Company Profile List of Projects Fusionspace Solutions Sdn Bhd List of Projects

Total Page:16

File Type:pdf, Size:1020Kb

Company Profile List of Projects Fusionspace Solutions Sdn Bhd List of Projects FUSIONSPACE Delivering Solutions Beyond Expectations COMPANY PROFILE LIST OF PROJECTS FUSIONSPACE SOLUTIONS SDN BHD LIST OF PROJECTS NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR ENGINEERING, PROCUREMENT, CONSTRUCTION MASMIRIN CORPORATION AND COMMISSIONING OF NPS 12 STEEL PIPE LINE 1 EPCC OF NGDS TO NIBONG TEBAL FL1 DL1, NIBONG TEBAL, PENANG 4,800,000.00 SDN BHD / GAS MALAYSIA 2004/2005 CONSTRUCTION OF ODORIZER BUILDING AND SDN BHD ODORIZER SYSTEM - 32 KM ENGINEERING, PROCUREMENT, CONSTRUCTION MASMIRIN CORPORATION 2 EPCC OF NGDS TO PRAI FL DL STAGE 1/03, PRAI IND. AREA, PENANG AND COMMISSIONING OF NPS 12 STEEL PIPES - 3,200,000.00 SDN BHD / GAS MALAYSIA 2005 8KM SDN BHD ENGINEERING, PROCUREMENT, CONSTRUCTION MASMIRIN CORPORATION 3 EPCC OF NGDS TO PRAI FL DL (LOOPING) STAGE 1/03, PRAI IND. AREA, PENANG AND COMMISSIONING OF NPS 8 STEEL PIPES - 2,800,000.00 SDN BHD / GAS MALAYSIA 2005 4.5KM SDN BHD EPCC OF THE NGDS TO TAMAN MAKMUR FL STAGE 1/08, KULIM, KEDAH DARUL ENGINEERING, PROCUREMENT, CONSTRUCTION 4 1,200,000.00 GAS MALAYSIA BERHAD 2009 AMAN AND COMMISSIONING OF NPS 8 STEEL PIPES - 4KM ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO SUNGAI PETANI FL STAGE 1/09, SUNGAI PETANI, KEDAH 5 AND COMMISSIONING OF NPS 8 STEEL PIPES - 145,000.00 GAS MALAYSIA BERHAD 2009 DARUL AMAN 0.4KM ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO KUNDANG FL STAGE 1/10, KUNDANG INDUSTRIAL AREA, 6 AND COMMISSIONING OF NPS 6 STEEL PIPES - 418,455.00 GAS MALAYSIA BERHAD 2009 RAWANG, SELANGOR DARUL EHSAN 0.7KM ENGINEERING, PROCUREMENT, CONSTRUCTION 7 EPCC OF GPRW AT PUTRA INTERCHANGE, PUTRAJAYA AND COMMISSIONING OF NPS 16 STEEL PIPES - 1,111,000.00 GAS MALAYSIA BERHAD 2009 720M EPCC OF GPRW AT CADANGAN MEMBINA JLN PINTAS DARI SENGKANG (J104) KE ENGINEERING, PROCUREMENT, CONSTRUCTION 8 FELDA INAS BANDAR TENGGARA, JALAN JOHOR BAHRU-AIR HITAM, KULAI, JOHOR AND COMMISSIONING OF NPS 8, NPS 4 STEEL PIPES 600,000.00 GAS MALAYSIA BERHAD Aug 2009 to Jan 2010 DARUL TAKZIM - 230M ENGINEERING, PROCUREMENT, CONSTRUCTION Dec 2009 to June 9 EPCC OF THE NGDS TO TEBRAU FL STAGE 1/10, TEBRAU, JOHOR DARUL TAKZIM AND COMMISSIONING OF NPS 6, NPS 4 STEEL PIPES 695,000.00 GAS MALAYSIA BERHAD 2010 - 226M NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO PANDAMAR FL STAGE 1/10, PANDAMAR, KLANG, SELANGOR 10 AND COMMISSIONING OF NPS 6, NPS 4 STEEL PIPES 595,000.00 GAS MALAYSIA BERHAD Dec 2009 to Oct 2010 DARUL EHSAN - 1416M ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO GAMBANG FL STAGE 1/10, GAMBANG, PAHANG DARUL 11 AND COMMISSIONING OF NPS 8, NPS 6, NPS 4 865,500.00 GAS MALAYSIA BERHAD 2010 MAKMUR STEEL PIPES - 2292M ENGINEERING, PROCUREMENT, CONSTRUCTION THE EPCC OF NGDS TO STX PRECISION SDN BHD IN NIBONG TEBAL, PULAU PINANG March 2010 to June 12 AND COMMISSIONING OF 63MM PE SERVICE LINE. - 88,000.00 GAS MALAYSIA BERHAD INCLUSIVE OF THE STATION CIVIL WORK 2010 600M ENGINEERING, PROCUREMENT, CONSTRUCTION April 2010 to August 13 EPCC OF THE NGDS TO PRAI DL STAGE 1/10, PRAI, PULAU PINANG AND COMMISSIONING OF 125MM AND 63MM PE 202,610.00 GAS MALAYSIA BERHAD 2010 PIPES. - 500M ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC AND COMMISSIONING OF THE NGDS TO CHENG FL STAGE 1/10, CHENG April 2010 to July 14 AND COMMISSIONING OF NPS 4 STEEL PIPES - 83,000.00 GAS MALAYSIA BERHAD INDUSTRIAL AREA, MELAKA 2010 200M ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO KAMUNTING FL STAGE 3/10, KAMUNTING, PERAK DARUL June 2010 to October 15 AND COMMISSIONING OF NPS 6 & NPS 4 STEEL 169,873.00 GAS MALAYSIA BERHAD RIDZUAN 2010 PIPES - 300M ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF NGDS TO LATEXX, PLANT 1 IN KAMUNTING, PERAK DARUL RIDZUAN April 2010 to July 16 AND COMMISSIONING OF NPS 4 STEEL SERVICE 94,923.00 GAS MALAYSIA BERHAD INCLUSIVE OF STATION CIVIL WORKS 2010 LINE - 600M EPCC OF THE NGDS TO SHAH ALAM DL STAGE 1/10, SHAH ALAM, SELANGOR DARUL ENGINEERING, PROCUREMENT, CONSTRUCTION 17 281,500.00 GAS MALAYSIA BERHAD 2010 EHSAN AND COMMISSIONING OF PE 125MM - 25M ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO GEBENG FL STAGE 1/10, GEBENG INDUSTRIAL AREA, PAHANG June 2010 to March 18 AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL 1,085,000.00 GAS MALAYSIA BERHAD DARUL MAKMUR 2011 SERVICE LINE - 2904M NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO SHAH ALAM FL DL STAGE 1/10, SHAH ALAM, SELANGOR DARUL June 2010 to Oct 19 AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL 445,000.00 GAS MALAYSIA BERHAD EHSAN 2011 SERVICE LINE - 540M ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO NORTH PORT DL STAGE 1/10, NORTH PORT, SELANGOR DARUL 20 AND COMMISSIONING OF PE 125MM, PE 90MM 195,000.00 GAS MALAYSIA BERHAD 2010 EHSAN AND PE 63MM - 300M ENGINEERING, PROCUREMENT, CONSTRUCTION 21 EPCC OF THE NGDS TO PUTRAJAYA FL STAGE 1/10, PRECINCT 18, PUTRAJAYA AND COMMISSIONING OF NPS 4 STEEL SERVICE 59,500.00 GAS MALAYSIA BERHAD 2010 LINE - 60M ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO SERI KEMBANGAN FL STAGE 2/10, SERI KEMBANGAN, August 2010 to 22 AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL 1,038,364.25 GAS MALAYSIA BERHAD SELANGOR DARUL EHSAN February 2011 PIPES - 3800M ENGINEERING, PROCUREMENT, CONSTRUCTION September 2010 to 23 EPCC OF THE NGDS TO NIBONG TEBAL FL STAGE 1/10, NIBONG TEBAL, PULAU PINANG AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL 130,280.00 GAS MALAYSIA BERHAD January 2011 PIPES - 800M ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE GPRW AT KERJA-KERJA MENGGANTIKAN JAMBATAN DI LALUAN A125, AND COMMISSIONING OF NPS 12 STEEL PIPES 24 454,410.00 GAS MALAYSIA BERHAD 2010 JALAN AYER TAWAR-SIMPANG LIMA, DAERAH MANJUNG, PERAK DARUL RIDZUAN WITH 2 NOS HOT TAPPING STOPPLE OF 12" X 12" - 200M ENGINEERING, PROCUREMENT, CONSTRUCTION EPCC OF THE NGDS TO KUALA KETIL FL STAGE 1/10, KUALA KETIL, KEDAH DARUL 25 AND COMMISSIONING OF NPS 6 AND NPS 4 STEEL 495,000.00 GAS MALAYSIA BERHAD Dec 2010 AMAN PIPES - 1100M KOMASI GENTING PURA KENCANA, BATU PAHAT PROPOSED STREET LIGHTING INSTALLATION COMMUNICATIONS SDN 26 CIVIL AND FIBER PULLING 381,820.00 2010 FOR PHASE 1A AND PHASE 1B BHD / GPROPERTY CONSTRUCTION SDN. BHD. KOMASI GENTING INDAHPURA, KULAI PROPOSED STREET LIGHTING INSTALLATION FOR 82 COMMUNICATIONS SDN 27 CIVIL AND FIBER PULLING 106,070.00 2010 UNIT SEMI-DETACHED HOUSE, PACKAGE 3A AT ZONE 33 BHD / GPROPERTY CONSTRUCTION SDN. BHD. NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR KOMASI COMMUNICATIONS SDN 28 INFRA-DIGI AT PARIT RAJA INDUSTRIAL PARK, BATU PAHAT CIVIL AND FIBER PULLING 2,116,161.80 2010 BHD / TIME DOTCOM BERHAD KOMASI COMMUNICATIONS SDN 29 PROPOSED OSP CIVIL TO DIGI CABIN AT BANDAR PUTRA, SEGAMAT JOHOR CIVIL AND FIBER PULLING 1,67,059.45 2010 BHD / TIME DOTCOM BERHAD KOMASI COMMUNICATIONS SDN 30 FIBER PULLING TO DIGI AT SEGAMAT, JOHOR CIVIL AND FIBER PULLING 151,786.02 2010 BHD / TIME DOTCOM BERHAD KOMASI COMMUNICATIONS SDN 31 INFRA & FIBER PULL -(DIGI MSC PRO KEPONG IND PARK) CIVIL AND FIBER PULLING 491,298.19 2010 BHD / TIME DOTCOM BERHAD KOMASI COMMUNICATIONS SDN 32 INFRA & FIBER - DIGI CABIN AT MIMALAND TO MH AT UIA GOMBAK (1 ROUTE) CIVIL AND FIBER PULLING 581,327.20 2010 BHD / TIME DOTCOM BERHAD KOMASI COMMUNICATIONS SDN 33 INFRA-PROPOSED OSP CIVIL TO DIGI CABIN AT GEMERAH, SEGAMAT, JOHOR CIVIL AND FIBER PULLING 131,729.24 2010 BHD / TIME DOTCOM BERHAD KOMASI COMMUNICATIONS SDN 34 FIBER PULLING (IB 48C)- DIGI PROJECT AT MIMALAND (ROUTE 2) CIVIL AND FIBER PULLING 1,072,413.02 2010 BHD / TIME DOTCOM BERHAD ELECTRIFIED DOUBLE TRACK PROJECT -SEREMBAN TO GEMAS PACKAGE KOMASI 1–CONSTRUCTION AND COMPLETION OF FIBER OPTIC CABLES RELOCATION WORK 35 CIVIL AND FIBER PULLING 209,960.00 COMMUNICATIONS SDN 2010 (ENGINEERING SERVICES) SECTION 7 (CH482.410-CH486.070 & CH488.450-CH490.300 BHD / FIBERAIL SDN BHD ) ELECTRIFIED DOUBLE TRACK PROJECT -SEREMBAN TO GEMAS PACKAGE KOMASI 2–CONSTRUCTION AND COMPLETION OF FIBER OPTIC CABLES RELOCATION WORK 36 CIVIL AND FIBER PULLING 210,478.10 COMMUNICATIONS SDN 2010 (ENGINEERING SERVICES) SECTION 2A (CH500.775-CH504.141 & CH505.150- BHD / FIBERAIL SDN BHD CH506.990) NO PROJECT TITLE DESCRIPTIONS VALUE (RM) OWNER / CLIENT YEAR ELECTRIFIED DOUBLE TRACK PROJECT -SEREMBAN TO GEMAS PACKAGE 2 KOMASI 37 –HORIZONTAL DIRECT DRILLING (HDD) INSTALLATION WORKS SECTION 2A CIVIL AND FIBER PULLING 513,916.00 COMMUNICATIONS SDN 2010 (CH500.775-CH504.141 & CH505.150-CH506.990) BHD / FIBERAIL SDN BHD KOMASI PERLAKSANAAN PROJEK RANGKAIAN TEMPATAN TELEKOM MALAYSIA BERHAD 38 CIVIL AND FIBER PULLING 10,000,000.00 COMMUNICATIONS SDN 2010 SECARA JADUAL KADAR HARGA BHD / TM BERHAD SUPPLY & INSTALL OF 7 WAY 100MM DIA HDPE DUCTING BY HDD METHOD AND KOMASI TELEPHONE MANHOLE AND DUCTING FOR CADANGAN PEMBANGUNAN KAMPUS 39 CIVIL AND FIBER PULLING 245,310.00 COMMUNICATIONS SDN 2010 BARU UNIVERSITI KUALA LUMPUR (UNIKL) CAWANGAN JOHOR DI PASIR GUDANG, BHD / TRC SDN. BHD. JOHOR KOMASI PERLAKSANAAN PROJEK RANGKAIAN TEMPATAN TELEKOM MALAYSIA BERHAD 40 CIVIL AND FIBER PULLING 5,000,000.00 COMMUNICATIONS SDN 2010 SECARA JADUAL KADAR HARGA BHD / TM BERHAD KOMASI RELOCATION OF FIBER OPTIC CABLE AT SEREMBAN – TABOH NANING BETWEEN 41 CIVIL AND FIBER PULLING 205,089.72 COMMUNICATIONS SDN 2010 KP119.000 – KP 121.000 BHD / FIBERAIL SDN BHD KOMASI ELECTRIFIED DOUBLE TRACK PROJECT - SEREMBAN TO GEMAS PACKAGE 1 42 ELECTRIFIED DOUBLE TRACK 244,140.40 COMMUNICATIONS SDN 2010 –HORIZONTAL DIRECT DRILLING (HDD) INSTALLATION WORKS–ADDITIONAL NO 7 BHD / FIBERAIL SDN BHD KOMASI PROPOSED STREET LISTING INSTALLATION FOR 82 UNITS SEMI-DETACHED HOUSES, COMMUNICATIONS SDN 43 STREET LISTING INSTALLATION 106,070.00 2010 PACKAGE 3A AT ZONE 33.
Recommended publications
  • Table of Contents
    TABLE OF CONTENTS PAGE Introduction ANANDA KRISHNAN PROFILE AND BACKGROUND 3 - 8 MAXIS COMMUNICATION COMPANY PROFILE 9 - 12 ASTRO COMPANY PROFILE 13 - 20 STYLE OF LEADERSHIP 21 - 24 LEADERSHIP THEORY ADAPTATION 25 Conclusion 26 References 27 1 (a) Background of the leader: the aim of this section is to know and understand the leader as a person and the bases for his/her success. The data and information should be taken from any published sources such as newspapers, company reports, magazines, journals, books etc. INTRODUCTION ANANDA KRISHNAN Who is Ananda Krishnan? According to a report then by Bernama News Agency, the grandfathers of Tan Sri T. Ananda Krishnan and Tan Sri G. Gnanalingam had been brought to Malaysia from Jaffna by British colonial rulers to work in Malaysia¶s Public Works Department, a common practice then as Jaffna produced some of the most educated people in the whole country. Tan Sri Gnanalingam himself told one of our ministers that he wants to put something back into this country because his grandfather was Sri Lankan," Deputy Director-General of Sri Lanka's Board of Investment (BOI) Santhusht Jayasuriya had told a a group of visiting Malaysian journalists then, 2 according to the Bernama 2003 story. Gnanalingam, executive chairman of Malaysia's Westport, held talks with Prime Minister Ranil Wickremesinghe during a visit to Malaysia in 2003 and the former followed up with a visit to Colombo. In the same year a Memorandum of Understanding was formalized in March this year between 'Westport' and the Sri Lanka Ports Authority (SLPA). Westport is keen to invest in Sri Lanka but no formal process has begun.
    [Show full text]
  • CASTLE USER REFERENCE Security Door Access System
    CASTLE USER REFERENCE Security Door Access System 1 2Y COMMUNICATION ENGINEERING SND. BHD. 61 AMWAY (M) SDN.BHD. 2 38 BIDARA CONDOMINIUM 62 ANGKASA GLOBAL SDN.BHD. 3 3D NETWORKS (M) SDN.BHD. 63 ANGSANA ANJUNG 4 A ‘FARMOSA GOLF RESORT BERHAD (MELAKA) 64 ANTARA CONSOLIDATION SDN BHD 5 A ’FAMOSA WATER WORLD THEME PARK SDN.BHD. (MELAKA) 65 ANTARA EKSKLUSIF SDN.BHD. 6 A ’FARMOSA RESORT HOTEL SDN BHD (MELAKA) 66 APAC AUCTION CENTRE SDN BHD 7 A. MAXIMA BUSINESS & TECHNOLOGY SDN BHD 67 APL TECH BATTERY INDUSTRY SDN BHD 8 A.G.V.I.S GROUP 68 APLEX CORPORATION SDN BHD 9 ABB DAIMLER 69 APL-NOL (M) SDN BHD 10 ABDUL & ABDUL TECHNOLOGY S/B 70 APMCE 11 ABI CONSTRUCTION SDN.BHD. 71 APPLIED BUSINESS SYSTEMS SDN BHD. 12 ABIMA ENTERPRISE SDN BHD 72 APPLIED EQUIPMENT (PENANG) 13 ABRAR FINANCIAL HOLDINGS (M) BERHAD 73 AQM CONCEPT (M) SDN.BHD. 14 ABRAR UNIT TRUST MANAGEMENT BERHAD 74 AR DENTAL SUPPLIES SDN.BHD. 15 ABRIC BERHAD 75 ARCADIAN WIRELESS ASIA PACIFIC (M) SDN.BHD. 16 ABS APPLIED BUSINESS SYSTEMS 76 AREMAC INTERNATIONAL MARKETING PTE LTD 17 AC NEILSEN (MALAYSIA) SDN BHD 77 ARENSI HOLDINGS SDN BHD 18 ACE – TEX PLASTIC SND.BHD. 78 ARKIB NEGARA MALAYSIA 19 ACE SYNERGY INSURANCE BERHAD 79 AROSA BUILDINGS SDN BHD 20 ACM NETWORKS ADVERTISING & COM 80 ARTHUR ANDERSON 21 ACP INDUSTRIES BERHAD 81 ARTSTAMP SDN BHD 22 AC-TECH ENGINEERING SDN BHD 82 ASEA BROWN BOVORI HOLDINGS SDN. BHD. 23 ADC TECHNOLOGIES INTERNATIONAL PTE. LTD. 83 ASIA PACIFIC ZONE SYSTEM SDN.BHD. 24 ADEM INTERIOR 84 ASIA UNIT TRUST BERHAD.(KOMPLEKS KEWANGAN) 25 ADVANTEST-ENG (M) SDN BHD 85 ASIAN PAC HOLDING BERHAD 26 ADVERTISING DESIGN IMPACT CHALENGGER 86 ASSOCIATED LOCKSMITH OF AMERICA (SEREMBAN) 27 ADWORKS SDN BHD 87 ASSOCIATED PROPERTY SDN.BHD.
    [Show full text]
  • Webinars Launched Newsletter Of
    Webinars Launched Newsletter of “The Mapping Guru” Unearth A Masterpiece. EDITION Number 13 V16.7sp2 RELEASED THIS ARTICLE HIGHLIGHTS SOME OF THE KEY FEATURES OF THE RECENTLY RELEASED V16.7SP2. Petrosys has introduced webinars to the range of events available to new and existing users. pg 2 The webinars are a free and easy way to get insight, information and demonstrations of Petrosys products and workflows. PETROSYS ASIA EXPANSION READ ABOUT THE EXCITING CHANGES TAKING Learn from Petrosys Mapping Gurus at your PLACE IN OUR KUALA LUMPUR OFFICE, AND desk, listen to software tips and tricks, learn CATCH UP ON GENERAL EVENTS IN THE REGION. about new features, get started with our products and more. Upcoming webinars are: pg 3 The Petrosys plug-in for Petrel - Integrated Workflows CHECKSHOT NOW IN WDF Presenter: Nathan Balls WE EXPLAIN WHAT A CHECKSHOT Date/time: June 28 2010, 3pm (UTC +1) SURVEY IS, HOW TO IMPORT A SURVEY INTO A WDF AND HOW TO USE THE Geoscientists and engineers using Petrel can SURVEY DATA IN PETROSYS. learn how to present their insight, integrated from several data sources, with the benefits of the Petrosys plug-in. pg 4 What's New in Petrosys v16.8 Presenter: Andrew Weller PPDM 3.8 CULTURE COMPLIANCY Date/time: July 8 2010, 1pm (UTC +8) CLIENTS WITH THE PETROSYS DBMAP SPATIAL OPTION WILL BENEFIT FROM Discover ways in which the features and SPATIALISATION OF THE PETROSYS enhancements of v16.8 can streamline your DBMAP CULTURE MODULE. DISCOVER workflows. HOW. Jump Start to Using Petrosys pg 6 Presenter: Andrew Weller Date/time: July 22 2010, 10am (UTC -5) DEAR STEVE..
    [Show full text]
  • Malaysia Real Estate Highlights
    RESEARCH REAL ESTATE HIGHLIGHTS 2ND HALF 2016 KUALA LUMPUR PENANG JOHOR BAHRU KOTA KINABALU HIGHLIGHTS KUALA LUMPUR HIGH END CONDOMINIUM MARKET Despite the subdued market, there were noticeably more ECONOMIC INDICATORS launches and previews in the TABLE 1 second half of 2016. Malaysia’s Gross Domestic Product Completion of High End (GDP) grew 4.3% in 3Q2016 from 4.0% Condominiums / Residences in in 2Q2016, underpinned by private 2H2016 The secondary market, however, expenditure and private consumption. continues to see lower volume Exports, however, fell 1.3% in 3Q2016 of transactions due to the weak compared to a 1.0% growth in 2Q2016. economy and stringent bank KL Trillion lending guidelines. Amid growing uncertainties in the Jalan Tun Razak external environment, a weak domestic KL City market and continued volatility in the 368 Units The rental market in locations Ringgit, the central bank has maintained with high supply pipeline and a the country’s growth forecast for 2016 at weak leasing market undergoes 4.0% - 4.5% (2015: 5.0%). correction as owners and Le Nouvel investors compete for the same Headline inflation moderated to 1.3% in Jalan Ampang 3Q2016 (2Q2016: 1.9%). pool of tenants. KL City 195 Units Unemployment rate continues to hold steady at 3.5% since July 2016 (2015: The review period continues to 3.1%) despite weak labour market see more developers introducing conditions. Setia Sky creative marketing strategies and Residences - innovative financing packages Bank Negara Malaysia (BNM) lowered the Divina Tower as they look to meet their sales Overnight Policy Rate (OPR) by 25 basis Jalan Raja Muda KL City target and clear unsold stock.
    [Show full text]
  • Malaysian Gamer Spends Four Days Creating Scale Replica of Petronas Twin Towers in 'Minecraft
    Thursday, 28 May 2020 Malaysian gamer spends four days creating scale replica of Petronas Twin Towers in ‘Minecraft PETALING JAYA, May 28 — University student Yusri Haneef has created a stunning replica of the iconic Petronas Twin Towers in the world of Minecraft. The youth from Kuching, Sarawak told Malay Mail that he spent four days constructing the landmark in the sandbox video game, in which players can mine raw materials and build custom structures or earthworks. He did so with the help of fellow Minecraft gamer Yu Yi Hao and another player known by the username Ivine123. Yusri explained that the virtual version of the Petronas Twin Towers is part of their contribution towards the Build The Earth (BTE) project, a worldwide effort by players to recreate a scale replica of our planet in Minecraft. The most challenging part of the building process was ensuring that the replica was true to scale and resembled the landmark in terms of visuals, decorations, lighting, and more. “The BTE project focuses on a perfect recreation of the Earth in Minecraft on a one-to-one scale (one metre equals one block in-game) so we needed to take into account every measurement including height, length, decoration, number of floors, and lighting. “Google Maps alone was not enough to be a reference when recreating the buildings, so we would look for aerial pictures on Google, drone footage, and even vlogs that were uploaded on YouTube,” said Yusri. The 21-year-old and his fellow gamers are still working on building the Suria KLCC shopping mall at the base of the towers after completing the nearby KLCC Tower 3 and the Maxis Tower.
    [Show full text]
  • No. Name Address City Postcod State Country Off. No. Email 1 JING
    No. Name Address City Postcod State Country Off. No. Email [email protected] JING SHENG BG-16, JALAN MESTIKA / 1 CONSTRUCTION & CHERAS 56100 SELANGOR MALAYSIA 342957713 17, TAMAN MESTIKA [email protected] ENGINEERING SDN BHD om 2H OFFSHORE SUITE 16-3, 16TH FLOOR, KUALA WIL PER 2 50450 MALAYSIA 60321627500 [email protected] ENGINEERING SDN BHD WISMA UOA II, 21 JALAN LUMPUR K.LUMPUR LEVEL 8, BLOCK F, OASIS 3 3M MALAYSIA SDN BHD PETALING JAYA 47301 SELANGOR MALAYSIA 03-78842888 SQUARE, NO. 2, JALAN LOT 15 & 19, PERSIARAN NEG. 4 3M SEREMBA SEREMBAN 70450 MALAYSIA 66778111 TANJUNG 2, SENAWANG SEMBILAN PLO 317, JALAN PERAK, PASIR 072521288 / schw@5e- 5 5E RESOURCES SDN BHD 81700 JOHOR MALAYSIA KAWASAN GUDANG 072521388 resources.com 17-6, THE BOULEVARD KUALA WIL PER 6 8 EDUCATION SDN BHD 59200 MALAYSIA 03-22018089 OFFICE, MID VALLEY LUMPUR K.LUMPUR A & D DESIGN NETWORK F-10-3, BAY AVENUE PULAU 7 BAYAN LEPAS 11900 MALAYSIA 46447718 [email protected] SDN BHD LORONG BAYAN INDAH 1 PINANG NO 23-A, TINGKAT 1, 8 A & K TAX CONSULTANTS JALAN PEMBANGUNAN JOHOR BAHRU 81200 JOHOR MALAYSIA 72385635 OFF JALAN TAMPOI 9 A + PGRP 36B, SAGO STREET SINGAPORE 50927 SINGAPORE SINGAPORE 656325866 [email protected] A A DESIGN 390-A, JALAN PASIR 10 IPOH 31650 PERAK MALAYSIA 6052537518 COMMUNICATION SDN PUTEH, A H T (NORLAN UNITED) & BLOK B UNIT 4-8 IMPIAN KUALA WIL PER 11 50460 MALAYSIA 322722171 CARRIAGE SDN BHD KOTA, JALAN KAMPUNG LUMPUR K.LUMPUR A JALIL & CO SDN BHD ( IPOH ) NO. 14B, LALUAN IPOH 31350 PERAK MALAYSIA 05-3132072 MEDAH RAPAT, 12 A JALIL & CO SDN BHD GUNUNG RAPAT, NO.
    [Show full text]
  • Property Market Review | 2020–2021 3
    2021 2020 / MARKET REVIEW MARKET PROPERTY 2020 / 2021 CONTENTS Foreword | 2 Property Market Snapshot | 4 Northern Region | 7 Central Region | 33 Southern Region | 57 East Coast Region | 75 East Malaysia Region | 95 The Year Ahead | 110 Glossary | 113 This publication is prepared by Rahim & Co Research for information only. It highlights only selected projects as examples in order to provide a general overview of property market trends. Whilst reasonable care has been exercised in preparing this document, it is subject to change without notice. Interested parties should not rely on the statements or representations made in this document but must satisfy themselves through their own investigation or otherwise as to the accuracy. This publication may not be reproduced in any form or in any manner, in part or as a whole, without writen permission from the publisher, Rahim & Co Research. The publisher accepts no responsibility or liability as to its accuracy or to any party for reliance on the contents of this publication. 2 FOREWORD by Tan Sri Dato’ (Dr) Abdul Rahim Abdul Rahman Executive Chairman, Rahim & Co Group of Companies 2020 came through as the year to be remembered but not in the way anyone had expected or wished for. Malaysia saw its first Covid-19 case on 25th January 2020 with the entrance of 3 tourists via Johor from Singapore and by 17th March 2020, the number of cases had reached above 600 and the Movement Control Order (MCO) was implemented the very next day. For two months, Malaysia saw close to zero market activities with only essential goods and services allowed as all residents of the country were ordered to stay home.
    [Show full text]
  • Emerging STRONGER TOGETHER Annual Report 2020
    EMERGING STRONGER TOGETHER Annual Report 2020 Last year proved to be an arduous year due to the COVID-19 pandemic. We have had to drastically adjust our operations and innovate ourselves by exploring new business models, technologies and developments. Amidst this landscape, Malaysia Airports continued to remain steadfast and resilient to ensure that we continually host joyful connections to guests, passengers and partners. Our commitment was recognised through various accolades, among which was that KL International Airport (IATA Code: KUL) was hailed as one of the world’s top 10 airports in the Airports Council International (ACI) Airport Service Quality (ASQ) ranking. This hard-won achievement would not have been possible without the full support of the whole airport community. Everyone in the community displayed a strong spirit of collaboration and came together as one to elevate the airport service performance as we continue to serve the nation. We are also extremely grateful to all airport frontliners who have tirelessly continued to devote their time and energy towards combating the pandemic while ensuring a seamless airport experience within the new norms. We are humbled by your immense contribution and unwavering support for the benefit of the nation. The Malaysia Airports Annual Report 2020 is complemented by the Annual Report Microsite as well as more interactive Table of Contents contents via the Malaysia Airports Augmented Reality App. Enjoy the interactive contents on the app with 6 easy steps: 2 About This Report Search for
    [Show full text]
  • 2018 >> Group Highlights 2018
    Stay Together. Stay Integrated Report 2018 >> GROUP HIGHLIGHTS 2018 Earnings Per Share 14.8 sen Shareholders Fund Dividend Per Share RM14.14 8.55 sen billion Ongoing Projects 45 Effective Land Banks 9,516 acres Revenue Strong GDV in the Pipeline Unbilled Sales Total Sales RM3.59 RM149.70 RM12.32 Achieved billion billion billion RM5.12 Profit Before Tax Profit Attributable to Owners Total Strong, Dynamic & billion RM991.0 of the Company Diversified Employees million RM671.0 2,300 million People* * Approximate 1 STAY TOGETHER. STAY SETIA >> Inside this Report Our growth trajectory is anchored in sound fundamentals. Our diligence, integrity and Content persistent focus on sound business practices provide a solid foundation for our continued delivery of value in the long term. Introduction 6 Our Approach to Reporting With decades of experience setting the bar in 8 About This Integrated Report Malaysia’s property market, we know beyond a doubt that it is only together that we can thrive. Our Business Our success is a truly befitting reflection of our 10 Who We Are belief that together, we can weather all challenges 12 Our Presence and achieve even greater heights. 14 Corporate Structure 17 Corporate Information As we continue to expand, we are also now 18 Corporate Calendar celebrating the deeper meaning that our name 25 Accolades stands for. We remain loyal to our stakeholders and steadfast in our commitment to quality and Our Leadership growth – striving to ensure a better life for all. 26 Chairman’s Message 30 Board of Directors Therefore, in staying true to our nature and our 40 Key Management Profile name, we will continue to “STAY TOGETHER.
    [Show full text]
  • Perumahan SLG Central Sdn Bhd(739880-U)
    338, Jln Tun Razak Developer Perumahan SLG Central Sdn Bhd (739880-U) (A subsidiary of Singapore Main Board Listed Company - SIM LIAN GROUP LTD) Sales Gallery Singapore Office t +603 2162 6882 t + 65 6303 6200 338, Jalan Tun Razak f +603 2164 6882 205 Upper Bukit Timah Road, f + 65 6769 6617 Kuala Lumpur, 50400, Malaysia w www.kltrillion.com #02-01 Singapore 588181 w www.simlian.com.sg Developer’s License: 10717 – 2/06 – 2017/841 • Validity Period: 27/06/2012 – 26/06/2017 • Sales & Advertising Permit: 10717 – 2/1805/2013 (07) • Validity Period: 26/07/2012 – 25/07/2013 • Land Tenure: Freehold • Land Encumbrances: UOB (M) Bhd • Approving Authority: Dewan Bandaraya Kuala Lumpur • Type of Property: Serviced Apartment • Approved Building Plan: 15 Jun 2012 • Total Units: 368 • Selling Price (RM): RM 1,250,000 (Min) and RM 5,000,000 (Max) • Expected Date of Completion: June 2016 • Bumiputra’s Discount: 5% • Sekatan-Sekatan Kepentingan: N/A Built-up area Standard Units : Type A – 963 sq ft/89.5 sq m; Type B – 1,485 sq ft/138 sq m; Type C – 2,065 sq ft/191.8 sq m; Type D – 3,101 sq ft/288.1 sq m; Type F – 2,506 sq ft/232.8 sq m Penthouses : Type E1 – 4, 224 sq ft/392.4 sq m; Type E2 – 5,088 sq ft/472.7 sq m; Type E3 – 6,274 sq ft/582.9 sq m All illustrations are artist’s impression only. All information contained are subject to changes, modifications and substitutions as may be required / recommended by the company’s architect, engineers or the relevant authorities and cannot form part of an offer or contract.
    [Show full text]
  • Strategy | MALAYSIA
    Strategy | MALAYSIA NOMURA SECURITIES MALAYSIA SDN BHD Wai Kee Choong +60 3 2027 6893 [email protected] NEW THEME ~ Action Stocks for action Who would have thought Malaysia’s population would have doubled to 28mn in the We recommend a group of stocks past 30 years, and grown by nearly 5mn in the past decade alone? To put this into which we believe will be the prime perspective, the 5mn increase is more than the entire population of Singapore and beneficiaries of the consumption close to Hong Kong’s. Even less well known is the remarkable increase in the boom in Malaysia. indigenous group or Bumiputera – mainly comprising the ethnic Malay population – which has more than doubled from 8.1mn in 1980 to an estimated 17.0mn this year. Anchor themes Nomura Share Price Stock rating price target After close to a year of promoting the earnings upgrade story, we are introducing a Maybank (MAY MK) BUY 7.70 9.25 brand new theme — Malaysia’s consumption boom. The potential impact is under- Genting (GENM MK) BUY 2.70 3.70 researched and overlooked by the street, in our view. Media Prima (MPR MK) BUY 2.09 2.50 SP Setia (SPSB MK) BUY 4.13 5.06 QSR Brands (QRS MK) BUY 4.25 5.47 While the consensus earnings upgrades cycle is likely to remain in positive territory, Note: prices as at 21 July, 2010 close; local currency we believe that the Malaysia consumption boom story will be the next focus. Malaysia Boleh #19: the untold story (I) Analysts Wai Kee Choong +60 3 2027 6893 c Malaysia’s consumption boom [email protected] Malaysia’s population surprisingly has risen by nearly 5mn over the past decade, an increase that is more than the entire population of Singapore and close to Hong Julian Chua +60 3 2027 6892 Kong’s.
    [Show full text]
  • HANAN... Chedet.Co.Cc January 27, 2009 by Dr. Mahathir Mohamad
    HANAN... Chedet.co.cc January 27, 2009 By Dr. Mahathir Mohamad Dear Hanan, 1. I agree entirely with you that building a great nation doesn't only take brains, but as you said it sure does help. 2. However brains alone without a heart (feelings) can produce a monster. 3. Israel is undoubtedly a great nation, becoming great through the brains and the numerous achievements you have listed. Yes I have used Israeli originated products like Microsoft Windows and Pentium chips (made in Malaysia) by Intel, an American company. 4. In fact I owe my life ultimately to Israel because there must be something invented by Israelis in the numerous instruments used in heart surgery. However most of the products used were invented and produced by Japanese. 5. I am amazed at the number of Nobel Laureates Israel has produced. I admit we have not produced even one. 6. But when the brain is without a heart it does not care for the misery resulting from the products of the brain. 7. The atom bombs which killed 100,000 men, women, children and babies are the product of Israeli (Jewish) brain. Most of the diabolical weapons now being used to kill millions of people are also the creation of Israelis on Zionist Jews. The depleted uranium and phosphorous shells being used in Gaza are also the product of Israeli brains. 8. The current financial crisis which is destroying the economies of the U.S. Britain and in fact all the countries of the world is due to manipulations of banks, financial institutions and the monetary system by Jewish supporters of Israel.
    [Show full text]