Partners in development (PID) Consulting engineers Zaman Plaza, First Floor, Bilal Market, Sector D-1, Phase 1, Hayatabad, Telephone: 091-5812075, email: [email protected]



M I S S I O N S T A T E M E N T

PID's objective is to play a key role in development of and brings improvement in its people life’s quality by providing superior Engineering services & introducing state of the art international practices for better management and by providing state of the art economically viable solutions compatible with the working environment of Pakistan.



B A C K G R O U N D

Partners in Development (PID) is a Engineering firm was established in 2010 to provide Engineering services in key disciplines of Environment, Civil & Electrical Engineering. PID is established by professionals having vast national and international experience in the field of Engineering and Finance. The staff of PID have worked in various organizations for number of years and have gained necessary experience to deal with the real world problems and come up with solutions to complicated problems that most of the big organizations are facing today while dealing with the construction projects. The purpose of forming PID is to provide one window operation to clients dealing with various aspects of Engineering projects i.e. Planning, Design, Bidding/Tendering, Construction Management, Financial Management, Physical and Financial progress monitoring and ensuring that Quality Check/ Quality Assurance (QC/QA) procedures are enforced.

PID has been divided into the following groups each headed by a specialist professional:

 Master Planning  Energy Renewable Group

 Water Supply and Sanitation Group

 Geotechnical/ Reinforced Earth Group

 Infrastructure Development Group

 Construction Management Group

 Financial Management Group

 Environmental Engineering Group

 Social Safeguard Group  Monitoring and Evaluation

Though PID is an experienced engineering company. PID has more than 10 years’ experience in dealing with public and private sector projects. PID has successfully completed various project assignments of national importance in major development sectors of Pakistan and around the world. Keeping in view qualifications, expertise, experience, and exposure of PID's key professionals, there shouldn't be any doubt in the mind of any client regarding PID's ability to execute/ handle their projects in the most efficient and best possible manner.

FU TUR E VI SI ON

PID's future vision is to manage projects in Pakistan by implying state of the art techniques and by following contract documents in true spirit and bring a revolution in the ways, projects are being managed in Pakistan. PID endeavors to be among the highly reputable Engineering firms of Pakistan. PID is gradually increasing its scope of services in almost all areas of civil engineering by engaging qualified staff and experts from various fields.

PID is planning to contribute to the development of infrastructure in its broadest sense, including management, supervision and monitoring of such projects and programs comprising, planning, design and implementation.

O R G A NI Z A T I O NA L S E T U P

PID's head office is located in Peshawar and a branch office located in . Mr. Shahid Zaman Khan is the Chief Executive Officer of the company. Mr. Khan is a Civil Engineer with Masters in Construction Engineering and Management from California State University Long Beach, USA. He has more than 22 years international and local experience as a consultant professional and has a privilege of working in Pakistan top companies but also America's top construction Management company “CH2MHILL” and has managed projects worth billions of dollars.

PID employs a staff of professionals (both full time and part time) including the engineers, economists, planners, construction managers, HRD trainers and financial analysts. PID specialists' team deals with projects from problem definition to the implementation of effective solutions, followed by close monitoring and evaluation to maximize project benefits. To supplement in-house staff resources, PID maintain a computerized professional registry of over 50 highly qualified professionals in multiple disciplines. This registry is updated on a continuous basis, which allows the firm to engage staff for technical positions from associated fields for short and long term assignments. PID's professionals have diversified and vast experience in a variety of fields including Monitoring & Evaluation, Project Preparation, Project Management, Community Development, Environmental, Planning and Training. PID's combined resources complimented by a group of professionals have gained an excellent reputation for providing Engineering services all over the country and abroad. PID specialists have been valued by their Clients for their skills, in-depth knowledge of the local conditions and socio-cultural traditions. They have worked on various challenging projects in most remote areas of the country.

PID is also associated with number of international & local firms and share technical knowledge & information with them.

Organizational structure of PID

PID

Construction Feasibility Financial Infrastructure Geotechnical Renewable Transportation Environmental Management Study & Management Group Group Energy Group Group / Social Group Group Design Group Group

Q U A LI T Y A SSU R A N C E A N D C O N T R O L

For each project, PID assembles a project team with the appropriate skills to ensure satisfactory achievement of the project objectives. A principal member of staff is nominated as Project Coordinator and his responsibilities during the assignment are typically as follows:

 Communication and Coordination with the Client

 Organization and Co-ordination of the Work within the Company

 Identification and Reappraisal of Objectives throughout the Project

 Control of the Work Schedule and the Project Budget

 Quality Assurance on the Project

Overall the Project Coordinator is responsible for assuring that the work of the Project Team is maintained to a high standard and to the satisfaction of the Client and of PID's management. Communication between the Project Team and the Client are usually at both formal and working level. This close cooperation and working contact is regarded by PID as being essential for mutual satisfaction of all parties and for the success of the work.

Consistent with a commitment to quality, PID operate within a Quality Assurance regime designed to meet the requirements for the development projects in all sectors. It is company policy to apply an effective Quality Assurance Plan to all projects. For each project the company appoints a QA Coordinator to ensure that the correct procedures are followed and to guarantee that the project work is being performed in accordance with the QA Plan drawn up for the project.

This QA Plan is normally prepared at the beginning of a project and set down the procedures for the project including:

 Identification of the Personnel who will be Working on the Project  Lines of Communication within the Company and with the Client  Time schedule for completing the Work

It is company policy to apply an effective Quality Assurance System to all projects and to implement the system in the most practical, economic and reliable manner consistent with Client needs. The Quality Assurance System provides the basis for executing, checking and progressing the work. The final report, conclusions and recommendations are thoroughly checked by suitably qualified persons and formally approved by the competent professional of the firm prior to submission to the Client..

S C O P E O F SE R VI C E S

PID is primarily focusing its professional contribution towards institutional strengthening/ capacity building supported by cost effective and practical solutions to the best standards. Our philosophy is based on technical excellence coupled with total dedication and commitment to the Client's needs.

PID concentrate on a unique approach of bringing together innovative solutions, balanced in all aspects of economic, technical, environmental and policy issues. An integrated package of professional skills and services tailored to each individual project is assembled in order to meet client’s requirement.

PID's professionals have a proven record of working with people to develop concepts, identify problems, propose solutions, improve the environment, enhance the quality of life, conserve and make the most effective use of our resources and bring together all of the skills and solutions that technology can provide.

Our firm's multi-disciplinary strengths allow us to offer a full range of professional advice in all aspects of engineering, financial management and human resource development.

PID provides a complete range of development related services including:

 Basic Design and Infrastructure Development Services

 Feasibility Studies and Surveys

 Project Costing and Estimation Services

 Project Planning and Scheduling

 Construction Management and Supervision Services

 Reinforced Earth Construction and Design.

 Financial Management

 Monitoring and Evaluation Services

 Project Management Assistance

 Institutional Strengthening/ Capacity Building

 QC/ QA Services

 Contract Management including Claims Settlement

 Risk Assessment Modeling

 Environmental Impact Assessment Studies

 Social Safeguard Studies

Partners in Development (PID) Company Profile

LIST OF MAJOR ASSIGNMENTS COMPLETED BY THE FIRM

Partners in Development (PID) Company Profile

Consultancy S. Date of Date of Employer/ Name of Project Nature of Project Fee (Rs. in No Commencement Completion Client Millions) MASTER PLANNING PROJECTS

Spatial/Structural Planning for MC Khar, Bajaur FATA Master Planning 1 Agency, FATA Jan 2012 June 2012 Secretariat, 14.7

World Bank

Spatial/Structural Planning for City FATA Master Planning 2 Kurram Agency , FATA Oct 2014 April 2015 Secretariat, 17.5

World Bank

FATA Spatial/Structural Planning for Sadda City Kurram Master Planning 3 Oct 2014 April 2015 Secretariat, 17.5 Agency , FATA World Bank Local Govt. Consultancy Services for Rehabilitation of Bara Department, 4 Master Planning Sep 2015 Nov 2015 3.5 Bazaar, Khyber Agency Khyber Agency FATA INFRASTRUCTURE PROJECTS Department Monitoring and Evaluation of Department for For International Development (DFID) Pakistan Vital 5 Infrastructure July 2012 March 2016 International 9.4 Transportation and Education Infrastructure Projects Development (40 Schools & 70 Bridges) (DFID), UK FEASIBILITY STUDY & DESIGNP ROJECTS Gilgit Baltistan Consultancy Services for Feasibility Study for Feasibility Study and Public Works 6 May 2018 June 2018 2.74 Improvement of Kargah Road Gilgit 25 Km Detailed Design Department (PWD)

Partners in Development (PID) Company Profile

Consultancy S. Date of Date of Employer/ Name of Project Nature of Project Fee (Rs. in No Commencement Completion Client Millions)

Asian Feasibility Study, Master 7 Post Conflict Need Assessment Study March 2010 August 2010 Development 1.35 Planning Bank (ADB)

M/s Sheladia Feasibility Study for 5-10 MW Waste to Energy 8 Feasibility Study Jan 2010 Dec 2010 Associates, Inc 27 Power Plant Near Karachi of USA

World Food Survey, Design of Drainage & Sewerage System of Feasibility Study, Master 9 Jan 2012 June 2012 Programme 0.5 WFP Compound Peshawar Planning, Design (WFP)

THIRD PARTY VALIDATION/ENVIRONMENTAL & SOCIAL MONITORING PROJECTS Frontier Highway External Monitoring Reports (EMA) of Social Authority/ 10 Safeguards and Environment for three Provincial Third Party Validation Oct 2009 Jan 2011 0.55 Roughton Highways, KPK International Consultants Third Party Validation/ Frontier Independent Environment Monitoring Consultants Independent Highway 11 July 2011 June 2013 4.5 (IEMC) for Chakdara to Kanju Road Environmental Monitoring Authority/ Consultant World Bank Frontier Independent Social Monitoring Consultants (ISMC) Independent Social Highway 12 July 2011 June 2013 1 for Dadahara to Sharif abad Road Monitoring Consultant Authority/ World Bank Development Management Environmental Impact Assessment, Charsadda Environmental Impact 13 Oct 2012 Nov 2010 Consultants, 1 Tangi Road Study Hayatabad, Peshawar

Partners in Development (PID) Company Profile

Consultancy S. Date of Date of Employer/ Name of Project Nature of Project Fee (Rs. in No Commencement Completion Client Millions) Pakhtunkhwa Independent Environment Monitoring Consultants Third Party Validation/ Highways 14 (IEMC) for Chakdara to Madyan Road (Shamozai- Independent Environmental Feb 2014 July 2015 3.97 Authority/ Dadahara Section) 14.7 Km Monitoring Consultant World Bank Pakhtunkhwa Independent Environment Monitoring Consultants Third Party Validation/ Highways 15 (IEMC) for Chakdara to Madyan Road (Chakdara - Independent Environmental March 2014 July 2015 1.862 Authority/ Shamozai Section) 10.7 Km Monitoring Consultant World Bank PAVEMENT DESIGN PROJECTS

Development Vetting / Authentication of the Design & Management Construction Supervision of Upgradation & 16 Pavement Designing July 2011 June 2013 Consultants, 0.5 Remodeling of Ring Road Southern Section Hayatabad, Peshawar Peshawar

MONITORING & EVALUATION PROJECTS

Department Monitoring and Evaluation of Department for For International Development (DFID) Pakistan Vital 17 M&E July 2012 March 2016 International 9.4 Transportation and Education Infrastructure Projects Development (40 Schools & 70 Bridges) (DFID), UK ASSET MANAGMENT PROJECTS Pakhtunkhwa Consultancy Services for Establishment and Highways 18 Implementation of Road Asset Management Asset Management Feb 2013 Sep 2014 Authority 18.54 System (PKHA), Peshawar CONSTRUCTION MANAGEMENT SERVICES PROJECTS

Partners in Development (PID) Company Profile

Consultancy S. Date of Date of Employer/ Name of Project Nature of Project Fee (Rs. in No Commencement Completion Client Millions)

Construction Management Services to NLC for National Construction Management December 19 Construction of Bab-e-Peshawar Flyover Phase-III July 2015 Logistics Cell 7.5 Services 2015 Chowk Hayatabad Peshawar (NLC)

Construction Management Services to NLC for National Construction of Service Road Along Ring Road Construction Management 20 March 2016 Nov 2016 Logistics Cell 14.9 Peshawar, University Town Roads, Hayatabad Services Roads and other Allied Works. (NLC)

PROCUREMENT PROJECT

FUCP, TARUCCI Procurement of Solar Street Lights for Khar, Bajaur 21 Procurement Feb 2013 Nov 2013 PMU, FATA 94.7 Agency FATA Secretariat / World Bank

Frontier Capacity Building and Institutional Strengthening, Procurement, Training and Highways 22 Trainings & Supply of NDT Equipments & August 2010 October 2010 9.8 Management Authority Computers Accessories/ software’s (FHA), C&W

Partners in Development (PID) Company Profile

LIST OF MAJOR ASSIGNMENTS IN HAND

Partners in Development (PID) Company Profile

Consultancy S. Date of Date of Employer/ Name of Project Nature of Project Fee (Rs. in No Commencement Completion Client Millions) MASTER PLANNING PROJECTS June 2017 Urban Policy Strategic Development Plan SDP-2035 for Mardan 1 Master Planning Feb 2016 (Time Unit, P&D 26 City Extended) Deptt. KP INFRASTRUCTURE PROJECTS Flyovers, Bridges and Culverts: 1.5 Consultancy Services for Infrastructure % and other National Logistic 2 Development for Border Services Improvement Infrastructure Jan 2017 2 Years Infrastructure Cell (NLC) Project at Torkham Development Works: 0.95% of the original cost of works Flyovers, Bridges and Culverts: 1.5 Consultancy Services for Infrastructure % and other National Logistic 3 Development for Border Services Improvement Infrastructure Jan 2017 2 Years Infrastructure Cell (NLC) Project at Chaman Development Works: 0.95% of the original cost of works FEASIBILITY STUDY & DESIGN PROJECTS

Consultancy Services for Feasibility Study and June 2017 National Detailed Design for Construction of 4 Lane Feasibility Study and Highway 4 Feb 2017 (Time 31.01 Expressway from Chakdara to Kalam - N 95 (133 Detailed Design Authority extended) Km) (NHA)

Partners in Development (PID) Company Profile

Consultancy S. Date of Date of Employer/ Name of Project Nature of Project Fee (Rs. in No Commencement Completion Client Millions)

Consultancy Services for Feasibility Study and June 2017 National Detailed Design for Construction of 4 Lane Feasibility Study and Highway 5 Feb 2017 (Time 22.72 Expressway from Khawazakhela to Besham – N Detailed Design Authority extended) 90 (64 Km) (NHA) Gilgit Baltistan Consultancy Services for Feasibility Study for Feasibility Study and Public Works 6 June 2018 Sep 2018 2.83 Bridge Minawar to Muhamma Abad Gilgit Detailed Design Department (PWD) Gilgit Baltistan Consultancy Services for Feasibility Study for Feasibility Study and Public Works 7 Widening and Metalling of Road from Ronao March 2019 June 2019 6.80 Detailed Design Department Chilas to Naran Road via Batogah Valley (PWD) CONSTRUCTION MANAGEMENT SERVICES PROJECTS 2.375% of National Construction Management Services (CMS) for Construction Management the Total 8 Infrastructure Development for Border Services Feb 2019 July 2022 Logistics Cell Services Project Bid Improvement Project at Torkham (NLC) Amount

Reconstruction and Rehabilitation of militancy PaRRSA- 9 damaged schools and BHUs under PaRRSA- Construction Supervision May 2019 April 2021 USAID (C&W 32.028 USAID program in Malakand Division. Swat & Dir)

THIRD PARTY MONITORING PROJECTS Third Party Monitoring Agent (TPMA) For the KP, Third Party Monitoring 10 July 2017 July 2020 World Bank 12.636 FATA and Balochistan Multi-Donor Trust Fund Agent (TPMA)

DATASHEETS OF MAJOR PROJECTS COMPLETED / IN HAND

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: External Monitoring Reports (EMA) of Social Pakistan Safeguards and Environment for three Provincial Highways, KPK PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT (KPK) Rs. 1.0 Billion NAME OF CLIENT: NO. OF STAFF: Frontier Highway Authority/ Roughton International 4 Consultants ADDRESS: NO. OF STAFF MONTHS: Attached Departments Complex Near Treasury 6 Office START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Rs. 550,000 October 2009 January 2011 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL Nil STAFF BY ASSOCIATED FORM: Nil NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED:

Shahid Khan-Project Director Miss Salmana Khan – Project Coordinator Mr. Abdullah – Enumerator Mr. Shahid Imran – Enumerator DETAILED NARRATIVE DESCRIPTION OF PROJECT:

Project involved periodic external monitoring of social safeguards/ resettlement in addition to environmental monitoring during the construction stage of three major provincial highways reconstruction project funded by Asian Development Bank namely Jehangira Swabi Road, Hangu Thall Road and Timergara Munda Road in Khyber Pakhtunkhwa province. DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

Periodic external monitoring reports of social safeguards and environmental monitoring were also conducted by M/s Partners in Development. As part of environmental monitoring air quality, water quality and noise levels along and in vicinity of the project road were observed, tested and reported for compliance while for social safeguard monitoring, status of land and other payments, resettlement of the AP’s, performance of Grievances Redressel Committee and provision of alternate means of living

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Post Conflict Need Assessment Study Pakistan (Transportation Sector KPK) PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST: Khyber Pakhtunkhwa (KPK) Rs. 3 Billion NAME OF CLIENT: NO. OF STAFF: Asian Development Bank (ADB) 2

ADDRESS: NO. OF STAFF MONTHS: Serena Office Complex, Islamabad 6 START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Rs. 13,50,000 March 2010 August 2010 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL Nil STAFF BY ASSOCIATED FORM: Nil

NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED:

Engr. Shahid Khan Mr. Shahid Imran DETAILED NARRATIVE DESCRIPTION OF PROJECT:

The study was conducted by Asian Development Bank to estimate the amount of damage in war affected areas of Khyber Pakhtunkhwa. Various sectors including transportation, energy, infrastructure, education, health and administration were studied under this study. Amount of damage was estimated and appropriate amount of needed funding for rehabilitation of various sectors was estimated and presented to various Govt quarters.

DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

M/s Partners in Development conducted the Post Conflict Need Assessment Study for the Transportation sector of the project area. Existing condition of the transportation section was surveyed and amount of damaged was noted. Needed funding for restoration of the transportation sector was estimated based on the prevailing rates and expected increment in the future prices. The findings were presented in the report for possible funding by the donor agencies.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Capacity Building and Institutional Strengthening, Pakistan Trainings & Supply of NDT Equipments& Computers Accessories/ software’s PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Khyber Pakhtunkhwa (KPK) Rs 800 Million NAME OF CLIENT: NO. OF STAFF: Frontier Highways Authority (FHA), C&W 6

ADDRESS: NO. OF STAFF MONTHS: Attached Departments Complex Near Treasury 8 Office Khyber Road Peshawar START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Rs 9.8 Million August 2010 October 2010 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL Nil STAFF BY ASSOCIATED FORM: Nil

NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. MaqboolZaman Khan Engr. Fakher-e-Alam Mr. Rana Sarwar Engr. Tabjeel Ashraf Engr. Shahid Khan Mr. Abdullah DETAILED NARRATIVE DESCRIPTION OF PROJECT: The project was comprised of providing assistance to the client/ department for institutional strengthening and capacity of its staff. Consultants were required to provide trainings to staff members of FHA, C&W and P&D departments on project management, profilometer, NDT equipment, economic analysis and various software’s for Asset Management, environmental monitoring, pavement design, scheduling and financial monitoring. DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

M/s Partners in Development (PID) provided the above mentioned trainings and services to the satisfaction of the client’s staff. Various software’s and Non-Destructive testing equipment was also purchased as part of this project.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Feasibility Study for 5-10 MW Waste to Energy Pakistan Power Plant Near Karachi PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Sindh Rs. 9.0 Billion NAME OF CLIENT: NO. OF STAFF: M/s Sheladia Associates, Inc of USA 3

ADDRESS: NO. OF STAFF MONTHS: F 8/3, Islamabad 11 (Intermittently)

START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Rs. 27 Million Jan 2010 Date NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL STAFF BY ASSOCIATED FORM: Waste Busters 5

NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. MaqboolZaman Khan Engr. Shahid Khan Mr. Abdullah

DETAILED NARRATIVE DESCRIPTION OF PROJECT:

Project involved feasibility study for 5-10 MW W aste to Energy Power Plant near Karachi. The project was funded by USTDA. Project involved feasibility study and detailed design for 5-10 MW waste to energy power plant near Karachi. Alternative Energy Development Board was the client of the project while it was implemented through Ministry of Environment, Govt of Sind. M/s Sheladia Associates was the lead consultant for the project.

DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

Mr. ShahidZaman Khan of M/s Partners in Development provided necessary assistance to M/s Sheladia Associates in conducting the feasibility study. M/s Sheladia Associates Inc. of USA was the main Engineering firm. M/s Partners in Development’s professionals were contracted for environmental monitoring, waste sampling and it’s suitability for power generation, project coordination with various utility companies and client. M/s PID’s professionals conducted the EIA study for the project and was also responsible for waste sampling and testing.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Independent Environment Monitoring Consultants Pakistan (IEMC) for Chakdara to Kanju Road

PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Khyber Pakhtunkhwa (KPK) Rs. 600 Million NAME OF CLIENT: NO. OF STAFF INVOLVED: Frontier Highway Authority/ World Bank 5 ADDRESS: NO. OF STAFF MONTHS: Attached Departments Complex Near Treasury 9 (Intermittently) Office Khyber Road Peshawar START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Rs. 4.5 Million July 2011 June 2013 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL STAFF BY ASSOCIATED FIRM: Department of Environmental Sciences, Uni. Of 3 Peshawar NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Dr. ShaukatFarooq Engr. Shahid Khan Ms. Salmana Khan Mr. Mukhtiar Ali DETAILED NARRATIVE DESCRIPTION OF PROJECT: Project involved independent environmental monitoring of a road construction project (Chakdara to Kanju). Project involves verification of baseline data provided in the EIA report of the project. All environmental parameters like air quality, water quality, noise and soil will be tested and monitored. Findings will be submitted in the report along with recommendations for mitigation measures, every four months during the construction period.

DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

M/s Partners in Development has conducted Third Party Validation (TPV) on a four monthly basis to assess the effectiveness of the various environmental aspects of the project. During TPV, the implementation and effectiveness of the Environmental and Social Management Framework (ESMF) was evaluated, in addition to various other environmental enhancement tasks included in the project. Initially verification of baseline data was completed and report was submitted to World Bank. Additionally quality monitoring of key environmental factors is being carried out for any deviations.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: PKA11NF046, Survey & Design of Drainage & Pakistan Sewerage System, Peshawar

PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Khyber Pakhtunkhwa (KPK) Rs. 4.5 Million NAME OF CLIENT: NO. OF STAFF INVOLVED: World Food Programme (WFP) 5 ADDRESS: NO. OF STAFF MONTHS: WFP Compound Provincial Office, House No.10, 10 Sahibzada Abdul Qayyum Road, University Town Peshawar START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Rs. 500,000 January 2012 June 2012 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL STAFF BY ASSOCIATED FIRM: Nil Nil

NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. Shahid Zaman Khan Engr. Sibghat Ullah Jan Mr. Mukhtiar Ali Mr. Zahid Niaz DETAILED NARRATIVE DESCRIPTION OF PROJECT: Project involved preparation of feasibility study, detailed structural design, drainage and sewerage system design along with submission of bid documents included estimated costs, drawing and other necessary details for the various components in the World Food Programme (WFP) Compound Provincial Office in Peshawar. Work also include environmental assessment of the effects of existing and proposed water supply, sewerage and wastewater treatment facilities within the project areas to ensure that proposed options under consideration are environmentally sound and sustainable.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Spatial/Structural Planning For MC Khar, Bajaur Pakistan Agency, FATA PROJECT LOCATION WITH IN THE TOTAL COST OF THE PROJECT: COUNTRY: Rs. 700 Million FATA Khyber Pakhtunkhwa (KPK) NAME OF CLIENT: NO. OF STAFF INVOLVED: FATA Secretariat / World Bank 10 ADDRESS: NO. OF STAFF MONTHS: Project Director (TARUCCI) 6 (Intermittently) 3rd Floor, Park View Apartments START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) 14.7 Million January 2012 June 2012 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL EA Consultant Pvt Ltd STAFF BY ASSOCIATED FIRM: Karachi 24 NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Mr. Masood Jaffri Engr. Shahid Khan Mr. Shabbir Ahmad Mr. W aseem Hayat Mr. DETAILED NARRATIVE DESCRIPTION OF PROJECT:

Project involved primary and secondary data collection of the existing facilities and constraints, land ownership details & land availability, economic & financial gains, water resources, waste disposal, public facilities and traffic circulation & flow etc. Preparation of GIS map showing all the above existing facilities and proposed structural development plans. Project also involves arrangement of training programs and social mobilization workshops.

DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

A team of Social experts from M/s Partners in Development are working on data collection regarding Khar Tehsil, which includes Roads hatchery, Education, Health facilities, Population, Water Supply Schemes, Drainage & Sewerage System and other existing facilities for the community. Additionally a GIS map is being developed for Khar Bajaur so that future development of Khar, Bajaur is structured to a Master plan which will be developed at the end of this project.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Independent Social Monitoring Consultants Pakistan (ISMC) for Dadahara to Sharif abad Road

PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Khyber Pakhtunkhwa (KPK) Rs. 600 Million NAME OF CLIENT: NO. OF STAFF INVOLVED: Frontier Highway Authority/ World Bank 4 ADDRESS: NO. OF STAFF MONTHS: Attached Departments Complex Near Treasury 12 Office Khyber Road Peshawar START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Rs. 1.0 Million July 2011 June 2013 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL STAFF BY ASSOCIATED FIRM:

NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Dr. ShaukatFarooq Engr. Shahid Khan Ms. Salmana Khan Mr. Mukhtiar Ali DETAILED NARRATIVE DESCRIPTION OF PROJECT: As per project requirements, PHA intends to carry out an Independent Social Monitoring / Third Party Validation of approximately 10.5 km long road from Dadahara to Sharifabad, District Swat under Emergency Roads Recovery Project (ERRP). For this purpose, PHA intends to engage an independent agency/ consultant (an NGO, an academic institute or a firm) to conduct 3rd party/independent monitoring and validation of RAP implementation as per principles and mechanisms laid down in the ESSAF and RAP. DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM: M/s Partners in Development has conducted third party validation (TPV) on a four monthly basis to assess the effectiveness of the various social aspects of the project. During TPV, Three comprehensive quarterly social monitoring reports during the first year of project execution followed by final report at the end of the project will be prepared as per PHA and W orld Bank guidelines in accordance to TOR requirements. Details of findings, action plan, description of responsibilities, Implementation of recommended actions and photographs, etc, will also be enclosed in the report along with interpretation of and review comments on the secondary information and primary data. Initially a draft report will be submitted to the Client for comments. After incorporation of review comments, final report will be submitted to the client.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Monitoring and Evaluation of Department for Pakistan International Development (DFID) Pakistan Vital Transportation and Education Infrastructure Projects PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Malakand Agency Khyber Pukhtunkhwa Rs. 1.9 Billion NAME OF CLIENT: NO. OF STAFF INVOLVED: Department For International Development (DFID), 5 UK ADDRESS: NO. OF STAFF MONTHS: DFID, British High Commission, Diplomatic 45 Enclave, Islamabad START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) July 2012 March 2017 Rs. 9.4 Million NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL STAFF BY ASSOCIATED FIRM:

NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. Shahid Khan Mr. Shabbir Ahmad Mr. Abdullah Khan Ms. Salmana Khan DETAILED NARRATIVE DESCRIPTION OF PROJECT: Department For International Development (DFID), UK intends to monitor the ongoing construction activities on 70 bridges &40 schools in Malakand agency. For the purpose they intend to hire an independent monitoring consultant (single source) to the monitor these construction activities. DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM: Monitoring of the construction of bridges & schools at different stages on monthly basis. Check the progress on each bridge, any blockages / delays incurred during building process & specific technical feedback on Bridge foundations like ramp quality, retaining walls etc, check quality of construction materials used, construction methods / workmanship adopted &any issues encountered during fixing of the steel bridges. Conduct perception survey, bridge usage data and Health & Safety of workers. Also gather feedback from community during & after construction of bridges & school, Contract management issues (if any), provide advice to the on-site Contractors with regards to any possible improvement in the construction quality. Maintain close liaison with regional authorities Communication and Works Department (C&W ) where the construction is being undertaken and also with the construction supervisors Halcrow/Mott. Assess if there is any financial or fiduciary risk to the bridges & schools programme including the Government delivered abutments. Identifying, understanding, possibly seeking and providing advice to DFID-Pakistan with regards to resolving problems and issues arising from the meetings and site activities. Preparation of Monthly Progress Report of the above activates. Prepare Quarterly progress report focusing on effectiveness, efficiency, quality of programme delivery, construction methods, contract management and any lessons learnt. Spot check all other infrastructure investments of DFID in the area.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Environmental Impact Assessment, Charsadda Pakistan Tangi Road PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: CharsaddaTangi Rs. 1.9 Billion NAME OF CLIENT: NO. OF STAFF INVOLVED: Development Management Consultants, 5 Hayatabad, Peshawar ADDRESS: NO. OF STAFF MONTHS: House No. 190-B, St.-8, Sector E-1, Phase I, 10 Hayatabad, Peshawar, Pakistan. START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Rs. 1 Million October 2012 November 2012 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL STAFF BY ASSOCIATED FIRM: NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. Shahid Khan Mr. W isal Shah Mr. Mukhtiar Ali Mr. Rowidullah Mr. Sifatullah Mr. Mukhtiar DETAILED NARRATIVE DESCRIPTION OF PROJECT: Objectives of this EIA study are to determine potential environmental impacts, propose suitable mitigation measures along with related components for environmental protection and prepare environment management plans (EMP). The major beneficiaries of this road project will be the communities from villages of Charsadda, Rajjar, Utmanzai, Turangzai, Sherpao, and Tangi. The project will add to infrastructural development of the immediate area, increase population’s access to markets and social services will play a positive role towards poverty alleviation of the whole extended area of the influence of the road. DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM: In this EIA study a wide range of roads-related biophysical and socio-cultural factors are addressed as per Environmental Protection Agency October 1997 guidelines. These factors include physical, ecological, and human resources. Assessments of institutional reforms, social impacts and poverty issues are also being conducted in details. However, in this EIA some summarized data had been incorporated in the context of baseline conditions for the project area. Testing of key environmental parameters including Noise level, ambient air quality and ground water quality were conducted by EIA team at seven locations. A literature survey of reports, maps and other documents was also conducted. Additional study methods had also been used, including discussions with a wide segment of enlightened persons at all levels, government officials, community leaders, business persons, transporters and a wide range of road users. During the course of fieldwork, Survey of Pakistan topographic maps and the FHA road maps were also consulted. For ground orientation and land-use purposes, GPS (Global Position System) fixes were recorded and transacts, wherever required, were also made on either side of the road ways. All relevant infra-structural details, affecting the roadway environments, were also noted down.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Vetting / Authentication of the Design & Pakistan Construction Supervision of Upgradation & Remodeling of Ring Road Southern Section Detouring Hayatabad Peshawar PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Ring Road Peshawar Rs. 15.5 MILLION NAME OF CLIENT: NO. OF STAFF INVOLVED: Development Management Consultants, 3 Hayatabad, Peshawar ADDRESS: NO. OF STAFF MONTHS: House No. 190-B, St.-8, Sector E-1, Phase I, 12 Hayatabad, Peshawar, Pakistan. START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Rs.0.5 MILLION July 2011 June 2013 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL STAFF BY ASSOCIATED FIRM:

NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. Shahid Khan Mr. Mukhtiar Ali Mr.Abdullah

DETAILED NARRATIVE DESCRIPTION OF PROJECT: Vetting / Authentication of the design & construction supervision of upgradation & remodeling of Ring Road Southern Section detouring Hayatabad Peshawar.

DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

Find the exact reason of detouring with survey using state of the art equipments, and suggest the authority for the perfect solution & recommendation. Preparation of reports including the test results done. Supervision of the work in progress.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Consultancy Services for Establishment and Pakistan Implementation of Road Asset Management System PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Khyber Pakhtunkhwa (KPK) Rs. 102.96 MILLION NAME OF CLIENT: NO. OF STAFF INVOLVED: Pakhtunkhwa Highways Authority (PKHA), Peshawar 12 ADDRESS: NO. OF STAFF MONTHS: Attached Departments Complex Near Treasury Office 120 Khyber Road Peshawar START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) February 2013 September 2014 Rs.18.54 MILLION NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL Indus Associated Consultants & Nichols Consulting STAFF BY ASSOCIATED FIRM: Engineers, Chtd 6 NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr.Shahid Khan Engr. Salman Ashfaq Engr.Shaukat Farooq Mr. Khurram Saleem Mr.Mukhtiar Ali Mr. Amir Gul Mr.Abdullah Mr. Umair Anwar DETAILED NARRATIVE DESCRIPTION OF PROJECT: A Road Management Unit (RMU) is recently established by C&W Department for managing and operation of Khyber Pakhtunkhwa’s approximately 1500 km of Provincial Highways falling in settled areas of Khyber- Pakhtunkhwa in addition to secondary/District road and rural access roads with a total length of approximately 10,000 km. The aim of establishment of RAMS is to provide road users with a well maintained, safe, and efficiently operated road network. The C&W Department will also be earmarking other sources to ensure a stable and secure source of maintenance and operations funding of its road assets in future. DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM: M/s Partners in Development (Lead Firm) in association with M/s Indus Associated Consultants and Nichols Consulting Engineers, Chtd have been successfully establishment the Road Asset Management System for both provincial and C&W maintained road network. The project components include physical road condition surveys for complete PKHA and C&W road network, 24 Hrs Traffic Count with TIRTL at 35 stations, Axle load surveys with Portable Weigh Bridge at 35 stations, Road Roughness Surveys with Profilometer, Falling Weight Deflectometer (FWD) testing and Overlay design for 1500Km of road network, HDM-4 analysis and preparation of individual Annual Maintenance Plans for both provincial and C&W maintained road network. Additionally PID has also completed RAMS training programme at PKHA and various circles offices of C&W department which were highly appreciated by the concern staff.

The PKHA’s RAMS directorate is highly satisfied with the performance of M/s PID. The Project is being completed in a timely manner and work has been carried out in accordance to Term of Reference and contract documents.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Procurement of Solar Street Lights for Khar, Bajaur Pakistan Agency FATA PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: FATA Khyber Pakhtunkhwa (KPK) Rs. 700 MILLION NAME OF CLIENT: NO. OF STAFF INVOLVED: FUCP, TARUCCI PMU, FATA Secretariat / 10 World Bank ADDRESS: NO. OF STAFF MONTHS: Project Director (TARUCCI) 54 3rd Floor, Park View Apartments, Peshawar START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Rs.94.7 MILLION February 2013 November 2013 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL Sharif International (SI) STAFF BY ASSOCIATED FIRM: 3 NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. Shahid Khan Engr. Fakher-e-Alam Mr. Nasir Amin Mr. Zaheen Shah Mr. Mukhtiar Ali Mr. Abdullah Mr. Saif Ur Rehman DETAILED NARRATIVE DESCRIPTION OF PROJECT: Installation & commissioning of Solar Street light at Khar, Bajaur Agency. Dismantling of existing street light poles and shifting to the designated warehouse/ storage area identified by the client within the limits of Khar, Bajaur Agency. DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM: M/s Partners in Development & Sharif International (Joint Venture) has awarded the installation & commissioning of Solar Street Lights and dismantling of existing street lights for Khar Bajaur Agency. The project involved installation and commissioning of 450 units of Solar Street light in different areas like AHQ Hospital, Civil Colony, Main Khar Munda road & old bazaar. The installation and commissioning of 450 units (Phase 1 & 2) of solar street lights have been completed and the dismantling of existing street lights poles have been shifted the designated warehouse. The project was successfully handed over to FATA Secretariat upon completion.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Independent Environment Monitoring Consultants Pakistan (IEMC) for Chakdara to Madyan Road (Shamozai- Dadahara Section) 14.7 Km PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Khyber Pakhtunkhwa (KPK) Rs. 600 Million NAME OF CLIENT: NO. OF STAFF INVOLVED: Pakhtunkhwa Highways Authority/ World Bank 5 ADDRESS: NO. OF STAFF MONTHS: Attached Departments Complex Near Treasury 9 (Intermittently) Office Khyber Road Peshawar START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Rs. 3.97 Million February 2014 July 2015 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL STAFF BY ASSOCIATED FIRM: Department of Environmental Sciences, Uni. Of 3 Peshawar NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. Shahid Khan Dr. Muhammad Nafees Ms. Salmana Khan Mr. Abdullah DETAILED NARRATIVE DESCRIPTION OF PROJECT: Project involved independent environmental monitoring of a road construction project (Shamozai to Dadahara). Project involves verification of baseline data provided in the EIA report of the project. All environmental parameters like air quality, water quality, noise and soil will be tested and monitored. Findings will be submitted in the report along with recommendations for mitigation measures, every six months during the construction period.

DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

M/s Partners in Development has conducted Third Party Validation (TPV) on a six monthly basis to assess the effectiveness of the various environmental aspects of the project. During TPV, the implementation and effectiveness of the Environmental and Social Management Framework (ESMF) was evaluated, in addition to various other environmental enhancement tasks included in the project. Initially verification of baseline data was completed and report was submitted to World Bank. Additionally quality monitoring of key environmental factors is being carried out for any deviations.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Spatial/Structural Planning For Parachinar City Pakistan Kurram Agency, FATA PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: FATA Khyber Pakhtunkhwa (KPK) Rs. 500 Million NAME OF CLIENT: NO. OF STAFF INVOLVED: FATA Secretariat / World Bank 12 ADDRESS: NO. OF STAFF MONTHS: Project Director (TARUCCI) 6 (Intermittently) Talat Qayum House, Justice Talat Qayum Road/ Warsak Road, Near park View Apartments, Peshawar KP START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) 17.5 Million Oct 2014 April 2015 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL EA Consulting Pvt. Ltd. Karachi STAFF BY ASSOCIATED FIRM: 36 NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Mr. Masood Jaffri Engr. Shahid Khan Mr. Fakhar e Alam Mr. Waseem Hayat Mr. Ajmad Ali Mr. Abdullah Khan DETAILED NARRATIVE DESCRIPTION OF PROJECT: Project involved primary and secondary data collection of the existing facilities and constraints, land ownership details & land availability, economic & financial gains, water resources, waste disposal, public facilities and traffic circulation & flow etc. Preparation of GIS map showing all the above existing facilities and proposed structural development plans. Project also involves arrangement of training programs and social mobilization workshops.

DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM: A team of Social experts from M/s Partners in Development are working on data collection regarding Parachinar City, which includes Roads hatchery, Education, Health facilities, Population, Water Supply Schemes, Drainage & Sewerage System and other existing facilities for the community. Additionally a GIS map is being developed for Parachinar City so that future development of Parachinar City is structured to a Master plan which will be developed at the end of this project.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Spatial/Structural Planning For Sadda City Kurram Pakistan Agency, FATA PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: FATA Khyber Pakhtunkhwa (KPK) Rs. 500 Million NAME OF CLIENT: NO. OF STAFF INVOLVED: FATA Secretariat / World Bank 12 ADDRESS: NO. OF STAFF MONTHS: Project Director (TARUCCI) 6 (Intermittently) Talat Qayum House, Justice Talat Qayum Road/Warsak Road, Near park View Apartments, Peshawar KPK START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Oct 2014 April 2015 17.5 Million

NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL EA Consultant Pvt Ltd Karachi STAFF BY ASSOCIATED FIRM: 36 NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Mr. Masood Jaffri Engr. Shahid Khan Mr. Fakhar e Alam Mr. Waseem Hayat Mr. Ajmad Ali Mr. Abdullah Khan DETAILED NARRATIVE DESCRIPTION OF PROJECT:

Project involved primary and secondary data collection of the existing facilities and constraints, land ownership details & land availability, economic & financial gains, water resources, waste disposal, public facilities and traffic circulation & flow etc. Preparation of GIS map showing all the above existing facilities and proposed structural development plans. Project also involves arrangement of training programs and social mobilization workshops. DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

A team of Social experts from M/s Partners in Development are working on data collection regarding Sadda City, which includes Roads hatchery, Education, Health facilities, Population, Water Supply Schemes, Drainage & Sewerage System and other existing facilities for the community. Additionally a GIS map is being developed for Sadda City so that future development of Sadda City is structured to a Master plan which will be developed at the end of this project.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Independent Environment Monitoring Consultants Pakistan (IEMC) for Chakdara to Madyan Road (Chakdara - Shamozai Section) 10.7 Km PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Khyber Pakhtunkhwa (KPK) Rs. 600 Million NAME OF CLIENT: NO. OF STAFF INVOLVED: Pakhtunkhwa Highways Authority/ World Bank 5 ADDRESS: NO. OF STAFF MONTHS: Attached Departments Complex Near Treasury 9 (Intermittently) Office Khyber Road Peshawar START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Rs. 1.862 Million March 2014 July 2015 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL Department of Environmental Sciences, Uni. Of STAFF BY ASSOCIATED FIRM: Peshawar 3

NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. Shahid Khan Dr. Muhammad Nafees Ms. Salmana Khan Mr. Abdullah DETAILED NARRATIVE DESCRIPTION OF PROJECT: Project involved independent environmental monitoring of a road construction project (Chakdarato Shamozai). Project involves verification of baseline data provided in the EIA report of the project. All environmental parameters like air quality, water quality, noise and soil will be tested and monitored. Findings will be submitted in the report along with recommendations for mitigation measures, every six months during the construction period.

DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

M/s Partners in Development has conducted Third Party Validation (TPV) on a six monthly basis to assess the effectiveness of the various environmental aspects of the project. During TPV, the implementation and effectiveness of the Environmental and Social Management Framework (ESMF) was evaluated, in addition to various other environmental enhancement tasks included in the project. Initially verification of baseline data was completed and report was submitted to World Bank. Additionally quality monitoring of key environmental factors is being carried out for any deviations.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Construction Management Services to NLC Pakistan for Construction of Bab-e-Peshawar Flyover Phase-III Chowk Hayatabad Peshawar PROJECT LOCATION WITH IN THE TOTAL COST OF THE PROJECT: COUNTRY: Rs. 4.0 Billion Peshawar, Khyber Pakhtunkhwa (KPK) NAME OF CLIENT: NO. OF STAFF INVOLVED: National Logistics Cell (NLC) 9 ADDRESS: NO. OF STAFF MONTHS: Engineers Head Office, Sowan Camp, 54 Rawalpindi Pakistan START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Rs. 7.5 Million July 2015 December 2015 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL N/A STAFF BY ASSOCIATED FIRM: N/A

NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. Shahid Zaman Khan Engr. Muzaffar Aziz Iqbal Engr Abdul Hakim Engr. Jahangir Khan Sub Engr Muhammad Yousaf Engr. SaifUl Islam Engr. MuhammadKashif Engr Amjad Ismail Khan Mr. TariqAhmad DETAILED NARRATIVE DESCRIPTION OF PROJECT: Project involved construction of a 2-Levels Flyover (3 bridges at Level-I & one bridge at Level 2) with slip roads, drains, footpath and electrification work. DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

M/s Partners in Development was contracted by National Logistics Cell to provide construction management services especially Planning, item rate analysis, preparation of Interim Payment Certificates, preparation of material procurement plans, preparation of work schedule, traffic management plan, preparation of claims, generation of various reports/returns such as progress reports, MMR (Monthly Monitoring Reports) and keeping records of main construction materials brought to the site and their further usage at the project site etc..

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Construction Management Services to NLC for Pakistan Construction of Service Road Along Ring Road Peshawar, University Town Roads, Hayatabad Roads and Other Allied Works. PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Peshawar, Khyber Pakhtunkhwa (KPK) Rs. 4.0 Billion NAME OF CLIENT: NO. OF STAFF INVOLVED: National Logistics Cell (NLC) 9 ADDRESS: NO. OF STAFF MONTHS: Engineers Head Office, Sowan Camp, 72 Rawalpindi Pakistan START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Rs. 14.9 Million March 2016 November 2016 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL N/A STAFF BY ASSOCIATED FIRM: N/A

NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. ShahidZaman Khan Engr. Muzaffar Aziz Iqbal Engr Abdul Hakim Engr. Jahangir Khan C.QS Muhammad Yousaf Engr. SaifUl Islam Engr. Muhammad Kashif Engr Amjad Ismail Khan Mr. Tariq Ahmad DETAILED NARRATIVE DESCRIPTION OF PROJECT: Project involved construction of service roads along ring road Peshawar, side drains and culverts, construction of Hayatabad Roads and University Town Peshawar with ancillary works. DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

M/s Partners in Development was contracted by National Logistics Cell to provide construction management services especially Planning, Contract Management, item rate analysis, preparation of Interim Payment Certificates, preparation of material procurement plans, preparation of work schedule, traffic management plan, preparation of claims, generation of various reports/returns such as progress reports, MMR (Monthly Monitoring Reports) and keeping records of main construction materials brought to the site and their further usage at the project site etc..

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Consultancy Services for Rehabilitation of Bara Pakistan Bazaar, Khyber Agency

PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: FATA Khyber Agency, Khyber Pakhtunkhwa (KPK) Rs. 3.5 Million NAME OF CLIENT: NO. OF STAFF INVOLVED: Local Govt. Department, Khyber Agency FATA, 6 ADDRESS: NO. OF STAFF MONTHS: Khyber House, Qayyum Stadium Road, Peshawar 12 Cantt. START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Rs. 3.5 Million September2015 November2015 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF EA Consulting Pvt Ltd Karachi PROFESSIONAL STAFF BY ASSOCIATED FIRM: 09 NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Mr. MasoodJaffri Engr. Shahid Khan Engr. Fakhar e Alam Architect Muhammad Riaz Mr. Abdullah Khan Mr. Naveed khan DETAILED NARRATIVE DESCRIPTION OF PROJECT:

The project involved rehabilitation and improvement of historical Bara bazaar, Khyber Agency before the return of Internally Displaced People (IDP's). The project involved preparation of an improvement plan for Bara Bazaar along with provision of necessary facilities, offices, bus and taxis stands, facade uplift, sports and recreational facilities.

DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

Preparation of existing situation map, secondary and primary data collection for size estimation of required facilities and conducting social surveys. Overall improvement plans were prepared for Entry Gate, bazaar facade uplift, MC and Govt offices, sports stadium and other recreational facilities.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Strategic Development Plan SDP-2035 for Pakistan Mardan City

PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Mardan-KP Rs. 200 Million NAME OF CLIENT: NO. OF STAFF INVOLVED: Urban Policy Unit, Govt. Of Khyber Pakhtunkhwa, 8 Pakistan ADDRESS: NO. OF STAFF MONTHS: 30-A, Jamaluddin Afghani Road, University Town 40 Peshawar START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Rs. 26 Million Feb 2016 June 2017 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL STAFF BY ASSOCIATED FIRM: EA Consultant Pvt Ltd Karachi NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED:

Engr. ShahidZaman Khan Mr. Shabbir Ahmad Engr. Muzaffar Aziz Iqbal Prof. Dr. Muhammad Nafees Mr. Abdullah Khan DETAILED NARRATIVE DESCRIPTION OF PROJECT:

Project involved conduction of various surveys to establish the existing status of various infra structures, traffic, drainage, environmental, socio economic factors and livelihood conditions. The socio economic factors and social problems were identified to various interviews and focus group discussions and various recommendations were forwarded AS a result of this survey funds will be allocated for priority based projects to improve the socio economic conditions of the residents. The priority projects include construction of drains, streets, improvement of major intersection, sewerage line and some road networks.

DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

M/s Partners in Development conducted various type of surveys including traffic, socio economic, infra structure, drainage and environmental surveys for establishing the current status of the locality. Focal Group Discussions were also conducted for socio economic factor establishment.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Consultancy Services for Infrastructure Pakistan Development for Border Services Improvement Project at Torkham PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Torkham Border, KPK Pakistan Rs. 2000 Million NAME OF CLIENT: NO. OF STAFF INVOLVED: National Logistic Cell (NLC) 9

ADDRESS: NO. OF STAFF MONTHS: Engineers Head Office, Sowan Camp, Rawalpindi 24 Pakistan START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEA) (MONTH/YEAR) Flyovers, Bridges and Culverts: 1.5 % and other Jan 2017 2 years Infrastructure Development Works: 0.95% of the original cost of works NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL EA Consulting Pvt Ltd STAFF BY ASSOCIATED FIRM:

NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. ShahidZamanKhan Mr. AdnanKhan Engr. AbdulHakim Mr.Saqib Engr. MuzaffarAizIqbal Mr. Saif ur Rehman Mr. Musarrat AliShah Engr. Samad Khan DETAILED NARRATIVE DESCRIPTION OF PROJECT:

Project involved the (Master Plan Designed by Al-Imam Consulting) detail design for infrastructure development for Border improvement services at Torkham. Project also involved new border crossing export and import facilities, entry and exit pedestrian processing facilities and passengers terminal facilities for the primary and secondary Customs inspections, Support facilities (Quarantine, seized goods warehouses, weighbridges and scanners) and other facilities.

DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

M/s Partners in Development in association with Engineering Associates Consulting Pvt Ltd. have been contracted to provide consultancy services for infrastructure service at Torkham border. M/s Partners in Development will provide detail design and supervision of the design works that includes, Earthwork, Roads, Bridges, Retaining walls, River Training works, Drainage, Pedestrian bridges, Walkways and parking area.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Consultancy Services for Infrastructure Pakistan Development for Border Services Improvement Project at Chaman PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Torkham Border, KPK Pakistan Rs. 2000 Million NAME OF CLIENT: NO. OF STAFF INVOLVED: National Logistic Cell (NLC) 9

ADDRESS: NO. OF STAFF MONTHS: Engineers Head Office, Sowan Camp, Rawalpindi 24 Pakistan START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEA) (MONTH/YEAR) Flyovers, Bridges and Culverts: 1.5 % and other Jan 2017 2 years Infrastructure Development Works: 0.95% of the original cost of works NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL EA Consulting Pvt Ltd STAFF BY ASSOCIATED FIRM:

NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. ShahidZamanKhan Mr. AdnanKhan Engr. AbdulHakim Mr.Saqib Engr. MuzaffarAizIqbal Mr. Saif ur Rehman Mr. Musarrat AliShah Engr. Samad Khan DETAILED NARRATIVE DESCRIPTION OF PROJECT:

Project involved the (Master Plan Designed by Al-Imam Consulting) detail design for infrastructure development for Border improvement services at Chaman. Project also involved new border crossing export and import facilities, entry and exit pedestrian processing facilities and passengers terminal facilities for the primary and secondary Customs inspections, Support facilities (Quarantine, seized goods warehouses, weighbridges and scanners) and other facilities.

DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

M/s Partners in Development in association with Engineering Associates Consulting Pvt Ltd. have been contracted to provide consultancy services for infrastructure service at Chaman border. M/s Partners in Development will provide detail design and supervision of the design works that includes, Earthwork, Roads, Bridges, Retaining walls, River Training works, Drainage, Pedestrian bridges, Walkways and parking area.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Consultancy Services for Feasibility Study and Detailed Design for Construction of 4-Lane Pakistan Expressway from Chakdara to Kalam - N 95 (133 Km) PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT:

Swat Valley Rs. Million NAME OF CLIENT: NO. OF STAFF INVOLVED: National Highway Authority (NHA) 05

ADDRESS: NO. OF STAFF MONTHS: 27-Mruve Area, G-9/1, Post Box No. 1205, 05 months Islamabad Phone: +92-51 -9032727, START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Rs. 31.01 Million Feb 2017 June 2017 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL STAFF BY ASSOCIATED FIRM: EA Consulting Pvt Ltd NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. ShahidZaman- Traffic Engr Engr. Muzaffar Aziz Iqbal- Environmental Engr Engr. Abdul Hakim- Pavement Engr Mr. Shabir Ahmad- Social Sector Specialist Mr. SaifurRehman - Surveyor DETAILED NARRATIVE DESCRIPTION OF PROJECT: NHA is planning to construct the four lanes Expressway from Chakdara to Kalam. i. Conversation of Existing road in to 4-laneExpressway. ii. Construction of Expressway on New Alignment. iii. Construction of additional lane. (dualization of existing CW). iv. Re-validation of data of pervious study. v. Availability of Land for expressway to be studies in detail. DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM: M/s Partners in Development in association with Engineering Associates Consulting Pvt Ltd. have been contracted to provide consultancy services for feasibility study and detail design for Construction of 4-Lane Expressway from Chakdara to Kalam - N 95 (133 Km).

M/s Partners in Development will provide detail design and supervision of the design works that includes, data collection and coordination with concern department, feasibility study, topographic survey, soil investigation survey, Geotechnical investigation survey for bridges, design of toll plazas, associated buildings, rest area etc

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Consultancy Services for Feasibility Study and Detailed Design for Construction of Expressway Pakistan from Khawazakhela to Besham (64 Km) PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT:

Swat Valley Rs.Million NAME OF CLIENT: NO. OF STAFF INVOLVED: 05 National Highway Authority (NHA) ADDRESS: NO. OF STAFF MONTHS: 27-Mruve Area, G-9/1, Post Box No. 1205, 05 months Islamabad Phone: +92-51 -9032727, START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) Feb 2017 June 2017 Rs. 22.72 Million NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL STAFF BY ASSOCIATED FIRM: EA Consulting Pvt Ltd NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. ShahidZaman- Traffic Engr Engr. Muzaffar Aziz Iqbal – Environmental Engr Engr. Abdul Hakim – Pavement Engr Mr. Shabir Ahmad – Social Sector Specialist Mr. SaifurRehman – Surveyor DETAILED NARRATIVE DESCRIPTION OF PROJECT: NHA is planning to construct the four lanes Expressway from Khowazakhela to Besham. i. Conversation of Existing road in to 4-laneExpressway. ii. Construction of Expressway on New Alignment. iii. Construction of additional lane. (dualization of existing CW). iv. Re-validation of data of pervious study. v. Availability of Land for expressway to be studies in detail. DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM: M/s Partners in Development in association with Engineering Associates Consulting Pvt Ltd. have been contracted to provide consultancy services for Feasibility Study and Detailed Design for Construction of Expressway from Khawazakhela to Besham (64 Km)

M/s Partners in Development will provide detail design and supervision of the design works that includes, data collection and coordination with concern department, feasibility study, topographic survey, soil investigation survey, Geotechnical investigation survey for bridges, design of toll plazas, associated buildings, rest area etc

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY:

Third Party Monitoring Agent (TPMA) For the KP, Pakistan FATA and Balochistan Multi-Donor Trust Fund PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Khyber Pakhtunkhwa, FATA and Balochistan US$. 1655229.00 NAME OF CLIENT: NO. OF STAFF INVOLVED:

WORLD BANK 03 ADDRESS: NO. OF STAFF MONTHS: Associates in Development (AID), 22 SCHS, E- 11/2-3 Markaz, Islamabad START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEAR) (MONTH/YEAR) July 2017 July 2020 Rs. 13 Million NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL Associates In Development (AID) Lead Firm STAFF BY ASSOCIATED FIRM:

NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Mr. ShahidZaman Khan – Infrastructure M&E Specialist Mr. Muzaffar Aziz Iqbal – Community Development and Environment Specialist Mr. Shabbir Ahmad- Social Safeguards Specialist DETAILED NARRATIVE DESCRIPTION OF PROJECT:

World Bank has hired Associates in Development (AID) and Partners in Development (PID) as Third Party Monitoring Agent (TPMA) for the project for the Three Years Starting from July 2017 to 2020. DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

Third Party Monitoring in the following sectors:  Infrastructure works  CDD (Community Driven Development)  ESS (Environment and Social Safeguards etc

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Consultancy Services for Feasibility Study for Pakistan Improvement of Kargah Road Gilgit

PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Gilgit, Baltistan Pakistan NAME OF CLIENT: NO. OF STAFF INVOLVED: Public Works Department (PWD) 3

ADDRESS: NO. OF STAFF MONTHS: B&R Division, Gilgit 6

START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEA) (MONTH/YEAR) Rs. 2.74 Million May 2018 June 2018 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL M/s Global Consultants Peshawar STAFF BY ASSOCIATED FIRM: 10 NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. Nayyar Ahamad Engr. Shahid Zaman Khan Engr. Kayani Engr. Anjum Zafar Mr. Musarrat AliShah Mr. Saif ur Rehman DETAILED NARRATIVE DESCRIPTION OF PROJECT:

Due to recent floods in Kargah Nullah the metalled road is badly damage and needs realignment. Project involved preparation of details design of all components of structures involved in the project including RCC bridge, protective bund retaining wall, breast walls, parapet walls, side drains on both bank and details drawing showing the final alignment of the road.

DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

M/s Partners in Development in association with Global Consultants Peshawar have been contracted to provide consultancy services for feasibility study for improvement of Kargah road Gilgit. M/s Partners in Development will provide inputs in detail design that includes data collection and coordination with concern department, feasibility study, topographic survey, soil investigation survey, Geotechnical investigation survey for bridges and necessary inputs in preparation of bidding documents & cost estimates.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Construction Management Services (CMS) for Pakistan Infrastructure Development for Border Crossing Facilities Project at Torkham PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Torkham Border, KPK Pakistan Rs. 2000 Million NAME OF CLIENT: NO. OF STAFF INVOLVED: National Logistic Cell (NLC) 22

ADDRESS: NO. OF STAFF MONTHS: Engineers Head Office, Sowan Camp, Rawalpindi Pakistan START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEA) (MONTH/YEAR) 2.375% of the Total Project Bid Amount Feb 2019 July 2022 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL AL IMAM PMC PVT. LTD STAFF BY ASSOCIATED FIRM:

NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. Shahid Zaman Khan Engr. Mukammil Shah Mr. Shabbir Ahmad Engr. Zafar Iqbal Kiyani Engr. Zaka ullah Mr. Kifayatullah Engr. Faisal Pervaiz Engr. Saif ur Rehman Engr. Asif Ali Chudary Engr. Zafar Ali shah Mr. Mukhtiar Ali Mr. Ihsan Ullah Engr. Abuzar Amin Engr. Manzar Abbas Mr. Nadeem DETAILED NARRATIVE DESCRIPTION OF PROJECT:

Project involved the (Master Plan Designed by Al-Imam Consulting) Construction Management Services for infrastructure development for Border Crossing Facilities at Torkham. Project also involved new border crossing export and import facilities, entry and exit pedestrian processing facilities and passengers terminal facilities for the primary and secondary Customs inspections, Support facilities (Quarantine, seized goods warehouses, weighbridges and scanners) and other facilities.

DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

M/s Partners in Development in association with Al- Imam Pvt Ltd. have been contracted to provide Construction Management Services for infrastructure service at Torkham border. M/s Partners in Development will provide construction management services of the design works that includes, Earthwork, Roads, Bridges, Retaining walls, River Training works, Drainage, Pedestrian bridges, Walkways and parking area.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Consultancy Services for Feasibility Study of Bridge Pakistan from Minawar to Muhammad Abad

PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Gilgit, Baltistan Pakistan NAME OF CLIENT: NO. OF STAFF INVOLVED: Public Works Department (PWD) 3

ADDRESS: NO. OF STAFF MONTHS: B&R Division, Gilgit 6

START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEA) (MONTH/YEAR) Rs. 2.83 Million June 2018 Sep 2018 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL M/s Global Consultants Peshawar STAFF BY ASSOCIATED FIRM: 10 NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. Nayyar Ahamad Engr. Anjum Zafar Engr. Shahid Zaman Khan Mr. Musarrat AliShah Engr, Zafar Iqbal Kayani Mr. Saif ur Rehman DETAILED NARRATIVE DESCRIPTION OF PROJECT:

The Gilgit- Baltistan Public Works Department is planning to construct a bridge between Muhammadabad and Minawar. Presently the inhabitants of Halqa-111 from Muhammadabad to Jalalabad i/c Bagrote valley are linked with KKH via Danyore. The existing road from Danyore to Jalalabad having overall width of 22 ft provides communication facility needs an alternate link with KKH as the existing road has no capacity to overcome the increase traffic load due to which number of road accidents have been occurred and precious lives lost during the incidents. After construction of this bridge about 10 to 12 kilometers distance will be reduced in between Muhammadabad and Minawar.

DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

M/s Partners in Development in association with Global Consultants Peshawar have been contracted to provide consultancy services for feasibility study of Bridge from Minawar to Muhammad Abad M/s Partners in Development will provide inputs in detail design that includes data collection and coordination with concern department, feasibility study, topographic survey, soil investigation survey, Geotechnical investigation survey and Hydrological study for bridge and necessary inputs in preparation of bidding documents & cost estimates.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Consultancy Services for Feasibility Study for the Pakistan Project Widening and Metalling of 65 Km Road from Ranio Chilas to Naran Via Butogah Valley PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Gilgit, Baltistan Pakistan NAME OF CLIENT: NO. OF STAFF INVOLVED: Public Works Department (PWD) 4

ADDRESS: NO. OF STAFF MONTHS: B&R Division, Gilgit 8

START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEA) (MONTH/YEAR) Rs. 6.800 Million March 2019 June 2019 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL M/s Global Consultants Peshawar STAFF BY ASSOCIATED FIRM: 10 NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. Nayyar Ahamad Mr. Tikka Khan Engr. Shahid Zaman Khan Mr. Musarrat AliShah Engr. Zafar Iqbbal Kayani Mr. Saif ur Rehman Engr. Yasir Khan DETAILED NARRATIVE DESCRIPTION OF PROJECT:

The project envisages the construction, widening and improvement of existing road from Ranio Chilas to Naran via Butogah Valley and improving LOS. The objectives of the project are to improve mobility of both people and goods between Ranio Chilas and Naran Valley, thereby contributing to socio-economic development of the province of Gilgit- Baltistan. Aim of the project is to provide an alternate route from Ranoi Chilas to Naran N15 Road via Butogah valley, as the existing N15 road from Chilas to Naran via Babusar has very sharp curves coupled with high gradient.

DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

M/s Partners in Development in association with Global Consultants Peshawar have been contracted to provide consultancy services for feasibility study for the Project Widening and Metalling of 65 Km Road from Ranio Chilas to Naran Via Butogah Valley M/s Partners in Development will provide inputs in detail design that includes data collection and coordination with concern department, feasibility study, topographic survey, soil investigation survey, Geotechnical investigation survey for bridges and necessary inputs in preparation of bidding documents & cost estimates.

Major Services That Best Illustrate Qualifications

PROJECT NAME: COUNTRY: Reconstruction and Rehabilitation of militancy Pakistan damaged schools and BHUs under PaRRSA- USAID program in Malakand Division PROJECT LOCATION WITH IN THE COUNTRY: TOTAL COST OF THE PROJECT: Swat, Dir & Malakand Rs. 954.604 Million NAME OF CLIENT: NO. OF STAFF INVOLVED: PaRRSA-USAID 12

ADDRESS: NO. OF STAFF MONTHS: Project Director PaRRSA USAID Projects Unit C&W 270 Department Peshawar START DATE: COMPLETION DATE: APPROX. VALUE OF SERVICES: (MONTH/YEA) (MONTH/YEAR) Rs. 32.028 Million May 2019 April 2021 NAME OF ASSOCIATED FIRM(S) IF ANY: NO. OF MAN-MONTHS OF PROFESSIONAL M/s Global Consultants Peshawar STAFF BY ASSOCIATED FIRM: 70 NAME OF SENIOR STAFF INVOLVED AND FUNCTIONED PERFORMED: Engr. Nayyar Ahamad Mr. Tikka Khan Engr. Shahid Zaman Khan Mr. Musarrat AliShah Engr. Zafar Iqbbal Kayani Mr. Saif ur Rehman

DETAILED NARRATIVE DESCRIPTION OF PROJECT:

Due to the conflict on terrorism in the specific area of Swat, Malakand and Dir. The education and health network was badly effected in terms of damages occurred in schools and BHU’s. The overall objective was to improve the Militancy damaged school, Agricultural Research Institute, Veterinary Centre and BHU’s in Swat, Malakand and Dir.

DETAILED DESCRIPTION OF ACTUAL SERVICES PROVIDED BY THE FIRM:

M/s Partners in Development in association with Global Consultants Peshawar have been contracted to provide consultancy services for Reconstruction and Rehabilitation of militancy damaged schools and BHUs under PaRRSA-USAID program in Malakand Division.

REGISTRATION CERTIFICATES

Firm Registration (Form H)

Pakistan Engineering Council (PEC)

Registration with Survey of Pakistan

National Tax Number (NTN)

Sales Tax Registration

PERMANENT KEY STAFF

Details of Permanent Key Staff

S. No Name Designation Qualification

M. Sc. (Civil Engineering) 1 Shahid Zaman Khan Managing Director B. S (Civil Engg) MBA (Finance) Managing Partner/ Electrical 2 Maqbool Zaman Khan B.Sc. (Electrical Engineering) Engineer

3 Lt Col.(R) Zafar Iqbal Kiyani Project Manager B.Sc Civil Engg (MCE)

M. Sc. (Civil Engineering) 4 Shakil A. Shaikh Regional Director (Karachi) B. S (Civil Engg) MBA

5 Fakhar Zaman Khan Material Engineer B.A/B.E. Engineering Ph.D. Envir Engg 6 Dr. Shaukaht Farooq Environmentalist M.S. Sanitary Engg B.E. Civil Engg

7 Sanaullah Khan Design Engineer B.E (Civil)

8 Amir Ayaz Traffic Engineer M.Sc.( Civil Engineering) M.Sc. Eng. MBA, 9 Qardar Ali Shah Transport Planner M. Sc(Envir Engg) B.Sc (Civil Engg) M.BA, 10 Shabbir Ahmad Social Sector Expert M.Sc Sociology

Economist/ 11 Waheeda Zafar Masters in Economics Social Sector Gender Specialist M. Sc (Hydropower Engg) 12 Khurram Saleem Hydrologist B. Sc (Civil Engg) 13 Muhammad Asim Zaib Junior Design Engr B. Sc (Civil Engg)

14 Mukhtiar Ali Sr. Project Coordinator B.A M.IT 15 Abdullah Khan Office Manager MBA (Finance)

16 Hazrat Ali Accountant M.BA, M.Sc Eco

17 Saif Ur Rehman Enumerator/Surveyor DAE

18 Iftikhar Abbas Civil Draftsman DAE

19 Saqib Shah Cad Operator DAE

20 Waseem Sabir Quantity Surveyor DAE

Daud Khan Office Assistant B. Sc

LIST OF FACILITIES

LIST OF FACILITIES OFFICE PROMISES, HARDWARE & SOFTWARE AND SURVEY EQUIPMENT AVAILABLE WITH PID

A list of Facilities available with PID with detail description is given below:

a. Office Promises: i. Peshawar Head Office located at Zaman Plaza First Floor Bilal Market, D/1, Phase 1, Hayatabad, Peshawar ii. Islamabad Regional Office located at 5th Floor, 4th Apartment, Gloria Heights, Plaza#120, D-Block, Phase-IV, Civic Centre, Bahria Town, Rawalpindi/Islamabad. b. Office Furniture: i. Tables with Executive Chairs 20 Nos ii. Side Racks 15 Nos iii. Almirah 10 Nos c. Computers Hardware Workstations (Core I5) 2 Set Laptops (Core I7 / I5 / I3) 10..Sets Desktop Computer (Pentium IV/ Core-2-Duo) 15 Sets Printers (A3/A4) 8...Sets Scanners (A4) …4…Sets Data Storage Devices …8…Sets d. Computer Software

i. Survey Works:  Civil 3D  AutoCAD

ii. Building Projects:  3D Max  Sketchup  Photoshop  AutoCAD

iii. Highway Projects:  Highway Design Model (HDM)  Eagle Point RoadCalc  Bridge Design System (BDS)  AutoCAD e. Survey Equipment i. GPS System 2 Nos ii. Total Station 4 Nos iii. Theodolite 4 Nos iv. Electronic Distance Measuring Equipment 3 Nos v. Automatic Levels Machine 5 Nos

f. Office Vehicles: i. Toyota Corolla 2 Nos ii. Suzuki Carry 1 No iii. Toyota Hiace 1 No iv. Toyota Double Cabin 3 Nos

Partners in development(PID) Consulting engineers Zaman Plaza, First Floor, Bilal Market, Sector D-1, Phase 1, Hayatabad,Peshawar