Building Plot, Witcham Road, Mepal, Ely, Cambridgeshire, CB6 Asking Price £225,000

Total Page:16

File Type:pdf, Size:1020Kb

Building Plot, Witcham Road, Mepal, Ely, Cambridgeshire, CB6 Asking Price £225,000 EPC Exempt Building Plot, Witcham Road, Mepal, Ely, Cambridgeshire, CB6 Asking Price £225,000 A great opportunity to purchase a building plot (with planning permission granted) close to the village of Mepal. A generously sized building plot measuring approx. 46.8m x 15.0m (stms), positioned between 2 existing properties. Benefiting from its' own gated entrance with the real advantage of being fully south-facing at the rear of the plot. With planning permission granted on 02/04/2020 for a 3 bedroom detached bungalow and with architect drawings which could of course be varied to build chalet-style bungalow (with planning consent) and currently show a spacious open-plan lounge diner and kitchen, opening out to the rear garden, in addition to a utility room, 3 double bedrooms; the master bedroom including an en-suite shower room, and the family bathroom. With gas supply and sewerage treatment system in place, this is a superb opportunity to build a wonderful property in a tranquil, scenic location. Viewings are strictly by appointment through Abbotts in Ely. abbotts.co.uk Viewing arrangement by appointment 01353 666502 [email protected] Abbotts, 7 Forehill, Ely, CB7 4AA Interested parties should satisfy themselves, by inspection or otherwise as to the accuracy of the description given and any floor plans shown in these property details. All measurements, distances and areas listed are approximate. Fixtures, fittings and other items are NOT included unless specified in these details. Please note that any services, heating systems, or appliances have not been tested and no warranty can be given as to their working order. A member of Countrywide plc. Countrywide Estate Agents, trading as Abbotts. Registered in England No. 789476 | Code: Anglia EA_10010_ELY210109_AL6PLB.
Recommended publications
  • Registered Food Premises by Organisation
    Registered Food Premises by Organisation No of records 651 These records are valid as at 21/05/2010 16:01:28 Organisation Address Usage 1Eleven B & B 111 High Street Cheveley Newmarket Suffolk CB8 9DG Hotels, guest houses 72 B & B Medrena House 72 Wisbech Road Littleport Ely Cambridgeshire CB6 1JJ Hotels, guest houses A & N J Turner & Sons Croft House Hasse Road Soham Ely Cambridgeshire CB7 5UN Haulage Company A B Fish Lancaster Farm Witcham Road Mepal Ely Cambridgeshire CB6 2AF Fish processors A L Lee & Sons Whitebridge Farm Ely Road Littleport Ely Cambridgeshire CB6 1RT Potato Growers A L Saberton 21 Main Street Little Downham Cambridgeshire Wholesalers A Tasca 24 High Street Soham Ely Cambridgeshire CB7 5HE Cafes A10 Chip Van 10 Read Street Stretham Ely Cambridgeshire CB6 3JT Mobile vans (food preparation) Acremont House School Acremont House 30 Egremont Street Ely Cambridgeshire CB6 1AE Schools, hospitals etc. AJ Caterers 14A Station Road Littleport Ely Cambridgeshire CB6 1QE Cafes Alans Fish Bar 21 Broad Street Ely Cambridgeshire CB7 4BD Fish and Chips Aldreth Village Hall Aldreth Village Hall High Street Aldreth Cambridgeshire Village halls, community centres etc. Ali Taj 18 Churchgate Street Soham Ely Cambridgeshire CB7 5DS Restaurants Alis Kebabs 12 Main Street Littleport Ely Cambridgeshire CB6 1PJ Take away Amberside Amberside Stretham Station Road Wilburton Ely Cambridgeshire CB6 3QD Schools, hospitals etc. AMG Foods Ltd Trading As Sklep Monopoly. 56 High Street Soham Ely Cambridgeshire CB7 5HE Retailer Anchor Inn Anchor Inn
    [Show full text]
  • Constitution Part 1
    CONTENTS Page No Part 1 Introduction 1(1) List of District Councillors 1(2) Councillors by Ward 1(7) Villages/Town District Ward List 1(8) THE CONSTITUTION Part 2 - Articles of the Constitution 2(1) Article 1 - The Council's Constitution, overall purpose and strategic objectives 2(2) Article 2 - Members of the Council 2(4) Article 3 - Citizens and the Council 2(7) Article 4 - The role of Council - meanings, functions, Council meetings 2(10) Article 5 - Chairman of the Council 2(11) Article 6 - Committees and other Member bodies 2(12) Article 7 - Joint Arrangements 2(14) Article 8 - Officers 2(15) Article 9 - Decision Making 2(20) Article 10 - Finance, Contracts and Legal Matters 2(21) Article 11 - Review and Revision of the Constitution 2(22) Article 12 - Suspension, Interpretation and Publication of the Constitution 2(23) Part 3 - Responsibility for Functions 3(1) 1. Council Committees and other Member Bodies, Objectives, Terms of Reference and Delegation to Officers A. Council 3(2) B. Policy Committees 3(5) I) Operational Services Committee 3(6) II) Finance & Assets Committee 3(15) Sub-Committee Hearings 3(30) Sub-Committee Hearings Procedure 3(33) C. Regulatory Committees: 3(37) Licensing Committee 3(38) Licensing Sub-Committees 3(42) Planning Committee 3(47) D. Other Committees/Joint Committees 3(55) Anglia Revenues Partnership Joint Committee 3(56) Version: 10/2019 Part 1 - Contents 2. Proper Officer Functions 3(60) 1 Part 4 Rules of Procedure 4(1) 1. Council Procedure Rules 4(2) 2. Access to Information Procedure Rules 4(20) 3.
    [Show full text]
  • LS Booklet Dec 19 Web.Pub
    £1 when sold December 2019 ;EEG7: 516 NEWSNEWS AND AND VIEWS VIEWS FROM FROM LODE LODE WITH WITH LONGMEADOW LONGMEADOW http://www.lode.org.uk/lodestar.htmlhttp://www.lode.org.uk/lodestar.html LODE 2 STAR LODE 3 STAR WHAT’S WHERE WHAT’S ON WHEN Issue No: 516 December 2019 IN LODE STAR LC Lode Chapel; StJ St James’ Church; FH Fassage Hall; It’s that time of year when, as well as if, on occasion, I could pass the 3. Editorial BSSC B’shm Sports & Social Club; BVC Bottisham Village College wishing each other the greetings of decision-making on to someone else, 4. Lode Parish Council December the season, we thank those who have even temporarily. 5. BVC Adult Learning 1 Matthew’s Winter Open Studio (p20) been of particular help during the The one decision I have taken for this Last recommended posting year. dates for Christmas 4 Last day to make donations to issue is that, because of the General Cambridge Women’s Refuge (p22) I must therefore thank everyone who Election, Lode Star would stay clear 6. Print Centre Christmas Fayre Sudoku 6 Walk for Health, 11am Surgery (p14) has contributed their thoughts and of anything that might be construed as SB School Xmas Fair 3.15pm (p10) musings, the goings-on of local political; especially as I’ll be the one 7. Thanks & Remembrance organisations and for letting us know handing you your voting paper on Sylvia Ayres 7 Last date to send letters to Santa (p11) Print Centre Christmas Fayre (p21) the information we all need to ease 12th December.
    [Show full text]
  • APPENDIX 1 Asset Current Position Notes Mepal Outdoor Centre
    APPENDIX 1 Asset Current Position Notes Mepal Outdoor Centre Currently vacant with Council consent to A separate update to be provided enter in to a lease with an operator Paradise Pools Site The old pool site has been demolished A full report will be considered by the Finance & and the site has been secured. Assets Committee at the appropriate time Officers are currently considering the development options available for this site. Paradise Centre Leased to the Paradise Centre until 2085 The Hive, Ely Occupied by GLL Public Conveniences- Littleport Officers are working with Littleport Parish Council who have expressed interest in taking over ECDC responsibilities. Public Conveniences- Soham Leased from Soham Town Council until 2085. Officers are working with Soham Town Council who have expressed interest in taking over ECDC responsibilities. Public Conveniences- Fordham Officers are finalising legal documentation for the transfer of the public conveniences to Fordham Parish Council Public Conveniences- Burwell Officers are finalising legal documentation for the transfer of the public conveniences to Burwell Parish Council Public Conveniences- Barton Road, Ely ECDC receive a contribution per annum from City of Ely Council to operate the service Public Conveniences- Ship Lane, Ely ECDC own and manage public conveniences 1 Public Conveniences- Cloisters, Ely ECDC lease this site from Cloisters until 2099 Public Conveniences- Palace Green, Ely ECDC own and manage public conveniences Ely Museum The building is leased Ely Museum. The It is anticipated that the Museum will re-open in museum is now closed for refurbishment Autumn 2020. works. This is on a peppercorn rent until 2047.
    [Show full text]
  • Agenda Item 10 - Page 1 4.0 CURRENT POSITION of ‘SMALL VILLAGES’ S106 ALLOCATION
    AGENDA ITEM NO 10 TITLE: The Future of Grant Funding for Small Villages Committee: Community & Environment Committee Date: Thursday 8th May 2014. Author: Julie Cornwell, Partnerships Officer. [N284] 1.0 ISSUE 1.1 To note the current levels of the ‘Small Villages’ S106 funds and the implications for this moving forwards and to one of the 2 options proposed. 2.0 RECOMMENDATION(S) 2.1 To consider the 2 options presented at 6.1 – ‘Cease offering capital grants’ and 6.2 – ‘Establish a new capital grant fund’ for the future delivery of capital grant funding for parishes with little or no S106 or CIL receipts and to recommend the preferred course of action to the Chairman’s Group. 2.2 If the option at 6.2 is selected (i.e. to set up a new Capital Grant Fund from 2015-16), to task the Corporate Governance & Finance Committee with identifying suitable funds. 3.0 BACKGROUND 3.1 Since 1st April 2008 the Council has spent the majority of its S106 allocations via a grant scheme, open to parish councils and other community based organisations that operate on a not-for-profit basis in East Cambridgeshire. There are two grant schemes: the ‘Community Facilities Section 106 Grant’, for parishes with their own allocation of S106 funding and the ‘Small Villages Grant’ for parishes without their own allocation of S106 monies, which historically has tended to be the smaller parishes in the District. ‘Small Village’ applicants can bid for a maximum of £10,000 per application. 3.2 No further monies will be added to either of these grant pots for two reasons: 1) As of February 2011 Section 106 agreements were worded to more closely align with the Community Infrastructure Levy (CIL) process that was due imminently.
    [Show full text]
  • As You Read This, the Builders Will Have Finished the Beeches Website at on Site and Handed Over the Building to The
    Isleham Informer Issue 59 • December 2013 [email protected] • 01638 780839 • www.islehaminformer.org.uk The formal hand over of the finished building from CJ Murfitts took place on the 29th November. The appointment of the centre manager also sees the launch of As you read this, the builders will have finished The Beeches website at on site and handed over the building to the www.thebeechesisleham. Parish Council, on the 29th November, in turn co.uk where all details the Parish Council will lease the building to the ICA. for bookings, facilities Fantastic progress has been made over the last etc will be available. All 2 months and our last site meeting on the 5th events will be displayed November saw progress at 90%. With only 10% on the site as well as the to go, all the finishing touches took place at an village site, please keep ever-increasing rate. Whilst there has been some delay, this an eye out for the many was only minor (2 weeks) and, considering the poor weather, future events. the builders have performed admirably. The centre already has bookings for events on 14th December From the day the running of the centre was passed to the ICA, and New Year’s Eve and more in the New Year, and user groups there still remained a lot of work to do as the build was just the have also been actively seeking time slots so there are busy structure and excludes many fixtures and fittings, tables, chairs, times ahead. blinds, etc but the teams have been hard at work in the weeks and We have planned for two open days on 14th and 15th December months before handover sourcing many of the articles needed.
    [Show full text]
  • East Cambridgeshire District County Wildlife Sites Supplementary
    East Cambridgeshire District County Wildlife Sites Supplementary Planning Document June 2010 © THE WILDLIFE TRUST FOR BEDFORDSHIRE, CAMBRIDGESHIRE, NORTHAMPTONSHIRE & PETERBOROUGH LTD and EAST CAMBRIDGESHIRE DISTRICT COUNCIL All rights reserved. No part of the text of this publication may be reproduced, stored in any type of retrieval system or transmitted in any form or by any means (electronic, photocopying, mechanical, recording or otherwise) without the permission of the copyright owners All mapping is based upon Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Office © Crown copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Cambridgeshire County Council 100023205 (2005). EAST CAMBRIDGESHIRE DISTRICT COUNTY WILDLIFE STIES REGISTER CONTENTS 1 INTRODUCTION 1 2 METHODOLOGY 2 2.1 Field Survey 2 2.2 Assessment of Sites 3 2.3 Output Format 3 3 RESULTS 4 3.1 Statistics 4 COUNTY WILDLIFE SITES REGISTER ANNEXE Criteria for the Selection of County Wildlife Sites Version 5 (2009). CONTENTS PAGE EAST CAMBRIDGESHIRE DISTRICT COUNCIL COUNTY WILDLIFE SITES SPD 1 Introduction 1.1 The East Cambridgeshire District Council (ECDC) County Wildlife Sites Supplementary Planning Document has been produced to update the East Cambridgeshire District County Wildlife Sites Register 2005 so that it can be adopted as a Supplementary Planning Document (SPD) to the East Cambridgeshire Local Development Framework (LDF). 1.2 On the 20th October 2009 East Cambridgeshire District Council adopted its Core Strategy Development Plan Document as part of its LDF. The adoption of the Core Strategy means that most of the policies in the East Cambridgeshire District Local Plan 2000 have been superceded.
    [Show full text]
  • Local Government Boundary Commission - Review of Cambridgeshire County Council
    Local Government Boundary Commission - Review of Cambridgeshire County Council East Cambridgeshire - Conservative Party Response from South East Cambridgeshire Conservative Association (SECCA) Summary 1. We believe that single Member Divisions provide for the most effective local government in East Cambridgeshire, giving greater clarity to the electorate and to City, Town and Parish Councils and other local organisations. 2. Our preferred scenario (scenario 1) is based on 63 Members, meaning that 9 will be in East Cambridgeshire. This proposed scenario allows for provision of single Member Divisions, achieves good electoral equality, provides for convenient and effective local government and offers the best solution, by some margin, in terms of reflecting community interests and identity. 2.1. We strongly believe that the Boundary Commission’s proposal for two 2 Member Divisions (within the 61 Member scenario) has made serious compromises to both community interests and identity and to convenient and effective local government, markedly so for the proposed Littleport West Division (Division 16). The geographical size and marked difference in service needs of different parts of this Division could cause conflict in Members’ ability to represent the whole of the Division effectively. 2.2. Sutton, and particularly the villages to the south of Sutton (Wentworth, Witchford, Haddenham, Aldreth, Wilburton, Stretham and Little Thetford) are totally remote from Littleport - geographically (residents of those areas look to Ely and Cambridge and do not use or travel to Littleport), culturally (residents of those areas do not link themselves in any way to Littleport), demographically and in terms of service need (educational, economic and health and wellbeing needs are markedly different).
    [Show full text]
  • ELY ZIPPER Bus Time Schedule & Line Route
    ELY ZIPPER bus time schedule & line map ELY ZIPPER Ely View In Website Mode The ELY ZIPPER bus line (Ely) has 3 routes. For regular weekdays, their operation hours are: (1) Ely: 6:45 AM - 12:30 PM (2) Ely: 1:30 PM - 5:30 PM (3) Witcham: 6:25 PM Use the Moovit App to ƒnd the closest ELY ZIPPER bus station near you and ƒnd out when is the next ELY ZIPPER bus arriving. Direction: Ely ELY ZIPPER bus Time Schedule 28 stops Ely Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 6:45 AM - 12:30 PM Market Street, Ely 39-41 Market Street, Ely Tuesday 6:45 AM - 12:30 PM King's School, Ely Wednesday 6:45 AM - 12:30 PM Tesco, Ely Thursday 6:45 AM - 12:30 PM The Dock, Ely Friday 6:45 AM - 12:30 PM Cambridge Commodities, Ely Saturday 6:45 AM - 12:30 PM Wellington Road, Ely Civil Parish Church Road, Wentworth Haddenham Road, Witcham Toll ELY ZIPPER bus Info Direction: Ely Manor Farm, Witcham Stops: 28 Martins Lane, Witcham Civil Parish Trip Duration: 55 min Line Summary: Market Street, Ely, King's School, Ely, Northumbria Close, Haddenham Tesco, Ely, Cambridge Commodities, Ely, Church Road, Wentworth, Haddenham Road, Witcham Toll, Hop Row, Haddenham Manor Farm, Witcham, Northumbria Close, Bull Lane, Haddenham Haddenham, Hop Row, Haddenham, Linden End, Haddenham, Linden Way, Haddenham, The Borough, Linden End, Haddenham Aldreth, Linden Way, Haddenham, Cherry Orchard, Haddenham, Orchard Way, Haddenham, High Street, Linden Way, Haddenham Wilburton, Carpond Lane, Wilburton, Station Road, Wilburton, Millƒeld Place, Wilburton, Short Road, The
    [Show full text]
  • 1. Settlement Characteristics 2. Key Statistics 3. Housing
    East Cambridgeshire Local Plan Draft Version (October 2012) Part Two: Village Visions – Mepal MEPAL 1. Settlement characteristics Mepal is a small, rural village on the East Cambridgeshire/Fenland border, 6 miles west of Ely. The village, situated off the A142, is less than ten metres above sea level. The Old Bedford River and the New Bedford River (also known as the Hundred Foot Drain) run very close on the north- west side of the village. Mepal has a number of Listed Buildings including the 13th century Church, notable as the only church in the Isle of Ely without either tower or spire. The main features of the village are shown on Map xxx. Facilities in the village include a shop and post office, church, public hall, public house and a sports field, Primary school, Mepal Community Pavilion and Mepal Outdoor centre on the edge of the village. The village has a regular bus service which runs to Ely and Cambridge. 2. Key statistics Mepal Population1 900 2 Dwellings 420 New dwellings built 2001-2011 (net) 114 Estimated new dwellings 2012-2031 Employment3 14% work from home, 50% travel up to 20km to work, 45% travel over 20km to work Existing public transport services Regular services to Ely and Cambridge (Monday-Saturday) (as at June 2012) 3. Housing 1 Population for Mepal parish (mid-2010), Cambridgeshire County Council Research Group 2 Dwellings in Mepal parish (mid-2010), Cambridgeshire County Council Research Group 3 Distance travelled to work, East Cambridgeshire 005B Lower Layer Super Output Area (covering Mepal and Witcham), Census 2001 East Cambridgeshire District Council Page xx East Cambridgeshire Local Plan Draft Version (October 2012) Part Two: Village Visions – Mepal Mepal is likely to continue to grow at a slow rate, with new housing being built on suitable ‘infill’ sites within the village.
    [Show full text]
  • Site Assessment Evidence Report
    Site Assessment Evidence Report Final Report - November 2017 1 OS Map – Copyright Note The maps in this document are reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty's Stationary Office Crown copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. 100023279. 2017. 2 Contents Table of Contents Final Report - November 2017 ................................................................................................ 1 Contents ...................................................................................................................................................... 3 1. Introduction .................................................................................................................................. 5 2. Methodology .................................................................................................................................. 6 Background ............................................................................................................................................... 6 General approach .................................................................................................................................... 7 Assumptions ......................................................................................................................................... 8 Site Assessment Criteria .................................................................................................................
    [Show full text]
  • Annual Report 2018
    Red RGB:165-29-47 CMYK: 20-99-82-21 Gold RGB: 226-181-116 CMYK: 16-46-91-1 Blue RGB: 39-47-146 CMYK: 92-86-1-0 Annual Report 2018 Published 12 June 2019 Ely Diocesan Board of Finance We pray to be generous and visible people of Jesus Christ. Nurture a confident people of God Develop healthy churches Serve the community Re-imagine our buildings Target support to key areas TO ENGAGE FULLY AND COURAGEOUSLY WITH THE NEEDS OF OUR COMMUNITIES, LOCALLY AND GLOBALLY TO GROW GOD’S CHURCH BY FINDING DISCIPLES AND NURTURING LEADERS TO DEEPEN OUR COMMITMENT TO GOD THROUGH WORD, WORSHIP AND PRAYER. ENGAGE • GROW • DEEPEN | 3 Contents 04 Foreword from Bishop Stephen 05 Ely2025 – A Review 06 Safeguarding 09 Ministry 11 Mothers' Union 12 Mission 15 Retreat Centre 16 Church Buildings and Pastoral Department 20 Secretariat 21 Programme Management Office 23 Changing Market Towns 24 Parish Giving Scheme 25 Contactless Giving (Card Readers) 26 Communications and Database 29 Education 32 Finance 34 Houses Sub-Committee 35 Diocesan Assets Sub-Committee 37 Ministry Share Tables 4 | ENGAGE • GROW • DEEPEN Foreword from Bishop Stephen As a Diocese we are seeking to be People Fully Alive, as we One of the most important ways in which we serve our pray to be generous and visible people of Jesus Christ. We communities is through the Diocesan family of schools, as we are seeking to do this as we engage with our communities educate over 15,000 children. These are challenging times for locally and globally, as we grow in faith, and as we deepen in the education sector and especially for small and rural schools.
    [Show full text]