KUROW

40km SECTION 6: Otematata to Kurow T LAKE BENMORE Fitness: Easy • Skill: Easy • Traffic: High • Grade: 3 SAILORS CUTTIN

6km ENMORE AM

Loc Lar R CHECK WEBSITE FOR UPDATES RIAR ULL CAMROUN 20km T e A 17km ka TE AATARAA OTAMATAPAIO RIVER ta Te Akataraa R S83 ra CAMROUN a R AITANI OTEMATATA CAMROUN IRLISTON RANE

LAKE AVIEMORE eep Stream alkn Track DEEP STREAM 28km ISERMANS EN OTEMATATA RIVER AVIEMORE AM S83 36km AITAI AM

TRAIL GUARDIAN TO DUNTROON ST MARS RANE

Aaokomo R AATARAMEA AWAKINO RIVERKUROW S82 Mapwww.alps2ocean.com current as of 20/2/17 N 40km

0 1 2 3 4 5km S83 KEY: Onroad Off-road trail Picnic Area Scale

WAITAKI RIVER From Otematata, take the sealed KUROW CREEK pathway beside Loch Laird Road, then

follow the gravel track beside the lake. Otake Roa rants R This takes you through several camping areas. You then ride up Loch Laird Road ars R OTIAKE RIVER onto the massive Benmore Hydro Dam 6km . It’s a steep road up to the dam, so you may need to walk the last 800 Specal Scool R metres. Follow the Te Akatarawa Road along the margins of OTEKAIEKE RIVER to the Aviemore Dam 28km . After crossing the dam the trail follows State Highway 83 to Lake Waitaki and the Trail route and weather conditions Waitaki Dam 36km , then to Kurow. This subject to change. Please check section of trail has an interesting hydro website before daily departure. history with dams and project towns.

Trail Surfaces: Safety Highlights: Notes: • Parts of the trail are • Te Akatarawa Road on State Highway 83. • Lake Aviemore Cyclists are advised • Deep Stream Walking Track to ride single file • Aviemore Dam and stay left. Sealed Track (1%) Sealed Road (99%) Smooth Shingle (9%) • Waitaki Dam

$10 TRAIL SUPPORTER WRISTBAND – BUY YOURS AT PASQUALE KUROW WINERY