KR Engineering Brochure 6Paged

Total Page:16

File Type:pdf, Size:1020Kb

KR Engineering Brochure 6Paged A strong tradition of engineering Hillside provides the foundation of expertise and Hutt that exists in our Workshops – a track record workshops today of engineering excellence KIWIRAIL MECHANICAL 0800 801 070, Option 0 HUTT WORKSHOPS HILLSIDE WORKSHOPS Elizabeth Street 300 Hillside Road Moera, Lower Hutt South Dunedin New Zealand 5010 New Zealand 9044 PO Box 36005 PO Box 2146 Wellington Mail Centre South Dunedin 9044 Lower Hutt 5045 Ph: +64 3 479 3470 Ph: +64 4 587 1800 Fax: +64 3 479 3209 Fax: +64 4 587 1736 • Overhaul • Refurbish • Rebuild • Components • Test • Inspection • Manufacture • Design • Inventory • Fabrication • Foundry • Machining • Traction Systems • Hillside Workshops Hutt Workshops This site has manufactured rolling stock for the The Hutt Workshops site has a long history of rail The Hutt workshops’ site also houses KiwiRail’s New Zealand rail industry since 1875, and more engineering, having been established in 1929-30 electrical equipment facility that carries out overhaul recently it has expanded its unique skills base and as a locomotive manufacturing and maintenance and refurbishment of electrical systems including heavyweight capability to all engineering facility. Today, as a KiwiRail-owned facility, it traction motors and alternators for heavy applications. continues to provide a range of engineering services, applications. A track record notably around component manufacture and Hillside Workshops is one of Dunedin’s best-known locomotive overhauls. The wide ranging inventory warehouse facilities at of engineering landmarks with eight hectares of open yard and Hutt Workshops are also the national logistics nearly three hectares of covered floor space In recent years, Hutt Workshops’ main focus has centre, including an inventory of spares and consumables for operations around the country. including on site foundry, machining, been on overhaul programmes and refurbishment excellence projects, of which many are extensive and require assembly, paint and finishing facilities. WINNER – Otago Chamber of WINNER – NZ Casting of IPENZ – Excellence Award Commerce Westpac Business of the Year Award 2002 for Mechanical and the facility’s specialist skills, capabilities, plant the Year Supreme Excellence Manufacture 2005 and tooling. Award 2004 KiwiRail has manufactured and assembled rolling stock in Products and Services Projects Major Resources Testing & Inspection Services Products and Services Projects Major Resources Testing & Inspection Services New Zealand since the inception of the railways in the late 1800s. • Specialised welding process • C class flat-deck wagons • NZ’s largest heavy engineering • IANZ accreditation since 1991 • Major rolling stock overhaul • EO class locomotive • High stud engineering facility • “5S” Continuous Improvement capability facility refurbishment We have a strong tradition of engineering that has provided the • CE class coal hopper wagons • Destructive and non- • Heavy maintenance and • 40,000m2 floor area • ISO9002 accreditation foundation of expertise that exists in our workshops today. • New rail rolling stock • 10,500m2 floor area in two destructive testing overhaul of locomotives (diesel • Freight wagon overhaul and manufacture • YJ class ballast hopper wagons workshops and electric) refurbishment • 100 tonne overhead crane • Traction motor electrical load • Mechanical testing equipment testing The KiwiRail Mechanical business provides mechanical support to • Steel components • SA and SD class passenger • 100 tonne overhead crane for strength, toughness and • Heavy maintenance and • Diesel engine overhauls • Electrical systems unit manufacture for rail carriages for Auckland hardness overhaul of passenger fleets • Brake component test facility the New Zealand rail industry and other markets. Wide-ranging • 18 metre bed profile cutting • Electric traction system • Traction motor test bay • SW, SWS and SWG class • Locomotive load banking • Civil structure manufacture machine – plasma and oxy- • Radiographic (x-ray) testing • Maintenance and overhaul of overhaul • Wheelset production. knowledge and experience in the New Zealand rail industry’s and refurbishment passenger carriages for the acetylene processes freight rolling stock facility Wellington-Wairarapa service • Surface methods (cracks • DX class locomotive rebuild regulatory and statutory framework includes commissioning and • Refurbishment of rail wagons • Internal fit-out of passenger testing) equipment • Refurbishment of rolling stock and upgrade. • Woodward governor testing. • AK scenic carriages for tourism carriages type testing of new vehicles, together with extensive capability in • Rebuild of freight, passenger experience trains • Weld testing and inspection • Diesel engine overhaul – strip and locomotive bogies • Large capacity grit blast and down, rebuild, remanufacture design, manufacture, maintenance and overhaul. Skills and resources • GT class car carrier wagons paint booths • Lloyds accredited foundry. Fabrication • Locomotive refurbishment and Locomotive bogie process • are concentrated at two sites, Hutt Workshops in Wellington and upgrade programmes • • 5 tonne arc furnace improvements • Electrical systems Hillside Workshops in Dunedin, with both sites benefitting from maintenance and overhaul • Steel and iron castings YJ class wagon controls fit-out • 2 tonne hot heel induction • furnace excellent road and mainline rail connections. Hillside has developed • Rail componentry and • Wheelset, axles and brake disc • High quality passenger bogie production a depth of fabrication expertise around passenger carriage and inventory refurbishment – one million • 500kg high frequency kilometres before overhaul induction furnace freight wagon builds, while Hutt Workshop’s focus is on component • Smelter industry components • Refurbishment of rail wagons • ZH class box wagons • Heat treatment and • Mining industry components spectrometer capability • Rebuild of freight, passenger manufacture, electric motors and heavy locomotive overhauls / refurbishment and locomotive bogies • Stainless steel valve bodies • Materials testing laboratory rebuilds. • Refurbishment of DSG shunt • Locomotive refurbishment and • Heat-resistant castings. locomotive • Machining facility with CNC upgrade programmes Engineering capabilities are also being used by customers outside machines and various • Supplier of stainless steel valve • Steel and iron castings the rail industry, from power generation and shipping, mining and body castings specialist machines • Butler Plano mill (9m bed) • Rail componentry and forestry, to irrigation and decorative castings. KiwiRail’s workshops • Research and development of inventory. high temperature materials 3D modelling software. are a major force in New Zealand engineering, with 400 staff across • • Turbine casings for power two sites including electrical engineers, mechanical engineers, trade stations. qualified employees (maintenance and diagnostic), fitters, fabricators, a range of semi-skilled workers, engineering support and registered engineers. Modern efficiency and quality standards are used across everything we do, including the the “5S” principles, which provide the basis for continuous improvement and maintain workplace efficiency in production environments. Both sites are ISO accredited..
Recommended publications
  • Annual Integrated Report 2019 Welcome – Tēnā Koutou
    F.18A KIWIRAIL’S EVOLUTION ANNUAL INTEGRATED REPORT 2019 WELCOME – TĒNĀ KOUTOU Rail has a long and proud history in reservation and tracking system. Those services contribute to our New Zealand, stretching back more We will also be replacing aging purpose of building a better than 150 years. The financial year to locomotives and wagons and improve New Zealand through stronger 30 June 2019 (FY19) has seen the our major maintenance depots at Hutt connections. Government renew that commitment and Waltham. It will also be used to We do this by putting the customer at to rail, laying the foundations for us to progress the procurement of two new, the centre of everything we do, and our play the role we should in delivering for rail-enabled ferries that will replace workers strive every day to meet their the country. Interislander’s aging Aratere, Kaitaki, needs. In the 2019 Budget, the Government and Kaiarahi ferries. allocated $741 million through Vote Our workforce, spread throughout That outstanding level of investment Transport over the next two years and New Zealand, reflects the nation. It made a further $300 million available is a clear recognition of the value includes men and women from all for regional rail projects through the rail adds to New Zealand’s transport corners of the world, and from diverse Provincial Growth Fund (PGF). system. ethnic backgrounds. There is however still room to improve. The money is being used to address It is a driver of economic development legacy issues to improve reliability and employment, delivered through These are exciting times for rail in and resilience for tracks, signals, our freight network, world-class tourism New Zealand, and we look forward to bridges and tunnels, for new freight services, and the commuter services building a future on the investment that handling equipment and a new freight we enable in Auckland and Wellington.
    [Show full text]
  • New Zealand North Island Railways
    NEW ZEALAND (NORTH ISLAND) RAILWAYS - SL 116 09.02.20 page 1 of 8 PASSENGER STATIONS & STOPS Based on Government Rlys Public TTs 1894 (z), 1913 (a), 1924 (b), 1941 (c), 1957 (d), 1976 (e) and 1993 (f). Also 1910 (n), Ideal TT 1917 (p), 1930 (q), 1934 (r), 1950 (s), 1965 (t) & 1984 (u), Working TTs (w), 1925 (w1), 1947 (w2) & 1953 (w3) and Quail Atlas (#). $: stops for school chidren only; $$: railway staff only; y-f = yzabcdef etc. f*: changes since 1993 Former names: [ ] Distances in Miles; Gauge 3’ 6” unless noted; (date)t / (date)w: other public (t) & working (w) TTs op. opened; cl. closed; rn. renamed; rl. relocated; tm. terminus of service at date shown; pass? passenger service?; All points served by passenger trains unless shown ( ) or noted. There were a large number of “bush” railways/tramways built primarily for transportation of timber (see Quail Atlas). At least one, Taupo Timber Co., see 12, had a public passenger service and there may have been others. 1. AUCKLAND - OPUA 39.3 Mount Rex z-d + Newmarket cl. 2008>2010 with temporary station at 41.0 Punganui cd [Pukanui zab ] Newmarket West 42.3 Kaukapakapa z(tm)abcd ++ closed 2003, except for excursions, and from 2015 also 45.0 Kanohi abcd used by services to Wellington 48.0 Makarau abcd 51.3 Tahekeroa abcd [Tahakeroa #] 0.5 Auckland Britomart (op.2003) f* 56.0 Ahuroa abcd 0.5 Auckland (2nd) zab 58.5 Woodcocks abcd 0.5 Auckland (1st) (cl.1885) 61.5 Kaipara Flats abcd 0.0 Auckland Strand f* ++ 64.0 Hoteo abcd [Tauhoa # ] [Auckland (3rd) cdef ] 67.7 Wayby abcd 1.
    [Show full text]
  • Hutt Workshop Milestone 2 CONTENTS EDITORIAL
    THETRANSPORT MAR WORKER The2020 journal of the RMTU – NZ's largest specialist transport union Celebrating 90 years Hutt Workshop milestone 2 CONTENTS EDITORIAL ISSUE 1 • MARCH 2020 6 FRENCH DISCONTENT Wayne Butson We analyse the causes behind the protests General and strikes coursing through French secretary society.. 11 MONEY MAN RETIRES RMTU Ports Retirement Scheme chair takes retirement himself after setting the Fund on a steady course. Starting the year on a 18 MUST SEE DOCO positive note Helen Kelly Together ELCOME to the first issue ofThe Transport Worker for 2020 and I am is doing the circuit sure you will agree that this is another great issue which chronicles currently and some of the things our leaders, delegates and rank and file members provides a wonderful get up to as part of their daily working life. I use the word 'working' illustration of a in the context that all of us in the RMTU are working for YOU, whether it is me, Wthe paid staff or delegates and activists our efforts are always focussed on what is dedicated and generous union identified and agreed democratically as being best for members. enthusiast doing her Our port members have seen considerable change in recent times and some very best to the bitter have been for the good. One such welcome change had been major staffing changes end. in management in Lyttelton. We were hopeful that this would herald a sea change in behaviour and our relationship with the company and, as they say, the proof is in the pudding. We have seen personal grievances settled to the satisfaction of all COVER PHOTOGRAPH: Some of the 200 parties and we have seen the Lyttelton logistics officers collective agreement settled plus people who gathered last month to in the record time of half a day with a fair deal now subject to member ratification celebrate 90 years of operation at Hutt (as I write this column).
    [Show full text]
  • Auckland Metro Rail Network Electrification
    AUCKLAND METRO RAIL NETWORK ELECTRIFICATION Heritage Assessment Table of Contents 1.0 Executive Summary 3 2.0 Introduction 4 3.0 Heritage Significance 6 4.0 Western Line (Newmarket–Swanson) 12 5.0 Britomart–Penrose–Onehunga 18 6.0 Penrose–Papakura (including Manukau Branch) 26 7.0 Eastern Diversion (Britomart–Westfield) 32 8.0 Conclusion 35 9.0 Appendices APPENDIX 1: Identification of Groups / 37 Individuals / Stakeholders for Consultation APPENDIX 2: Historical Chronology 38 APPENDIX 3: Policy for Government 66 Departments’ Management of Historic Heritage APPENDIX 4: Draft Areas of Visual Sensitivity 75 for Discussion APPENDIX 5: Map of Study Area 89 APPENDIX 6: Map of Railway Lines 90 APPENDIX 7: Items of Potential Significance (P*) 91 to be Altered or Demolished AUCKLAND METRO-RAIL ELECTRIFICATION: Heritage Assessment Page 2 of 92 1.0 Executive Summary This heritage assessment has been prepared to identify the built rail heritage in the Auckland Metro Rail network and to understand the heritage issues associated with the electrification of the network. It is supported and underpinned by the Policy for Government Departments’ Management of Historic Heritage 2004. The overall heritage significance of the various lines is discussed and the study further identifies 59 heritage ‘items’ including stations and associated structures on a 3 tiered scale according to their identified (I), potential (P) and adjacent significance (A), (see Section 3.0) Based on the historical chronology, (see APPENDIX 2), the assessment follows in consecutive order along the rail lines as they developed historically, section 4.0 Western Line, section 5.0 Britomart-Penrose- Onehunga, section 6.0 Penrose-Papakura (including Manukau Branch), and section 7.0 Eastern Diversion (Britomart-Westfield).
    [Show full text]
  • Single Stage Business Case Hamilton to Auckland Start-Up
    SINGLE STAGE BUSINESS CASE HAMILTON TO AUCKLAND START-UP PASSENGER RAIL SERVICE PREPARED FOR WAIKATO REGIONAL COUNCIL November 2018 HAMILTON TO AUCKLAND PASSENGER SERVICE SSBC This document has been prepared for the benefit of the Waikato Regional Council. No liability is accepted by this company or any employee or sub-consultant of this company with respect to its use by any other person. This disclaimer shall apply notwithstanding that the report may be made available to other persons for an application for permission or approval to fulfil a legal requirement. QUALITY STATEMENT PROJECT MANAGER PROJECT TECHNICAL LEAD Andrew Maughan Doug Weir PREPARED BY Andrew Maughan, Doug Weir, Sarah Loynes, Shaun Bosher CHECKED BY Andrew Maughan REVIEWED BY Phil Peet APPROVED FOR ISSUE BY Andrew Maughan 9/11/2018 HAMILTON 468 Tristram Street, Whitiora, Hamilton 3200 PO Box 13-052, Armagh, Christchurch 8141 TEL +64 7 839 0241, FAX +64 7 839 4234 Stantec │ Hamilton to Auckland Start-Up Passenger Rail Service │ November 2018 Status: Final │ Project No.: 80510468 │ Our ref: Single Stage BC Master Report FINAL_TIO HAMILTON TO AUCKLAND PASSENGER SERVICE SSBC REVISION SCHEDULE Signature or Typed Name (documentation on file) Rev Date Description No. Prepared Checked Reviewed Approved by by by by 1 31/8/18 Draft one AM, PP, SL, 2 4/9/18 Draft for client review AM PP AM DW 3 7/9/18 Draft for client review AM, DW AM PP AM 4 11/9/18 Draft for TCWG Review AM, DW AM PP AM 5 12/9/18 TIO Submission AM, DW AM AM AM 6 19/10/18 Review document SB SB Working draft for
    [Show full text]
  • Names & Opening & Closing Dates of Railway Stations
    Names & Opening & Closing Dates of Railway Stations in New Zealand 1863 to 2010 Researched & Written by Juliet Scoble for the Rail Heritage Trust of New Zealand JRS/291 © Juliet Scoble 4/2010 © Rail Heritage Trust of New Zealand 4/2010 Introduction This document lists the names of railway stations and the dates they were opened and closed. Included are the dates stations were opened for goods and or passenger traffic before the lines were officially opened or handed over to the Working Railways Department. Often the Public Works Department would run goods and passenger services whilst the list was still in their custody. These services were operated by the Public Works Department's ballast engine. Goods were carried in Working Railway's wagons. Occasionally a passenger car or covered wagon fitted with seats were provided, but most times passengers were carried in Public Works' ballast wagons. I have included the stations on the lines owned by the government railways, and private lines where government rolling stock was run thereon. This is an on-going work as I am still looking through files and am finding more names and other information to include in this document. Revised versions will be issued from time to time, the frequency depending upon the new information I find. Juliet Scoble 4/2010 Acknowledgements Most information has been obtained from the Rail Heritage Trust's Station Archive created and researched by Juliet Scoble, and from research specifically undertaken for this document. Additional information supplied by: Auckland
    [Show full text]
  • Heritage Inventory 461 Residential Railway Cottages Anzac Parade
    Built Heritage Inventory Railway Cottages 188 – 195 Anzac Parade Register Item Number: 461 Building Type: Residential Commercial Industrial Recreation Institutional Agriculture Other Significance: Archaeological Architectural Historic Scientific Location: Anzac Parade, Whanganui Heritage NZ Pouhere Taonga Technological List Number: nil Cultural Physical Description: The precinct includes a number of single storeyed, Thematic Context timber framed, standardised railway cottage plans with their typical symmetrical Early Settlement street elevations, variety of roof forms and entries with a range of porch designs. Residential The houses have a double hung sash window either side of the front door with Industry most having hood over the windows, either as an independent element or as a Agricultural continuation of the entry porch roof. The houses have lean-tos at the rear. Commerce Transport Other known names: Civic/Admin Current Use: housing Health Former Uses: Education Heritage Status: District Plan Class: BR Precinct Religion Architectural Style: Railway housing Date of Construction: 1926 Recreation Materials: Painted timber rusticated weatherboards, coverboards, entry Community detailing and joinery, corrugated steel roofing, Memorials Registered owner: Military Legal Description: Railway cottages 188 – 195 Anzac Parade Dzxy271 Built Heritage Inventory History: The extent of the NZ Railways Department-supplied housing subdivision at Wanganui East has not been researched in depth. This was a major NZR-focused area surrounding
    [Show full text]
  • Hillside Redundancies Anger Dunedin 2 32 16
    SEPTEMBER 2011 TransportThe Worker The journal of the RMTU NZ's largest specialist transport union hillside Redundancies anger Dunedin 2 Contents editorial ISSUE 3 • SEPTEMBER 2011 6 new AKs roll out Wayne Butson General secretary RMTU Hillside shows what it's capable of HEN I was a young lad I oft heard my elders talking about how New building with new carriages for the Zealand was an egalitarian society founded upon the beliefs of the early TranzAlpine and Coastal Pacific lines. settlers who came to the new lands with a strong bias toward not rec- 16 Protest in DuneDin Wreating, here in New Zealand, the class-based society and the income/ living gap between rich and poor prevalent in the countries they came from. It is with this grounding in values that I find myself presently wondering where this country is Hundreds of headed under current NZ Government policy settings. It is very clear to me that its Dunedin supporters policy settings, on a wide range of fronts, are fundamentally wrong. I can’t believe I of Hillside am living in a New Zealand where: Engineering filled n 275,000 workers are paid the minimum wage of currently $13/hour; the Octogon to n 270,000 children live in families with the total family income falling below the protest KiwiRail poverty line (currently measured at $14,000 per annum); redundancies. n Where the top 150 families increased their wealth to $7 billion in the last 12 months; n A recent book ranked New Zealand as the sixth most unequal society of 23 rich 32 CrAne trAining countries when comparing the incomes of the richest and poorest 20%; and n The unemployment rate for young people (aged 15-25) is more than double the unemployment rate of the general population.
    [Show full text]
  • Hillside's Women Workers Find Place in Workshop
    TransportTHE Worker ISSUE 3 • SEptEmbEr 2009 Equity issues PORT TAURANGA ADDITION Hillside’s women workers find place in workshop Port Tauranga's latest straddle crane doubles loads, reaches further and is smoooooooth. Page 7 COVERED IN MUD LE Adam Ford thought his days had ended when he saw a slip covering the end of the tunnel. Pages 8 & 9 Hillside’s women workers lean out the window of one of the part-built carriages they are working on: (from left) Rebecca Hauck, Lisa McKinlay and Becky Newton. HAVS By Mike Regan sion to apply to work at one of New Zealand’s foremost heavy engineering workshops where handling huge OMEN comprise just under two loads and cutting, welding and forging components for Everyday tools and their percent of Dunedin’s Hillside En- rail rolling stock is all part of the daily diet. hidden hazards. gineering work force – three out of Youngest of the three – Lisa McKinlay – has been 180 people – but there’s no reason Pages 10, 11 and 14 there the least time. She is half way through her first year why there shouldn’t be more, say as an apprentice and is currently learning welding both Wall three. Management, their fellow workers and their at the workshop and at weekly night school classes. She WWW.RMTUNION.ORG.NZ union agree. In fact all three are very comfortable with their deci- ISSN 1173-6488 Continued on the next page RMTU – NZ's Largest Specialist Transport Union EQUITY says she has only received encouragement Hillside Engineering from the people she works with and also her family and friends.
    [Show full text]
  • Kiwirail Overview Kiwirail Is a State Owned Enterprise and the Backbone of New Zealand’S Integrated Transport Network
    2012 ANNUAL REPORT KiwiRail Overview KiwiRail is a State Owned Enterprise and the backbone of New Zealand’s integrated transport network. Our vision is to be a world class mover of freight and people by rail and ships, and to be the natural choice for our customers in the markets in which we operate. We have four business units: ▪ KiwiRail Freight provides rail freight services and locomotives for passenger services ▪ KiwiRail Infrastructure and Engineering maintains and improves the rail network, controls the operation of trains on the network, and operates Whangarei the heavy workshops that refurbish and maintain Dargaville our rolling stock ▪ KiwiRail Interislander operates the ferry passenger and freight services AUCKLAND ▪ KiwiRail Passenger provides urban passenger services in Wellington under contract to the Greater Tauranga Wellington Regional Council through the Tranz Metro Hamilton Kawerau team, and the Tranz Scenic team operates the long Te Kuiti Kinleith distance passenger rail services. Gisborne Taumarunui New Plymouth Operations Stratford Waiouru Napier Each week, train control operations manage Whanganui the movement of: Dannevirke Palmerston North ▪ 900 freight trains ▪ 44 inter-city passenger trains Otaki Masterton ▪ Approximately 2,200 suburban Featherston passenger services in Wellington Picton WELLINGTON Blenheim ▪ Approximately 2,000 suburban Westport passenger services in Auckland. Reefton In a year, Interislander manages Greymouth Kaikoura 4,600 sailings carrying: Hokitika ▪ 755,000 passengers ▪ 53,000 rail wagons Rolleston CHRISTCHURCH ▪ 73,000 trucks Ashburton ▪ 212,000 cars. Timaru Assets Oamaru ▪ 4,000 kms track Port Chalmers ▪ 1,656 bridges DUNEDIN Wairio ▪ 18,000 ha of land managed ▪ 198 mainline locomotives Invercargill Bluff ▪ 4,585 freight wagons ▪ 2 owned and 1 leased ferry ▪ 4,200 staff approximately.
    [Show full text]