective) (resubmission following invalid application 5/2013/3026) at 167b Hatfield Road St Albans Hertfordshire AL1 4LB Applicant: Agent: Miss Natcha Panngam Omsins -
Site Allocations 2006-2031 Written Statement
Site Allocations 2006-2031 Written Statement Adopted 12 July 2017 Dacorum’s Local Planning Framework All images and maps in this document are subject to the following copyright notice: © Crown Copyright. All rights Reserved. Dacorum Borough Council Licence No. 100018935 2017 Site Allocations DPD Adopted 12 July 2017 Contents PART A – THE CONTEXT 1. Introduction 1 Summary of Content 7 PART B – THE STRATEGY 11 The Sustainable Development Strategy 13 2. Promoting Sustainable Development 15 Identified Proposals and Sites 15 Countryside and Settlement Boundaries 16 Small Villages in the Green Belt or Rural Area 16 Major Developed Sites in the Green Belt 17 Mixed Use Developments 20 3. Enabling Convenient Access between Homes, Jobs and Facilities 25 Transport Proposals 25 Parking Provision 27 Strengthening Economic Prosperity 33 4. Providing for Offices, Industry, Storage and Distribution 35 Employment Targets 35 General Employment Areas 36 Employment Areas in the Green Belt 41 5. Supporting Retailing and Commerce 43 Town Centres 43 Shopping Areas 44 Local Centres 45 New Retail Floorspace 46 Shopping Proposal Sites 46 Providing Homes and Community Services 49 6. Providing Homes 51 Identification and Selection of Sites 51 The Housing Programme 53 Housing Schedule 55 i Site Allocations DPD Adopted 12 July 2017 Local Allocations 56 Rural Sites for Affordable Housing 79 Gypsy and Travellers 79 Travelling Showpeople 81 7. Meeting Community Needs 93 Social and Community Facilities 94 Leisure and Cultural Facilities 98 Looking after the Environment 101 8. Enhancing the Natural Environment 105 Protecting and Improving the Landscape 105 Biodiversity and Geological Conservation 105 9. Conserving the Historic Environment 107 Place Strategies 109 10. -
Church of St. Mary, Carlton Wood End Farm, Water End, Cople the Wixams, Elstow
Archaeological Investigations Project 2008 Post-determination/Research (E.09.2173/2008) SP9517854852 Parish: Carlton and Chellington Postal Code: MK437LD CHURCH OF ST. MARY, CARLTON Church of St. Mary, Carlton, Bedfordshire. Archaeological Observation, Investigation and Recording Lodoen, A Bedford : Albion Archaeology, Report: 2008/129 2008, 8pp, colour pls, figs, tabs, refs Work undertaken by: Albion Archaeology A watching brief was carried out during groundwork for the installation of a trench arch drain, manhole and pipes west and south of the tower of the church. During excavations for the trench arm drain, a broken undecorated limestone sarcophagus was discovered along with a quantity of semi-articulated and disarticulated human remains of a fragmented nature, shallow depth and orientation of the sarcophagus suggested the redeposition of a significantly disturbed burial. The sarcophagus was characteristic of a medieval tomb, but no other dating evidence was recovered to provide insight to its origin. The excavations for the manhole cover exposed an east-west orientated grave containing an in situ articulated human skeleton. The absence of a coffin indicated that it was not a recent inhumation, but a lack of associated finds limited further assessment or dating evidence. The pipe trench contained no archaeological remains. [Au(abr)] Archaeological periods represented: UD OASIS ID: albionar1-49427 (E.09.2175/2008) TL10594729 Parish: Cople Postal Code: MK443TY WOOD END FARM, WATER END, COPLE Wood End Farm, Water End, Cople, Bedfordshire. Archaeological Observation, Investigation, Recording, Analysis and Publication Smith, L Hertford : Archaeological Solutions, Report: 3125 2008, 20pp, figs Work undertaken by: Archaeological Solutions A programme of monitoring and recording was undertaken on land to the north of Wood end Farm. -
Cell Park Farm
Cell Park Farm Millfield Lane | Markyate | Hertfordshire Cell Park Farm Millfield Lane | Markyate | Hertfordshire | AL3 8QQ Harpenden 6.2 miles (St Pancras International from 27 minutes), St Albans 9.6 miles, London Luton Airport and Luton Parkway Station 4.9 miles, M1 (J9) 3.2 miles M25 (J21) 9 miles & Central London 32 miles A fine Estate within striking distance of London and consisting of a handsome Georgian farmhouse with separate granary cottage, over 10 acres of parkland; an additional 15 acres available by negotiation reception hall | drawing room | morning room | study | kitchen and breakfast/dining area utility room | master bedroom with en suite bathroom | four further first floor bedrooms one with en suite and two sharing a ‘jack and jill’ en suite | family bathroom two second floor bedrooms and separate cloakroom | extensive cellar the granary cottage with studio/kitchen | bedroom | bathroom four garages | workshop | store | large open fronted barn gardens & parkland extending to in excess of 10 acres the additional land extends to 15.10 acres and is predominantly paddock land, but with woodland and tree belts; ideal for shooting Introduction The morning room is a recent addition and enjoys a south facing aspect. It Cell Park Farm is a superb example of an attractive and yet manageable . has been built in a style to compliment original aspects of the house and Estate within close proximity to London. It is set in rolling landscape the new lead roof includes two skylights to ensure a light and airy feel, and offers a wealth of use potential, with ample land for equestrian, whilst keeping cool during warmer months. -
Looking After the Environment
Looking After the Environment Site Allocations Background Issues Paper June 2015 Background Issues Papers Introduction A series of background papers have been prepared to support the Pre-Submission Site Allocations DPD. These are as follows: The Sustainable Development Strategy: (a) Green Belt, Rural Area and Settlement Boundaries (b) Transport Strengthening Economic Prosperity Providing Homes and Community Services (a) Providing Homes (b) Social Infrastructure Looking After the Environment These papers form part of the evidence base. Their role is to inform the content of the Site Allocations DPD through: (a) summarising background policy, guidance and advice relevant to each subject area; and (b) assessing which sites, designations and/or boundary changes it is appropriate to take forward in the context of this advice and set out any additional selection criteria used. Information has been collected from a number of different sources and as the assessment has been an interactive process, incorporating the conclusions of sustainability appraisal and advice from technical experts as appropriate (see Figure 1). This document is version 2 and updates and supersedes the previous version published in September 2014. Figure 1: Assessment of Alternative Sites, Options and Designations Sources of information / sites / designations 2006 Issues and Options consultation, including Schedule of Site Appraisals 2008 Issues and Options Assessment mechanisms supplementary consultation, including Schedule of Site Sustainability Working Notes on: Appraisals 2006 Schedule of Site Appraisals 2008 Schedule of Site Appraisals 2014 Schedule of Site 2014 Schedule of Site Appraisals Appraisals 2014 Sustainability Appraisal Report (Pre-Submission stage) Annual Monitoring Report 2015 Sustainability Appraisal (AMR), Employment and Report Addendum (Pre- Housing Land Position Submission Focussed Changes) Statements Policy compliance with Core Strategy, NPPF, NPPG and other relevant Infrastructure Delivery Plan guidance and advice. -
Looking After the Environment Appendices
Looking After the Environment Appendices Site Allocations Background Issues Paper September 2014 APPENDICES Appendix 1 – Map showing extent of Special Area of Conservation (SAC) 3 Appendix 2 – Map showing extent of Wildlife Site designations 5 Appendix 3 - Schedule of Ancient Woodlands within Dacorum 11 Appendix 4 – Revised boundaries of RIGS 19 Appendix 5 – Map showing Updates and Amendments to Areas of 23 Archaeological Significance Appendix 6 - Assessment of Potential local designated Historic Park 29 and Gardens 2 Appendix 1 Map showing extent of Special Area of Conservation (SAC) 3 4 Appendix 2 Map showing extent of Wildlife Site designations 5 6 7 8 9 10 Appendix 3 Schedule of Ancient Woodlands within Dacorum NAME TYPE SITE ID X_COORD Y_COORD ABELS GROVE Ancient Replanted 245830 505392 213346 Woodland BIRCHLEY WOOD Ancient Replanted 245825 503985 210914 Woodland BREACH WOOD Ancient & Semi-Natural 245309 502765 213129 Woodland BROWNLEYS Ancient & Semi-Natural 245348 507439 216824 Woodland BULLS WOOD Ancient Replanted 1108311 493322 210442 Woodland BURY WOOD Ancient & Semi-Natural 245161 503179 204814 Woodland BURY WOOD Ancient & Semi-Natural 245295 509422 211904 Woodland COKERS SPRING Ancient & Semi-Natural 1108308 499526 206249 Woodland COLESHILL WOOD Ancient & Semi-Natural 245173 500902 205070 Woodland CROMER WOOD Ancient & Semi-Natural 1115758 500110 211941 Woodland CROMER WOOD Ancient & Semi-Natural 245301 500110 211941 Woodland DEAN WOOD Ancient & Semi-Natural 245321 504229 214061 Woodland DEDMANSEY/BYSLIP Ancient Replanted -
Site No.16 Rossway, South of Berkhamsted Location Rossway, South of Berkhamsted
Site No.16 Rossway, south of Berkhamsted Location Rossway, south of Berkhamsted 89 Existing designations Green Belt Listed Buildings Area of Special Control of Adverts Area of Outstanding Natural Beauty Agricultural Land Classification – Grade 3 Assessment against Site not considered to merit designation based on criteria consideration of English Heritage guidance, advise and knowledge of Historic Gardens Trust and/or is considered by Officers to be sufficiently protected from inappropriate development by existing policies. HERTFORDSHIRE GARDENS TRUST LOCAL LIST: DACORUM Present Name of Site Historic Name (if known) ROSSWAY Pratt’s Place (C16) Rothway (C17) Parish/Town Northchurch National Grid Reference of Principal Building: SP960 073 Present Area (approximate) c. 1200 Acres Brief Description In 1616 it consisted of a messuage and 50 acres of land. The estate, part of which extends into Wigginton, was bought in 1802 by Robert Sutton of Highgate. The mansion was surrounded by Parkland. In 1863 it was purchased by Charles Staunton Hadden, a Ceylon Coffee Planter. At that time the estate comprised 577 acres and was worth £34,500.Hadden built the present mansion, near the former residence. Hawridge Bottom Farm was added to the estate in 1906. In 1999 875 acres of land were sold off. Approaches: Berkhamsted Lodge: c.1802 of uncoursed knapped flint with steep half-hipped tiled roof with rustic verandah to north and east. Tring Lodge: 1802 . A single-storey rectangular rustic gate-lodge facing west. Uncoursed knapped flint. Red scalloped tile steep hipped roof carried down to form a rustic verandah on north, west and south sides supported on rough wooden columns like trees, with braces. -
Hertfordshire 10269150.Pdf
K /M HE RTFORDSH I RE T H E L I T T L E G U I D E S l th s leather s . d . net. P ott 8 vo , c o , 3 . , 3 6 O AN OLLE E S . C ! C G O N W ALL . S a m o n . O F RD D ITS R . By A L l l W lls M . I s t t A u r te B B u r . B . e I a . C . o e y J , ll d by l New . l u s tr ated by E . H . B AN . Bar Y. S in F ou r th E d ztw n. RITT By g u s tr ate is s G o u ld . Ill d by M CA AN I TS OL ie . MBRIDGE D C J. Wyll L B . H am ilt o n EGES . y A o m s o I us tr ate Th n . am er t . p ll d by S U RRE Y. By F . H . L b w E . Ne . u s t E H N w H Ill tr a e d by . e . ’ S HAKE S P EARE S C O U N TRY . O . E lla . I l C . G b R M E . By y B B . C . in e y A W dl , C . B u ter . l u s tr ated by B . o l I s E H . A. u tr ate . M . ll d by N ew . S ec o nd E d I tzo n . -
Cell Park Farm
Cell Park Farm Millfield Lane | Markyate | Hertfordshire Cell Park Farm Millfield Lane | Markyate | Hertfordshire | AL3 8QQ Harpenden 6.2 miles (St Pancras International from 27 minutes), St Albans 9.6 miles, London Luton Airport and Luton Parkway Station 4.9 miles, M1 (J9) 3.2 miles M25 (J21) 9 miles & Central London 32 miles A fine Estate within striking distance of London and consisting of a handsome Georgian farmhouse with separate granary cottage, over 10 acres of parkland, plus an additional 100 acres reception hall | drawing room | morning room | study | kitchen and breakfast/dining area utility room | master bedroom with en suite bathroom | four further first floor bedrooms one with en suite and two sharing a ‘jack and jill’ en suite | family bathroom two second floor bedrooms and separate cloakroom | extensive cellar the granary cottage with studio/kitchen | bedroom | bathroom four garages | workshop | store | large open fronted barn gardens & parkland extending to in excess of 10 acres the land extends to 100 acres and is available in a further two lots predominantly arable, but with a number of tree belts; ideal for shooting Introduction The morning room is a recent addition and enjoys a south facing aspect. It Cell Park Farm is a superb example of an attractive and yet manageable . has been built in a style to compliment original aspects of the house and Estate within close proximity to London. It is set in rolling landscape the new lead roof includes two skylights to ensure a light and airy feel, and offers a wealth of use potential, with ample land for equestrian, whilst keeping cool during warmer months. -
Looking After the Environment
Looking After the Environment Site Allocations Background Issues Paper November 2015 Background Issues Papers Introduction A series of background papers have been prepared to support the Pre-Submission Site Allocations DPD. These are as follows: The Sustainable Development Strategy: (a) Green Belt, Rural Area and Settlement Boundaries (b) Transport Strengthening Economic Prosperity Providing Homes and Community Services (a) Providing Homes (b) Social Infrastructure Looking After the Environment These papers form part of the evidence base. Their role is to inform the content of the Site Allocations DPD through: (a) summarising background policy, guidance and advice relevant to each subject area; and (b) assessing which sites, designations and/or boundary changes it is appropriate to take forward in the context of this advice and set out any additional selection criteria used. Information has been collected from a number of different sources and as the assessment has been an interactive process, incorporating the conclusions of sustainability appraisal and advice from technical experts as appropriate (see Figure 1). This document is version 3 and updates and supersedes the previous version published in June 2015. Figure 1: Assessment of Alternative Sites, Options and Designations Sources of information / sites / designations 2006 Issues and Options consultation, including Schedule of Site Appraisals 2008 Issues and Options Assessment mechanisms supplementary consultation, including Schedule of Site Sustainability Working Notes on: Appraisals 2006 Schedule of Site Appraisals 2008 Schedule of Site Appraisals 2014 Schedule of Site 2014 Schedule of Site Appraisals Appraisals 2014 Sustainability Appraisal Report (Pre-Submission stage) Annual Monitoring Report 2015 Sustainability Appraisal (AMR), Employment and Report Addendum (Pre- Housing Land Position Submission Focused Changes) Statements Policy compliance with Core Strategy, NPPF, NPPG and other relevant Infrastructure Delivery Plan guidance and advice. -
Dacorum Borough Green Infrastructure Plan: Appendices
DACORUM BOROUGH GREEN INFRASTRUCTURE PLAN: APPENDICES Prepared for Dacorum Borough Council by Land Use Consultants March 2011 www.landuse.co.uk LUC SERVICES Environmental Planning Landscape Design Landscape Management Masterplanning Landscape Planning Ecology Environmental Assessment Rural Futures Digital Design Urban Regeneration Urban Design 43 Chalton Street 14 Great George Street 37 Otago Street 28 Stafford Street London NW1 1JD Bristol BS1 5RH Glasgow G12 8JJ Edinburgh EH3 7BD Tel: 020 7383 5784 Tel: 0117 929 1997 Tel: 0141 334 9595 Tel: 0131 202 1616 Fax: 020 7383 4798 Fax: 0117 929 1998 Fax: 0141 334 7789 [email protected] [email protected] [email protected] [email protected] 1 Stakeholder consultation record: Stakeholder event, Dacorum Borough Council, 7th December 2010 Land Use Consultants 4993 Dacorum GI Plan: Stakeholder event, 7th December. Record of discussion and LUC responses (in bold) Stakeholder Thoughts Group 1: Visioning (LUC responses in bold) • Strategic transport corridors – recognise issues of severance but also opps for wildlife. Yes • Vision for rural areas good – what about project for bulk of population? LUC to check. • Strategic tree planting for Hemel. Agree – idea of urban greening project for Hemel – link to Hemel’s Transition Towns initiative. • Positive use of land for recreation / learning, and better understanding of this. Yes. • Alternative visitor hubs – currently no focus for a country park visit. • Recognise value in Hemel (greenspace resource). • Value of land for agriculture / food production. Yes. • HLS surely key opportunity (Boxmoor in HLS). Yes, more for projects than visioning and subject to next point below, but agree. • HLS is now delivering less (access).