CHAPTER 2 the PROJECT 2.0 the Project 2.1 Project Road Alignment

Total Page:16

File Type:pdf, Size:1020Kb

CHAPTER 2 the PROJECT 2.0 the Project 2.1 Project Road Alignment Kaladan Multimodal Transport Project in Mizoram EIA-EMP Report Construction of road from NH-54 to Indo-Myanmar border Chapter-2- The Project CHAPTER 2 THE PROJECT 2.0 The Project 2.1 Project road alignment The Project Road takes off at 76.400 km on NH-54 at Lawngtlai town in south Mizoram, runs towards the south and terminates at Indo Myanmar border ( River Zocha) road. The Project road alignment passes through frequently cultivated degraded jhumland. It crosses the existing BRO roads, namely, Lawngtlai to Diltlang Parva road at one point and Nalkawn Chamdur Valley road at four points. The road, proposed to be of double – lane NH standard is of length 99.830 km. The road also passes through the villages of Saizawh East and Zochachhuah. The location of this proposed trade route has been shown in Map 2.1 . About 17.88 % length of the road passes through private land , 75.76% passes through degraded jhumland and 6.36 % pass through forest land. The road passes through mainly two villages ,viz Saizawh East and Zochachhuah. 2.2 Proposed Road Segments The road has been divided into four homogeneous segments I, II, III and IV with respect to physical features as given in following table Table2.1: Project road segments Location in chainages Type of Terrain Major River crossing Length Segment Name of Location From To (km) Hilly Steep River at km Lawngtlai Leichhekawn Segment-I (0.00) (40.980) 40.980 4.098 36.882 Ruankhum 34.634 Leichhekawn R.Ngengpui Segment-II (40.980) (56.500) 15.520 9.1568 6.3632 Ngengpui 56.500 Darnam R.Ngengpui Saddle Segment-III (56.500) (74.300) 17.800 5.874 11.926 - - Bawklawk 79.323 Lunghauka 81.530 Darnam R.Zocha Khawrawp Segment-IV Saddle (Border) 25.530 18.892 6.6378 89.321 (74.300) (99.830) Hmawngbu 94.204 Zochate 96.225 Zocha 99.800 99.830 38.021 61.809 Government of Mizoram Page 2- 1 Public Works Department, Mizoram Kaladan Multimodal Transport Project in Mizoram EIA-EMP Report Construction of road from NH-54 to Indo-Myanmar border Chapter-2- The Project Segment I: Lawngtlai (0.000 km) to – Leichhekawn (40.980km) , 40.98 kms At the project road take off point, the Lairam Isua Krista Baptist Kohhran (LIKBK) Church at chainage 0.00 kmp and Assam Oil Corporation (AOC) filling station will be required to be removed to have adequate area at junction point with NH-54 and also to accommodate bus bays and truck lay-byes at this junction. There are two cemetery locations, viz. Lawngtlai III cemetery at chainage 1.00 – 1.150 km and Chanmari Cemetery chainage 2.800 – 2.900 km. Some portions of this cemetery have to be acquired to have requisite ROW for the project. This segment, from take off point of the project road to Leichhekawn (Ch. 40.980), is mostly steep terrain with about 10% mountainous terrain and the rest being hilly terrain. New earth cutting to obtain the required formation will be required. In this segment the proposed alignment crosses LDP Road at Chainage 4.440 km and NCV Road at Chainage 38.150km. There is no crossing of big river or human habitation or settlements in this section. However, there are five villages which are located nearby but outside the project corridor, they will get benefit from the proposed road on its completion. The name of the villages, located nearby the project road corridor, which will be directly influenced by the project road are listed below – Sl.No. Village Name Population 1. Nalkawn 20 2. Saikah ‘U’ 524 3 Paithar 517 4 R.Vanhne 120 5 Rulkual 670 Source: Mizoram PMGSY There is one running stone quarry near Rulkual village which will be one of the main sources of stone material for construction purposes, especially the pavement works. Segment II : Leichhekawn (40.980km) to- R.Ngengpui (56.500 km) 15.520kms In this segment the general topography is that the mountainous terrain is 59% and the steep terrain is 41%. The alignment also passes through Saizawh East village at Government of Mizoram Page 2- 2 Public Works Department, Mizoram Kaladan Multimodal Transport Project in Mizoram EIA-EMP Report Construction of road from NH-54 to Indo-Myanmar border Chapter-2- The Project chainage 47.9KM – 48.45KM The population of this village is 224. RCC double lane bridge will be required to cross the R.Ngengpui at chainage 56.500KM. Segment III: R.Ngengpui (56.5km) to Darnam Saddle (74.300km) 17.800kms In this sector the general topography is 33% of mountainous terrain and the rest may be classified as hilly terrain characterized by several natural drainages and streams perennial and non- perennial. The project road crosses the zigzagging NCV road at three locations, viz. chainage 60.8km, 70.92km and 71.32km, 74.30km, 85km, 91.2 km & 98.28 km. Segment IV: Darnam Saddle(74.300km) to R. Zocha (Indo-Myanmar Border), (99.830km) , 25.530km This is the last segment of the project road meeting the Indo Myanmar Border at River Zocha (chainage 99.83 KM). About 74% of this sector is mountainous and steep terrain of 26%. In this sector the alignment crosses six rivers including the river at border The alignment of the project passes through Zochachhuah Village, the last village in Mizoram along the project alignment before reaching the Myanmar side. The Nalkawn Chamdur Valley (NCV) road which was constructed by Border Roads Organization (BRO) and later taken over by Mizoram PWD recently. There are four villages in the vicinity of the project road within segment III and IV. Table 2.2 Villages in the vicinity of Project Road. (Segment III & IV) Sl. No Village Name Population 1 Darnamtlang 408 2 Lunghauka 434 3 Hmawngbuchhuah 439 4 Hmawngbu 615 5 Sabualtlang 239 6 Kakichhuah 120 7 Tuithumhnar 420 Government of Mizoram Page 2- 3 Public Works Department, Mizoram Kaladan Multimodal Transport Project in Mizoram EIA-EMP Report Construction of road from NH-54 to Indo-Myanmar border Chapter-2- The Project Map 2.1 Proposed trade routes – Proposed road alignment Government of Mizoram Page 2- 4 Public Works Department, Mizoram Kaladan Multimodal Transport Project in Mizoram EIA-EMP Report Construction of road from NH-54 to Indo-Myanmar border Chapter-2- The Project 2.3 Design standards for proposed road The design standards adopted for the project road are based on relevant Indian Roads Congress Codes. Specifications for Road and Bridges of Ministry of Road Transport & Highways. 2.3.1 Geometric Design Standards and Design Speed The project road traverses through hilly terrain comprising mountainous and steep terrain. The terrain classification adopted for the Project Road is given in Table below. Table 2.3: Terrain Classification Sl/No. Terrain % Cross slope 1. Plain < 10 2. Rolling 10 – 25 3. Mountainous 25 – 60 4. Steep > 60 Proposed Design Speed (km/hr) Sl/No Mountainous Terrain Steep Terrain Ruling Minimum Ruling Minimum 1. 50 40 40 30 2.3.2 Road Land Width: The desirable width of road land as given by IRC (Right of Way) for the stretches of project road, located in open and built up areas is given in table. Desirable Road Land Width (ROW) Sl/No Open Areas Built up Areas Normal Exceptional Normal Exceptional 1. 24 m 18 m 20 m 18 m 2.3.3 Alignment Geometry The design parameters governing the horizontal alignment are given in table. The minimum lengths of transition curves proposed for different speed and radii are given Government of Mizoram Page 2- 5 Public Works Department, Mizoram Kaladan Multimodal Transport Project in Mizoram EIA-EMP Report Construction of road from NH-54 to Indo-Myanmar border Chapter-2- The Project in table. The design criteria proposed for design of hairpin bend are presented in table. The design criteria for vertical alignment are given in table. Table2.4: Design Parameters for Horizontal Curve Sl.No. Design Elements Design Speed (km/hr) 50 40 30 1. Radius of Horizontal Curve (m) > Minimum 80 50 30 > No transition curve 500 300 170 2. Max. Super 0.10 0.10 0.10 Elevation (e) Table2.5: Minimum Lengths of Transition Curve Sl/No Curve Radius (m) Transition Length (m) 50 kmph 40 kmph 30 kmph 1. 25 - - NA 2. 30 - - 30 3. 40 - NA 25 4. 50 - 40 20 5. 55 - 40 20 6. 70 NA 30 15 7. 80 55 25 15 8. 90 45 25 15 9. 100 45 20 15 10. 125 35 15 15 11. 150 30 15 15 12. 170 25 15 NR 13. 200 20 15 14. 300 15 NR 15. 400 15 - 16. 500 NR - NA: Not applicable NR: Not required Government of Mizoram Page 2- 6 Public Works Department, Mizoram Kaladan Multimodal Transport Project in Mizoram EIA-EMP Report Construction of road from NH-54 to Indo-Myanmar border Chapter-2- The Project Table2.6 Gradients for Vertical Alignment Sl/No Gradient Terrain Mountainous Steep 1. Ruling 5% (1 in 20) 6% (1 in 16.7) 2. Limiting 6% (1 in 16.3) 7% (1 in 14.3) 3. Exceptional 7% (1 in 14.3) 8% (1 in 12.5) Cross-section Elements : The carriageway width of NH-54 varies from single lane (3.75m) to intermediate lane (5.5m). The maximum expected traffic between two countries would be to the tune of 100 trucks/per day as indicated in the report of “Inland Water Transport between Sittwe Port and Kaletwe in Myanmar, 2002”. Besides, there would also be some passenger vehicles.
Recommended publications
  • Executive Summary
    Kaladan Multimodal Transport Project in Mizoram EIA-EMP Report Construction of road from NH-54 to Indo-Myanmar border Executive Summary EXECUTIVE SUMMARY E1.0 INTRODUCTION E 1.1 Background India occupies a strategic position in Asia, looking across the seas to Arabia and Africa on the west and Burma, Malaysia and the Indonesian Archipelago on the east. Geographically, the Himalayan ranges keep India apart from the rest of Asia. In India Mizoram State is bordering Myanmar in the east & south and Bangladesh in the West. Map 1.1 Map showing position of Mizoram in India Government of India is establishing good ties with the neighbouring countries especially with eastern neighbours, both economically and politically. With the growth of global economic development and Asia in particular the Govt. of India set up a new policy known as “Look East Policy” wherein a sectoral trade link will be established with the far East countries. River Kaladan, after meandering along the Indo Myanmar Boarder at North East India flows through the southern part of Mizoram (India) and finally empties itself at Sittwe, the seaport in Myanmar into Bay of Bengal. This river can be utilized as a Trade Route with the eastern countries by Public Works Department Government of Mizoram Kaladan Multimodal Transport Project in Mizoram EIA-EMP Report Construction of road from NH-54 to Indo-Myanmar border Executive Summary Inland waterway up to the navigable point and by road transport where navigation is not feasible. Then the goods to imported can be distributed in other parts of the country especially among north eastern states by road or train .So the means of transport comprises of sea, inland water, roads & railways and land will serve as a Multi-Modal trade route.
    [Show full text]
  • The Mizoram Gazette Published by Authority
    Regd. No. NE 907 • The Mizoram Gazette Published by Authority VOL. xxv Aizawl Friday, 1. 11. 1996 Kartika 10, S.E. 1918 Issue No. 44 Government of Mizoram Part I Appointments, Postings, Transfers, Powers, Leave and Other Personal Notioes and Order&. • (ORDERS BY THE GOVERNOR) I • ! • NOTIFICATIO NS • No. A. 19015j1� 196-VIG the 1st November, 1996. On the expiry of his re-employ­ ment as Deputy Superintendent of Police, Anti-Corruption Branch for period of 4 (four) months with effect from 1.7.1996 to 31.10 1996, Pu R. Doliana, Deputy Superintendent of Police, Anti-Corruption Branch is released from the office of Superintendent of Police, Anti-Corruption Branch on 31.10.96(AjN). T. Sangkunga, Deputy Secretary to the Govt. of Mizoram, Vigilance Department. No. A. 33012jlj96-HFW(L) the 28th October, 1996. The Governor of Mizoram is pleased to retire and release Pi Thanpari Pautu, Dy. Director (Nursing), Mizoram Aizawl who bas attained the age of superannuation retirement with effect from 31. 10. 1996 (A N)' She wiIl hand over charge to Director, Health & Family Welfare Department. Haukhum Hauzel, Commisioner to the Govt. of Mizoram, Health & Family Welfare Department. \ 2 No. A.l1 013/1/94-EDN(L): the 31st October, 1996. In the interest of Public Service, the Governor of Mizoram is pleased to order tr:J.n<;f�r and posting of the fo llowing Lecturers to the Colleges shown against their nam�s with immediate effect. 51. Name of Lectura Present place New place Remarks No. of posting of posting I 2 3 4 5 • Pu T.
    [Show full text]
  • Pab) 2O1a-19, Hetd on 25.5,2018 - Circulation of Minutes in Respect of L{Izoram
    F. No. 20 5/2018-15.17 Governrnent of India Ivlinistry of Human Resource Development Department of School Education & Uteracy Oated the 13s August, 2018 Ssbiect: Samagra Shiksha -Meeting of the project Approval Board (pAB) 2O1a-19, hetd on 25.5,2018 - Circulation of Minutes in respect of l{izoram. The meeting of the Project Approvat Board of Samagra Shikha was held on 25.5.2018 in Conference Room No.220-A Wing, Department of Fertilizers, Shastri Bhawan, New Delhi to consider and approve the Annual Work Plan & Budget (AWP&B), 2018-19 for the State of l\4izoram. 2. A copy of the PAB minutes duty approved by the Secretary(SE&L) in respect of A 2018 19 for the State of l4izoram under Samagra Shiksha ls enclosed. Under Secretary to Tel Email: sbhushan To 1. Shri Rakesh Srivastava, Secretary, tyinistry of W & C.D. 2. Smt. t4. Sathiyavathy, Secretary, I4inistry of Labour & Emptoyment. 3. l4s. G. Latha Krishna Rao, Secretary, I\4 n stry of Social Justice & Empowerment 4. Iqs. Leena Nair, Secretary, ltinistry of TrjbalAffairs 5. Stlri Parameswarao lyer, kretary, ltinistry of Drinking Water & Sanitatio!, 4th floor, paryavaran Bhavan, CGO Complex, Lodhi Road, New De|hi,110003. 6. Shri Ameising Luikham, Secretary, 14 nistry of Minority Affairs, 11th floor, paryavaran Bhavan, CGO Complex, Lodhi Road, New Delhi-110003. 7. Ms. G. Latha Krishna Rao, Secretary, Department of Disability Affairs, Ministry of Social Justice & Empowerment, CGO Complex, Lodhi Road, New Delhi - 11OOO3. 8. Ms. Poonam Srivastava, Dy. Adviser (Education), Niti Aayog. 9. Prof. Hrushikesh Senapaty, Director, NCERT. 10.
    [Show full text]
  • The Mizoram Gazette
    The Mizoram Gazette EXTRA ORDINARY Published by Authority Regn. No. NE-313(MZ) Rs.2/- per Issue VOL-XXXIV Aizawl, Monday, 17.10 .2005 Asvina25, S.E. 1927, Issue No.274 NOTICE OF PUBLICATION OF LIST OF POLLING STATIONS No.H.I4012/S/2005- DC(LTI), the 1 st September,2005. In pursuance of the provisions of Rule159 (1 ) of "The Lai Autonomous District Council (Constitution and Conduct of Business) Rules,2002 , I, Johny T. O. Returning Officer for General Election to Lai Autonomous District Council-2005hereby provide for 1-23 MDCConstituencies, the list of polling stations specified in the appended list for the . polling areas or groups of voters noted against each. Sd/­ JohnyT.O. ReturningOfficer 1-23 MDC Constituencies LaiAutonomous DistrictCouncil LawngtlaiDistrict : Lawngtlai � A r 2 Ex-27412005 AI}PENDIX : LIST OF POLLING STATIONS FOR GENERAL ELECTION TO LAI AUTONOMOUS DISTRICT COUNCIL - 2005 '10. & Name of MDC No. & Name of Polling Building in which it will Whether for all voters or Polling Areas Constituency Station be located men only or women only t 2 3 4 5 t) 111 - Pangkhua Govt. Middle School, Pangkhua Pangkhua For all voters 1 - PANGKHlJA 112 - Cheural Govt. Middle School, Cheural 1) Cheural -do- 2/1 - Sangau-I 1) Sangau -I -do- 2 - SANGAU EAST Primary School- I, Sangau-I 2) Sentetfiang 2/2 - Thaltlang Middle School, Thaltlang 1) Thaltlang -do - - 1) Sangau - II 311 -Sangau -II Govt. Middle School, Sangau-II -do - - 2) Part of Sam!au I - 3 - SANGAU WEST 311 (A) - Sangau -II 1) Sangau. II Govt. Middle School, Sangau-II -do - u Auxiliary 2) Part of Sanga • I 4/1 -Lungtian Middle School, Lungtian 1)Lungtia n -do- 4 - LUNGTIAN 4/2 - Vartek Primary School, Vartek 1) Vartek -do- 4/3 - Vartekkai Primary School, Vartekkai 1) Vartekkai -do- 5/1 - Lungpher Govt.
    [Show full text]
  • 3669 Ha Project Cost
    0 AREA : 3669 Ha Project Cost : 550.35 Lakhs Hmawngbuchhuah, Kakichhuah, Sabualtlang. Prepared by, DO, Soil & Water Conservation Deptt. 1 INDEX CHAPTER Page No. 1. Introduction ------------------------------------------3 2. Project Profile ------------------------------------------8 3. Basic Information of Project Villages ------------------------------------------13 4. Participatory Rural Appraisal ------------------------------------------14 5. Problem Typology ------------------------------------------15 6. Project Intervention Plan ------------------------------------------18 7. DPR Plan Abstract ------------------------------------------19 8. Preparatory Phase. ------------------------------------------20 9. Work Plan Details ------------------------------------------21 10. Consolidation and Withdrawal Phase. ----------------------------------23 11. Capacity Building Institute Identified ----------------------------------24 12. Institutional & Capacity building Plan ----------------------------------25 13. Basic Profile of the project location -------- -------------------------27 14. Maps of the project ----------------------------------28 15. Institutional mechanism& Agreements. ----------------------------------32 16. SWOT Analysis of PIA. ----------------------------------33 17. PIA & Watershed Committee details. ----------------------------------34 18. Convergence Plans. ----------------------------------35 19. Expected Outcomes. ----------------------------------37 20. Expected Estimate Outcomes. ----------------------------------39
    [Show full text]
  • Statistical Hand Book Mizoram
    STATISTICAL HAND BOOK MIZORAM 1985 N IEP A D C D06409 caChar (viAmpuB.. CH,-: fcix v j / •: " ’ < I-.. .V REFERENCES OISrtNCT HORS. DIST. BOUNDARY SUB DIV. b o u n d a r y BLOCK CENTRES SUB DIVISIONAL ROAD BLACKTOP h o s p it a l Copies 3,000 X)- 3 - t o - S I Department of Economics & Statistics Government of Mizoram ^Uzawl. Printed at the GOSEN PRESS, Aizawl, Mizoram. PREFACE This is the sixth issue of the Stat istical Hand Book published by the Directorate of Economics and Statis­ tics, Mizoram. Efforts are made to improve its cover­ age of data and to fill up the gaps of statistical infor­ mation as far as possible. The primary data presented in this book are most­ ly collected from various departments and the source of information is indicated at the top of each table. The data collected from various sources are scrutinised and compiled by Shri C. Lalparliana, Statistician and charts are prepared by Shri V.L. Ruata, Artist under the supervision of Shri Y. Chhetri, Research Officer. We gratefully acknowledge the co-operation exten­ ded to us by various departments in making available the materials for this publication. We hope Government departments and research scholars will make the best use of this publication. (F. THANGHULHA) Joint Director Economics and Statistics, & Add I. Chief Registrar of Births&Deaths, Mizoram (i) CONVERSION TABLES I-Standard of Weights 1 Ounce 28.350 grams 1 Pound 453/92 grams 1 Tola 11.664 grams 1 Chhatak 58.32 grams 1 Seer 933.10 grams I Maund 37.324 Kilograms 1 kilogram 2.205 Pounds 1.072 Seers 1 Ton 1016.05 Kilograms 1 Quintal 100 Kilograms I Metric tonne 220.462 Pound 10 Quintals Il^Standard of Length 1 Inch 25.4 Milimetres 1 foot 0.3048 metre 1 Metre 3.2808 feet 1 Yard 3 feet 0.9144 metre or 91.44 Centimetres 1 Mile 1.6093 Kilometres 1760 Yards 1 Kilometre 0.6214 Mile (ii) III-Standard of Capacity 1 Gallon 4.546 Litres 1 Litre 0.220 Gallon 1 Cubic foot 0.0283 Cubic nfietrc.
    [Show full text]
  • F. No. Msdp-13/176/2017-Msdp-MOMA Government of India Ministry of Minority Affairs 11Th Floor, Pt Deen Dayal Antodaya Bhavan C.G.O
    F. No. MsDP-13/176/2017-MsDP-MOMA Government of India Ministry of Minority Affairs 11th Floor, Pt Deen Dayal Antodaya Bhavan C.G.O. Complex, Lodi Road NewDelhi-110003 Dated: 27.09.2017 To, The Pay & Accounts Officer, Ministry of Minority Affairs, Paryavaran Bhavan, New Delhi Subject: Grant in aid under the Centrally Sponsored Scheme of Multi sectoral Development Programme for Minority Concentration District to Government of Mizoram for the year 2017-18 for Lawngtlai District. Sir, In continuation to this Ministry's sanction letter of even number dated 29.02.2016, I am directed to convey the sanction of the President for release of an amount of Rs 2, 91, 11,000/- (Rupees Two Crore Ninety-One Lakh Eleven Thousand Only) as 2nd instalment to the Govt. of Mizoram for implementing the scheme "Multi Sectoral Development Programme for Minority Concentration Districts" for Lawngtlai district as per the details enclosed at Annexure -I. The non-recurring grant may be released to the Govt. of Mizoramthrough CAS, Reserve Bank of India, Nagpur. 2. The State Government should ensure that proportionate share of State share for the projects mentioned at Annexure-I is released to the implementing agency along with Central share. 3. The expenditure is debitable to Demand No.66, Ministry of Minority Affairs Major Head- "3601" Grant-in-aid to State Governments, 06- Grants for State Plan Schemes (Sub Major Head), 101-General-(Welfare of Schedule Casts/Schedule Tribes and Other Backward Classes and Minorities) -Other Grants (Minor Head), 49 - Multi sectoral Development Programme for minorities, 49.00.35 - Grant for creation of capital assets for the year 2017-18.
    [Show full text]
  • Inside Kaladan Movement Briefer English
    One cannot step into the same river twice: making the Kaladan Project people-centred June, 2013 www.kaladanmovement.org Front (clockwise from upper left): Farmers engage in riverside cultivation; woman preparing tobacco leaves for transportation on the Kaladan River; fi shing with a hand-net; local residents depend on water from the Kaladan River for household use such as drinking and washing Back: Fishing boats set-off near Paletwa Town Design & Printing: Wanida Press, Thailand One cannot step into the same river twice: 2 making the Kaladan Project people-centred Table of Contents Executive Summary .............................................................................................. 4 Recommendations ................................................................................................ 6 The Kaladan Movement ........................................................................................ 8 Part 1: Introduction to the Kaladan Multi-Modal Transit Transport Project .... 9 1.1 Specifi cations of the Kaladan Multi-Modal Transit Transport Project .. 14 1.2 Context of the Kaladan Project: India-Burma relations ....................... 20 1.3 Economies of Mizoram, Arakan, and Chin States .............................. 24 1.4 The natural environment in the Kaladan Project area ........................ 27 Part 2: Potential Impacts of the Kaladan Project ............................................... 28 2.1 Potential benefi cial impacts of the Kaladan Project ............................ 28 2.2 Potential negative impacts
    [Show full text]
  • 1 List of Health Insitution Including Hospital/Private
    LIST OF HEALTH INSITUTION INCLUDING HOSPITAL/PRIVATE HOSPITAL/SUB-DISTRICT HOSPITAL/CHC/PHC/MAIN CENTRE/SUB-CENTRE AND CLINICS AIZAWL WEST DISTRICT HOSPITAL/PRIVATE PHC/UPHC MAIN CENTRE SUB-CENTRE SUB-CENTRE CLINICS CLINICS COVERED HOSPITAL/SUB- COV ERED VILLAGES VILLAGES DISTRICT HOSPITAL/ CHC HOSPITAL UPHC under 1) Aizawl S M/C 1) Republic S/C Republic 1) ITI Clinic ITI 1. Referral Hospital, NUHM 2) Upper Republic S/C Upper Republic 2) Tuikhuahtlang Clinic Tuikhuahtlang Falkawn 1. Chawlhhmun 3) Mission Veng S/C Mission Vengthlang 3) Republic Vengthlang Republic Vengthlang 2. Dist. TB Centre, 2. Hlimen 4) Kulikawn S/C Kulikawn 4) Thakthing Clinic Thakthing Aizawl Dist., 3. Lawipu 5) Venghnuai S/C Venghnuai 5) Model Veng Clinic Model Veng Falkawn 6) Salem S/C Salem Veng 6) Mission Veng Clinic Mission Veng 7) Tlangnuam S/C Tlangnuam 7) S. Hlimen Clinic S. Hlimen SUB-DISTICT Tlangnuam Vengthar 8) Samtlang Clinic Samtlang HOSPITAL 8) Melthum S/C Melthum 9) Lungleng Clinic Lungleng 1. Kulikawn Hospital Saikhamakawn 10) Damveng Clinic Damveng 9) Lungleng S/C Lungleng PRIVATE HOSPITAL 10) Hualngohmun S/C Hualngohmun 1. Aizawl Hospital, 11) Melriat S/C Melriat Khatla 2) Aizawl West 1) Zotlang S/C Zotlang 1) Kanan Clinic Kanan 2. BN Hospital, M/C 2) Vaivakawn S/C Vaivakawn 2)Rangvamual Clinic Rangvamual Kulikawn 3) Hunthar S/C Hunthar Phunchawng 3. Alpha Hospital, Kulikawn 4) Tanhril Tanhril 3) Bungkawn Vengthar Bungkawn Vengthar 4. Seventh Day Tuivamit 4) Lawipu Clinic Lawipu Hospital, Vaivakawn 5) Sakawrtuichhun S/C Sakawrtuichhun 5) Dinthar
    [Show full text]
  • Myanmar: Query Response
    Myanmar: Query Response The situation in Chin State and Sagaing Region March 2019 (COI between 1 January 2016 and 19 February 2019) Commissioned by the United Nations High Commissioner for Refugees, Division of International Protection. UNHCR is not responsible for, nor does it endorse, its content. Any views expressed are solely those of the author. © Asylum Research Centre, 2019 ARC publications are covered by the Creative Commons License allowing for limited use of ARC publications provided the work is properly credited to ARC, it is for non-commercial use and it is not used for derivative works. ARC does not hold the copyright to the content of third party material included in this report. Reproduction or any use of the images/maps/infographics included in this report is prohibited and permission must be sought directly from the copyright holder(s). Please direct any comments to [email protected] Cover photo: © Volina/shutterstock.com 2 Contents Explanatory Note ............................................................................................................................ 7 Sources and databases consulted ................................................................................................. 13 List of acronyms ............................................................................................................................ 17 Map of Myanmar .......................................................................................................................... 18 Map of Chin State ........................................................................................................................
    [Show full text]
  • Globalization and Connectivity in Mizoram
    Vol. VI, Issue 2 (December 2020) http://www.mzuhssjournal.in/ Globalization and Connectivity in Mizoram T. Lianhmingsanga * Abstract The process of globalization has resulted in the improvement of infrastructure and transportation and communication, international trade, and business. Along with globalization in Mizoram, the Act East Policy will play a significant role in the development of the state and it will gain many benefits as it will be the corridor for Southeast Asia and central India. Many routes in terms of aviation, by-roads, and of course railways within Mizoram state will lie in a great strategic point for India. Also, the coming up of globalization in the state of Mizoram has brought much development for the state as well as for the people. But development cannot be seen immensely as the connectivity within the state is in very bad shape. For the accomplishment and flourish of the so-called ‘Act East Policy’ good connectivity within the state is a must. Keywords : Connectivity, Globalization, Flourish, Transport. Introduction Globalization integrates and mobilizes the cultural values of the people. Many states and countries are amalgamated and mutated due to globalization. It has a gigantic effect on the social, economic, political, cultural, and way of life. Globalization is the progression over which societies and economies which is incorporated over cross border flow of ideas, technology, capital, communication, goods and services, and that of information. The process of globalization began in the 20th century; as a result, the improvement of infrastructure and transportation and communication, international trade, and business gradually grew rapidly. Due to this, the way of life, livelihood, and culture of the Mizo has immensely changed.
    [Show full text]
  • Map of Rd Blocks in Mizoram Operating Badp
    92°20'0"E 92°40'0"E 93°60'0"E 93°20'0"E 93°40'0"E MAP OF RD BLOCKS IN MIZORAM Vairengte II OPERATING BADP Vairengte I Saihapui (V) Phainuam Chite Vakultui Saiphai Zokhawthiang North Chhimluang North Chawnpui Saipum Mauchar Phaisen Bilkhawthlir N 24°20'0"N 24°20'0"N Buhchang Bilkhawthlir S Chemphai North Thinglian Bukvannei I Tinghmun BuBkvIaLnKneHi IAI WTHLIR Parsenchhip Saihapui (K) Palsang Zohmun Builum Sakawrdai(Upper) Thinghlun(Lushaicherra) Hmaibiala Veng Rengtekawn Kanhmun South Chhimluang North Hlimen Khawpuar Lower Sakawrdai Luimawi KOLASIB N.Khawdungsei Vaitin Pangbalkawn Hriphaw Luakchhuah Thingsat Vervek E.Damdiai Bungthuam Bairabi New_Vervek Meidum North Thingdawl Thingthelh Lungsum Borai Saikhawthlir Rastali Dilzau H Thuampui(Zawlnuam) Suarhliap R Vengpuh i(Zawlnuam) i Chuhvel Sethawn a k DARLAWN g THINGDAWL Ratu n a Zamuang Kananthar L Bualpui Bukpui Zawlpui Damdiai Sunhluchhip Lungmawi Rengdil N.Khawlek Hortoki Sailutar Sihthiang R North Kawnpui I i R Daido a Vawngawnzo l Vanbawng v i Tlangkhang Kawnpui w u a T T v Mualvum North Chaltlang N.Serzawl i u u Chiahpui i N.E.Tlangnuam Khawkawn s T Darlawn a 24°60'0"N 24°60'0"N Lamherh R Kawrthah Khawlian Mimbung K Sarali North Sabual Sawleng Chilui Zanlawn N.E.Khawdungsei Saitlaw ZAWLNUAM Lungmuat Hrianghmun SuangpuilaPwnHULLEN Vengthar Tumpanglui Teikhang Venghlun Chhanchhuahna kepran Khamrang Tuidam Bazar Veng Nisapui MAMIT Phaizau Phuaibuang Liandophai(Bawngva) E.Phaileng Serkhan Luangpawn Mualkhang Darlak West Serzawl Pehlawn Zawngin Sotapa veng Sentlang T l Ngopa a Lungdai
    [Show full text]