NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

ENGINEERING, PROCUREMENT, CONSTRUCTION MASMIRIN CORPORATION AND COMMISSIONING OF NPS 12 STEEL PIPE LINE 1 EPCC OF NGDS TO NIBONG TEBAL FL1 DL1, NIBONG TEBAL, 4,800,000.00 SDN BHD / GAS 2004/2005 CONSTRUCTION OF ODORIZER BUILDING AND SDN BHD ODORIZER SYSTEM - 32 KM

ENGINEERING, PROCUREMENT, CONSTRUCTION MASMIRIN CORPORATION 2 EPCC OF NGDS TO PRAI FL DL STAGE 1/03, PRAI IND. AREA, PENANG AND COMMISSIONING OF NPS 12 STEEL PIPES - 3,200,000.00 SDN BHD / GAS MALAYSIA 2005 8KM SDN BHD

ENGINEERING, PROCUREMENT, CONSTRUCTION MASMIRIN CORPORATION 3 EPCC OF NGDS TO PRAI FL DL (LOOPING) STAGE 1/03, PRAI IND. AREA, PENANG AND COMMISSIONING OF NPS 8 STEEL PIPES - 2,800,000.00 SDN BHD / GAS MALAYSIA 2005 4.5KM SDN BHD

EPCC OF THE NGDS TO TAMAN MAKMUR FL STAGE 1/08, KULIM, DARUL ENGINEERING, PROCUREMENT, CONSTRUCTION 4 1,200,000.00 GAS MALAYSIA BERHAD 2009 AMAN AND COMMISSIONING OF NPS 8 STEEL PIPES - 4KM

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO SUNGAI PETANI FL STAGE 1/09, SUNGAI PETANI, KEDAH 5 AND COMMISSIONING OF NPS 8 STEEL PIPES - 145,000.00 GAS MALAYSIA BERHAD 2009 DARUL AMAN 0.4KM

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO KUNDANG FL STAGE 1/10, KUNDANG INDUSTRIAL AREA, 6 AND COMMISSIONING OF NPS 6 STEEL PIPES - 418,455.00 GAS MALAYSIA BERHAD 2009 RAWANG, DARUL EHSAN 0.7KM

ENGINEERING, PROCUREMENT, CONSTRUCTION 7 EPCC OF GPRW AT PUTRA INTERCHANGE, PUTRAJAYA AND COMMISSIONING OF NPS 16 STEEL PIPES - 1,111,000.00 GAS MALAYSIA BERHAD 2009 720M

EPCC OF GPRW AT CADANGAN MEMBINA JLN PINTAS DARI SENGKANG (J104) KE ENGINEERING, PROCUREMENT, CONSTRUCTION 8 FELDA INAS BANDAR TENGGARA, JALAN BAHRU-AIR HITAM, KULAI, JOHOR AND COMMISSIONING OF NPS 8, NPS 4 STEEL PIPES 600,000.00 GAS MALAYSIA BERHAD Aug 2009 to Jan 2010 DARUL TAKZIM - 230M

ENGINEERING, PROCUREMENT, CONSTRUCTION Dec 2009 to June 9 EPCC OF THE NGDS TO TEBRAU FL STAGE 1/10, TEBRAU, JOHOR DARUL TAKZIM AND COMMISSIONING OF NPS 6, NPS 4 STEEL PIPES 695,000.00 GAS MALAYSIA BERHAD 2010 - 226M NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO PANDAMAR FL STAGE 1/10, PANDAMAR, KLANG, SELANGOR 10 AND COMMISSIONING OF NPS 6, NPS 4 STEEL PIPES 595,000.00 GAS MALAYSIA BERHAD Dec 2009 to Oct 2010 DARUL EHSAN - 1416M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO GAMBANG FL STAGE 1/10, GAMBANG, PAHANG DARUL 11 AND COMMISSIONING OF NPS 8, NPS 6, NPS 4 865,500.00 GAS MALAYSIA BERHAD 2010 MAKMUR STEEL PIPES - 2292M

ENGINEERING, PROCUREMENT, CONSTRUCTION THE EPCC OF NGDS TO STX PRECISION SDN BHD IN NIBONG TEBAL, PULAU PINANG March 2010 to June 12 AND COMMISSIONING OF 63MM PE SERVICE LINE. - 88,000.00 GAS MALAYSIA BERHAD INCLUSIVE OF THE STATION CIVIL WORK 2010 600M

ENGINEERING, PROCUREMENT, CONSTRUCTION April 2010 to August 13 EPCC OF THE NGDS TO PRAI DL STAGE 1/10, PRAI, PULAU PINANG AND COMMISSIONING OF 125MM AND 63MM PE 202,610.00 GAS MALAYSIA BERHAD 2010 PIPES. - 500M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC AND COMMISSIONING OF THE NGDS TO CHENG FL STAGE 1/10, CHENG April 2010 to July 14 AND COMMISSIONING OF NPS 4 STEEL PIPES - 83,000.00 GAS MALAYSIA BERHAD INDUSTRIAL AREA, MELAKA 2010 200M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO KAMUNTING FL STAGE 3/10, KAMUNTING, PERAK DARUL June 2010 to October 15 AND COMMISSIONING OF NPS 6 & NPS 4 STEEL 169,873.00 GAS MALAYSIA BERHAD RIDZUAN 2010 PIPES - 300M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF NGDS TO LATEXX, PLANT 1 IN KAMUNTING, PERAK DARUL RIDZUAN April 2010 to July 16 AND COMMISSIONING OF NPS 4 STEEL SERVICE 94,923.00 GAS MALAYSIA BERHAD INCLUSIVE OF STATION CIVIL WORKS 2010 LINE - 600M

EPCC OF THE NGDS TO SHAH ALAM DL STAGE 1/10, SHAH ALAM, SELANGOR DARUL ENGINEERING, PROCUREMENT, CONSTRUCTION 17 281,500.00 GAS MALAYSIA BERHAD 2010 EHSAN AND COMMISSIONING OF PE 125MM - 25M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO GEBENG FL STAGE 1/10, GEBENG INDUSTRIAL AREA, PAHANG June 2010 to March 18 AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL 1,085,000.00 GAS MALAYSIA BERHAD DARUL MAKMUR 2011 SERVICE LINE - 2904M NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO SHAH ALAM FL DL STAGE 1/10, SHAH ALAM, SELANGOR DARUL June 2010 to Oct 19 AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL 445,000.00 GAS MALAYSIA BERHAD EHSAN 2011 SERVICE LINE - 540M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO NORTH PORT DL STAGE 1/10, NORTH PORT, SELANGOR DARUL 20 AND COMMISSIONING OF PE 125MM, PE 90MM 195,000.00 GAS MALAYSIA BERHAD 2010 EHSAN AND PE 63MM - 300M

ENGINEERING, PROCUREMENT, CONSTRUCTION 21 EPCC OF THE NGDS TO PUTRAJAYA FL STAGE 1/10, PRECINCT 18, PUTRAJAYA AND COMMISSIONING OF NPS 4 STEEL SERVICE 59,500.00 GAS MALAYSIA BERHAD 2010 LINE - 60M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO SERI KEMBANGAN FL STAGE 2/10, SERI KEMBANGAN, August 2010 to 22 AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL 1,038,364.25 GAS MALAYSIA BERHAD SELANGOR DARUL EHSAN February 2011 PIPES - 3800M

ENGINEERING, PROCUREMENT, CONSTRUCTION September 2010 to 23 EPCC OF THE NGDS TO NIBONG TEBAL FL STAGE 1/10, NIBONG TEBAL, PULAU PINANG AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL 130,280.00 GAS MALAYSIA BERHAD January 2011 PIPES - 800M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE GPRW AT KERJA-KERJA MENGGANTIKAN JAMBATAN DI LALUAN A125, AND COMMISSIONING OF NPS 12 STEEL PIPES 24 454,410.00 GAS MALAYSIA BERHAD 2010 JALAN AYER TAWAR-SIMPANG LIMA, DAERAH MANJUNG, PERAK DARUL RIDZUAN WITH 2 NOS HOT TAPPING STOPPLE OF 12" X 12" - 200M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO KUALA KETIL FL STAGE 1/10, KUALA KETIL, KEDAH DARUL 25 AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL 495,000.00 GAS MALAYSIA BERHAD Dec 2010 AMAN PIPES - 1100M

KOMASI GENTING PURA KENCANA, BATU PAHAT PROPOSED STREET LIGHTING INSTALLATION COMMUNICATIONS SDN 26 CIVIL AND FIBER PULLING 381,820.00 2010 FOR PHASE 1A AND PHASE 1B BHD / GPROPERTY CONSTRUCTION SDN. BHD.

KOMASI GENTING INDAHPURA, KULAI PROPOSED STREET LIGHTING INSTALLATION FOR 82 COMMUNICATIONS SDN 27 CIVIL AND FIBER PULLING 106,070.00 2010 UNIT SEMI-DETACHED HOUSE, PACKAGE 3A AT ZONE 33 BHD / GPROPERTY CONSTRUCTION SDN. BHD. NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

KOMASI COMMUNICATIONS SDN 28 INFRA-DIGI AT PARIT RAJA INDUSTRIAL PARK, BATU PAHAT CIVIL AND FIBER PULLING 2,116,161.80 2010 BHD / TIME DOTCOM BERHAD

KOMASI COMMUNICATIONS SDN 29 PROPOSED OSP CIVIL TO DIGI CABIN AT BANDAR PUTRA, SEGAMAT JOHOR CIVIL AND FIBER PULLING 1,67,059.45 2010 BHD / TIME DOTCOM BERHAD

KOMASI COMMUNICATIONS SDN 30 FIBER PULLING TO DIGI AT SEGAMAT, JOHOR CIVIL AND FIBER PULLING 151,786.02 2010 BHD / TIME DOTCOM BERHAD

KOMASI COMMUNICATIONS SDN 31 INFRA & FIBER PULL -(DIGI MSC PRO KEPONG IND PARK) CIVIL AND FIBER PULLING 491,298.19 2010 BHD / TIME DOTCOM BERHAD

KOMASI COMMUNICATIONS SDN 32 INFRA & FIBER - DIGI CABIN AT MIMALAND TO MH AT UIA GOMBAK (1 ROUTE) CIVIL AND FIBER PULLING 581,327.20 2010 BHD / TIME DOTCOM BERHAD

KOMASI COMMUNICATIONS SDN 33 INFRA-PROPOSED OSP CIVIL TO DIGI CABIN AT GEMERAH, SEGAMAT, JOHOR CIVIL AND FIBER PULLING 131,729.24 2010 BHD / TIME DOTCOM BERHAD

KOMASI COMMUNICATIONS SDN 34 FIBER PULLING (IB 48C)- DIGI PROJECT AT MIMALAND (ROUTE 2) CIVIL AND FIBER PULLING 1,072,413.02 2010 BHD / TIME DOTCOM BERHAD

ELECTRIFIED DOUBLE TRACK PROJECT -SEREMBAN TO GEMAS PACKAGE KOMASI 1–CONSTRUCTION AND COMPLETION OF FIBER OPTIC CABLES RELOCATION WORK 35 CIVIL AND FIBER PULLING 209,960.00 COMMUNICATIONS SDN 2010 (ENGINEERING SERVICES) SECTION 7 (CH482.410-CH486.070 & CH488.450-CH490.300 BHD / FIBERAIL SDN BHD )

ELECTRIFIED DOUBLE TRACK PROJECT -SEREMBAN TO GEMAS PACKAGE KOMASI 2–CONSTRUCTION AND COMPLETION OF FIBER OPTIC CABLES RELOCATION WORK 36 CIVIL AND FIBER PULLING 210,478.10 COMMUNICATIONS SDN 2010 (ENGINEERING SERVICES) SECTION 2A (CH500.775-CH504.141 & CH505.150- BHD / FIBERAIL SDN BHD CH506.990) NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

ELECTRIFIED DOUBLE TRACK PROJECT -SEREMBAN TO GEMAS PACKAGE 2 KOMASI 37 –HORIZONTAL DIRECT DRILLING (HDD) INSTALLATION WORKS SECTION 2A CIVIL AND FIBER PULLING 513,916.00 COMMUNICATIONS SDN 2010 (CH500.775-CH504.141 & CH505.150-CH506.990) BHD / FIBERAIL SDN BHD

KOMASI PERLAKSANAAN PROJEK RANGKAIAN TEMPATAN TELEKOM MALAYSIA BERHAD 38 CIVIL AND FIBER PULLING 10,000,000.00 COMMUNICATIONS SDN 2010 SECARA JADUAL KADAR HARGA BHD / TM BERHAD

SUPPLY & INSTALL OF 7 WAY 100MM DIA HDPE DUCTING BY HDD METHOD AND KOMASI TELEPHONE MANHOLE AND DUCTING FOR CADANGAN PEMBANGUNAN KAMPUS 39 CIVIL AND FIBER PULLING 245,310.00 COMMUNICATIONS SDN 2010 BARU UNIVERSITI (UNIKL) CAWANGAN JOHOR DI PASIR GUDANG, BHD / TRC SDN. BHD. JOHOR

KOMASI PERLAKSANAAN PROJEK RANGKAIAN TEMPATAN TELEKOM MALAYSIA BERHAD 40 CIVIL AND FIBER PULLING 5,000,000.00 COMMUNICATIONS SDN 2010 SECARA JADUAL KADAR HARGA BHD / TM BERHAD

KOMASI RELOCATION OF FIBER OPTIC CABLE AT SEREMBAN – TABOH NANING BETWEEN 41 CIVIL AND FIBER PULLING 205,089.72 COMMUNICATIONS SDN 2010 KP119.000 – KP 121.000 BHD / FIBERAIL SDN BHD

KOMASI ELECTRIFIED DOUBLE TRACK PROJECT - SEREMBAN TO GEMAS PACKAGE 1 42 ELECTRIFIED DOUBLE TRACK 244,140.40 COMMUNICATIONS SDN 2010 –HORIZONTAL DIRECT DRILLING (HDD) INSTALLATION WORKS–ADDITIONAL NO 7 BHD / FIBERAIL SDN BHD

KOMASI PROPOSED STREET LISTING INSTALLATION FOR 82 UNITS SEMI-DETACHED HOUSES, COMMUNICATIONS SDN 43 STREET LISTING INSTALLATION 106,070.00 2010 PACKAGE 3A AT ZONE 33. BHD / GPROPERTY CONSTRUCTION SDN. BHD.

KOMASI PROPOSED ELECTRICAL LV INFRASTRUCTURE WORKS AT ZONE 33A PACKAGE 3A FOR COMMUNICATIONS SDN 44 ELECTRICAL LV INFRASTRUCTURE WORKS 219,912.00 2010 SEMI-DETACHED HOUSES BHD / GPROPERTY CONSTRUCTION SDN. BHD.

KOMASI 45 PROPOSED STREET LIGHTING INSTALLATION FOR PHASE 1A AND PHASE 1B STREET LIGHTING INSTALLATION 38,180.00 COMMUNICATIONS SDN 2010 BHD / ALD CONSTRUCTION NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

MACH 3 ENGINEERING DIVING SERVICES TO CONDUCT UNDERWATER INSPECTION OF ANODES AND PIPELINE CONSULTANTS SDN 46 AT WEST MOORING DOLPHIN, JIMAH POWER PLANT, PORT DICKSON, NEGERI MARINE & SALVAGE WORKS 177,000.00 March 2011 BHD/EXCALIBER SEMBILAN DARUL KHUSUS RESOURCES SDN BHD

MACH 3 ENGINEERING TO REPAIR ANODES FEEDER CABLE AT JIMAH POWER PLANT PORT DICKSON, NEGERI CONSULTANTS SDN 47 MARINE & SALVAGE WORKS 160,000.00 March 2011 SEMBILAN DARUL KHUSUS BHD/EXCALIBER RESOURCES SDN BHD

IFACTORS SDN April 2011 to May 48 TO PROVIDE MANPOWER (DIVERS) AT TURKMENISTAN CABLE LAYING PROJECT MARINE & SALVAGE WORKS 550,000.00 BHD/EXCALIBER 2011 RESOURCES SDN BHD

TO CONDUCT UNDERWATER SURVEY, HACKING, REPAIR RE-BAR, INSTALL FOAM RNC TECHNOLOGY (M) SDN 49 WORK AND GROUTING AT INNER JETTY SHELL BAGAN LUAR, BUTTERWORTH, MARINE & SALVAGE WORKS 160,000.00 BHD/EXCALIBER May 2011 PENANG RESOURCES SDN BHD

MACH 3 ENGINEERING TO REPAIR ANODES FEEDER CABLE AT JIMAH POWER PLANT PORT DICKSON, NEGERI CONSULTANTS SDN 50 MARINE & SALVAGE WORKS 230,000.00 August 2011 SEMBILAN DARUL KHUSUS BHD/EXCALIBER RESOURCES SDN BHD

ENGINEERING, PROCUREMENT, CONSTRUCTION 51 EPCC OF THE NGDS TO SITIAWAN, FL STAGE 1/11, SITIAWAN, PERAK DARUL RIDZUAN AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4 249,400.00 GAS MALAYSIA BERHAD 2011 STEEL PIPES

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO MERU FL STAGE 1/11, MERU, KLANG, SELANGOR DARUL 52 AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL 530,000.00 GAS MALAYSIA BERHAD 2011 EHSAN PIPES

SUPPLY MATERIALS, MANPOWERS WITH NECESSARY HANDLING TOOLS & TRACTOR-LINE INDUSTRIES 53 EQUIPMENT FOR INSTALLATION, TESTING AND COMMISSIONING OF NATURAL GAS PIPELINE TESTING AND COMMISSIONING 1,070,000.00 2011 SDN BHD PIPELINE WORK FOR BAHRU STAINLESS PROJECT, TANJUNG LANGSAT, JOHOR

ENGINEERING, PROCUREMENT, CONSTRUCTION 54 EPCC OF THE NGDS TO SENAWANG FL STAGE 1/10, SENAWANG, NEGERI SEMBILAN 175,000.00 GAS MALAYSIA BERHAD 2011 AND COMMISSIONING OF NPS 4 STEEL PIPES -24M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO AYER HITAM FL STAGE 1/11, AYER HITAM, JOHOR DARUL 55 AND COMMISSIONING OF NPS 4 STEEL PIPES - 235,000.00 GAS MALAYSIA BERHAD 2011 TAKZIM 144M NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

KOMASI COMMUNICATIONS SDN 56 HERCULES PROJECT: FTK MAN CIVIL & FIBER INFRASTRUCTURE AT SACC SHAH ALAM CIVIL AND FIBER PULLING 2,875,146.74 2011 BHD / TIME DOTCOM BERHAD

SUPPLY AND ENGINEERING WORKS FOR MAXIS PROJECT ~ RAILWAY CROSSING AT KOMASI 57 ALOR SETAR, KUBANG SEMANG, MAMBANG DIAWAN, TANJUNG MALIM, KUALA CIVIL AND FIBER PULLING 748,102.30 COMMUNICATIONS SDN 2011 KUBU BARU, KEPONG CENTRAL AND KAJANG BHD / FIBERAIL SDN BHD

KOMASI 58 RELOCATION FOR NETWORK JALAN MUTIARA RINI – GELANG PATAH CIVIL AND FIBER PULLING 213,000.00 COMMUNICATIONS SDN 2011 BHD / CELCOM (M) BERHAD

KOMASI THE SUPPLY AND PROVISION OF UNDERGROUND INFRASTRUCTURE, 48 CORES COMMUNICATIONS SDN 59 OPTICAL FIBRE CABLE AND ACCESSORIES FROM TNBD SEREMBAN TO KILAT FOR CIVIL AND FIBER PULLING 433,645.50 2011 BHD / FIBRECOMM TELEKOM MALAYSIA REQUIREMENT NETWORK (M) SDN BHD

KOMASI COMMUNICATIONS SDN 60 MAXIS NGBB PROJECT SAUJANA VILLA- CIVIL WORK CIVIL AND FIBER PULLING 280,341.87 BHD / HUAWEI 2011 TECHNOLOGIES (M) SDN BHD KOMASI COMMUNICATIONS SDN 61 MAXIS NGBB PROJECT HP DESIGN (JY33) CIVIL AND FIBER PULLING 130,328.04 BHD / HUAWEI 2011 TECHNOLOGIES (M) SDN BHD KOMASI COMMUNICATIONS SDN CIVIL AND HORIZONTAL DIRECTIONAL DRILLING 62 CIVIL WORK (HDD) (DSH2 FDC1) 324,296.95 BHD / HUAWEI 2011 (HDD) TECHNOLOGIES (M) SDN BHD KOMASI COMMUNICATIONS SDN 63 MAXIS NGBB PROJECT DAMANSARA HEIGHT WSEM FDC6 - MICROTRENCHING CIVIL AND FIBER PULLING 208,981.34 BHD / HUAWEI 2011 TECHNOLOGIES (M) SDN BHD KOMASI COMMUNICATIONS SDN 64 MAXIS NGBB PROJECT DAMANSARA HEIGHT WSEM FDC6 - MICROTRENCHING CIVIL AND FIBER PULLING 216,343.13 BHD / HUAWEI 2011 TECHNOLOGIES (M) SDN BHD NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

KOMASI COMMUNICATIONS SDN 65 CIVIL WORK (BANGSAR PERMAI) CIVIL WORK 213,441.86 BHD / HUAWEI 2011 TECHNOLOGIES (M) SDN BHD KOMASI COMMUNICATIONS SDN 66 MAXIS NGBB PROJECT DAMANSARA HEIGHT WSEM FDC9 (DSH1 FDC9) CIVIL AND FIBER PULLING 303,446.00 BHD / HUAWEI 2011 TECHNOLOGIES (M) SDN BHD

KOMASI SUPPLY, INSTALL, COMMUNICATION OF CIVIL INFRASTRUCTURE AND FIBRE OPTIC 67 CIVIL AND FIBER PULLING 440,205.00 COMMUNICATIONS SDN 2011 CABLE WORKS FOR EASTERN AND SOUTHERN REGIONS BHD / CELCOM (M) BERHAD

KOMASI SUPPLY AND ENGINEERING WORKS FOR LINE MAXIS TP TANAH MERAH, PASIR MAS, 68 CIVIL AND FIBER PULLING 526,961.00 COMMUNICATIONS SDN 2011 MENTAKAB, WAKAF BARU, GUA MUSANG AND KUALA KRAI BHD / FIBERAIL SDN BHD

KOMASI 69 ENGINEERING WORKS FROM MAXIS TOWER TO ML409 AYER TAWAR , PERAK CIVIL AND FIBER PULLING 950,758.39 COMMUNICATIONS SDN 2011 BHD / FIBERAIL SDN BHD

ENGINEERING, PROCUREMENT, CONSTRUCTION March 2011 to Sept 70 EPCC OF THE NGDS TO PLENTONG FL STAGE 1/11, PLENTONG, JOHOR DARUL TAKZIM 225,000.00 GAS MALAYSIA BERHAD AND COMMISSIONING OF NPS 4 STEEL PIPES - 60M 2012

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO BANTING FL STAGE 1/11, BANTING,OLAK LEMPIT, BANTING, June 2011 to April 71 AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4 4,745,000.00 GAS MALAYSIA BERHAD SELANGOR 2012 STEEL PIPES - 1512M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO PADANG TERAP FL STAGE 1/11 & 2/11, PADANG TERAP, AND COMMISSIONING OF NPS 8 STEEL PIPES AND 72 6,887,783.00 GAS MALAYSIA BERHAD 2011 to 2012 KEDAH DARUL AMAN CONSTRUCTION OF ODORIZER BUILDING AND ODORIZER SYSTEM - 17000M

SBN INDUSTRIES SDN TO INSTALL CP ANODES (410 UNIT) BY UNDERWATER WELDING METHOD AT LOADING March 2012 to April 73 MARINE & SALVAGE WORKS 350,000.00 BHD/EXCALIBER JETTY TG. BIN POWER PLANT, KUKUP, PONTIAN, JOHOR DARUL TAKZIM 2012 RESOURCES SDN BHD NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

IEV ENGINEERING SDN DIVING SERVICES FOR DECOMMISIONING WORK OF PCSB AT SM-4 AND SM-V April 2012 to May 74 MARINE & SALVAGE WORKS 980,000.00 BHD/EXCALIBER PLATFORM, LABUAN FT 2012 RESOURCES SDN BHD

DSTS SDN BHD/EXCALIBER September 2012 to 75 DIVING SERVICES AT FERRY TERMINAL, PRAI, PENANG MARINE & SALVAGE WORKS 215,000.00 RESOURCES SDN BHD October 2012

RNC TECHNOLOGY (M) SDN UNDERWATER INSPECTION AND REPAIR (WELDING & JACKETING) OF JETTY PILES AT November 2012 to 76 MARINE & SALVAGE WORKS 320,000.00 BHD/EXCALIBER KARAMUNTING BULK OIL TERMINAL, SANDAKAN, December 2012 RESOURCES SDN BHD

ENGINEERING, PROCUREMENT, CONSTRUCTION 77 EPCC OF THE NGDS TO KAPAR FL STAGE 1/12, (REINFORCEMENT), KAPAR, SELANGOR 990,060.00 GAS MALAYSIA BERHAD 2012 AND COMMISSIONING OF NPS 8 STEEL PIPES - 36M

ENGINEERING, PROCUREMENT, CONSTRUCTION 78 EPCC OF THE NGDS TO NILAI FL STAGE 1/12, NILAI, NEGERI SEMBILAN DARUL KHUSUS AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL 284,795.00 GAS MALAYSIA BERHAD 2012 PIPES - 240M

ENGINEERING, PROCUREMENT, CONSTRUCTION & 79 MENSA : KELANA BREM TOWER 1 (KEB1B) 22,000.00 TIME DOT COM BERHAD 2012 COMMISSIONING

ENGINEERING, PROCUREMENT, CONSTRUCTION & 80 MENSA : KELANA BREM 2 (KEBTB) 22,000.00 TIME DOT COM BERHAD 2012 COMMISSIONING

ENGINEERING, PROCUREMENT, CONSTRUCTION & 81 HTK CARINA COVERAGE (GPON): DAMANSARA UPTOWN 3 (DUPBB) 22,000.00 TIME DOT COM BERHAD 2012 COMMISSIONING

SO-12F FIBER PULLING FROM TDC M/H W-18-01-03 TO CKHBW RISER LEVEL 5 (UOB ENGINEERING, PROCUREMENT, CONSTRUCTION & 82 3,942.20 TIME DOT COM BERHAD 2012 KL) COMMISSIONING

ENGINEERING, PROCUREMENT, CONSTRUCTION & 83 SO-48F FIBER PULLING FROM BMPTW (MDF) TO CKHBW RISER LEVEL 5 (MUAMALAT) 19,398.26 TIME DOT COM BERHAD 2012 COMMISSIONING

ENGINEERING, PROCUREMENT, CONSTRUCTION & 84 MENSA : FTK FOR MENSA WISMA GOOD YEAR 22,000.00 TIME DOT COM BERHAD 2012 COMMISSIONING NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

SO : 48 FIBER PULLING & SPLICING FROM BANK RAKYAT SERVER ROOM TO MANHOLE 85 CIVIL AND FIBER PULLING 9,795.71 TIME DOT COM BERHAD 2012 W-12-00-01

ENGINEERING, PROCUREMENT, CONSTRUCTION & 86 CARINA : FTK FOR DAMANSARA UPTOWN 1 22,000.00 TIME DOT COM BERHAD 2012 COMMISSIONING

ENGINEERING, PROCUREMENT, CONSTRUCTION & 87 CARINA : FTK FOR DAMANSARA UPTOWN 2 22,000.00 TIME DOT COM BERHAD 2012 COMMISSIONING

FTK - CARINA COVERAGE (GPON) : FIBER PULLING AT DAMANSARA UPTOWN 5 ENGINEERING, PROCUREMENT, CONSTRUCTION & 88 22,000.00 TIME DOT COM BERHAD 2012 (DAUPB) COMMISSIONING

ENGINEERING, PROCUREMENT, CONSTRUCTION & 89 FTK WORK - JALAN DAMANSARA - JALAN 19/13 84,126.18 TIME DOT COM BERHAD 2012 COMMISSIONING

ENGINEERING, PROCUREMENT, CONSTRUCTION & 90 REPAIR DUCT - S/O BGN BANK RAKYAT 11,000.00 TIME DOT COM BERHAD 2012 COMMISSIONING

ENGINEERING, PROCUREMENT, CONSTRUCTION & 91 FIBER PULLING 48F FROM ROCHE TO MH B19-00-06 4,229.06 TIME DOT COM BERHAD 2012 COMMISSIONING

ENGINEERING, PROCUREMENT, CONSTRUCTION & 92 COVERAGE : OVERTIME CHARGERS AND CABLE TRAY FOR UPTOWN 5 25,185.56 TIME DOT COM BERHAD 2012 COMMISSIONING

ENGINEERING, PROCUREMENT, CONSTRUCTION & 93 NETWORK UPGRADE : VIRGO - FIBER 48F FOR ROYAL DOMAIN (RDSPW) 19,165.06 TIME DOT COM BERHAD 2012 COMMISSIONING NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

NETWORK UPGRADE : VIRGO FIBER PULLING AND TERMINATION 48F FOR MONT ENGINEERING, PROCUREMENT, CONSTRUCTION & 94 6,287.96 TIME DOT COM BERHAD 2012 KIARA DAMAI (MKDCW) COMMISSIONING

NETWORK UPGRADE : VIRGO FIBER PULLING AND TERMINATION 48F FOR MONT ENGINEERING, PROCUREMENT, CONSTRUCTION & 95 8,594.84 TIME DOT COM BERHAD 2012 KIARA ASTANA, CROWN(MKCTW) & TIARA (MKTTW) COMMISSIONING

NETWORK UPGRADE : VIRGO FIBER PULLING AND TERMINATION 48F FOR MONT ENGINEERING, PROCUREMENT, CONSTRUCTION & 96 6,287.96 TIME DOT COM BERHAD 2012 KIARA AMAN (MKACW) COMMISSIONING

ENGINEERING, PROCUREMENT, CONSTRUCTION & 97 TRANSFORMER ADSL TO GPON : VISTA COM B. - PULLING AND TERMINATION 27,531.38 TIME DOT COM BERHAD 2012 COMMISSIONING

KOMASI SUPPLY AND ENGINEERING WORKS FOR SITES SG PETANI (TWSW), PADANG SERAI ENGINEERING, PROCUREMENT, CONSTRUCTION & 98 448,155.93 COMMUNICATIONS SDN 2012 (PSERFH), JERANTUT (JERA) AND LAHAT (JTSK) COMMISSIONING BHD / FIBERAIL SDN BHD

KOMASI COMMUNICATIONS SDN RELOCATION OF UTILITIES TELEKOM & TNB WORKS (PROJECT MEMBINA JALAN ENGINEERING, PROCUREMENT, CONSTRUCTION & 99 689,440.00 BHD / KONSORTIUM 2012 LINGKARAN TENGAH SEREMBAN, NEGERI SEMBILAN - FASA 2B COMMISSIONING TEMOKIN VILLA JELAS JV SDN BHD

KOMASI (OSP) 48F FIBER PULLING FROM KLANG PROTECH TO RINGCUT EXTS TIME MANHOLE COMMUNICATIONS SDN 100 (B-50-01-83) (96C MAN GLMRB- I-CITY) & SO-(OSP)48F FIBER PULLING FROM KLANG CIVIL AND FIBER PULLING 371,406.88 2012 BHD / TIME DOTCOM PROTECH INTAN MELLINIUM MDF ROOM BERHAD

KOMASI ELECTRIFIED DOUBLE TRACK PROJECT BETWEEN SEREMBAN TO GEMAS PACK 1- 101 ELECTRIFIED DOUBLE TRACK 117,678.80 COMMUNICATIONS SDN 2012 SEREMBAN TO TABOH NANING. (CH464.00-CH466.275) BHD / FIBERAIL SDN BHD

KOMASI MICRO TRENCHING AND 12C ABF FIBER OPTIC WORKS FROM HP TOWER TO MENARA 102 CIVIL AND FIBER PULLING 161,878.84 COMMUNICATIONS SDN 2012 SHELL, BUKIT DAMANSARA. BHD / FIBERAIL SDN BHD NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

KOMASI THE SUPPLY AND PROVISION OF ENGINEERING SERVICES FOR CIVIL INFRASTRUCTURE, COMMUNICATIONS SDN 103 OPTICAL FIBRE CABLE AND ACCESSORIES FROM STULANG DARAT TO MENARA CIVIL AND FIBER PULLING 372,000.00 2012 BHD / FIBRECOMM CYBERPOT. NETWORK (M) SDN BHD

KOMASI THE CIVIL WORK AND INSTALLATION FIBRE OPTIC CABLE FROM FIBRECOMM-MAXIS COMMUNICATIONS SDN 104 CIVIL AND FIBER PULLING 389,037.20 2012 R5 TO TM PUTRAJAYA VIA TM DUCTING BHD / FIBRECOMM NETWORK (M) SDN BHD

KOMASI NEW CIVIL INFRASTRUCTURE OPTICAL FIBRE CABLE AND ACCESSORIES SEMANTAN COMMUNICATIONS SDN 105 CIVIL AND FIBER PULLING 369,518.00 2012 (LEVEL 7) –FCN HP TOWER CABIN (ROOFTOP) USING MICRO TRENCHING METHOD BHD / FIBRECOMM NETWORK (M) SDN BHD

KOMASI PROPOSED CIVIL, HORIZONTAL DIRECTIONAL DRILLING AND MICRO TRENCHING CIVIL, HORIZONTAL DIRECTIONAL DRILLING AND 106 3,139,120.30 COMMUNICATIONS SDN 2012 WORKS FROM NTT CYBERJAYA TO PATIMAS TO MENARA AIK HUA MICRO TRENCHING WORKS BHD / NTT MSC SDN BHD

KOMASI COMMUNICATIONS SDN 107 MENSA PROJECT : FTK MAN CIVIL & FIBER INFRASTRUCTURE AT KELANA JAYA CIVIL AND FIBER PULLING 1,547,393.21 2012 BHD / TIME DOTCOM BERHAD

- SUPPLY & INSTALL 2 WAY GI PIPE FOR ROAD CROSSING ITRAMAS TECHNOLOGY - SUPPLY & INSTALL 100MM CORRUGATED DUCT SDN BHD / WCT (TRAFFIC - INSTALL 19 CORE P/S/P CABLE SIGNAL SYSTEM FOR 108 SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 850,000.00 MEDINI, BANDAR 2012 - INSTALL 2 CORE P/S/P CABLE ISKANDAR, JOHOR) / - INSTALL CABLE PIT DETECTOR PIT INTEGRATED DYNASTY (M) SDN BHD - INSTALL POLES, ASPECTS AND TRAFFIC LIGHT CONTROLLER - SUPPLY & INSTALL DETECTOR LOOP SENSOR - SUPPLY & INSTALL TRAFFIC LIGHT CONTROLLER PLINTH NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

- SUPPLY & INSTALL 100MM CORRUGATED DUCT ITRAMAS TECHNOLOGY - INSTALL 19 CORE P/S/P CABLE SDN BHD / WCT (TRAFFIC - INSTALL 2 CORE P/S/P CABLE SIGNAL SYSTEM FOR 109 SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 356,500.00 MEDINI, BANDAR 2013 - INSTALL / REPAIR CABLE PIT ISKANDAR, JOHOR) / - SUPPLY & INSTALL DETECTOR LOOP SENSOR INTEGRATED DYNASTY (M) SDN BHD - INSTALL TRAFFIC LIGHT POLE, ASPECTS C/W TERMINATION

TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN 110 TRAFFIC LIGHT JUNCTION WORK AT NEGERI SEMBILAN (GEMAS AND GEMENCHEH) SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 90,800.00 2013 BHD / INTEGRATED DYNASTY (M) SDN BHD

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO PULAU INDAH, FL STAGE 2/12 KLANG, SELANGOR DARUL 111 AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4 250,000.00 GAS MALAYSIA BERHAD 2013 EHSAN STEEL PIPES - 200M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO BUKIT RAMBAI, FL STAGE 1/12 BUKIT RAMBAI INDUSTRIAL 112 AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL 489,000.00 GAS MALAYSIA BERHAD 2013 AREA IV, MELAKA PIPES - 700M

ENGINEERING, PROCUREMENT, CONSTRUCTION RELOCATION OF GAS PIPELINE WORKS RELATED TO THE CONSTRUCTION AND MUDAJAYA CORPORATION AND COMMISSIONING OF NPS 8 STEEL PIPES 113 COMPLETION OF VIADUCT GUIDEWAY AND OTHER ASSOCIATED WORKS FROM 4,200,000.00 BERHAD / MRT 2013 RELOCATION WITH 6 NOS OF HOT TAPPING DATARAN SUNWAY STATION TO SECTION 17 CORPORATION BHD STOPPLES OF 8" X 8" - 3200M

EPCC OF THE NGDS TO KAPAR MERU FL STAGE 1/12, KAPAR & MERU, KLANG, ENGINEERING, PROCUREMENT, CONSTRUCTION 114 382,350.00 GAS MALAYSIA BERHAD July 2012 to Jan 2013 SELANGOR DARUL EHSAN AND COMMISSIONING OF NPS 4 STEEL PIPES - 66M

RNC TECHNOLOGY (M) SDN TO CONDUCT DIVING INSPECTION AT JETTY PILES QUAY 2 & 3 MMHE PASIR GUDANG, 115 MARINE & SALVAGE WORKS 270,000.00 BHD/EXCALIBER May 2013 JOHOR RESOURCES SDN BHD

SBN INDUSTRIES SDN 116 TO INSTALL ANODES AT TANJUNG LANGSAT JETTY, JOHOR DARUL TAKZIM MARINE & SALVAGE WORKS 325,000.00 BHD/EXCALIBER June 2013 RESOURCES SDN BHD NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO SENAI FL STAGE 1/13, SENAI INDUSTRIAL AREA, JOHOR DARUL 117 AND COMMISSIONING OF NPS 4 STEEL PIPES - 199,998.00 GAS MALAYSIA BERHAD 2013 TAKZIM 600M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO KULAI FL STAGE 1/12, JALAN AIR HITAM, KULAIJAYA, JOHOR 118 AND COMMISSIONING OF NPS 4 STEEL PIPES - 256,265.00 GAS MALAYSIA BERHAD 2013 DARUL TAKZIM 120M

ENGINEERING, PROCUREMENT, CONSTRUCTION 119 EPCC OF THE NGDS TO CHUPING FL STAGE 1/12, CHUPING,PERLIS INDERA KAYANGAN AND COMMISSIONING OF NPS 8, NPS 6, AND NPS 4 2,335,700.00 GAS MALAYSIA BERHAD 2013 STEEL PIPES - 9864M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO TANJUNG LANGSAT FL STAGE 3/12, TANJUNG LANGSAT, 120 AND COMMISSIONING OF NPS 8, AND NPS 4 STEEL 435,000.00 GAS MALAYSIA BERHAD 2013 JOHOR DARUL TAKZIM PIPES - 900M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO SEPANG FL STAGE 1/13 (REINFORCEMENT), SALAK TINGGI, 121 AND COMMISSIONING OF NPS 8 STEEL PIPES - 3,603,188.00 GAS MALAYSIA BERHAD 2013 SEPANG, SELANGOR DARUL EHSAN 3198M

KOMASI PROJEK MENAIKTARAF LEBUHRAYA JOHOR BAHRU- PASIR GUDANG DARI 4 LORONG COMMUNICATIONS SDN 122 ROAD MAINTENANCE WORKS 555,647.80 2013 KE 6 LORONG, JOHOR (THE''PROJECT") BHD / IDX MULTI RESOURCES SDN BHD

KOMASI THE SUPPLY AND THE PROVISION OF ENGINEERING SERVICES OF OPTICAL FIBRE COMMUNICATIONS SDN 123 CALBLE INFRASTRUCTURE AND INSTALLATION FOR JOHOR FIBRE ROLL-OUT MENARA CIVIL AND FIBER PULLING 2,245,568.50 2013 BHD / PUNCAK SEMANGAT ANSAR TO DANGA BAY (8.5 KM) SDN BHD

KOMASI THE ROAD NAMELY UTILITY MAPPING , HDD, MILLING & PAVING & PIER CABLE COMMUNICATIONS SDN 124 BRIDGE FOR TNB'S CABLE LAYING FROM 33KV PMU TTJ TO TNB SSU AT ON SEMI-SITE CIVIL AND FIBER PULLING 2,820,635.00 2013 BHD / SCG INDUSTRIES 1 MALAYSIA SDN BHD

KOMASI COMMUNICATIONS SDN 125 PSND10948: NWK: CIVIL & FIBER FOR MUADZAM SHAH (MAXIS) CIVIL AND FIBER PULLING 499,905.30 2013 BHD / TIME DOTCOM BERHAD NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

KOMASI COMMUNICATIONS SDN 126 PSND10936: NWK: CIVIL & FIBER FOR DIGI SOUTH OF RAUB (AS) CIVIL AND FIBER PULLING 1,463,299.63 2013 BHD / TIME DOTCOM BERHAD

KOMASI COMMUNICATIONS SDN 127 PSND10949: NWK: CIVIL & FIBER FOR DIGI DONG , PAHANG CIVIL AND FIBER PULLING 1,914,462.41 2013 BHD / TIME DOTCOM BERHAD

KOMASI SUPPLY AND ENGINEERING WORKS FROM TH PROPERTIES DATA CENTRE TO EXISTING 128 CIVIL WORKS 564,304.21 COMMUNICATIONS SDN 2013 MANHOLE (ROUTE 1 AND ROUTE 2) AT BANDAR ENSTEK BHD / FIBERAIL SDN BHD

3R SYSTEMS SDN UNDERWATER INSPECTION TO JETTY STRUCTURE AT FELDA SAHABAT, LAHAD DATU, 129 MARINE & SALVAGE WORKS 185,000.00 BHD/EXCALIBER March 2014 SABAH RESOURCES SDN BHD

RNC TECHNOLOGY (M) SDN March 2014 to April 130 UNDERWATER INSPECTION AT BOUSTEAD NAVAL DOCK YARD, LUMUT, PERAK MARINE & SALVAGE WORKS 155,000.00 BHD/EXCALIBER 2014 RESOURCES SDN BHD

SBN INDUSTRIES (M) SDN REHABILITATION OF CATHODIC PROTECTION AT KPC, KUANTAN, PAHANG DARUL March 2014 to May 131 MARINE & SALVAGE WORKS 510,000.00 BHD/EXCALIBER MAKMUR 2014 RESOURCES SDN BHD

SBN INDUSTRIES (M) SDN June 2014 to July 132 INSTALL ANODES (WELDING) AT KBOT JETTY PILES, SANDAKAN, SABAH MARINE & SALVAGE WORKS 280,000.00 BHD/EXCALIBER 2014 RESOURCES SDN BHD

CENDOR MOPU PRODUCER 133 DIVING SERVICES FOR DEWATERING AT CENDOR MOPU (OFFSHORE) MARINE & SALVAGE WORKS 1,250,000.00 LTD/EXCALIBER RESOURCES October 2014 SDN BHD

RNC TECHNOLOGY (M) SDN CONDITION ASSESSMENT AND ENGINEERING WORKS AT BOUSTEAD NAVAL Nov 2014 to Dec 134 MARINE & SALVAGE WORKS 220,000.00 BHD/EXCALIBER DOCKYARD, LUMUT, PERAK 2014 RESOURCES SDN BHD NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

ENGINEERING, PROCUREMENT, CONSTRUCTION 135 EPCC OF THE NGDS TO LUMUT FL STAGE 1/13, SITIAWAN, PERAK DARUL RIDZUAN AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL 330,000.00 GAS MALAYSIA BERHAD 2014 PIPES - 456M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO KULAI FL STAGE 1/13, KAWASAN PERINDUSTRIAN I-PARK, 1,238,000.00 136 AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL GAS MALAYSIA BERHAD 2014 KULAIJAYA, JOHOR BAHRU, JOHOR DARUL TAKZIM PIPES - 2388M

CADANGAN PEMBANGUNAN KILANG BERKEMBAR 3 ½ TINGKAT JENIS A (6 UNIT), JENIS B (10 UNIT) DAN KILANG SESEBUAH 3 1/2 TINGKAT (1 UNIT) DI ATAS LOT PT SUB-CONTRACT OF GAS PIPE PROTECTION AND 200,000.00 BROADWAY MERGER SDN 137 2014 1260 (HSD) 176557, JALAN PUCHONG, MUKIM PETALING, DAERAH PETALING, MDPE PIPE RELOCATION - 150M BHD SELANGOR DARUL EHSAN UNTUK TETUAN BROADWAY MERGER SDN BHD

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO MAK MANDIN & PRAI FL DL STAGE 1/14, MAK MANDIN & 1,298,000.00 138 AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4 GAS MALAYSIA BERHAD 2014 PRAI, PULAU PINANG STEEL PIPES - 1380M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO TANJUNG LANGSAT FL STAGE 2/14, TANJUNG LANGSAT, 530,000.00 139 AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4 GAS MALAYSIA BERHAD 2014 JOHOR DARUL TAKZIM STEEL PIPES - 984M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO TANJUNG LANGSAT FL STAGE 3/14, TANJUNG LANGSAT, 850,000.00 140 AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL GAS MALAYSIA BERHAD 2014 JOHOR DARUL TAKZIM PIPES - 822M

KOMASI MENAIKTARAF JALAN MUAR - TANGKAK-SEGAMAT JOHOR (FASA 1: SEGAMAT - COMMUNICATIONS SDN 141 ROAD MAINTENANCE WORKS 4,847,006.50 2014 TANGKAK) PAKEJ 2 BHD / BINA MEKAR SDN BHD KOMASI FULL TURNKEY OF CIVIL AND FIBER INFRASTRUCTURE OF CELCOM PROJECT - PHASE 2 : COMMUNICATIONS SDN 142 CIVIL AND FIBER PULLING 234,000.00 2014 CELCOM SKUDAI TAMAN UNIVERSITI BHD / TIME DOTCOM BERHAD

MASS RAPID TRANSIT LEMBAH KLANG: JAJARAN SUNGAI BULOH KAJANG PACKAGE V8 KOMASI : CONSTRUCTION AND COMPLETION OF VIADUCT GUIDEWAY AND OTHER WORKS ENGINEERING, PROCUREMENT, CONSTRUCTION & 143 237,123.88 COMMUNICATIONS SDN 2014 FROM TAMAN MESRA KAJANG STATION RELOCATION OF EXISTING DIGI & MAXIS COMMISSIONING FOR CIVIL AND FIBER PULLING BHD / FIBERAIL SDN BHD SERVICES

KOMASI SUPPLY AND ES FOR NEW CIVIL INFRASTRUCTURE, OPTICAL FIBRE CABLE AND COMMUNICATIONS SDN 144 CIVIL AND FIBER PULLING 216,608.80 2014 ACCESSORIES FOR 48 CORES FROM CABIN PMU SKUDAI TO TAMAN SRI SKUDAI BHD / FIBRECOMM NETWORK (M) SDN BHD NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

KOMASI 145 CABLE MIGRATION WORKS TO JB SENTRAL CABLE MIGRATION WORKS 278,970.52 COMMUNICATIONS SDN 2014 BHD /FIBERAIL SDN BHD

KOMASI ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMUNICATIONS SDN 146 BUTTERFLY PROJECT AIR HITAM SKUDAI LINK 468,538.00 2014 COMMISSIONING BHD / TIME DOTCOM BERHAD

KOMASI 147 HDD WORKS FOR SITE "JPELFH01" KTMB CROSSING JOHOR BAHRU HORIZONTAL DIRECTIONAL DRILLING WORKS 123,860.97 COMMUNICATIONS SDN 2014 BHD /FIBERAIL SDN BHD

KOMASI RELOCATION OF MICRO TRENCHING WORKS FROM MH NO 3 (ISTANA HOTEL)TO 148 CIVIL AND FIBER PULLING 916,280.52 COMMUNICATIONS SDN 2014 EXISTING MANHOLE AT MAJU EXPRESSWAY (BULATAN KG PANDAN) BHD /FIBERAIL SDN BHD

KOMASI CIVIL AND PULLING WORK FOR MALAYSIA MARINE HEAVY ENGINEERING COMMUNICATIONS SDN 149 CIVIL AND FIBER PULLING 234,115.00 2014 (MMHE)(THE 'WORK) BHD / TIME DOTCOM BERHAD

TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN 150 TRAFFIC LIGHT JUNCTION WORK AT MEDINI JUNCTION, BANDAR ISKANDAR, JOHOR SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 61,000.00 2014 BHD / INTEGRATED DYNASTY (M) SDN BHD

TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN 151 TRAFFIC LIGHT JUNCTION WORK AT TAMAN SELASIH, KULIM SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 75,000.00 2014 BHD / INTEGRATED DYNASTY (M) SDN BHD

TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN 152 TRAFFIC LIGHT JUNCTION WORK AT LABU, NEGERI SEMBILAN SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 43,000.00 2014 BHD / INTEGRATED DYNASTY (M) SDN BHD NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN 153 TRAFFIC LIGHT JUNCTION WORK AT TANJUNG TOKONG, PENANG SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 95,000.00 2014 BHD / E & O / INTEGRATED DYNASTY (M) SDN BHD

TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN 154 TO RELOCATE TRAFFIC SIGNAL SYSTEM AT CENTRAL MARKET SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 57,000.00 2014 BHD / E & O / INTEGRATED DYNASTY (M) SDN BHD

2 X 13KV AIS OHL FEEDER BAYS, 2X 132KV UGC FEEDER BAYS, 1X132 BUS COUPLER BAY, NEW TRANSMISSION RTU, CONTROL & RELAY PANEL, LVAC, GENSET, EARTHING SYSTEMS AND ALL 155 PMU 132KV TASEK GELUGOR SWITCHING STATION 505,520.00 TRANSPRO SDN BHD 2014 OTHER ASSOCIATE ANCILLARY EQUIPMENT, NEW 132KV BUILDING, ACCESS ROAD AND ASSOCIATED CIVIL WORK , ALL RELATED TESTING &COMMISIONING WORKS BY OEM'S TESTER

TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN 156 TRAFFIC LIGHT JUNCTION WORK AT JELUTONG EXPRESSWAY, PENANG SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 125,000.00 2014 BHD / IJM / INTEGRATED DYNASTY (M) SDN BHD

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO BUKIT KEMUNING DL STAGE 1/13 (LOOPING) BUKIT 157 AND COMMISSIONING OF PE 125 MM, PE PIPES - 517,337.50 GAS MALAYSIA BERHAD Aug 2013 to Jan 2014 KEMUNING, SHAH ALAM, SELANGOR DARUL EHSAN 750M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO SEPANG FL STAGE 3/13, TANJUNG INDUSTRIAL PARK, SEPANG, Dec 2013 to Nov 158 AND COMMISSIONING OF NPS 16, NPS 8 AND NPS 6,494,600.00 GAS MALAYSIA BERHAD SELANGOR DARUL EHSAN 2014 6 STEEL PIPES - 9260M

TO SUPPLY APC SOLUTIONS FOR JPKN NEW BUILDING DATA CENTER IN KK AND DRC TO SUPPLY APC SOLUTIONS FOR JPKN NEW 159 6,000,000.00 SRI KOMPUTER SDN BHD July 2014 to Jan 2015 IN TAWAU BUILDING DATA CENTER IN KK AND DRC IN TAWAU

BOUSTEAD NAVAL SUPPLY MANPOWER AND DIVING EQUIPMENT FOR SALVAGE WORK (KD PERANTAU) 160 MARINE & SALVAGE WORKS 1,600,000.00 DOCKYARD/EXCALIBER Dec 2014 to Jan 2015 AT LUMUT PERAK RESOURCES SDN BHD

CARRY OUT PRESERVATION OF MACHINERY AND PRESERVATION SERVICES FOR TREATMENT OF WATER DAMAGED MACHINERY OF BOUSTEAD NAVAL 161 EQUIPMENT DAMAGE PREVENTION AND 3,100,000.00 Dec 2014 Feb 2015 PARTIALLY SUNKEN KD PERANTAU. SHIPYARD SDN BHD CLEANING AFTER SALVAGE OF KD PERANTAU. NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

TO CONTINUE AND TAKE OVER SALVAGE BOUSTEAD NAVAL 162 SALVAGE OPERATION KD PERANTAU 1,594,232.50 Jan-15 OPERATION SHIPYARD SDN BHD

EXTENSION OF SALVAGE OPERATION KD BOUSTEAD NAVAL 163 EXTENSION - SALVAGE OPERATION KD PERANTAU 2,441,886.00 Jan-15 PERANTAU (UPRIGHT AND REAFLOAT) SHIPYARD SDN BHD

TO PROVIDE ENGANGE SERVICE OF NAVAL ARCHITECT TO CONDUCT DOCKING ANALYSIS AND BOUSTEAD NAVAL 164 NAVAL ARCHITECTURE - SALVAGE KD PERANTAU 92,400.00 Jan-15 SHIP STABILITY ANALYSIS OF KD PERANTAU AND TO SHIPYARD SDN BHD PROVIDE FULL ANALYSIS REPORT. RNC TECHNOLOGY (M) SDN REPAIR, REHABILITATION AND REVIVAL OF SHIP LIFT PLATFORM AT TLDM LUMUT FOR Mar 2015 to June 165 MARINE & SALVAGE WORKS 215,000.00 BHD/EXCALIBER BOUSTEAD NAVAL SHIPYARD, LUMUT, PERAK D.R 2015 RESOURCES SDN BHD TO SUPPLY APC SOLUTIONS FOR MATRADE Mar 2015 to Sept 166 TO SUPPLY APC SOLUTIONS FOR MATRADE BUILDING DATA CENTER UPGRADING JOB 1,800,000.00 BIT GROUP SDN BHD BUILDING DATA CENTER UPGRADING JOB 2015

EXCALIBER RESOURCES SDN Nov 2015 to Dec 167 UNDERWATER SALVAGE OF TUG BOAT AT PENANG PORT CONSORTIUM PENANG MARINE & SALVAGE WORKS 250,000.00 BHD 2015

EXCALIBER RESOURCES SDN Nov 2015 to Dec 168 UNDERWATER SALVAGE OF TUG BOAT AT PENANG PORT CONSORTIUM PENANG MARINE & SALVAGE WORKS 250,000.00 BHD 2015

ENGINEERING, PROCUREMENT, CONSTRUCTION 169 EPCC OF THE NGDS TO TEBRAU FL STAGE 1/14, TEBRAU, JOHOR DARUL TAKZIM AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL 1,213,852.00 GAS MALAYSIA BERHAD 2015 PIPES -1296M

EPCC OF THE NGDS TO WEST PORT FL STAGE 2/14, WEST PORT, KLANG, SELANGOR ENGINEERING, PROCUREMENT, CONSTRUCTION 170 218,000.00 GAS MALAYSIA BERHAD 2015 DARUL EHSAN AND COMMISSIONING OF NPS 4 STEEL PIPES -48M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO BANTING FL STAGE 1/14, OLAK LEMPIT INDUSTRIAL AREA, 2,460,080.00 171 AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4 GAS MALAYSIA BERHAD 2015 BANTING, SELANGOR DARUL EHSAN STEEL PIPES

EPCC OF THE NGDS TO MERU FL STAGE 3/15, MERU, KLANG, SELANGOR DARUL ENGINEERING, PROCUREMENT, CONSTRUCTION 172 176,278.00 GAS MALAYSIA BERHAD 2015 EHSAN AND COMMISSIONING OF NPS 4 STEEL PIPES NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

MSVT-TUKAR KABEL VOLTAN TINGGI 22KV PILC UNTUK TUJUAN PENUKARAN PILC KOMASI SEDIA ADA SEPANJANG 2KM KAWASAN PASIR GUDANG INDUSTRI FASA 8 (KERJA - COMMUNICATIONS SDN 173 KERJA MERENTANG 1 LITAR KABEL 240MMP XLPE 22KV IC BARU ANTARA PE TIONG CIVIL AND FIBER PULLING 197,067.00 2015 BHD / TENAGA NASIONAL NAM KE PCOC DAN BYPASS PE KOMERSIAL MINERAL BAGI MENGGANTIKAN KABEL BERHAD LAMA) -KERJA HDD MSVT-MERENTANG KABEL VOLTAN TINGGI 11KV XLPE UNTUK TUJUAN RE- KOMASI CONFIGURE SISTEM SEDIADA KAWASAN JOHOR JAYA FASA 10 (MSVT NEW INJECTION COMMUNICATIONS SDN 174 MERENTANG 1 LITAR KABEL VOLTAN TINGGI 1C 240MMP 22KV DARI PMU TEBRAU KE CIVIL AND FIBER PULLING 249,294.40 2015 BHD / TENAGA NASIONAL TEMPAT CADANGAN POTONG & SAMBUNG KE S/S GIANT SEPANJANG 1746M) (KERJA BERHAD KONTRAK HDD)

KOMASI RECTIFICATION WORK FOR INTERMARK CABLE AT JUNCTION OF - 175 CIVIL AND FIBER PULLING 102,591.31 COMMUNICATIONS SDN 2015 JALAN TUN RAZAK BHD / FIBERAIL SDN BHD

MSVT- TUKAR KABEL VOLTAN TINGGI 11KV UNTUK TUJUAN RE-CONFIGURE SISTEM KOMASI SEDIADA DI KAWASAN JOHOR JAYA FASA 8 (MSVT NEW INJECTION 3C 240MMP 11KV COMMUNICATIONS SDN 176 CIVIL AND FIBER PULLING 103,000.00 2015 PE TMN MOLEK NO 3 KE PE TMN MOLEK NO 14 SEPANJANG 1229 METER ) (KERJA BHD / TENAGA NASIONAL KONTRAK HDD) BERHAD

KOMASI CONTRACT FOR NETWORK DEVELOPMENT PROJECT VIA SCHEDULE OF RATE (JKH) FOR 177 CIVIL AND FIBER PULLING 34,773,000.00 COMMUNICATIONS SDN 2015 TELEKOM MALAYSIA BERHAD ™ BHD / TM BERHAD

THE SUPPLY, DELIVERY, INSTALLATION, TESTING AND COMMISSIONING OF THE KOMASI TELEPHONE INFRASTRUCTURE WORKS FOR TOTAL 80 UNITS OF MIXED RESIDENTIAL ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMUNICATIONS SDN 178 UNITS ( STAGE 1-39 UNITS & STAGE 2-41 UNITS) DI ATAS SEBAHAGIAN LOT PTD 418,730.00 2015 COMMISSIONING BHD / GPROPERTY 104940, INDAHPURA ZONE 33B, MUKIM KULAI, DAERAH KULAIJAYA, NEGERI JOHOR CONSTRUCTION SDN BHD DARUL TAKZIM

THE SUPPLY, DELIVERY , INSTALLATION , TESTING & COMMISSIONING OF TELEPHONE KOMASI INFRASTRUCTURE WORKS FOR PROPOSED DEVELOPMENT AT PHASE 1 FOR ECO ENGINEERING, PROCUREMENT, CONSTRUCTION & COMMUNICATIONS SDN 179 819,705.00 2015 BUSINESS PARK 1 ON PART OF LOT PTD 117036, 117040 & 117041, MUKIM TEBRAU , COMMISSIONING BHD / ECO BUSINESS PARK DAERAH JOHOR BHARU, JOHOR 1 DEVELOPMENT SDN BHD

TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN 180 TRAFFIC LIGHT JUNCTION WORK AT NILAI, NEGERI SEMBILAN SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 145,000.00 2015 BHD / IJM / INTEGRATED DYNASTY (M) SDN BHD NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN 181 TRAFFIC LIGHT JUNCTION WORK AT LUKUT, NEGERI SEMBILAN SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 30,000.00 2015 BHD / INTEGRATED DYNASTY (M) SDN BHD

TYCO FIRE, SECURITY & SERVICES MALAYSIA SDN 182 TRAFFIC LIGHT JUNCTION WORK AT KEPONG SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 95,000.00 2015 BHD / INTEGRATED DYNASTY (M) SDN BHD

07.07.2015 to 183 LOI FOR P&D : COVERAGE: WISMA UOA DAMANSARA 2 CIVIL AND FIBER PULLING 1,060.00 TIME DOT COM BERHAD 07.07.2015

SERVICE ORDER : FIBER PULLING WORK TO MDF ROOM MENARA PNB JALAN TUN 13.08.2015 to 184 CIVIL AND FIBER PULLING 2,333.56 TIME DOT COM BERHAD RAZAK, KL 13.08.2015

09.09.2015 TO 185 THE ASCENT @ PARADIGM MALL PETALING JAYA, SELANGOR DARUL EHSAN CIVIL AND FIBER PULLING 1,537.78 TIME DOT COM BERHAD 09.09.2015

28.10.2015 TO 186 RAISE UP MANHOLE – MENARA PNB CIVIL AND FIBER PULLING 1,060.00 TIME DOT COM BERHAD 28.10.2015

187 LOI FOR P&D : NTT CYBERJAYA CIVIL AND FIBER PULLING 1,060.00 TIME DOT COM BERHAD 2015

15.09.2015 TO 188 FIBER PULLING FOR NTT CYBERJAYA CIVIL AND FIBER PULLING 4,348.21 TIME DOT COM BERHAD 28.09.2015

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO LIPAT KAJANG FL STAGE 2/13 AND STAGE 3/13, LIPAT KAJANG 189 AND COMMISSIONING OF NPS 12, NPS 8 AND NPS 9,988,772.00 GAS MALAYSIA BERHAD 2015 INDUSTRIAL AREA, MUKIM JASIN, MELAKA 6 STEEL PIPES -29262M NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

ENGINEERING, PROCUREMENT, CONSTRUCTION 190 EPCC OF THE NGDS TO KL FL STAGE 1/15, JALAN PEEL, KUALA LUMPUR AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4 2,731,471.60 GAS MALAYSIA BERHAD 2015 STEEL PIPES -1056M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF GPRW AT JALAN GUDANG, JOHOR PORT INDUSTRIAL AREA, PASIR GUDANG, 191 AND COMMISSIONING OF NPS 6 STEEL PIPES - 494,998.80 GAS MALAYSIA BERHAD 2015 JOHOR DARUL TAKZIM 204M

ENGINEERING, PROCUREMENT, CONSTRUCTION 192 EPCC OF THE NGDS TO KULAI FL STAGE 1/15, KULAIJAYA, JOHOR DARUL TAKZIM AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL 868,924.40 GAS MALAYSIA BERHAD 2016 PIPES -1506M

COVERAGE : PROPOSED CIVIL & FIBER PULLING 48 FROM BANGSAR HEIGHT TOWER 193 CIVIL AND FIBER PULLING 26,624.18 TIME DOT COM BERHAD 2016 TO TIME EXISTING M/H

COVERAGE : PROPOSED CIVIL & FIBER PULLING FROM PURI AYU CONDO TO TIME 194 CIVIL AND FIBER PULLING 49,425.24 TIME DOT COM BERHAD 2016 EXISTING M/H

EPCC OF NGDS TO PEGOH FL STAGE 2/15, HICOM INDUSTRIAL PARK PEGOH, ALOR ENGINEERING, PROCUREMENT, CONSTRUCTION 195 1,898,000.00 GAS MALAYSIA BERHAD 2016 GAJAH, MELAKA (HONDA MALAYSIA SDN BHD) AND COMMISSIONING OF NPS 4 & NPS 6

TF LAND SDN BHD / TO DESIGN AND BUILD TRAFFIC LIGHT SIGNALLING JUNCTION AT MACHANG BUBUK, 196 SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 212,265.00 INTEGRATED DYNASTY (M) 2016 PENANG SDN BHD

NURI MERDU SDN BHD / 197 TO RELOCATE EXISTING TRAFFIC LIGHTS JUNCTION @ MEDINI, JOHOR SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 109,230.00 INTEGRATED DYNASTY (M) 2016 SDN BHD

EXCALIBER RESOURCES SDN Feb 2016 to March 198 SALVAGE WORKS AT PENANG PORT SDN BHD MARINE & SALVAGE WORKS 670,000.00 BHD 2016

SCORR TECHNOLOGY SDN PROPOSED CONTAINER TERMINAL ASSOCIATED INFRASTRUCTURE WORKS AT POIC, March 2016 to May 199 MARINE & SALVAGE WORKS 250,000.00 BHD/EXCALIBER LAHAD DATU, SABAH 2016 RESOURCES SDN BHD NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

200 COVERAGE : CIVIL AND FIBER PULLING AT BUKIT PANDAN 1 CIVIL AND FIBER PULLING 25,440.00 TIME DOT COM BERHAD 2016

SUASANA BUKIT CEYLON - CIVIL (60MTR) AND PULLING (200MTR) FOR SUASANA 201 CIVIL AND FIBER PULLING 19,480.40 TIME DOT COM BERHAD 2016 BUKIT CEYLON AT PERSIARAN RAJA CHULAN, KUALA LUMPUR

SO DRIVEN (DIGI) : OVERHEAD INFRA (2000M) AND FIBER PULLING (2300M) FOR DIGI 202 CIVIL AND FIBER PULLING 46,662.37 TIME DOT COM BERHAD 2016 DONG RESILIENCY TOWN AREA

203 CIVIL AND FIBER PULLING AT MAXIS KUANTAN CIVIL AND FIBER PULLING 163,800.00 TIME DOT COM BERHAD 2016

204 SO : FIBER INFRA WORKS AT CELCOM SITE - JALAN KIA PENG, KUALA LUMPUR CIVIL AND FIBER PULLING 38,941.78 TIME DOT COM BERHAD 2016

205 SO : CIVIL AND FIBER PULLING AT SUCCESS ELECTRONIC CIVIL AND FIBER PULLING 17,713.46 TIME DOT COM BERHAD 2016

206 SO : CIVIL AND FIBER FOR VISI CENDERAWASIH @ PTTC IPOH, PERAK CIVIL AND FIBER PULLING 33,541.49 TIME DOT COM BERHAD 2016

FTK FOR PROPOSED NEW INFRASTRUCTURE OF CIVIL AND FIBER PULLING FROM 207 CIVIL AND FIBER PULLING 209,880.00 TIME DOT COM BERHAD 2017 JALAN TAMAN BUKIT MALURI TO KIARA 5

PROPOSED FIBER INFRASTRUCTURE WORK AT SOUTHVIEW SERVICES APARTMENT 208 CIVIL AND FIBER PULLING 77,829.52 TIME DOT COM BERHAD 2017 BANGSAR, KUALA LUMPUR

SO : PROPOSED NEW FIBER INFRA TO GRAND WEIL HOTEL, JALAN SULTAN IDRIS, 209 CIVIL AND FIBER PULLING 105,292.10 TIME DOT COM BERHAD 2017 IPOH, PERAK NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

INSTALLATION OF 132KV SUBSTATION INCLUDING PEMBINAAN TERAS MAJU 210 PMU 132KV BUKIT TENGAH REHAB (STAGE 3 ), PULAU PINANG 1,100,000.00 2017 CABLING, TESTING & COMMISIONING SDN BHD

2W CIVIL AND 48F PULLING WORK FOR MAISSON ARA DAMANSARA TO EXISTING 211 CIVIL AND FIBER PULLING 176,893.85 TIME DOT COM BERHAD 2017 TIME M/HOLE

PROJEK MASS RAPID TRANSIT LEMBAH KELANG JAJARAN SUNGAI BULOH - KAJANG MUDAJAYA CORPORATION 212 PACKAGE V3 : CONSTRUCTION AND COMPLETION OF VIADUCT GUIDEWAY AND SUPPLY & INSTALLATION TRAFFIC LIGHT SYSTEM 1,283,310.20 2017 BERHAD OTHER ASSOCIATED WORKS FROM DATARAN SUNWAY STATION TO SECTION 17

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF NGDS TO PULAU INDAH FL STAGE 1/16, SELANGOR HALAL HUB, PULAU 213 AND COMMISSIONING OF NPS 8 AND NPS 4 STEEL 485,290.00 GAS MALAYSIA BERHAD 2017 INDAH, SELANGOR DARUL EHSAN (LONGSON FOOD PRODUCTS SDN BHD) PIPES - 324M

EPCC OF NGDS TO SENDAYAN FL STAGE 2/16, SENDAYAN TECH VALLEY, SEREMBAN 2, ENGINEERING, PROCUREMENT, CONSTRUCTION 214 NEGERI SEMBILAN DARUL KHUSUS (VIO STAR INTERNATIONAL (M) SDN BHD AND AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL 662,700.00 GAS MALAYSIA BERHAD 2017 DAIHATSU ENGINE MANUFACTURING SDN BHD) PIPES -1290M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO TANJUNG LANGSAT FL STAGE 3/16, TANJUNG LANGSAT, 215 AND COMMISSIONING OF NPS 8, NPS 6 AND NPS 4 692,700.00 GAS MALAYSIA BERHAD 2017 JOHOR DARUL TAKZIM (KIRAN GLOBAL ALKALI SDN BHD) STEEL PIPES -1688M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO TANJUNG LANGSAT FL STAGE 4/16, TANJUNG LANGSAT, 216 AND COMMISSIONING OF NPS 8 AND NPS 4 STEEL 228,600.00 GAS MALAYSIA BERHAD 2017 JOHOR DARUL TAKZIM (POLYNT COMPOSITE MALAYSIA SDN BHD) PIPES -264M

EPCC OF THE NGDS TO TANJUNG LANGSAT FL STAGE 5/16, TANJUNG LANGSAT, ENGINEERING, PROCUREMENT, CONSTRUCTION 217 223,900.00 GAS MALAYSIA BERHAD 2017 JOHOR DARUL TAKZIM (NORMAN PROCESS OILS MALAYSIA PLANT SDN BHD) AND COMMISSIONING OF NPS 4 STEEL PIPES -60M

PROJEK MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH-SERDANG-PUTRAJAYA (SSP) UNDERGROUND WORKS PACKAGE: DESIGN, CONSTRUCTION AND COMPLETION OF MMC GAMUDA KVMRT (T) 218 END CAPPING WORK AT PETRONAS KG. BARU 58,000.00 2017 TUNNELS, STATION AND ASSOCIATED STRUCTURES FROM JALAN IPOH NORTH ESCAPE SDN BHD SHAFT TO DESA WATERPARK SOUTH PORTAL

EPCC OF THE NGDS TO KAPAR FL STAGE 5/16, KAPAR, KLANG, SELANGOR DARUL ENGINEERING, PROCUREMENT, CONSTRUCTION 219 289,000.00 GAS MALAYSIA BERHAD 2017 EHSAN (SUNWAY VCP SDN BHD) AND COMMISSIONING OF NPS 4 STEEL PIPES -48M

EPCC OF THE NGDS TO MERU FL STAGE 2/16, KLANG, SELANGOR DARUL EHSAN ENGINEERING, PROCUREMENT, CONSTRUCTION 220 250,000.00 GAS MALAYSIA BERHAD 2017 (IDEAL QUALITY SDN BHD) AND COMMISSIONING OF NPS 4 STEEL PIPES -36M NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

EPCC OF THE NGDS TO PASIR GUDANG FL STAGE 3/16, PASIR GUDANG, JOHOR DARUL ENGINEERING, PROCUREMENT, CONSTRUCTION 221 298,000.00 GAS MALAYSIA BERHAD 2017 TAKZIM (ALMER MALAYSIA SDN BHD) AND COMMISSIONING OF NPS 4 STEEL PIPES -60M

EPCC OF THE NGDS TO YONG PENG FL STAGE 1/17, YONG PENG, JOHOR DARUL ENGINEERING, PROCUREMENT, CONSTRUCTION 222 268,000.00 GAS MALAYSIA BERHAD 2017 TAKZIM (TEO SENG FEEDMILLS SDN BHD) AND COMMISSIONING OF NPS 4 STEEL PIPES -84M

FULL TURNKEY FOR PROPOSED NEW INFRASTRUCTURE OF CIVIL AND FIBER PULLING 223 CIVIL AND FIBER PULLING 2,099,880.00 TIME DOT COM BERHAD 2017 FROM JALAN TAMAN BUKIT MALURI TO KIARA 5

FULL TURNKEY TO BUILD CIVIL AND FIBER INFRASTRUCTURE WORK AT SRI 224 CIVIL AND FIBER PULLING 495,180.00 TIME DOT COM BERHAD 2017 KEMBANGAN

FULL TURNKEY TO BUILD CIVIL AND FIBER INFRASTRUCTURE WORK FOR DESA PARK 225 CIVIL AND FIBER PULLING 282,108.92 TIME DOT COM BERHAD 2017 CITY MAN PROJECT

226 COVERAGE: AS-BUILD : FIBER AND CIVIL INFRASTRUCTURE WORK FOR KIPARK MAN CIVIL AND FIBER PULLING 171,592.80 TIME DOT COM BERHAD 2017

SO DRIVEN (DIGI): OVERHEAD INFRA AND FIBER PULLING FOR DIGI DONG RESILIENCY 227 CIVIL AND FIBER PULLING 56,474.02 TIME DOT COM BERHAD 2017 TOWN AREA

SERVICE ORDER: PROPOSED FIBER INFRASTRUCTURE FOR TNB PMU PROJECT RAUB 228 CIVIL AND FIBER PULLING 98,985.61 TIME DOT COM BERHAD 2017 SITE-PERMANENT SOLUTION

SERVICE ORDER: PROPOSED FIBER INFRASTRUCTURE WORK AT TNB PMU BENTONG, 229 CIVIL AND FIBER PULLING 54,504.59 TIME DOT COM BERHAD 2017 PAHANG

EPCC OF NGDS TO BUKIT RAJA FL STAGE 1/16, BUKIT RAJA PRIME INDUSTRIAL PARK ENGINEERING, PROCUREMENT, CONSTRUCTION 230 240,000.00 GAS MALAYSIA BERHAD 2017 KLANG. AND COMMISSIONING OF NPS 4 STEEL PIPES -36M

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF NGDS TO SITIAWAN FL STAGE 1/16, KAMPUNG ACHEH INDUSTRIAL ESTATE, 231 AND COMMISSIONING OF NPS 8 - 192M, NPS 6 - 428,000.00 GAS MALAYSIA BERHAD 2017 SITIAWAN, PERAK. 408M AND NPS 4 - 48M STEEL PIPES NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF NGDS TO GEBENG FL STAGE 2/17 GEBENG INDUSTRIAL AREA, KUANTAN, 232 AND COMMISSIONING OF NPS 12 - 300M, NPS 8 - 1,830,000.00 GAS MALAYSIA BERHAD 2017 PAHANG DARUL MAKMUR. 2,688M AND NPS 6 - 12M STEEL PIPES

TO SUPPLY, DELIVER, INSTALL, TEST AND PEMBINAAN TERASMAJU 233 KERJA- KERJA PMU 132/33KV BERANANG ICT (2x90MVA) SELANGOR 201,135.00 2017 COMMISIONNING SDN BHD

TO SUPPLY, DELIVER, INSTALL, TEST AND PEMBINAAN TERASMAJU 234 KERJA- KERJA PMU 132/33KV NEW TELUK INTAN PERAK 420,555.00 2017 COMMISIONNING SDN BHD

SUPPLY OF THREE (3) UNITS OF 132kV 30MVAR SHUNT CAPACITOR BANK DAMPING REACTOR (0.5%) , THREE UNITS OF 132kV 30MVAR SHUNT CAPACITOR BANK DAMPING REACTOR (6.0%), SUPPLY AND DELIVERY OF SHUNT CAPACITOR BANK DAMPING REACTOR TO ASSET THREE (3) UNITS OF 132kV 60 MVAR SHUNT 235 1,220,000.00 TRANSPRO SDN BHD 2017 MAINTENANCE DEPARTMENT, TNB TRANSMISSIO AS STRATEGIC SPARES CAPACITOR BANK DAMPING REACTOR (0.5%), THREE (3) UNITS OF 132kV 60MVAR SHUNT CAPACITOR DAMPING REACTOR (6.0%) TO ASSET MAINTENANCE DEPARTMENT, TNB TRANSMISSION AS STRATEGIC SPARES

SUPPLY OF 275kV SURGE ARRESTER FOR ASSET MAINTENANCE, TRANSMISSION SUPPLY AND DELIVERY OF 90 UNITS 275kV SURGE 236 910,000.00 TRANSPRO SDN BHD 2017 DIVISION, TNB ARRESTER

ENGINEERING, PROCUREMENT, CONSTRUCTION 237 EPCC OF NGDS TO KAMUNTING FL STAGE 2/17, TAIPING, PERAK DARUL RIDZUAN AND COMMISSIONING OF NPS 8 - 240M, NPS 6 - 347,000.00 GAS MALAYSIA BERHAD 2018 24M STEEL PIPES

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF NGDS TO PULAU INDAH FL STAGE 3/17, PULAUN INDAH INDUSTRIAL PARK 238 AND COMMISSIONING OF NPS 8 - 228M, NPS 4 - 286,000.00 GAS MALAYSIA BERHAD 2018 (PHASE 2A), KLANG, SELANGOR DARUL EHSAN. 24M STEEL PIPES

TO SUPPLY, DELIVER, INSTALL, TEST AND PEMBINAAN TERASMAJU 239 KERJA- KERJA PMU 132/33KV BATU RAKIT EXTENSION (1x45MVA) 182,850.00 2018 COMMISIONNING SDN BHD

EPCC OF NGDS TO SENAWANG FL STAGE 1/17, SENAWANG INDUSTRIAL AREA, ENGINEERING, PROCUREMENT, CONSTRUCTION 240 239,000.00 GAS MALAYSIA BERHAD 2018 SENAWANG, NEGERI SEMBILAN DARUL KHUSUS. AND COMMISSIONING OF NPS 4 - 24M STEEL PIPES

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF NGDS TO BUKIT RAJA FL STAGE 1/17, BUKIT RAJA PRIME INDUSTRIAL PARK, 241 AND COMMISSIONING OF NPS 6 - 504M,NPS 4 - 319,500.00 GAS MALAYSIA BERHAD 2018 BUKIT RAJA, SELANGOR DARUL EHSAN. 36M STEEL PIPES

CIVIL AND PULLING FOR UMOBILE HUTAN MELINTANG (MELI), TAMAN DESA 242 CIVIL AND FIBER PULLING 29,518.08 TIME DOT COM BERHAD 2018 MELINTANG BARU FASA LI, PERAK

243 CIVIL AND PULLING FOR UMOBILEPULAU JUAR, PERAK CIVIL AND FIBER PULLING 13,713.82 TIME DOT COM BERHAD 2018 NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

244 CIVIL AND PULLING FOR UMOBILE SLIM RIVER EXIT (PBNS) CIVIL AND FIBER PULLING 170,053.25 TIME DOT COM BERHAD 2018

245 CIVIL AND PULLING FOR UMOBILE KOTA SETIA (KTST)) CIVIL AND FIBER PULLING 81,911.31 TIME DOT COM BERHAD 2018

246 CIVIL AND PULLING FOR UMOBILE KEM PLKN SUNGKAI (KPSK) SUNGKAI, PERAK. CIVIL AND FIBER PULLING 33,829.74 TIME DOT COM BERHAD 2018

FIBER PULLING (550M) FOR ATELIER CONSTRUCTION SDN BHD AT SHELL STATION, 247 CIVIL AND FIBER PULLING 13,148.17 TIME DOT COM BERHAD 2019 HENTIAN RTC GOPENG MUKIM SIMPANG PULAI, PERAK

FIBER PULLING (260M) FOR ATELIER CONSTRUCTION SDN BHD AT SHELL STATION, 248 CIVIL AND FIBER PULLING 10,277.17 TIME DOT COM BERHAD 2019 HENTIAN ALOR PONGSU PERAK.

(BBB 90964) CADANGAN MSVT BAGI MENGATASI ISU FEEDER PANJANG & NTL TO LAY 2 WAY AND 3 WAY 160MM HDPE PN10 BY 249 700,000.00 MUTU NUSANTARA / TNB 2019 ELEMENT PADA PMU SSWW (F05) SEBANYAK 0.6mw (PMU SSW 11kV, TNB BANGI) HDD METHOD

INSTALLATION, TESTING AND COMMISIONING OF 33KV ALUMINIUM XLPE SINGLE TO SUPPLY HDD MACHINE, PILOTING, REAMING 250 CORE UNDERGROUND CABLES, UNDERGROUND AND ACCESSORIES FROM PMU KOTA 1,200,000.00 MUTU NUSANTARA / TNB 2019 AND PULLING 4 WAY HDPE 6" AND WAY 4" DAMANSARA TO PPU TROPICANA 2 FOR TNB DISTRIBUTION SELANGOR

KERJA-KERJA MEMBAIKPULIH, MENGUJI DAN MEMULATUGAS PENGECAS MODEL 110 TPR 50 BUATAN SAFT NIFE DI PENCAWANG MASUK UTAMA BATU GAJAH (BGJH) TENAGA NASIONAL 251 REFURBISH CHARGER 55,000.00 2019 275kV DIBAWAH JAGAAN UNIT PERLINDUNGAN DAN AUTOMASI JABATAN BERHAD SENGARAAN GRID UTARA (SUBZONE - IPOH)

PEMBEKALAN PERALATAN PENCAWANG DI PMU 75/132KV NATIONAL UNIVERSITY TENAGA NASIONAL 252 MATERIAL SUPPLY 128,220.00 2019 (NUNI) DAN PMU 275KV SERDANG (SRDG) BERHAD

KERJA-KERJA MEMBAIKPULIH, MENGUJI DAN MEMULATUGAS PENGECAS BATERI BANK DI PENCAWANG MASUK UTAMA BINTANG (BTNG) 132kV DIBAWAH JAGAAN TENAGA NASIONAL 253 REFURBISH DC CHARGER 48,000.00 2019 UNIT PERLINDUNGAN DAN AUTOMASI JABATAN SENGARAAN GRID UTARA (SUBZONE BERHAD - IPOH)

TO SUPPLY, DELIVER, INSTALL, TEST AND PEMBINAAN TERASMAJU 254 KERJA- KERJA PMU 132/33KV BERANANG ICT (2x90MVA) SELANGOR 201,135.00 2019 COMMISIONNING SDN BHD

MENAIKTARAF LALUAN FT60 DARI DAMAR LAUT KE CHANGKAT JERING (PAKAEJ 2A), 255 CIVIL AND FIBER PULLING 220,682.37 TUMPUAN BINA SDN BHD 2019 PERAK

DISTRIBUTION CABLE (D/SIDE) FROM FXC OUTDOOR CABINET TO OUTDOOR 256 CIVIL AND FIBER PULLING 148,000.00 TIME DOT COM BERHAD 2019 PEDESTAL TROPICANA AMAN CHERIA, SLEANGOR. NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

MENAIKTARAF LALUAN FT60 DARI DAMAR LAUT KE CHANGKAT JERING (PAKEJ 1: 257 CIVIL AND FIBER PULLING 340,579.97 MEGA SASA SDN BHD ON GOING CH0-CH10400)

UNIT PERMODENAN MEREKA BENTUK DAN MEMBANGUN INFRASTRUKTUR PUSAT DATA SERTA TADBIRAN DAN ONGOING MEMBEKAL, MEMASANG, MENGUJI, MENTAULIAH DAN MENYELENGGARA MEREKA BENTUK DAN MEMBANGUN 258 44,838,000.00 PERANCANGAN (MAINTENANCE UP PERALATAN INFRASTRUKTUR PUSAT DATA DI BANGUNAN BUSINESS CENTRE II, INFRASTRUKTUR PUSAT DATA PENGURUSAN MALAYSIA TO 2020 KULIM HI-TECH PARK, KEDAH (MAMPU)

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF NGDS TO BESTARI JAYA FL STAGE 1/17 (REINFORCEMENT), BESTARI JAYA, 259 AND COMMISSIONING OF NPS 16 - 8,400M, NPS 8 - 4,470,000.00 GAS MALAYSIA BERHAD ON GOING SELANGOR DARUL EHSAN 240M STEEL PIPES

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF NGDS TO KLUANG FL STAGE 2/17 (REINFORCEMENT), KLUANG, JOHOR 260 AND COMMISSIONING OF NPS 12 - 15,480M, NPS 8,298,000.00 GAS MALAYSIA BERHAD ON GOING DARUL TAKZIM 8 - 24M, NPS 6 - 60M STEEL PIPES

FULL TURNKEY FOR UNDERGROUND CIVIL & FIBRE INFRASTRUCTURE WORK FROM 261 CIVIL AND FIBER PULLING 2,330,000.00 TIME DOT COM BERHAD ON GOING BUKIT KERAYONG TO SIMPANG ASSAM JAWA

FULLY TURNKEY FOR NEW CIVIL & FIBER INFRASTRUCTURE FOR RAWANG MAN PH3 AWARDED, 262 CIVIL AND FIBER PULLING 1,052,000.00 TIME DOT COM BERHAD AND PANGSAURI SERI CEMPAKA (USP CLAWBACK PROJECT 2017) ENGINEERING STAGE

PROJECT MASS RAPID TRANSIT LALUAN 2: SUNGAI BULOH-SERDANG-PUTRAJAYA MMC GAMUDA KVMRT (T) AWARDED, 263 REINSTATEMENT OF GAS PIPELINES 1,898,000.00 (SPP) REINSTATEMENT OF GAS PIPELINES FOR KAMPUNG BARU NORTH STATION SDN BHD ENGINEERING STAGE

NEW FIBER PULLING AT PLUS HIGHWAY (AYER KEROH TO SEREMBAN) 264 1. AYER KEROH - PEDAS LINGGI (MULTIPLE LOCATIONS) FIBER PULLING 245,000.00 TIME DOT COM BERHAD ON GOING 2.PEDAS LINGGI - SENAWANG (END TO END) ENGINEERING, PROCUREMENT, CONSTRUCTION AND COMMISSIONING OF ENGINEERING, PROCUREMENT, CONSTRUCTION NATURAL GAS DISTRIBUTION SYSTEM TO BANDAR SULTAN SULAIMAN FL STAGE AWARDED, 265 AND COMMISSIONING OF NPS 6 STEEL PIPES - 297,500.00 GAS MALAYSIA BERHAD 1/20, BANDAR SULTAN SULAIMAN INDUSTRIAL AREA, KLANG SELANGOR DARUL ENGINEERING STAGE 396M AND NPS 4 STEEL PIPES - 24M EHSAN

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF NGDS TO NILAI DL STAGE 1/20, NILAI INDUSTRIAL AREA, NILAI, NEGERI AWARDED, 266 AND COMMISSIONING OF NPS 4 STEEL PIPES -80M 137,500.00 GAS MALAYSIA BERHAD SEMBILAN DARUL KHUSUS ENGINEERING STAGE PE 63MM ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF NGDS TO TONGKANG PECHAH FL STAGE 1/20, TONGKANG PECHAH AWARDED, 267 AND COMMISSIONING OF NPS 4 STEEL PIPES -12M 277,500.00 GAS MALAYSIA BERHAD INDUSTRIAL ESTATE JOHOR DARUL TAKZIM ENGINEERING STAGE AND NPS 6 STEEL PIPES 228M

EPCC OF NGDS TO TANGJUNG LANGSAT FL STAGE 2/20, TANJUNG LANGSAT ENGINEERING, PROCUREMENT, CONSTRUCTION AWARDED, PENDING 268 137,000.00 GAS MALAYSIA BERHAD INDUSTRIAL COMPLEX, JOHOR DARUL TAKZIM AND COMMISSIONING OF NPS 4 STEEL PIPES 84M LETTER OF AWARD

SHORTLISTED, PENDING BOARD 269 MANAGE SERVICES (IT OUTSOURCING) IT OUTSOURCING FOR TOUCH 'N GO SDN BHD 2,247,000.00 TOUCH 'N GO SDN BHD COMMITTEE FOR AWARD NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR

SHORTLISTED, MEREKABENTUK, MEMBANGUN, MEMBEKAL, MEMASANG, MENGKONFIGURASI, KEMENTERIAN PENDING BOARD 270 ICT AND MAINTENANCE FOR MINDEF 37,800,000.00 MENGUJI DAN MENTAULIAH PUSAT DATA BERSEPADU KEMENTERIAN PERTAHANAN PERTAHANAN MALAYSIA COMMITTEE FOR AWARD MEREKA BENTUK , MEMBEKAL, MENGHANTAR, MEMASANG, MENGKONFIGURASI, UNIT PERMODENAN SHORTLISTED, MENGUJI DAN MENTAULIAH PUSAT DATA MELIBATKAN SISTEM RANGKAIAN SERTA TADBIRAN DAN PENDING BOARD 271 KESELAMATAN, PERALATAN DAN PERISIAN TEKNOLOGI MAKLUMAT DAN ICT FOR MAMPU CLOUD 41,300,000.13 PERANCANGAN COMMITTEE FOR KOMUNIKASI (ICT) SERTA KHIDMAT SOKONGAN BAGI PENGGANTIAN PERALATAN PENGURUSAN MALAYSIA AWARD ICT DAN PUSAT PEMULIHAN BENCANA (DRC) APLIKASI KRITIKAL AGENSI (MAMPU) DESIGN, SUPPLY, INSTALL, TESTING, COMMISSIONING AND IMPLEMENTATION OF SHORTLISTED, AIRPORT DESIGN, SUPPLY, INSTALL, TESTING, MALAYSIA AIRPORTS PENDING BOARD 272 COLLABORATIVE DECISION MAKING (A-CDM) INCLUDING COMPREHENSIVE COMMISSIONING, 20,600,000.00 (SEPANG) SDN BHD COMMITTEE FOR MAINTENANCE FOR IMPLEMENTATION AND MAINTENANCE AWARD MALAYSIA AIRPORTS (SEPANG) SDN. BHD.

CONTRACT FOR THE SUPPLY AND DELIVERY OF 3 LAYER PE COATED (3 LPE) STEEL SUPPLY AND DELIVERY OF 3 LAYER PE COATED (3 PRE- QUALIFICATION 273 42,000,000.00 GAS MALAYSIA BERHAD LINE PIPE TO GMB LPE) STEEL LINE PIPE TO GMB STAGE

CONTRCT FOR ENTENDED UNINTERRUPTABLE POWER SUPPLY (UPS) AND 274 EXTENDED UPS AND SUPPLY SMART RACK 1,229,430.40 GAS MALAYSIA BERHAD TENDERING STAGE IMPLEMENTATION OF SMART RACK SOLUTION FOR GAS MALAYSIA

ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF NGDS TO ENSTEK FL STAGE 1/20, TECHPARK 2 @ ENSTEK, NEGERI 275 AND COMMISSIONING OF NPS 4 STEEL PIPES - 406,440.00 GAS MALAYSIA BERHAD TENDERING STAGE SEMBILAN DARUL KHUSUS 132M AND NPS 6 STEEL PIPES- 324M

EPCC OF NGDS TO PASIR GUDANG FL STAGE 1/20, PASIR GUDANG INDUSTRIAL ENGINEERING, PROCUREMENT, CONSTRUCTION 276 296,000.00 GAS MALAYSIA BERHAD TENDERING STAGE AREA, PASIR GUDANG JOHOR DARUL TAKZIM AND COMMISSIONING OF NPS 4 STEEL PIPES -12M