Energy Sector of Georgia
Total Page:16
File Type:pdf, Size:1020Kb
ENERGY SECTOR OF GEORGIA 2010 Regional Energy Hub - Net Electricity Exporter • Reliable transit country and regional energy hub . Baku-Tbilisi-Ceyhan (BTC) oil pipeline . Baku-Supsa oil pipeline . South-Caucasus gas pipeline (SCP) from Shah-Deniz AGRI . North-South Gas pipeline . Georgia-Azerbaijan Southern Gas (GASP) • Gas supply contracts with Azerbaijan for 10 years and with Shah Deniz for 20 years • Transit role for oil & gas – pipelines and railway . Circa 1.6% of world oil production • LNG across Black Sea – Azerbaijan-Georgia-Romania Interconnection (AGRI) project initiated by three states together with NABUCCO/White Stream – huge potential to transport gas from the Caspian to Europe • The only country in the region (which doesn’t have its own gas resource) that was not effected by gas crises in January 2009 • Georgia/Romania MoU for transportation carbon recourses from Caspian via Black Sea • Net electricity exporter in all four neighboring countries • Construction of 500 and 154 KV power transmission line to Turkey • Additional new 500 KV interconnection to Turkey is negotiated • 5 new HPP projects under Construction with installed capacity of around 170 MW (7MW, 46 MW, 78 MW, 5 MW and 36 MW) • Huge untapped hydro resources • Only 18% of the country’s hydro potential has been utilised • Huge, rapidly growing consumption rate and high tariffs on the Turkish electricity market expandable to Iraq, Syria and EU countries • Once all three electricity lines are operational, total transmission capacity to Turkey will reach more than 2000 MW - 15 times more than current capacity Electricity Balance Current Projected Seasonal Asymmetry of Generation and Consumption 15% Winter Summer W W O O L L H 100% H G G I 85% I H H Thermal & Import Generation Hydro Consumption Tw/h 2004 2005 2006 2007 2008 2009 2010 Generation 6.9 7.1 7.6 8.3 8.6 8.9 9.4 Hydro 6.0 6.0 5.4 6.9 7.3 7.7 8.4 Thermal 0.9 1.0 2.2 1.5 1.3 1.2 1.0 Net Import / Export -1.2 -1.3 -0.7 0.2 0.3 0.5 1.3 Consumption 8.1 8.3 8.3 8.1 8.3 8.4 8.1 Distribution 5.7 5.9 5.9 5.9 6.0 6.1 6.0 Direct Customers 1.7 1.9 2.0 2.0 2.1 2.1 2.1 Transmission Losses 0.7 0.5 0.4 0.2 0.2 0.2 0.4 Consumption per capita 1.8 1.8 1.84 1.9 1.9 1.95 1.87 Source : Ministry of Energy of Georgia Transmission Capacity Russia - 900 MW 220KV Azerbaijan - 1300MW Armenia - 600 MW 500 KV Russia Turkey - 2000MW KHUDONI HPP (750 MW) NAMAKHVANI HPP (450 MW) ENGURI HPP ONI HPP (281 MW) 500KV Existing Lines Planned ZESTAPHONI B DC Link - HVDC KSANI BAKHVI HPP (6 MW) AKHALTSIKHE MTKVARI HPP (38 MW) B MARNEULI GARDABANI PARAVANI HPP (78MW) 154 KV 220KV 500/400 KV 330KV 500KV 400KV Turkey Azerbaijan Armenia Potential Medium and Small Size Hydro Projects The Cadastre of small hydro power technical potential of Georgia’s rivers includes around 300 potential places for new hydro with total capacity 4000 MW Information on potential projects Oni Cascade (5 HPP) – 282 MW available at: Kheledula Cascade (3 HPP) – 85 MW www.minenergy.gov.ge Magana Cascade (2 HPP) – 42 MW Potential Medium and Small Size Hydro Projects # Project Name River Name Region Capacity MW Regulation Type 1 Magana HPP Magana Samegrelo 20.6 Reservoir 2 Leqarde HPP Magana Samegrelo 20.0 Run-of-the-River 3 Medani HPP Chanis Tskali Samegrelo 4.4 Run-of-the-River 4 Lebarde HPP I Lebarde Samegrelo 4.56 Run-of-the-River 5 Lebarde HPP II Tekhuri Samegrelo 4.16 Run-of-the-River 6 Lesulkhe HPP Tsachkhuru Samegrelo 5.7 Run-of-the-River 7 Tekhuri 1-6 HPP Tekhuri Samegrelo 19.2 Run-of-the-River 8 Nakra HPP 1 Nakra Svaneti 19.6 Run-of-the-River 9 Nankra HPP Nakra Svaneti 29.2 Run-of-the-River 10 Khumpreri HPP Khumpreri Svaneti 16.37 Run-of-the-River 11 Kheledula HPP 1 Kheledula Svaneti 18.8 Run-of-the-River 12 Kheledula HPP 2 Kheledula Svaneti 21.6 Run-of-the-River 13 Kheledula HPP 3 Kheledula Svaneti 44.3 Run-of-the-River 14 Stori HPP 1 Stori Kakheti 14.0 Run-of-the-River 15 Cheshura HPP Cheshura Racha 7.5 Run-of-the-River 16 Samitso HPP Jejora Racha 24.3 Reservoir 17 Jejora HPP Jejora Racha 15.8 Reservoir 18 Janauli HPP Janauli Racha-Lechkhumi 13.0 Run-of-the-River 19 Alpana HPP Rioni Racha-Lechkhumi 70.6 Reservoir 20 Chala HPP Kvirila Imereti 9.14 Run-of-the-River 21 Jria HPP Kvirila Imereti 9.2 Run-of-the-River 22 Boriti HPP Dumala Imereti 6.4 Run-of-the-River 23 Tsablari I (sairme) HPP Tsablaristskali Imereti 7.7 Run-of-the-River 24 Tsablari II HPP Tsablaristskali Imereti 12.0 Run-of-the-River 25 Khan-Tsablari HPP III Khani/Tsablaristskali Imereti 8.3 Run-of-the-River Potential Medium and Small Size Hydro Projects # Project Name River Name Region Capacity MW Regulation Type 26 Khani VII HPP Khanistskali Imereti 6.4 Run-of-the-River 27 Zestafoni HPP I Kvirla Imereti 10.0 Run-of-the-River 28 Zestafoni HPP II Kvirla Imereti 11.9 Run-of-the-River 29 Zestafoni HPP III Kvirla Imereti 15.9 Run-of-the-River 30 Zestafoni HPP IV Kvirla Imereti 15.9 Run-of-the-River 31 Tazara Shavi Tskali Imereti 6.0 Run-of-the-River 32 Sakhvlari Shavi Tskali Imereti 5.3 Run-of-the-River 33 Khunevi Dzirula Imereti 11.3 Reservoir 34 Gubazeuli HPP VI Gubazeuli Guria 3.1 Run-of-the-River 35 Bakhvi HPP 1 Bakhvis Tskali Guria 15.0 Reservoir 36 Bakhvi HPP 2 Bakhvis Tskali Guria 20.0 Run-of-the-River 37 Khala HPP Chaqvis Tskali Achara 13.0 Reservoir 38 Merisi HPP Akavreta Achara 11.5 Run-of-the-River 39 Skhalta HPP Skhalta Achara 5.3 Run-of-the-River 40 Iori HPP Iori Mtskheta-Mtianeti 9.7 Run-of-the-River 41 Tergi HPP Tergi Mtskheta-Mtianeti 14.6 Run-of-the-River 42 Dariali HPP Tergi Mtskheta-Mtianeti 93.0 Run-of-the-River 43 Samkhuri HPP I Samkhuris Tskali Kakheti 12.4 Run-of-the-River 44 Samkhuri HPP II Samkhuris Tskali Kakheti 22.2 Run-of-the-River 45 Avani HPP Avanis Khevi Kakheti 4.6 Run-of-the-River 46 Duruji HPP Duruji Kakheti 1.74 Run-of-the-River 47 Uraveli HPP Uroveli Samckhe-Javakheti 5.0 Run-of-the-River 48 Stori HPP 2 Stori Kakheti 11.4 Run-of-the-River 49 Chelti HPP 1 Chelti Kakheti 4.8 Run-of-the-River 50 Chelti HPP 2 Chelti Kakheti 4.8 Run-of-the-River Potential Medium and Small Size Hydro Projects # Project Name River Name Region Capacity MW Regulation Type 51 Ksani HPP 1 Ksani Mtskheta-Mtianeti 4.2 Run-of-the-River 52 Ksani HPP 2 Ksani Mtskheta-Mtianeti 2.1 Run-of-the-River 53 Ksani HPP 3 Ksani Mtskheta-Mtianeti 3.2 Run-of-the-River 54 Ksani HPP 4 Ksani Mtskheta-Mtianeti 3.6 Run-of-the-River 55 Ksani HPP 5 Ksani Mtskheta-Mtianeti 6.0 Run-of-the-River 56 Marelisi HPP Bjholis Khevi Imereti 4.6 Run-of-the-River 57 Bakhvi HPP 4 Bakhvis Tskali Guria 1.0 Run-of-the-River 58 Bakhvi HPP 5 Bakhvis Tskali Guria 2.0 Run-of-the-River 59 Adjaristskali HPP 1 Adjaristskali Adjara 26.46 Run-of-the-River 60 Adjaristskali HPP 2 Adjaristskali Adjara 13.76 Run-of-the-River 61 Adjaristskali HPP 3 Adjaristskali Adjara 6.09 Run-of-the-River 62 Amala HPP Amala Mtskheta-Mtianeti 14 Run-of-the-River 63 Chkheri HPP Chkheri Mtskheta-Mtianeti 14.6 Run-of-the-River 64 Juta HPP Juta Mtskheta-Mtianeti 8.24 Run-of-the-River 65 Khidistskali HPP Khidistskali Mtskheta-Mtianeti 9.3 Run-of-the-River 66 Kobi HPP Tergi Mtskheta-Mtianeti 11 Run-of-the-River 67 Stori HPP 3 Stori Kakheti 13.7 Run-of-the-River 68 Stori HPP Stori Kakheti 11.8 Run-of-the-River 69 Truso HPP Tergi Mtskheta-Mtianeti 8.7 Run-of-the-River 70 Tsdo HPP Juta Mtskheta-Mtianeti 72 Reservoir Large-Size Hydro Projects Cascade of Mtkvari HPPs Cascade of Oni HPPs Installed capacity – 180 MW; Installed capacity – 282 MW; Av. annual generation – 0,965 TWh; Av. annual generation – 1,530 TWh; (Awarded, MOU under negotiation) (Announcement of EoI is planned) KHUDONI HPP ONI HPP Cascade NAMAKHVANI HPP Cascade Mtkvari HPP Cascade Khudoni HPP Cascade of Namakhvani HPPs Installed capacity – 702 MW; Installed capacity – 450 MW; Av. annual generation – 1,53 TWh; Av. annual generation – 1,6 TWh (Under development) Under Development On-Going Projects • Total of 18 HPP on-going projects . Total installed capacity of 1440 MW and annual generation 4.8 TWH . Investment 2,5 bln USD. • 12 HPP projects awarded and MOUs under negotiations . Total installed capacity of 397 MW and annual generation 2 TWH . Investment 650 mln USD. • 2 new HPP constructions launched in 2009 . Bakhvi HPP . Mtkvari HPP . Capacity - 6 MW • Capacity - 46 MW • Cost - $10 million • Cost - $60 million • 4 new HPP constructions launched in 2010 Paravani HPP – 78 MW Lukhuni 2 HPP – 12 MW Cost – $100 million Cost - $21 million Zoti HPP – 36 MW Kvirila HPP – 5.2 MW Cost - $80 million Cost - $12 million • 2 new HPP constructions planned to be launched in 2011 Khudoni HPP – 702 MW Namakhvani Cascade (3 HPP) – 450 MW Easy Regulatory Framework • Greenfield projects based on Build-Own-Operate (BOO) principle • All new constructions are totally deregulated .