San Elijo Lagoon Construction Stages
Total Page:16
File Type:pdf, Size:1020Kb
San Elijo Lagoon Construction Stages StageSan 1:Elijo 6 months Lagoon Construction Stages: Stage One - Six Months Highway San Elijo Avenue Establish Pedestrian Access Across Manchester Avenue South Coast Hwy 101 ENCINITAS Set Up Construction Oces, Lay Down Area, and Concrete Batch Plant Site at Strawberry Fields Area Manchester Utility Work Bridge #240.4 Rail Staging Area Establish Access Roads and Lay Down Areas San Elijo Visitor Center Manchester Avenue Manchester Yard Staging Area Ocean Cove Cmto Ocean Cove Drive Cove Ocean Cmto Manchester Avenue Cape Sebastian WEST BASIN EAST BASIN Rail work Staging Area CENTRAL BASIN Santa SOLANA BEACH Inez Santa Hilalga LEGEND Road Construction Work South Coast Hwy 101 CROSS SECTION OF EXISTING BRIDGE Santa Direction of Trac Florencia North Rios Avenue Rail Rail Access Roads Granados Avenue North Staging Areas Canyon Place Note: For Plan of Trails and Trail Impacts go to; SOUTHBOUND NORTHBOUND www.KeepSanDiegoMoving.com/BuildNCC Rawl Place Place Rawl Canyon Drive StageSan 2: Elijo 12 months Lagoon Construction Stages: Stage Two - 12 Months Highway San Elijo Avenue San Elijo bridge construction begins; trac shifts inside South Coast Hwy 101 on existing bridge ENCINITAS New bridge and highway widening will be built outside of the existing facility Existing number of trac lanes will be maintained in each direction Bridge #240.4 Staging Lagoon Area Rail Clear and Grub Vegetation in Central Basin Bridge Dredge pit in Central Basin and pump to ocean San Elijo Visitor Center Grade Central Basin Manchester Avenue Rail Manchester Yard Place embankment for new track on east side of existing Staging Area Ocean Cove embankment Cmto Ocean Cove Drive Cove Ocean Cmto Cape Manchester Avenue Sebastian WEST BASIN EAST BASIN Rail work Staging Area CENTRAL BASIN Santa SOLANA BEACH Inez Santa Hilalga LEGEND Road Construction Work South Coast Hwy 101 Santa Pedestrian CROSS SECTION OF STAGE TWO BRIDGE Direction of Trac Florencia Tunnel North Rios Avenue NEW STRUCTURE NEW STRUCTURE Rail CONSTRUCTION EXISTING EXISTING CONSTRUCTION Rail Access Area Granados Avenue North Clearing and Grubbing Area Canyon Place Staging Areas SOUTHBOUND Place Rawl NORTHBOUND Note: For Plan of Trails and Trail Impacts go to; Canyon Drive www.KeepSanDiegoMoving.com/BuildNCC KeepSanDiegoMoving.com/BuildNCC San Elijo Lagoon Construction Stages StageSan 3: Elijo 12 months Lagoon Construction Stages: Stage Three - 12 Months San Elijo Avenue Highway Complete outside freeway and bridge widening South Coast Hwy 101 ENCINITAS Lagoon Finish Central & East Basin dredging and grading Begin West Basin dredging Bridge Rail #240.4 Staging Construct at-grade crossing at Chestereld Drive Area (not shown) Rail Bridge Complete pedestrian tunnel near North Rio Trail San Elijo Visitor Center Complete rail bridge over lagoon & double tracking Install Construction Fence to guide pedestrians to Manchester Avenue Chestereld Drive crossing Manchester Yard Staging Area Ocean Cove Cmto Ocean Cove Drive Cove Ocean Cmto Cape Manchester Avenue Sebastian WEST EAST BASIN BASIN Rail work Staging Area CENTRAL BASIN SOLANA BEACH Santa LEGEND Inez Santa Hilalga Road Construction Work Direction of Trac South Coast Hwy 101 Santa Pedestrian CROSS SECTION OF STAGE THREE BRIDGE Rail Tunnel Florencia North Rios Avenue NEW STRUCTURE NEW STRUCTURE Rail Access and Staging CONSTRUCTION EXISTING EXISTING CONSTRUCTION Clearing and Grubbing Area Granados Avenue North Completed Dredging Area Canyon Place Staging Areas SOUTHBOUND Place Rawl NORTHBOUND Note: For Plan of Trails and Trail Impacts go to; www.KeepSanDiegoMoving.com/BuildNCC Canyon Drive StageSan 4: Elijo 18 months Lagoon Construction Stages: Stage Four - 18 Months San Elijo Avenue Trail Continues Highway North to Batiquitos South Coast Hwy 101 Lagoon San Elijo bridge construction continues on the new bridge, trac shifts to completed outside bridge and ENCINITAS new ramps Demolition of existing inside bridge Inside widening and median work on I-5 Bridge #240.4 Construct multi-use park and ride Staging Area Construct separate bike path from multi-use park & ride to San Elijo Visitor Center Rail Bridge Replacement to improve tidal ow and lagoon health San Elijo Lagoon Visitor Center Active revegetation Manchester Avenue Site of future Rail Manchester Avenue Multi-use Park and Rail work complete Ocean Cove Ride/Community Cmto Gardens Ocean Cove Drive Cove Ocean Cmto Cape Manchester Avenue Sebastian WEST BASIN EAST BASIN Rail work Staging Area CENTRAL BASIN SOLANA BEACH Santa LEGEND Inez Santa Hilalga Road Construction Work Direction of Trac South Coast Hwy 101 Santa Pedestrian CROSS SECTION OF STAGE FOUR BRIDGE Rail Tunnel Florencia North Rios Avenue Rail Access and Staging Area NEW STRUCTURE CONSTRUCTION CONSTRUCTION NEW STRUCTURE Revegetated Lagoon Area Granados Avenue North Staging Areas/Manchester Ave. Canyon Place Future Multi-use Park & Ride Trail I-5 North Coast Trail SOUTHBOUND Place Rawl NORTHBOUND Continues South to Note: For Plan of Trails and Trail Impacts go to; San Dieguito Canyon Drive Lagoon www.KeepSanDiegoMoving.com/BuildNCC KeepSanDiegoMoving.com/BuildNCC.