GREATER CITY COUNCIL BUILDING A BETTER SHEPPARTON ROAD INITIATIVE BACKGROUND The city of Shepparton is growing and as this growth continues so too does the traffic volumes on the road network. Two major north-south and east-west arterial roads currently intersect within the centre of Shepparton, namely the and the Midland Highway. These arterial roads attract significant traffic volumes through the city. As the traffic volumes on eseth roads continue to increase, a number of undesirable impacts are becoming apparent. These include impacts on road safety, amenity, congestion, travel time variability and reducing network resilience. To counter act this Greater Shepparton City Council in collaboration with Regional Roads , Major Road Projects Victoria and the Department of Transport are working on a number of intersection upgrades and new link roads to cut down on travel time, make roads safer and ease congestion in and around Shepparton. The intersection upgrades will also support significant government investment in infrastructure projects such as schools and hospitals. Roads of Strategic Importance Initiative (ROSI) The Australian Government has provided funding of $3.5 billion through the Roads of Strategic Importance (ROSI) initiative to improve productivity and efficiency on ’s key freight roads, providing better connections between agricultural regions and ports, airports and other transport hubs and better access for tourism, mining and other sectors. An additional $1 billion was allocated to this imitative in the 2019/2020 Federal Budget. Victoria has been allocated $160 million under this program from to Seymour. The Council is seeking to secure some of this funding for intersection upgrades on the through Shepparton.

2 Greater Shepparton City Council Building a Better Shepparton Road Initiative Intersection Number Name Project Funding Cost

1. Hawkins Street / Road Goulburn Valley Highway Improvements Federal/ council/developer ROSI $2,520,000

2. Graham Street / Numurkah Road Goulburn Valley Highway improvements Federal ROSI $1,795,000

3. Hayes Street / Wyndham Street Goulburn Valley Highway improvements / Federal ROSI $1,583,000 Shepparton CBD Inner Eastern Link Road

4. Fitzjohn Street / Wyndham Street Goulburn Valley Highway improvements Federal/ Council ROSI $4,676,000

5. Hoskin Street / Midland Highway Shepparton CBD Inner Eastern Link Road State $3,095,000

6. Fryers Street / Railway Parade Shepparton CBD Inner Eastern Link Road State $5,500,000

7. Knight Street / Railway Parade Shepparton CBD Inner Eastern Link Road State $3,004,000

8. Hayes Street/ Johnson Street Shepparton CBD Inner Eastern Link Road State $2,470,000

9. Fryers Street / Welsford Street Welsford Street enhancement State $1,834,000

Total $26,477,000

3 4 Greater Shepparton City Council Building a Better Shepparton Road Initiative Overall context map

5 Intersection Map

9

6 Greater Shepparton City Council Building a Better Shepparton Road Initiative Route Map

Inner Eastern Link Road

Goulburn Valley Highway

7 Intersection No.1 Hawkins Street / Numurkah Road (Goulburn Valley Highway) Cost Approximately $2,520,000

Description This project will provide a signal controlled intersection to improve the safety and operation of the intersection. The upgraded intersection will allow for safe movements of traffic to and from a regional level sports precinct, sub regional shopping precinct and residential developments. In addition to this, the upgraded intersection would provide safe pedestrian access across Goulburn Valley Highway between the sports precinct and the retail precinct. This intersection will be part funded by developer contributions.

Benefits • Support State Government investment in the Munarra and Rumbalara Re-life projects and future Shepparton Sports and Events Centre; • Provide an enhanced intersection that will allow safe and efficient movements of vehicles to in and out of a regional level sports precinct and sub-regional retail facilities; • Reduces unsafe traffic environment caused by vehicles queueing along Goulburn Valley Highway; • Reduces congestion and travel times ; and • Provides a safe crossing point for pedestrian and reduces unsafe pedestrian access by foot.

What we are doing Upgrade the intersection of Hawkins Street and Goulburn Valley Highway to provide safe vehicular and pedestrian access to the retail precinct.

How are we doing it • Installing traffic lights to improve traffic flow; • Reducing unsafe traffic environments; and • Providing safe pedestrian access.

When are we doing this The final designs are currently being developed.

8 Greater Shepparton City Council Building a Better Shepparton Road Initiative LEGEND EXTENT OF EXISTING INTERSECTION

ASPHALT ROAD PAVEMENT - PROPOSED

ASPHALT ROAD PAVEMENT - EXISTING

LIMIT OF WORK HAWKINS STREET HAWKINS

GOULBURN VALLEY HWY LIMIT OF WORK OF LIMIT

LIMIT OF WORK LIMIT OF WORK OF LIMIT

SERVICE ROAD LIMIT OF WORK OF LIMIT CONCEPT ONLY INTERSECTION NUMBER 1 HAWKINS STREET / NUMURKAH ROAD - CONCEPT PLAN

9 Intersection No.2 Graham Street / Numukah Road (Goulburn Valley Highway) Cost Approximately $1,795,000

Description This project will provide a signal controlled intersection to provide safe access and egress to the Goulburn Valley Health, which is currently being extended. The signal controlled intersection will allow for safe east west movements into and out of the hospital to Goulburn Valley Highway. In addition to this, the upgraded intersection would elevate the existing safety concerns relating to cars queueing along Goulburn Valley Highway seeking to enter the hospital. Additionally the upgraded intersection would provide for appropriate pedestrian access across Goulburn Valley Highway.

Benefits • Provide an enhanced intersection that will allow safe and efficient movements of vehicles to in and out of GV Health; • Reduces unsafe traffic environment caused by vehicles queueing along Goulburn Valley Highway; • Reduces congestion and travel times; and • Provides a safe crossing point for pedestrian and reduces unsafe pedestrian access by foot.

What we are doing Upgrade the intersection of Graham Street and Goulburn Valley Highway to provide safe vehicular and pedestrian access to the Goulburn Valley Health.

How are we doing it • Installing traffic lights to improve traffic flow; • Reducing unsafe traffic environments; and • Providing safe pedestrian access.

When are we doing this Final designs for this intersection are currently being developed

10 Greater Shepparton City Council Building a Better Shepparton Road Initiative 11 Intersection No.3 Hayes Street / Wyndham Street intersection (Goulburn Valley Highway) Cost Approximately $1,583,000

Description This project will provide a signal controlled intersection to allow safe access to the Shepparton CBD Inner Eastern Link Road for cars and freight to move safely around the CBD. In addition the intersection will provide enhanced pedestrian links across the Goulburn Valley Highway to the Victoria Park Lake Precinct.

Benefits • Provide a signal controlled intersection that will allow safe and efficient movements of vehicles to the Shepparton CBD Inner Eastern Link Road; • Improves freight access to the Inner Eastern Link Road; • Reduces congestion and travel times ; and • Improves safety by reducing conflict between pedestrians and vehicular traffic.

What we are doing The project will provide safe and convenient access for freight and cars from the Goulburn Valley Highway to the Shepparton CBD Inner Eastern Link Road which will reduce congestion and travel times within Shepparton CBD. In addition the intersection will include pedestrian lights to reduce conflict between pedestrian and vehicular traffic.

How are we doing it • Installing traffic lights to improve traffic flow; • Improved freight access to the Shepparton CBD Inner Eastern Link Road; and • Providing safe pedestrian access.

When are we doing this Final designs for this intersection are current being developed.

12 Greater Shepparton City Council Building a Better Shepparton Road Initiative 13 Intersection No. 4 Fitzjohn Street / Wyndham Street (Goulburn Valley Highway) Cost Approximately $4,676,000

Description This project will provide access to the relocated Shepparton Art Museum and rationalise existing intersections to residential areas

Benefits • Improves access into the Shepparton Art Museum to ensure safe traffic movements into a major tourist destination; • Upgrades a number of adjacent intersections to improve access to residential areas; • Improves access over an existing railway crossing; and • Improves freight access to the Inner Eastern Link Road which will improve freight time lines by improving the flow of traffic by combating queueing by segregating traffic turning into SAM from through traffic.

What we are doing The project will provide safe and convenient access to the relocated Shepparton Art Museum and at the same time a number of existing intersections between Goulburn Valley Highway and residential areas to the east and west of the highway. The works will ensure safe movements throughout the area. In addition to this the surface around a railway crossing will be improved to improve freight access and efficiency.

How are we doing it • Installing traffic lights to improve traffic safety and traffic flow; • Improving an existing railway crossing to improve access for freight traffic; • Providing safe pedestrian access; and

When are we doing this Late 2019-early 2020

14 Greater Shepparton City Council Building a Better Shepparton Road Initiative 15 Intersection No.5 Hoskin Street / Midland Highway Intersection Cost Approximately $3,095,000

Description This project will provide an upgraded intersection between North Street and Midland Highway to enable the continuation of the Shepparton CBD Inner Eastern Link Road. This project will ensure that the intersection has appropriate dimensions to allow freight traffic to use this intersection.

Benefits • Provide an enhanced intersection that will allow safe and efficient movements of vehicles to the Shepparton CBD Inner Eastern Link Road; • Improves freight efficiency by allowing freight traffic to travel around Shepparton CBD; • Supports the Shepparton Health and Education Hub; • Reduces congestion and travel times. • Enable the pedestrianisation of North Street enhancing safety between Latrobe University and GoTafe by removing through traffic.

What we are doing Upgrade the intersection of Hoskin Street and High Street to improve traffic efficiency and road safety. How are we doing it • Installing traffic lights to improve traffic flow; • Intersection widening to accommodate additional right turn traffic movements; and • Providing safe pedestrian access.

When are we doing this Final designs for this intersection are currently being developed.

16 Greater Shepparton City Council Building a Better Shepparton Road Initiative 17 Intersection No. 6 Fryers Street / Railway Parade Intersection Cost Approximately $5,550,000

Description This project will provide an upgraded intersection between Fryers Street and Railway Parade to enable the continuation of the Shepparton CBD Inner Eastern Link Road. This project will ensure that the intersection has appropriate dimensions to allow freight traffic to use this intersection. Benefits • Provide an enhanced intersection that will allow safe and efficient movements of vehicles to the Shepparton CBD Inner Eastern Link Road; • Improves freight efficiency by allowing freight traffic to travel around Shepparton CBD; and • Reduces congestion and travel times. • Improve access for pedestrians and vehicles to the Greater Shepparton College (interim name)

What we are doing Upgrade the intersection of Fryers Street and High Street to improve traffic efficiency and road safety.

How are we doing it • Installing traffic lights to improve traffic flow; • Intersection widening to accommodate additional right turn traffic movements; and • Providing safe pedestrian access.

When are we doing this Final designs for this intersection are currently being developed

18 Greater Shepparton City Council Building a Better Shepparton Road Initiative G S LIMIT OF WORK

T T TRAFFICS SIGNAL PHASING DIAGRAMS T LEGEND T 44 T G W W W W S EXTENT OF EXISTING INTERSECTION S T

T G S T ASPHALT ROAD PAVEMENT - PROPOSED S T T G W S W W

T ASPHALT ROAD PAVEMENT - EXISTING

S S T

W S T T CONCRETE KERB, PATH AND INFILL T G G W W W

T LANDSCAPING - GRASS T

T S RAILWAY 1 2 3 T T W LANDSCAPING - GRANITIC SAND SIGNALS T G W ACTIVE W W G T ELECTRICITY POLE

T T T

T 46 LIGHT POLE S T G W W W W

Ø150 AC (1963) T OVERHEAD POWER LINES

G T T E UNDERGROUND POWER LINES T T G W

Ø300 W T W S G GAS MAIN W 55 T SKENE STREET Ø100 AC (1963) T Ø450 CON (1961) T S SEWER MANHOLE AND MAIN G T G W

W W

T W WATER MAIN STOP T T TELECOMMUNICATION PIT TO BE RAILWAY PARADE S Ø460 AC (1961) Ø300 W T 221 INVESTIGATED AND RELOCATED T PROPOSED DRAINAGE PIT AND PIPELINE T OUTSIDE OF THE PROPOSED G W W W G ROAD PAVEMENT TO TELSTRA Ø300 EXISTING DRAINAGE PIT AND PIPELINE T

T T Ø225 REQUIREMENTS T T T T TELSTRA PIT AND MAIN G T S CHAIN WIRE FENCE

W T G T G W W T G T Ø100 AC WATER MAIN TO BE W T NEXTGEN PIT AND MAIN T G T T T T G INVESTIGATED AND REPLACED G R G 48 A N I L I T S T T S W G (1950) RAILWAY LINE O W WITH DICL PIPES ONLY IF R A C Y

T Ø225 CON T W G G W T G DEEMED NECESSARY BY T S W W RAILWAY SIGNALS AND BOOM GATE LIMIT OF WORK W G T W G T GOULBURN VALLEY WATER W T T Ø460 AC WATER MAIN TO BE STOP G T ONRED W T SIGNAL T W G T T INVESTIGATED AND REPLACED Ø225 T G T T

CLEAR W T W WITH DICL PIPES ONLY IF T LEFT

KEEP G T W W KEEP W T G T DEEMED NECESSARY BY TRAFFIC SIGNAL POLE

G W T T S T /

Ø100 AC (1963) G T T W W / GOULBURN VALLEY WATER

G /

W / W W / T

/ PROPERTY STREET NUMBER

W / 230 /

T

/ /

G Ø300 S RAILWAY CROSSING TREE TO BE REMOVED

W T

KEEP LEFT W T W LIMIT OF WORK PEDESTRIAN MAZE

W W

R S C

FRYERS STREET O /

I S A N

W T G R T

N I

R

O

O L

Ø250 DICL (1982) A

E

P L

W D S

W S

/

A I / W

Y KEEP

T LEFT N / G G / W / / T / W W T / / / / / / T S S T / / REMOVE EXISTING / /

T / LEFT KEEP / LIGHT POLE / W T / W / / T W

G Ø300 Ø375

S T

W

RC R S

S O

I

S

60 N A

T G

T

N I

R

O

O L

A

UE E

L P D

KEEP LEFT S

G W

W S

T N Y

A I

I A

W Y N UE S W

G S D W P L E

A L O GIVE O I R

LIMIT OF WORK T N R G A N Ø225 S I

S O T WAY UE R C S RELOCATE EXISTING Ø225 S T

G LIGHT POLE KEEP LEFT

W UE KEEP LEFT W T T 230 W Ø100 DICL (2005) W UE T S S T UE / / UE FRYERS STREET / /

G W UE G

T / N Y

I UE

W / A / S W

W UE UE / S P D Ø375 T W / L E

A Ø300 L O O UE I R T N

/ / S R G A N S I UE O UE

/ R C S T S / Ø300 T UE T Ø150 EW (1981) / W Ø300 UE G

BANNER S Ø375 W

W

/ T S T / W UE UE T RESERVE UE / T UE / UE W / UE LIMIT OF WORK

S UE / / UE UE UE G T / UE S W RAILWAY CROSSING UE T UE W PEDESTRIAN MAZE UE

T T UE Ø225 CON (1950) W W UE STAY T S

STAY FUTURE PATH Ø460 AC (1961) UE Ø300 T HIGH VOLTAGE ELECTRICITY S W UE G POLE AND OVERHEAD POWER UE T W W LINES TO BE REALIGNED WATER MAIN TO BE T S UE W T (INDICATIVELY SHOWN ONLY) INVESTIGATED AND REPLACED UE S T WITH DICL PIPES ONLY IF Ø150 AC (1963) W UE DEEMED NECESSARY BY UE T W G T S W GOULBURN VALLEY WATER SKENE STREET W FUTURE PATH UE T Ø300 T S W UE

T Ø450 CON (1961) W T S W UE

G Ø300

S T W W SHEPPARTON SHOWGROUNDS

T T W S T W UE Ø225 S W T

G

W UE T W NOTE T W T Ø300 THE SERVICES INFORMATION CONTAINED WITHIN THIS PLAN HAS S W T T UE BEEN DERIVED FROM A DESKTOP STUDY UNDERTAKEN IN 2014.

G RAILWAY PARADE T SERVICES SHOWN ON THIS PLAN ARE INDICATIVE ONLY, DERIVED T W W S W FROM A DIAL BEFORE YOU DIG INQUIRY UNDERTAKEN IN 2014 AND

S T UE HAVE NOT BEEN VERIFIED ON SITE. LIMITS OF WORK W T T S Ø225 CI (1937) S T W AERIAL PHOTOGRAPHY USED IN THIS PLAN WAS TAKEN IN 2017 S W G S FUTURE PATH UE FUTURE OFF STREET CAR PARK W (OUTSIDE SCOPE OF WORKS) W T T THIS CONCEPT PLAN HAS BEEN PREPARED AS A POSSIBLE INTERSECTION OPTION FOR A FUTURE FRYERS STREET UPGRADE. UE T T W RAILWAY LINE W

S G W T Ø100 AC (1981) T UE W T T W FUTURE PATH Ø225 CON (1950) FUTURE(OUTSIDE OFF STREET SCOPE CAROF WORKS) PARK W T CONCEPT ONLY S UE W T T

G

W W W LIMIT OF THOMPSON STREETUE S INTERSECTION NUMBER 6 W T T T WORK UE

W

G W T FRYERS STREET / RAILWAY PARADE - CONCEPT PLAN W S W T T 19 Intersection No.7 Knight Street / Railway Parade Intersection Cost Approximately $3,004,000

Description This project will provide a member of benefits, including an upgraded intersection between Knight Street and Railway Parade to enable the continuation of the Shepparton CBD Inner Eastern Link Road. This project will ensure that the intersection has appropriate dimensions to allow freight traffic to use this intersection. Additionally the projects will also future proof the intersection to allow enhanced access for school buses to Greater Shepparton College (Interim name)

Benefits • Provides enhanced access for school buses, pedestrian and cyclists to the Greater Shepparton College (Interim name) • Improves freight efficiency by allowing freight traffic to travel around Shepparton CBD; • Reduces congestion and travel times ; and • Provides enhanced access for school buses, pedestrian and cyclists to the Greater Shepparton College (Interim name).

What we are doing Upgrade the intersection of Fryers Street and High Street to improve traffic efficiency and road safety for freight, school busses, pedestrians and cyclists.

How are we doing it • Installing traffic lights to improve traffic flow; • Intersection widening to accommodate freight and bus movements; and • Providing safe pedestrian access.

When are we doing this The concept plans for this intersection are currently being developed.

20 Greater Shepparton City Council Building a Better Shepparton Road Initiative 21 Intersection No. 8 Hayes / Johnson Street Intersection Cost Approximately $2,470,000

Description This project will provide a member of benefits, including an upgraded intersection between Hayes Street and Johnson Street to enable the continuation of the Shepparton CBD Inner Eastern Link Road (Interim name). This project will ensure that the intersection has appropriate dimensions to allow freight traffic to use to safely access the Shepparton CBD Inner Eastern Link Road (interim name).

Benefits • Provide an enhanced intersection that will allow safe and efficient movements of vehicles to the Shepparton CBD Inner Eastern Link Road (interim name); • Improves freight efficiency by allowing freight traffic to travel around Shepparton CBD; • Reduces congestion and travel times ; and • Provides enhanced access for school buses, pedestrian and cyclists to the Greater Shepparton College (Interim name).

What we are doing Upgrade the intersection of Hayes Street and Johnson Street to improve traffic efficiency and road safety for vehicular traffic including freight, pedestrians and cyclists.

How are we doing it • Installing traffic lights to improve traffic flow; • Intersection widening to accommodate car and freight traffic; and • Providing safe pedestrian and cyclist access.

When are we doing this The concept plans for this intersection are currently being developed.

22 Greater Shepparton City Council Building a Better Shepparton Road Initiative INTERSECTION 8 CONCEPT ONLY HAYES STREET / JOHNSON STREET CONCEPT PLAN

23 Intersection No.9 Fryers Street / Welsford Street Intersection Cost Approximately $1,834,000

Description This project will provide a member of benefits, including an upgraded intersection between Fryers Street and Welsford Street to enable the upgrade of the Midland Highway and Welsford Street intersection to ensure traffic flows are catered for in a safe manner including ensuring B –Double movements from the east to access an alternate route to using the CBD, thus ensuring a safer traffic environment in the CBD. This project will ensure that the intersection has appropriate dimensions to allow freight traffic to use this intersection.

Benefits • Provide an enhanced intersection that will allow safe and efficient movements of vehicles to from Midland Highway to the Shepparton CBD and B-Double for vehicles from the east access to an alternate route around Shepparton CBD; • Improves freight efficiency by allowing freight traffic to travel around Shepparton CBD; • Reduces congestion and travel times ; and

What we are doing Upgrade the intersection of Fryers Street and Welsford Street to improve traffic efficiency and road safety for freight, cars, pedestrians and cyclists.

How are we doing it • Duplicating the road to improve traffic flow and reduce congestion • Intersection modifications to accommodate freight and bus movements; and • Providing safe pedestrian access.

When are we doing this Final designs for this intersection are currently being developed.

24 Greater Shepparton City Council Building a Better Shepparton Road Initiative WHEN WET

P 40 km/h P 2P 9AM - 5PM MON - FRI

2P 9AM - 5PM MON - FRI GIVE WAY

0 2.5 5 10 15

H 1:250 @A1

Greater Shepparton City Council 90 Welsford Street , Shepparton VIC 3630 Locked Bag 1000, Shepparton VIC 3632 T: (03) 5832 9700 F: (03) 5831 1987 E: [email protected] W: www.greatershepparton.com.au 25 CONTACT US Business hours: 8.15am to 5pm weekdays In person: 90 Welsford Street, Shepparton Mail: Locked Bag 1000, Shepparton, VIC, 3632 Phone: (03) 5832 9700 | SMS: 0427 767 846 | Fax: (03) 5831 1987 Email: [email protected] Web: www.greatershepparton.com.au

Join the conversation: