Roads Department of Georgia Ministry of Regional

Total Page:16

File Type:pdf, Size:1020Kb

Roads Department of Georgia Ministry of Regional ROADS DEPARTMENT OF GEORGIA MINISTRY OF REGIONAL DEVELOPMENT AND INFRASTRUCTURE Environmental and Social Management Plan Secondary Roads Asset Management Project Sh17: Kutaisi-Tkibuli-Ambrolauri Road Rehabilitation km 61.9 – km 62.2 Georgia 2020 PART I: GENERAL PROJECT AND SITE INFORMATION INSTITUTIONAL & ADMINISTRATIVE Country Georgia Project title Rehabilitation of Kutaisi-Tkibuli-Ambrolauri (sh17) road section from km 61.9 – km 62.2 Scope of project and On the basis of the results of qualitative and quantitative analysis of the detailed engineering-geological and activity hydro geological research and of the rock-sliding actions (prediction of its subsequent dynamics) on the problematic road-section km 61.9 – km 62.2 of Kutaisi-Tkibuli-Ambrolauri secondary road (sh17), the appropriate anti-rock sliding decisions were determined. The detailed design considers clearing the slope from debris and arrangement of net that will protect a section of the road from the rockfall on the carriageway and ensure traffic safety in a long term, adapting it to the expected impacts of the climate change. The project envisages: Cleaning of slopes from 300 L/m - Demolition of moving parts and excavation of potentially unsustainable cracked rocks by a group of mountaineers using various pneumatic and electro-mechanical tools. The project envisages the cleaning from unreliable hanging stones of various sizes. Arranging a grid consisting of a longitudinal and transverse cable system, which allows the formation of cells with size 1.5X2.0. This ensures that the torn mass is retained in place and prevents the breakage of rock mass through the anchors, which cover the slopes, where there is a danger of falling stone Institutional Project Team Leader Safeguard Supervision arrangements Aymen A. Osman Ali Darejan Kapanadze, Environment (World Bank) Sophia Georgieva, Social Institutional Project Manager Supervisor Contractor arrangements Giorgi Tsereteli, (if different from employer) (Not Defined) (Borrower) Consultant to Roads Department (not defined) SITE DESCRIPTION Name of site Kutaisi-Tkibuli-Ambrolauri (sh17) road section from km 61.9 – km 62.2 Describe site The road starts at km 61.9 of Kutaisi-Tkibuli-Ambrolauri road and ends at km 50.3 of the same road. The location road section is located on the territory of Khotevi village near the bridge crossing point; the site is laid between state-owned hilly lowland terrain vacant form any structures/ buildings of commercial and/or residential designation. Khotevi is a village in Ambrolauri municipality, located on the northern slope of the Racha Ridge, on the bank of the Khoteura River, 1000 meters above sea level, and in 10 km from the city of Ambrolauri. The relief of the road section is slightly inclined slope with smooth and treed surface. In the relief there are formed two small dry gorges (1-2 meters of depth and with the same width) into the road crossing direction. In the micro-relief of the site there are also mentioned the technogenic formations in the form of small earth fills and trenches. From the upper Cretaceous limestone slope adjacent to Kutaisi-Tkibuli-Ambrolauri secondary road (sh17) km61+900-km62+200 (height 12-15 m, layer thickness from 10 sm to 60sm is changed the slope azimuth 50, slope angle - 80); during the heavy precipitation the rock-sliding is occurred from the erosive parts of the slope that damages the asphalt coat and cars moving on the road and is danger for health and life. Geodynamic conditions and associated stabilization measures: The geodynamic condition of the site is completely determined by the stone-sliding on the vertical slope of the half-cut road that is formed on cracked rocky slopes. Following from the existed situation there is no possibility for construction of the protective wall against the stone-sliding, because of the small distance between the traffic part of the road and the foot (foundation) of the slope, so covering the slope with a wire net is the only real solution for protection of the road, in order to exclude the falling of broken parts of the rock on the road carriageway. The wire net will be functioning better in case if the slope will be released from loose large stones and block 2 stones in advance. Besides that during tests on part of the road from km61+850 up to km61+870 there was observed the deformation of the road surface, presumably because of disorder of the foundation ground, though further the exploitation service (that was performing the repairing road works at that time) repaired the mentioned section of the road and the defect is corrected now. The ditches should be cleaned on the site and the water draining system is also to be repaired in the road line. Who owns the land? The existing ROW is owned by Ambrolauri Municipality. Rehabilitation works on the road will not have any negative impact on privately-owned/used land as the area around the project site is not populated. Description of Location: The project road section starts at km 61.9 and ends at km 62.2 Kutaisi-Tkibuli-Ambrolauri (sh17) geographic, physical, road. The road section runs to valley of the river Khoteura that is the left tributary of the river Krikhula. biological, Climate: According to the construction-climate zoning the territory of the road section belongs to the sub geological, region “b” of II climate region. The average annual air temperature for the area is + 5.50C (11.20C), -3.10C hydrographic and (1.10C) in winter, and 15.40C (20.60C) in summer. The absolute minimum is -270C and the absolute socio-economic maximum is + 400C. The total amount of precipitation is 1,075 mm/year. context Air: Air quality in the project area is good due to low traffic levels and absence of industrial facilities. Water and Soil: The existence of groundwater on the site is not mentioned anywhere visually. The groundwater is not also mentioned in the drilled wells of the site. Correspondingly while performing the stabilization works on the site the groundwater will not be expected, though while arranging any construction and developing the pits temporary appearance of little water, so called “upper pore water” is not excluded, especially during the rain and snow melting. No pollution of water and soil is reported. Flora: Vegetation of the area though the road passes is mainly composed by maple, beech, Hornbeam, spruce trees and bushes. No tangible adverse impact is expected on the vegetative cover. Fauna: The project road pass through the degraded territory and accordingly the fauna is not reach. Mostly fauna is presented by the species which does not need any special protecting measures. Due to the small area of the project the impact on the fauna will be minimal. Noise: The current noise level is low due to low intensity of traffic and lack of industrial facilities. Impact related to the noise generated from construction activities is not expected as the road section from km 61.9 – km 62.2 is laid between unpopulated hilly terrains. Social/ Involuntary Resettlement: No land take is required for undertaking rehabilitation of the road section. No temporary impact on private lands, fences or other assets is expected along this road section as territory is free from population and privately-owned lands. Locations and Information about material resources near the project road: distance for material Description Location sourcing, especially River (Sand-gravel) Quarry Village Chrebello, Ambrolauri Municipality inert aggregates, Balk Stones Village Kursebi, Tkibuli Municipality water, stones LEGISLATION Identify national & SRAMP is implemented in accordance with the World Bank's safeguard policy OP/BP 4.01 - local legislation Environmental Assessment. Based on this policy, present subproject is classified as environmental &permits that apply category "B". The following Plan for Environmental and Social Management is prepared according to the to project activity principles defined by OP/BP 4.01 and Environmental and Social Management Framework of SRAMP. Under the Georgian legislation, works for road rehabilitation project does not require assessment of an environmental impact, approval or issuance of a permit/Environmental decision. However, with the national regulation system: i) Contractor company must be licensed; ii) Construction materials must be obtained from licensed providers, iii) If the Contractor wants to open a quarry, an appropriate license must be obtained from the National Agency of Mines under the Ministry of Economy and Sustainable Development; iv) If the Contractor wants to open its own plant of asphalt or concrete (or both), an environmental decision, which will cover the upper limit of pollution concentration; 3 v) Construction waste should be disposed at the official landfill based on the agreement with the Solid Waste Management Company or placed at the pre-selected site officially agreed with local self-government. GRIEVANCE REDRESS MECHANISM A grievance redress mechanism will be available to allow project effected people appealing any action or decision on which they disagree. The APs will be informed about the available GRM during public consultations and through distributing of brochures prior to commencement of works. In addition, an announcement with relevant information will be displayed on the information boards in the lobbies of buildings of each and every project-affected municipality. APs will be fully informed of their rights and of the procedures for addressing complaints either verbally or in writing during pre-contraction, construction and operation periods. Care will always be taken to prevent grievances rather than going through a redress process. Mr. Giorgi Gagoshidze, Head of Spatial Arrangement and Infrastructure Department of Ambrolauri Municipality Mobile Phone: 595445244; e-mail: [email protected] The Contact Person shall collect and record the grievances in a special log. If the grievance remains unsolved at the local level, it will be lodged to the RDMRDI.
Recommended publications
  • YOUTH POLICY IMPLEMENTATION at the LOCAL LEVEL: IMERETI and TBILISI © Friedrich-Ebert-Stiftung
    YOUTH POLICY IMPLEMENTATION AT THE LOCAL LEVEL: IMERETI AND TBILISI © Friedrich-Ebert-Stiftung This Publication is funded by Friedrich-Ebert-Stiftung. The views expressed in this publication are not necessarily those of the Friedrich-Ebert Stiftung. Commercial use of all media published by the Friedrich-Ebert-Stiftung (FES) is not permitted without the written consent of the FES. YOUTH POLICY IMPLEMENTATION AT THE LOCAL LEVEL: IMERETI AND TBILISI Tbilisi 2020 Youth Policy Implementation at the Local Level: Imereti and Tbilisi Tbilisi 2020 PUBLISHERS Friedrich-Ebert-Stiftung, South Caucasus South Caucasus Regional Offi ce Ramishvili Str. Blind Alley 1, #1, 0179 http://www.fes-caucasus.org Tbilisi, Georgia Analysis and Consulting Team (ACT) 8, John (Malkhaz) Shalikashvili st. Tbilisi, 0131, Georgia Parliament of Georgia, Sports and Youth Issues Committee Shota Rustaveli Avenue #8 Tbilisi, Georgia, 0118 FOR PUBLISHER Felix Hett, FES, Salome Alania, FES AUTHORS Plora (Keso) Esebua (ACT) Sopho Chachanidze (ACT) Giorgi Rukhadze (ACT) Sophio Potskhverashvili (ACT) DESIGN LTD PolyGraph, www.poly .ge TYPESETTING Gela Babakishvili TRANSLATION & PROOFREADING Lika Lomidze Eter Maghradze Suzanne Graham COVER PICTURE https://www.freepik.com/ PRINT LTD PolyGraph PRINT RUN 150 pcs ISBN 978-9941-8-2018-2 Attitudes, opinions and conclusions expressed in this publication- not necessarily express attitudes of the Friedrich-Ebert-Stiftung. Friedrich-Ebert-Stiftung does not vouch for the accuracy of the data stated in this publication. © Friedrich-Ebert-Stiftung 2020 FOREWORD Youth is important. Many hopes are attached to the “next generation” – societies tend to look towards the young to bring about a value change, to get rid of old habits, and to lead any country into a better future.
    [Show full text]
  • Conferenceproceedingseng Final
    CLIMATE CHANGE AT THE LOCAL LEVEL: POLICY AND ACTION National Conference April, 2016 Institutionalization of Climate Change Adaptation and Mitigation in Georgian Regions (ICCAMGR) This Publication is made possible by the generous support of the American people through the United States Agency for International Development (USAID). The contents are the responsibility of NALAG and authors of the texts and do not necessarily reflect the views of USAID or the United States Government. CONTENTS BACKGROUND INFORMATION ................................................... 6 Brief History ........................................................................................................ 6 CLIMATE CHANGE AT THE LOCAL LEVEL: POLICY AND ACTION ....... 7 CONFERENCE REPORTS .......................................................... 8 Climate Change and Agriculture ............................................................................. 9 Regional Information Consultation Centers (RICC) in Georgia .................................. 10 Impacts of Climate Change on Industry ................................................................ 10 Energy Sector Vulnerability to Climate Change ...................................................... 11 Climate Change and the Social Sector .................................................................. 11 INTERNATIONAL EXPERIENCE ................................................ 12 Mountains and Climate Change: Experience from Alps - Austria ............................. 12 Climate Plans in Western Europe:
    [Show full text]
  • 6. Imereti – Historical-Cultural Overview
    SFG2110 SECOND REGIONAL DEVELOPMETN PROJECT IMERETI REGIONAL DEVELOPMENT PROGRAM IMERETI TOURISM DEVELOPMENT STRATEGY Public Disclosure Authorized STRATEGIC ENVIRONMENTAL, CULTURAL HERITAGE AND SOCIAL ASSESSMENT Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Tbilisi, December, 2014 ABBREVIATIONS GNTA Georgia National Tourism Administration EIA Environnemental Impact Assessment EMP Environmental Management Plan EMS Environmental Management System IFI International Financial Institution IRDS Imereti Regional Development Strategy ITDS Imereti Tourism Development Strategy MDF Municipal Development Fund of Georgia MoA Ministry of Agriculture MoENRP Ministry of Environment and Natural Resources Protection of Georgia MoIA Ministry of Internal Affairs MoCMP Ministry of Culture and Monument Protection MoJ Ministry of Justice MoESD Ministry of Economic and Sustaineble Developmnet NACHP National Agency for Cultural Heritage Protection PIU Project Implementation Unit PPE Personal protective equipment RDP Regional Development Project SECHSA Strategic Environmental, Cultural Heritage and Social Assessment WB World Bank Contents EXECUTIVE SUMMARY ........................................................................................................................................... 0 1. INTRODUCTION ........................................................................................................................................... 14 1.1 PROJECT CONTEXT ...............................................................................................................................
    [Show full text]
  • 2018 Presidential Election First Interim Report of the Pre-Election Monitoring
    2018 Presidential Election First Interim Report of the Pre-Election Monitoring (August 1 - September 8) 13 September 2018 This report is made possible by the generous support of the American people through the United States Agency for International Development (USAID) and the National Endowment for Democracy (NED). Views expressed in this publication belong solely to the International Society for Fair Elections and Democracy and do not necessarily reflect the views of USAID, the United States Government or the NED. Table of Contents I. Introduction ......................................................................................................................................... 2 II. Key Findings ........................................................................................................................................ 2 III. Recommendations ......................................................................................................................... 4 IV. Electoral Administration ............................................................................................................. 5 Appointment of Temporary Members of DECs ................................................................................. 5 V. Media environment ........................................................................................................................ 9 VI. Intimidation/harassment on alleged political grounds ...................................................... 12 VII. Physical confrontation ..............................................................................................................
    [Show full text]
  • Realizing the Urban Potential in Georgia: National Urban Assessment
    REALIZING THE URBAN POTENTIAL IN GEORGIA National Urban Assessment ASIAN DEVELOPMENT BANK REALIZING THE URBAN POTENTIAL IN GEORGIA NATIONAL URBAN ASSESSMENT ASIAN DEVELOPMENT BANK Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) © 2016 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2444 www.adb.org Some rights reserved. Published in 2016. Printed in the Philippines. ISBN 978-92-9257-352-2 (Print), 978-92-9257-353-9 (e-ISBN) Publication Stock No. RPT168254 Cataloging-In-Publication Data Asian Development Bank. Realizing the urban potential in Georgia—National urban assessment. Mandaluyong City, Philippines: Asian Development Bank, 2016. 1. Urban development.2. Georgia.3. National urban assessment, strategy, and road maps. I. Asian Development Bank. The views expressed in this publication are those of the authors and do not necessarily reflect the views and policies of the Asian Development Bank (ADB) or its Board of Governors or the governments they represent. ADB does not guarantee the accuracy of the data included in this publication and accepts no responsibility for any consequence of their use. This publication was finalized in November 2015 and statistical data used was from the National Statistics Office of Georgia as available at the time on http://www.geostat.ge The mention of specific companies or products of manufacturers does not imply that they are endorsed or recommended by ADB in preference to others of a similar nature that are not mentioned. By making any designation of or reference to a particular territory or geographic area, or by using the term “country” in this document, ADB does not intend to make any judgments as to the legal or other status of any territory or area.
    [Show full text]
  • Environmental and Socio-Economic Implications of the Mining Sector
    ENVIRONMENTAL AND SOCIO-ECONOMIC IMPLICATIONS OF THE MINING SECTOR AND PROSPECTS OF RESPONSIBLE MINING IN GEORGIA The study was prepared within the framework of the project 'Promoting Environmental and Social Accountability in the Mining Sector in the Caucasus', which is being implemented with the financial support of the Bread for the World Protestant Development Service (BftW). The content of the publication is the responsibility of the implementing organisation alone. 2 CONTENT INTRODUCTION 5 1. Mineral reSourceS of GeorGia anD The hiSTory of Their MininG anD ProceSSing 7 1.1 Brief DeScriPTion of Mineral reSources 7 1.2 Brief hiSTory of MininG in GeorGia 7 1.3 DynaMicS of The DeveloPMenT of MininG inDuSTry in GeorGia 9 1.3.1 SoliD MineralS 9 1.3.2 oil anD Gas 10 2. GeorGian laWS anD inSTiTuTional SeT-uP relaTeD To MininG 13 2.1 naTional leGiSlaTion 13 2.1.1 conSTiTuTion of GeorGia 13 2.1.2 laW of GeorGia on enTrailS of The earTh 13 2.1.3 laW of GeorGia on licenceS anD PerMits 13 2.1.4 laW of GeorGia on environMenTal ProTecTion 14 2.1.5 laW of GeorGia on culTural heriTaGe 14 2.1.6 oTher reGulaTionS relaTeD To culTural heriTaGe 14 2.1.7 inTernaTional convenTionS relaTeD To culTural heriTaGe raTifieD By GeorGia 14 2.2 inSTiTuTional fraMeWork of The GeorGian MininG inDuSTry 15 2.2.1 STaTe inSTiTuTionS anD Their ManDaTes 15 2.2.2 inTeraGency cooPeraTion 17 3. inTernaTional DeveloPMenT orGanizaTionS acTive in GeorGia anD caTeGorieS of DeveloPMenT Projects 19 4. STa.TiSTicS of inveSTMenTS MaDe in The MininG SecTor of GeorGia (2009-2015) 23 4.1 aMounT of inveSTMents 23 4.2 inveSTMenT SourceS 24 5.
    [Show full text]
  • Improvement of Cultural Heritage Zones in Motsameta Monastery
    Municipal Development Fund of Georgia Improvement of Cultural Heritage Zones in Motsameta Monastery Sub-project Environmental and Social Screening and Environmental Review WORLD BANK FINANCED REGIONAL DEVELOPMENT PROJECT 2 January, 2018 Sub-project Description The sub-project (SP) envisages the rehabilitation of the Motsameta monastic complex, which implies the following activities: 1. Rehabilitation of the existing parking; 2. Arrangement of a new parking area in 150 meters from the existing one; 3. Communication system (power supply, water supply) rehabilitation; 4. Rehabilitation of Visitor Center building; 5. Rehabilitation of the existing lavatory building; 6. Reinforcement of the fence walls; 7. Installation of small architectural forms in the complex area; 8. Rehabilitation of railway crossing; 9. Arrangement of additional pathways; 10. Safeguarding of the pathway towards river Tskaltsitela. 1. Rehabilitation of the existing parking The existing parking area dimensions will not be changed after the rehabilitation, as it fits to international standards (5m x 3,5m). The parking area is intended for 12 cars. The drainage channel near parking area will be moved for several meters to prevent it from being easily damaged. The drainage grilles will be removed from the passing area. In the course of the above-mentioned works, the old existing asphalt cover on the territory of parking will be removed and a new asphalt cover will be applied. The edging and concrete drainage channel will be arranged near the parking area. 2. Arrangement of a new parking area SP includes arrangement of the new parking area in the distance of 120 meters from the existing parking lot (see Annex 1).
    [Show full text]
  • List of the Micro Projects Funded Under Youth Integration Program by Youth Banks in Georgia (2008-2014)
    List of the micro projects funded under Youth Integration Program by Youth Banks in Georgia (2008-2014) Initiatives funded by the Akhaltsikhe Youth Bank: 1. Marathon - to mobilize youth from Akhaltsikhe schools and organize a marathon to promote healthy lifestyle among youth. 2. What? Where? When? - to organize intellectual games for the 9th and 10th graders enrolled in six public schools of Akhaltsikhe municipality in order to motivate them to read books. 3. Education - to set up a literature club for the students of Akhaltsikhe Public School #5 and purchase 40 up-to-date academic books to improve the students’ access to contemporary educational materials. 4. TAO - to encourage local youth to practice healthy lifestyle, by organizing a rugby tournaments for 9th and 10th graders enrolled in 5th and 1st public Schools of Akhaltsikhe municipality. 5. Books for all - to set up a literature club for the students of Akhaltsikhe Public School #1 and purchase up-to-date academic textbooks in order to improve the students’ access to contemporary educational materials. 6. Everlasting Art - to organize a charity action to help the Akhaltsikhe Orphanage by Akhaltsikhe State University students. 7. Clean and Comfortable School Yard - to clean the territory of Akhaltsikhe Public School # 1, which was used by the local population as a garbage dump and establish plant garden there. 8. Books First of All - to purchase books for the library at Akhaltsikhe Public School # 1 and organize intellectual contest for the school students. 9. Healthy Life Style for Akhaltsikhe Youth - to popularize soccer among youth in Akhaltsikhe by forming two soccer teams, training them and providing them with necessary equipment and finally, by organizing a soccer tournament.
    [Show full text]
  • 53178-001: East–West Highway (Shorapani–Argveta Section) Improvement Project
    Environmental Impact Assessment Project Number: 53178-001 May 2019 GEO: East–West Highway (Shorapani–Argveta Section) Improvement Project Part 8 (Sections F–G) Prepared by the Roads Department of the Ministry of Regional Development and Infrastructure of Georgia for the Asian Development Bank. This environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section on ADB’s website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Section F4 of the Khevi-Ubisa-Shorapani-Argveta Road (E60 Highway) Environmental Impact Assessment Sample ID Coordinates Rationale for Site Selection SW02 42 ° 06’12.29”N / 43° 03’57.67”E At location of Bridge BRI 4.1.04-AT/TA, Kvirila River Figure 48: Surface Water Monitoring Locations 443. The results of the water quality monitoring are presented in Table 34 below show that both the Dzirula and Kvirila rivers meet the national MACs for surface water quality at the sampling locations, although the levels of manganese in the Kvirila sample was above the recommended standards for drinking water. This reflects the findings of the study on manganese in the Kvirila river
    [Show full text]
  • National Assessment of Georgian Municipalities (2019)
    RESULTS FOR 2019 1 61% Batumi 60 9% Samtredia 2 57% Rustavi 61 8% Adigeni 3 56% Lagodekhi 62 7% Aspindza NATIONAL ASSESSMENT OF 4 55% Zugdidi 63 7% Ninotsminda GEORGIAN MUNICIPALITIES 5 52% Tetritskaro 64 6% Akhalkalaki (2019) 4 60 3 1 61 5 2 62 64 63 28% % 21% 31% % 24% 19% 25% 2017 2019 2017 2019 AVERAGE SCORE 2017 2019 MUNICIPAL COUNCIL CITY HALL Municipalities with Biggest Improvements Compared to 2017 www.lsgindex.org +34% +26% +25% +24% +23% Batumi City Senaki Tsageri Tetritskaro Tsalenjikha Municipality Municipality Municipality Municipality Municipality RESULTS FOR 2019 1 61% Batumi 60 9% Samtredia 2 57% Rustavi 61 8% Adigeni 3 56% Lagodekhi 62 7% Aspindza NATIONAL ASSESSMENT OF 4 55% Zugdidi 63 7% Ninotsminda GEORGIAN MUNICIPALITIES 5 52% Tetritskaro 64 6% Akhalkalaki (2019) 4 60 3 1 61 5 2 62 64 63 28% 31% 21% 24% 19% 25% 2017 2019 2017 2019 AVERAGE SCORE 2017 2019 MUNICIPAL COUNCIL CITY HALL Municipalities with Biggest Improvements Compared to 2017 www.lsgindex.org +34% +26% +25% +24% +23% Batumi City Senaki Tsageri Tetritskaro Tsalenjikha Municipality Municipality Municipality Municipality Municipality Proactive Disclosure of Public Information Participation and Accountability Administrative General The Council of Civil Advisors 7% Expenses 50% Information is yet to be created in MUNICIPALITIES 11% 11 Legal 40% Entities Legal Acts and Court Decisions 19% 33% Budget Property Only 26 MAYORS MAJORITY OF MEMBERS of only 15 held public hearings of their municipal councils held public hearings of 29% performance reports their performance
    [Show full text]
  • Local Economic Development Plan Tkibuli Municipality
    Local Economic Development Plan Tkibuli Municipality Local Economic Development Plan Municipality: Tkibuli Country: Georgia 2019 1 Local Economic Development Plan Tkibuli Municipality Preface from Mayor of Tkibuli Municipality I am exceedingly happy that Tkibuli Municipality has been given the opportunity to join the EU initiative “Mayors for Economic Growth” (M4EG), which entailed elaboration of Local Economic Development Plan (LEDP) for Tkibuli Municipality. The plan aims to diversify and develop the local economy, to reduce the unemployment rate and improve the business environment. Cooperation with the EU is a great honor and responsibility for us, as we fully realize the importance and need for the governance principles that have already been successfully implemented in EU member states. We strongly believe that introduction of these principles and sharing of EU experiences will be a guarantee of bigger steps towards diversification and strengthening of the local economy through active involvement of private-public-civil partnership. In the process of preparing the Action Plan, along with the representatives of the local government, representatives of the civil and business sectors were actively involved in every stage, making the document even more valuable and responsible. Consequently, we will spare no effort to implement the measures outlined in the Action Plan and to achieve the strategic objectives. Migration of the population (external and internal) and use of our overseas compatriots’ potential in the matter of local development remain to be an important challenge for Tkibuli municipality. Financial and intellectual resources of labor emigrants and diaspora can be effectively used to accelerate economic development of the municipality, to build up economic ties and facilitate return of our compatriots to their homeland.
    [Show full text]
  • Organic Law of Georgia on Changes to the Election
    Strasbourg, 13 January 2016 CDL-REF(2016)001 Opinion No. 834 / 2016 Engl. only EUROPEAN COMMISSION FOR DEMOCRACY THROUGH LAW (VENICE COMMISSION) ORGANIC LAW OF GEORGIA ON CHANGES TO THE ELECTION CODE OF GEORGIA (ON REDRAWING OF CONSTITUENCIES) ADOPTED ON 8 JANUARY 2016 This document will not be distributed at the meeting. Please bring this copy. www.venice.coe.int CDL-REF(2016)001 - 2 - Article 1. Organic Law of Georgia on the "Election Code of Georgia" (Legislative Herald of Georgia (www.matsne.gov.ge), 10.01.2012, registration code: 010190020.04.001.016032) shall be amended as follows: 1. Article 14, paragraph 1, subparagraph "e" shall be formed as follows: „e) by an ordinance, set up election districts and/or specify their boundaries in accordance with the procedures prescribed by this Law; ". 2. Article 18 shall be formed as follows: "Article 18. Election Districts 1. Election districts, their boundaries, titles and numbers shall be determined in accordance with this Law by a CEC ordinance, except for cases defined by paragraph 2 of this Article. 2. For the elections of the Parliament of Georgia, majoritarian districts shall be set up, their boundaries and numbers shall be determined in accordance with this Law and based on the procedures set by Articles 110 and 1101 of this Law." 3. Paragraph 2 of Article 19 shall be formed as follows: "2. The CEC is authorized to set up, by an ordinance, one DEC within boundaries of one or more self-governing units and 10 DECs in Tbilisi.". 4. Article 110 shall be formed as follows: "Article 110.
    [Show full text]