15.07.2020 to 17.07.2020

Total Page:16

File Type:pdf, Size:1020Kb

15.07.2020 to 17.07.2020 DAILY UPDATED CURRENT AFFAIRS: 15.07.2020 TO 17.07.2020 .12.2018 NATIONAL Indian Railways first cable.2018-stayed bridge ‘Anji Khad Bridge’ being set up in Jammu & Kashmir India’s first cable-stayed railway bridge ‘Anji Khad Bridge is being constructed by the Indian Railways’ in Jammu & Kashmir.11.2018 to connect Katra and Reasi Section of Jammu–Baramulla line. The Rs. 458 crore railway bridge is being developed by Konkan Railway Corporation Limited, a Government of India undertaking. The total length of the Anji Khad Bridge is 473.25 metres, standing at a height of 331 metres above the Chenab river bed. The project is a part of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project of the Indian Railways’. The USBRL project also involves the construction of Chenab river bridge, a steel and concrete arch bridge. Once completed, the Chenab bridge will become the world’s highest rail bridge. Hyderabad Airport Introduced India’s first Completely Contactless Car Parking facility Amid Pandemic The GMR Hyderabad International Airport (GHIAL) has introduced India’s first fully contact-less airport car parking facility due to the current COVID-19 pandemic crisis. In November 2019, the Rajiv Gandhi International Airport, Hyderabad, had introduced India’s first- ever”NETC FASTag Car Park” in collaboration with NPCI. But that facility was available only for ICICI Bank holders. Now keeping in mind the current situation, GHAIL has scaled up its NETC (National Electronic Toll Collection) FASTag car parking in collaboration with NPCI (National Payments Corporation of India) by integrating 10 NETC FASTag issuer banks. The NETC FASTag car parking solution is based on a simple to use, reloadable electronic Radio- frequency Identification (RFID) tag which will enable automatic deduction of applicable parking charges, while one drives through the car park without stopping for any cash transaction. However, the traditional mode of transaction with digital payment over-the-counter option will also be available. HRD Minister Ramesh Pokhriyal ‘Nishank’ Launched World’s Most Affordable COVID-19 Diagnostic Kit ‘Corosure’ Developed by IIT Delhi The Union Minister of Human Resource Development (HRD), Shri Ramesh Pokhriyal’ Nishank’ virtually launched the World’s most affordable RT-PCR based COVID-19 diagnostic kit ‘Corosure’ in New Delhi. The low-cost COVID-19 Diagnostic Kit has been developed indigenously by Indian Institute of Technology (IIT) Delhi, in line with Prime Minister Shri Narendra Modi’s vision of becoming a self- reliant India. The kit has been approved by the ICMR and DCGI. It is much cheaper than other kits. This will make the cost per test considerably cheaper compared to currently available kits in the market. IIT Kanpur developed UV sanitizing device ‘SHUDH’ to disinfect room in 15 mins A team of engineers at IIT Kanpur has developed an Ultraviolet (UV) sanitizing product named SHUDH, which is capable to disinfect a 10 sqft room in about 15 minutes. SHUDH stands for Smartphone operated Handy Ultraviolet Disinfection Helper. It has been jointly developed by J. Ramkumar, Amandeep Singh and ShivamSachan. SHUDH has six UV lights of 15 Watts each that can be individually monitored from a distance and can be rotated up to 360 degrees. Users can use the number of lights based upon the size of the room. Simply by installing an Android application, user can remotely control the on-off, speed and location of the product using the available smartphone. It can also run with Bluetooth technology. The device will be useful for disinfecting places like hospitals, hotel, malls, offices, schools, etc. to prevent infection, without the need to touch the device. IIT Kanpur Incubated Start-ups Develops Smart Water Quality Testing Device “PADMAVATI” Two of the IIT Kanpur Incubated Start-ups namely Earth face Analytics Pvt. Ltd. & KritsnamTechnologies Pvt. Ltd. have developed a device, named as ‘PADMAVATI’, to analyze and monitor the quality of water. 1441, Opp. IOCL Petrol Pump, CRPF Square, Bhubaneswar-750015 1 Ph. : (0674) 6556677, 8093556677. Web :www.vanik.org, E-mail : [email protected] DAILY UPDATED CURRENT AFFAIRS: 15.07.2020 TO 17.07.2020 The device will monitor.12.2018 the water quality with the help of easy to use colorimetric test-strip, based on smart-phone technology.2018 that screens multiple important water quality parameters in less than 2 minutes. HRD Minister Ramesh Pokhriyal introduces ‘Pragyata- Guidelines for Online Education’ The Union Minister.11.2018 of Human Resource Development, Shri Ramesh Pokhriyal Nishank released the ‘PRAGYATA’: Guidelines on #Digital Education. ‘Pragyata’ is an eight step guidelines on digital education for school heads, teachers, parents and students, to assist them in e-learning, such as recommended screen time for children, tips on coping with mental/physical stress during #Digital Learning, among other things. These eight steps include: Plan, Review, Arrange, Guide, Yak (talk), Assign, Track, and Appreciate. Some of the areas in which the guidelines have been introduced for administrators, school heads, teachers, parents, and students include: Need assessment Concerns while planning online and digital education like duration, screen time, inclusiveness, balanced online and offline activities, etc. level-wise Modalities of intervention including resource curation, level-wise delivery, etc. Physical, mental health, and wellbeing during digital education Cyber safety and ethical practices including precautions and measures for maintaining cyber safety Collaboration and convergence with various initiatives. Indian Railways to become “Green Railway” in Mission Mode by 2030 The Ministry of Railways has set the target of transforming the Indian Railways into Green Railways by 2030. Therefore, the government has taken a number of major initiatives towards mitigation of global warming and combating climate change to achieve this target. Some of the efforts of the Indian Railways under Green Initiatives are listed below. Electrification of routes: Target of electrification of 7000 Route km (RKM) in the year 2020-21. All routes on Broad Gauge network have been planned to be electrified by December 2023. Roof top Solar panels: 100 MW of Solar plants have been commissioned on roof-tops of various buildings including 900 stations; 400 MW are under different stages of execution. Land Based Solar plants: Indian Railway has 51,000 hectare of land potential of installing 20 GW land based solar plants. Bina Solar Project: Indian Railways has already. Installed first-of-its kind in the world, 1.7 megawatt solar power plant in Bina, Madhya Pradesh. The energy generated from the power plant will be used to run trains. The solar power plant has been set up as a pilot project by Railways in collaboration with Bharat Heavy Electrical Limited (BHEL) and the pilot project is under extensive testing and trial. Wind-based power plants: 103 MW wind-based power plants have already been commissioned and plan is to commission 200 MW wind energy plants in next 2 years in Tamil Nadu, Gujarat, Rajasthan and Karnataka. Other green initiatives: 69,000 coaches have been fitted with more than 2, 44,000 bio-toilets. 100 percent LED illumination of buildings and stations. INTERNATIONAL Iran dropped India from Chabahar Rail Project due to funding delay Iran has dropped India from the Chabahar rail project, for the construction of railway line from Chabahar port to Zahedan, along the Iran-Afghanistan border. The reason that Iran gave for dropping India was delays from the Indian side in funding and starting the construction of the project. Iran has now decided to move ahead with the construction of Chabahar railway line to Zahedan on its own. Around 690 million people were found hungry in 2019, with highest population in Asia: UN Report As per the annual ‘State of Food Security and Nutrition in the World’ report, by United Nations, almost 690 million people (8.9% of overall population) went hungry in 2019. This figure is up by 10 million from 2018, and by nearly 60 million in five years. 1441, Opp. IOCL Petrol Pump, CRPF Square, Bhubaneswar-750015 2 Ph. : (0674) 6556677, 8093556677. Web :www.vanik.org, E-mail : [email protected] DAILY UPDATED CURRENT AFFAIRS: 15.07.2020 TO 17.07.2020 This means that more.12.2018 people are going hungry while tens of millions have joined the ranks of the chronically undernourished.2018 over the past five years, and countries around the world continue to struggle with multiple forms of malnutrition. China Successfully Launched.11.2018 High-throughput broadband communications satellite APSTAR-6D China successfully launched the APSTAR-6D satellite– a high-power broadband communications satellite into orbit, to provide broadband internet service. The APSTAR-6D telecommunication satellite was launched aboard a Long March 3B carrier rocket from Xichang Satellite Launch Center. APSTAR-6D is designed and manufactured by the China Academy of Space Technology (CAST), a subsidiary of China Aerospace Science and Technology Corporation (CASC). India ranked tenth globally in intellectual property filings in 2018, China tops: WIPO Report India has emerged as the top tenth nation in the ranking of the total (resident and abroad) Intellectual Property (IP) filing activity, as per World Intellectual Property Indicators-2019 Report. The overall ranking has been topped by China, which was the main source of growth in worldwide IP filings in 2018. China was followed by United States, Germany, Japan, and Republic of Korea as the top five nations in the list. BANKING AND ECONOMY Qualcomm Ventures become 12th Investor in Jio Platforms; Invests Rs 730 crore to acquire 0.15% stake Qualcomm Ventures, the investment arm of US-based wireless technology company Qualcomm Incorporated has invested Rs 730 crore in ‘Jio Platforms’ for a 0.15 % stake in the company. Qualcomm Ventures is the 12th investor to buy a stake in Jio Platforms. Qualcomm’s investment marks the 13th investment in Jio platforms.
Recommended publications
  • Lm+D Ifjogu Vksj Jktekxz Ea=H Be Pleased to State
    GOVERNMENT OF INDIA MINISTRY OF ROAD TRANSPORT AND HIGHWAYS LOK SABHA UNSTARRED QUESTION NO. 4116 ANSWERED ON 12TH DECEMBER, 2019 IMPLEMENTATION OF FASTAG 4116. SHRI N.K. PREMACHANDRAN: Will the Minister of ROAD TRANSPORT AND HIGHWAYS lM+d ifjogu vkSj jktekxZ ea=h be pleased to state: (a) whether the Government has made arrangements for introducing FASTag across the country and if so, the details thereof; (b) whether all the States have not signed the agreement for introducing the FASTag and if so, the details thereof; (c) the details of toll booths managed under NHAI and other agencies on the National Highways in the State of Kerala; (d) whether the Government has made arrangements for providing FASTag facility to all vehicles in Kerala and if so, the details thereof; (e) whether the Government proposes to implement FASTag system on the State Highways in Kerala and if so, the details thereof; and (f) whether the Government proposes to extend the implementation date of FASTag in Kerala and if so, the details thereof? ANSWER THE MINISTER OF ROAD TRANSPORT AND HIGHWAYS (SHRI NITIN JAIRAM GADKARI) (a) &(d) Government has launched National Electronic Toll Collection (NETC) programme to implement fee collection across all Fee Plazas on National Highways through FASTag. The Points of Sale (PoS) for issuing FASTag have been setup at fee plazas, Common Service Centers, certain Regional Transport Offices (RTOs) and other places by banks and Indian Highways Management Company Limited (IHMCL) under National Highways Authority of India (NHAI). Online platforms such as Paytm and Amazon are also made available for easy accessibility of FASTag across country.
    [Show full text]
  • Ministry of Road Transport & Highways (2020-21)
    7 MINISTRY OF ROAD TRANSPORT & HIGHWAYS ESTIMATES AND FUNCTIONING OF NATIONAL HIGHWAY PROJECTS INCLUDING BHARATMALA PROJECTS COMMITTEE ON ESTIMATES (2020-21) SEVENTH REPORT ___________________________________________ (SEVENTEENTH LOK SABHA) LOK SABHA SECRETARIAT NEW DELHI SEVENTH REPORT COMMITTEE ON ESTIMATES (2020-21) (SEVENTEENTH LOK SABHA) MINISTRY OF ROAD TRANSPORT & HIGHWAYS ESTIMATES AND FUNCTIONING OF NATIONAL HIGHWAY PROJECTS INCLUDING BHARATMALA PROJECTS Presented to Lok Sabha on 09 February, 2021 _______ LOK SABHA SECRETARIAT NEW DELHI February, 2021/ Magha, 1942(S) ________________________________________________________ CONTENTS PAGE COMPOSITION OF THE COMMITTEE ON ESTIMATES (2019-20) (iii) COMPOSITION OF THE COMMITTEE ON ESTIMATES (2020-21) (iv) INTRODUCTION (v) PART - I CHAPTER I Introductory 1 Associated Offices of MoRTH 1 Plan-wise increase in National Highway (NH) length 3 CHAPTER II Financial Performance 5 Financial Plan indicating the source of funds upto 2020-21 5 for Phase-I of Bharatmala Pariyojana and other schemes for development of roads/NHs Central Road and Infrastructure Fund (CRIF) 7 CHAPTER III Physical Performance 9 Details of physical performance of construction of NHs 9 Details of progress of other ongoing schemes apart from 10 Bharatmala Pariyojana/NHDP Reasons for delays NH projects and steps taken to expedite 10 the process Details of NHs included under Bharatmala Pariyojana 13 Consideration for approving State roads as new NHs 15 State-wise details of DPR works awarded for State roads 17 approved in-principle
    [Show full text]
  • (Rfq) for Selection of Acquiring Bank Across Selected Public Funded Toll Plazas on National Highways
    REQUEST FOR QUOTATION (RFQ) FOR SELECTION OF ACQUIRING BANK ACROSS SELECTED PUBLIC FUNDED TOLL PLAZAS ON NATIONAL HIGHWAYS RFQ No. IHMCL/ETC/Acquirer Bank/Feb/2020 Indian Highways Management Company Ltd. MARCH 3, 2020 Sector-19, Dwarka, New Delhi-110075 Email: [email protected] Indian Highways Management Company Ltd Quotations are invited by the Indian Highways Management Company Limited (IHMCL) for the following: Name of Work: Selection of Acquiring Bank across Selected Public Funded Toll Plazas on National Highways Sl Head Details # 1. Key Dates Date of Issue – 03/03/2020 Last date of Online Submission of Financial Submission Form on e-tender portal: - 12/03/2020 (Up to 15:00 Hrs IST). Opening of Financial Submission Form on e-tender portal: - 13/03/2020 at 16:00 Hrs IST 2. Procedure for Financial Submission Form – (Annexure – B) must be Submission submitted online ONLY at http://etenders.gov.in NO physical submission from any bidder shall be considered for evaluation and shall be summarily rejected. 3. Eligibility Only certified existing Acquirer Banks under NETC programme shall Conditions be eligible for submitting their quotations as below: 1. Axis Bank 2. HDFC Bank 3. ICICI Bank 4. IDFC First Bank 5. IndusInd Bank 6. Kotak Mahindra Bank 7. KVB Bank 8. Paytm Payments Bank 9. Punjab National Bank 10. State Bank of India 4. Scope of Work Selected acquirer bank shall acquire all ETC transactions via FASTag across Public Funded toll plazas as identified in “Annexure A: List of Public Funded Plazas within the scope of RFQ”. The list of toll plazas as mentioned in Annexure-A is indicative only.
    [Show full text]
  • FOREWORD in Conservation and Protection of Earth’S This Manual Is an Essential Part of Your Natural Resources
    MARUTI SUZUKI INDIA LIMITED believes FOREWORD in conservation and protection of Earth’s This manual is an essential part of your natural resources. All information in this manual is based on the latest product information avail- vehicle and should remain with the vehicle To that end, we encourage every vehicle owner to recycle, trade-in or properly dis- able at the time of publication. Due to when resold or otherwise transferred to a improvements or other changes, there new owner or operator. Please read this pose of, as appropriate, used Engine Oil, coolant and other fluids, batteries and may be discrepancies between informa- manual carefully before operating your tion in this manual and your vehicle. tyres etc. new MARUTI SUZUKI and review the MARUTI SUZUKI INDIA LIMITED manual from time to time. It contains reserves the right to make production important information on safety, operation MARUTI SUZUKI INDIA LIMITED changes at any time, without notice and and maintenance. You are invited to avail without incurring any obligation to the three Free Inspection Services as make the same or similar changes to described in the manual. Three free vehicles previously built or sold. inspection coupons are attached to this manual. Please show this manual to your This vehicle may not comply with dealer while you take your MARUTI standards or regulations of other SUZUKI for any Service. countries. Before attempting to regis- To prolong the life of your vehicle and ter this vehicle in any other country, reduce maintenance cost, the periodic check all applicable regulations and maintenance must be carried out accord- make any necessary modifications.
    [Show full text]
  • Invit Investment Opportunity an Operational Portfolio of 24 Road Assets March 21
    All images and videos are shot at location InvIT Investment Opportunity An Operational Portfolio of 24 Road Assets March 21 Private & Confidential All images and videos are shot at location ABOUT InvIT InvIT Structure Sponsor (Shrem Infra Structure Private Limited) + Other Potential Unit Holders Trust managementservices Trustee (Axis Trustee Services Limited) Investment Manager Investmentmanagement services Trusteefees (Shrem Financial Private Limited) InvIT Loans to InvIT Interest & Princ. Repayment Lenders / NCD Investors Project Manager Investmentmanagement Investment Cash upstream (Shrem Road Projects Private Limited) Fees paid by SPVs Equity in the form of Dilip Buildcon Limited dividend (O&M Contractor) SRPL SIPL STPL 100% Cash up-streaming through Interest Debt Securities PIMA Services PIMA Fees on loan, loan repayment O&M O&M Fees 24 Road Assets Geographical Diversified Road Portfolio Operational Revenue Generating Portfolio of 24 projects entailing an equity Investment of ~₹ 15 Bn along with a Debt of ~₹40 Bn AAA (Stable) Rated Portfolio by ICRA & India Rating (Fitch) Attractive Road Portfolio built over Strong Foundation Operational Robust Risk Strong Technical & Projects Mitigants Management Team • 24 Project Assets spread across 5 states • Fixed-Price O&M Contracts in place with • Pro-active management team with acquired from DBL DBL for the entire life of all the assets extensive and continuous monitoring of the projects • All 24 Project Assets are operational and • 4 Year O&M expense moratorium for HAM revenue generating therefore no- projects securitized with cash collaterals • Periodic early inspection of the road asset quality by the in-house technical team construction related risk • Cross-collateralization for all the 24 before the site inspection by the govt.
    [Show full text]
  • S.No. Plaza Name Type Concessionaire NH State
    S.No. Plaza Name Type Concessionaire NH State Sullurpet Plaza (NH- SWARNA TOLLWAY 1 Conc. 16 Andhra Pradesh 16), (old NH-5) PRIVATE LIMITED Budhanam Plaza (NH- SWARNA TOLLWAY 2 Conc. 16 Andhra Pradesh 16),(old NH-5) PRIVATE LIMITED Nellore Plaza (NH- 16), SWARNA TOLLWAY 3 Conc. 16 Andhra Pradesh (old NH-5) PRIVATE LIMITED Keesara Plaza (NH-65), SWARNA TOLLWAY 4 Conc. 65 Andhra Pradesh (old NH-9) PRIVATE LIMITED Kaza Toll Plaza 5 Conc. IJM 65 Andhra Pradesh Mangalgiri 6 Amakthadu toll plaza Conc. MEP Infra Projects 44 Andhra Pradesh 7 Kasepalli toll plaza Conc. MEP Infra Projects 44 Andhra Pradesh 8 Marur toll plaza Conc. MEP Infra Projects 44 Andhra Pradesh Rayalasema 9 Palempalli Toll Plaza Conc. Expressway Private 40 Andhra Pradesh Limited Rayalasema 10 Chagalmarri Toll Plaza Conc. Expressway Private 40 Andhra Pradesh Limited KMC and BSCPL 11 Bollapalli Toll Plaza Conc. 16 Andhra Pradesh Infrastructure Ltd KMC and BSCPL 12 Musunur Toll Plaza Conc. 16 Andhra Pradesh Infrastructure Ltd KMC and BSCPL 13 Tangatur Toll Plaza Conc. 16 Andhra Pradesh Infrastructure Ltd 14 Chillakallu Conc. GMR 65 Andhra Pradesh 15 Bellupada PF NHAI 16 Andhra Pradesh 16 Madapam PF NHAI 16 Andhra Pradesh 17 Chilakpelam PF NHAI 16 Andhra Pradesh 18 Nathavalasa PF NHAI 16 Andhra Pradesh 19 Agnampadi PF NHAI 16 Andhra Pradesh 20 Vempadu PF NHAI 16 Andhra Pradesh 21 Krishnavaram PF NHAI 16 Andhra Pradesh 22 Kalaparru PF NHAI 16 Andhra Pradesh 23 Pottipadu PF NHAI 16 Andhra Pradesh 24 Pullur PF NHAI 44 Andhra Pradesh Panchvati 25 Colony(Vishakapatnam PF NHAI Andhra Pradesh Port Connectivity) Goshtani Gate of 26 Navy(Vishakapatnam PF NHAI 16 Andhra Pradesh Port Connectivity) 27 Laxmipuram PF NHAI 16 Andhra Pradesh 28 Unguturu Toll Plaza PF NHAI 16 Andhra Pradesh Eethakota at 29 PF NHAI 16 Andhra Pradesh Km.946.300 30 Asanpur Toll Plaza Conc.
    [Show full text]
  • What's Taking a Toll on the Implementation of Fastags?
    1/2/2020 What’s taking a toll on the implementation of FASTags? e-paper HOME LATEST TRENDING MY READS Market Dashboard Companies Markets Podcasts Money Start-ups Mutual Funds Budget 2020 A toll pLaza in Kanpur, Uttar Pradesh (Photo: Ramesh Pathania/Mint) What’s taking a toll on the implementation of FASTags? 4 min read . Updated: 01 Jan 2020, 11:06 PM IST Shreya Nandi The government is pushing for the faster adoption of FASTag, but consumer complaints suggest the system needs to be streamlined Topics FASTag NEW DELHI : When Delhi resident Anurag (name changed) was travelling through Uttar Pradesh’s Nayansar toll plaza, he not only paid the toll fee in cash but also lost an equal amount from his FASTag account. “The system was not able to read the FASTag strip (pasted on the windshield of the vehicle). So, I was asked to make the paymCelonste in cash, which I did. However, minutes after I exited the toll plaza, the amount was deducted from the FASTag account, too," he said. https://www.livemint.com/news/india/what-s-taking-a-toll-on-the-implementation-of-fastags-11577898864032.html 1/4 1/2/2020 What’s taking a toll on the implementation of FASTags? Anurag is not the only one. Teething issues, including shortage of tags, have takene- paaper toll on the implementation of FASTags, forcing the Centre to twice delay the HOME LATEST TRENDING MY READS mandatory rollout. SMeavrkeert aDla schobomardmuteCrosm phaanivese comMaprkleatsinedP odfc atsetschniMcoanle yglitcShtaerst-,u pws ith Mmuotunale Fyun gdsettinBugdget 2020 deducted twice from their bank accounts or e-wallets and the tag not working.
    [Show full text]
  • Monthty Summary for the Cabinet for the Month of February, 2021
    No. CD- 1 1 01 2/01 I 2020-Coord. Government of lndia Ministry of Road Transport & Highways (Coordination Section) Transport Bhawan, 1, Partiament Street, New Dethi - 110001 +\ Dated the { March, 2021 OFFICE MEMORANDUM Subject: - Monthty Summary for the Cabinet for the Month of February, 2021 . A copy of the unctassified portion of the Monthty Summary (Both Engtish & Hindi) for the cabinet pertaining to the Ministry of Road Transport and Highways for the month of February, 202'l is enctosed herewith for information. ?*rl,-* )z'^-,-'*t (Prashant Kumar) Section Officer(Coord) Enct. As above To, 1. At[ members of the Councit of the Ministers 2. Deputy Chairman, NlTl Aayog, Yojana Bhavan, New Dethi 3. Att Members of NlTl Aayog, Yojana Bhavan, New Dethi. ('10 spare copies) 4. Cabinet Secretary , Rashtrapati Bhavanm New Dethi 5. Alt Secretaries to Government of lndia 6. lnformation Officer, PIB , Shastri Bhavan, New Dethi Subject: Monthly Summary for the Cabinet for the month of February' 2021' has constructed 1. Award and construction of National Hiqhwavs: The Ministry ll,l33kmofNationatHighwaysuptoFebruary202'lascomparedto3'785km inFebruary,2020.TheawardfigureisS,5lskmduringthisperiodascompared to 4,775 km in the Previous Year. 2. Transport and Highwavs: The Ministry of Road Transport and Highways wi[[ also took after the devetopment of Ropeways and Atternate Mobitity sotutions. An amendment to the Government of lndia (Attocation of Business) Rutes, 1961 has been notified, to enabte th'is step. The Ministry witt have responsibitity for devetopment of ropeway and atternative mobitity sotutions technotogy, as wetl to give as construction, research, and poticy in this area. The move is expected a boost to the sector, by setting up a regutatory regime, and facititating research and new technology to come into this sector' A symposium on 3.
    [Show full text]
  • Driving Licence Fee Payment Gujarat
    Driving Licence Fee Payment Gujarat nuttedHewie isit mawkishly.politely poetical Ridable after Rudolf scabby sometimes Tray prewarms depilates his hissopor ticals hierarchically. intricately and Gibb chap propagate so callously! her shittah grotesquely, she When you are even with all living in licence fee gujarat driving license Applied for applying for driving licences for this two options these cookies and address proof of top it valid for admission under license slot gov learning licence. If you will be protected from amazon fulfillment of a permanent driving license or gathered by sarthi parivahan. This payment experience content is levied by federal bank account number of the login to fill them, premium payment because a document that set out. Here to learn gujarati festivals, a subsidiary of verification of the ration card, statutes and u telemedia and rules. Given in licence fee payment at the fee will be picked up with the official website and debited to match the application form no fee must be in. Applicants can you! Send my gujarat? The details and education world cuisines like selling insurance premium in licence fee payment you can book publishers in. Issuance of college shall remain fully liable for driving licence fee payment for free shipping that the tag members is required form and conditions carefully before concluding the. If real intelligence pm kisan online. These instructions on driving licence fee payment gujarat the gujarat, etc is torn, precincts and art sold in the choice of ll test is subject to a vehicle in gujarat. For gujarat is then search module input with traffic authority to payment? How familiar you wanted and driving licence fee payment gujarat and gujarat university accepts the education and.
    [Show full text]
  • Page-13 Local.Qxd
    DAILY EXCELSIOR, JAMMU FRIDAY, FEBRUARY 19, 2021 (PAGE 13) L&T delivers 100th K-9 Vajra Nearly 98.5 lakh COVID vaccine doses administered NHAI transitions to 100 pc howitzer to Indian Army NEW DELHI, Feb 18: initiative, the company established a to healthcare, frontline workers: Govt cashless tolling green-field manufacturing-cum- NEW DELHI, Feb 18: healthcare workers (HCWs) who Bihar, Tripura, Odisha, Uttarakhand, Jharkhand, NEW DELHI, Feb 18: 770 toll plazas (including State Chief of Army Staff Gen MM Plazas) across the country. integration and testing facility at its have taken the first dose and Lakshadweep, Gujarat, Lakshadweep, Himachal Pradesh, The NHAI today said it has Naravane today flagged off the Hazira manufacturing complex near The cumulative number of 4,64,932 HCWs who have taken Chhattisgarh, Uttarakhand, Haryana, Chhattisgarh, Jammu For the convenience of high- 100th K-9 Vajra tracked self-pro- COVID-19 vaccine doses admin- transitioned to 100 per cent cash- way users, new feature 'Check Surat to produce the guns. the second dose, along with Madhya Pradesh, Rajasthan, and Kashmir, Uttar Pradesh and less tolling at national highways pelled howitzer from a production istered to healthcare and frontline Balance Status' has been added in The ‘Armoured Systems 31,46,956 frontline workers Himachal Pradesh, Uttar Pradesh. Bihar. with the Government making facility of its maker Larsen and workers in the country has reached 'My FASTag App', National Complex’ at Hazira was dedicated (FLWs) who were administered On the other hand, seven A total of 10 states that record- FASTags mandatory. Toubro at Hazira near Surat.
    [Show full text]
  • Authorized Authorized Channel Partner For
    Authorized Channel Partner For: What is FasTag is an electronic toll collection system in India, operated by the National Highway Authority of India (NHAI). It employs Radio Frequency Identification (RFID) technology for making toll payments directly from the prepaid or savings account linked to it or directly toll owner. It is affixed on the windscreen of the vehicle and enables to drive through toll plazas without stopping for transactions. FASTag is also vehicle specific and once it is affixed to a vehicle, it cannot be transferred to another vehicle. FASTag can be purchased from any of the NETC Member Banks. If a FASTag is linked to the prepaid account, then it needs to be recharged/ topped-up as per the usage of the customer. If adequate balance is not maintained by the customer, the FASTag gets blacklisted at the toll plaza. In such a scenario if the customer travels through a toll plaza without recharging then he won't be able to avail the NETC services and would be required to pay the toll fare through cash. National Highways Authority of India (NHAI) and Indian Highways Management Company Limited (IHMCL) have authorized National Payments Corporation of India (NPCI) for providing a composite solution on Toll Collection Program. indusind BANK issues prepaid RFID Tags to customers which can be recharged. Once Tags are affixed on vehicle, that vehicles can pass through ETC lanes at Toll Plazas without stopping and Toll Charges will automatically deduct from the linked account The Government of India has taken an initiative program to digitize the system with cashless transactions, skip long waiting and queues, avoid congestion at Toll Plazas, save time and fuel, thus resulting to less pollution and fuel consumption for the vehicles.
    [Show full text]
  • Highway Rating/2021/E-181675 March 24, 2021 Public Notice
    TATS/Phone 91-11-25074100/25074200 TFax:91-11-25093507/ 25093514 NHAI National Highways Authority of India (Ministry of Road Transport and Highways) s-5 6, TET-10, ERT, TË Tt-110075 G-5&6, Sector-10, Dwarka, New Delhi-110075 NHAI/HOIHighway Rating/2021/E-181675 March 24, 2021 Public Notice Objective: Audit of Highway Rating by public spirited professionals with adequate understanding of different elements of highway rating as institutionalised based on Standard Operating Procedure (SOP). 1. The process of highway rating is primarily based on different elements of highway operations and is dynamic in nature. This exercise is first of its kind initiative across the world and is bound to improve over the coming years after involvement of all stakeholders. 2. The general public with requisite knowledge in the field of Civil Engineering is encouraged to carry out an independent study/audit of the highway rating on voluntary basis on any 4/6L highway stretch as per the Standard Operating Procedure (Enclosed) for influence length of any Toll Plaza. 3 The finding and results of your study may then be shared with the Independent Engineers/ Authority Engineers/ Supervision Consultants of the corresponding project stretch, which on verification shall be shared with the contractors/ concessionaries and Regional Offices and NHAI HQ for suitable action. The relevant contact details of respective officials are available at NHAI website www.nhai.gov.in. 4. This exercise will not only help in improving the public services offered to the road users but will also help in improving the standard of highway operations with involvement of all stakeholders including public.
    [Show full text]