WESTERN DIVISION Report to CITY & DISTRICT COUNCIL

LOCAL TRANSPORT & SAFETY MEASURES, BRIDGES, AND STREET LIGHTING

Draft Programme 2018 - 2020 21 November 2017

B350 RossdowneyPage Road 1 of ,24 Londonderry

CONTENTS PAGE Foreword 3 Draft LT&SM Programme Carriageway Improvements 2018 - 2020  B165 Bellspark Road, Clady 4  A2 Clooney Road Route Management Strategy 5 Sightline Improvements 2018 - 2020  C679 Drumlegagh Rd North / C680 Drumlegagh Church Rd 6  B72 Liskey Road / C607 Camus Road, 7  B118 Road / U1146 Highmoor Road 8 Footways 2018 - 2020  Strabane Footbridge 9  C568 Temple Road Footway Widening 10  U1134 Fincairn Road / U1553 Chestnut Drive Link 11 Parking Measures 2018- 2020  Rossville Street Resident’s Parking Scheme 12 Traffic Calming 2018- 2020  B524 Lonemoor Road 13  U1103 Braehead Road 14

Draft Bridges Programme Bridges Programme 2018- 2020  Bridge, Bridge Number 61158 15  Crew Bridge, Bridge Number 60016 16  Toneduff Bridge, Bridge Number 61158 17  Killymore Bridge, Bridge Number 61436 18  Not Named, Bridge Number 62182 19  Not Named, Bridge Number 62243 20  A47 Killadeas Road, Killadeas 21 Draft Street Lighting Programme 2018- 2020 22-24

Appendix 1 – update to spring report to the Council

Page 2 of 24

Foreword It is my pleasure to submit to you the Local Transport and Safety Measures, bridges and street lighting draft programme for District Council Area for the period 2018- 2020.

The Draft LT&SM Programme 2018-20 contains proposed schemes generated by requests for improvements from the public, public representatives and schemes identified within TransportNI. All the proposed schemes have been assessed in accordance with current procedures and are considered to be high priority and represent good value for money. The assessment procedure takes into account a number of factors including cost, traffic volumes and collisions.

Based on current funding levels, it would not be possible to deliver all of the schemes included in the draft programme over the 2018-2020 period. The Division will however continue to bid for additional funding and plan ahead by developing schemes in terms of design and land acquisition to ensure that we are well placed to utilise additional funding should it become available.

I hope you find the report and presentation interesting and informative. DfI values comments on the various scheme proposals included in the draft programme. An appendix is also attached updating progress on the current year’s programme and I hope you find this information helpful.

Robert McCartney, Maintenance Engineer, Deaglan MacBride, Network Development Engineer and Harry Gallagher, Network Development Manager for the Derry City and Strabane District Council area look forward to meeting the Council to present this programme and to hear member’s views on it.

Conor Loughrey

Divisional Manager

Page 3 of 24 DRAFT LTSM PROGRAMME Carriageway Improvements 2018 – 2020

B165 Bellspark Road, Clady – Carriageway Improvement Location: Corner on Eastern side of the junction of Clady GAA club

The road is restricted in width and in conjunction with a sharp radius and the roadside boundary reducing the forward sight distance; it is difficult for larger vehicles to pass oncoming traffic on this localised stretch of the Bellspark Road. The aim of the scheme is to improve road safety and traffic progression by widening the road and providing a nearside verge to improve both the passing width of the carriageway and the forward sight distance around the bend.

The estimated cost of the scheme is £30K.

Page 4 of 24

DRAFT LTSM PROGRAMME Carriageway Improvements 2018 – 2020

A2 Clooney Road Route Management Strategy Location: Clooney Road from Caw Roundabout to Roundabout

TransportNI commissioned an Options Study to identify engineering solutions to improve traffic safety along the study route. Along this 2.5km section of dual carriageway particular focus has been given to improvements at the Judges Road, Temple Road / Ardlough Road and Henderson Park junctions.

Page 5 of 24

DRAFT LTSM PROGRAMME Sightline Improvements 2018 – 2020

C679 Drumlegagh Road North / C680 Drumlegagh Church Road Location: C679 Drumlegagh Road North and C680 Drumlegagh Church Road Crossroads, Drumlegagh.

The existing junction has restricted sightlines in both directions along the Drumlegagh Road North when exiting from the eastern leg of the Drumlegagh Church Road due to roadside fencing and hedgerow. The scheme aims to create a safer environment for road users by improving the junction visibility splays in both directions.

The estimated cost of the scheme is £45,000. .

Page 6 of 24

DRAFT LTSM PROGRAMME Sightline Improvements 2018 – 2020

B72 Liskey Road / C607 Camus Road, Douglas Bridge Location: B72 Liskey Road at the junction with the C607 Camus Road, Douglas Bridge

At present the existing sightline on the Liskey Road is restricted in the southern direction by roadside boundary embankment and hedging which is impeding the motorist’s view when exiting the Camus Road. This scheme, to provide the junction visibility splay in the southern direction when exiting the minor road, will create a safer environment for road users.

The estimated cost of the scheme is £15,000.

Page 7 of 24

DRAFT LTSM PROGRAMME Sightline Improvements 2018 – 2020

B118 Tamnaherin Road / U1146 Highmoor Road Location: B118 Tamnaherin Road at the junction with the U1146 Highmoor Road.

At present the existing sightline on the Tamnaherin Road is restricted in the northern direction by roadside boundary fencing and hedging which is impeding the motorist’s view when exiting from Highmoor Road. This scheme to provide the junction visibility splay in the northern direction when exiting the minor road will create a safer environment for road users.

The estimated cost of the scheme is £95,000.

Page 8 of 24

DRAFT LTSM PROGRAMME Footways 2018 – 2020

Strabane Footbridge Location: Downstream of Strabane Bridge, Strabane

The existing road at Strabane Bridge provides the only pedestrian / cycle link between Melmount Rd and the town centre. The existing footways across the bridge are narrow and are hazardous for pedestrians with no dedicated facilities for cyclists. The aim of the scheme is to provide enhanced connections for pedestrians and cyclists between the Melmount Road area and the town centre as highlighted through the Sub Regional Transport Plan 2015. The footbridge is proposed downstream of the existing Strabane Bridge and will link the town centre to the bus centre and the general Melmount area.

Page 9 of 24

DRAFT LTSM PROGRAMME Footways 2018 – 2020

C568 Temple Road Footway Widening Location: C568 Temple Road

The existing footway along Temple Road from number 14 to the bottom of the access road at Westlake is 0.7 metres in width over a length of approximately 120 metres. The aim of the scheme is to provide enhanced connections for pedestrians and cyclists between the Clooney Road and .

The estimated cost of the scheme is £25,000.

Page 10 of 24

DRAFT LTSM PROGRAMME Footways 2018 – 2020

U1134 Fincairn Road / U1153 Chestnut Drive Footway Link Location: U1134 Fincairn Road and U1553 Chestnut Drive

The existing footway along Fincairn Road has no link with Chestnut Drive. However there is visible evidence of residents accessing Chestnut Drive via the common ground between both roads. This link will make it safer for pedestrians to access both roads by removing the need to clamber up a grass bank. .

Page 11 of 24

DRAFT LTSM PROGRAMME Parking Measures 2018 – 2020

Rossville Street Area Residents’ Parking Scheme Location: Rossville Street Area

The Department for Infrastructure is proposing to introduce a residents’ parking scheme within the area of the city. Formal consultation is expected to commence within the coming weeks. This will allow residents and the general public to review and comment on the scheme.

Page 12 of 24

DRAFT LTSM PROGRAMME Traffic Calming 2018 – 2020

Lonemoor Road – Traffic Calming Scheme Location: B524 Lonemoor Road, Londonderry Lonemoor Road will be traffic calmed as part of the resurfacing scheme being financed by Department for Communities. It is hoped that this scheme will be carried out in the 2017/2018 financial year.

Page 13 of 24

DRAFT LTSM PROGRAMME Carriageway Improvements 2018 – 2020

Braehead Road – Traffic Calming Scheme Location: U1103 Braehead Road, Londonderry

Braehead Road traffic calming scheme went through the public consultation exercise in early spring 2017. As a result of this DfI Roads received five objection letters. We are discussing these objections with the individuals who submitted them.

Page 14 of 24

DRAFT BRIDGES PROGRAMME Bridge Schemes 2018 – 2020

Plumbridge Bridge Location: B47, Glenelly Road, Plumbridge. Bridge Number 61158

Description: This structure has been assessed and found to have a defect on its retaining wing-wall. We propose to carry out maintenance to repair the defective section.

The scheme cost is estimated to be £10,000.

Page 15 of 24

DRAFT BRIDGES PROGRAMME Bridge Schemes 2018 – 2020

Crew Bridge Location: C680, Crew Road, Crew. Bridge Number 60016

Description: This multi-span masonry bridge has been assessed and found to have scoured foundations in some localised areas. We propose to carry out maintenance to the bridge foundations, general vegetation removal and maintenance to its parapets.

The scheme cost is estimated to be £40,000.

Page 16 of 24

DRAFT BRIDGES PROGRAMME Bridge Schemes 2018 – 2020

Toneduff Bridge

Location: C514, Kilcatten Road, . Bridge Number 30062

Description: This multi-span masonry bridge has scoured out foundations in some localised areas. We propose to carry out the necessary maintenance/scour protection to the bridge foundations.

The scheme cost is estimated to be £15,000.

Page 17 of 24

DRAFT BRIDGES PROGRAMME Bridge Schemes 2018 – 2020

Killymore Bridge Location: B46, Killymore Road, . Bridge Number 61436

Description: This concrete bridge has defective concrete to the underside of the bridge deck. It is necessary to carryout concrete and steel reinforcement repairs to protect the bridge from further deterioration.

The scheme cost is estimated to be £50,000.

Page 18 of 24

DRAFT BRIDGES PROGRAMME Bridge Schemes 2018 – 2020

Not Named Location: U1978, Park Road, . Bridge Number 62182

Description: This single span masonry bridge is showing some signs of deterioration. We propose to carry out bridge repairs and strengthening work at this location.

The total cost of the works is estimated at £20,000.

Page 19 of 24

DRAFT BRIDGES PROGRAMME Bridge Schemes 2018 – 2020

Not Named Location: C611, Corramore Road, Cranagh. Bridge Number 62243

Description: This single span masonry bridge is showing some signs of deterioration. We propose to replace the bridge to comply with current standards. The total cost of the works is estimated at £50,000.

Page 20 of 24

DRAFT BRIDGES PROGRAMME Bridge Schemes 2018 – 2020

A47 Killadeas Road, Killadeas – Provision of new Footway link

Location: A47 Killadeas Road at Killadeas

There is no existing footway link to the Bus Stop on Killadeas Road for residents living on the Kesh side the Tully Road junction. This scheme will provide a safer environment for pedestrians by providing a new footway over a length of approx. 230m.

The total cost of the works is estimated at £30,000.

Strabane Bridge

Page 21 of 24

DRAFT STREET LIGHTING PROGRAMME 2018 – 2020

Over the next 2 years, it is our intention to continue our general programme of improvement /replacement of older systems.

Opportunity will also be taken to improve street lighting in areas where other street works are planned.

Street lighting faults can now be reported on the NIDirect website www.nidirect.gov.uk/services/report-street-light-fault or by phoning the new call centre on 0300 200 7899.

It is likely that the 2018 -2020 programmes of work will be drawn from the following:

Scheme Title Scheme Description Status

Bloomfield Park Phase 3 Phased Street Lighting Renewal Scheme Ongoing

Car Parks - Strabane & Alterations for Handover to Council Complete Londonderry

Glenowen Park, Phased Street Lighting Renewal Scheme Phase 1 Complete

Craigavon Bridge Pedestrian Additional lighting Not started Crossing @ Foyle Road Jct

Slievemore Park Street Lighting Renewal Scheme Complete

Fern Park Street Lighting Renewal Scheme Complete

Gortica Road, Street Lighting Renewal Scheme Phase1 Complete

Claggan Road, Straidarrin Street Lighting Renewal Scheme Not started

Shearwater Way Street lighting Replacement/Upgrade Not started

Knockwellan Park, Final Phase Street lighting Replacement/Upgrade Complete

Foyle Fold Street lighting Replacement/Upgrade Complete

Gamble Park, Street lighting Replacement/Upgrade Complete

Breen Park, Victoria Bridge Street Lighting Replacement/Upgrade Not started

Springmount Park, Victoria Street lighting Replacement/Upgrade Not started Bridge

Kingsfort Park Street lighting Replacement/Upgrade Not started

Page 22 of 24

Scheme Title Scheme Description Status

Maybrook Mews Street lighting Replacement/Upgrade Not started

Fortwilliam Avenue/Crescent Street lighting Replacement/Upgrade Not started

Danesfort Crescent Street lighting Replacement/Upgrade DfC Not started

St Eugene’s Cathedral Triangle Street lighting Replacement/Upgrade DfC Complete

Rosemount Gardens Street lighting Replacement/Upgrade DfC Complete

Mount St / Wesley St / Epworth Street lighting Replacement/Upgrade DfC Not started St / Ernest St / Florence St

Carnhill Street lighting Replacement/Upgrade DfC Not started

Fergleen Park Street lighting Replacement/Upgrade DfC Complete

Rossdowney Park/ Gardens Street lighting Additional Not started Footpath

Bann Dr/Dennet Gardens Street lighting lantern/Upgrade Not started

Old Drumahoe Road Street lighting Replacement/Upgrade Not started

Foyle Bridge Street lighting Lantern/Upgrade Complete

Ardstraw Strabane Street lighting Replacement/Upgrade Complete

Churchview Street lighting Replacement/Upgrade Complete

Garvetagh Strabane Street lighting Replacement/Upgrade Complete

Melmount Park Strabane Street lighting Replacement/Upgrade Not started

St Mary’s Area Strabane Street lighting Replacement/Upgrade Not started

Derry Road Strabane Street lighting Lantern/Upgrade Not started

Claudy Crossroads Baranailt Street lighting Lantern/Upgrade Not started

Claudy Crossroads Killaloo Street lighting Lantern/Upgrade Not started

Clooney Road Maydown Street lighting Lantern/Upgrade Not started

Page 23 of 24

Scheme Title Scheme Description Status

Glengalliagh Road Street lighting Lantern/Upgrade Complete

Altnagelvin U/Passes Street lighting Lantern/Upgrade Not started

Page 24 of 24