***************************************************************************************************************************************************************************************** NASA TELEVISION SCHEDULE STS-132 ISS UTILIZATION LOGISTICS FLIGHT 4 / MINI RESEARCH MODULE 1 (RASSVET) 5/10/2010 ***************************************************************************************************************************************************************************************** NASA TV (Public, Education, Media Channels and occasional HD programming) Digital Satellite C-Band Downlink coordinates for continental North America, Alaska and Hawaii: Satellite = AMC 3 / Transponder = 15C / 87 Degrees West / DVB-S, 4:2:0 / Downlink Frequency = 4000 Mhz / Downlink Polarity = Horizontal / FEC = 3/4 / Data Rate = 38.860 MHz / Symbol Rate = 28.1115. Clients actively participating in Standard-Definition on-orbit interviews, interactive press briefings and satellite interviews must use the LIMO Channel: Satellite = AMC 3 / Transponder = 9C / 87 degrees West / DVB-S, 4:2:0 / Downlink Frequency = 3865.5 Mhz / Downlink Polarity = Horizontal / FEC = 3/4 / Data Rate = 6.0 Mbps / Symbol rate = 4.3404 Msps. A Digital Video Broadcast compliant Integrated Receiver Decoder is required for reception. Mission Audio is available at: http://www.nasa.gov/ntv.

ALL TIMES SUBJECT TO CHANGE This TV schedule is available via the Internet. The address is: http://www.nasa.gov/shuttletv

ORBIT SUBJECT SITE MET CDT EDT GMT

MONDAY, MAY 10

EXPEDITION 23 ISS UPDATE JSC 10:00 AM 11:00 AM 15:00

VIDEO FILE HQ 11:00 AM 12:00 PM 16:00

STS-132 CREW ARRIVAL KSC 6:00 PM 7:00 PM 23:00

TUESDAY, MAY 11

COUNTDOWN PREVIEW BRIEFING KSC 9:00 AM 10:00 AM 14:00

EXPEDITION 23 ISS UPDATE JSC 10:00 AM 11:00 AM 15:00

VIDEO FILE HQ 11:00 AM 12:00 PM 16:00

WEDNESDAY, MAY 12

SOYUZ TMA-17 RELOCATION COVERAGE (Undocking from Poisk module scheduled at 8:20am CT, redocking to JSC 8:00 AM 9:00 AM 13:00 Zvezda Service Module aft port scheduled at 8:40am CT)

EXPEDITION 23 ISS UPDATE JSC 9:00 AM 10:00 AM 14:00

Page 1 of 14 ORBIT SUBJECT SITE MET CDT EDT GMT

STS-132 PRELAUNCH NEWS CONFERENCE (Time subject to completion of Mission Management Team KSC 10:00 AM 11:00 AM 15:00 Meeting)

VIDEO FILE HQ 11:00 AM 12:00 PM 16:00

THURSDAY, MAY 13

COUNTDOWN STATUS BRIEFING KSC 9:00 AM 10:00 AM 14:00

ISS SCIENCE BRIEFING KSC 10:00 AM 11:00 AM 15:00

VIDEO FILE HQ 11:00 AM 12:00 PM 16:00

ROTATING SERVICE STRUCTURE RETRACTION KSC 4:30 PM 5:30 PM 21:30

FRIDAY, MAY 14 FD 1

STS-132 FUELING COVERAGE BEGINS KSC 3:45 AM 4:45 AM 8:45

STS-132 LAUNCH COVERAGE BEGINS KSC 8:00 AM 9:00 AM 13:00

LAUNCH KSC 00/ 00:00 01:20 PM 02:20 PM 18:20

MECO 00/ 00:08 01:28 PM 02:28 PM 18:28

1 NASA TELEVISION ORIGINATION SWITCHED TO JSC JSC 00/ 00:10 01:30 PM 02:30 PM 18:30

1 NASA TELEVISION ORIGINATION SWITCHED TO KSC KSC 00/ 00:13 01:33 PM 02:33 PM 18:33

1 LAUNCH REPLAYS (approx. 5 min. after MECO) T=30:00 KSC 00/ 00:13 01:33 PM 02:33 PM 18:33

1 POST LAUNCH NEWS CONFERENCE KSC 00/ 00:55 02:15 PM 03:15 PM 19:15

2 PAYLOAD BAY DOOR OPENING (may not be televised live) 00/ 01:25 02:45 PM 03:45 PM 19:45

3 ASCENT FLIGHT CONTROL TEAM VIDEO REPLAY JSC 00/ 03:40 05:00 PM 06:00 PM 22:00

3 RMS CHECKOUT 00/ 04:15 05:35 PM 06:35 PM 22:35

4 EXTERNAL TANK HANDHELD VIDEO DOWNLINK 00/ 04:40 06:00 PM 07:00 PM 23:00

Page 2 of 14 ORBIT SUBJECT SITE MET CDT EDT GMT

5 ATLANTIS CREW SLEEP BEGINS 00/ 06:00 07:20 PM 08:20 PM 00:20

FLIGHT DAY 1 HIGHLIGHTS (replayed on the hour during 5 JSC 00/ 06:40 08:00 PM 09:00 PM 01:00 crew sleep)

6 VIDEO FILE HQ 00/ 07:40 09:00 PM 10:00 PM 02:00

SATURDAY, MAY 15 FD 2

10 ATLANTIS CREW WAKE UP (begins FD 2) 00/ 14:00 03:20 AM 04:20 AM 08:20

11 OMS POD SURVEY 00/ 16:05 05:25 AM 06:25 AM 10:25

12 OBSS UNBERTH 00/ 16:55 06:15 AM 07:15 AM 11:15

13 EMU CHECKOUT 00/ 17:50 07:10 AM 08:10 AM 12:10

13 RMS/OBSS SURVEY OF ATLANTIS TPS BEGINS 00/ 18:10 07:30 AM 08:30 AM 12:30

17 MISSION STATUS BRIEFING JSC 00/ 23:40 01:00 PM 02:00 PM 18:00

17 OBSS BERTH / RENDEZVOUS TOOL CHECKOUT 01/ 00:20 01:40 PM 02:40 PM 18:40

18 CENTERLINE CAMERA INSTALLATION 01/ 01:30 02:50 PM 03:50 PM 19:50

18 MMT BRIEFING JSC 01/ 01:40 03:00 PM 04:00 PM 20:00

18 ODS RING EXTENSION 01/ 02:00 03:20 PM 04:20 PM 20:20

20 ATLANTIS CREW SLEEP BEGINS 01/ 05:00 06:20 PM 07:20 PM 23:20

FLIGHT DAY 2 HIGHLIGHTS (replayed on the hour during 21 JSC 01/ 05:40 07:00 PM 08:00 PM 00:00 crew sleep

SUNDAY, MAY 16 FD 3

26 ATLANTIS CREW WAKE UP (begins FD 3) 01/ 13:00 02:20 AM 03:20 AM 07:20

26 RENDEZVOUS OPERATIONS BEGIN 01/ 14:20 03:40 AM 04:40 AM 08:40

28 TI BURN 01/ 17:19 06:39 AM 07:39 AM 11:39

Page 3 of 14 ORBIT SUBJECT SITE MET CDT EDT GMT

ATLANTIS RPM / ISS CREW VIDEO DOCUMENTATION 30 01/ 19:02 08:22 AM 09:22 AM 13:22 BEGINS

30 ATLANTIS / ISS DOCKING (may not be televised live) 01/ 20:07 09:27 AM 10:27 AM 14:27

ATLANTIS / ISS CREW HATCH OPENING AND 32 01/ 22:10 11:30 AM 12:30 PM 16:30 WELCOME CEREMONY

32 SSRMS GRAPPLE & UNBERTH ICC FROM ATLANTIS 01/ 23:15 12:35 PM 01:35 PM 17:35

33 MISSION STATUS BRIEFING JSC 02/ 23:40 01:00 PM 02:00 PM 18:00

33 SSRMS BERTHS ICC ON MBS POA 02/ 00:00 01:20 PM 02:20 PM 18:20

33 EVA # 1 PROCEDURE REVIEW 02/ 00:55 02:15 PM 03:15 PM 19:15

34 MMT BRIEFING JSC 02/ 01:40 03:00 PM 04:00 PM 20:00

34 SHUTTLE VTR PLAYBACK OF DOCKING 02/ 02:10 03:30 PM 04:30 PM 20:30

35 EVA # 1 CAMPOUT BEGINS (Reisman and Bowen) 02/ 03:25 04:45 PM 05:45 PM 21:45

36 ISS CREW SLEEP BEGINS 02/ 04:30 05:50 PM 06:50 PM 22:50

36 ATLANTIS CREW SLEEP BEGINS 02/ 05:00 06:20 PM 07:20 PM 23:20

FLIGHT DAY 3 HIGHLIGHTS (replayed on the hour during 37 JSC 02/ 05:40 07:00 PM 08:00 PM 00:00 crew sleep)

HIGH DEFINITION FLIGHT DAY 3 CREW HIGHLIGHTS (if 39 available; on the NASA-TV HDTV Channel; replays from JSC 02/ 08:40 10:00 PM 11:00 PM 03:00 5:00am CT - 4:00pm CT on May 17)

40 ISS FLIGHT DIRECTOR UPDATE JSC 02/ 10:10 11:30 PM 12:30 AM 04:30

MONDAY, MAY 17 FD 4

41 ISS FLIGHT DIRECTOR UPDATE REPLAY JSC 02/ 12:40 02:00 AM 03:00 AM 07:00

41 ATLANTIS / ISS CREW WAKE UP (begins FD 4) 02/ 13:00 02:20 AM 03:20 AM 07:20

Page 4 of 14 ORBIT SUBJECT SITE MET CDT EDT GMT 42 EVA # 1 PREPARATIONS RESUME 02/ 13:40 03:00 AM 04:00 AM 08:00

45 EVA # 1 BEGINS (Reisman and Bowen) 02/ 17:55 07:15 AM 08:15 AM 12:15

45 REDUNDANT SGANT INSTALLATION 02/ 19:15 08:35 AM 09:35 AM 13:35

47 EOTP INSTALLATION 02/ 22:00 11:20 AM 12:20 PM 16:20

48 SSRMS CLEANUP / P6 BATTERY PREPARATIONS 02/ 23:30 12:50 PM 01:50 PM 17:50

49 EVA # 1 ENDS 03/ 00:25 01:45 PM 02:45 PM 18:45

50 MISSION STATUS / MMT BRIEFING JSC 03/ 01:40 03:00 PM 04:00 PM 20:00

51 ISS CREW SLEEP BEGINS 03/ 04:00 05:20 PM 06:20 PM 22:20

52 ATLANTIS CREW SLEEP BEGINS 03/ 04:30 05:50 PM 06:50 PM 22:50

FLIGHT DAY 4 HIGHLIGHTS (replayed on the hour during 52 JSC 03/ 04:40 06:00 PM 07:00 PM 23:00 crew sleep)

53 VIDEO FILE HQ 03/ 06:40 08:00 PM 09:00 PM 01:00

HIGH DEFINITION FLIGHT DAY 4 CREW HIGHLIGHTS (if 54 available; on the NASA-TV HDTV Channel; replays from JSC 03/ 07:40 09:00 PM 10:00 PM 02:00 5:00am CT - 4:00pm CT on May 18)

55 ISS FLIGHT DIRECTOR UPDATE JSC 03/ 09:40 11:00 PM 12:00 AM 04:00

TUESDAY, MAY 18 FD 5

56 ISS FLIGHT DIRECTOR UPDATE REPLAY JSC 03/ 11:25 12:45 AM 01:45 AM 05:45

57 ATLANTIS / ISS CREW WAKE UP (begins FD 5) 03/ 12:30 01:50 AM 02:50 AM 06:50

58 SRMS GRAPPLE & UNBERTH MRM-1 FROM ATLANTIS 03/ 14:35 03:55 AM 04:55 AM 08:55

59 SRMS HANDOFF MRM-1 TO SSRMS 03/ 16:35 05:55 AM 06:55 AM 10:55

60 SSRMS BERTHS MRM-1 TO NADIR PORT 03/ 17:30 06:50 AM 07:50 AM 11:50

62 SSRMS GRAPPLE & UNBERTH OBSS 03/ 19:45 09:05 AM 10:05 AM 14:05

Page 5 of 14 ORBIT SUBJECT SITE MET CDT EDT GMT 62 SSRMS HANDOFF OBSS TO SRMS 03/ 20:30 09:50 AM 10:50 AM 14:50

OBSS FOCUSED INSPECTION OF ATLANTIS' TPS (If 63 03/ 22:05 11:25 AM 12:25 PM 16:25 required)

64 U.S. PAO EVENT ISS Ku 04/ 00:05 01:25 PM 02:25 PM 18:25

65 EVA # 2 PROCEDURE REVIEW 04/ 00:25 01:45 PM 02:45 PM 18:45

65 MISSION STATUS BRIEFING JSC 04/ 01:10 02:30 PM 03:30 PM 19:30

66 EVA # 2 CAMPOUT BEGINS (Bowen and Good) 04/ 02:55 04:15 PM 05:15 PM 21:15

67 ISS CREW SLEEP BEGINS 04/ 04:00 05:20 PM 06:20 PM 22:20

67 ATLANTIS CREW SLEEP BEGINS 04/ 04:30 05:50 PM 06:50 PM 22:50

FLIGHT DAY 5 HIGHLIGHTS (replayed on the hour during 67 JSC 04/ 04:40 06:00 PM 07:00 PM 23:00 crew sleep)

69 VIDEO FILE HQ 04/ 06:40 08:00 PM 09:00 PM 01:00

HIGH DEFINITION FLIGHT DAY 5 CREW HIGHLIGHTS (if 69 available; on the NASA-TV HDTV Channel; replays from JSC 04/ 07:40 09:00 PM 10:00 PM 02:00 5:00am CT - 4:00pm CT on May 19)

71 ISS FLIGHT DIRECTOR UPDATE JSC 04/ 10:10 11:30 PM 12:30 AM 04:30

WEDNESDAY, MAY 19 FD 6

72 ISS FLIGHT DIRECTOR UPDATE REPLAY JSC 04/ 11:25 12:45 AM 01:45 AM 05:45

73 ATLANTIS / ISS CREW WAKE UP (begins FD 6) 04/ 12:30 01:50 AM 02:50 AM 06:50

73 EVA # 2 PREPARATIONS RESUME 04/ 13:10 02:30 AM 03:30 AM 07:30

75 SSRMS REMOVES ICC FROM MBS POA 04/ 15:55 05:15 AM 06:15 AM 10:15

76 EVA # 2 BEGINS (Bowen and Good) 04/ 17:25 06:45 AM 07:45 AM 11:45

76 P6 BATTERY REMOVAL AND REPLACEMENT BEGINS 04/ 18:00 07:20 AM 08:20 AM 12:20

Page 6 of 14 ORBIT SUBJECT SITE MET CDT EDT GMT 79 INSTALL OLD P6 BATTERIES ON PALLET 04/ 22:15 11:35 AM 12:35 PM 16:35

80 EVA # 2 ENDS 04/ 23:55 01:15 PM 02:15 PM 18:15

81 MISSION STATUS BRIEFING JSC 05/ 01:40 03:00 PM 04:00 PM 20:00

82 ISS CREW SLEEP BEGINS 05/ 03:30 04:50 PM 05:50 PM 21:50

83 ATLANTIS CREW SLEEP BEGINS 05/ 04:00 05:20 PM 06:20 PM 22:20

FLIGHT DAY 6 HIGHLIGHTS (replayed on the hour during 83 JSC 05/ 04:40 06:00 PM 07:00 PM 23:00 crew sleep)

84 VIDEO FILE HQ 05/ 06:40 08:00 PM 09:00 PM 01:00

HIGH DEFINITION FLIGHT DAY 6 CREW HIGHLIGHTS (if 85 available; on the NASA-TV HDTV Channel; replays from JSC 05/ 07:40 09:00 PM 10:00 PM 02:00 5:00am CT - 4:00pm CT on May 20)

87 ISS FLIGHT DIRECTOR UPDATE JSC 05/ 10:10 11:30 PM 12:30 AM 04:30

THURSDAY, MAY 20 FD 7

88 ISS FLIGHT DIRECTOR UPDATE REPLAY JSC 05/ 11:40 01:00 AM 02:00 AM 06:00

88 ATLANTIS / ISS CREW WAKE UP (begins FD 7) 05/ 12:00 01:20 AM 02:20 AM 06:20

90 MRM-1 / ZARYA LEAK CHECKS 05/ 15:10 04:30 AM 05:30 AM 09:30

91 MRM-1 HATCH OPENING 05/ 16:25 05:45 AM 06:45 AM 10:45

91 EVA #3 TOOL CONFIGURATION 05/ 16:50 06:10 AM 07:10 AM 11:10

92 U.S. PAO EVENT ISS Ku 05/ 18:35 07:55 AM 08:55 AM 12:55

93 ATLANTIS / ISS CREW OFF-DUTY PERIOD BEGINS 05/ 19:55 09:15 AM 10:15 AM 14:15

94 MISSION STATUS BRIEFING JSC 05/ 21:10 10:30 AM 11:30 AM 15:30

95 VIDEO FILE HQ 05/ 22:40 12:00 PM 01:00 PM 17:00

96 EVA # 3 PROCEDURE REVIEW 05/ 23:55 01:15 PM 02:15 PM 18:15

Page 7 of 14 ORBIT SUBJECT SITE MET CDT EDT GMT 97 EVA # 3 CAMPOUT BEGINS (Good and Reisman) 06/ 02:25 03:45 PM 04:45 PM 20:45

98 ISS CREW SLEEP BEGINS 06/ 03:30 04:50 PM 05:50 PM 21:50

98 ATLANTIS CREW SLEEP BEGINS 06/ 04:00 05:20 PM 06:20 PM 22:20

FLIGHT DAY 7 HIGHLIGHTS (replayed on the hour during 99 JSC 06/ 04:40 06:00 PM 07:00 PM 23:00 crew sleep)

HIGH DEFINITION FLIGHT DAY 7 CREW HIGHLIGHTS (if 101 available; on the NASA-TV HDTV Channel; replays from JSC 06/ 07:40 09:00 PM 10:00 PM 02:00 5:00am CT - 4:00pm CT on May 21)

102 ISS FLIGHT DIRECTOR UPDATE JSC 06/ 09:40 11:00 PM 12:00 AM 04:00

FRIDAY, MAY 21 FD 8

103 ISS FLIGHT DIRECTOR UPDATE REPLAY JSC 06/ 11:40 01:00 AM 02:00 AM 06:00

104 ATLANTIS / ISS CREW WAKE UP (begins FD 8) 06/ 12:00 01:20 AM 02:20 AM 06:20

104 EVA #3 PREPARATIONS RESUME 06/ 12:40 02:00 AM 03:00 AM 07:00

106 SSRMS MANEUVERS ICC TO EVA WORKSITE 06/ 16:15 05:35 AM 06:35 AM 10:35

107 EVA #3 BEGINS (Reisman and Good) 06/ 16:55 06:15 AM 07:15 AM 11:15

108 P6 BATTERY REMOVAL AND REPLACEMENT RESUMES 06/ 18:05 07:25 AM 08:25 AM 12:25

109 INSTALL OLD P6 BATTERIES ON PALLET 06/ 20:40 10:00 AM 11:00 AM 15:00

110 P6 CLEANUP WORK 06/ 21:30 10:50 AM 11:50 AM 15:50

110 RETRIEVE PDGF (If time permits) 06/ 21:40 11:00 AM 12:00 PM 16:00

SSRMS MANEUVERS ICC TO MBS POA FOR 110 06/ 21:45 11:05 AM 12:05 PM 16:05 TEMPORARY STOWAGE

111 EVA #3 ENDS 06/ 23:20 12:40 PM 01:40 PM 17:40

113 MISSION STATUS BRIEFING JSC 07/ 01:40 03:00 PM 04:00 PM 20:00

114 ISS CREW SLEEP BEGINS 07/ 03:00 04:20 PM 05:20 PM 21:20

Page 8 of 14 ORBIT SUBJECT SITE MET CDT EDT GMT

114 ATLANTIS CREW SLEEP BEGINS 07/ 03:30 04:50 PM 05:50 PM 21:50

FLIGHT DAY 8 HIGHLIGHTS (replayed on the hour during 114 JSC 07/ 03:40 05:00 PM 06:00 PM 22:00 crew sleep)

116 VIDEO FILE HQ 07/ 06:40 08:00 PM 09:00 PM 01:00

HIGH DEFINITION FLIGHT DAY 8 CREW HIGHLIGHTS (if 116 available; on the NASA-TV HDTV Channel; replays from JSC 07/ 06:40 08:00 PM 09:00 PM 01:00 5:00am CT - 4:00pm CT on May 22)

118 ISS FLIGHT DIRECTOR UPDATE JSC 07/ 10:10 11:30 PM 12:30 AM 04:30

SATURDAY, MAY 22 FD 9

119 ISS FLIGHT DIRECTOR UPDATE REPLAY JSC 07/ 11:10 12:30 AM 01:30 AM 05:30

119 ATLANTIS / ISS CREW WAKE UP (begins FD 9) 07/ 11:30 12:50 AM 01:50 AM 05:50

121 SSRMS BERTHS ICC IN ATLANTIS' PAYLOAD BAY 07/ 14:50 04:10 AM 05:10 AM 09:10

123 U.S. PAO EDUCATIONAL EVENT ISS Ku 07/ 17:20 06:40 AM 07:40 AM 11:40

125 MISSION STATUS BRIEFING JSC 07/ 19:40 09:00 AM 10:00 AM 14:00

125 ATLANTIS CREW OFF DUTY PERIOD 07/ 20:45 10:05 AM 11:05 AM 15:05

129 ISS CREW SLEEP BEGINS 08/ 02:00 03:20 PM 04:20 PM 20:20

129 ATLANTIS CREW SLEEP BEGINS 08/ 02:30 03:50 PM 04:50 PM 20:50

FLIGHT DAY 9 HIGHLIGHTS (replayed on the hour during 129 JSC 08/ 02:40 04:00 PM 05:00 PM 21:00 crew sleep)

HIGH DEFINITION FLIGHT DAY 9 CREW HIGHLIGHTS (if 131 available; on the NASA-TV HDTV Channel; replays from JSC 08/ 05:40 07:00 PM 08:00 PM 00:00 5:00am CT - 4:00pm CT on May 23)

134 ATLANTIS / ISS CREW WAKE UP (begins FD 10) 08/ 10:30 11:50 PM 12:50 AM 04:50

Page 9 of 14 ORBIT SUBJECT SITE MET CDT EDT GMT SUNDAY, MAY 23 FD 10

137 RENDEZVOUS TOOL CHECKOUT 08/ 14:50 04:10 AM 05:10 AM 09:10

138 JOINT CREW NEWS CONFERENCE ISS Ku 08/ 16:10 05:30 AM 06:30 AM 10:30

139 FAREWELL AND HATCH CLOSURE 08/ 17:50 07:10 AM 08:10 AM 12:10

CENTERLINE CAMERA INSTALLATION AND ODS LEAK 139 08/ 18:30 07:50 AM 08:50 AM 12:50 CHECK

141 ATLANTIS UNDOCKS FROM ISS 08/ 21:00 10:20 AM 11:20 AM 15:20

141 ATLANTIS FLYAROUND OF ISS BEGINS 08/ 21:25 10:45 AM 11:45 AM 15:45

142 ATLANTIS FINAL SEPARATION FROM ISS 08/ 22:43 12:03 PM 01:03 PM 17:03

142 SHUTTLE VTR PLAYBACK OF UNDOCKING 08/ 22:55 12:15 PM 01:15 PM 17:15

144 MISSION STATUS BRIEFING JSC 09/ 01:40 03:00 PM 04:00 PM 20:00

145 ATLANTIS CREW SLEEP BEGINS 09/ 02:30 03:50 PM 04:50 PM 20:50

FLIGHT DAY 10 HIGHLIGHTS (replayed on the hour during 145 JSC 09/ 02:40 04:00 PM 05:00 PM 21:00 crew sleep)

HIGH DEFINITION FLIGHT DAY 10 CREW HIGHLIGHTS 147 (if available; on the NASA-TV HDTV Channel; replays from JSC 09/ 05:40 07:00 PM 08:00 PM 00:00 5:00am CT - 4:00pm CT on May 24)

150 ATLANTIS / ISS CREW WAKE UP (begins FD 11) 09/ 10:30 11:50 PM 12:50 AM 04:50

MONDAY, MAY 24 FD 11

154 LATE INSPECTION OF ATLANTIS' TPS 09/ 15:50 05:10 AM 06:10 AM 10:10

156 MISSION STATUS BRIEFING JSC 09/ 19:40 09:00 AM 10:00 AM 14:00

157 OBSS BERTH 09/ 21:05 10:25 AM 11:25 AM 15:25

158 VIDEO FILE HQ 09/ 22:40 12:00 PM 01:00 PM 17:00

Page 10 of 14 ORBIT SUBJECT SITE MET CDT EDT GMT

160 MMT BRIEFING JSC 10/ 01:40 03:00 PM 04:00 PM 20:00

160 ATLANTIS CREW SLEEP BEGINS 10/ 02:00 03:20 PM 04:20 PM 20:20

FLIGHT DAY 11 HIGHLIGHTS (replayed on the hour during 161 JSC 10/ 02:40 04:00 PM 05:00 PM 21:00 crew sleep)

HIGH DEFINITION FLIGHT DAY 11 CREW HIGHLIGHTS 163 (if available; on the NASA-TV HDTV Channel; replays from JSC 10/ 05:40 07:00 PM 08:00 PM 00:00 5:00am CT - 4:00pm CT on May 24)

165 ATLANTIS CREW WAKE UP (begins FD 12) 10/ 10:00 11:20 PM 12:20 AM 04:20

TUESDAY, MAY 25 FD 12

168 FCS CHECKOUT 10/ 13:10 02:30 AM 03:30 AM 07:30

168 CABIN STOWAGE BEGINS 10/ 13:25 02:45 AM 03:45 AM 07:45

168 RCS HOT-FIRE TEST 10/ 14:20 03:40 AM 04:40 AM 08:40

170 ATLANTIS U.S. PAO EVENT TDRE 10/ 17:40 07:00 AM 08:00 AM 12:00

172 MISSION STATUS BRIEFING JSC 10/ 19:40 09:00 AM 10:00 AM 14:00

174 KU-BAND ANTENNA STOWAGE 10/ 22:50 12:10 PM 01:10 PM 17:10

175 VIDEO FILE HQ 11/ 00:40 02:00 PM 03:00 PM 19:00

176 ATLANTIS CREW SLEEP BEGINS 11/ 02:00 03:20 PM 04:20 PM 20:20

FLIGHT DAY 12 HIGHLIGHTS (replayed on the hour during 176 JSC 11/ 02:40 04:00 PM 05:00 PM 21:00 crew sleep)

HIGH DEFINITION FLIGHT DAY 12 CREW HIGHLIGHTS 178 (if available; on the NASA-TV HDTV Channel; replays from JSC 11/ 05:40 07:00 PM 08:00 PM 00:00 5:00am CT - 4:00pm CT on May 25)

181 ATLANTIS CREW WAKE UP (begins FD 13) 11/ 10:00 11:20 PM 12:20 AM 04:20

Page 11 of 14 ORBIT SUBJECT SITE MET CDT EDT GMT WEDNESDAY, MAY 26 FD 13

183 ATLANTIS DEORBIT PREPARATIONS BEGIN 11/ 13:20 02:40 AM 03:40 AM 07:40

184 PAYLOAD BAY DOOR CLOSING 11/ 14:41 04:01 AM 05:01 AM 09:01

186 ATLANTIS DEORBIT BURN 11/ 17:21 06:41 AM 07:41 AM 11:41

187 MILA C-BAND RADAR ACQUISITION OF ATLANTIS 11/ 18:11 07:31 AM 08:31 AM 12:31

187 KSC LANDING KSC 11/ 18:24 07:44 AM 08:44 AM 12:44

POST-LANDING NEWS CONFERENCE KSC NET L+2 HRS.

ENTRY FLIGHT CONTROL TEAM VIDEO REPLAY JSC ~ L+3 HRS. (replayed after Post-Landing News Conference)

STS-132 MISSION HIGHLIGHTS VIDEO REPLAY (replayed after Entry Flight Control Team Video) JSC ~ L+3.5 HRS.

STS-132 CREW NEWS CONFERENCE (may be postponed KSC NET L+4.5 HRS. or cancelled)

Page 12 of 14 ORBIT SUBJECT SITE MET CDT EDT GMT ***************************************************************************************************************************************************************************************** DEFINITION OF TERMS ***************************************************************************************************************************************************************************************** AMC: Americom Satellite CDT: Central Daylight Time Destiny: U.S. Laboratory on ISS EMU: Extravehicular Mobility Unit EOTP Enhanced ORU Temporary Platform EST: Eastern Daylight Time EVA: Extravehicular Activity FCS: Flight Control System FD: Flight Day GMT: Greenwich Mean Time HARMONY: Node 2 HD: High Definition Television HQ: NASA Headquarters ISS: International Space Station JSC: Johnson Space Center Kibo: Japanese Pressurized Module KSC: Kennedy Space Center L: Launch or Landing time LIMO: Live Interview Media Outlet channel MECO: Main Engine Cut-Off MET: Mission Elapsed Time, which begins at the moment of launch and is read: DAYS/HOURS:MINUTES. LAUNCH=00/00:00 MILA Merritt Island, Florida Tracking Station MMT: Mission Management Team MRM-1 Mini Research Module 1 (new docking port on ISS) MS: Mission Specialist NET: No Earlier Than OBSS: Orbiter Boom Sensor System ODS: Orbiter Docking System OMS: Orbital Maneuvering System ORU: Orbital Replacement Unit P6: Port Six Truss Segment PAO: Public Affairs office PDGF: Power Data Grapple Fixture PMA-3: Pressurized Mating Adapter 3 POA: Payload ORU Accomodation RCS: Reaction Control System RPM: Rendezvous Pitch Maneuver SGANT: Space-to-Ground Antenna SRMS: Shuttle Remote Manipulator System on Atlantis SSRMS: Space Station Remote Manipulator System (Canadarm2 ISS Robotic Arm) STS: Space Transportation System TI: Terminal Initiation Rendezvous Maneuver

Page 13 of 14 ORBIT SUBJECT SITE MET CDT EDT GMT TDRE, W: Tracking and Data Relay Satellite, East and West Longitudes TPS: Thermal Protection System Unity: Connecting Node 1 on International Space Station VTR: Videotape Recorder WLE: Wing Leading Edge Zvezda: Russian Service Module of ISS

Page 14 of 14