GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
GRAM PANCHAYAT DEVELOPMENTAL PLAN OF VILLAGE PANCHAYAT CHINCHINIM- DEUSSUA
Village Development Plan Chinchinim- Deussua 1
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
PH No. 2863283 Office of Village Panchayat Chinchinim - Deussua Salcete -Goa.
Ref.No. VP / CD /2018-19/ Date:
To, The Block Development Officer, South Shri. Mathany Saldhana Administrative Complex, ‘C’ Block, 2nd Floor, Room No. 223, Margao, Salcete Goa.
Sub: Gram Panchayat Developmental Plan of Village Panchayat Chinchinim- Deussua
Sir,
We enclose herewith one set of Gram Panchayat Developmental Plan (GPDP) of Village Panchayat Chinchinim- Deussua, prepared as per the participatory planning process in the prescribed format for your information.
The works of GPDP is already approved by Village Development committee and Gramsabha, necessary correction/ changes to the same will be intimated to you immediately.
Kindly acknowledge the receipt of the same.
Thanking you,
______(Smt. Roquizinha Fernandes) Secretary, V.P. Chinchinim- Deussua
Enclosed: one set of GPDP of V.P. Chinchinim- Deussua
Village Development Plan Chinchinim- Deussua 2
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Draft Status Report cum GPDP of Village Panchayat of Chinchinim- Deussua
Index
Sr. No. Description Page No. 1. Inauguration of 3-days meet for planning of GPDP of V.P. Chinchinim- Deussua 2. Aims and Objectives 3. I. Introduction of the Village of Chinchinim II. Schemes and Programmes implemented by the Village Panchayat of Chinchinim III. Observation / Information collected during Field Visits, PRA, FGDs, etc. a) Sector Visit – Anganvaddi Centres at Chinchinim & Baida b) Sector Visit – Primary Health Centre & Sub Health Centre c) Sector Visit – Telephone exchange d) Focus Group Discussion with Farmers e) Sector Visit – Govt. Primary School f) Sector Visit – Fair Price Shops (Societies) at Chinchinim, Dandeavaddo & Sucaldem g) Sector Visit – Electricity Department h) Focus Group Discussion with Senior Citizens i) Sector Visit – Post Office j) Sector Visit – Sports & Social Clubs (CRCC, Union of Chinchinim, St. Anthony Sports Club Deussua, Fatima Baida Sports Club, Sucaldem Youth Club, Coddeavaddo Youth) k) Focus Group Discussion with Milk Producers l) Sector Visit - Library m) Sector Visit – Old Age Home (Provedoria) n) Focus Group Discussion with people engaged in Prawn Farming in Inland Fisherman o) Focus Group Discussion with Womens Self Help Group p) Focus Group Discussion with ST, OBC etc. 4 Annexures a) Basic Facilities
Village Development Plan Chinchinim- Deussua 3
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
b) Chinchinim- Deussua Village Panchayat Details (Annexture-1A) c) Chinchinim- Deussua Panchayat Revenue Detail (Anneture-2A) d) Details of Committees (Annexture-3A) e) Village Development Committee f) Action Plan for the planning process and preparation of draft GPDP.
Village Development Plan Chinchinim- Deussua 4
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Program for the Preparation of Gram Panchayat Development Plan of V. P. Chinchinim- Deussua, Salcete Goa on 14th, 15th and 16th June 2018. Schedule
DAY 1 : Thursday 14th June, 2018
SR. ACTIVITY TIME NO. 1 Building rapport with Village Panchayat Officials, ERs, VDC Members and 10:00 a.m Village People 2 Preparation of GPDP discussion with Panchayat Body 12:00 p.m 3 Data collection of panchayat, VDC members and other committees formed (basic 2:30 p.m facilities- 6 pages, Annexure 1-A/ 5 pages, Annexure 2-A/ 3 pages, Annexure 3- A/4 pages and VDC details 4 Sector Visit- Anganwaddi Centres Chinchinim & Baida to be Conducted by 3:00 p.m Ricardo Fernandes/ Inacina Rebello 5 Sector Visit - Primary Health Centre, Chinchinim and Sub Health Centre to be 3:00 p.m conducted by Marcos De Mello/ Inacina Rebello 6 Sector Visit – Telephone Exchange, Chinchinim to be conducted by Proto Rodrigues 7 Focus group discussion with farmers to be Conducted by Santano Antao 3:30 p.m
DAY 2 : Friday 15th June, 2018
SR. NO ACTIVITY TIME 1 Sector visit – Govt. Primary School to be Conducted by Valentino Barretto 10:00 a.m 2 Sector visit – Fair Price Shops (societies) to be Conducted by John B. Pereira 10:00 a.m 3 Sector visit – Electricity Department to be Conducted by Irinio Rodrigues 10:00 a.m 4 Focus group Discussion with Senior Citizens to be Conducted by Rosario 10:00 a.m Domingos Rebello 5 Sector visit – Post Office, Chinchinim to be Conducted by Nelson Lopes 10:00 a.m 6 Sector Visit – Sports & Social Clubs (CRCC, Union of Chinchinim, St. Anthony 10:00 a.m Sports Club Deussua, Fatima Baida Sports Club, Sucaldem Youth Club) to be Conducted by Chalton Furtado 7 Focus group Discussion with Milk Producers to be Conducted by Menino 10:00 a.m Fernandes 8 Sector visit – Library, Chinchinim to be Conducted by Nelson Lopes 10:30 a.m 9 Sector visit – Old Age Home (Providoria) to be Conducted by Valentino Barretto 10:30 a.m 10 Focus group Discussion with people engaged in Prawn Farming and Local 12:00 p.m inland Fisherman conducted by John Pereira (to inform people engaged in the activity) 11 FGD with Women Self Help Group to be Conducted by Flory Pereira 2:30 p.m 12 FGD with ST, OBC, etc to be Conducted by Inacina Rebello and Melcy Barretto 4:30 p.m
Village Development Plan Chinchinim- Deussua 5
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
DAY 3 : Saturday 16th June, 2018
SR. NO ACTIVITY TIME 1 Participatory Rural Appraisal 10:00 a.m 2 Preparation of Social Map and Resource Map with ERs, Village People and VDC 11:30 a.m Led by Marcos De Mello 3 Compilation of draft situation report and draft GPDP 4:00 p.m
Sd/- Sd/- Acting Sarpanch Convenor V.P. Chinchinim- Deussua Village Development Committee
Village Development Plan Chinchinim- Deussua 6
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
AIMS & OBJECTIVES
1. Create awareness about village planning with people’s participation. 2. Understand the status of various sectors in the village. 3. Collect data and identify the problems/ issues. 4. Identify projects and proposals on works in various sectors. 5. Achieves specific development goals within a specified time-frame. 6. Incentivizes low cost/no cost development goals and local initiatives. 7. Strengthens bond between Govt., GP & local inhabitants leading to responsive government. 8. Planning only way to facilitate poverty free GPs/clusters/ communities. 9. Prepare the Gram Panchayat Development Plan of Village Panchayat Chinchinim – Deussua with people’s participation.
Village Development Plan Chinchinim- Deussua 7
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
I. Introduction of the Village
hinchinim is a beautiful village situated on the banks of the River Sal. It is known to be the biggest rural village of Goa having a predominant C Catholic population. It is bordered by the villages of Assolna and Cuncolim to its south and Navelim to its north. In the vicinity one can also find high schools, a post office, a football ground, a hospital, a Primary Health Centre, a Sub Health Centre, Panchayat Ghar, a rural telephone exchange etc. The Village Panchayat Chinchinim- Deussua is situated in the Taluka of Salcete South Goa District. It has a population approx. 10,000 and according to the census of 2011 the total population was 6908, with 3263 males and 3645 female population. The Panchayat consists of 11 wards and has 11 elected representatives. (Male - 04 & Female - 07). There are 246 household of OBC, 50 households of SC and 948 households of STs.
The jurisdiction of Village Panchayat Chinchinim - Deussua has two schools but it is closed. There are two Anganwadi with __ children. There is one Primary Health Centre (PHC) & Sub Health Centre in Dandeavaddo. A Hospital i.e. Dr. Nagzarkar Hospital & Clinic. The major source of income for the Panchayat is the house tax, market auction/ market fees, Bank interest, construction fees and other grants. Chinchinim is known as Chinchone in Konkani and is known to have got its name from a Portuguese version of Chinch-oneam. Chinch means a tamarind tree in Konkani and according to many it is possible that the village was full of these tamarind trees in the olden days. Chinchinim is also famous for the feast of Mount Mary that is celebrated every year in the month of September which attracts thousands of devotees.
Confrontations: North – Dramapur of Navelim South - Assolna and Cuncolim East – Orlim & River Sal West: Sarzora
Chinchinim Village has 1 spring and it is mostly for picnic spots as the water is also considered very well and Medicinal – This Spring is frequented more often – called Bonkiwada, Sant Moddi.
Village Development Plan Chinchinim- Deussua 8
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
This Village has the following wards:-
1. Bandfoll, Mingfoll and Caramorod 2. Daneavaddo 3. Alleamvaddo 4. Baida and Caritas Colony 5. Zoribhat and Baida (part) 6. Durga and Sant Moddi 7. Palmar Grande and Sucaldem 8. Bamado and Tolleaband 9. Coddeavaddo, Copelvaddo and 2nd Palvem 10. Deussua, Vellor, Saicovaddo, Mazilvaddo and Betifind 11. Secreamvaddo, 1st Palvem and Sancle Tolleaband
Elected Sarpanch’s
1. Mr. Thomas Aquino Furtado 13. Santos Rebello 2. Mr. Francisco Rebello 14. Valentino Barretto 3. Mr. Anant Nagvenkar 15. Assunta Pereira 4. Mr. Joaquim Remediouis Barretto 16. Archange Dsa 5. Domingos Simoes 17. Allwyn Antao 6. Philomeno Pereira 18. Santos Rebello 7. Dattaram Colvecar 19. Royen Viegas 8. Joao Glorio Furtado 20. Antonio Sequeira 9. Aurelio Viegas 21. Constancio Fernandes 10. Albertina Dias 22. Santos Rebello 11. Neofita Gomes 23. Flory Pereira 12. Antonio Gonsalves 24. Inacina Rebello
Village Development Plan Chinchinim- Deussua 9
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
II. SCHEMES AND PROGRAMMES IMPLEMENTED BY THE VILLAGE PANCHAYAT OF CHINCHINIM- DEUSSUA
Amount Sr. No. Title of the Scheme Department (wherever possible) Mahatma Gandhi National Rural District Rural Development 1. Employment Guarantee Scheme Agency (MGNREGA) Rajiv AwaasYojana (RAY) District Rural Development 2. Agency Indira AsraYojana Scheme Directorate of Tribal 3. (IAYS) Welfare AtalAsraYojana Scheme (AAYS) District Rural Development 4. Agency National Family Benefit Scheme District Rural Development 5. (NFB) Agency GrihaAadhar Scheme Directorate of Women and 6. Child Development Dayanand Social Security Directorate of Social 7. Scheme (DSS) Welfare AntyaSanskarSahayYojana Directorate of Tribal 8. Scheme Welfare 9. Payment of Doles Panchayat LadliLaxmi Scheme Directorate of Women and 10 Child Development
Village Development Plan Chinchinim- Deussua 10
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
The following committees are constituted by the Panchayat:
i. Standing Committees 1. Production Committee 2. Social Justice Committee 3. Amenties Committee 4. Bio Diversity Committee
ii. Other Committees 1. Child Development Committee 2. Garbage/Waste Management Committee 3. Health, Sanitation & Nutrition Committee 4. Road Safety & Traffic Management Committee 5. Biodiversity Committee 6. Ward Development Committee
Observations:
These committees are formed however some committees do not meet regularly. If these committees meet and conduct their meetings regularly, several issues of the people in the village can be addressed.
Village Development Plan Chinchinim- Deussua 11
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
III. Observations/ Information collected during Field/ Sector Visits, Participatory Rural appraisal (PRA), Focus Group Discussion (FGD) :
Village Development Plan Chinchinim- Deussua 12
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
a) SECTOR VISIT- ANGANWADI CENTRES i.e at CHINCHINIM & BAIDA
ANGANWADI at Chinchinim
District: South Block: Salcete
Village Panchayat: Chinchinim Ward: 1st Palvem, Chinchinim
Constituency: 35 – Velim Anganwadi Code: 121 & 30586040210
Date of visit: 14/06/2018
Anganwadi Worker name : Elcy Ferrao Address: Baradi, Velim contact number: 9960806011
Anganwadi Helper name: nil Address, contact number: nil
Village Development Plan Chinchinim- Deussua 13
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Sr. Solution/ Service Information Number Observation No. Suggestion Pregnant women 12 Lactating mothers 11 Anganwadi 0 - 6 month infant 11 1 Beneficiaries status for last financial year >6 -30 months child 30 >30 months – 6 years child 12 Adolescent girls (age) 11-18 - Anganwadi Worker Yes Anganwadi Helper No Date of last refresher Training 2 Human Resource attended by Anganwadi Yes Worker Date of last refresher Training - attended by Anganwadi Helper Own Building Own
building 3 Anganwadi Building Rented No Area available in sq.m. - Kitchen Room Yes Utensils facilities No Kitchen and other Cooking facility (gas/kerosene 4 Yes associated facilities stove) Storage facilities Yes Nashta Chart displayed Yes Nashta Chart largely followed Yes Toilet for Children No Need toilet
5 Toilet facilities Toilet with running water No
Toilet with stored water No Water filter No Drinking Water 6 Boiled water made available Yes facilities Tap/ Well Water Tap water Below 1 – 5 yr Yes Weight children 7 operational status Machine Adult No
Village Development Plan Chinchinim- Deussua 14
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Medicine Kit Yes Toys (Types and adequacy related to age and Yes number of children) Other facilities Nail cutter No
Growth chart Yes Pre education kit/material (chart, posters, Yes drawing, abacus, etc)
Yes 0-6 yrs boy child Maintenance of 0-6 yrs girl child Yes 8 Registers Lactating mother Yes Pregnant women Yes Adolescent girl No SNP (6 months – 2 ½ yrs) 59 No. of children between 2 ½ 6 18 yrs Provision of No. of pregnant women 12 No. of Lactating mother (At 9 Nutritional food in 12 last financial year least 6 months No. of Adolescent girl (At least 0 3 months continuously) Whether ration received in Yes time and eligible quantity Maintenance of Once in the month for children 10 Weight & Growth Yes up to 5 yrs chart Medicine & No. of children between grade 11 nutritional food for Yes 2 & 3 as per growth chart malnourished child No. of Adolescent girls given Distribution of iron 12 iron tablets at least once in a - tablets week Health & Nutrition For Lactating mother, education sessions Pregnant Women and 13 No organized in last Adolescent Girls once in a financial year month Total No. of Home To all women & new born in 14 - visits last financial year. Village Development Plan Chinchinim- Deussua 15
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Full immunization 6 months to 6 yrs children Yes Family planning No. of couple Yes For Lactating mothers, Pregnant women, New Born 15 Referral service Yes Babies & Malnourished Children Celebration of Information regarding health 16 Village Health & nutritional program for Yes Nutritional Day villagers Details of health checkup Health Checkup (by conducted in last one financial 17 government, private year. (for 6 months to 6yrs Yes agencies) children) (date & name of doctor) Visits by officials of Number of visit of Child Women & Child Yes Development Project Officer in Development 18 last financial year Department Number of visit of Mukhya Yes Sevika in last financial year Mamata Scheme by Number of application received Women & Child under Mamata Scheme by the Yes 19 Development Dept Anganwadi worker Number of beneficiaries
received the benefits
Name of Anganwadi Worker: Elcy Ferrao
Name of Anganwadi Helper: Nil
Village Development Plan Chinchinim- Deussua 16
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
ANGANWADI at Baida
District: South Goa Block: Salcete
Village Panchayat: Chinchinim - Deussua Ward: Baida
Constituency: 35 – Velim Anganwadi Code: 30580640206
Date of visit: 14/06/2018
Anganwadi Worker name : Rossy Borges Address: Demani Cuncolim, Salcete Goa contact number:9822986461
Anganwadi Helper name: Socorina Rebello Address:Baida Chinchinim contact number: 9763305492
Village Development Plan Chinchinim- Deussua 17
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Sr. Solution/ Service Information Number Observation No. Suggestion Pregnant women 16 Lactating mothers 07 Anganwadi 0 - 6 month infant 07 1 Beneficiaries status for last financial year >6 -30 months child 10 >30 months – 6 years child 42 Adolescent girls (age) 11-18 - Anganwadi Worker No Anganwadi Helper No Date of last refresher Training 2 Human Resource attended by Anganwadi Yes Worker Date of last refresher Training No attended by Anganwadi Helper Own Building G.P.S
3 Anganwadi Building Rented No Area available in sq.m. No Kitchen Room Yes Utensils facilities Yes Kitchen and other Cooking facility (gas/kerosene 4 Yes associated facilities stove) Storage facilities Yes Nashta Chart displayed Yes Nashta Chart largely followed Yes Toilet for Children Yes
5 Toilet facilities Toilet with running water No
Toilet with stored water Yes Water filter No Drinking Water 6 Boiled water made available Yes facilities Tap/ Well Water Yes Below 1 – 5 yr Yes Weight children 7 operational status Machine Adult Yes
Village Development Plan Chinchinim- Deussua 18
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Medicine Kit Yes Toys (Types and adequacy related to age and Yes number of children) Other facilities Nail cutter Yes
Growth chart Yes Pre education kit/material (chart, posters, Yes drawing, abacus, etc)
Yes 0-6 yrs boy child Maintenance of 0-6 yrs girl child Yes 8 Registers Lactating mother Yes Pregnant women Yes Adolescent girl No SNP (6 months – 2 ½ yrs) Yes No. of children between 2 ½ 6 Yes yrs Provision of No. of pregnant women Yes No. of Lactating mother (At 9 Nutritional food in Yes last financial year least 6 months No. of Adolescent girl (At least - 3 months continuously) Whether ration received in Yes time and eligible quantity Maintenance of Once in the month for children 10 Weight & Growth Yes up to 5 yrs chart Medicine & No. of children between grade 11 nutritional food for Yes 2 & 3 as per growth chart malnourished child No. of Adolescent girls given Distribution of iron 12 iron tablets at least once in a No tablets week Health & Nutrition For Lactating mother, education sessions Pregnant Women and 13 Yes organized in last Adolescent Girls once in a financial year month Total No. of Home To all women & new born in 14 20 visits last financial year. Village Development Plan Chinchinim- Deussua 19
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Full immunization 6 months to 6 yrs children Yes Family planning No. of couple No For Lactating mothers, Pregnant women, New Born 15 Referral service Yes Babies & Malnourished Children Celebration of Information regarding health Yes 16 Village Health & nutritional program for Republic Nutritional Day villagers day Details of health checkup Health Checkup (by conducted in last one financial Yes 17 government, private year. (for 6 months to 6yrs 7/2/2018 agencies) children) (date & name of Dr. Sujata doctor) Visits by officials of Number of visit of Child Women & Child Development Project Officer in Yes Development 18 last financial year Department Number of visit of Mukhya - Sevika in last financial year Mamata Scheme by Number of application received Yes Women & Child under Mamata Scheme by the 31 19 Development Dept Anganwadi worker Number of beneficiaries 28 received the benefits
Name of Anganwadi Worker: Rossy Borges
Name of Anganwadi Helper: Socorina Rebello
Village Development Plan Chinchinim- Deussua 20
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
OBSERVATIONS:
. There are total of 2 Anganwadi Centres i.e in Chinchinim and Baida. . Number of students in each Anganwadi’s vary from 10 to 25. . Most of the students/ the parents are from the migrant community. . The Anganwadi’s are not child friendly . No proper storage facilities & No toilet in Chinchinim Anganwadi . Repairs & renovation required
SUGESSIONS:
. All that Anganwadi’s should be made child friendly by painting the walls with pictures of stories, animals, flowers, fruits etc. . Proper storage and kitchen facility should be arranged . Requirement of toilet in Chinchinim Anganwadi . Repairs and renovation works to be taken up . Chinchinim villagers/ locals to be motivated to make use of Anganwadi’s
Ricardo Fernandes (VDC Member)
Inacina Rebello (Sarpanch)
Village Development Plan Chinchinim- Deussua 21
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
b) SECTOR VISIT- PRIMARY HEALTH CENTRE & SUB HEALTH CENTRE
PRIMARY HEALTH CENTRE
District: South Goa Block: Salcete
Village Panchayat: Chinchinim- Deussua Constituency: 35 – Velim
Wadda/ Ward: Dandeavaddo Primary Health Centre Code: --
Date of visit:
Health Worker name, address & Contact No. : Dr. Nixon Martinho Fernandes Ph. 2863237
Whether member of Village Sanitation Committee: Yes
Village Development Plan Chinchinim- Deussua 22
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Part – A
Target population in number to be served 35017 1 (mention Male and Female separately) 2 Male/ female N.A Target area (Mention name of revenue village Chinchinim, Deussua, covered) Sarzora, Assolna,
Ambelim, Cavelossim, Orlim, Carmona, Varca Name of the further village from the Primary Navelim 3 Health Centre
Sr. Service Information Current Observat Solution/ No Status ion Suggestio n 1 Human Doctor (Days when Daily resource present per week) Compounder Yes Health Worker Yes Helper Yes Contact Health No worker No. of trained Dai/s No Other information - 2 Information Citizens Charter Yes and IEC material Yes Communication Material 3 Essential Independent Yes Infrastructure building Rented/ owned Yes Waiting room No Electricity available Yes Water supply Yes Toilet with water Yes supply Compound wall Yes Telephone facilities Yes Checkup table Yes Procedure followed Yes for disposal of
Village Development Plan Chinchinim- Deussua 23
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Biomedical Waste (Please specify) 4 Equipment’s & Medicine Kit Yes Medicines ORS Available Yes (Pleasure look Chloroquim tablets Yes at the Iron Adults Yes functioning of Tablets Child No the equipment’s B P apparatus and Yes and record stethoscope their status Blood test Yes including equipment (malaria expiry date of testing etc the medicines HB testing Yes and working Weighti Yes condition of ng Yes equipment’s) machine Height chart Yes Delivery No equipment’s & medicines Disposable Delivery No Kit Disposal syringe & Yes Hub cutter Urine testing kit Yes Other equipment’s (specify) 4 Training for New born care Yes Health worker training received Child care training Yes received Any other training Yes recieved
Service & Facilities
Solution/ Sr. Observati Service Information Number Suggestio No on n New born Total newborn 27 1 Baby register children (within 28
Village Development Plan Chinchinim- Deussua 24
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
days) Services for No. of pregnant 399 pregnant women who had Women done three checkup provided in the No. of pregnant 360 last financial women given one year Titanus injection No. of pregnant 351 2 women given 2 T.T injection No. of pregnant 46 women given booster injection No. of pregnant 399 women given 100 iron tablets Delivery No. of last year details for the delivery last financial No. of institutional 357 3 year delivery No. of delivery at - S.H.C No. of home delivery 01 Total no. of To all women & new 1000 4 home visits born in last financial year Full Children upto 6 yrs 384
immunization Tetanus Between 10 – 16 yrs 851
injection boys/girls Family No. of eligible 4608
planning couples Janani - BPL women Yes Suraksha - Benefit for first Yes Yojana two delivery
Suggestion: - Extension of the PHC building premises as the present building became very congested because of increase patient attendance
Name of the Health worker: Dr. Noxon Martinho Fernandes
Village Development Plan Chinchinim- Deussua 25
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
sub HEALTH CENTRE
District: South Goa Block: Salcete
Village Panchayat: Chinchinim- Deussua Constituency: 35 – Velim
Wadda/ Ward: Dandeavaddo Primary Health Centre Code: --
Date of visit: 14/06/2018
Health Worker name, address & Contact No. : Edmundo Da Cunha, 9822180420
Whether member of Village Sanitation Committee: --
Part – A
Target population in number to be served 8729 1 (mention Male and Female separately) 2 Male/ female Target area (Mention name of revenue village Part Chinchinim and
covered) V.P. Deussua Name of the further village from the Sub Health Deussua (3 km) 3 Centre Named of the Primary Health Centre to which PHC Chinchinim 4 affiliated and its distance in k.m from Sub Health Centre
Solution/ Sr. Current Observat Service Information Suggestio No Status ion n Yes, Doctor (Days when Wednesda present per week) y Human Compounder No 1 resource Health Worker Yes Yes, 1 Helper male Contact Health No
Village Development Plan Chinchinim- Deussua 26
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
worker No. of trained Dai/s No Other information Information Citizens Charter Yes and 2 Communication IEC material Yes Material Independent No building Rented/ owned Yes Waiting room No Electricity available Yes Water supply No Toilet with water No supply Essential 3 Infrastructure Compound wall Yes Telephone facilities Yes Checkup table Yes Yes, As Procedure followed per Bio for disposal of Medical
Biomedical Waste waste (Please specify) disposable policy Medicine Kit Yes ORS Available Yes Equipment’s & Chloroquim tablets Yes Medicines Iron Adults Yes (Pleasure look Tablets Child No at the B P apparatus and Yes functioning of stethoscope the equipment’s Blood test and record equipment (malaria Yes 4 their status testing etc including HB testing No expiry date of Weighti Children Yes the medicines ng Adult Yes and working machine condition of Height chart No equipment’s) Delivery equipment’s & No medicines
Village Development Plan Chinchinim- Deussua 27
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Disposable Delivery No Kit Disposal syringe & Yes Hub cutter Urine testing kit Yes Other equipment’s
(specify) New born care Yes training received Training for Child care training 4 Yes Health worker received Any other training Yes recieved
Service & Facilities
Solution/ Sr. Observati Service Information Number Suggestio No on n New born Total newborn 04 1 Baby register children (within 28 days) No. of pregnant 75 women who had done three checkup No. of pregnant 60 women given one Services for Titanus injection pregnant No. of pregnant 60 Women 2 women given 2 T.T provided in the injection last financial No. of pregnant 13 year women given booster injection No. of pregnant 75 women given 100 iron tablets Delivery No. of last year 71 details for the delivery 3 last financial No. of institutional 70 year delivery
Village Development Plan Chinchinim- Deussua 28
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
No. of delivery at Nil S.H.C No. of home delivery 01 Total no. of To all women & new 1759 4 home visits born in last financial year Full Children upto 6 yrs 62
immunization Tetanus Between 10 – 16 yrs 165
injection boys/girls Family No. of eligible 838
planning couples Janani - BPL women Yes Suraksha - Benefit for first Yes Yojana two delivery
Name of the Health worker: Edmundo Da Cunha
Observation:
1. Increase in number of available doctor is advised 2. Waiting room is very much congested during the peak hours where patient cannot sit comfortably
Suggestion: 1. Maintenance and up- keeping of the premises 2. Prevention of vector borne disease, for example, by fogging. However fogging is an activity that needs to be restricted of scientific reason, and therefore all approvals for fogging should go through the (PHC).
Village Development Plan Chinchinim- Deussua 29
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
3. Help with water and sanitation issues, for example constructing soak pit in common places where water/ sewage is let out into the open by groups of households 4. Help the PHC in their awareness programmes 5. Can propose extension of PHC by atleast one additional room in order to decrease congestion as the PHC is very congested at present 6. Acquisition of adjacent portion of land on the eastern side for extension of the premises for OPD & admission facilities
Marcos De Melo (VDC Member)
Inacina Rebello (Sarpanch)
Village Development Plan Chinchinim- Deussua 30
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
c) SECTOR VISIT- TELEPHONE EXCHANGE
Telephone exchange District: South Goa Block: Salcete
Village Panchayat: Chinchinim- Deussua Department contact No.:2862000 / Constituency: 35 – velim 2863198
Wadda/ Ward: Alleamvaddo
Date of visit: 15/06/2018
Incharge name & designation : Prakash R. Anandache, JTO
Contact No. : 9423885572
Village Development Plan Chinchinim- Deussua 31
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Sr. Solution/ Service Information Number Observation No Suggestion Beneficiaries status 1.Land Line 1600 1 for last financial 2.Broad 600 year band(Internet) 2 Human Resource 4 nos Own Own Building Building Rented N.A
3 Building/ shop Independent N.A About Area available in 300 sq.mtrs sq.mtr Toilet for workers Available Toilet with running Yes 4 Toilet Facilities water Toilet with stored No water
Not Water filter Drinking water available 5 facilities Tap Tap/ well water water 1.Land line Phone call services 2.Mobile services 6 Nil provided to users 3.Broad band / internet services
Village Development Plan Chinchinim- Deussua 32
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
1.Land line Types of Network 2.Mobile services 7 provided 3.Broad band / internet service
8 Timings 9:30 am to 5:30 pm
. BSNL introduced New Plan by name BBG Combo ULD
Name of the Incharge: Prakash R. Anandache, JTO
OBSERVATION:
Telephone Exchange staff is very co- operative. Ready to solve people’s problems/ grievances at any time. All types of records/ register books are maintained. If complaint in regards to fault in the line than the problem is solved in 24 hrs and if the problem is underground fault than problem solved in 3 days’ time.
SUGGESTION:
Insufficient staff leads to delay in work, so there is a need of more employees.
Proto Rodrigues (VDC Member)
Village Development Plan Chinchinim- Deussua 33
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
d) FOCUSED GROUP DISCUSSIONS - FARMERS
OBSERVATIONS:
. The lack of manpower and the cost of equipment. . Our own seeds are not produced. . Cattle Destroys crop as the cattle owners live them loose. . Most of traditional access to Farm – Land are placed. . Climate change. . Lack of marketing hub. . Garbage such as syringes, plastic etc. are thrown in the fields. . Insecticides and pesticides are not provided by the government. . Construction in farming land creates hindrances. . Lack of knowledge about different schemes in agricultural sector.
Village Development Plan Chinchinim- Deussua 34
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
SUGGESTIONS:
. Implementation of modern tools. . Build fencing around farm lands and also arrange Garbage Management. . Registration of Farmers club. . Demarcate open and traditional access and increase its width to 6.0m & ensure that traditional accesses are not closed. . Build bundhs and sluice gates to avoid salt water entering farm lands. . Awareness programme of different schemes available. . Training on modern farming techniques. . MGNREGA scheme should be implemented. . Ensure that only organic manure is used to maintain soil condition & also support and help to produce our own seeds. . Increase Government Subsidy. Make the maintenance of machinery free. . Farmers also requested the Panchayat should purchase machinery such as 50 h.p tractors etc.
Product of Rice:-
100 80 60 Cumbos 40 Candis 20 0 Sorodio Joti Jaya Vegetables
Santano Antao (VDC Member)
e) SECTOR VISIT- PRIMARY SCHOOL …. Closed
Village Development Plan Chinchinim- Deussua 35
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
f) SECTOR VISIT – FAIR PRICE SHOPS (SOCIETIES) i.e CHINCHINIM, SUCALDEM & DANDEAVADDO
Fair price shop at Chinchinim
District: South Block: Salcete
Village Panchayat: Chinchinim- Deussua Wadda/ Ward: Chinchinim Bazar
Name of Department : Chinchinim Sarzora Department Code: -- VKSS Society
Incharge name: Dattakumar Pai Angle (Civil Address & Contact No: Chinchinim Supplies) Bazar, ph. 9175976410
Date of visit: 15/06/2018
Village Development Plan Chinchinim- Deussua 36
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Sr. Service Information Number Observat Solution/ ion No Suggestion 1 Beneficiaries Shop No 26 & 28 1388 status for last Shop No. 27 292 financial year 2 Human Dattakumar Pai Resource Angle 3 Building/ Own Building No shop Rented Yes Independent No Area available in 4/8 mtrs sq. mtrs 4 Toilet Toilet for workers No Facilities Toilet with No running water Toilet with stored No water 5 Drinking Water filter No water facilities Tap/ well water No 6 Types of Rice, Wheat & Commodities Sugar available
Village Development Plan Chinchinim- Deussua 37
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
7 No. of Shop No. 26 & 28 PHH- 829 registered APL - 549 House holds AAY – 10 Shop No. 27 PHH- 159 APL - 130 AAY - 3 8 Timings 9:30 am – 1:00 pm 4:30 pm – 7:30 pm
Name of the Incharge: Dattakumar Pai Angle
Fair price shop at Dandeavaddo
District: South Goa Block: Salcete
Village Panchayat: Chinchinim- Deussua Wadda/ Ward: II
Name of Department: Progressive
Name and Designation of Incharge: Antelmo Address & Contact No. Fernandes, Chirman Dandeavaddo Chinchinim, Salcete Goa. 9130352013
Village Development Plan Chinchinim- Deussua 38
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Sr. Solution/ Service Information Number Observation No Suggestion 1 Beneficiaries APL 460 status for last BPL 360 financial year 2 Human Resource 3 Building/ Own Building No shop Rented Yes Independent - Area available in 30 m2 sq.mtrs 4 Toilet Toilet for No Facilities workers Toilet with No running water Toilet with stored No water 5 Drinking Water filter No water Tap/ well water No facilities 6 Types of Rice & wheat Commodities available
Village Development Plan Chinchinim- Deussua 39
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
7 No. of 820 registered
House holds 8 Timings 9:00 am to 1:00 pm 3:00 pm to 7:00 pm
Name of the Incharge: Antelmo Fernandes
Fair price shop at Sucaldem
District: South Goa Block: Salcete
Village Panchayat: Chinchinim - Deussua Constituency: 35 – Velim
Wadda/ Ward: Sucaldem Department: - Civil supplies
Date of visit: 15/06/2018
Incharge name: Conceicao D’Costa Address: H. No. 161, Sucaldem Chinchinim Contact No.: 2862092
Sr. Solution/ Service Information Number Observation No Suggestion
Beneficiaries status for 1 APL as well as BPL 105 last financial year
2 Human Resource Conceicao Dcosta 1 nos
Village Development Plan Chinchinim- Deussua 40
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Own Building Own Rented N.A 3 Building/ shop Independent Yes Area available in 6 x 6
sq.mtrs sq.mtr
Toilet for workers Yes
Toilet with running Yes 4 Toilet Facilities water Toilet with stored Yes water
Drinking water Water filter Yes 5 facilities Tap/ well water Tap
Types of Commodities 6 available Wheat, Rice, Sugar
No. of registered 7 BPL & APL 270 House holds
8 Timings 3: 30 p.m to 7:00 p.m
Name of the Incharge: Conceicao Dcosta
John B. Pereira (Ward Member)
Village Development Plan Chinchinim- Deussua 41
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
g) SECTOR VISIT – ELECTRICITY DEPARTMENT
Electricity department
District: South Goa Block:
Village Panchayat: Chinchinim- Deussua Constituency:
Wadda/ Ward: Dandeavaddo Department Code:
Date of visit: 15/06/2018
Incharge name: Mr. Shailesh Morgoankar Address & Contact No. : 2863031
Village Development Plan Chinchinim- Deussua 42
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Sr. Service Information Number Observation Solution/ No Suggestion 1 Beneficiaries status for last 5266 financial year 2 Human Junior executive : Labours Resource Sailesh 31 nos. Madgoankar 3 Building/ Own Building No shop Rented Yes Independent No Area available in Approx. sq.mtrs 40 m2 4 Toilet Toilet for workers Yes Facilities Toilet with Yes running water Toilet with stored Yes water 5 Drinking Water filter No water facilities Tap/ well water Tap Water 6 Types of Solve the queries
Village Development Plan Chinchinim- Deussua 43
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
services given of the customers to the users as an when the complaint received 7 No. of Chinchinim 3019 registered Dramapur 1250 House with Sarzora 997 meter box 8 Timings 24 hours service Service shift wise
Name of the Incharge: Mr. Shailesh Morgoankar
Irinio Rodrigues (VDC Member)
Village Development Plan Chinchinim- Deussua 44
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
h) FOCUS GROUP DISCUSSION – SENIOR CITIZENS
OBSERVATIONS & SUGGESTIONS:
. Need full-fledged health centres to provide free medicines and Ambulance . Senior citizens should be given some concession in electricity and water bills. . Police patrolling . Joggers park . Frequent Health checkup
Rosario Domingos Rebello (VDC Member)
Village Development Plan Chinchinim- Deussua 45
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
i) SECTOR VISIT – POST OFFICE Post office
District: Salcete Block: Salcete
Village Panchayat: Chinchinim- Deussua Constituency: 35 – Velim
Wadda/ Ward: Dandeavaddo Department Code: -
Date of visit: 14/06/2018 Incharge name: Laxmi Dudhani Postal Assistant Incharge name: Kantu Devali Post Master Address : Gogol Housing Board, Margao Address : Dicarpali Lakaki, Navelim
Sr. Observati Solution/ Service Information Number No on Suggestion Beneficiaries status 1 for last financial - year 1 1.Post Master 1 2.Assistant 3 2 Human Resource 3.Postman 1 4.GDS 1 5.Sweeper
Own Building No 3 Building/ shop Rented Yes Independent N.A
Village Development Plan Chinchinim- Deussua 46
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
With 2 Area available Approx. rooms
in sq.mtrs 50 m2 enclosed veranda Provision Toilet for needed as it is Nil necessity workers whole day work 4 Toilet Facilities Toilet with Nil running water Toilet with Nil stored water Stand with Water filter No Drinking water refill 5 facilities Tap/ well - water
Types of Useful to
6 communication 1 contact for Phone internet available information
Need No. of Saving Not permitted 7 permission accounts till date from authority Need No. of recurring 8 Not permitted permission accounts till date from authority Name of the Incharge: Kantu Devali Post Master
Nelson Lopes (VDC Member)
Village Development Plan Chinchinim- Deussua 47
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
j) SECTOR VISIT – SPORTS & SOCIAL CLUBS i.e CRCC, UNION OF CHINCHINIM, ST. ANTHONY SPORTS CLUB DEUSSUA, FATIMA BAIDA SPORTS CLUB, SUCALDEM YOUTH CLUB & CODDEAVADDO YOUTH CLUB
Chalton Furtado (Convener of VDC)
Village Development Plan Chinchinim- Deussua 48
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
k) FORCUS GROUP DISCUSSION – MILK PRODUCERS
Menino Fernandes
Village Development Plan Chinchinim- Deussua 49
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
l) SECTOR VISIT – LIBRARY
library
District: Salcete Block: Salcete
Village Panchayat: Chinchinim- Deussua Constituency: 35 – velim
Wadda/ Ward: Dandeavaddo Department Code: -
Date of visit: 15/06/2018
Incharge name: Soccorro Antao Address : Chinchinim Contact No. : 9422061143
Name of Assistant: Shusma Naik
Village Development Plan Chinchinim- Deussua 50
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Sr. Solution/ Service Information Number Observation No Suggestion Increase to Beneficiaries Members 924 Deposit Rs. Rs.50/- 1 status for last Daily visitors 30 25/- Visit schools to financial year encourage use
Human Sweeper daily 26 days 26 days Rs. 2 Resource wages 1 hr a day 1016 payment
Govt. Building Own Building primary School Rented N.A Independent N.A 3 Building/ shop Needs Area available additional place 50 m2 in sq.mtrs concreted with furniture Toilet for Needs to be Yes workers repaired Toilet with 4 Toilet Facilities Yes running water Toilet with Water tank
stored water overhead Drinking water Water filter No 5 facilities Tap/ well water Tap Types of 6 Communication No No telephone available
Village Development Plan Chinchinim- Deussua 51
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
No. of
7 registered 924
members
English, Konkani, Hindi, Marathi, Portuguese, Std X, XI, XII Fiction & 8 Types of books Encyclopedia, gazette, test books magazines, newspapers Non- Fiction (English, Konkani & (reference) Marathi) Furniture 9 Open book rack 2 nos requirements Board of Govt. 8:30 am to 12:30 Board Library in Konkani 10 Timings pm displayed & English cost of 4 pm to 6:30 pm Rs. 3000/- estimate 1 GBBN connection Computer working Pending Is Internet priority, Govt. 11 facility due to available will provide Out of order 2 connection infrastructure
Name of the Incharge: Socorro Antao & Susma Naik
OBSERVATION & SUGGESTION: . Internet connectivity urgent to provide facilities of Goa Broad Band Network (GBBN) . Yearly grants by Panchayat for books should be regular & grant suitably to meet the cost. . The toilet facility should be immediately restored, repaired with basinand enclosed wall raised for protection both from inside & outside, locking facility to be provided
Village Development Plan Chinchinim- Deussua 52
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
. Village Library Committee exists, need activating. . The oral assurance by church to expand badly needed space can be constructed on northern side adjacent to the wall on Dandeavaddo road one room atleast. . Immediate stand & water refill (drinking water) . Members can use free internet for information and printouts at reasonable cost . Suggestion register exists
Nelson Lopes (VDC Member)
Village Development Plan Chinchinim- Deussua 53
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
m) SECTOR VISIT – OLD AGE HOME (PROVEDORIA)
Valentino Barretto (Dy. Sarpanch)
Village Development Plan Chinchinim- Deussua 54
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
n) FORCUS GROUP DISCUSSION – ENGAGED IN PRAWN FARMING & LOCAL INLAND FISHERMAN
John B. Pereira (Ward Member)
Village Development Plan Chinchinim- Deussua 55
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
o) FORCUS GROUP DISCUSSION – WOMEN SELF HELP GROUP
Objectives :
1. To create group feeling among members.
2. To enhance the confidence and capabilities of members.
3. To develop collective decision making among members.
4. To encourage habit of saving among members and facilitate the accumulation of their own capital resource base.
5. To motivate members taking up social responsibilities particularly related to development.
Flory Pereira (Ward Member
Village Development Plan Chinchinim- Deussua 56
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
p) FORCUS GROUP DISCUSSION - ST, OBC etc – Nobody Attended
q) FORCUS GROUP DISCUSSION – COMMUNIDADE OF CHINCHINIM & DEUSSUA
John B. Pereira (Ward Member)
Village Development Plan Chinchinim- Deussua 57
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Basic facilities
District: South Goa Block: Salcete
Village Panchayat: Chinchinim- Deussua Revenue Village:
Name of the Secretary: Roquizinha Fernandes Date: 02/11/2017
Name of Sarpanch: Inacina Rebello Date: 11/06/2018
Public building
Sr. Suggestion/ Service Current Status Observation No Solution 1 Community Hall No 2 Gym No 3 Playground No 4 Garden Yes 5 Godown/ Storeroom Yes 6 Library No
Crematorium
Information on Sr. crematorium Teen- Compound Availability Road Electricity No Name/ Area of shade wall of water connectivity Crematorium 1 Yes/No Yes/No Yes/No Yes/No Yes/No 2 Yes/No Yes/No Yes/No Yes/No Yes/No 3 Yes/No Yes/No Yes/No Yes/No Yes/No 4 Yes/No Yes/No Yes/No Yes/No Yes/No 5 Yes/No Yes/No Yes/No Yes/No Yes/No
Village Development Plan Chinchinim- Deussua 58
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Demand for Crematorium
Sr. Name /Area of Crematorium Observation Demand No
Basic Amenities available in Village Panchayat
Sr. Suggestion/ Service Current Status Observation No Solution Road connectivity to 1 Yes Village Panchayat 2 Independent Building Yes Requirement for repair of 3 Yes building 4 Compound wall No 5 Available Furniture Yes 6 Computer Yes 7 Internet Connection Yes Email ID of Village 8 Yes Panchayat Telephone No. of Village 9 Yes Panchayat 10 Veterinary Hospital more than 5 km
11 Dairy Centre 5 km
12 Police Station more than 5 km 13 Post Office In village 14 Credit Society In village 15 Bank In village 16 Farmers Club Not registered Ration fair pair shop (In 17 03 No.) Poultry Farm (In 18 01 Numbers)
Educational Health information
Sr. Solution / Service Facilities Current Status Observation No Suggestion Primary School (In 1 Yes/No Closed No.)
Village Development Plan Chinchinim- Deussua 59
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Higher Secondary 2 01 Yes/No School (No.) 3 Secondary School 02 In village If not available how far 4 Yes/No is the other school 5 Health Centre Yes 6 Primary Health Centre Yes 7 Aganwadi 02 Yes
Sanitation Details
Sr. Current Facilities Observation Requirement Suggestion No. Status Information on 1 private Toilet at BPL Yes/No home APL Yes/No 2 Public Toilet No No. of 3 Public Toilet in use No community toilet No. of families No wage No. of In use No seats Not No in use Toilet with doors No Bathroom No Wash basins No Water availability No within area Maintenance of No public toilets Unused public No. of 4 No toilets community toilet No. of families No wage No. of In use No seats Not No in use Toilet with doors No Bathroom No Wash basins No Water No
Village Development Plan Chinchinim- Deussua 60
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
availability within area Maintenance of No public toilets 5 Public Biogas No
Solid Waste and Waste Water Management
Sr. Current facilities Observation Requirement Suggestion No. status Invited Quotation for Whether Solid waste the collection 1 Yes/No management Gram of dry waste Panchayat on dated has managed 12/07/2018 solid waste 2 Compost pit No unit 3 Dustbin No 4 Earthworm pit No 5 Vehicle with bell No 6 Dumping area No 7 Other Yes/No Waste water Ward wise 8 Yes/No management management 9 Open drain (in mtrs) Village Yes 10 Closed drain (in mtrs) Panchayat Yes has done disposal of 11 Soaking pit No waste water management 12 Use of waste water No Use of waste 13 Community soaking pit No water 14 Community park No management 15 Field No 16 Others No Human Resource requirement for solid & liquid waste management
Sr. Current Facilities Observation Requirement Suggestion No Status 1 Sweeper Yes/No Whether available to 2 Yes/No construct toilet Whether supervisor 3 is available to check Yes/No biogas
Village Development Plan Chinchinim- Deussua 61
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
ANNEXURES
Annexure 1-A
Name CHINCHINIM - DEUSSUA
Taluka SALCETE District SOUTH Total Population Details : - 6908
Male 3263 Female 3645 Adults 6197 Children 6 to 14 - 711 Socio economic Status Schedule Caste 50 Schedule Tribes 948 Other Backward Classes 246 Economic status PHH APP Public amenities Market Public toilet working and non-working N.A Crematorium 01 Anganwadi 02 Post Box 01 Gymnasium -
Education data Pri Primary Government Male dropout Female dropout Sitting capacity Teachers pupil ratio
Private school Sitting capacity Village Development Plan Chinchinim- Deussua 62
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Male Dropout Female Dropout Teachers pupil ratio
Primary Government Male dropout Female dropout Sitting capacity Teachers pupil ratio
Private Male dropout Female dropout Sitting capacity Teachers pupil ratio
Middle Government Male dropout Female dropout Sitting capacity Teachers pupil ratio
Private Male dropout Female dropout Sitting capacity Teachers pupil ratio
Secondary
Government enrollment dropouts
Private enrollment dropouts
Higher secondary Government enrollment dropouts Male dropout Female dropout Village Development Plan Chinchinim- Deussua 63
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Private enrollment dropout Male dropout Female dropout
College Male female
Tourism Number of Hotels 5 star hotel/ rooms 3 star hotel/ rooms 0 star hotel/ rooms
Number of shacks Number of Guest houses Number of restaurants/Bars
Agricultural data Total agricultural land Irrigated Non irrigated Khaza Private Forest Garden Lands Main Agricultural products Small industries data No of SSI/Tiny industries
Club Associations, SHGs,Mandals,Youth
clubs/NGO
Financial Institutions Banks NBFCs
Transport/Accessibility No of routes No of bus tops/Shelter
Village Development Plan Chinchinim- Deussua 64
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Distance to critical institutions PHC Block Office Big hospital Availability of Ambulance
Communications No of telephone towers Estimation of phones
Natural resources Rivers Streams Beaches Waterfalls Forts Places of worship Natural views Water supplies No of OHC No of Open wells No of water connections No of Bore wells No of street taps Average use of water/ day(Liters)
Panchayat No of staff Regular/Contractual Own building Conservancy vehicles Other Panchayat assets a. Shops b. Go down c. Tractor d. Vehicles
No of polling stations Aadhar card registration
Village Development Plan Chinchinim- Deussua 65
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Annexure 2-A VILLAGE PANCHAYAT REVENUE DETAILS:
AMOUNT Amount Balance of INCOME Expenditure the last year Sr.No Particular RECEIVED Balance of the 9460181.07 1 last year Grants from
12 Government a) Special Grant + XIV FFC 1040482 Grants b) General Grant -Matching 212500 GIA Garbage 100000 3 Other Grants (MGNREGA )
a) Octroi - GIA members pay 414000 Staff Salary 623700 4 Proceeds of taxes fees under
sec 153 of the Act a) Certificate 72760 b) NOC 114400 c) RTI 5576 d) RBD 26768 e) House Tax 821937.50 f) Cart Tax - g) Bicycle Tax - h) Dog Tax - i) Licensing fees ( building 595884 shops/hotel/industries) j) Tourist fees (light) 28880.37 K) Penalty (garbage thrown on 500 roadside) l) Interest 404398 m) Trade Tax 28925 n) Application fee 2820 o) Market fee 795845 p) Parking fee ( - q) Tender form fee - r) Sale proceeds 250 Village Development Plan Chinchinim- Deussua 66
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Recovery tax/fees I.T,S.T, 55900 Royalty, EMD,SD, Ed. cess Advertisement on which tax 7710 shall be levied Entertainment tax - Rent for Village Panchayat - Others Receipts 65763 5 Agriculture including - agriculture extension 6 Land improvement implementation of land - reforms, land consolidation and soil conservation 7 Minor irrigation, water management and watershed - development 8 Animal husbandry, dairying - and poultry 9 Fisheries - 10 Social Forestry - & forestry 11 Minor Forest - Produce 12 Small scale industries, including food processing - industries 13 Khadi, Village & collage - industries 14 Rural Housing -
15 Drinking Water -
16 Fuel and Fodder -
17 Roads, culverts, bridge, ferries, water ways and other means of -
communication 18 Rural electrification, including distribution of electricity (street 205722 light operators & electrical materials) 19 Non-conventional energy - source
Village Development Plan Chinchinim- Deussua 67
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
20 Poverty alleviation - programmes 21 Education, including primary & 5700 secondary schools 22 Technical training and - vocational education 23 Adult & non-formal education -
24 Libraries -
25 Cultural activities -
26 Markets and fairs 91200
27 Health & sanitation, including hospitals, primary health 127600
centres and dispensaries 28 Family Welfare -
29 Woman & child - Development 30 Social Welfare, including welfare of the handicapped and 1000
mentally retarded 31 Welfare of the weaker sections,& in particular of the - scheduled Caste and the Scheduled Tribes 32 Public distribution 701300
System 33 Maintenance of Community - assets 34 Construction and maintenance of cattle sheds, ponds and cars -
stands 35 Construction & maintenance of - slaughter houses 36 Maintenance of public parks, 772284 playground etc 37 Providing reliefs in natural - calamities 38 CSR/Donation 42625
39 Administration 428177
a) Refreshment 49806
Village Development Plan Chinchinim- Deussua 68
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
b) staff salary 714468
c) Stationary 110056
d) Maintenance 5400 of Building e) Utility Services
f) TA/DA 48030
Misc 90493
Total 5418998 3393861
Annexure 3-A
DETAILS OF COMMITTEES
Any Gram Issues complaint Commit As How No. Of sabha Existence No. of Active/ discussed received Name of tee per frequently members resolution of present Memb non last against Remarks Committee Constitu Nor meetings meeting on issued committee ers Active meeting committee ted ms organised attended in years attended raised by in the last committee year As and 1st when meeting 1.Village required - 47 Developm 10 Yes Yes 53 Active as per ent months decision 2nd Committee of the meeting Sarpanch -22 2.Water Sanitation No Committee 3.Village Education No Committee 4.Social Audit No Committee As and 1st 5.Garbage/ when meeting Waste required - 7 10 Manageme Yes Yes 7 Active as per 2nd months nt decision meeting Committee of the -7 Sarpanch 6.Child Developm 10 Yes Yes 6 No ent months Committee 7.Any Other Committee 8. Bio As and 1st 10 Yes Yes 7 Active Diversity when meeting months Village Development Plan Chinchinim- Deussua 69
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Committee required - 8 as per 2nd decision meeting of the -4 Sarpanch 9.Supervis ory No Committee 10.Sarva Shiksha No Abhiyan Committee 11.Health Sanitation 10 and Yes Yes 8 No months Nutrition Committee 12.Standin 10 g Yes Yes 18 No months Committee As and when 13.Road required 10 Safety Yes Yes 7 Active as per 18 months Committee decision of the Sarpanch 14.Touris m No Committee 15.Adviso ry No Committee 16.Vigilan ce No Committee 17.Forest Right No Committee 18.Traditi onal Occupatio No n Committee 19.Stray dog No Committee 20.Reginal Plan No Committee 21.Animal Birth No control committee 22.Social As and 10 Justice Yes Yes 8 Active when 3 months Committee required
Village Development Plan Chinchinim- Deussua 70
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
as per decision of the Sarpanch 23. women & Child No Committee
24.Art and Culrture No Committee 25.Any Other Committee (i).Product 10 ion Yes Yes 7 No months Committee (ii).Amnet 10 ies Yes Yes 7 No months Committee (iii).Sterri 10 ng Yes Yes 7 No months Committee
Village Development Plan Chinchinim- Deussua 71
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
ACTION PLAN FOR THE PLANNING PROCESS AND PREPARATION OF DRAFT GPDP AT VILLAGE PANCHAYAT LEVEL
Taluka: - Salcete
Date for Date for Date for awareness Date for Date for approval Date for Date for approval Village creation the preparation of the GPDP by submission of of the Panchayat on planning of DSR and draft Panchayat plan BDOs draft by planning Processor GPDP GPDP by Body Office VDC in village Gram 1 2 3 4 5 6 7 8
14th, 15th & 14th 17th Chinchinim- 8th June 17th January 16th June 17th June 2018 October December 18th June 2018 Deussua 2018 2018 2018 2017 2017
Village Development Plan Chinchinim- Deussua 72
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Gram Panchayat Developmental Plan 2017 – 18 (Phase – 1)
1. It is resolved unanimously to construct drainage near Collins Pereira residence & installing a slab around 100 meters.
2. Laying of interlocking blocks in Dandeavaddo near Catering College.
3. Construction of drainage from G.P.S Chinchinim to fields near PHC (Health Center), Chinchinim. 4. Repairs of existing drains at Dandeavaddo from Michael Fernandes house to fields. 5. Laying of road side Pavers opp. ICICI bank Chinchinim at Alleamvaddo. 6. Construction of drain with slab near Syrian Barretto house to Almar Apartment at Alleawaddo. 7. Construction of drainage with slabs at Caritas Colony from Albert house to Inacio Rebello house at Baida. 8. Painting & Beutification of Govt. Primary school at Baida. 9. Construction of drainage from Josifa Rebello house to Zoribhat Holy Cross Chapel on southern side and from Anthony Rodrigues house to Zoribhat chapel on the northern side. 10. To undertake roadside cutting near Anthony Rodrigues plot and laying of concrete slabs over drainage till the house of Raju Raikar. 11. Construction of drainage near St.Cruz chapel near Grande Durga. 12. Laying of pavers in front of Sucaldem Youth Club. 13. Construction of drainage near Rosario Cardozo house in Palmar Grande 14. Construction of drainage near Evaristo Pereira house Voilowaddo, Palmar Grande. 15. Construction of drainage from Maria Soares house connecting existing drainage to Alberto Dcosta property Sucaldem.
Village Development Plan Chinchinim- Deussua 73
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
16. Construction of footpath along road by laying pavers opposite Crown Servicing Station. 17. Repairing of drainage from Roven Residence leading towards fields. 18. Construction of drainage from house of Anthony Leitao to Brenda Leitao house at Coddeavaddo. 19. Construction of drainage from house of Linda Pereira to Delphina Viegas house at Coddeavaddo. 20. Construction of drain along the road from Peter Correia house to Anthony Cardoz house 21. Beautification of Deussua lake surroundings at ward X 22. Maintenance & Improvement of existing walking track surround Deussua Lake. 23. Work of painting of St. Anthonian Club. 24. Reducing of height of existing wall and laying of Balloosters at Secreamvaddo near house of Mr. Fernandes. 25. Construction of road from Savio Coutinho house to Antonio Pinto’s house at ward XI.
Village Development Plan Chinchinim- Deussua 74
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Gram Panchayat Developmental Plan 2017 – 18 (Phase – 2)
1. It is resolved to construction of Drainage near Filomena Barretto, Rocky Coutinho residence, Mingfoll in ward I. 2. It is resolved undertake work of cleaning and maintaining of Play ground in Mingfoll. 3. It is resolved to undertake construction of drains with Slabs near Willy D’Silva in Bandfoll. 4. It is resolved unanimously to undertake or installation of Convex mirrors of 5 numbers in Mingfoll & Caramorod. 5. Construction of road at St.Cross Chapel at Francis Vaz house to Charlie Dias house Dandeavaddo. 6. Construction of road at Felix Gracias houseto Ivy Dias house, Dandeavaddo. 7. Laying of Pavers/ interlocking blocks at Maggie’s house to Sardin Barretto house at Dandeavaddo. 8. Cleaning & Desilting of drain from Maria Mendes house to Martha Serrao House at Alleawaddo. 9. Hotmixing of raod near Sebastian Classic Housing Co-operative society at Alleawaddo. 10. Hotmixing of Road near Senador house at Alleawaddo. 11. Laying of cement slabs at various spots at Baida. 12. Construction of Children Park in existing open space at Caritas Colony. 13. Removal of Pipe towards house of Sesolina and replace with iron grilling near Zoribhat Chapel. 14. Removal of pipes & replace with concrete slabs towards road going to Sant Moddi at Zoribhat in Bosco’s property. 15. Construction of road near water tank, Gonsai at ward VI.
Village Development Plan Chinchinim- Deussua 75
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
16. Construction of road near new Durga near new Durga near property of Lowrence Cardozo. 17. Construction of Shed near crematorium at ward VI. 18. Installation of convex mirrors at intersection of various roads at ward VII. 19. Development of Sucaldem play ground. 20. Laying of pavers near the Datta Mandir 21. Construction of footpath from Agosto Pereira house to Juliet Leitao house wityh laying of pavers. 22. Installation of Convex mirror for dangerous intersection of road at ward no VIII. 23. Construction of drain from Joanita Leitao house to Newton Leitao house towards tolleaband. 24. Leveling of drainage near Kamat store. 25. Construction of Tar roads at all internal roads at Coddeavaddo. 26. Installation of Convex mirrors near Chapel of Coddeavaddo. 27. Construction of walking track on both sides of by pass from Arvind Coutinho house to St. Sebastian Chapel at ward X. 28. Construction of Children Park near Deussua lake and construction of hall for recreation for Senior Citizen at ward X. 29. Laying of convex mirrors at dangerous intersection road. 30. Construction of drainage from Zakarians Furtado house to Sidhesh Lotlikar house. 31. Extension of street light from Deussua Orlim road to Cajie Cracias house. 32. Repairs of existing Tinto/ Fish Market including painting/ tilling and laying of Pavers. 33. Repairs of existing road from garage to Dmello’s house. 34. Construction of retaring road at Coddeavaddo from Tony Cardozo to Juliet Viegas house and drainage slab to cover the drain hence the road is narrow 35. Construction of drain at Peter Correia house in ward no. IX. Village Development Plan Chinchinim- Deussua 76
GRAM PANCHAYAT DEVELOPMENT PLAN V. P. CHINCHINIM – DEUSSUA
Village Development Plan Chinchinim- Deussua 77