FY 2007-2012 Proposed Highway Improvement Program

HIGHWAY DISTRICT 2 TABLE OF CONTENTS

Program Summary State Project Descriptions Local Project Descriptions

MAPS

District 2 Rock Island and Vicinity Rockford and Vicinity

Jobs For Program Program Descriptions Program Map

HIGHWAY PROGRAM SUMMARY ILLINOIS DEPARTMENT OF TRANSPORTATION REGION 2, DISTRICT 2, DIXON

Overview

Highway District 2 encompasses 10 counties in northwestern Illinois and includes the cities of Rockford, Rock Island-Moline, Geneseo, Rochelle, Dixon, Freeport, Spring Valley, Belvidere, Kewanee, Sandwich and Sterling-Rock Falls, plus many smaller communities which serve as satellites for the larger employment centers or as focal points of this farming area. The state highway system in District 2 consists of 1,617 miles of highways and 897 bridges, supporting 10.8 million vehicle miles of travel daily.

State Program

The program for state and local highways will average $1.738 billion annually for the FY 2007-2012 period. Approximately $583 million will be provided during FY 2007-2012 for improvements to state highways in District 2. The following table summarizes anticipated accomplishments on the state highway system in District 2 during this time frame.

FY 2007-2012 Accomplishments

System Maintenance Interstate (miles) 30 Non-Interstate (miles) 594 Safety Locations (number) 34 Bridge Maintenance Interstate (number) 31 Non-Interstate (number) 53 New Bridges (number) 0 Congestion Mitigation Roads (miles) 0 Traffic Improvements (number) 7 System Expansion Roads (miles) 0 Locations (number) 0

Major projects of interest that are tentatively scheduled during the FY 2007-2012 time frame include:

• Interstate 74/US 6 Corridor in Rock Island County. A corridor study, engineering for contract plans and land acquisition are programmed during FY 2008-2012 at a cost of $19.6 million. SAFETEA-LU provided $4.7 million in HPP funds, $7.5 million of NCII funds and $3.5 million of TI funds. Iowa is the lead agency with Illinois sharing the costs.

• Interstate 74 from 0.5 mile south of Interstate 80 to north of Illinois 17 in Henry County. Resurfacing on 17.2 miles is programmed during FY 2008-2012 at a cost of $24.1 million.

• Interstate 80 from the Mississippi River to 0.8 mile north of Illinois 5/92 in Rock Island County. Reconstruction of 2.4 miles and a median crossover are programmed during FY 2007-2012 at a cost of $14.5 million. Of this total, $500,000 is programmed in FY 2007 for a median crossover.

• Interstate 280 from the Mississippi River to Airport Road in Rock Island County. Bridge rehabilitation, bridge new deck, bridge replacement and engineering for contract plans are programmed during FY 2008-2012 at a cost of $21.7 million.

2-i • US 20 (Rockford Bypass) from Falconer Road west of Rockford to Interstate 39/US 51 in Rockford. Resurfacing on 2.7 miles from Falconer Road to Meridian Road southwest of Rockford, engineering for contract plans and bridge work are programmed during FY 2007-2012 at a cost of $3.7 million. Of this total, engineering for contract plans is programmed in FY 2007 at a cost of $120,000. Resurfacing on 8.1 miles from southeast of Cunningham Road to Interstate 39/US 51 in Rockford, bridge work, land acquisition, median crossovers, engineering for design, location and environmental studies and engineering for contract plans are programmed during FY 2007-2012 at a cost of $22.6 million. Of this total, resurfacing on 8.1 miles, median crossovers, engineering for design, location and environmental studies and engineering for contract plans are programmed in FY 2007 at a cost of $4.5 million.

• US 20 Business (West State Street) from Pierpoint Avenue to Rockton Avenue in Rockford. Widening and resurfacing on 1.9 miles, intersection improvements, land acquisition, utility adjustments, railroad crossing improvements, engineering for contract plans and associated work are programmed during FY 2007-2012 at a cost of $20.5 million. Of this total, land acquisition and engineering for contract plans are programmed in FY 2007 at a cost of $3.6 million.

• US 20 from Galena to Freeport. The final Environmental Impact Statement (EIS) and design report for this project has been approved by the Federal Highway Administration and the Record of Decision was signed September 22, 2005. Engineering for contract plans and land acquisition for the Galena Bypass are under way.

• US 20 (Galena Bypass) from Illinois 84 northwest of Galena to Horseshoe Mound Interchange southeast of Galena. The proposed bond program provides $13.2 million for utility adjustments, land acquisition, archaeological survey and engineering for contract plans. SAFETEA-LU provided $7.4 million in HPP funds for this work. (Northwest Region)

• US 20 (Freeport Bypass) from US 20 Business west of Freeport to west of Illinois 26. The proposed bond program provides $20.5 million for additional lanes for 4 miles, a new bridge, land acquisition, utility adjustments and engineering for contract plans. SAFETEA-LU provided $760,000 in HPP funds for this work. (Northern Stateline Region)

• US 52/Illinois 64 from east of the Plum River at Savanna to east of Mount Carroll. Resurfacing and shoulder repair on 9.2 miles, turning lanes, a bridge replacement, utility adjustments and land acquisition are programmed in FY 2007 at a cost of $8.6 million.

• Illinois 2 from 1 mile south of Madison Street in Oregon north to Beltline Road south of Rockford. Resurfacing on 18 miles, reconstruction on 2.2 miles from south of Mud Creek Road to Fair Street in Oregon, turning lanes, utility adjustments and land acquisition are programmed during FY 2007-2012 at a cost of $16.4 million. Of this total, resurfacing on 0.9 mile and land acquisition are programmed in FY 2007 at a cost of $1.5 million.

• Illinois 75 from 0.3 mile north of US 20 northeast of Freeport to 0.4 mile east of Illinois 70 south of Durand. Resurfacing on 16.8 miles, shoulder reconstruction, utility adjustments, land acquisition, a bridge replacement, culvert replacements, intersection reconstruction at Illinois 70 south of Durand and associated work are programmed during FY 2007-2012 at a cost of $13.3 million. Of this total, resurfacing on 8.8 miles, shoulder reconstruction, utility adjustments, land acquisition, a culvert replacement and associated work are programmed in FY 2007 at a cost of $4.3 million.

• Illinois 75 from Illinois 70 to Interstate 90 in South Beloit. Resurfacing on 17.9 miles, culvert replacements, a bridge replacement, land acquisition, utility adjustments and associated work are programmed during FY 2007-2012 at a cost of $11.7 million. Of this total, resurfacing on 2.2 miles from Illinois 2 to Interstate 90 in South Beloit, a bridge replacement and land acquisition are programmed in FY 2007 at a cost of $2.4 million.

2-ii • Illinois 78 from Stockton to the north corporate limits of Mt. Carroll. Resurfacing on 19 miles, a culvert replacement, land acquisition, utility adjustments and associated work are programmed during FY 2008-2012 at a cost of $5.9 million.

• Illinois 84 from 0.1 mile north of Garden Plain Road to 10th Avenue North (Riverview Drive) in Albany. Vertical realignment on 1.8 miles, a bridge replacement, intersection reconstruction, utility adjustments and land acquisition are programmed during FY 2008-2012 at a cost of $5.4 million.

• Illinois 251 (Kishwaukee Street) from 15th Avenue to Harrison Avenue in Rockford. Reconstruction for 0.9 mile, intersection improvements, utility adjustments and land acquisition are programmed in FY 2007 at a cost of $6.2 million.

2-iii FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

I 39 US 20 (W) TO I-90 P.E. (PHASE I) $1,250,000 WINNEBAGO 3 2007 US 51 P.E. (CONSULTANT TSL) US 20

I 39 US 20 (W) TO I-90 P.E. (PHASE I) $1,250,000 WINNEBAGO 1 2008-2012 US 51 P.E. (CONSULTANT TSL) US 20

I 39 US 20 INTCHG P.E. (PHASE I) $600,000 WINNEBAGO 3 2007 US 51 P.E. (CONSULTANT TSL) US 20

I 39 US 20 INTCHG P.E. (PHASE I) $700,000 WINNEBAGO 1 2008-2012 US 51 P.E. (CONSULTANT TSL) US 20

I 39 KISHWAUKEE RIVER 0.8 MI S OF BLACKHAWK RD BRIDGE REHABILITATION $6,000,000 WINNEBAGO 2 2007 US 51

I 39 KISHWAUKEE RIVER 0.8 MI S OF BLACKHAWK RD CONSTRUCTION ENGINEERING $400,000 WINNEBAGO 1 2007 US 51

I 39 2 MI N OF ILL 38 (WEIGH STATION) LAND ACQUISITION $3,000 OGLE 1 2008-2012 US 51 (NORTHBOUND)

I 39 2 MI N OF ILL 38 (WEIGH STATION) LAND ACQUISITION $8,000 OGLE 1 2008-2012 US 51 (SOUTHBOUND)

I 39 AT WILLOW CREEK REST AREA 3 MI S OF US 30 BUILDING $3,000 LEE 1 2007 (SOUTHBOUND)

I 39 AT WILLOW CREEK REST AREA 3 MI S OF US 30 DRAINAGE $45,000 LEE 1 2007

I 39 AT WILLOW CREEK REST AREA 3 MI S OF US 30 REST AREA IMPROVEMENT $25,000 LEE 1 2007

2 - 1 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

I 74 MISSISSIPPI RIVER CORRIDOR P.E. (CORRIDOR STUDY) $9,375,000 ROCK ISLAND 1 2008-2012 US 6 SAFETEA-LU NATIONAL CORRIDOR INFRASTRUCTURE IMPROVEMENT PROJECT. STATE MATCH REQUIRED BORDER BRIDGE BETWEEN ILLINOIS AND IOWA. IOWA IS LEAD AGENCY.

I 74 MISSISSIPPI RIVER CORRIDOR P.E. (PHASE II) $6,250,000 ROCK ISLAND 1 2008-2012 US 6 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED SAFETEA-LU TRANSPORTATION IMPROVEMENT PROJECT. STATE MATCH REQUIRED. BORDER BRIDGE BETWEEN ILLINOIS AND IOWA. IOWA IS LEAD AGENCY.

I 74 MISSISSIPPI RIVER CORRIDOR LAND ACQUISITION $2,000,000 ROCK ISLAND 1 2008-2012 US 6 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED BORDER BRIDGE BETWEEN ILLINOIS AND IOWA. IOWA IS LEAD AGENCY.

I 74 MISSISSIPPI RIVER CORRIDOR LAND ACQUISITION $2,000,000 ROCK ISLAND 1 2008-2012 US 6 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED BORDER BRIDGE BETWEEN ILLINOIS AND IOWA. IOWA IS LEAD AGENCY.

I 74 S OF 7TH AVE TO S OF ILL 5 IN MOLINE PATCHING $9,995,000 ROCK ISLAND 2 2008-2012 US 6 Miles = 2.85 RESURFACING BRIDGE DECK REPAIRS SLOPEWALL REPAIR COLD MILLING

I 74 S OF 23RD AVE (AVE OF THE CITIES) TO ROCK RIVER IN P.E. (PHASE I) $1,000,000 ROCK ISLAND 2 2008-2012 US 6 MOLINE P.E. (CONSULTANT TSL)

2 - 2 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

I 74 S OF 23RD AVE (AVE OF THE CITIES) TO ROCK RIVER IN P.E. (PHASE II) $1,500,000 ROCK ISLAND 2 2008-2012 US 6 MOLINE

I 74 0.2 MI E OF MILAN BELTWAY TO 1.3 MI E OF HENRY / ROCK RESURFACING $9,700,000 ROCK ISLAND 1 2008-2012 I 280 ISLAND CO LINE PATCHING HENRY Miles = 6.81 COLD MILLING

I 74 0.5 MI S OF I-80 TO ILL 81 RESURFACING $13,300,000 HENRY 1 2008-2012 Miles = 9.52

I 74 ILL 81 TO 0.2 MI N OF ILL 17 RESURFACING $10,800,000 HENRY 1 2008-2012 Miles = 7.72

I 74 TR 379B 1 MI N OF ILL 17 & OPHIEM RD 3 MI S OF ILL 81 BRIDGE REHABILITATION $3,400,000 HENRY 9 2008-2012 BRIDGE NEW DECK

I 74 AT KRISDALA BAKA REST AREA 1.3 MI S OF OPHIEM RD REST AREA IMPROVEMENT $7,000 HENRY 1 2007 (SOUTHBOUND)

I 80 MISSISSIPPI RIVER, ILL 84 & BN&SF RR W OF RAPIDS CITY BRIDGE REPAIR $150,000 ROCK ISLAND 2 2008-2012

ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY.

I 80 MISSISSIPPI RIVER, ILL 84 & BN&SF RR W OF RAPIDS CITY LIGHTING $300,000 ROCK ISLAND 1 2007

ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY.

I 80 MISSISSIPPI RIVER TO 0.8 MI N OF ILL 5/92 RECONSTRUCTION $14,000,000 ROCK ISLAND 2 2008-2012 Miles = 2.37

I 80 MISSISSIPPI RIVER TO ILL 5/92 MEDIAN CROSSOVER $500,000 ROCK ISLAND 2 2007

I 80 0.8 MI N OF ILL 5/92 TO HENRY CO LINE RESURFACING $3,000,000 ROCK ISLAND 2 2008-2012 Miles = 2.50

2 - 3 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

I 80 0.8 MI N OF ILL 5/92 TO HENRY CO LINE P.E. (PHASE I) $300,000 ROCK ISLAND 1 2008-2012

I 80 OVER I-88 & ILL 5/92 2.5 MI NE OF SILVIS BRIDGE NEW DECK $3,000,000 ROCK ISLAND 2 2008-2012

I 80 OVER I-88 & ILL 5/92 2.5 MI NE OF SILVIS P.E. (PHASE II) $220,000 ROCK ISLAND 2 2008-2012

I 80 OVER BN&SF RR 1.1 MI S OF ILL 5/92 BRIDGE REPLACEMENT $3,000,000 ROCK ISLAND 2 2008-2012

I 80 OVER BN&SF RR 1.1 MI S OF ILL 5/92 P.E. (PHASE II) $220,000 ROCK ISLAND 2 2008-2012

I 80 OVER BN&SF RR 1.1 MI S OF ILL 5/92 P.E. (PHASE I) $220,000 ROCK ISLAND 2 2008-2012 P.E. (CONSULTANT TSL)

I 80 OVER BARSTOW RD 1.3 MI S OF ILL 5/92 BRIDGE REPLACEMENT $4,200,000 ROCK ISLAND 2 2008-2012

I 80 OVER BARSTOW RD 1.3 MI S OF ILL 5/92 P.E. (PHASE I) $220,000 ROCK ISLAND 2 2008-2012 P.E. (CONSULTANT TSL)

I 80 OVER BARSTOW RD 1.3 MI S OF ILL 5/92 P.E. (PHASE II) $220,000 ROCK ISLAND 2 2008-2012

I 80 GREEN RIVER 1.9 MI N OF US 6 BRIDGE NEW DECK $2,400,000 HENRY 2 2008-2012 BRIDGE WIDENING

I 80 GREEN RIVER 1.9 MI N OF US 6 P.E. (PHASE II) $250,000 HENRY 2 2008-2012

I 80 UNDER POPPY GARDEN RD IN COLONA BRIDGE REPLACEMENT $2,600,000 HENRY 7 2007

I 80 UNDER POPPY GARDEN RD IN COLONA UTILITY ADJUSTMENT $50,000 HENRY 2 2007

2 - 4 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

I 80 MINERAL CREEK 2.9 MI E OF I-74 BRIDGE REPLACEMENT $1,910,000 HENRY 5 2008-2012

I 80 MINERAL CREEK 2.9 MI E OF I-74 P.E. (PHASE II) $150,000 HENRY 5 2008-2012

I 80 MINERAL CREEK 2.9 MI E OF I-74 P.E. (PHASE I) $60,000 HENRY 2 2008-2012 P.E. (CONSULTANT TSL)

I 88 ILL 92 TO ILL 78 BRIDGE DECK REPAIRS $2,250,000 ROCK ISLAND 6 2008-2012 BRIDGE NEW DECK WHITESIDE

I 88 ILL 92 TO ILL 78 P.E. (PHASE II) $60,000 WHITESIDE 1 2008-2012

I 90 AT TURTLE CREEK REST AREA 0.8 MI S OF THE REST AREA IMPROVEMENT $20,000 WINNEBAGO 1 2007 STATE LINE

I 280 MISSISSIPPI RIVER TO AIRPORT RD BRIDGE REHABILITATION $19,900,000 ROCK ISLAND 2 2008-2012 ILL 92 BRIDGE NEW DECK BRIDGE REPLACEMENT

I 280 MISSISSIPPI RIVER TO AIRPORT RD P.E. (PHASE II) $1,800,000 ROCK ISLAND 2 2008-2012 ILL 92

US 6 SHAEFFER CREEK 1 MI W OF HENRY CO LINE BRIDGE REPLACEMENT $2,400,000 ROCK ISLAND 9 2008-2012 1ST AVE TURNING LANES BRIDGE APPROACH ROADWAY

US 6 SHAEFFER CREEK 1 MI W OF HENRY CO LINE LAND ACQUISITION $100,000 ROCK ISLAND 9 2008-2012 1ST AVE

US 6 SHAEFFER CREEK 1 MI W OF HENRY CO LINE UTILITY ADJUSTMENT $55,000 ROCK ISLAND 6 2008-2012 1ST AVE

2 - 5 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

US 6 ILL 84 TO I-80 SE OF COLONA RESURFACING $435,000 HENRY 2 2008-2012 Miles = 1.06 DITCH CLEANING SHOULDER RECONSTRUCTION DRAINAGE

US 6 ILL 82 (S) IN GENESEO TO STATE ST (ATKINSON RD) IN RESURFACING $2,325,000 HENRY 2 2008-2012 ATKINSON PATCHING Miles = 7.52

US 6 STATE ST (ATKINSON RD) IN ATKINSON TO MUD CREEK RESURFACING $1,580,000 HENRY 2 2008-2012 Miles = 5.11 PATCHING

US 20 MISSISSIPPI RIVER IN EAST DUBUQUE LAND ACQUISITION $3,500,000 JODAVIESS 2 2007

INCLUDES SPECIAL FEDERAL FUNDS.

US 20 PLUM ST EXT IN EAST DUBUQUE RETAINING WALL $2,400,000 JODAVIESS 4 2008-2012 SINSINAWA AVE Miles = 0.14 STORM SEWER (NEW) CURB AND GUTTER GRADING PAVING INCLUDES SPECIAL FEDERAL FUNDS.

US 20 PLUM ST EXT IN EAST DUBUQUE UTILITY ADJUSTMENT $150,000 JODAVIESS 4 2008-2012 SINSINAWA AVE INCLUDES SPECIAL FEDERAL FUNDS.

US 20 BARGE TERMINAL RD TO ILL 84 P.E. (PHASE II) $1,200,000 JODAVIESS 4 2008-2012

US 20 BARGE TERMINAL RD TO LITTLE RIVER RESURFACING $2,450,000 JODAVIESS 2 2007 Miles = 2.57

US 20 MENOMINEE RIVER E OF EAST DUBUQUE BRIDGE NEW DECK $1,800,000 JODAVIESS 1 2008-2012 BRIDGE WIDENING

US 20 MENOMINEE RIVER E OF EAST DUBUQUE P.E. (PHASE I) $100,000 JODAVIESS 1 2008-2012 P.E. (CONSULTANT TSL)

2 - 6 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

US 20 MENOMINEE RIVER E OF EAST DUBUQUE P.E. (PHASE II) $100,000 JODAVIESS 1 2008-2012

US 20 LITTLE MENOMINEE RIVER 4.8 MI W OF ILL 84 BRIDGE NEW DECK $2,800,000 JODAVIESS 1 2008-2012 BRIDGE WIDENING

US 20 LITTLE MENOMINEE RIVER 4.8 MI W OF ILL 84 P.E. (PHASE I) $160,000 JODAVIESS 1 2008-2012 P.E. (CONSULTANT TSL)

US 20 LITTLE MENOMINEE RIVER 4.8 MI W OF ILL 84 P.E. (PHASE II) $160,000 JODAVIESS 1 2008-2012

US 20 LITTLE MENOMINEE RIVER TO ILL 84 RESURFACING $4,550,000 JODAVIESS 2 2008-2012 Miles = 4.78

US 20 MENOMINEE RD 3.2 MI W OF ILL 84 BRIDGE NEW DECK $900,000 JODAVIESS 1 2008-2012

US 20 MENOMINEE RD 3.2 MI W OF ILL 84 P.E. (PHASE II) $70,000 JODAVIESS 1 2008-2012

US 20 MENOMINEE RD 3.2 MI W OF ILL 84 P.E. (PHASE I) $70,000 JODAVIESS 1 2008-2012 P.E. (CONSULTANT TSL)

US 20 SINSINAWA RIVER 2 MI W OF ILL 84 (N) BRIDGE REPLACEMENT $1,400,000 JODAVIESS 1 2008-2012 (EASTBOUND)

US 20 SINSINAWA RIVER 2 MI W OF ILL 84 (N) P.E. (PHASE I) $100,000 JODAVIESS 1 2008-2012 (EASTBOUND) P.E. (CONSULTANT TSL)

US 20 SINSINAWA RIVER 2 MI W OF ILL 84 (N) P.E. (PHASE II) $100,000 JODAVIESS 1 2008-2012 (EASTBOUND)

US 20 GEAR ST TO GALENA RIVER IN GALENA WIDENING & RESURFACING $5,500,000 JODAVIESS 3 2008-2012 ILL 84 Miles = 1.20 DRAINAGE STORM SEWER (NEW)

2 - 7 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

US 20 GEAR ST TO GALENA RIVER IN GALENA UTILITY ADJUSTMENT $350,000 JODAVIESS 3 2008-2012 ILL 84

US 20 GEAR ST TO GALENA RIVER IN GALENA LAND ACQUISITION $500,000 JODAVIESS 3 2008-2012 ILL 84

US 20 MT HOPE RD TO TIPPETT RD SE OF GALENA RESURFACING $2,200,000 JODAVIESS 6 2007 ILL 84 Miles = 4.39 PATCHING

US 20 TIPPETT RD TO APPLE RIVER E OF ILL 84 RESURFACING $2,380,000 JODAVIESS 2 2008-2012 ILL 84 Miles = 5.15

US 20 APPLE RIVER E OF ILL 84 TO DERINDA RD E OF ELIZABETH RESURFACING $2,000,000 JODAVIESS 3 2008-2012 Miles = 3.94

US 20 GALENA OAKS RD E OF ELIZABETH TO LOGEMANN RD RESURFACING $1,500,000 JODAVIESS 2 2008-2012 Miles = 4.91

US 20 LOGEMANN RD TO W EDGE OF STOCKTON RESURFACING $10,700,000 JODAVIESS 2 2008-2012 Miles = 3.41 SHOULDER REPAIR TURNING LANES CULVERT REPLACEMENT HORIZONTAL REALIGNMENT

US 20 LOGEMANN RD TO W EDGE OF STOCKTON LAND ACQUISITION $750,000 JODAVIESS 2 2008-2012

US 20 LOGEMANN RD TO W EDGE OF STOCKTON UTILITY ADJUSTMENT $350,000 JODAVIESS 2 2008-2012

US 20 0.5 MI W OF RUSH ST IN STOCKTON TO 0.2 MI E OF ILL 78 (N) RESURFACING $870,000 JODAVIESS 2 2008-2012 ILL 78 Miles = 2.24 NORTH AVE

US 20 AT ILL 78 (S) IN STOCKTON TRAF SIGNAL INSTALLATION $110,000 JODAVIESS 2 2008-2012 ILL 78 NORTH AVE MAIN ST

2 - 8 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

US 20 0.2 MI E OF ILL 78 (N) TO REES RD RESURFACING $3,100,000 JODAVIESS 2 2008-2012 Miles = 8.65 STEPHENSON

US 20 0.9 MI SE OF W GALENA RD CULVERT REPLACEMENT $400,000 STEPHENSON 2 2007 RR FLAGGER

US 20 0.9 MI SE OF W GALENA RD LAND ACQUISITION $20,000 STEPHENSON 2 2007

US 20 0.9 MI SE OF W GALENA RD UTILITY ADJUSTMENT $20,000 STEPHENSON 2 2007

US 20 FREEPORT TO ROCKFORD PRELIMINARY ENGINEERING $750,000 STEPHENSON 2 2008-2012 WINNEBAGO

US 20 US 20 BUSN E OF FREEPORT TO WINNEBAGO CO LINE RESURFACING $5,510,000 STEPHENSON 2 2008-2012 Miles = 7.34

US 20 STEPHENSON CO LINE TO 0.2 MI W OF PECATONICA RD RESURFACING $1,505,000 WINNEBAGO 2 2008-2012 W STATE ST Miles = 1.86

US 20 FALCONER RD TO MERIDIAN RD SW OF ROCKFORD RESURFACING $2,495,000 WINNEBAGO 2 2008-2012 ROCKFORD BYP Miles = 2.65 W STATE ST

US 20 UNDER MERIDIAN RD 1 MI S OF US 20 BUSN BRIDGE NEW DECK $1,100,000 WINNEBAGO 2 2008-2012 ROCKFORD BYP

US 20 UNDER MERIDIAN RD 1 MI S OF US 20 BUSN P.E. (PHASE II) $120,000 WINNEBAGO 2 2007 ROCKFORD BYP

US 20 SE OF CUNNINGHAM RD TO I-39 / US 51 IN ROCKFORD RESURFACING $3,700,000 WINNEBAGO 2 2007 ROCKFORD BYP Miles = 8.08

US 20 UNDER MONTAGUE RD 1.5 MI SE OF MERIDIAN RD BRIDGE NEW DECK $1,100,000 WINNEBAGO 2 2008-2012 ROCKFORD BYP

2 - 9 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

US 20 UNDER MONTAGUE RD 1.5 MI SE OF MERIDIAN RD P.E. (PHASE II) $120,000 WINNEBAGO 2 2007 ROCKFORD BYP

US 20 CROSSOVERS FOR STUCTURES OVER PRAIRIE RD & MEDIAN CROSSOVER $400,000 WINNEBAGO 1 2007 ROCKFORD BYP SIMPSON RD

US 20 OVER PRAIRIE RD 1 MI W OF ILL 2 BRIDGE NEW DECK $1,500,000 WINNEBAGO 2 2008-2012 ROCKFORD BYP

US 20 OVER SIMPSON RD 0.8 MI W OF ILL 2 BRIDGE NEW DECK $1,800,000 WINNEBAGO 2 2008-2012 ROCKFORD BYP

US 20 OVER ILL 2 S OF ROCKFORD BRIDGE APPROACH ROADWAY $4,400,000 WINNEBAGO 2 2008-2012 ROCKFORD BYP BRIDGE REPLACEMENT

US 20 OVER ILL 2 S OF ROCKFORD P.E. (PHASE II) $150,000 WINNEBAGO 2 2008-2012 ROCKFORD BYP

US 20 OVER ILL 2 S OF ROCKFORD P.E. (PHASE I) $150,000 WINNEBAGO 2 2007 ROCKFORD BYP P.E. (CONSULTANT TSL)

US 20 OVER ILL 251 IN ROCKFORD BRIDGE REPLACEMENT $7,000,000 WINNEBAGO 8 2008-2012 ROCKFORD BYP

US 20 UNDER 20TH ST 0.7 MI E OF ILL 251 IN ROCKFORD BRIDGE REPLACEMENT $1,800,000 WINNEBAGO 2 2008-2012 ROCKFORD BYP BRIDGE APPROACH ROADWAY

US 20 UNDER 20TH ST 0.7 MI E OF ILL 251 IN ROCKFORD P.E. (PHASE I) $120,000 WINNEBAGO 2 2007 ROCKFORD BYP P.E. (CONSULTANT TSL)

US 20 UNDER 20TH ST 0.7 MI E OF ILL 251 IN ROCKFORD P.E. (PHASE II) $120,000 WINNEBAGO 2 2008-2012 ROCKFORD BYP

US 20 UNDER 20TH ST 0.7 MI E OF ILL 251 IN ROCKFORD LAND ACQUISITION $200,000 WINNEBAGO 2 2008-2012 ROCKFORD BYP

2 - 10 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

US 20 BUS PIERPONT AVE TO ROCKTON AVE IN ROCKFORD WIDENING & RESURFACING $16,200,000 WINNEBAGO 8 2008-2012 W STATE ST Miles = 1.87 TRAF SIGNAL MODERNIZATION INTERSECTION IMPROVEMENT LANDSCAPING CURB AND GUTTER SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE SIGNIFICANT ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT.

US 20 BUS PIERPONT AVE TO ROCKTON AVE IN ROCKFORD LAND ACQUISITION $3,000,000 WINNEBAGO 3 2007 W STATE ST

US 20 BUS PIERPONT AVE TO ROCKTON AVE IN ROCKFORD UTILITY ADJUSTMENT $200,000 WINNEBAGO 4 2008-2012 W STATE ST

US 20 BUS PIERPONT AVE TO ROCKTON AVE IN ROCKFORD RR CROSSING IMPROVEMENT $500,000 WINNEBAGO 3 2008-2012 W STATE ST

US 20 BUS PIERPONT AVE TO ROCKTON AVE IN ROCKFORD P.E. (PHASE II) $550,000 WINNEBAGO 1 2007 W STATE ST

US 20 BUS W STATE ST TO E STATE ST RESURFACING $1,260,000 WINNEBAGO 6 2007 ILL 251 A Miles = 1.37 CURB AND GUTTER ILL 251 COLD MILLING ROCKTON AVE CHESTNUT ST 1ST AVE

US 20 BUS W STATE ST TO E STATE ST RR CROSSING IMPROVEMENT $100,000 WINNEBAGO 1 2007 ILL 251 A ILL 251 ROCKTON AVE CHESTNUT ST 1ST AVE

US 20 BUS E STATE ST TO MULBERRY ST IN ROCKFORD RESURFACING $1,080,000 WINNEBAGO 1 2008-2012 ILL 70 Miles = 1.35 COLD MILLING US 20 BUSA CURB AND GUTTER JEFFERSON ST KILBURN AVE

2 - 11 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

US 20 BUS AT PERRYVILLE RD IN ROCKFORD TRAF SIGNAL MODERNIZATION $125,000 WINNEBAGO 1 2007 E STATE ST

US 20 BUS AT BELL SCHOOL RD IN ROCKFORD TRAF SIGNAL MODERNIZATION $125,000 WINNEBAGO 1 2007 E STATE ST

US 20 BUS SHAW RD E OF WINNEBAGO CO LINE TO HIGHLINE ST IN RESURFACING $1,830,000 BOONE 6 2008-2012 BELVIDERE Miles = 3.66

US 20 BUS 0.1 MI S OF LOGAN AVE (OLD US 20 BUSN) TO PERSSON'S RESURFACING $290,000 BOONE 6 2008-2012 GENOA RD PKWY IN BELVIDERE SHOULDER RECONSTRUCTION Miles = 0.51

US 30 MISSISSIPPI RIVER AT FULTON CONSTRUCTION ENGINEERING $350,000 WHITESIDE 1 2007 GATEWAY BRIDGE ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY.

US 30 0.4 MI E OF LINCOLN ST/DAKIN RD TO ILL 78 (N) RESURFACING $1,600,000 WHITESIDE 2 2008-2012 Miles = 9.80

US 30 ILL 136 TO I-88 P.E. (PHASE I) $1,500,000 WHITESIDE 1 2007

SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED

US 30 ILL 136 TO I-88 P.E. (PHASE I) $6,250,000 WHITESIDE 1 2008-2012

SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED

US 30 ROCK CREEK NW EDGE MORRISON BRIDGE REPLACEMENT $800,000 WHITESIDE 2 2008-2012 ILL 78

US 30 ROCK CREEK NW EDGE MORRISON UTILITY ADJUSTMENT $50,000 WHITESIDE 2 2008-2012 ILL 78

2 - 12 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

US 30 ROCK CREEK NW EDGE MORRISON LAND ACQUISITION $250,000 WHITESIDE 2 2008-2012 ILL 78

US 30 0.2 MI E OF JACKSON ST IN MORRISON TO FRENCH CREEK UTILITY ADJUSTMENT $200,000 WHITESIDE 1 2007

US 30 AT MCNEILL RD E OF ROCK FALLS INTERSECTION IMPROVEMENT $490,000 WHITESIDE 6 2007 TURNING LANES

US 30 AT MCNEILL RD E OF ROCK FALLS LAND ACQUISITION $50,000 WHITESIDE 6 2007

US 30 AT MCNEILL RD E OF ROCK FALLS UTILITY ADJUSTMENT $100,000 WHITESIDE 4 2007

US 30 0.2 MI W OF SOMONAUK RD TO 0.3 MI E OF REES ST IN UTILITY ADJUSTMENT $25,000 DEKALB 1 2007 LINCOLN AVE HINCKLEY

US 34 0.1 MI S OF PROSPECT ST TO 0.3 MI S OF SOUTH ST IN RESURFACING $1,130,000 HENRY 2 2008-2012 ILL 78 KEWANEE COLD MILLING TENNEY ST Miles = 1.41

US 34 UNDER BN RR/AMTRAK N OF KENTVILLE RD NE OF P.E. (PHASE II) $750,000 HENRY 1 2008-2012 RAILROAD AVE KEWANEE

SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED

US 34 UNDER BN RR/AMTRAK N OF KENTVILLE RD NE OF P.E. (PHASE I) $600,000 HENRY 1 2008-2012 RAILROAD AVE KEWANEE P.E. (CONSULTANT TSL)

SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED. PROJECT MAY REQUIRE SIGNIFICANT ADDITIONAL STATE AND OR LOCAL FUNDS TO IMPLEMENT.

US 52 MISSISSIPPI RIVER & BN&SF RR BRIDGE DECK REPAIRS $600,000 CARROLL 2 2008-2012 ILL 64 ILLINOIS LEAD AGENCY; IOWA AND ILLINOIS WILL SHARE COST EQUALLY.

2 - 13 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

US 52 E OF PLUM RIVER AT SAVANNA TO E OF MT CARROLL RESURFACING $8,400,000 CARROLL 8 2007 ILL 64 Miles = 9.20 PATCHING TURNING LANES SHOULDER REPAIR BRIDGE REPLACEMENT

US 52 E OF PLUM RIVER AT SAVANNA TO E OF MT CARROLL UTILITY ADJUSTMENT $100,000 CARROLL 4 2007 ILL 64

US 52 E OF PLUM RIVER AT SAVANNA TO E OF MT CARROLL LAND ACQUISITION $100,000 CARROLL 1 2007 ILL 64

US 52 ILL 64 TO ILL 26 RESURFACING $1,975,000 OGLE 9 2008-2012 Miles = 6.28

US 52 ILL 64 TO ILL 26 UTILITY ADJUSTMENT $100,000 OGLE 4 2008-2012 CARROLL

US 52 ILL 64 TO ILL 26 LAND ACQUISITION $300,000 OGLE 3 2007 CARROLL

US 52 AT ILL 64 INTERSECTION RECONSTN $4,000,000 OGLE 1 2008-2012 ILL 64 CARROLL

US 52 PLUM HOLLOW TO 4TH AVE IN DIXON RESURFACING $500,000 LEE 6 2008-2012 ILL 26 Miles = 0.59 TRAF SIGNAL INSTALLATION GALENA AVE

US 52 4TH AVE TO NORTH COURT IN DIXON RESURFACING $750,000 LEE 6 2008-2012 ILL 26 Miles = 0.31 GALENA AVE

US 52 4TH AVE TO NORTH COURT IN DIXON LAND ACQUISITION $500,000 LEE 6 2008-2012 ILL 26 GALENA AVE

US 52 4TH AVE TO NORTH COURT IN DIXON UTILITY ADJUSTMENT $200,000 LEE 4 2008-2012 ILL 26 GALENA AVE

2 - 14 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

US 52 NORTH COURT TO CHAMBERLAIN ST IN DIXON RESURFACING $700,000 LEE 1 2008-2012 ILL 26 Miles = 0.61 COLD MILLING GALENA AVE

US 52 ELDENA RD TO US 30 RESURFACING $2,200,000 LEE 2 2007 US 52 B Miles = 8.17 PATCHING SHOULDER REPAIR INTERSECTION IMPROVEMENT

US 52 N OF HENKLE RD TO 0.1 MI N OF ILL 251 IN MENDOTA RESURFACING $1,500,000 LEE 3 2008-2012 Miles = 4.15 CURB AND GUTTER LASALLE DITCH CLEANING DRAINAGE PATCHING

US 52 N OF HENKLE RD TO 0.1 MI N OF ILL 251 IN MENDOTA LAND ACQUISITION $200,000 LEE 2 2008-2012 LASALLE

US 52 N OF HENKLE RD TO 0.1 MI N OF ILL 251 IN MENDOTA UTILITY ADJUSTMENT $50,000 LEE 2 2008-2012 LASALLE

US 67 0.2 MI NW OF FRONT ST IN MILAN TO 19TH AVE IN ROCK RESURFACING $1,850,000 ROCK ISLAND 2 2008-2012 11TH ST ISLAND 9TH ST Miles = 2.35

US 67 3RD ST W TO 0.2 MI W OF FRONT ST IN MILAN RESURFACING $1,000,000 ROCK ISLAND 6 2008-2012 11TH ST Miles = 0.69 TRAF SIGNAL MODERNIZATION 1ST AVE

US 67 3RD AVE TO N OF 10TH AVE IN MILAN RESURFACING $1,500,000 ROCK ISLAND 5 2008-2012 1ST ST Miles = 0.58 COLD MILLING INTERSECTION IMPROVEMENT TURNING LANES

US 67 3RD AVE TO N OF 10TH AVE IN MILAN LAND ACQUISITION $400,000 ROCK ISLAND 5 2008-2012 1ST ST

US 67 3RD AVE TO N OF 10TH AVE IN MILAN RR CROSSING IMPROVEMENT $65,000 ROCK ISLAND 4 2008-2012 1ST ST

2 - 15 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

US 67 3RD AVE TO N OF 10TH AVE IN MILAN UTILITY ADJUSTMENT $200,000 ROCK ISLAND 4 2008-2012 1ST ST

US 67 N OF 10TH AVE IN MILAN TO 0.1 MI N OF ILL 94 RESURFACING $5,500,000 ROCK ISLAND 5 2008-2012 Miles = 3.48 PATCHING INTERSECTION IMPROVEMENT

US 67 N OF 10TH AVE IN MILAN TO 0.1 MI N OF ILL 94 LAND ACQUISITION $800,000 ROCK ISLAND 5 2008-2012

US 67 N OF 10TH AVE IN MILAN TO 0.1 MI N OF ILL 94 UTILITY ADJUSTMENT $100,000 ROCK ISLAND 4 2008-2012

US 150 ILL 17 (W) TO S OF ILL 17 (E) THROUGH ALPHA RESURFACING $950,000 HENRY 4 2008-2012 ILL 17 Miles = 1.55 PATCHING 1ST ST CURB AND GUTTER STORM SEWER (NEW) COLD MILLING

US 150 ILL 17 (W) TO S OF ILL 17 (E) THROUGH ALPHA UTILITY ADJUSTMENT $100,000 HENRY 2 2008-2012 ILL 17 1ST ST

US 150 ILL 17 (W) TO S OF ILL 17 (E) THROUGH ALPHA LAND ACQUISITION $200,000 HENRY 2 2008-2012 ILL 17 1ST ST

ILL 2 LITTLE CREEK W OF SAUK VALLEY COLLEGE BRIDGE REPLACEMENT $800,000 LEE 2 2008-2012 (WESTBOUND)

ILL 2 LITTLE CREEK W OF SAUK VALLEY COLLEGE P.E. (PHASE II) $65,000 LEE 2 2008-2012 (WESTBOUND)

ILL 2 DRAINAGE DITCH E OF SAUK VALLEY COLLEGE BRIDGE REPLACEMENT $800,000 LEE 2 2008-2012 (WESTBOUND)

ILL 2 DRAINAGE DITCH E OF SAUK VALLEY COLLEGE P.E. (PHASE II) $65,000 LEE 2 2008-2012 (WESTBOUND)

2 - 16 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

ILL 2 OTTAWA AVE TO E OF RIVER ST IN DIXON RESURFACING $245,000 LEE 3 2008-2012 2ND ST E Miles = 0.73 COLD MILLING

ILL 2 0.1 MI N OF FAIR ST TO 0.1 MI S OF MADISON ST IN OREGON RESURFACING $475,000 OGLE 7 2007 ILL 64 Miles = 0.93 COLD MILLING 4TH ST CURB AND GUTTER

ILL 2 S OF MUD CREEK RD TO FAIR ST IN OREGON RECONSTRUCTION $8,500,000 OGLE 4 2008-2012 Miles = 2.23 TURNING LANES RETAINING WALL

ILL 2 S OF MUD CREEK RD TO FAIR ST IN OREGON UTILITY ADJUSTMENT $200,000 OGLE 1 2008-2012

ILL 2 S OF MUD CREEK RD TO FAIR ST IN OREGON LAND ACQUISITION $1,050,000 OGLE 1 2007

ILL 2 ILL 72 W OF BYRON TO S OF MUD CREEK RD RESURFACING $1,950,000 OGLE 9 2008-2012 Miles = 6.46

ILL 2 BELTLINE RD S OF ROCKFORD TO ILL 72 (E) IN BYRON RESURFACING $4,250,000 OGLE 9 2008-2012 Miles = 10.60 WINNEBAGO

ILL 2 AT CLIFTON AVE 1.8 MI N OF US 20 UTILITY ADJUSTMENT $200,000 WINNEBAGO 1 2007 S MAIN ST

ILL 2 AT AUBURN ST IN ROCKFORD P.E. (PHASE I) $400,000 WINNEBAGO 1 2007 N MAIN ST P.E. (PHASE II)

ILL 5 US 67 TO 24TH ST IN ROCK ISLAND RESURFACING $390,000 ROCK ISLAND 1 2007 BLACKHAWK RD Miles = 0.93

ILL 5 52ND AVE EXT LANDSCAPING $525,000 ROCK ISLAND 2 2007 BLACKHAWK RD

ILL 5 COLONA RD TO 0.1 MI NE OF BARSTOW RD RESURFACING $2,760,000 ROCK ISLAND 2 2008-2012 ILL 92 Miles = 2.43 PATCHING JOHN DEERE RD

2 - 17 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

ILL 26 N OF CEDAR CREEK IN CEDARVILLE TO FAIRVIEW RD RESURFACING $975,000 STEPHENSON 2 2007 Miles = 3.66

ILL 26 FAIRVIEW RD TO S OF US 20 BUSN IN FREEPORT RESURFACING $2,200,000 STEPHENSON 2 2008-2012 WEST AVE Miles = 2.03

ILL 26 S OF US 20 BUSN IN FREEPORT TO EMPIRE ST S OF RESURFACING $850,000 STEPHENSON 2 2008-2012 WEST AVE FREEPORT Miles = 0.96

ILL 26 0.5 MI N OF ILL 72 0.1 MI S OF COFFMAN & 0.4 MI N OF CULVERT REPLACEMENT $365,000 OGLE 3 2008-2012 PRAIRIE DELL RD

ILL 26 0.5 MI N OF ILL 72 0.1 MI S OF COFFMAN & 0.4 MI N OF LAND ACQUISITION $50,000 OGLE 3 2008-2012 PRAIRIE DELL RD

ILL 40 ILL 78 TO SCHOOL ST IN CHADWICK RESURFACING $2,080,000 CARROLL 6 2008-2012 Miles = 8.24 CULVERT REPLACEMENT

ILL 40 ILL 78 TO SCHOOL ST IN CHADWICK LAND ACQUISITION $250,000 CARROLL 3 2008-2012

ILL 40 ILL 78 TO SCHOOL ST IN CHADWICK UTILITY ADJUSTMENT $100,000 CARROLL 2 2008-2012

ILL 40 STONER ST TO ADAMS ST IN MILLEDGEVILLE RESURFACING $530,000 CARROLL 2 2008-2012 Miles = 1.16 COLD MILLING CULVERT REPLACEMENT

ILL 40 ADAMS ST IN MILLEDGEVILLE TO S OF 26TH ST IN STERLING RESURFACING $4,515,000 WHITESIDE 2 2008-2012 LUTHER RD Miles = 12.31 DRAINAGE CARROLL LOCUST ST

ILL 40 ELKHORN CREEK 2 MI N OF STERLING BRIDGE REPLACEMENT $1,000,000 WHITESIDE 6 2008-2012 SHOULDER RECONSTRUCTION

2 - 18 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

ILL 40 ELKHORN CREEK 2 MI N OF STERLING LAND ACQUISITION $50,000 WHITESIDE 6 2008-2012

ILL 40 ELKHORN CREEK 2 MI N OF STERLING UTILITY ADJUSTMENT $20,000 WHITESIDE 6 2008-2012

ILL 40 ROCK RIVER BETWEEN STERLING & ROCK FALLS P.E. (CONSULTANT TSL) $700,000 WHITESIDE 2 2007

ILL 40 ROCK RIVER BETWEEN STERLING & ROCK FALLS P.E. (PHASE II) $700,000 WHITESIDE 2 2008-2012

ILL 40 ROCK RIVER BETWEEN STERLING & ROCK FALLS P.E. (CONSULTANT TSL) $600,000 WHITESIDE 1 2008-2012

ILL 40 HENNEPIN CANAL FEEDER 0.5 MI S OF US 30 BRIDGE REPLACEMENT $1,000,000 WHITESIDE 1 2008-2012 BIKEWAY

ILL 40 HENNEPIN CANAL FEEDER 0.5 MI S OF US 30 P.E. (PHASE I) $100,000 WHITESIDE 1 2007 P.E. (CONSULTANT TSL)

ILL 40 HENNEPIN CANAL FEEDER 0.5 MI S OF US 30 P.E. (PHASE II) $100,000 WHITESIDE 1 2008-2012

ILL 40 HENNEPIN CANAL FEEDER 0.5 MI S OF US 30 LAND ACQUISITION $20,000 WHITESIDE 1 2008-2012

ILL 40 HENNEPIN CANAL FEEDER 0.5 MI S OF US 30 UTILITY ADJUSTMENT $20,000 WHITESIDE 1 2008-2012

ILL 40 GREEN RIVER 1 MI S OF DEER GROVE UTILITY ADJUSTMENT $20,000 WHITESIDE 1 2007

ILL 64 0.1 MI S OF WILLOW RD CULVERT REPLACEMENT $400,000 CARROLL 5 2007 US 52

ILL 64 0.1 MI S OF WILLOW RD LAND ACQUISITION $30,000 CARROLL 5 2007 US 52

2 - 19 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

ILL 64 0.1 MI S OF WILLOW RD UTILITY ADJUSTMENT $20,000 CARROLL 4 2007 US 52

ILL 64 ELKHORN CREEK 2.7 MI W OF ILL 26 BRIDGE REPLACEMENT $460,000 OGLE 1 2008-2012

ILL 64 ELKHORN CREEK 2.7 MI W OF ILL 26 P.E. (PHASE I) $60,000 OGLE 1 2008-2012 P.E. (CONSULTANT TSL)

ILL 64 ELKHORN CREEK 2.7 MI W OF ILL 26 P.E. (PHASE II) $60,000 OGLE 1 2008-2012

ILL 64 ELKHORN CREEK 2.7 MI W OF ILL 26 LAND ACQUISITION $20,000 OGLE 1 2008-2012

ILL 64 ELKHORN CREEK 2.7 MI W OF ILL 26 UTILITY ADJUSTMENT $20,000 OGLE 1 2008-2012

ILL 64 BN&SF RR AT MT MORRIS TO W ILLINOIS ST IN OREGON PATCHING $1,550,000 OGLE 2 2008-2012 Miles = 4.61 RESURFACING

ILL 64 0.2 MI E OF DAYSVILLE RD TO CHANA RD RESURFACING $1,310,000 OGLE 2 2008-2012 WASHINGTON ST Miles = 5.03

ILL 64 CHANA RD TO ILL 251 RESURFACING $2,200,000 OGLE 2 2007 Miles = 7.99

ILL 70 TRIBUTARY OF 0.1, 0.5 & 0.6 MI W OF BRIDGE REPLACEMENT $1,800,000 WINNEBAGO 1 2008-2012 CEMETERY RD

ILL 70 TRIBUTARY OF PECATONICA RIVER 0.1, 0.5 & 0.6 MI W OF P.E. (PHASE I) $150,000 WINNEBAGO 1 2008-2012 CEMETERY RD P.E. (CONSULTANT TSL)

ILL 70 TRIBUTARY OF PECATONICA RIVER 0.1, 0.5 & 0.6 MI W OF P.E. (PHASE II) $150,000 WINNEBAGO 1 2008-2012 CEMETERY RD

2 - 20 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

ILL 70 TRIBUTARY OF PECATONICA RIVER 0.1, 0.5 & 0.6 MI W OF LAND ACQUISITION $75,000 WINNEBAGO 1 2008-2012 CEMETERY RD

ILL 70 TRIBUTARY OF PECATONICA RIVER 0.1, 0.5 & 0.6 MI W OF UTILITY ADJUSTMENT $75,000 WINNEBAGO 1 2008-2012 CEMETERY RD

ILL 72 ROCK RIVER IN BYRON TO WCL OF STILLMAN VALLEY RESURFACING $1,200,000 OGLE 2 2008-2012 Miles = 4.04

ILL 72 WCL OF STILLMAN VALLEY TO ILL 251 IN DAVIS JUNCTION RESURFACING $1,580,000 OGLE 2 2008-2012 Miles = 5.65

ILL 72 DITCHES 0.3 MI W OF MILL RD, 0.2 & 0.8 MI W OF CONGER CULVERT REPLACEMENT $1,250,000 OGLE 2 2008-2012 RD, & 0.6 MI W OF BLAIN ST & NEAR BLAIN ST IN LEAF RIVER

ILL 72 DITCHES 0.3 MI W OF MILL RD, 0.2 & 0.8 MI W OF CONGER LAND ACQUISITION $50,000 OGLE 2 2007 RD, 0.6 MI W OF BLAIN ST & NEAR BLAIN ST IN LEAF RIVER

ILL 72 DITCHES 0.3 MI W OF MILL RD, 0.2 & 0.8 MI W OF CONGER UTILITY ADJUSTMENT $60,000 OGLE 2 2008-2012 RD, & 0.6 MI W OF BLAIN ST & NEAR BLAIN ST IN LEAF RIVER

ILL 72 DITCHES 0.5 MI W OF DEKALB CO LINE & 0.5 MI E OF CULVERT REPLACEMENT $315,000 OGLE 2 2008-2012 BENNETT RD

ILL 72 DITCHES 0.5 MI W OF DEKALB CO LINE & 0.5 MI E OF LAND ACQUISITION $25,000 OGLE 2 2007 BENNETT RD

ILL 72 DITCHES 0.5 MI W OF DEKALB CO LINE & 0.5 MI E OF UTILITY ADJUSTMENT $30,000 OGLE 2 2008-2012 BENNETT RD

ILL 73 US 20 TO CARROLL CO LINE RESURFACING $2,700,000 STEPHENSON 2 2008-2012 Miles = 10.98

2 - 21 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

ILL 75 HOWARD ST TO US 20 BYP NE OF FREEPORT RESURFACING $700,000 STEPHENSON 2 2008-2012 Miles = 2.29 BI-DIRECT LEFT TURN LANE SHOULDER RECONSTRUCTION STORM SEWER REPAIR DRAINAGE

ILL 75 0.3 MI N OF US 20 NE OF FREEPORT TO 0.1 MI W OF ROCK RESURFACING $2,700,000 STEPHENSON 8 2007 CITY RD IN ROCK CITY PATCHING Miles = 8.80 DITCH CLEANING SHOULDER RECONSTRUCTION

ILL 75 0.3 MI N OF US 20 NE OF FREEPORT TO 0.1 MI W OF ROCK UTILITY ADJUSTMENT $110,000 STEPHENSON 4 2007 CITY RD IN ROCK CITY

ILL 75 0.3 MI N OF US 20 NE OF FREEPORT TO 0.1 MI W OF ROCK LAND ACQUISITION $500,000 STEPHENSON 2 2007 CITY RD IN ROCK CITY

ILL 75 8 CULVERTS BETWEEN 0.3 MI N OF US 20 NE OF FREEPORT CULVERT REPLACEMENT $650,000 STEPHENSON 1 2007 TO 0.1 MI W OF ROCK CITY RD IN ROCK CITY

ILL 75 0.1 MI W OF ROCK CITY RD IN ROCK CITY TO 0.4 MI E OF ILL RESURFACING $2,225,000 STEPHENSON 8 2008-2012 70 S OF DURAND PATCHING WINNEBAGO Miles = 8.03 DITCH CLEANING SHOULDER RECONSTRUCTION

ILL 75 0.1 MI W OF ROCK CITY RD IN ROCK CITY TO 0.4 MI E OF ILL UTILITY ADJUSTMENT $100,000 STEPHENSON 4 2008-2012 70 S OF DURAND WINNEBAGO

ILL 75 0.1 MI W OF ROCK CITY RD IN ROCK CITY TO 0.4 MI E OF ILL LAND ACQUISITION $350,000 STEPHENSON 3 2007 70 S OF DURAND WINNEBAGO

ILL 75 0.1 MI W OF ROCK CITY RD IN ROCK CITY TO 0.4 MI E OF ILL LAND ACQUISITION $650,000 STEPHENSON 1 2008-2012 70 S OF DURAND WINNEBAGO

2 - 22 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

ILL 75 STRUCTURES BETWEEN 0.1 MI W OF ROCK CITY RD IN BRIDGE REPLACEMENT $2,000,000 STEPHENSON 1 2008-2012 ROCK CITY TO 0.4 MI E OF ILL 70 S OF DURAND BRIDGE APPROACH ROADWAY WINNEBAGO CULVERT REPLACEMENT

ILL 75 AT ILL 70 S OF DURAND INTERSECTION RECONSTN $4,000,000 WINNEBAGO 1 2008-2012

ILL 75 ILL 70 TO HARRISON RD RESURFACING $1,955,000 WINNEBAGO 2 2008-2012 Miles = 7.39 COLD MILLING CULVERT REPLACEMENT

ILL 75 HARRISON RD TO ROCK RIVER IN ROCKTON RESURFACING $1,710,000 WINNEBAGO 2 2008-2012 FREEPORT RD Miles = 6.85 CULVERT REPLACEMENT BLACKHAWK BLVD

ILL 75 DITCH 0.3 MI E OF MERIDIAN RD E OF HARRISON BRIDGE REPLACEMENT $550,000 WINNEBAGO 4 2007

ILL 75 DITCH 0.3 MI E OF MERIDIAN RD E OF HARRISON LAND ACQUISITION $30,000 WINNEBAGO 4 2007

ILL 75 ROCK RIVER TO ILL 2 IN ROCKTON RESURFACING $5,300,000 WINNEBAGO 8 2008-2012 BLACKHAWK BLVD Miles = 1.48 CURB AND GUTTER STORM SEWER (NEW) DRAINAGE

ILL 75 ROCK RIVER TO ILL 2 IN ROCKTON UTILITY ADJUSTMENT $300,000 WINNEBAGO 3 2008-2012 BLACKHAWK BLVD

ILL 75 ROCK RIVER TO ILL 2 IN ROCKTON LAND ACQUISITION $1,000,000 WINNEBAGO 2 2007 BLACKHAWK BLVD

ILL 75 ILL 2 TO I-90 IN SOUTH BELOIT RESURFACING $820,000 WINNEBAGO 2 2007 US 51 Miles = 2.22 GARDNER AVE

ILL 76 AT WALNUT GROVE DR 2.8 MI N OF US 20 BUSN N OF TURNING LANES $360,000 BOONE 3 2008-2012 BELVIDERE

2 - 23 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

ILL 76 AT WALNUT GROVE DR 2.8 MI N OF US 20 BUSN N OF LAND ACQUISITION $20,000 BOONE 3 2008-2012 BELVIDERE

ILL 76 AT WALNUT GROVE DR 2.8 MI N OF US 20 BUSN N OF UTILITY ADJUSTMENT $20,000 BOONE 2 2008-2012 BELVIDERE

ILL 78 CLINTON ST TO N OF WINSLOW RD IN WARREN RESURFACING $415,000 JODAVIESS 2 2008-2012 MAIN ST Miles = 1.08 TISDELL ST

ILL 78 STOCKTON TO CARROLL CO LINE RESURFACING $3,000,000 JODAVIESS 8 2008-2012 MAIN ST Miles = 12.10 DITCH CLEANING CULVERT REPLACEMENT GUARDRAIL

ILL 78 STOCKTON TO CARROLL CO LINE LAND ACQUISITION $500,000 JODAVIESS 8 2008-2012 MAIN ST

ILL 78 STOCKTON TO CARROLL CO LINE UTILITY ADJUSTMENT $250,000 JODAVIESS 8 2008-2012 MAIN ST

ILL 78 JODAVIESS CO LINE TO NCL OF MT CARROLL RESURFACING $2,100,000 CARROLL 9 2008-2012 Miles = 6.86

ILL 78 S OF I-80 TO SOUTH ST IN ANNAWAN RESURFACING $500,000 HENRY 6 2008-2012 CANAL ST Miles = 0.61

ILL 78 SOUTH ST IN ANNAWAN TO 0.6 MI S OF 1300N RESURFACING $2,030,000 HENRY 2 2008-2012 Miles = 4.59

ILL 78 AT ILL 81 IN KEWANEE UTILITY ADJUSTMENT $100,000 HENRY 1 2007 MAIN ST

ILL 81 US 150 TO I-74 MICROSURFACING $170,000 HENRY 1 2007

2 - 24 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

ILL 82 STREAM 3 MI S OF ILL 92 CULVERT REPLACEMENT $650,000 HENRY 2 2008-2012

ILL 82 STREAM 3 MI S OF ILL 92 P.E. (PHASE II) $75,000 HENRY 2 2008-2012

ILL 82 STREAM 3 MI S OF ILL 92 LAND ACQUISITION $75,000 HENRY 2 2008-2012

ILL 82 STREAM 3 MI S OF ILL 92 UTILITY ADJUSTMENT $40,000 HENRY 2 2008-2012

ILL 82 HENNEPIN CANAL 1.2 MI N OF GENESEO BRIDGE REPLACEMENT $720,000 HENRY 2 2008-2012

ILL 82 HENNEPIN CANAL 1.2 MI N OF GENESEO P.E. (PHASE II) $75,000 HENRY 2 2008-2012

ILL 82 GRADE SEPARATION STUDY AT IAIS RR IN GENESEO P.E. (FEASIBILITY STUDY) $300,000 HENRY 1 2007

SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED

ILL 82 TRIB SPRING CREEK 1.7 & 3.4 MI N OF ILL 81 BRIDGE REPLACEMENT $1,000,000 HENRY 7 2008-2012

ILL 82 TRIB SPRING CREEK 1.7 & 3.4 MI N OF ILL 81 P.E. (PHASE II) $100,000 HENRY 7 2008-2012

ILL 82 TRIB SPRING CREEK 1.7 & 3.4 MI N OF ILL 81 LAND ACQUISITION $70,000 HENRY 7 2008-2012

ILL 82 TRIB SPRING CREEK 1.7 & 3.4 MI N OF ILL 81 UTILITY ADJUSTMENT $40,000 HENRY 2 2008-2012

ILL 82 TRIB OF EDWARDS RIVER 1 MI S OF ILL 81 CULVERT REPLACEMENT $430,000 HENRY 2 2008-2012

2 - 25 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

ILL 82 TRIB OF EDWARDS RIVER 1 MI S OF ILL 81 LAND ACQUISITION $20,000 HENRY 2 2008-2012

ILL 82 TRIB OF EDWARDS RIVER 1 MI S OF ILL 81 UTILITY ADJUSTMENT $20,000 HENRY 2 2008-2012

ILL 82 SCL OF CAMBRIDGE TO 700N MICROSURFACING $130,000 HENRY 1 2007

ILL 84 IRISH HOLLOW CREEK 2.3 MI S OF US 20 BRIDGE NEW DECK $180,000 JODAVIESS 1 2008-2012

ILL 84 IRISH HOLLOW CREEK 2.3 MI S OF US 20 P.E. (PHASE I) $90,000 JODAVIESS 1 2008-2012 P.E. (CONSULTANT TSL)

ILL 84 IRISH HOLLOW CREEK 2.3 MI S OF US 20 P.E. (PHASE II) $90,000 JODAVIESS 1 2008-2012

ILL 84 NCL OF HANOVER TO GARFIELD ST IN HANOVER RESURFACING $360,000 JODAVIESS 2 2007 Miles = 0.73

ILL 84 0.2 MI N OF DOTY RD TO WHITESIDE CO LINE RESURFACING $2,985,000 CARROLL 2 2008-2012 Miles = 10.40

ILL 84 0.2 MI N OF DOTY RD TO WHITESIDE CO LINE RR CROSSING IMPROVEMENT $150,000 CARROLL 2 2008-2012

ILL 84 CATTAIL CREEK 0.9 MI S OF US 30 BRIDGE BEAM REPLACEMENT $410,000 WHITESIDE 1 2007 BRIDGE NEW DECK

ILL 84 0.1 MI N OF GARDEN PLAIN RD TO 10TH AVE N (RIVERVIEW VERTICAL REALIGNMENT $4,575,000 WHITESIDE 5 2008-2012 DR) IN ALBANY BRIDGE REPLACEMENT Miles = 1.80 INTERSECTION RECONSTN

ILL 84 0.1 MI N OF GARDEN PLAIN RD TO 10TH AVE N (RIVERVIEW UTILITY ADJUSTMENT $50,000 WHITESIDE 5 2008-2012 DR) IN ALBANY

2 - 26 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

ILL 84 0.1 MI N OF GARDEN PLAIN RD TO 10TH AVE N (RIVERVIEW LAND ACQUISITION $750,000 WHITESIDE 5 2008-2012 DR) IN ALBANY

ILL 84 1.1 MI S OF WHITESIDE CO LINE TO N OF BLUE SPRUCE DR RESURFACING $1,000,000 ROCK ISLAND 2 2008-2012 IN CORDOVA Miles = 6.22

ILL 84 N OF BLUE SPRUCE DR TO 0.1 MI S OF ASH LN IN CORDOVA RESURFACING $450,000 ROCK ISLAND 2 2008-2012 Miles = 1.43

ILL 84 DITCH AT S EDGE OF CORDOVA CULVERT REPLACEMENT $475,000 ROCK ISLAND 2 2008-2012

ILL 84 DITCH AT S EDGE OF CORDOVA P.E. (PHASE I) $75,000 ROCK ISLAND 2 2007 P.E. (CONSULTANT TSL)

ILL 84 DITCH AT S EDGE OF CORDOVA P.E. (PHASE II) $60,000 ROCK ISLAND 2 2008-2012

ILL 84 DITCH AT S EDGE OF CORDOVA LAND ACQUISITION $30,000 ROCK ISLAND 2 2008-2012

ILL 84 0.1 MI S OF ASH LN IN CORDOVA TO 0.2 MI N OF FAIRFIELD RESURFACING $340,000 ROCK ISLAND 2 2008-2012 ST IN PORT BYRON Miles = 2.03

ILL 84 0.2 MI N OF FAIRFIELD ST IN PORT BYRON TO 0.3 MI N OF RESURFACING $875,000 ROCK ISLAND 2 2008-2012 11TH ST IN RAPIDS CITY COLD MILLING Miles = 3.52

ILL 84 0.3 MI N OF 11TH ST TO 0.1 MI S OF 20TH ST (FRONTAGE RD) RESURFACING $375,000 ROCK ISLAND 2 2008-2012 IN RAPIDS CITY COLD MILLING Miles = 1.15

ILL 84 0.1 MI S OF 20TH ST (FRONTAGE RD) IN RAPIDS CITY TO 9TH RESURFACING $810,000 ROCK ISLAND 2 2008-2012 ST IN HAMPTON COLD MILLING Miles = 2.95

2 - 27 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

ILL 84 9TH ST IN HAMPTON TO ILL 92 IN SILVIS RESURFACING $1,100,000 ROCK ISLAND 2 2008-2012 Miles = 3.33

ILL 84 ILL 92/5 IN CARBON CLIFF TO COLONA RD RESURFACING $900,000 ROCK ISLAND 2 2008-2012 Miles = 1.88

ILL 92 ILL 192 TO 7TH ST IN ANDALUSIA RESURFACING $2,170,000 ROCK ISLAND 8 2008-2012 Miles = 6.83

ILL 92 ILL 192 TO 7TH ST IN ANDALUSIA LAND ACQUISITION $250,000 ROCK ISLAND 2 2008-2012

ILL 92 BIG BRANCH CREEK 1.5 MI N OF ILL 192 BRIDGE REPLACEMENT $675,000 ROCK ISLAND 1 2008-2012

ILL 92 BIG BRANCH CREEK 1.5 MI N OF ILL 192 P.E. (PHASE I) $120,000 ROCK ISLAND 1 2008-2012 P.E. (CONSULTANT TSL)

ILL 92 BIG BRANCH CREEK 1.5 MI N OF ILL 192 P.E. (PHASE II) $120,000 ROCK ISLAND 1 2008-2012

ILL 92 BIG BRANCH CREEK 1.5 MI N OF ILL 192 LAND ACQUISITION $60,000 ROCK ISLAND 1 2008-2012

ILL 92 BIG BRANCH CREEK 1.5 MI N OF ILL 192 UTILITY ADJUSTMENT $40,000 ROCK ISLAND 1 2008-2012

ILL 92 DITCH W OF 120TH ST (W) AT WCL OF ANDALUSIA CULVERT REPLACEMENT $400,000 ROCK ISLAND 1 2008-2012

ILL 92 DITCH W OF 120TH ST (W) AT WCL OF ANDALUSIA UTILITY ADJUSTMENT $20,000 ROCK ISLAND 1 2008-2012

ILL 92 DITCH W OF 120TH ST (W) AT WCL OF ANDALUSIA LAND ACQUISITION $35,000 ROCK ISLAND 1 2008-2012

2 - 28 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

ILL 92 DRAINAGE DITCHES AT E EDGE & 1.5 MI E OF ANDALUSIA UTILITY ADJUSTMENT $25,000 ROCK ISLAND 1 2007 ADAMS ST 78TH ST

ILL 92 AT TURKEY HOLLOW RD W OF MILAN TURNING LANES $750,000 ROCK ISLAND 6 2007 ANDALUSIA RD

ILL 92 AT TURKEY HOLLOW RD W OF MILAN UTILITY ADJUSTMENT $300,000 ROCK ISLAND 3 2007 ANDALUSIA RD

ILL 92 E OF TURKEY HOLLOW RD TO 0.3 MI E OF ILL 92 (N) RESURFACING $500,000 ROCK ISLAND 1 2008-2012 Miles = 1.15 PATCHING

ILL 92 S OF I-280 TO ANDALUSIA RD SHOULDER REPAIR $1,325,000 ROCK ISLAND 6 2007 CENTENNIAL EXPY PATCHING

ILL 92 S OF 3RD AVE TO I-280 IN ROCK ISLAND RESURFACING $2,820,000 ROCK ISLAND 2 2008-2012 CENTENNIAL EXPY Miles = 3.25

ILL 92 31ST AVE & IAIS RR 0.2 MI S OF 18TH AVE & 18TH AVE & 7TH BRIDGE REPLACEMENT $7,800,000 ROCK ISLAND 6 2008-2012 CENTENNIAL EXPY AVE IN ROCK ISLAND BRIDGE NEW DECK

ILL 92 31ST AVE & IAIS RR 0.2 MI S OF 18TH AVE & 18TH AVE & 7TH UTILITY ADJUSTMENT $100,000 ROCK ISLAND 4 2008-2012 CENTENNIAL EXPY AVE IN ROCK ISLAND

ILL 92 38TH ST TO 24TH ST IN ROCK ISLAND RESURFACING $825,000 ROCK ISLAND 2 2007 ILL 92 A Miles = 1.55 COLD MILLING ILL 92 B 5TH AVE 4TH AVE

ILL 92 48TH ST TO 0.1 MI E OF 27TH ST IN MOLINE RESURFACING $1,600,000 ROCK ISLAND 2 2008-2012 ILL 92 B Miles = 1.77 4TH AVE 5TH AVE

ILL 92 OVER ILL 84 IN SILVIS (SILVIS INTCHG) BRIDGE REPLACEMENT $6,000,000 ROCK ISLAND 4 2008-2012 ILL 5 BRIDGE APPROACH ROADWAY

2 - 29 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

ILL 92 E OF I-88 TO 307TH ST (N) E OF JOSLIN RESURFACING $850,000 ROCK ISLAND 2 2008-2012 38TH AVE N Miles = 2.06

ILL 92 ROCK RIVER TO ILL 78 (N) RESURFACING $3,900,000 HENRY 1 2008-2012 Miles = 12.80 ROCK ISLAND

ILL 92 MAIN UNION SP DITCH 0.9 MI W OF ILL 78 BRIDGE REPLACEMENT $390,000 HENRY 1 2008-2012

ILL 92 MAIN UNION SP DITCH 0.9 MI W OF ILL 78 P.E. (PHASE I) $65,000 HENRY 1 2007 P.E. (CONSULTANT TSL)

ILL 92 MAIN UNION SP DITCH 0.9 MI W OF ILL 78 P.E. (PHASE II) $65,000 HENRY 1 2008-2012

ILL 92 MAIN UNION SP DITCH 0.9 MI W OF ILL 78 LAND ACQUISITION $20,000 HENRY 1 2008-2012

ILL 92 MAIN UNION SP DITCH 0.9 MI W OF ILL 78 UTILITY ADJUSTMENT $20,000 HENRY 1 2008-2012

ILL 94 0.2 MI S OF ILL 192 TO ILL 94 (S) IN MERCER CO RESURFACING $2,600,000 ROCK ISLAND 2 2008-2012 Miles = 7.24 CULVERT REPLACEMENT MERCER DRAINAGE SHOULDER RECONSTRUCTION

ILL 94 0.2 MI S OF ILL 192 TO ILL 94 (S) IN MERCER CO LAND ACQUISITION $30,000 ROCK ISLAND 2 2008-2012 MERCER

ILL 94 0.2 MI S OF ILL 192 TO ILL 94 (S) IN MERCER CO UTILITY ADJUSTMENT $40,000 ROCK ISLAND 2 2008-2012 MERCER

ILL 136 MISSISSIPPI RIVER IN FULTON BRIDGE REPAIR $375,000 WHITESIDE 3 2008-2012

IOWA LEAD AGENCY; ILLINOIS' SHARE OF THE COST.

2 - 30 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

ILL 136 MISSISSIPPI RIVER TO US 30 RESURFACING $1,450,000 WHITESIDE 2 2008-2012 Miles = 3.21 PATCHING COLD MILLING LEFT TURN LANES

ILL 173 AT I-90 IN LOVES PARK CONSTRUCTION ENGINEERING $850,000 WINNEBAGO 1 2007 WEST LANE RD

ILL 173 AT I-90 IN LOVES PARK UTILITY ADJUSTMENT $200,000 WINNEBAGO 1 2007 WEST LANE RD

ILL 173 BEAVER CREEK 2 MI E OF POPLAR GROVE BRIDGE REPLACEMENT $1,000,000 BOONE 6 2007

ILL 192 105TH ST W TO TURKEY HOLLOW RD RESURFACING $695,000 ROCK ISLAND 2 2008-2012 134TH AVE W Miles = 2.24

ILL 251 ROOSEVELT RD TO ILL 173 IN MACHESNEY PARK RESURFACING $1,370,000 WINNEBAGO 2 2007 N 2ND ST Miles = 1.54 COLD MILLING

ILL 251 SPRING CREEK RD IN ROCKFORD BRIDGE REHABILITATION $4,000,000 WINNEBAGO 2 2008-2012 N 2ND ST BRIDGE NEW DECK

ILL 251 SPRING CREEK RD IN ROCKFORD P.E. (PHASE II) $140,000 WINNEBAGO 2 2008-2012 N 2ND ST

ILL 251 15TH AVE TO HARRISON AVE IN ROCKFORD INTERSECTION IMPROVEMENT $5,300,000 WINNEBAGO 9 2007 KISHWAUKEE ST Miles = 0.91 CURB AND GUTTER RECONSTRUCTION

ILL 251 15TH AVE TO HARRISON AVE IN ROCKFORD UTILITY ADJUSTMENT $100,000 WINNEBAGO 3 2007 KISHWAUKEE ST

ILL 251 15TH AVE TO HARRISON AVE IN ROCKFORD LAND ACQUISITION $750,000 WINNEBAGO 3 2007 KISHWAUKEE ST

ILL 251 WINNEBAGO CO LINE TO N OF FLAGG RD RESURFACING $3,225,000 OGLE 2 2008-2012 Miles = 14.40

2 - 31 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

ILL 251 DITCH 2.6 MI S OF ILL 72 CULVERT REPLACEMENT $450,000 OGLE 2 2008-2012

ILL 251 DITCH 2.6 MI S OF ILL 72 P.E. (PHASE II) $65,000 OGLE 2 2008-2012

ILL 251 DITCH 2.6 MI S OF ILL 72 LAND ACQUISITION $40,000 OGLE 2 2008-2012

ILL 251 DITCH 2.6 MI S OF ILL 72 UTILITY ADJUSTMENT $20,000 OGLE 2 2008-2012

ILL 251 N OF FLAGG RD TO ILL 38 (E) IN ROCHELLE BI-DIRECT LEFT TURN LANE $5,000,000 OGLE 3 2008-2012 SEVENTH ST Miles = 0.81 RESURFACING CURB AND GUTTER STORM SEWER (NEW)

ILL 251 N OF FLAGG RD TO ILL 38 (E) IN ROCHELLE LAND ACQUISITION $750,000 OGLE 3 2008-2012 SEVENTH ST

ILL 251 N OF FLAGG RD TO ILL 38 (E) IN ROCHELLE UTILITY ADJUSTMENT $100,000 OGLE 3 2008-2012 SEVENTH ST

ILL 251 I-88 TO CHICAGO RD RESURFACING $3,885,000 OGLE 2 2008-2012 Miles = 13.83 LEE

ILL 251 CHICAGO RD TO US 52 IN MENDOTA RESURFACING $4,000,000 LEE 2 2008-2012 Miles = 11.74 CULVERT EXTENSION LASALLE

ILL 251 PIKE CREEK 2.3 MI N OF US 34 BRIDGE REPLACEMENT $600,000 LASALLE 1 2008-2012

ILL 251 PIKE CREEK 2.3 MI N OF US 34 P.E. (PHASE I) $65,000 LASALLE 1 2008-2012 P.E. (CONSULTANT TSL)

ILL 251 PIKE CREEK 2.3 MI N OF US 34 P.E. (PHASE II) $65,000 LASALLE 1 2008-2012

2 - 32 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

ILL 251 PIKE CREEK 2.3 MI N OF US 34 LAND ACQUISITION $30,000 LASALLE 1 2008-2012

ARGO FAY RD STREAM 1.5 MI SW OF ARGO FAY CULVERT REPLACEMENT $375,000 CARROLL 3 2008-2012 FAS 2076 ISOLATED STRUCTURE THAT WILL BE NEGOTIATED FOR TRANSFER WITH FUTURE ROADWAY IMPROVEMENT.

ARGO FAY RD STREAM 1.5 MI SW OF ARGO FAY LAND ACQUISITION $30,000 CARROLL 3 2008-2012 FAS 2076 ISOLATED STRUCTURE THAT WILL BE NEGOTIATED FOR TRANSFER WITH FUTURE ROADWAY IMPROVEMENT.

FOREST HILLS RD ILL 251 (NB) IN ROCKFORD BRIDGE NEW DECK $1,200,000 WINNEBAGO 2 2008-2012 (SOUTHBOUND) BRIDGE WIDENING FAU 5146 BRIDGE REHABILITATION

FOREST HILLS RD ILL 251 (NB) IN ROCKFORD P.E. (PHASE II) $110,000 WINNEBAGO 2 2008-2012 (SOUTHBOUND) FAU 5146

HARRISON AVE OVER ICG RR & CNW RR 1 MI E OF ILL 251 IN ROCKFORD BRIDGE REPLACEMENT $3,516,000 WINNEBAGO 6 2008-2012 FAP 525 LOCAL MAJOR BRIDGE PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY.

HARRISON AVE OVER ICG RR & CNW RR 1 MI E OF ILL 251 IN ROCKFORD CONSTRUCTION ENGINEERING $391,000 WINNEBAGO 4 2008-2012 FAP 525 LOCAL MAJOR BRIDGE PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY.

IDEAL RD OVER BN&SF RR 2 MI W OF MILLEDGEVILLE BRIDGE REPLACEMENT $1,200,000 CARROLL 5 2007 CH 8 FAS 1084 LOCAL MAJOR BRIDGE PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY.

2 - 33 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

IDEAL RD OVER BN&SF RR 2 MI W OF MILLEDGEVILLE CONSTRUCTION ENGINEERING $50,000 CARROLL 3 2007 CH 8 FAS 1084 LOCAL MAJOR BRIDGE PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY.

MOLINE RD I-88 AT HILLSDALE TO ILL 78 (N) RESURFACING $2,150,000 ROCK ISLAND 2 2008-2012 FAS 203 Miles = 14.27 WHITESIDE

MOLINE RD MEREDOSIA DITCH AT ROCK ISLAND CO LINE BRIDGE REPLACEMENT $1,000,000 WHITESIDE 4 2007 FAS 203 ISOLATED STRUCTURE THAT WILL BE NEGOTIATED FOR TRANSFER WITH FUTURE ROADWAY IMPROVEMENT.

MOLINE RD MEREDOSIA DITCH AT ROCK ISLAND CO LINE LAND ACQUISITION $10,000 WHITESIDE 4 2007 FAS 203 ISOLATED STRUCTURE THAT WILL BE NEGOTIATED FOR TRANSFER WITH FUTURE ROADWAY IMPROVEMENT.

MOLINE RD MEREDOSIA DITCH AT ROCK ISLAND CO LINE UTILITY ADJUSTMENT $10,000 WHITESIDE 2 2007 FAS 203

MORGAN ST ROCK RIVER & OVER BN RR IN ROCKFORD BRIDGE REPLACEMENT $23,800,000 WINNEBAGO 9 2007 FAU 5077 LOCAL MAJOR BRIDGE PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY.

MORGAN ST ROCK RIVER & OVER BN RR IN ROCKFORD CONSTRUCTION ENGINEERING $1,900,000 WINNEBAGO 5 2007 FAU 5077 LOCAL MAJOR BRIDGE PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY.

PERRYVILLE RD OVER C&NW RR IN ROCKFORD BRIDGE REHABILITATION $963,000 WINNEBAGO 4 2008-2012 FAU 5148 LOCAL MAJOR BRIDGE PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY.

2 - 34 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

PERRYVILLE RD OVER C&NW RR IN ROCKFORD CONSTRUCTION ENGINEERING $125,000 WINNEBAGO 2 2008-2012 FAU 5148 LOCAL MAJOR BRIDGE PROJECT; CONTINGENT UPON JOINT FUNDING AGREEMENT BETWEEN IDOT, ICC, RAILROAD AND LOCAL AGENCY.

VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS $11,260,000 DIST-WIDE 4 2008-2012

VARIOUS HIGHWAY SAFETY IMPROVEMENT PROGRAM PROJECTS SAFETY IMPROVEMENTS $2,599,000 DIST-WIDE 5 2007

VARIOUS DISTRICT MISCELLANEOUS MISCELLANEOUS PROJECTS $500,000 DIST-WIDE 5 2007

VARIOUS DISTRICT MISCELLANEOUS MISCELLANEOUS PROJECTS $2,500,000 DIST-WIDE 3 2008-2012

VARIOUS SMART RESURFACING PROJECTS RESURFACING $19,000,000 DIST-WIDE 9 2008-2012 Miles = 172.75

VARIOUS ARCHAEOLOGICAL SURVEYS ARCHAEOLOGICAL SURVEY $450,000 DIST-WIDE 2 2008-2012

VARIOUS ARCHAEOLOGICAL SURVEYS ARCHAEOLOGICAL SURVEY $150,000 DIST-WIDE 2 2007

VARIOUS WETLANDS AT I 74/280 NE OF MOSQUITO CREEK SW OF ILL WETLAND MITIGATION $60,000 ROCK ISLAND 1 2008-2012 5 & 7TH ST IN MOLINE, & NE OF AIRPORT RD & MILAN LANDSCAPING HENRY BELTWAY

VARIOUS WETLANDS AT I 74/280 NE OF MOSQUITO CREEK SW OF ILL WETLAND MITIGATION $30,000 ROCK ISLAND 1 2007 5 & 7TH ST IN MOLINE, & NE OF AIRPORT RD & MILAN LANDSCAPING HENRY BELTWAY

VARIOUS WETLAND AREA 1 MIW OF ILL 26 N OF US 20 N OF WETLAND MITIGATION $15,000 STEPHENSON 1 2007 FREEPORT LANDSCAPING

2 - 35 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

VARIOUS WETLAND AREA 1 MIW OF ILL 26 N OF US 20 N OF WETLAND MITIGATION $30,000 STEPHENSON 1 2008-2012 FREEPORT LANDSCAPING

VARIOUS WETLAND MITIGATION WETLAND CREDITS $750,000 DIST-WIDE 4 2007

VARIOUS WETLAND MITIGATION WETLAND CREDITS $750,000 DIST-WIDE 4 2008-2012

VARIOUS ORANGEVILLE BYP WETLAND APPROXIMATELY 0.5 MI S OF WETLAND MITIGATION $75,000 STEPHENSON 2 2008-2012 ORANGEVILLE E OF ILL 26

VARIOUS ORANGEVILLE BYP WETLAND 0.5 MI S OF ORANGEVILLE E WETLAND MITIGATION $25,000 STEPHENSON 2 2007 OF ILL 26

VARIOUS RIGHT-OF-WAY DOCUMENTS P.E. (ROW) $1,400,000 DIST-WIDE 1 2007

VARIOUS RIGHT-OF-WAY DOCUMENTS P.E. (ROW) $700,000 DIST-WIDE 1 2008-2012

VARIOUS PRE-LAND ACQUISITION ACTIVITY PRE-ACQUISITION ACTIVITY $4,500,000 DIST-WIDE 2 2008-2012

VARIOUS PRE-LAND ACQUISITION ACTIVITY PRE-ACQUISITION ACTIVITY $900,000 DIST-WIDE 2 2007

VARIOUS POST-LAND ACQUISITION ACTIVITY POST-ACQUISITION ACTIVITY $3,000,000 DIST-WIDE 2 2008-2012

VARIOUS POST-LAND ACQUISITION ACTIVITY POST-ACQUISITION ACTIVITY $600,000 DIST-WIDE 2 2007

VARIOUS MISCELLANEOUS LAND ACQUISITION LAND ACQUISITION $75,000 DIST-WIDE 2 2007

2 - 36 FY 2007-2012 Highway Improvement Program District 2 State Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

VARIOUS ON-CALL ENGINEERING P.E. (PHASE I) $500,000 DIST-WIDE 1 2008-2012 P.E. (PHASE II)

VARIOUS ON-CALL ENGINEERING P.E. (PHASE I) $750,000 DIST-WIDE 1 2007 P.E. (PHASE II)

VARIOUS CONSTRUCTION ENGINEERING CONSTRUCTION ENGINEERING $1,500,000 DIST-WIDE 1 2007

VARIOUS CHANGE ORDER RESERVE CHANGE ORDERS $3,500,000 DIST-WIDE 1 2007

FAU 5103 KISHWAUKEE RIVER 1.5 MI SW OF BELT LINE RD BRIDGE REPLACEMENT $4,030,000 WINNEBAGO 2 2008-2012

LOCAL MAJOR BRIDGE PROJECT; CONTINGENT UPON LOCAL AGENCY PROVIDING MATCHING FUNDS.

District 2 State Project Totals 396 Projects $582,970,000

2 - 37 FY 2007-2009 Highway Improvement Program District 2 Local Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

ILL 251 KEITH CREEK 0.2 MI N OF BROADWAY BRIDGE REPLACEMENT $2,700,000 WINNEBAGO 7 2007 KISHWAUKEE ST

11TH AVE 36TH ST TO 38TH ST MISCELLANEOUS $1,875,000 ROCK ISLAND 1 2008-2012 MS 1270A SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED THIS EARMARK WILL BE FUNDED SEPARATELY.

19TH ST 12TH AVE TO 8TH AVE RECONSTRUCTION $300,000 WHITESIDE 1 2008-2012 FAU 5565 Miles = 0.34

19TH ST LINDY AVE TO ILL 40 RECONSTRUCTION $75,000 WHITESIDE 1 2008-2012 FAU 5565 Miles = 0.08

85TH AVE WEST TURKEY HOLLOW RD TO CENTENNIAL EXPY RECONSTRUCTION $2,285,000 ROCK ISLAND 2 2007 FAU 5794 Miles = 1.29

ALBANY RD DIAMOND RD TO I-88 RESURFACING $560,000 WHITESIDE 1 2008-2012 FAS 1225 Miles = 5.52

BARSTOW RD ILL 5 TO 38TH AVE RESURFACING $400,000 ROCK ISLAND 3 2008-2012 FAS 2204 Miles = 9.41 FAU 5758

BAXTER RD W OF FALCON RD TO W OF LINDENWOOD RD RESURFACING $1,050,000 WINNEBAGO 1 2008-2012 FAU 5154 Miles = 2.32

BELVIDERE RD ILL 251 TO ILL 173 RESURFACING $1,000,000 WINNEBAGO 3 2007 FAU 9884 Miles = 4.70

CEDARVILLE RD ROCK RUN CREEK 3 MI S OF DAVIS BRIDGE REPLACEMENT $400,000 STEPHENSON 1 2007 FAS 60

CH 14 SPRING CREEK 6.5 MI NE OF CAMBRIDGE BRIDGE REPLACEMENT $500,000 HENRY 6 2007 FAS 238

2 - 38 FY 2007-2009 Highway Improvement Program District 2 Local Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

CHICAGO ST MAIN ST TO US 6 SIDEWALKS $225,000 HENRY 1 2008-2012 FAU 5679 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED THIS EARMARK WILL BE FUNDED SEPARATELY.

COUNCIL HILL RD E FORK GALENA RIVER 3.5 MI W OF SCALES MOUND BRIDGE REPLACEMENT $400,000 JODAVIESS 5 2008-2012 CH 1

DAYSVILLE RD BN&SF RR TO LIGHTHOUSE RD RESURFACING $375,000 OGLE 1 2007 FAS 87 Miles = 3.95

DERINDA RD US 20 TO CARROLL CO LINE RESURFACING $950,000 JODAVIESS 1 2007 FAS 80 Miles = 10.15

DIXON AVE I&M FEEDER CANAL E EDGE OF ROCK FALLS BRIDGE REHABILITATION $250,000 WHITESIDE 1 2008-2012 FAU 5560

EDSON RD UNNAMED STREAM 5 MI NE OF STILLMAN VALLEY BRIDGE REPLACEMENT $150,000 OGLE 1 2007 TR 59 WINNEBAGO

ELIZABETH/ SCALES MOUND TO US 20 RESURFACING $1,225,000 JODAVIESS 1 2007 SCALES MOUND RD Miles = 13.04 FAS 71

GENOA RD I-90 TO DEKALB CO LINE RESURFACING $700,000 BOONE 1 2007 FAS 37 Miles = 6.28

HAHNAMAN RD ILL 172 TO ILL 40 RESURFACING $550,000 WHITESIDE 3 2008-2012 FAS 195 Miles = 4.97

HARRISON AVE SE DRAINAGE WAY IN ROCKFORD BRIDGE REPLACEMENT $7,880,000 WINNEBAGO 5 2008-2012 FAP 525

HARRISON AVE 11TH ST TO 20TH ST LAND ACQUISITION $2,400,000 WINNEBAGO 2 2008-2012 FAP 525

HENNEPIN AVE RIVER ST TO 3RD ST RECONSTRUCTION $550,000 LEE 4 2007 FAU 5498 Miles = 0.20

2 - 39 FY 2007-2009 Highway Improvement Program District 2 Local Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

LATHROP ST ILL 78 TO 2900 E RECONSTRUCTION $4,577,000 HENRY 1 2007 MS 1040 Miles = 0.27 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED THIS EARMARK WILL BE FUNDED SEPARATELY.

LOST NATION RD ILL 2 TO OGLE CO LINE RESURFACING $510,000 LEE 1 2008-2012 FAS 2179 Miles = 5.01 OGLE

LOUD THUNDER RD LAKE GEORGE SPILLWAY 5 MI NE OF ILLINOIS CITY BRIDGE REPLACEMENT $600,000 ROCK ISLAND 1 2008-2012 FAS 204

LYNN BLVD 16TH AVE TO FREEPORT RD RESURFACING $500,000 WHITESIDE 1 2008-2012 FAU 5548 Miles = 0.54

MAIN ST COURT ST TO NORTH ST RECONSTRUCTION $1,200,000 HENRY 1 2007 MS 6600 Miles = 0.35 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED THIS EARMARK WILL BE FUNDED SEPARATELY.

MILL ST 3RD AVE TO 13TH AVE RESURFACING $500,000 ROCK ISLAND 1 2008-2012 FAU 5803 Miles = 0.48 SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED THIS EARMARK WILL BE FUNDED SEPARATELY.

MULFORD RD WINNEBAGO CO LINE TO LINDENWOOD RD RESURFACING $1,000,000 OGLE 3 2008-2012 FAS 91 Miles = 6.71

PARK BLVD GALENA AVE TO STEPHENSON ST RESURFACING $150,000 STEPHENSON 1 2007 FAU 5249 Miles = 0.62

PEARL CITY RD ILL 73 TO W ENTRANCE OF HIGHLAND COLLEGE RESURFACING $1,765,000 STEPHENSON 2 2007 FAS 62 Miles = 8.05

PERRY RD & BN&SF RR TO DEKALB CO LINE & S OF MCGIRR RD TO DRY RESURFACING $575,000 LEE 1 2007 STEWARD RD RUN CREEK FAS 176 Miles = 6.26 FAS 180

2 - 40 FY 2007-2009 Highway Improvement Program District 2 Local Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

PERRYVILLE RD NORTH BRANCH KISHWAUKEE RIVER 0.4 MI N OF BRIDGE REHABILITATION $475,000 WINNEBAGO 1 2007 FAU 5148 BLACKHAWK RD

PINES RD ECL OF POLO TO FOREST RD RESURFACING $400,000 OGLE 1 2007 FAS 85 Miles = 5.56

RIDGE RD ILL 64 TO PINES RD RESURFACING $230,000 OGLE 1 2008-2012 FAS 1075 Miles = 3.20

RIVER ST PEORIA AVE TO GALENA AVE MISCELLANEOUS $3,200,000 LEE 1 2008-2012 FAU 5483 PARKING (NEW) SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED THIS EARMARK WILL BE FUNDED SEPARATELY.

ROCK GROVE RD ILL 26 IN ORANGEVILLE TO AFOLKEY RD RESURFACING $800,000 STEPHENSON 6 2008-2012 FAS 40 Miles = 3.91

ROCK GROVE RD ILL 26 IN ORANGEVILLE TO AFOLKEY RD AGGREGATE SURFACE $600,000 STEPHENSON 4 2008-2012 FAS 40 Miles = 3.91

ROCK GROVE RD DAKOTA RD TO WINNEBAGO CO LINE RESURFACING $900,000 STEPHENSON 1 2008-2012 FAS 40 Miles = 5.77

SPRING VALLEY ILL 78 TO LYNDON RD RESURFACING $620,000 WHITESIDE 4 2007 RD Miles = 4.00 FAS 2187

SPRINGFIELD AVE AT AUBURN RD INTERSECTION IMPROVEMENT $500,000 WINNEBAGO 1 2007 FAP 525

STAGECOACH RD WEST FORK APPLE RIVER 3 MI SW OF APPLE RIVER BRIDGE REPLACEMENT $600,000 JODAVIESS 8 2008-2012 FAS 67

2 - 41 FY 2007-2009 Highway Improvement Program District 2 Local Highways

MYP Years

Route/Street Location Improvements Est. Cost County Past Current

WILLOW CREEK TR ROCK CUT STATE PARK TO LONG PRAIRIE TRAIL P.E. (PHASE I) $200,000 WINNEBAGO 1 2008-2012

SAFETEA-LU HIGH PRIORITY PROJECT. STATE AND/OR LOCAL MATCH REQUIRED THIS EARMARK WILL BE FUNDED SEPARATELY.

WILLOW RD MUDDY PLUM RIVER 4 MI SE OF STOCKTON BRIDGE REPLACEMENT $400,000 JODAVIESS 5 2007 FAS 1067

WILLOW RD US 20 TO KRISE RD RESURFACING $475,000 JODAVIESS 1 2008-2012 FAS 1067 Miles = 5.04

TR 205 BR OF OAT CREEK 6 MI SW OF ATKINSON BRIDGE REPLACEMENT $300,000 HENRY 1 2008-2012

District 2 Local Project Totals 47 Projects $47,877,000

2 - 42 See Detail

Warren East Dubuque Apple River Winslow South Beloit Map Menominee 84 :9 Scales Mound Orangeville STEPHENSON 0/20 Rockton :978 Nora Davis Durand Roscoe Galena :975 :976 Capron Rock City 90 2 21Machesney Dakota WINNEBAGO :9 :984 Lena Park 173 20 JO DAVIESS Cedarville :9 0/ North Caledonia Stockton :970 Timberlane Poplar Grove 0/20 :926 Loves BOONE Elizabeth 73 Pecatonica :9 Ridott Park Freeport 0/20B 251 20 :9 0/20B Pearl City 0/ Winnebago Belvidere Hanover 20 Rockford 0/ 90 Cherry Valley 21 German Valley :984

New Millford :972 Shannon 72 :9 Adeline Byron Davis Junction Forreston 72 Leaf River :978 Lanark :9 72 Mt Carroll Stillman Valley :9 64 52 :9 0/ 26 251 Savanna 64 :9 :9251 :9 OGLE CARROLL :964 Mt Morris Oregon 0/52 :926 Chadwick :964 Polo :92 51 Thomson Milledgeville 0/ Creston 52 38 0/ Rochelle :9 :926 40 Coleta :9 39 Ashton 21 Fulton :9136 30 :938 0/ WHITESIDE Dixon Franklin Grove Steward 2188 :92 :984 :978 Morrison Sterling Nelson Lee Albany :9251 Rock Falls 0/30 :926 LEE Harmon Lyndon Amboy 2188 Compton :978 0/52 West Brooklyn See Cordova Paw Paw Prophetstown :9172 Erie Detail Sublette Tampico Map Port Byron Hillsdale Deer Grove

Rapids City :992 Hampton :992 92 2188 East Moline 92 :9 :9 Hooppole 6 0/ Cleveland Rock Island Silvis :982 Moline Colona 5 84 :9 280 :9 REGION 2 21280 21 0/6 Geneseo :992 Coal 74 Andalusia Valley 21 Atkinson 78 80 6 :9 Milan Oak Grove 21 0/ Annawan DISTRICT 2 192 94 :9 :9 0/67 :982 ROCK ISLAND HENRY PROPOSED FY 2007-2012 Reynolds Orion 0/150 2174 HIGHWAY PROGRAM :981 Andover :981 Cambridge FY 2007 FY 2008-2012 IMPROVEMENT 0/34 Kewanee SPOT :982 0/34 78 Bishop Hill :9 ROADWAY Alpha 91 Woodhull Galva :9 0/150 :917 0/34 :917 0/34 BRIDGE

DISTRICT2 PROPOSED JOBS FOR ILLINOIS PROGRAM

JOBS FOR ILLINOIS PROGRAM District 2 State Highways

Route/Street Location Improvements Est. Cost County Proposed Years

US 20 US 20 BUSN W OF FREEPORT TO W OF ILL 26 GRADING $12,150,000 STEPHENSON 2008-2011 FREEPORT BYP BRIDGE (NEW)

US 20 US 20 BUSN W OF FREEPORT TO W OF ILL 26 LAND ACQUISITION $300,000 STEPHENSON 2007 FREEPORT BYP

US 20 US 20 BUSN W OF FREEPORT TO W OF ILL 26 UTILITY ADJUSTMENT $50,000 STEPHENSON 2007 FREEPORT BYP

US 20 US 20 BUSN W OF FREEPORT TO W OF ILL 26 ADDITIONAL LANES $7,400,000 STEPHENSON 2008-2011 FREEPORT BYP Miles = 4.01

US 20 US 20 BUSN W OF FREEPORT TO W OF ILL 26 P.E. (PHASE II) $600,000 STEPHENSON 2007 FREEPORT BYP

US 20 ILL 84 NW OF GALENA TO HORSESHOE MOUND INTCHG SE P.E. (PHASE II) $9,300,000 JODAVIESS 2008-2011 GALENA BYP OF GALENA

US 20 ILL 84 NW OF GALENA TO HORSESHOE MOUND INTCHG SE P.E. SURVEYS (ROW) $500,000 JODAVIESS 2007 GALENA BYP OF GALENA

US 20 ILL 84 NW OF GALENA TO HORSESHOE MOUND INTCHG SE P.E. (PHASE II) $1,700,000 JODAVIESS 2008-2011 GALENA BYP OF GALENA

US 20 ILL 84 NW OF GALENA TO HORSESHOE MOUND INTCHG SE UTILITY ADJUSTMENT $500,000 JODAVIESS 2008-2011 GALENA BYP OF GALENA

US 20 ILL 84 NW OF GALENA TO HORSESHOE MOUND INTCHG SE LAND ACQUISITION $1,000,000 JODAVIESS 2007 GALENA BYP OF GALENA

US 20 ILL 84 NW OF GALENA TO HORSESHOE MOUND INTCHG SE ARCHAEOLOGICAL SURVEY $150,000 JODAVIESS 2007 GALENA BYP OF GALENA

ILL 2 BELTLINE RD TO 0.4 MI N OF HARRISON AVE SW OF WIDENING & RESURFACING $2,868,000 WINNEBAGO 2007 S MAIN ST ROCKFORD BI-DIRECT LEFT TURN LANE Miles = 2.43 CURB AND GUTTER STORM SEWER (NEW) BRIDGE REPLACEMENT

ILL 2 BELTLINE RD TO 0.4 MI N OF HARRISON AVE SW OF LAND ACQUISITION $500,000 WINNEBAGO 2007 ILL 2 B ROCKFORD S MAIN ST

2 - 1

ALL PROJECTS ARE CONTINGENT ON NEW BOND PROGRAM AUTHORIZATION AND APPROPRIATION BY THE GENERAL ASSEMBLY. JOBS FOR ILLINOIS PROGRAM District 2 State Highways

Route/Street Location Improvements Est. Cost County Proposed Years

ILL 2 BELTLINE RD TO 0.4 MI N OF HARRISON AVE SW OF UTILITY ADJUSTMENT $200,000 WINNEBAGO 2007 S MAIN ST ROCKFORD

ILL 2 S OF POND ST TO CEDAR ST SW OF ROCKFORD WIDENING & RESURFACING $6,300,000 WINNEBAGO 2008-2011 ILL 2 B Miles = 1.67 BI-DIRECT LEFT TURN LANE S MAIN ST CURB AND GUTTER STORM SEWER (NEW)

ILL 2 S OF POND ST TO CEDAR ST SW OF ROCKFORD LAND ACQUISITION $600,000 WINNEBAGO 2007 ILL 2 B S MAIN ST

ILL 2 S OF POND ST TO CEDAR ST SW OF ROCKFORD UTILITY ADJUSTMENT $200,000 WINNEBAGO 2008-2011 ILL 2 B WIRE LINE ADJUSTMENTS S MAIN ST

ILL 2 S OF POND ST TO CEDAR ST SW OF ROCKFORD RR CROSSING IMPROVEMENT $300,000 WINNEBAGO 2008-2011 ILL 2 B S MAIN ST

ILL 2 S OF POND ST TO CEDAR ST SW OF ROCKFORD P.E. (ROW) $600,000 WINNEBAGO 2007 ILL 2 B S MAIN ST

ILL 2 S OF POND ST TO CEDAR ST SW OF ROCKFORD LAND ACQUISITION $600,000 WINNEBAGO 2008-2011 ILL 2 B S MAIN ST

ILL 2 RIVERSIDE BLVD TO AUBURN ST IN ROCKFORD INTERSECTION RECONSTN $12,582,000 WINNEBAGO 2008-2011 N MAIN ST Miles = 1.97 RECONSTRUCTION

ILL 2 RIVERSIDE BLVD TO AUBURN ST IN ROCKFORD LAND ACQUISITION $3,000,000 WINNEBAGO 2008-2011 N MAIN ST

ILL 2 RIVERSIDE BLVD TO AUBURN ST IN ROCKFORD UTILITY ADJUSTMENT $1,000,000 WINNEBAGO 2008-2011 N MAIN ST

ILL 2 RIVERSIDE BLVD TO AUBURN ST IN ROCKFORD P.E. (PHASE II) $800,000 WINNEBAGO 2008-2011 N MAIN ST

ILL 2 RIVERSIDE BLVD TO AUBURN ST IN ROCKFORD P.E. (PHASE I) $1,200,000 WINNEBAGO 2007 N MAIN ST

ILL 2 ELMWOOD RD TO LATHAM RD N OF ROCKFORD INTERSECTION IMPROVEMENT $21,000,000 WINNEBAGO 2007 MAIN ST Miles = 2.51 INTERCHANGE (NEW) ADDITIONAL LANES BRIDGE (NEW) BRIDGE DECK OVERLAY HANDRAIL REPLACEMENT

2 - 2

ALL PROJECTS ARE CONTINGENT ON NEW BOND PROGRAM AUTHORIZATION AND APPROPRIATION BY THE GENERAL ASSEMBLY. JOBS FOR ILLINOIS PROGRAM District 2 State Highways

Route/Street Location Improvements Est. Cost County Proposed Years

ILL 2 ELMWOOD RD TO LATHAM RD N OF ROCKFORD UTILITY ADJUSTMENT $250,000 WINNEBAGO 2007 MAIN ST

ILL 5 16TH ST TO 70TH ST IN MOLINE LAND ACQUISITION $3,000,000 ROCK ISLAND 2008-2011 JOHN DEERE RD

ILL 5 W OF 38TH ST TO 70TH ST IN MOLINE P.E. (PHASE II) $2,300,000 ROCK ISLAND 2007 JOHN DEERE RD

ILL 5 16TH ST TO 70TH ST IN MOLINE P.E. (ROW) $1,000,000 ROCK ISLAND 2007 JOHN DEERE RD

ILL 5 W OF 38TH AVE TO 53RD ST IN MOLINE ADDITIONAL LANES $12,500,000 ROCK ISLAND 2008-2011 JOHN DEERE RD Miles = 1.10 INTERSECTION IMPROVEMENT INTERCHANGE (NEW) BRIDGE (NEW)

ILL 5 W OF 38TH AVE TO 53RD ST IN MOLINE UTILITY ADJUSTMENT $250,000 ROCK ISLAND 2008-2011 JOHN DEERE RD

ILL 5 53RD ST TO 70TH ST IN MOLINE ADDITIONAL LANES $9,795,000 ROCK ISLAND 2008-2011 JOHN DEERE RD Miles = 0.92 INTERSECTION IMPROVEMENT INTERCHANGE (NEW)

ILL 5 53RD ST TO 70TH ST IN MOLINE UTILITY ADJUSTMENT $275,000 ROCK ISLAND 2008-2011 JOHN DEERE RD

ILL 173 AT ILL 251 IN MACHESNEY PARK INTERSECTION RECONSTN $4,000,000 WINNEBAGO 2008-2011 ILL 251 WEST LANE RD

ILL 173 AT ILL 251 IN MACHESNEY PARK LAND ACQUISITION $500,000 WINNEBAGO 2007 ILL 251 WEST LANE RD

ILL 173 AT ILL 251 IN MACHESNEY PARK UTILITY ADJUSTMENT $500,000 WINNEBAGO 2008-2011 ILL 251 WEST LANE RD

ILL 173 ILL 251 TO BOONE CO LINE ADDITIONAL LANES $29,500,000 WINNEBAGO 2008-2011 WEST LANE RD Miles = 4.69 RESURFACING (3R) TURNING LANES SIGNAL TIMING/PROGRESSION

ILL 173 ILL 251 TO BOONE CO LINE P.E. (PHASE II) $700,000 WINNEBAGO 2007 WEST LANE RD

ILL 173 ILL 251 TO BOONE CO LINE LAND ACQUISITION $4,942,000 WINNEBAGO 2007 WEST LANE RD

2 - 3

ALL PROJECTS ARE CONTINGENT ON NEW BOND PROGRAM AUTHORIZATION AND APPROPRIATION BY THE GENERAL ASSEMBLY. JOBS FOR ILLINOIS PROGRAM District 2 State Highways

Route/Street Location Improvements Est. Cost County Proposed Years

ILL 173 ILL 251 TO BOONE CO LINE UTILITY ADJUSTMENT $150,000 WINNEBAGO 2008-2011 WEST LANE RD

District 2 State Project Totals 41 Projects $155,062,000

2 - 4

ALL PROJECTS ARE CONTINGENT ON NEW BOND PROGRAM AUTHORIZATION AND APPROPRIATION BY THE GENERAL ASSEMBLY. Warren Apple River Winslow South Beloit Menominee 84 :9 Scales Mound Orangeville STEPHENSON 0/20 Rockton :978 Nora Davis Durand Roscoe Galena :975 :976 Capron Rock City 90 2 21Machesney Dakota WINNEBAGO :9 :984 Lena Park 173 20 JO DAVIESS Cedarville :9 0/ North Caledonia Stockton :970 Timberlane Poplar Grove 0/20 :926 Loves BOONE Elizabeth 73 Pecatonica :9 Ridott Park 20B 251 Freeport 0/ :9 20B 20 0/20B Pearl City 0/ Winnebago Belvidere Hanover 20 Rockford 0/ 90 Cherry Valley 21 German Valley :984

New Millford :972 Shannon 72 :9 Adeline Byron Davis Junction 72 Leaf River :978 Lanark Forreston :9 72 Mt Carroll 52 Stillman Valley :9 64 0/ 26 :9 64 :9 :9251 :9 OGLE CARROLL :964 Mt Morris Oregon 0/52 :926 Chadwick :964 Polo :92 51 Thomson Milledgeville 0/ Creston 52 38 0/ Rochelle :9 :926 40 Coleta :9 39 Ashton 21 Fulton :9136 30 :938 0/ WHITESIDE Dixon Franklin Grove Steward 2188 :92 :984 :978 Morrison Sterling Nelson Lee Albany :9251 Rock Falls 0/30 :926 LEE Harmon Lyndon Amboy 2188 Compton :978 0/52 West Brooklyn Cordova Paw Paw Prophetstown :9172 Erie Sublette Tampico

Hillsdale Deer Grove

Rapids City :992 :992 92 2188 92 :9 :9 Hooppole 6 0/ Cleveland Silvis :982 Moline Colona 5 84 :9 280 :9 1280 21 0/6 Geneseo :992 Coal 2174 Andalusia Valley REGION 2 Atkinson 78 80 6 :9 Milan Oak Grove 21 0/ Annawan 192 94 :9 :9 0/67 :982 ROCK ISLAND HENRY DISTRICT 2 Reynolds Orion 0/150 2174 81 Jobs For Illinois Andover 81 :9 Cambridge :9

0/34 Kewanee Program :982 0/34 78 Bishop Hill :9 Alpha SPOT Woodhull 91 Galva :9 ROADWAY 0/150 :917 0/34 :917 0/34 ENGINEERING LAND ACQUISITION BRIDGE