European Union Water Initiative Plus for the Eastern Partnership
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
IJTPE Journal
International Journal on ISSN 2077-3528 “Technical and Physical Problems of Engineering” IJTPE Journal (IJTPE) www.iotpe.com Published by International Organization of IOTPE [email protected] June 2021 Issue 47 Volume 13 Number 2 Pages 107-111 ESTIMATION OF ENERGY RESOURCES POTENTIAL FOR SOLAR PHOTOVOLTAIC SYSTEMS LOCATED ON THE WATER SURFACE OF SMALL LAKES AND RESERVOIRS Z.A. Mammadov 1,2 R.E. Kerimov 2 O.Z. Kerimov 3 N.R. Rahmanov 3 1. Ministry of Energy, Baku, Azerbaijan, [email protected] 2. CPEE Center, Baku, Azerbaijan, [email protected] 3. CPEE Center, Baku, Azerbaijan, [email protected] 4. CPEE Center, Baku, Azerbaijan, [email protected] Abstract- At present, the photovoltaic (PV) systems are reflected light of solar panels, etc. Taking into account one of the most promising among renewable energy also the lack of useful arable land, the use of FPV Solar resources (RES), which share of power generation is Stations will avoid some of these problems. In addition, growing dynamically, ahead of other types RES. The FPV Solar Stations also use some part of sunlight Floating PV Systems (FPV) are a new type of such reflected from the water surface and additional cooling of systems that are located in the unused part of the water solar cells by water - which makes them 11% more surfaces of lakes, river deltas, natural water basins, efficient in comparison with similar stations on land [1]. reservoirs of hydroelectric power stations. For FPV Solar FPV also reduce the evaporation of reservoir water [2] Station even a small water reservoirs intended for and protect algae by creating the shade [3]. -
River Basin Management Development in Kura Upstream Mingachevir Dam River Basin District in Azerbaijan
European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+): Results 2 and 3 ENI/2016/372-403 RIVER BASIN MANAGEMENT DEVELOPMENT IN KURA UPSTREAM MINGACHEVIR DAM RIVER BASIN DISTRICT IN AZERBAIJAN PART 1 - CHARACTERISATION PHASE THEMATIC SUMMARY EUWI-EAST-AZ-03 January 2019 EUWI+: Thematic summary Kura Upstream of Mingachevir Reservoir River basin Produced by SADIG LLC Authors: Vafadar Ismayilov, Fuad Mammadov, Anar Nuriyev,Farda Imanov, Farid Garayev Supervision Yannick Pochon Date 12.01.2019 Version Draft Acknowledgements: NEMD MENR, NHMD MENR, NGES MENR, Amelioration JSC, Azersu OSC, WRSA MOES Produced for: EUWI+ Financed by: European Union – Co-financed by Austria/France DISCLAMER: The views expressed in this document reflects the view of the authors and the consortium implementing the project and can in no way be taken to reflect the views of the European Union. Page | 2 EUWI+: Thematic summary Kura Upstream of Mingachevir Reservoir River basin TABLE OF CONTENT 1. CHARACTERIZATION OF THE RIVER BASIN DISTRICT ..................................................................... 4 1.1 Natural Conditions in the River Basin District (RBD) ......................................................................... 4 1.2 Hydrological & geohydrological characteristics of the RBD ............................................................... 5 1.3 Driving forces ...................................................................................................................................... 6 1.4 The river basin in -
The World Factbook Middle East :: Azerbaijan Introduction
The World Factbook Middle East :: Azerbaijan Introduction :: Azerbaijan Background: Azerbaijan - a nation with a majority-Turkic and majority-Shia Muslim population - was briefly independent (from 1918 to 1920) following the collapse of the Russian Empire; it was subsequently incorporated into the Soviet Union for seven decades. Azerbaijan has yet to resolve its conflict with Armenia over Nagorno-Karabakh, a primarily Armenian-populated region that Moscow recognized in 1923 as an autonomous republic within Soviet Azerbaijan after Armenia and Azerbaijan disputed the territory's status. Armenia and Azerbaijan began fighting over the area in 1988; the struggle escalated after both countries attained independence from the Soviet Union in 1991. By May 1994, when a cease-fire took hold, ethnic Armenian forces held not only Nagorno-Karabakh but also seven surrounding provinces in the territory of Azerbaijan. The OSCE Minsk Group, co-chaired by the United States, France, and Russia, is the framework established to mediate a peaceful resolution of the conflict. Corruption in the country is widespread, and the government, which eliminated presidential term limits in a 2009 referendum, has been accused of authoritarianism. Although the poverty rate has been reduced and infrastructure investment has increased substantially in recent years due to revenue from oil and gas production, reforms have not adequately addressed weaknesses in most government institutions, particularly in the education and health sectors. Geography :: Azerbaijan Location: Southwestern -
RBMP SEA Report ENG FINAL
European Union Water Initiative Plus for Eastern Partnership Countries (EUWI+) STRATEGIC ENVIRONMENTAL ASSESSMENT (SEA) OF THE DRAFTALAZANI-IORI RIVER BASIN MANAGEMENT PLAN SEA Report November 2020 2 This SEA report was prepared by the national SEA team established for the pilot project “The Application of a Strategic Environmental Assessment (SEA) for the Draft Alazani-Iori River Basin Management Plan” (hereinafter also the SEA pilot project): Ms. Elina Bakradze (water and soil quality aspects), Ms. Anna Rukhadze (biodiversity, habitats and protected areas), Ms. Lela Serebryakova (health related aspects), Mr. Giorgi Guliashvili (hydrology and natural hazards), Mr. Davit Darsavelidze (socio-economic aspects), Mr. Irakli Kobulia (cultural heritage aspects and GIS) and the UNECE national consultant Ms. Irma Melikishvili (the team leader also covering climate change aspects), under the guidance and supervision of the UNECE international consultant Mr. Martin Smutny. Maps: The thematic maps presented in the SEA Report are produced by Mr. Irakli Kobulia on the basis of the GIS database provided by the EUWI + programme. The SEA Report also includes maps developed in the framework of the EUWI + programme (under result 2) by the REC Caucasus, subcontractor of the EUWI+ programme. The SEA pilot project was carried out under the supervision of Mr. Alisher Mamadzhanov, the EUWI+ programme leader from UNECE with the support provided by Ms. Christine Kitzler and Mr. Alexander Belokurov, UNECE and Ms. Eliso Barnovi, the EUWI+ Country Representative -
Innovating Solar Energy Development Through Floating Photovoltaic
Innovating Solar Energy Development through Floating Photovoltaic Technology Regional Knowledge and Support Technical Assistance Afghanistan, Azerbaijan, Kyrgyz Republic Cindy Cisneros Tiangco, PhD Senior Energy Specialist. Asian Development Bank Central and West Asia Solar PV Resources Monthly variation of Theoretical Global Average Annual Global Horizontal Horizontal Irradiation in the Region Irradiation In the Region with (solar photovoltaic potential) Cumulative constraints Weighted exclusion factors applied for: Practical Resources: • Airports/runway alignments, railroads, urban areas, pipelines • National borders (5 km buffer) • Areas with population density > 100 persons/km2 • Areas >20km away from roads (for construction access) • seismic danger areas • Areas with elevation >3000m or slopes >10% Ecological Resources • Snow and ice areas, shifting sand dunes and salt pans, tundra, swampland, All environmentally protected areas GHI data based upon 12 year half hourly satellite images; Validated by 92 measuring stations worldwide. Accuracy of GHI estimates is around +/- 5%; provides good quality prediction of long term average irradiance For more details see http://www.3tier.com/static/ttcms/us/documents/publications/vali dations/3TIER_Global_Solar_Validation.pdf . Generation mix, potential and installed capacity, NDC targets – (AFG, AZE, KGZ) Southwest Asia – Afghanistan, Pakistan Caucasus – Armenia, Azerbaijan, Georgia Central Asia – Kazakhstan, Kyrgyz Republic, Tajikistan, Turkmenistan, Uzbekistan Kyrgyz Afghanistan Azerbaijan -
State Programme on Poverty Reduction and Economic Development 2003-2005 Azerbaijan Progresses Toward the Achievement of the Mill
STATE PROGRAMME ON POVERTY REDUCTION AND ECONOMIC DEVELOPMENT 2003-2005 AZERBAIJAN PROGRESSES TOWARD THE ACHIEVEMENT OF THE MILLENNIUM DEVELOPMENT GOALS PROGRESS REPORT – 2003/2004 BAKU – 2005 DECREE OF THE PRESIDENT OF THE REPUBLIC OF AZERBAIJAN on Approval of the State Programme on Poverty Reduction and Economic Development in the Republic of Azerbaijan for 2003-2005 The consistent reform program carried out in the Republic of Azerbaijan in recent years has helped to ensure economic development, gradual improvement of macroeconomic performance and improvement of the living standards in the country. Thus, in the period 1996-2002, Gross Domestic Product increased by 1.7 times, capital investment increased by 7.8 times, nominal monetary income of population increased by 3 times and average monthly wages and pensions increased by 5 times. There are improvements in other economic performance indicators. However, these ongoing efforts and achievements have not yet led to a sufficiently high level of economic development and the living standards of the population have still not reached international standards: part of population is still unemployed, minimum wages are not sufficient to meet the minimum subsistence level and a number of factors causing poverty have not been eliminated. In order to further strengthen social protection of the population for the near future, ensure poverty reduction in the country and implement necessary measures to meet the commitments of the 2000 United Nations Millennium Summit, I hereby decree: 1. The “State Program on Poverty Reduction and Economic Development in the Republic of Azerbaijan for 2003-2005” shall be approved. 2. The Ministry of Economic Development of the Republic of Azerbaijan shall be responsible for coordinating the implementation of measures set out in the State Program. -
Azertag.Az 02.07.2020
AZERTAG.AZ 02.07.2020 Asif Verdiyev: Water level in rivers has decreased Recently, there has been a significant reduction in precipitation due to climate change, and a decrease in water content in the country's rivers as a result of prolonged drought in the warmer months of the year. In May and June this year, the water level in the Kura River, as well as other rivers flowing into it, decreased due to subnormal rainfall and abnormal temperatures in early June. As a result, from May 15 to May 31, the water level in the upper reaches of the Kura River, such as the Giragkesemen settlement, decreased by 108 centimeters. At the same time, below the Mingachevir reservoir of the Kura River, the water level decreased by 47 cm in Yevlakh, 127 cm in Zardab, 165 cm in Surra, 190 cm in Shirvan, 154 cm in Salyan and 122 cm in Novruzlu settlement of the Araz River. The statement came from Asif Verdiyev, chief hydrologist of the National Hydrometeorological Service. According to him, although the water level in Giragkesemen settlement continued to decrease in June, the water level in the lower reaches fluctuated due to a slight increase in the amount of water discharged from the Mingachevir reservoir. At the same time, the level of demand for water has decreased in some years. This year's decline is slightly higher than in previous years, but a similar situation was observed in 2001. The use of large amounts of water resources in both neighboring Georgia and Turkey, as well as in Azerbaijan, to meet the demand for water, leads to more water being withdrawn from the Kura River, which affects its current situation. -
The Cost of Water Services for Public Water Supply and Agriculture in the Kura River Basin
UNDP/GEF Kura II project The cost of water services for public water supply and agriculture in the Kura river basin A report for the UNDP-GEF Kura II project Vania Paccagnan International Consultant July 2018 Produced by: Vania Paccagnan Authors: Vania Paccagnan Produced for: UNDP/GEF Kura II Project Financed by: UNDP/GEF 2 Contents List of Tables ............................................................................................................................................ 5 List of Figures ........................................................................................................................................... 7 List of Acronyms ...................................................................................................................................... 8 Acknowledgements ................................................................................................................................. 9 1 Introduction ................................................................................................................................... 10 1.1 Scope of the report .............................................................................................................. 10 1.2 Water uses in the Kura river basin ....................................................................................... 10 2 Methodology to calculate the Operation and Maintenance (O&M) costs of water provision in the Kura river basin ..................................................................................................................................... -
Public Association for Assistance to Free Economy on Condition of Right
Public Association for Assistance to Free Economy On condition of right to property in 2011-2012 in Azerbaijan Authors: Ulviyya Asadzada Ziya Guliyev Editor: Zohrab Ismayil Corrector: Kamala Aghayeva Baku, Qanun Publication House, 2013 Funded by National Endowment for Democracy. CONTENTS ABBREVIATIONS ECHR European Court of Human Rights PAAFE Public Union for Assistance to Free Economy OJSC Open Joint-Stock Company SOCAR State Oil Company of Azerbaijan Republic UN United Nations SSC State Statistics Committee SCPI State Committee on Property Issues PU Public Union EA Executive Authority PUHRE Public Union on Human Rights Education Ltd. Limited Liability Company HCPU Housing Communal Production Union Navy Naval Forces IPD Institute for Peace and Democracy Mass-media Mass-media 1. SUMMARY The research shows that the causes of the violations of property rights is not a sectoral. Such violations are due to many reasons. One of the main reasons behind the violation of the right to property is similar to other violations of law is itt’s inability to ensure rule of law, dependence of courts on executive structures, politically motivated decisions. İn this regard, attention is brought to the lack of independence of the judicial system of Azerbaijan, and the cases of corruption in the court system in a number of international reports. While analysing the cases of violation of the right to property, in 2011 it becomes evident that the courts have made decisions in favour of the executive authority structures instead of citizens. This decreases the belief of citizens toward the court, causes a situation as if they have “voluntarily” abandoned their properties and “gave up”. -
SON2013EN Mundaricat Duzeliw
Contents: 2 Message of the President of SOCAR 48 Environmental activities Rovnag Abdullayev 4 About the report 74 Innovation activities 5 About the State Oil Company 80 Support to the regional development 16 Corporate management 85 Complying to the GRI Guidelines 18 SOCAR Committees 22 Business Ethics and Anti-Corruption activities 24 Relations with stakeholders 27 Human Resources 94 Key Financial Indicators (Appendix 1) 42 Occupational Safety and Health 95 Independent Assurance Statement SOCAR • 1 Message of the President of SOCAR Rovnag Abdullayev We are proud to present our second non-financial report which was prepared according to the UN concept on sustaina- ble development and GRI sus- tainability reporting guidelines. Together with SOCAR’s* non- financial parameters, this re- port reflects on the steps taken to achieve social and economic targets, preserve the environ- ment and resolve environmen- tal issues. Unlike the last year’s report, the 2012 report demonstrates that the Company’s deci- sion-making process is guided by the principles of comprehen- sive approach towards social and economic development along with environmental pre- servation. This has been made possible by applying transpa- rent and advanced international standards and creating added value in operations. Compared to the last year, this report covered more parame- ters which reflect the results of the Company’s sustainable development. We cannot call 2012 an or- dinary year. During this year the Company not only man- aged to preserve its dynamic development in the Caspian region but also took significant steps to become a reputable organization on a global scale. This proves that the Company successfully follows defined strategic priorities and adopts balanced administrative deci- sions. -
Engija, Vileshchay, Zayamchay), to Be Built Based on the President's Decree of July 27, 2020
XEZERXEBER.AZ 26.08.2020 Heavy rain raises reservoirs water level The recent rains in the northern regions have caused the water level in the reservoirs to rise. Gulu Karimov, a representative of the Azerbaijan Amelioration and Water Management OJSC, told KhazarKhabar. According to him, this increase was recorded in the areas due to flood waters flowing into reservoirs. "In recent days, the Takhtakorpu reservoir received 8 cubic meters of water per second, but after the rains it was 40 cubic meters per second. In addition, as we know, the Takhtakorpu reservoir feeds the Jeyranbatan reservoir, the main source of water in Baku, Absheron Peninsula and Sumgayit. The water level in Jeyranbatan reservoir also decreased compared to previous years. However, the rains had a positive effect on this reservoir. However, the rains lasted for 3 days, very little. But if it rained a little more, we could get a better result," Karimov said. He noted that flood waters flowed from the north- western rivers Balakanchay, Kurmukchay, Kishchay, Dashagil. "Although there are no reservoirs on these rivers, they also indirectly flow into the Mingachevir reservoir," he added. http://www.xezerxeber.az/G%C3%BCnd%C9%99m/304179 .html QAZET.AZ 27.08.2020 The Kura River joins Caspian Sea after a three-month separation As the water level in the Kura River decreased, the water of the Caspian Sea mixed with the Kura for a distance of 40-50 km. As a result, the population of the downstream Neftchala region was experiencing acute water problems. According to Gazet.az, heavy rains in recent days, floods in the Turyanchay and Goychay rivers, as well as the shutdown of water pumps in the Kura region have caused an increase in water in the Kura River. -
Azerbaijan Quarter 2 Highlights
Azerbaijan Quarter 2 Highlights Following EUWI+ support to development of the Technical support by the EUWI+ team to the partner Water Strategy of Azerbaijan, the Water Commission, laboratory of the Environmental Monitoring Centre of the formed in April 2020, is considering steps towards National Environmental Monitoring Department in Baku strategy implementation. EUWI+ is currently supporting progressed for finalising all necessary quality management development of an Action Plan to aid strategy documentation for the envisaged laboratory accreditation. implementation. MENR and EUWI+ agreed on the required ISO standards for laboratory work that will be purchased and translated into As a follow up to the regional webinar on the SDG 6.5.2 Azerbaijani. indicator on transboundary water cooperation in late May, support is being provided by EUWI+ to the Ministry of In response to COVID-19 restrictions, the approach to Public Ecology and Natural Resources in finalising the report and Consultations of the Kura upstream of the Mingachevir official submission to UNECE and UNESCO. reservoir pilot basin area RBMP Programme of Measures was adapted. It included several smaller consultation meetings The report on the detailed assessment of the existing in 12 rayons of the basin, with a total participation of 119 groundwater monitoring network and a proposal for an people representing different stakeholders and the general expanded chemical and quantitative monitoring network population. The meetings took place during 10-17 June in the pilot basin area in line with WFD requirements was 2020 and included participation of the EUWI+ national finalised. coordinator, the National Focal Point and representatives of Hydrometconsulting. Regional offices of MENR in the pilot Results of the work on the assessment of the priority needs area assisted the team in preparing a questionnaire on the for improvement of hydrological monitoring in the pilot RBMP, which was issued to stakeholders.