Groundwork Yorkshire and the Humber Dalton Lane

Total Page:16

File Type:pdf, Size:1020Kb

Groundwork Yorkshire and the Humber Dalton Lane GROUNDWORK YORKSHIRE AND THE HUMBER DALTON LANE, KEIGHLEY LANDSCAPE IMPLEMENTATION PLAN Prepared by: Groundwork Yorkshire and the Humber Environment & Business Centre Merlyn Rees Avenue Morley Leeds LS27 9SL January 2007 Dalton Lane - Landscape Implementation Plan - Final report 1 2 Dalton Lane - Landscape Implementation Plan - Final report CONTENTS SECTION CONTENTS PAGE NO. 1.0 Introduction 5 1.1 The Dalton Lane Concept 5 1.2 Introduction to the Landscape Implementation Plan 9 1.3 Partners in the implementation plan process 9 1.4 The study area 10 1.5 Location maps 11 2.0 Landscape analysis 13 2.1 Landscape analysis methodology 13 2.2 Analysis criteria 14 Landscape Analysis plan (A3 insert) 17 3.0 Landscape Implementation plan 19 3.1 Methodology 19 3.2 Implementation plan criteria 21 Landscape Implementation plan (A3 insert) 23 4.0 Action plan 25 APPENDICES Appendix 1: Background information 63 Appendix 2: Business support activities 65 Appendix 3: Red Walk 67 Appendix 4: Potential consultees (not exhaustive) 69 Appendix 5: Dalton lane, Keighley Industrial Area. Baseline study 71 final report Dalton Lane - Landscape Implementation Plan - Final report 3 4 Dalton Lane - Landscape Implementation Plan - Final report DALTON LANE - LANDSCAPE IMPLEMENTATION PLAN 1.0 INTRODUCTION 1.1 The Dalton Lane Concept Groundwork Yorkshire and the Humber have been running a Green Business Parks Programme throughout the Yorkshire and Humber region (see appendix 1). During a series of meetings and networking events, Groundwork Yorkshire and the Humber and the Airedale Partnership saw the opportunity to create a unique concept for the Dalton Lane area of Keighley, West Yorkshire, to utilise Groundwork’s experience of Green Business Parks and to drive forward the momentum of the current two pronged regeneration catalyst in the area. The current regeneration comprises of the re-development of the Keighley College site to the south west of the study area and the re-development of Dalton Mills, both with the potential to create a very different dynamic for the area as a whole. In September 2006, Groundwork Yorkshire and the Humber, The Airedale Partnership and Groundwork Environmental Services (Leeds) Limited provided funding for the development of a bespoke Green Business Parks programme for the Dalton Lane area. The funding will be used to build upon the information collected and the recommendations highlighted in a baseline study, completed in December 2003. An executive summary of the baseline study is detailed in the following paragraphs: 1.1.1. Introduction The aim of this baseline study was to deliver a technically robust assessment of Dalton Lane, Keighley industrial area businesses against set criteria. The specified study was carried out over a 12 week period and was completed in December 2003. This report relates to a well-established industrial area situated to the north-east of the town centre with the River Worth running through the area. The set criteria was to make area-specific recommendations relating to the Green Business Park project’s 5 key sustainability outputs. Dalton Lane industrial area is a very well established mix of the older housing, traditional businesses of Keighley but includes a few more modern activities. There are no specific development or improvement plans for the area, which has been suffering from a gradual deterioration of maintenance and constantly suffers the negative impacts of drug-related crime and other anti-social behaviour. This has resulted in the overall conclusion of this report that the study area would greatly benefit from the delivery of the UK Green Business Park project to realise the significant potential that is clearly present. In particular it has been identified that the location has certain desirable advantages such as proximity to the rail network, town centre and trunk roads. It also has the potential to develop a character related to its heritage and location to ‘Bronte’ country. If the overall priorities and key improvement issues set out below can be economically and effectively addressed, then there can be a high degree of confidence that the area will become more attractive to businesses looking to locate in Keighley. This will bring with it much needed additional investment and help to build on current investment levels. Dalton Lane - Landscape Implementation Plan - Final report 5 1.1.2. Key Issues on the Estate The following table sets out 17 key issues on the estate identified through the study process. These are related to 3 defined Overall Site Priority areas. Overall Site Priority Key Issues Identified A. Improve security Uncoordinated approach to site security and tackle anti-social Lack of CCTV within the area behaviour Lack of site lighting, including street lighting Accessibility throughout the area by potential drug dealers, thieves and vandals etc Rising incidence of fly tipping The level of semi-dereliction across the area Lack of policing in the area Proximity of housing within and close to the area B. Improve traffic Profile, status recognition and clear identity for the area management, identity Lack of external identity/navigation signs to the area and image of the area Lack of internal navigation signs within the area Poor general maintenance e.g. street signs, road markings, pavements, traffic management The presence of derelict land within the area Facelift/renovation of buildings & facades Lack of consideration of the area’s heritage & character C. Develop cost- Lack of general awareness re cost reduction potential of waste and effective waste & energy management energy management Lack of adequate recycling facilities within the area 1.1.3. Prioritised Actions A matrix of prioritised actions for achieving the project key sustainability outputs of: Resource efficiency; Jobs created; Jobs safeguarded; Businesses supported, is set out in the following table. In setting the priorities, consideration has been given to the overall need to minimise costs for existing businesses. This has been done in recognition of the response, which identified that 56% of businesses would consider moving if faced with increased rent and/or rates. We have estimated that, as a result of the successful implementation of the proposed prioritised actions, the potential for job creation is 30-40 after 3 years and 130-200 after 7 years. Our analysis suggests that there are significant and sustainable gains to be made provided that the current negative social and identity impacts can be controlled and minimised. A key element in improvement lies in protecting small businesses on a collective, economic basis within secure industrial zones. This allows the companies to concentrate more effectively on business development and spend less time/resources on the damaging effects of actual or potential criminal activity. The achievement of this objective will take time, hence the projection that it will take at least 3 years before the gains become significant. 6 Dalton Lane - Landscape Implementation Plan - Final report Prioritised Action Matrix Action Description & Key Overall Site Relative Estimated Identified Priority Reason Sustainability Priority cost time scale Contributors Cross (subsection category Reference 5.1) Reference 1 Set up an Estate Club Potential to A, B & C Low 2 months BiC; BMDC; – Coordinated contribute Estate approach needed to significantly to businesses achieve many of the all four improvements 2 Develop estate Jobs A Some 6 months to Estate Club; security improvement safeguarded; elements develop the Community programme – Top Businesses low, others programme Safety Team; priority of supported medium or then rolled out Private security respondents. NOTE: high in 1-7 years to service providers must be coordinated implement with 3 below 3 Agree and implement Jobs A, B Low 6-12 months to Estate Club; identifiable ‘zones’ safeguarded; develop and BMDC; Highways across the area – businesses implement Authority; Helps create a supported Businesses within structure and identity the area/zones for the area 4 Improve internal & Businesses A & B Low-high 2-24 months Estate Club; external signage + supported; dependent with some Highways general maintenance: Resource on extent starting after Authority; BMDC particularly street efficiency zones lighting & signs, peak (reduction in established traffic flow systems, time/fuel) better access & manoeuvring for HGV’s – Identified as important issues 5 Implement agreed Businesses A, B & C Medium to 1-5 year roll Estate Club; zone structure and supported; High out Community security Jobs programme Safety Team; arrangements for safeguarded; BMDC; Private them – Creates jobs created security service combined security providers and identity benefits 6 Develop & implement Jobs created; B Medium 6-12 months to Estate Club; land management Businesses develop and BMDC; Estate scheme within supported implemented landlords & established secure after preceding businesses zones – derelict land actions given a high priority (estimated to by respondents start 1.5-2 yrs into the programme) 7 Carry out Envirowise Resource C Free initial Can be started Estate Club; & Action Energy visits efficiency; visits within 1 month Envirowise; to appropriate Businesses Action Energy; businesses – Lack of supported; Estate awareness of Waste Jobs businesses & Energy costs and safeguarded potential savings 8 Establish a recycling Resource C (also Medium Co-ordinate as Estate Club; facility based on zone efficiency; contributes to B) per 6 above BMDC; Pennine structure
Recommended publications
  • ! National Rivers Authority ! Information Centre '9Ad Office Jass N O
    NATIONAL RIVERS AUTHORITY YORKSHIRE REGION RIVER FLOW & RAINFALL STATISTICS UPDATED TO 31ST DECEMBER 1992 National Rivers Authority Northumbria & Yorkshire Region Olympia House Gelderd Lane Gelderd Road Leeds LS12 6DD August 1993 ! National Rivers Authority ! Information Centre '9ad Office Jass N o ................. | accession No NATIONAL RIVERS AUTHORITY YORKSHIRE REGION RIVER FLOW AND RAINFALL STATISTICS UPDATED TO 31ST DECEMBER 1992 This publication combines the 1992 annual reports on River Flow Statistics and on Rainfall. It is in two sections:- (i) River Flow Statistics updated to 31st December 1992. (ii) Annual Rainfall Report 1992. IMPORTANT NOTICE The published d^ta are the best available in August 1993. Please consult the Resource Planning and Hydrometry Section about the accuracy of the data, and the possibility of revision, before using these records for detailed investigations. The Section would also be pleased to be notified of any errors which may be discovered. Telephone: Leeds 440191 NRA Northumbria & Yorkshire Region August 1993 RIVER FLOW STATISTICS UPDATED TO 31ST DECEMBER 1992 Introduction This publication contains summary data for 1992 and analyses of long period river flow records. The data should be used with some caution. All the published river flows are "net" or "as measured". No adjustments have been made in respect of abstractions.from, or discharges to, the river upstream of the flow measuring station, or for changes in storage of reservoirs etc. Records allowing for such adjustments are usually available from the appropriate Division of Yorkshire Water pic or from NRA Northumbria and Yorkshire Region Resource Planning and Hydrometry Section. Records have been included for some stations which were designed primarily to measure low flows.
    [Show full text]
  • River Response to Recent Environmental Change in the Yorkshire Ouse Basin, Northern England
    River response to recent environmental change in the Yorkshire Ouse basin, northern England. Sean Anthony Longfield, B.Sc. (H ons) 'N/ Submitted in accordance with the requirements for the degree of Doctor of Philosophy The University of Leeds School of Geography July 1998 The candidate confirms that the work submitted is his own and that appropriate credit has been given where reference has been made to the w'ork of others II A b s t r a c t Longfield, S.A. 1998. River response to recent environmental change in the Yorkshire Ouse basin, northern England. University of Leeds, Ph.D. This study examines historical variations in flood frequency and magnitude in the Yorkshire Ouse basin, northern England, over the last 900 years. The causes of temporal and spatial variations in flooding are evaluated through investigation of climatic and land-use controls. Documentary evidence of flooding and climate suggests that a series of large floods between 1263 and 1360 were associated with climatic deterioration from the Medieval Optimum. A shift to generally milder conditions between 1361 and 1549 resulted in no floods being documented in the Ouse basin The frequency of large magnitude floods increased dramatically between 1550 and 1680, as a result of low temperatures, increased surface wetness, more frequent snowfall and a southward shift of prevailing storm tracks over middle latitudes, associated with the onset of the "Little Ice Age’. In contrast, during a wanner phase of the Little Ice Age, between 1681 and 1763, the frequency of localised summer flooding increased in the Ouse basin due to more frequent high intensity, short duration convective storms.
    [Show full text]
  • Actionable Plan
    Aire and Calder Catchment Partnership Actionable Plan A healthy and wildlife-rich water environment within the Aire and Calder that is valued and enjoyed, bringing increasing social and economic benefits to all1 Contents Executive summary .............................................................................................3 Upper Aire .....................................................................................................46 Introduction .............................................................................................................4 Lower Calder ................................................................................................47 A Catchment Based Approach ......................................................................4 Middle Calder ..............................................................................................47 The Aire and Calder Catchment ...................................................................4 Upper Calder ................................................................................................48 The Aire and Calder Operational Catchments ....................................4 Colne and Holme .......................................................................................49 Upper Aire Operational Catchment ...................................................6 Strategic zone ......................................................................................................50 Middle Aire Operational Catchment .................................................8
    [Show full text]
  • Report of the [Director] to the Meeting of [Name of Committee] to Be Held on [Date]
    Report of the Strategic Director of Place to the meeting of Regeneration and Environment Overview and Scrutiny Committee to be held on 09th October 2019 R Subject: Water Management Scrutiny Review- Progress of Recommendations. Summary statement: The Environment and Waste Management Overview Scrutiny Committee undertook a wider scrutiny review into water management across the District following the devastating winter 2015 floods. The Water Management Scrutiny Review was endorsed by the Environment and Waste Management Overview Scrutiny Committee at their meeting on 4th July 2017 where it was recommended to be considered by the Corporate Overview and Scrutiny Committee in their meeting on the 26th October 2017 where it was subsequently endorsed. Following its adoption, The Water Management Scrutiny Review included twenty-six recommendations and it was resolved that a report would be made in the following twelve months which monitored progress against all the recommendations contained in the review. Within the October 2018 report it was again resolved by the Regeneration and Environment Overview Committee that an update report would be presented in a further 12 months. This report briefly outlines the progress made and the status of each of the twenty-six recommendations in the last 12 months. Strategic Director: Portfolio: Steve Hartley Planning, Transportation and Highways Strategic Director of Place Report Contact: Overview & Scrutiny Area: Edward Norfolk Regeneration and Environment Principal Drainage Engineer Phone: (01274) 433905 E-mail: [email protected] 1. SUMMARY The Environment and Waste Management Overview Scrutiny Committee undertook a wider scrutiny review into water management across the District following the devastating winter 2015 floods.
    [Show full text]
  • Local Environment Agency Plan
    I S /1 / + o local environment agency plan AIRE CONSULTATION DRAFT JUNE 1998 YOUR VIEWS Welcome to the Consultation Draft LEAP for the Aire, which is the Agency's initial analysis of the state of the environment and the issues that we believe need to be addressed. We would like to hear your views: • Have we identified all the major issues? • Have we identified realistic proposals for action? • Do you have any comments to make regarding the Plan in general? • Do you want to comment on the work of the Agency in general? During the consultation period for this Draft LEAP the Agency would be pleased to receive any comments in writing to: Aire LEAP Officer Environment Agency Phoenix House Global Avenue LEEDS LS11 8PG All comments must be received by 30th September 1998 Note: Whilst every effort has been made to ensure the accuracy of information in this Report it may contain some errors or omissions which we will be pleased to note Further copies of the document can be obtained from the above address. All comments received on the Consultation Draft will be considered in preparing the final LEAP which will build upon Section 3 of this consultation document by turning proposals into specific actions. All written responses will be considered to be in the public domain unless consultees explicitly request otherwise. LSZfr?* AIRE CONSULTATION DRAFT LEAP FOREWORD I am pleased to introduce the Consultation Report for the Aire Local Environment Agency Plan (LEAP). When completed this plan and its companion for the Calder catchment will identify the challenges, opportunities and priorities for the Agency’s services across West Yorkshire.
    [Show full text]
  • The Worth Way LANE
    KEIGHLEY CAVENDISH ST Keighley Station LOW MILL The Worth Way LANE 11 mile/17.5km circular walk or a EAST PARADE 1 Low 5 /2 mile/8.75km linear walk (returning to Keighley either by bus Bridge Mill or train from Oxenhope). PARKWOOD STREET WORTH WAY PARK (Allow at least 6 hours to complete the 11 mile/17.5km walk). LANE Parkwood The Walk Greengate Knowle Mill WOODHOUSE ROAD SOUTH STREET Woodhouse Museum Crag Place Crag Hill Ingrow Station Farm Ingrow Kirkstall Wood y a w il a R y e ll a short unofficial V h diversion t HAINWORTH r LANE o River Worth W d n The Keighley and Worth Valley Railway Line Bracken Bank a y e l h Hainworth g i e K D E DAMEMS ROAD AM MS Damems LA NE Station SYKE LN. GOOSE COTE LANE Damems Hill Top Harewood level Hill crossing E Cackleshaw G D New House E Farm R EAST O ROYD O STATION M ROAD S Oakworth Oakworth HALIFAX ROAD (A629) Station E level E PROVIDENCE crossing L LANE VALE MILL LANE Hebble Row reservoir Toll tunnel House VICTORIA AVE. Barcroft ROAD EY EB L River Worth O NG R L I Mytholmes A HAWORTH ROAD B N E LEES LANE Cross Roads HALIFAX ROAD (A629) MYTHOLMES LANE Haworth Sugden H school A Station Reservoir R playing D G fields A MILL HEY T E L A N Haworth E BROW TOP ROAD CENTRAL PARK STATION ROAD STATION Stump Cross BROW Farm BRIDGHOUSE ROAD LANE Naylor Hill Quarry, Brow Moor BROW MOOR War Memorial Bridgehouse Beck HEBDEN ROAD Wind Turbine CULLINGWORTH Naylor Hill MOOR Quarry diversion to viewpoint Lower NaylorHill Upper Naylor Farm Hill Farm y a Ives w l i Bottom a R y y e l l Donkey MARSH LANE a V Bridge BLACK MOOR ROAD h Delf Hill t r o W d n a y le h ig e North K Birks Sewage MOORHOUSE LANE Works Oxenhope Station Key KEIGHLEY ROAD Lower Route Hayley NE MILL LA HARRY Farm LANE DARK LANE OS Map Oxenhope Sue Explorer 21 Ryder N Manorlands South Pennines Donkey Bridge, Bridgehouse Valley City of Bradford Metropolitan District Council Countryside & Rights of Way Starting at Keighley Railway Station with your back to the The Worth Way building, turn left at the station forecourt and immediately left again down the cobbled Low Mill Lane.
    [Show full text]
  • Lease of Life BRADFORD’S BECKS
    BRADFORD’S A New BECKS Lease of Life BRADFORD’S BECKS River Wharfe A PLAN FOR THE 21ST CENTURY Silsden Beck Ilkley Silsden River Aire Morton One of the most appealing features of Yorkshire’s Beck landscapes is its rivers. The district of Bradford is Loadpit Beck no exception to this with water everywhere - from River Aire Keighley Gill Beck Bingley springs to becks to the River Aire. Shipley This plan is about managing the catchment of River Worth the Bradford Beck and its tributaries, which flow Harden Beck through the City. Bradford Bradford Beck Queensbury City of Bradford Contents Page Metropolitan Catchment Map 1 District River Spen Introduction 3-4 Urban Area Schematic Maps 5 Catchment boundary Visions 6-11 N Bradford Beck Activity Areas 12-23 Catchment 0 2km Summary 24 The Way Forward 25 Acknowledgements 26 BRADFORD BECK CATCHMENT AREA 1 Bradford’s Becks Bradford’s Becks 2 INTRODUCTION Watercourses have always been important to Bradford but they now need revitalising so that they can play a greater part in place-making and economic regeneration and contribute to Safer, Cleaner, Greener Neighbourhoods. The Bradford Beck is a small river system of around the Beck. The Beck up until the industrial revolution 11km that flows through the City of Bradford. It starts would have been the idyllic English country stream and as a collection of tiny tributaries in the west of the was integral to Bradford for powering the corn mills. By City which coalesce into one waterway which flows 1800 as the wool and textile processing trade became eastwards towards the city centre gathering momentum increasingly mechanised the town grew and prospered.
    [Show full text]
  • Humber Eel Management Issues: Barriers and Stocking
    UNIVERSITY OF Hull International Fisheries Institute HIFI Humber eel management issues: barriers and stocking FINAL REPORT A. D. Nunn, J. P. Harvey, R. A. A. Noble & I. G. Cowx April 2007 TABLE OF CONTENTS Page No. LIST OF TABLES iv LIST OF FIGURES iv LIST OF PLATES v ACKNOWLEDGEMENTS viii 1. INTRODUCTION 1 2. OBJECTIVES 1 2.1 Specific objectives 2 3. PROJECT STRATEGY 2 3.1 Identification of eel migration barriers 2 3.1.1 Collection and collation of fisheries data 2 3.1.2 Prioritisation of eel migration barriers 2 3.2 Elver stocking 3 4. DEVELOPMENT OF PRIORITISATION MATRICES 3 4.1 Eel migration barrier prioritisation matrix 3 4.2 Elver stocking prioritisation matrix 6 5. PRIORITISATION OF EEL MIGRATION BARRIERS 7 5.1 River Hull 7 5.2 Yorkshire Ouse 11 5.3 Yorkshire Derwent 11 5.4 River Ure 13 5.5 River Swale 14 5.6 River Nidd 15 5.7 River Wharfe 16 5.8 River Trent 17 5.9 River Don 19 5.10 River Rother 20 5.11 River Dearne 21 5.12 River Aire 22 5.13 River Calder 23 5.14 River Ancholme 24 5.15 River Foulness/Market Weighton Canal 25 5.16 Swinefleet Warping Drain 26 5.17 Tetney Haven 26 5.18 Adlingfleet Drain 27 5.19 Pauper’s Drain 27 5.20 Bosky Dyke (Keadby Warping Drain) 28 6. PRIORITISATION OF ELVER STOCKING AREAS 28 6.1 Yorkshire Ouse 28 6.2 Yorkshire Derwent 36 6.3 River Ure 39 6.4 River Trent 39 6.5 River Don 46 6.6 River Rother 49 6.7 River Dearne 51 6.8 River Aire 54 6.9 River Calder 57 6.10 River Ancholme 60 ii 6.11 Swinefleet Warping Drain 60 6.12 Tetney Haven 62 6.13 Adlingfleet Drain 62 6.14 Pauper’s Drain 62 6.15 Bosky Dyke (Keadby Warping Drain) 64 7.
    [Show full text]
  • River Aire Catchment Flood Management Plan
    Aire Catchment Flood Management Plan Summary Report December 2010 managing flood risk We are the Environment Agency. It’s our job to look after your environment and make it a better place – for you, and for future generations. Your environment is the air you breathe, the water you drink and the ground you walk on. Working with business, Government and society as a whole, we are making your environment cleaner and healthier. The Environment Agency. Out there, making your environment a better place. Published by: Environment Agency Rivers House 21 Park Square South Leeds LS1 2QG Tel: 0870 8506506 Email: [email protected] www.environment-agency.gov.uk © Environment Agency All rights reserved. This document may be reproduced with prior permission of the Environment Agency. December 2010 Introduction I am pleased to introduce our summary of the Aire Catchment Flood Management Plan (CFMP). This CFMP gives an overview of the flood risk in the Aire catchment and sets out our preferred plan for sustainable flood risk management over the next 50 to 100 years. The Aire CFMP is one of 77 CFMPs for England and groundwater, surface water and sewers. Just under Wales. Through the CFMPs, we have assessed inland 13,400 properties have a one per cent chance of flood risk across all of England and Wales for the first flooding each year if there were no defences in place. time. The CFMP considers all types of inland flooding, Flooding from other sources such as groundwater, from rivers, ground water, surface water and tidal canals and surface water are not as closely monitored, flooding, but not flooding directly from the sea mitigated or recorded, and so the risk posed from these (coastal flooding), which is covered by Shoreline sources is not fully evaluated.
    [Show full text]
  • Flood Risk High Page 9
    Specimen Address, Specimen Town Written by: C Butler MSc PIEMA Professional opinion Reviewed by: A Grant MSc PIEMA Contaminated Land Moderate-High: Action Required page 6 Flood Risk High page 9 Consultant’s guidance and recommendations inside. © Crown copyright and database rights 2019. Ordnance Survey licence 100035207 Operational Environmental Risk Contaminated land liability Low page 6 Ground Stability Banking security Identified page 9 Is it likely that the property will represent acceptable banking security from a contaminated land Radon perspective? Identified page 9 Further assessment required Energy Statutory or 3rd party action Identified page 10 Is there a risk of statutory (e.g. Part 2A EPA 1990) or Transportation third party action being taken against the site? Identified page 11 Potential Planning Constraints Environmental liability Identified page 12 Is there a risk that the property value may be impacted due to contaminated land liability issues? Planning Applications Potential Not selected Ref: Sample_ser_0918 [email protected] Your ref: GS-TEST 08444 159 000 Grid ref: 406799 441511 Date: 8 May 2019 Specimen Address, Specimen Town Ref: Sample_ser_0918 Your ref: GS-TEST Grid ref: 406799 441511 Useful contacts Bradford Metropolitan District Council: Environment Agency National Customer http://www.bradford.gov.uk/ Contact Centre (NCCC): 01274 432111 [email protected] 03708 506 506 Overview of findings and recommendations To save you time when assessing the report, we only provide maps and data tables of features within the search radius that we have identified to be of note. These relate to environmental risks that may have liability implications, affect insurance premiums, property values and/or a lender's willingness to lend.
    [Show full text]
  • Can Catchment Management Planning Deliver Urban River Restoration?
    Can catchment management planning deliver urban river restoration? David Lerner University of Sheffield, Aire Rivers Trust & Friends of Bradford’s Becks The River Aire • Aire Rivers Trust • Invited by Defra to lead preparation of a Catchment Management Plan for the Bradford Beck The Rivers and Becks of Bradford River Wharfe Silsden Beck Ilkley Silsden River Aire Morton City of Bradford Beck Metropolitan District Loadpit Urban area Beck Gill Beck River Aire Keighley Catchment Bingley boundary Bradford Beck Shipley catchment River Worth Harden Beck Bradford Bradford Beck Queensbury River Spen Bradford Beck • 225 000 population • 60 km2 • A typical urban stream flood risk Misconnections effects urban area flytipping canalised underground industry Existing Beck (1) Under the city centre 1900s culvert under Canal Rd Ecological desert – 1.5 km chute Propping up the city centre Existing Beck (2) Redundant culvert Misconnections Flood bypass meets river In need of maintenance Existing Beck (3) Past engagement • Environment Agency – Incident responses – “forgotten” in WFD • Yorkshire Water – As required by EA Institutions Public • Bradford drainage – Flooding • Bradford regeneration – Fine words Friends of Riparian – “Don’t inhibit development” … owners • Voluntary groups – Virtually none • Riparian owners – Mainly ignorant or abusive Making a plan Steering Group Sampling campaign Advisory, Facilitated consultations contacts, data Volunteers at Final production EA, YW, 20 spots x 8 Visions, basic CBMDC, YWT visits information Designers Generated
    [Show full text]
  • Local Infrastructure Plan
    Local Infrastructure Plan February 2021 Content Page 1.0 Introduction 02 2.0 Physical Infrastructure: Highways and Road Network 10 3.0 Physical Infrastructure: Rail Network and Capacity 18 4.0 Physical Infrastructure: Station Improvements including Park & Ride 27 5.0 Physical Infrastructure: Public Transport (Bus and MRT) 32 6.0 Physical Infrastructure: Walking & Cycling 37 7.0 Physical Infrastructure: Electricity and Gas 43 8.0 Physical Infrastructure: Water Supply & Waste Water Treatment 51 9.0 Social Infrastructure: Education 57 10.0 Social Infrastructure: Health and Wellbeing 65 11.0 Social Infrastructure: Built Sports Facilities and Playing Pitches 73 12.0 Social Infrastructure: Community and Cultural Facilities 82 13.0 Environmental Infrastructure: Open Space and Green Infrastructure 92 14.0 Conclusion 96 1 1.0 Introduction What is Local Infrastructure Plan (LIP) 1.1 The Local Infrastructure Plan (LIP) is a supporting document to the emerging new Bradford Local Plan. The Local Plan sets out that the council will plan for 30,672 new homes over the plan period 2020-2038. Delivery of this housing is required to meet the needs of the predicted increase in population and economic growth over the next 15-20 years; The LIP sets out what level of new or improved infrastructure will be required to deliver this proposed growth in the Local Plan. It is an essential element in ensuring that the Local Plan is robust and deliverable. 1.2 This LIP forms an update of the previous iteration (March 2016) which supported the Core Strategy Submission Draft and went through extensive public consultation before and during the scrutiny of the Core Strategy by the Planning Inspector.
    [Show full text]