Highway System Preservation Projects
Total Page:16
File Type:pdf, Size:1020Kb
Highway System Preservation Projects Route Funding Years Years Years Number or Project Description Source* 1 to 4 5 to 10 11 to 27 Street Beacon Falls Beacon Valley Reconstruct Beacon Valley Bridge #05364 on new LOTCIP $1,500,000 Road alignment over the Beacon Hill Brook Burton Road & Realign intersection into a "T" intersection & clear sight STBG $1,500,000 Maple Avenue line issues Intersection safety improvements at Lopus Road & Route 42 STBG $1,500,000 Pines Bridge Road; straighten & widen Intersection Bethlehem Nonnewaug Replace Bridge 06121 over East Spring Brook BRZ $2,700,000 Road Flanders Road Reconstruct 1.5 mile section of Flanders Road STP-R $3,500,000 Intersection and geometric improvements at various Route 61 locations along Route 61, including at Flanders Road & STBG $1,500,000 Green Hill Road Intersection improvements at various locations Route Route 132 132: Improve sight lines, grade, and vertical and STBG $6,000,000 horizonal geometry. Realign intersection at Town Green to address skew Route 61 STBG $350,000 and align stop sign and stop bar Maddox Road Reconstruction of Bridge #05172 on Maddox Road Local Bridge $1,500,000 Bristol Intersection Improvements along Route 72 to Memorial Avenue, including improving 5-way intersection of Route 72 Downs St, Blakeslee St, Riverside Ave & Memorial NHPP $3,000,000 Blvd and replacing bridge 04205 and realigning Riverside Ave to create a four-way intersection Louisiana Replace Bridge 04480 over Coppermine Brook BRZ $4,110,000 Avenue Appendix A-1System Preservation Page 1 Bristol Roundabout Study: Evaluate feasibility of Various STBG $200,000 installing roundabouts at various locations US 6 & Route Intersection improvements to eliminate triangle NHPP $3,000,000 229 Route 229 Corridor Study : Develop strategies to Route 229 address pedestrian, bike & driver safety along corridor STBG $200,000 and opportunities to improve access control Woodland & STBG; Realign intersection to improve geometry & sight lines. $3,500,000 King Street LOTCIP Cheshire Traffic Signal Replacements to Accommodate Various Ramp Up $966,000 Pedestrians Intersection improvements at Cook Hill Rd and at Route 10 STBG $3,750,000 South Brooksvale Rd & Harrison Rd Intersection realignment at Lancaster Way & STBG; Jarvis Street $600,000 Guinevere Ridge LOTCIP Intersection improvements at Maple St and lengthen Route 70 STBG $150,000 dedicated left turn signal on to Route 70 Coordinate signals on Route 10 and install Adaptive Route 10 STBG $2,000,000 Traffic Control Systems Middlebury Benson Road Rehabilitate bridge 01160 over I-84 BRZ $5,500,000 STBG; Tucker Hill Road Improve geometry at Tucker Hill Road & Regan Road $2,500,000 LOTCIP Naugatuck Intersection Improvement at Hoadley St & Melbourne Rubber Avenue SIPH $800,000 St Route 63 Replace Traffic Control Signal at Rubber Avenue SIPH $335,000 North Main Reconstruction & roadway improvements from Calvin LOTCIP $3,000,000 Street St to Union St STBG; Cross Street Roadway improvements along 3300 LF of Cross Street $3,000,000 LOTCIP Field Street & Intersection Improvements to Improve sight lines and STBG; $1,000,000 Jones Road geometry LOTCIP Appendix A-1System Preservation Page 2 Intersection improvements at Rubber Ave and Meadow Route 63 NHPP $2,500,000 St to improve pedestrian safety LRARP; Mulberry Street Realign and traighten curves on Mulberry St $3,250,000 LOTCIP Reconstruct Rubber Avenue, including roadway, Rubber Ave sidewalk, drainage, from Old Fire House Rd to LOTCIP $4,000,000 Melbourne St Construct roundabout at Route 63, Church St & Millville Route 63 STBG $3,000,000 Ave to improve function and safety Oxford Dutton Road : Replace Bridge 04913 over Little River BRZ $2,160,000 Geometry improvements to soften major curve at Old Route 42 STBG $2,000,000 Litchfield Turnpike Intersection safety improvements along Route 67 to Route 67 improve geometry and sght lines at 8 skewed STBG $6,000,000 intersections from Chestnut Tree Hill Rd to Hawley Rd Plymouth Intersection improvements at North Main St to realign US Route 6 intersection and widen US Route 6 to provide left-turn NHPP $3,770,000 lanes Reconstruct to mprove vertical and horizontal Greystone Road STBG $9,000,000 geometry, clear sight lines, and add shoulder Harwinton Reconstruct from Schroback Rd to Armbruster Rd and STBG; $2,700,000 Avenue improve drainage and deficient geometry LOTCIP Harwinton Reconstruct from US Route 6 to Schroback Rd and STBG; $4,000,000 Avenue improve drainage and deficient geometry LOTCIP Intersection improvements at Harwinton Ave to realign US Route 6 NHPP $1,500,000 intersection into a "T" Improve geometry at South Main St, add sidewalk South Main barrier (curb), clear sight lines and add advanced STBG $3,000,000 Street warning signs of curve Reconstruct and realign at East Plymouth Road and Tory Crossing LOTCIP $2,000,000 Matthews St to improve geometry Appendix A-1System Preservation Page 3 Prospect Corridor Improvements: Reassess signal timing and Route 69; implement access management along Route 69 and NHPP $750,000 Route 68 Route 68 Reconstruct from Maria Hotchkiss Road to the Scott Road LOTCIP $4,000,000 intersection with Route 69 Route 68 Site Line Improvements at Talmadge Rd & Matthew St STBG $750,000 Southbury Buck Hill Road Rehabilitate bridge 01157 over I-84 BRZ $5,900,000 Signal Coordination Study: Study and coordinate Various STBG $250,000 signals throughout town to reduce congestion Thomaston Route 8 SB Rehabilitate bridge 01729 over Reynolds Bridge FIF-Bridge $800,000 Carter Road Repair bridge 140003 over Nibbling Brook $750,000 Realign Intersection at Watertown Rd and implement Route 109 STBG $1,500,000 geometry improvements Implement Main Street Safety Improvements along US US Route 6 Route at Route 8 NB exit 39 on- and off-ramps and at NHPP $1,250,000 Prospect St & Pleasant St Waterbury Rehabilitate bridge 03191A over I-84 WB, Route 8 & I-84 EB NHBR $52,627,966 Naugatuck River Rehabilitate bridge 03191B over I-84 WB, Route 8 & I-84 WB NHBR $39,025,587 Naugatuck River Downtown Signal Improvements: Traffic signal upgrade Various CMAQ $2,780,000 at 15 location in downtown Waterbury Rehabilitate 8 bridges at the I-84 & Route 8 I-84 & Route 8 interchange; bridges 03190 A, B, C, D, E, F & 03191 D, NHBR $124,183,766 E Rehabilitate bridge 03191F (ramp 197) over ramp 202 I-84 NHBR $5,000,000 (Meadow Street) Rehabilitate bridges 03176 & 03177 over Naugatuck Route 8 NHBR $10,200,000 River & local roads Appendix A-1System Preservation Page 4 Route 8 Rehabilitate bridges 03178 & 03179 over WBL NHBR $10,200,000 Widen to provide 28-foot cross section from Bunker Hill Aurora Street NHPP $5,940,000 Road to Watertown Ave Cooke Street & Install new traffic signal STBG $500,000 Rosebud St Eagle Street Reconstruct bridge over Naugatuck River Local Bridge $8,000,000 Reconstruct from North Main Street to Elm St and East Main Street provide additional on street parking and dedicated bus LOTCIP $3,000,000 lane Construct spot improvements and lane configurations SR 801 STBG $6,000,000 to provide a uniform road width and number of lanes Improve traffic operations at the signalized intersection Route 69 NHPP $500,000 with Edgewood Avenue Intersection improvements at Southmayd Rd & Route 69 NHPP $3,000,000 Meriden Rd and realign to make "T" Intersection North Main Install new traffic signals at Tudor St and Griggs St LOTCIP $1,500,000 Street North Main Construct traffic calming & intersection improvements STBG $1,500,000 Street Construct safety improvments and remove 1 through SR 801 lane in EB direction between Cherry Street and Brass LRARP $380,656 Mill Dr Walnut Street Construct safety improvments to mprove geometry LRARP $224,332 Washington Reconstruct bridge over Mad River Local Bridge $8,000,000 Street Watertown Reconstructfrom Eastwood Hall Rd to Crest View Rd to Guernseytown soften horizontal and vertical geometry and improve LOTCIP $3,416,400 Road intersection with West Road by improving sightlines Improve signal timing at Buckingham St, Hillside Ave Route 73 NHPP $1,000,000 and Riverside St/Davies St Middlebury Construct safety Improvements to improve geometry STBG $1,500,000 Road and sight lines Add left turn lane to mitigate congestion from Route 63 STBG $1,500,000 Middlebury TL to Bunker Hill Rd Appendix A-1System Preservation Page 5 Lake Construct safety improvements and adjust curvature to STBG $750,000 Winnemaug Rd align Sperry Rd at a 90 degree angle Wolcott Route 69 Replace bridge 03240 over Mad River FIF-Bridge $3,000,000 Wolcott Tank Replacements ENV Comp $1,300,000 Improve sight lines at various intersections through SR 844 STBG $650,000 tree trimming and minor widening Woodbury Hazel Plain : Replace bridge 05849 over Sprain Brook BRZ $2,700,000 Road Construct intersection Improvements at Main St & US Route 6, Sycamore Ave and upgrade ADA compliance and STBG $1,500,000 Route 317 traffic signals Construct intersection improvements by reducing US Route 6 STBG $1,000,000 turning radius at Old Sherman Hill Road Total: $367,179,707 $56,190,000 $0 Various Regional Bridge Program: Rehabilitate, widen and repair various bridges in the metropolitan planning area NVCOG Various $30,000,000 $50,000,000 to achieve Bridge Condition performance measures targets. Locations to be determined Regional Pavement Program: Resurface various state and local roads and highways in the metropolitan NVCOG planning area to achieve Pavement Condition Various $30,000,000 $50,000,000 performance measures targets. Locations to be determined Regional Reconstruction Program: Reconsturct