Advises That NRC & Emergency Response Data Sys Contractor Will
Total Page:16
File Type:pdf, Size:1020Kb
Florida Power and Light Company ATTN: Mr. J. H. Goldberg President - Nuclear P. 0. Box 14000 Juno Beach, FL 33408-0420 Gentlemen: SUBJECT: SUBJECT: EMERGENCY RESPONSE DATA SYSTEM (ERDS) MEETING Recently a new rule was published in 10 CFR Part 50 which affects the manner in which data is passed from nuclear power plants to the NRC Operations Center during accidents classified at the ALERT or higher emergency classification. The rule specifically requires the implementation of the Emergency Response Data System (ERDS) by all power reactor licensees. In June 1991, you were forwarded a copy of NUREG-1394 (Rev. 1) which outlines the ERDS implementation program. Among the NRC responsibilities in the implementation of ERDS at a utility is to provide a "site visit" during which site specific implementation needs may be discussed. These meetings are conducted by the NRC ERDS Project Officer and the ERDS implementation contractor. Utilities are generally represented by the' personnel assigned to staff the project. This normally includes representatives of licensing, emergency planning, and computer staff. In order to provide the most efficient performance of site visits, the NRC Project Officer and the ERDS contractor will provide a week long series of ERDS meetings at each of the NRC regional offices. Region II will be visited during the dates of October 1-4, 1991. The format for these visits will be structured so that no utility will be required to spend more than one day at the regional office. A copy of the daily schedule and agenda is enclosed. As you can see, the program will begin with a presentation of the program and a short demonstration followed by individual licensee meetings with the EROS Project Officer and the implementation contractor. Mr. Jim Hufham of my staff has been in contact with Mr. Tom Grozan to discuss a date and time to meet with Florida Power and Light Company. We have scheduled the meeting for Wednesday, October 2, 1991, at 1:00 p.m. Enclosure 2 provides directions and a map that we hope will help you locate the Region II office. Florida Power and Light Company If you have any questions concerning the ERDS meeting or directions to the office, please contact Mr. Hufham at 404-331-2603. Sincerely, /'78 0 /3g(.. ~y ~g /g+/ QyJ g /P7&leh ~,~ J. Philip Stohr, Director Division of Radiation Safety and Safeguards Enclosures: 1. Daily Agenda 2. Map cc w/encls: D. A. Sager, Yice President St. Lucie Nuclear Plant P. 0. Box 128 Ft.- Pierce, FL 34954-0128 R. E. Grazio, Director Nuclear Licensing Florida Power and Light Co. P. 0. Box 14000 Juno Beach, FL 33408-0420 G. J. Boissy, Plant Manager St. Lucie Nuclear Plant P. 0. Box 128 Ft. Pierce, FL 34954-0128 Harold F. Reis, Esq. Newman 5 Holtzinger 1615 L Street, NW Washington, D. C. 20036 John T. Butler, Esq. Steel, Hector and Davis 400 Southeast Financial Center Miami, FL 33131-2398 Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 cc w/encls: (Cont'd on page 3) Florida Power and Light Company (cc w/encls: cont'd) Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, FL 32301 Jack Shreve Public Counsel Office of the Public Counsel c/o The Florida Legislature 111 West Madision Ave., Room 812 Tallahassee, FL 32399-1400 Gordon Guthrie, Director Emergency Management Department of Community Affairs 2740 Centerview Drive Tallahassee,FL 32399-2100 James V. Chisholm County Administrator St. Lucie County'300 Virginia Avenue, Fort Pierce, FL 34982 Charles B. Brinkman Washington Nuclear Operations ABB Combustion Engineering, Inc. 12300 Twinbrook Parkway, Suite 330 Rockvi lie, MD 20852 K. N. Harris, Sr. Vice President Nuclear Operations Florida Power and Light Co. P. 0. Box 14000'uno Beach, FL 33408 T. F. Plunkett, Vice President Turkey Point Nuclear Plant P. 0. Box 029100 Miami, FL 33102 L. W. Pearce, Plant Manager Turkey Point Nuclear Plant P. 0. Box 029100 Miami, FL 33102 cc w/encls: (Cont'd on page 4) Florida Power and Light Company (cc w/encls: cont'd) L. W. Bladow Quality Manager Turkey Point Nuclear Plant P. 0. Box 029100 Miami, FL 33102 D. Powell, Superintendent- Plant Licensing Turkey Point Nuclear Plant P. 0. Box 029100 Miami, FL 33102 Attorney General ~ Department of Legal Affairs The Capitol Tallahassee, FL 32304 Joaquin Avino County Manager of Metropolitan Dade County 111 NH 1st Street, 29th Floor Miami, FL 33128 State of Florida bcc w/encls: Wocument Control Desk K. Landis, RII J. Norris, NRR L. Spessard, AEOD R. Auluck, NRR Ross Butcher, Sr. Resident Inspector U.S. Nuclear Regulatory Commission P. 0. Box 1448 Homestead, FL 33090 NRC Resident Inspector U.S. Nuclear Regulatory Commission 7585 South Highway A1A Jensen Beach, FL 33457 RI I: DRSS RII:DRSS R RSS RI I: P RI I: DRSS ham in ollins KLa is BMallett p 9l 9 /91 8 9/2g91 /91 9g+/91 ENCLOSURE I DAILY AGENDA I:00 - 3:00 p.01. Introduction ERDS Presentation 3:00 - 5:00 p.m. FPSL/NRC Meeting TOPICS ERDS Presentation I. Introduction A. 'Brief History B. System Requirements Analysis ~PS« A. NRC ERDS System B. Plants On-line III. Im lementation Schedule A. Utility Events B. Halliburton NUS Events C. NRC Events IV. ~ERO 0 Link Activation V. Plant Attribute Librar and Data Point Librar Information A. PAL Description B. DPL Description VI. Brief ERDS Demonstration Usin Re ional Workstation Utilit Meetin s I. Introduction of Responsible Parties II. Utility guestions Concerning Project III. Detailed Discussion of Utility Implementation Concept IV. Detailed DPL Discussion V. Projected Utility Schedule ENCLOSURE 2 U. S. Nuclear Regulatory Commission - Region II Located at: 101 Marietta Street NW 29th Floor IF YOU ARRIVE IN ATLANTA BY PLANE WE RECOMMEND THE FOLLOWING: Take the MARTA TRAIN that has a station inside the Atlanta Airport near the baggage area. Take the North train to the MARTA Peachtree Center Station. Once at the MARTA Peachtree Center Station, follow the signs to the Westin Peachtree Plaza Hotel. The Westin Hotel is easy to recognize because it is a glass, round, 76 story structure. The NRC - Region II Office is located three "short" blocks directly west of the hotel. The Region II Office is located in a 36 story, glass, square building. IF YOU ARRIVE IN ATLANTA BY AUTOMOBILE WE RECOMMEND THE FOLLOWING: Take any interstate (I-20, I-75, I-80) to downtown Atlanta. Once you are in the downtown area, look for the Westin Peachtree Plaza Hotel. This hotel is an easy "point of reference" because it is 76 stories and round. Once you have located the hotel, go three blocks directly west to the Region II Office (101 Marietta Street). There are plenty of parking garages around the 101 Marietta Street Building. C — Region U. S. Nuclear Regulatory Commission II Located at: 101 Marietta Street NW 29th Floor I-85 DOWNTOWN ATLANTA MARTA Peachtree NRC Office Center Station Nestin Peachtree (Marietta St.) Plaza Hotel I-20 ATLANTA AIRPORT Train) I-85 I-75 NORTH.