King's Lynn Legend/Notation

Total Page:16

File Type:pdf, Size:1020Kb

King's Lynn Legend/Notation Sheet 22 Drain Drain Mud Drain Drain Drain 0043 9.38mBM Hamonds Drain Drain Track Drain 1239 River Great Ouse Track Track Drain Pond Drain Lynn Channel Mean High Water Ling Common 0036 7637 Adopted King’s Lynn & West NorfolkPond Local Plan 1998 0036 45.3m Drain Path (um) LB 13.4m Drain Drain BM 48.69m Drain Track Drain Pond 9131 El Sub Sta Black Hills 47.8m 5.5m 4.3m 4.0m 8832 Black Hills Track South Wootton Common Inset 31 Path (um) Beacon South Wootton Common 1130 3029 4828 Drain Sluice 7527 4727 Track Sloping masonry Drain Drain Drain Track 3.4m Pond9223 Track Track Drain 0022 Drain King’s Lynn Drain Drain Drain Drain Drain Drain Drain Sloping masonry 10.4m Track Pond Drain Drain Drain Drain Drain This Map is reproduced from Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller Hamond's Drain Pillar of Her Majesty’s Stationery Office © Crown Copyright. Unauthorised reproduction infringes Crown Copyright and may leadBM 51.22m Drain Drain 7.0m Old West Sea Bank Drain to prosecution or civil proceedings. Borough Council of King’s Lynn and West Norfolk. LA086045. 1999. Pond Drain Drain Beacon 3.4m Drain 7.0m Maps produced by Lovell Johns Ltd., Oxford. England. SCALE 1:10000 2907 3.4m Path (um) 7.9m BM 14.44m OldDrain Way SubEl Sta 36.8m Old Way Drain Track 4200 3700 6800 (Drain) Drain 2700 Drain 2200 5400 6800 0003 0003 42.7m 0006 0078 0003 0003 0006 El Sub Sta8.2m 00030003 2700 5700 BM 4.03m Drain 0003 3700 6800 7.3m South Wootton 0006 4900 230 Drain Golf Course Track Drain Hamonds Drain 4.3m 50.5m 15.2m Drain Knights Hill BM 3.97m Drain Village Drain 2695 Drain Pond South Wootton Common South Wootton Common Drain Drain BM 5.12m Drain Drain 2.7m Drain Path (um) TCB Track Drain 41.2m Cemetery 15.2m Drain Drain Cemetery Track 1883 Pond South Outmarsh Drain Drain LB 10.1m BM 35.64m Drain Track 10.7m Drain El Sub Sta GRIMSTON ROAD 7.0m Hamonds Drain 4.0m 31.5m Drain 10.7m Old Way Drain BM 11.48m 0077 15.2m War 3676 7.3m Memorial 11.3m Track 11.70mBM BM 4.02m BM 15.08m 7.6m 12.8m 3673 Inset 33 El 25.0m StaSub Drain El Sub Sta Drain South Wootton 3.4m Proposals Map Central 9.8m 15.5m North Wootton/South Wootton Drain El Sub Sta Drain South Wootton PpgStn Bowling Green 3.7m 21.6m The Green 3362 0002 Sluice Drain BM 9.98m Path (um) Pond LB South Wootton 15.2m 3.7m Pond 9.4m 7958 4955 El Sub Sta South Wootton 18.6m Drain Track 7050 5250 River Great Ouse 2051 Lynn Channel Drain Drain South Wootton South Wootton BM 18.87m Sloping masonry KING'S LYNN KING'S LYNN 2149 15.2m 1348 Pond PathPath (um) (um) Pond 225 Mean High Water El Sloping masonry Sub Sta Mean High Water 7.3m Drain The Green KING'S LYNN 4.6mDrain Drain Path 18.3m South Wootton Kilham'sWay South Wootton BM 15.87m Drain 1940 4.3m Allotment Gardens TCB Allotment Gardens Drain Drain BM KING'S LYNN El Sub Sta 14.54m Drain 4434 Bowling Green 13.7m LB El Sub Sta 2931 6730 3.7m Path Drain Drain BM Drain 6.43m Drain Drain Drain 4.6m Drain Drain LB 0026 Quarry (disused) BM 6.82m 13.1m Track 3024 Playground Sewage Works Drain El Sub Sta ETL 4220 7.0m El Sub Sta 2420 Spring Wood Pond LB Pendall Head 1618 Drain 1516 Drain 12.5m El Sub Sta 5315 Drain KING'S LYNN ETL BM EDWARD BENEFER WAY 28.42m Drain3.7m BM 7.21m Reffley Reffley Wood ETL Wood Monkshood TCB Drain Drain 11.6m 25.8m Drain NORTH LYNN El Sub Sta 3.0m 3400 LB Pond Path Pond Drain SubEl Sta PondReffley Wood 7.0m Drain Drain El Sub Sta Drain Pond BM 11.64m Drain LB 11.0m Drain Drain Drain North Lynn 1000 0049 4500 8300 2000 4.0m Industrial Path 6700 0005 3900 8500 1900 2400 Estate Drain Drain TCB Drain KING'S LYNN Drain El Drain Drain Drain KING'S LYNN KING'S LYNN 10.7m KING'S LYNN Drain SubKING'S Sta LYNN 4500 6700 8300 0005 Drain Drain NORTH LYNN KING'S LYNN TCB Drain 220 Reffley(chalybeate) Spring Drain LB El Sub Sta 9792 El Sub Sta Charlock Drain ETL 7294 ElSub Sta Pond Drain Track El 10.1m 8291 Drain Sub Sta SubEl Sta LB 0190 Track Drain North Lynn BM Track El Sub Sta Industrial Estate 10.38m 7886 9285 8800 El Sub Sta Track 1783 BM 3.34m 10.1m 3085 Drain Drain Drain SubEl Sta Posts 16.6m 0583 StaSubEl 9581 Tanks KING'S LYNN Drain 16.3m 6281 Tank Tanks El Sub Sta Drain POLB Drain Drain Sloping masonry Chimney Mean High Water El Sub Sta Reffley Wood Sloping masonry BM 16.21m 6877 9.1m Drain 8475 Tanks North Reffley Wood 6876 Path Drain Drain Tanks WB El Sub Sta Drain Lynn Drain Drain Drain 3.7m KING'S LYNN 8766 Farm Drain 7770 Post Drain Drain River Great Ouse Grimston Warren 6567 8.2m ETL Lynn Channel Drain El Sub Sta El Playing Field BM 2.70m BM 4.54m 24.52mBM Sub Sta Drain 3.7m 8500 Tank TCB 2.7m 4.0m 4.0m 3.7m BM 3.89m Riverside Industrial Estate BM 3.73m 3.1m 0763 Tanks Depot Tank Marsh Lane Drain Track 3.4m Pond Post 12.4m 6.4m Black Drain Pond Drain 3.7m El Sub Sta Drain Tank Playing Field Chy El Sub Sta 3.7m El Garden Court 5.8m Black Drain 2.7m 4.6m 3.4m Sub Sta Tawny Sedge SM Sluice Mean High Water BM 3.72m ETL Black Drain BM 4.47m ETL Mud 4.6m KING'S LYNN Drain Drain Black Drain SwimmingNORTH LYNN Tanks Drain Pool Drain Spring Sedge Drain Gaywood River Drain Spring Pipe Line BM 3.40m Path (um) Sedge Sluice Mean High Water 2.1m Browning Place 3.7m Pond River Great Ouse Gaywood River Drain Drain Sluice Lynn Channel 4.0m Car Park BM 4.46m Drain Tanks Drain Depot Subway LB LB Black Drain Allotment Gardens Drain SM 4.0m White Sedge TCB 3.7m DrainTrack ETL Tank Subway Car Park Tank NORTH LYNN Drain KING'S LYNNNORTH LYNN NORTH LYNNKING'S LYNN NORTH LYNN TCB KING'S LYNN KING'S LYNN Drain 4.6m Track 0049 215 3.0m FB Tanks BM 2.72m El Sub Sta 4.0m ETL Chy Allotment Gardens Estuary Drain Drain 3.4m LB Gaywood River Drain Gaywood River 3.7m El Ps Pond WB Road Tanks 2.1m Playground ETL Black Drain Drain Track Reffley Wood 2.4m 4.0m Drain Posts Drain Depot Tanks NORTH LYNN WB NORTH LYNN StaSubEl Drain Drain BM Smallholdings 2.4m 2.80m 3.4m Depot 10.4m 4.9m WB SubEl Sta Tanks 3.7m Black Drain Path Post Mast SubEl Sta Drain 2.4m Tanks 2.1m El Sub Sta Sloping masonry 4.3m Drain River Industrial Estate Pipe Line Drain FB Drain 2.4m Post 3.7mBM 4.19m Drain Path (um)FB Gaywood Black Drain WB BM 2.47m Drain Bridge 7432 Bawsey Drain Wootton Road Gaywood River Drain Drain SubEl Drain FB Sta Drain Bawsey Drain Bawsey Drain FS FB Drain Tanks Track 4.6m Black Drain Drain 4.9m Tanks Bowling Green El Sub Sta ETL Drain 4.90mBM LB 4.9m Drain Tanks Hockey Pitches TCB Track Drain Allotment Gardens Bawsey Drain ETL The Delft KING'S LYNN Path (um) Tank El Sub Sta Sluice Car Park 4.0m Mean High Water FB Drain Allotment Gardens 3.4m Drain 1123 Sloping masonry LB Pond Drain NORTH LYNN Bawsey Drain Tanks Tanks 3.7m Drain Track NORTH LYNN Bawsey Drain 3.0m Depot Path (um) Drain 4220 Edward Recreation Ground Pond Gaywood River 4.9m Benefer SubEl Sta El Drain River Great Ouse WB BM 4.71m Sub Sta Pond Lynn Channel Drain Way Playing Field Bawsey Drain Gaywood River Bawsey Drain Path (um) Pond Track 3.4m Old East Sea Bank Drain 4.6m Drain 4.0m Allotment Path Drain Drain 2615 Gardens Drain Hockey Pitches 4.6m Drain Timber Yard Post Drain Playing Field 3.9m Pond BM 6.05m 3912 KING'S LYNN Path Timber Yard Drain Drain FAP Drain ETL 3.7m Playing Field Drain Timber Yard 5.2mBollards Drain Drain 4.9m El Sub Sta SM Path (um) BM 7.88m 7.0m Path (um) Drain BM 3.35m Sloping masonry FAP Gaywood River Mean High Water Bollard Bollards 3.4m 3.4m Drain SM Drain 8.0m Bollards 5.35mBM FB Playing Field Drain Pond Trundle Wood Bollard El Sub Sta Path (um) Playing Field Drain Drain Path (um) 5.5m Bollard 3.0m Trundle Wood Track Bentinck Dock Path 5.2m BM 3.73m Coal Yard Drain Drain Bollard Running Track Drain 3.0m 3.0m Drain Drain Bollard Bollards (courseTown Wall of) BM 5.83m 3300 5600 8200 BM 9.86m 5400 8200 3500 Mud Tank SubEl Sta Drain GAYWOOD Travelling Crane Bollard NORTH LYNN Pavilion L Twr Playing Field KING'S LYNN BM 3.77m Allotment Gardens KING'S LYNN Playing Field KING'SRunning LYNN Track KING'S LYNN GAYWOOD 0003 5400 3500 Path (um) Drain Drain 5.2m Tank Bowling Green Timber Yard L Twr 3.1m Path Path 5.8m 210 Timber Yard BM3.4m 3.69m Drain Path Works Bowling Green 5.5m Path (um) Drain Sloping masonry Timber Yard Water Drain Tank Allotment Gardens 4.0m NORTH LYNN Drain Drain Drain Allot Gdns 11.0m Drain L Twr Allotment Gardens 3.9m SubEl Sta Path Gaywood River Drain Und 5.8m LB Drain ETL L Twr WB El Edma Street Car Park Posts BM 11.56m TravellingBollards Crane Bentinck Dock Sub Sta Drain ETL Drain Drain Bawsey Drain Recreation GroundAllot Gdns WB Drain Mean High Water Drain Path Drain Drain 5.5m 5.5m Bollards Drain Water 6.1m Tennis Courts (course of) Drain 4.9m Posts Travelling Crane Mud Town Wall Track Drain Drain Track L Twr (course of) Fisher FleetLanding Stage 5.5m FB 3.0m Tennis Courts Drain Town Wall 4.3m Post El Sub Sta 4.0m LB Track Sloping masonry Landing StagePosts BM Bollards Playing Field Drain3.0m 5.97m Track 14.9m 4.0m BM 4.60m Pond BM 16.47m El Sub Sta Bollards North End 6.4m Fisher FleetMud Mean5.5m HighLevel Water Crossing 4.5m 3.7m Drain BM 5.00m BM 4.74m Church Drain Bol Bol Bol Path (um) (remains of) Path (um) Sluice Track Mud River Great Ouse 5.5m Post BM 7.18m Bawsey Drain Bol 4.6m Path 9.1m Drain Gaywood River Lynn Channel Tank Drain BM 3.54m Car Park Mean High Water KING'S LYNN Swing-bridge Subway 5.2mEl 8.5m LB El Sub Sta Foot Bridge TCB Level CrossingWB Sub Sta Drain Bawsey Drain Mean High Water Bollards Bol Bollards L Twr BM 8.64m 11.3m 1571 WB KING'S LYNN 11.9m 1772 Drain BM 5.22mBollards BM 12.09m Track 5.5m Swing-bridge 5.5m Long Pond Holding's Hill BolSM CrossingLevel 4.3m Bowling Green 13.7m
Recommended publications
  • Norfolk Local Flood Risk Management Strategy
    Appendix A Norfolk Local Flood Risk Management Strategy Consultation Draft March 2015 1 Blank 2 Part One - Flooding and Flood Risk Management Contents PART ONE – FLOODING AND FLOOD RISK MANAGEMENT ..................... 5 1. Introduction ..................................................................................... 5 2 What Is Flooding? ........................................................................... 8 3. What is Flood Risk? ...................................................................... 10 4. What are the sources of flooding? ................................................ 13 5. Sources of Local Flood Risk ......................................................... 14 6. Sources of Strategic Flood Risk .................................................... 17 7. Flood Risk Management ............................................................... 19 8. Flood Risk Management Authorities ............................................. 22 PART TWO – FLOOD RISK IN NORFOLK .................................................. 30 9. Flood Risk in Norfolk ..................................................................... 30 Flood Risk in Your Area ................................................................ 39 10. Broadland District .......................................................................... 39 11. Breckland District .......................................................................... 45 12. Great Yarmouth Borough .............................................................. 51 13. Borough of King’s
    [Show full text]
  • Archaeological Test Pit Excavations in Gaywood, Norfolk, in 2010-2013
    Archaeological Test Pit Excavations in Gaywood, Norfolk, in 2010-2013 Catherine Collins 1 2 Archaeological Test Pit Excavations in Gaywood, King’s Lynn, Norfolk, in 2010, 2011 and 2013 Catherine Collins 2018 Access Cambridge Archaeology Department of Archaeology University of Cambridge Pembroke Street Cambridge CB2 3QG 01223 761519 [email protected] http://www.access.arch.cam.ac.uk/ (Front cover image: Excavation at GAY/11/2. © ACA) 3 4 Contents 1 SUMMARY ................................................................................................................................... 11 2 INTRODUCTION ......................................................................................................................... 13 2.1 ACCESS CAMBRIDGE ARCHAEOLOGY .................................................................................... 13 2.2 THE HIGHER EDUCATION FIELD ACADEMY (HEFA) ............................................................. 13 2.3 TEST PIT EXCAVATION AND RURAL SETTLEMENT STUDIES ..................................................... 14 3 AIMS, OBJECTIVES AND DESIRED OUTCOMES ............................................................. 15 3.1 AIMS ...................................................................................................................................... 15 3.2 OBJECTIVES ........................................................................................................................... 15 3.3 OUTCOMES ...........................................................................................................................
    [Show full text]
  • River Restoration and Chalk Streams
    River Restoration and Chalk Streams Monday 22nd – Tuesday 23rd January 2001 University of Hertfordshire, College Lane, Hatfield AL10 9AB Organised by the River Restoration Centre in partnership with University of Hertfordshire Environment Agency, Thames Region Report compiled by: Vyv Wood-Gee Countryside Management Consultant Scabgill, Braehead, Lanark ML11 8HA Tel: 01555 870530 Fax: 01555 870050 E-mail: [email protected] Mobile: 07711 307980 ____________________________________________________________________________ River Restoration and Chalk Streams Page 1 Seminar Proceedings CONTENTS Page no. Introduction 3 Discussion Session 1: Flow Restoration 4 Discussion Session 2: Habitat Restoration 7 Discussion Session 3: Scheme Selection 9 Discussion Session 4: Post Project Appraisal 15 Discussion Session 5: Project Practicalities 17 Discussion Session 6: BAPs, Research and Development 21 Discussion Session 7: Resource Management 23 Discussion Session 8: Chalk streams and wetlands 25 Discussion Session 9: Conclusions and information dissemination 27 Site visit notes 29 Appendix I: Delegate list 35 Appendix II: Feedback 36 Appendix III: RRC Project Information Pro-forma 38 Appendix IV: Project summaries and contact details – listed 41 alphabetically by project name. ____________________________________________________________________________ River Restoration and Chalk Streams Page 2 Seminar Proceedings INTRODUCTION Workshop Objectives · To facilitate and encourage interchange of information, views and experiences between people working with projects and programmes with strong links to chalk streams and activities or research that affect this environment. · To improve the knowledge base on the practicalities and associated benefits of chalk stream restoration work in order to make future investments more cost effective. Participants The workshop was specifically targeted at individuals and organisations whose activities, research or interests include a specific practical focus on chalk streams.
    [Show full text]
  • Transactions of the Norfolk and Norwich
    the natural I HISTORY MUSEUM ! 4 APR 199? ncHAiue-"-! h 1i\j££>frL Lj'r^A/fT^Y' y Norfolk Bird Report - 1995 Editor: MICHAEL J. SEAGO County Recorder: MICHAEL E.S. ROONEY Assistant County Recorder: NEIL LAWTON Systematic List Compilers: P.R. ALLARD, D. APPLETON, A. BLOOMLIELD, A. BROWN, P. CLEMENT, K. DYE, V. EVE, P. FISHER, M. FISZER. P. HEATH. G. HIBBERD, J.B. KEMP, N. LAWTON, M.E.S. ROONEY, J. WILLIAMSON & M. YOUNG-POWELL Editorial 587 Review of the Year 590 Pine Bunting - A First for Norfolk 593 Breeding Waders in the Broads ESA 594 The Little Auk Wreck 600 Buzzards in Norfolk 602 Origins of Rock Pipits in Norfolk 606 County Rookery Survey 608 Wetland Bird Surveys 612 Ringed Pink-footed Geese in Norfolk 616 Contributors 620 Systematic List 622 Ringing Report 727 The feature containing selected Introductions, Hybrids, Escapes and Ferals has been held over until the next Report. Norfolk Mammal Report - 1995 Editor: MARTIN R. PERROW Editorial 735 The ‘Flattened Fauna’ Survey 736 Small Mammals in Reed-beds 738 Water Voles and Mink 742 Status of the Otter 743 Chinese Water-deer on the increase? 745 Classified List 746 Contributors 760 Published by NORFOLK & NORWICH NATURALISTS SOCIETY. Castle Museum, Norwich NR 1 3JU (Transactions Volume 30 Part 6 March 1997) ISSN 0375 7226 Keepsake back numbers are available from Mrs. M.J. Dorling, 6 New Road. Hethersett NR9 3HH. Front cover painting: Crossbills by J.C. Harrison (reproduced by courtesy C.R. Knights). Back cover photograph: Red Squirrel (D. Mason). NORFOLK BIRD REPORT - 1995 Editorial Th° Coimci! of the Norfolk & Norwich Naturalists’ Society presents the annual report on the buds of Norfolk.
    [Show full text]
  • Proposed Mineral Extraction Sites
    Proposed Mineral Extraction Sites 104 Breckland Sites Map of proposed sites in Beetley (MIN 08, MIN 12, MIN 13, MIN 51) MIN 12 - land north of Chapel Lane, Beetley Site Characteristics • The 16.38 hectare site is within the parish of Beetley • The estimated sand and gravel resource at the site is 1,175,000 tonnes • The proposer of the site has given a potential start date of 2025 and estimated the extraction rate to be 80,000 tonnes per annum. Based on this information the full mineral resource at the site could be extracted within 15 years, therefore approximately 960,000 tonnes could be extracted within the plan period. • The site is proposed by Middleton Aggregates Ltd as an extension to an existing site. • The site is currently in agricultural use and the Agricultural Land Classification scheme classifies the land as being Grade 3. • The site is 3.7km from Dereham and 12km from Fakenham, which are the nearest towns. • A reduced extraction area has been proposed of 14.9 hectares, which creates standoff areas to the south west of the site nearest to the buildings on Chapel Lane, and to the north west of the site nearest the dwellings on Church Lane. Amenity: The nearest residential property is 11m from the site boundary. There are 21 sensitive receptors within 250m of the site boundary. The settlement of Beetley is 260m away and Old Beetley is 380m away. However, land at the north-west and south-west corners is not proposed to be extracted. Therefore the nearest residential property is 96m from the extraction area and there are 18 sensitive receptors within 250m of the proposed extraction area.
    [Show full text]
  • King's Lynn and West Norfolk Borough Council (Anmer
    THE SANDRINGHAM ROYAL ESTATE It will be noticed that no public rights of way have been claimed across land comprising the Sandringham Royal Estate. As this is a private estate of Her Majesty the Queen it was mistakenly omitted from inclusion in the original survey of the definitive map and statement due to the belief that the estate was exempt from the provisions of the National Parks and Access to the Countryside Act 1949 as Crown Land. The Sandringham Royal Estate does not in fact qualify as Crown Land as a private estate of Her Majesty the Queen. All public rights of way within the Estate have, therefore, been mistakenly excluded from this survey. DEFINITIVE STATEMENT OF PUBLIC RIGHTS OF WAY KING'S LYNN AND WEST NORFOLK DISTRICT PARISH OF ANMER This parish lies wholly within the Sandringham Royal Estate which is exempt from the provisions of the National Parks and Access to the Countryside Act, 1949. PARISH OF BAGTHORPE-WITH-BARMER Restricted Byway No. 1 (Barmer-South Creake Road to Parish Boundary). Starts from the Barmer to South Creake Road, opposite Restricted Byway No. 2, and runs north north-westwards to the parish boundary. Restricted Byway No. 2 (Barmer-South Creake Road to Parish Boundary). Starts from the Barmer-South Creake Road and runs south eastwards for approximately 330 yards, then bears more easterly running through Manor Ling Wood to the parish boundary where it joins Syderstone Restricted Byway No. 4. Restricted Byway No. 3 (Barmer-South Creake Road to Parish Boundary). Starts from the Barmer-South Creake Road at Barmer Farm and runs in a south easterly direction to the parish boundary at the north east corner of Twenty Acre Plantation where it joins Syderstone Restricted Byway No.
    [Show full text]
  • King's Lynn IDB: Inspection Report 2011
    KING’S LYNN INTERNAL DRAINAGE BOARD SUMMER INSPECTION WEDNESDAY 20 JULY 2011 Page 1 of 17 ITINERARY 09:45 – 10:00 Board Room, Kettlewell House – Coffee 10:00 Depart Kettlewell House Note: via Tennyson Avenue, The Walks flood plain on right; via Nar-Ouse Way, Pierrepointe Pumping Station on left; via Eau Brink Road, Straight Mile Outfall into River Great Ouse 10:25 20 minute stop at Islington Pumping Station and Straight Mile 10:45 Depart Islington PS following the route of the main Smeeth Lode Note: replaced Black Ditch outfall on right; Greenbank Pumping Station and Museum on left 15 minute stop at Smeeth Road, Emneth Hungate to view completed flood storage 11:10 pond. Short explanation of purpose – off-line storage during event - and incidental benefits – biodiversity habitat. Lady’s Drove, Emneth Hungate – short pause to view larger flood storage pond across 11:35 approx intervening field (not possible to take coach closer to site) A47 Wisbech Bypass (pause in abandoned petrol station entrance) – View potential 11:55 approx development land and discuss Developer Contributions 12:10 Arrive lunch venue (Elme Hall Hotel, Wisbech) 14:00 Depart lunch venue On route along A47 and A149, the Engineer will highlight points of interest including: • Possible need for pond in future to protect north-east Wisbech to east of bypass on DRN145P1001 • Protection options for Hardwick Ind. Est. (pause in layby if possible) • King’s Reach Attenuation Pond and Pumping Station • Gaywood Flood Plain and River valley • Babingley River 15:00 20 minute stop
    [Show full text]
  • Sustainable Abstraction
    WRMP 2019 Technical Document: Sustainable Abstraction December 2019 Introduction PR14 NEP WFD No Option Selection Forward Look Invasive and Fish and Eel Article 4.7 Schemes Deterioration non-native species Passage This is a technical report that supports our WRMP submission. Anglian Water is committed to achieving sustainable levels of abstraction. This report provides an overview of our approach to sustainable abstraction in the 2019 WRMP, including our obligations under the Water Industry National Environment Programme (WINEP) and Water Framework Directive (WFD). 2 Introduction PR14 NEP WFD No Option Selection Forward Look Invasive and Fish and Eel Article 4.7 Schemes Deterioration non-native species Passage Contents Executive Summary 4 1. Introduction 5 • 1.1 The Water Resources Management Plan 5 • 1.2 Overview 6 2. PR14 NEP Schemes 7 • 2.1 Coston Fen 7 • 2.2 River Wensum 7 • 2.3 North Norfolk Coast 7 3. WFD No Deterioration 8 • 3.1 Time Limited Licences 9 • 3.2 Permanent Licences 9 • 3.3 Abstraction Incentive Mechanism 9 4. Option Selection 10 • 4.1 Options Appraisals Approach 10 • 4.2 Customer Support 11 • 4.3 Future Exports 12 • 4.4 Sustainability Changes 12 • 4.5 Mitigation Options 18 5. Forward Look 19 • 5.1 Investigations and Options Appraisals 19 • 5.2 AMP8 Mitigation Schemes 19 • 5.3 Ants Broads and Marshes 19 6. Invasive and non-native species 20 • 6.1 Supply Side Options 20 • 6.2 Current Operations 20 7. Fish and Eel Passage 21 8. Article 4.7 21 3 Introduction PR14 NEP WFD No Option Selection Forward Look Invasive and Fish and Eel Article 4.7 Schemes Deterioration non-native species Passage Executive summary Anglian Water is committed to achieving sustainable the allowance for cessation of abstraction from levels of abstraction through a combination of our groundwater source near Catfield Fen in 2021.
    [Show full text]
  • Transactions 1937
    1 5 MAK tC. / TRANSACTIONS OF THE Bin-folk auk Bmlotclj NATURALISTS’ SOCIETY For the Year 19 3 7 VOL. XIV. Part hi. Edited by Major A. Buxton NORWICH Printed by A. E. Soman & Co., Ltd. March, 1938 ±. Pricf. 10/- TRAN FACTIONS OF THE NORFOLK & NORWICH NATO K ALISTS’ SOCI ETV The Committee beg to direct the attention of authors of 1. communications to the Society to the following Regulations been in order to accelerate the which2. have drawn up publication of the Transactions, and to utilise as widely and as fairly as possible the funds which the Society devotes to the publication of 3.scientific researches : — —Precedence will be given to papers dealing with local Natural History. —MSS. of Papers.—As soon as any paper is ready for publication, whether it has been read before the Society or not, it for 5.must be sent to the Hon. Editor the consideration of the Committee. 6. —Illustrations.— Illustrations, if accepted, should be drawn in a form immediately suitable for reproduction by photographic process. 4—Proofs.—In general, a first proof and a revise of each paper will be sent to the author. If further proofs are re- quired, owing to corrections or alterations for which the printer is not responsible, the expense of such proofs and corrections shall be charged against the author. All proofs must be returned without delay addressed to the Hon. Editor. —Abstracts.—Authors are requested to hand to the Hon. Secretary abstracts of their Papers at the same time that they deposit their MSS. —Separate Issue or Reprints.—An author requiring reprints of his paper must inform the Editor of the number of copies he will require.
    [Show full text]
  • Local Flood Risk Management Strategy
    Norfolk Local Flood Risk Management Strategy Post Consultation Final 31 July 2015 1 2 Part One: Flooding and Flood Risk Management Contents Part One: Flooding and Flood Risk Management ........................................ 5 1. Introduction .................................................................................... 5 2 What Is Flooding? .......................................................................... 8 3. What is Flood Risk? .................................................................... 10 4. What are the sources of flooding? ............................................. 13 5. Sources of Local Flood Risk ....................................................... 14 6. Sources of Strategic Flood Risk ................................................. 17 7. Flood Risk Management .............................................................. 19 8. Flood Risk Management Authorities ........................................ ..23 Part Two: Flood Risk in Norfolk 9. Flood Risk in Norfolk ................................................................. ..31 10. Broadland District .................................................................... ....40 11. Breckland District ...................................................................... .46 12. Great Yarmouth Borough .......................................................... ..52 13. Borough of King’s Lynn & West Norfolk ................................. ..61 14. North Norfolk District ................................................................ ..74 15. Norwich
    [Show full text]
  • Gaywood Valley Discover Toolkit
    DISCOVER It’s our nature! For most of human history our lives have What’s more nature makes us feel good. been shaped by the local landscape: our Close your eyes and think of somewhere survival depended on knowing it well. really beautiful. The chances are your Knowledge of the wildlife and the habitats beautiful place was outdoors. Perhaps around us was second nature when most there was a river nearby (water makes of us worked on the land and walked to us feel really good), maybe the sun was our work places. Today, you might think shining through the fresh leaves of a tree, we no longer need nature but the more and there’s a good chance birds were you think about your connections with singing in the background or a butterfly nature – and we hope this guide will was chasing around. inspire you to think about them – the The DISCOVER section of this guide more you see them everywhere. What’s introduces you to some of the important the paper in this book made from? What habitats that are found in the Gaywood are you breathing, without even noticing, Valley Living Landscape and tells you while you read this? about the wildlife you can discover here. Do I really need healthy ecosystems wild insects to pollinate them and of course all of and a wildlife rich landscape? our food plants depend on the ecosystems that maintain healthy soils. The majority of land in the Even if you are sitting indoors while you read Gaywood Valley is farmland.
    [Show full text]
  • Babingley Catchment 8 Key Successes 2.1 Babingley Catchment – the Place 8 • 730 Followers on Twitter @9Chalkrivers
    9 Chalk River Project Community Engagement Report Never doubt that a small group of thoughtful, committed citizens “can change the world; indeed, it’s the only thing that ever has. Margaret Mead ” Contents Summary of key engagement successes for the 9 Chalk Summary of key engagement successes for the 9 Chalk Rivers Project 1 Summary of river enhancements and community work 2 Rivers Project 1. INTRODUCTION TO THE 9 CHALK RIVERS PROJECT 4 Key issues 1.1 Background 4 1.2 Why the project was undertaken and the role of local communities 4 Lack of access to rivers, increased development, loss of green 1.3 Overall management of the project 5 space, pollution in the river, loss of habitat and a need for people to 1.4 The project team 5 get out into the wider countryside to learn about the local environ- 1.5 Location of rivers 6 ment, health of the rivers and their wildlife and how these could be 1.6 How community engagement has been measured through the project 6 improved, water quality, continued support for farming to maintain 1.7 Structure of this report 6 profitable production, silt, localised flooding and better understand- ing of the rivers and their catchments. 2. THE RIVERS 7 2. Babingley catchment 8 Key successes 2.1 Babingley catchment – The place 8 • 730 followers on Twitter @9ChalkRivers. 2.2 The community 9 2.3 Practical work to the river 9 • Over 500 people subscribed to the 9 Chalk 2.4 Events in the Babingley catchment 9 Rivers Project newsletter. 2.5 Results of engagement and future for the river 10 • Over 70 public events held covering all 9 river 3.
    [Show full text]