Pre - Feasibility Report

Total Page:16

File Type:pdf, Size:1020Kb

Pre - Feasibility Report PRE - FEASIBILITY REPORT OF BORKHEDA DEPOSIT QUARRY, LEASE AREA – 1.22 HA. & KHASRA NO. 52/1 APPLICANT SHRI GANESH PATLE RESI. GRAM.- PAUNI, MAIN ROAD MALAJKHAND DISTT. BALAGHAT STATE: MADHYA PRADESH FOR SUBMITTED TO SEIAA/SEAC E-5, PARYAVARAN PARISAR ARERA COLONY, BHOPAL (M.P.) MINES BORKHEDA STONE DEPOSIT QUARRY, LEASE AREA – 1.22 HA. SHRI GANESH PATLE RESI. GRAM.- PAUNI, MAIN ROAD MALAJKHAND DISTT. BALAGHAT STATE: MADHYA PRADESH PRE-FEASIBILITY REPORT BORKHEDA STONE DEPOSIT QUARRY, LEASE AREA – 1.22 HA. PRE - FEASIBILITY REPORT 1. INTRODUCTION :- I. IDENTIFICATION OF PROJECT AND PROJECT PROPONENT The project Borkheda stone Deposit Quarry is situated at Khasra no. 52/1 in Village – Borkheda, Tehsil- Baihar District - Balaghat. This site is 60.00 km away from District- Balaghat. Area is marked by authorized agency for excavation of stone and there is a proved reserve of mineable stone. Applicant Shri Ganesh Patle Resi. Gram.- Pauni, Main Road Malajkhand Distt. Balaghat (MP). Quarry has been applied for stone mine lease for 10 years. The total applied area is 1.22 hectare. The proposed production is 2263 CUM / Annum, The excavation of stone boulder will be done by opencast manual method. All the necessary permission and NOC has been taken by the proponent. Also she is applying to MPSEIAA for getting Environmental Clearance before starting mining at site. II. Borkheda stone crusher Deposit Quarry will be carried out open cast manual method III. NEED OF THE PROJECT AND ITS IMPORTANCE TO THE REGION / COUNTRY. There is huge demand of stone in the region as well as through out country for the use in construction of Roads, House etc. IV. EMPLOYMENT GENERATION DUE TO PROPOSED PROJECT During mining operation skilled, semi-skilled and un-skilled labours will be required for drilling, blasting, sizing; loading etc. There will be employed 15 PRE-FEASIBILITY REPORT BORKHEDA STONE DEPOSIT QUARRY, LEASE AREA – 1.22 HA. persons including skilled and unskilled labors. There will be indirect employment of drivers, cleaners, loading and unloading labors for loaders, dumpers, tractors etc. PROJECT DESCRIPTION I. TYPES OF PROJECT: - Mining (Metal Stone) District/State Tehsil Village Khasara No Area in hect. Balaghat (MP) Baihar Borkheda 52/1 1.22 II. LOCATION OF THE PROJECT Khasra no. 52/1 Village Borkheda Tehsil Baihar District / State Balaghat/Madhya Pradesh Nearest Railway / Road Railway station – Balaghat 60.00 km Land area & Land use Total area – 1.22 hectare is Pvt. revenue PRE-FEASIBILITY REPORT BORKHEDA STONE DEPOSIT QUARRY, LEASE AREA – 1.22 HA. waste land (Non agriculture) III. DETAILS OF ALTERNATE SITES: Alternate site is not required because proposed mining project is site specific and mineral deposit has been identified by certifying agency. IV. SIZE OR MAGNITUDE OF OPERATION: The total lease area 1.22 ha. Area and total production is proposed 2263 CUM / Annum through opencast manual mining. V. PROJECT DESCRIPTION WITH PROCESS DETAILS: Topography Excavation of stone will be done semi mechanized by Iron rod, Hammer, excavator cum loader, & rock breaker. RECLAMATION / BACK FILLING:-Reclamation is not proposed, the mine pit will be developed as water body and a Boundary wall will be constructed surrounding the ML Area at the time of mine closer. VI. RAW MATERIAL REQUIREMENT: - Proposed project is a stone mining hence raw material is not required for the mining of stone. VII. RECYCLING AND REUSE: No sub grades mineral will be generated. Over burden will be used for land filling & Plantation. VIII. WATER SOURCE: - There is no surface water source in the proposed mining lease area. Drinking water will be supplied by private water tankers PRE-FEASIBILITY REPORT BORKHEDA STONE DEPOSIT QUARRY, LEASE AREA – 1.22 HA. IX. ELECTRIC SYSTEM: - Power will not be required for mining. Only fuel based mining equipment will be used for operation therefore there are no use of electricity. X. SOLID WASTE MANAGEMENT: - As such no solid waste will be generated from excavation of stone. Overburden will be generated which will be reused for filling of empty pits & plantation. 2. SITE ANALYSIS I. CONNECTIVITY: - The lease area is located at a distance approx 60.00 KM from Balaghat district Headquarter. The area is approachable in all season and the connectivity is by means of regular buses matadors’ taxi etc. The proposed mining lease site is located in village Borkheda and is about 60.00 km from Balaghat town. II. LAND FORM, LAND USE & LAND OWNERSHIP:- Proposed mining lease area is a barren land. District / State Tehsil Village Khasara Area in Land No. Ha. ownership Balaghat (MP) Baihar Borkheda 52/1 1.22 Pvt. Waste land III. TOPOGRAPHY: - The topography of the area is flat and undulated area. IV. EXISTING LAND USE PATTERN: - Existing land use pattern of the proposed mining lease area is barren land. VI. Details of nearest environmental setting of the lease area S. No. Particulars Details 1 Latitude 21o59’41.1” - N 2 Longitude 80o43’52.6” - E PRE-FEASIBILITY REPORT BORKHEDA STONE DEPOSIT QUARRY, LEASE AREA – 1.22 HA. 3 Nearest City Balaghat 4 Nearest Railway Station Balaghat – 60.00 Km 5 Nearest Highway Balaghat state highway 7 Hills/Valley No. 8 Ecological Sensitive Zone No national parks and sanctuary 9 Historical Place No 10 Reserve Forest No VI. EXISTING INFRASTRUCTURE: - No infrastructure within proposed lease area. VII. SOCIAL INFRASTRUCTURE AVAILABLE: - Nearby village is 500 meter away from site a. PLANNING CONCEPT: - It is a proposed stone mining project. b. POPULATION PROJECTION: - The project is small in magnitude. No influx of population is expected as labour shall be deployed from the local villages. c. LAND USE PLANNING (BREAKUP ALONG WITH GREEN BELT ETC.) Land use details as per mining plan after and before mining operation. d. AMENITIES / FACILITIES: - SPECIFIC amenities/facilities are not required in this mining project. 3. PROPOSED INFRASTRUCTURE I. INDUSTRIAL AREA (PROCESSING AREA): The project is mining project and will be carried out on private land. PRE-FEASIBILITY REPORT BORKHEDA STONE DEPOSIT QUARRY, LEASE AREA – 1.22 HA. II. RESIDENTIAL AREA (NON PROCESSING AREA):- No residential area is proposed for mining project. III. GREEN BELT: - Green belt will be developed around proposed lease area. IV. CONNECTIVITY (TRAFFIC AND TRANSPORTATION ROAD/ RAIL/METRO/ WATER WAYS ETC):- The lease area can be approached from district head quarter Balaghat by road it is just 60.00 km away. V. DRINKING WATER MANAGEMENT (SOURCE & SUPPLY OF WATER):- Drinking water will be arranged through local water sources like nearby borewell. VI SEWERAGE SYSTEM: - No construction or sewage waste is expected from the mining process. However the domestic waste from the toilets will be given treatment through septic tank and soak pit arrangement. VII. INDUSTRIAL WASTE MANAGEMENT: - No industrial waste will be generated. VIII. SOLID WASTE MANAGEMENT: - overburden will be reused for filling of pit. IX. POWER REQUIREMENT & SUPPLY/ SOURCE: - Power will not be required for mining. 4. REHABILITATION AND RESETTLEMENT (R & R) PLAN: - No R & R plan is required as no displacement of people will be done because there is no village within proposed mining lease area. 5. PROJECT SCHEDULE AND COST ESTIMATES. PRE-FEASIBILITY REPORT BORKHEDA STONE DEPOSIT QUARRY, LEASE AREA – 1.22 HA. I. LIKELY DATE OF START CONSTRUCTION AND LIKELY DATE OF COMPLETION (TIME SCHEDULE FOR PROJECT TO BE GIVEN) The proposed mining project will be started after obtaining Environmental Clearance, approval of lease from Collector (Mining Branch) Balaghat and consent to operate from MPPCB. II ESTIMATED PROJECT COST ALONG WITH ANALYSIS IN TERMS OF ECONOMIC VIABILITY OF THE PROJECT. Not applicable 6. ANALYSIS OF PROPOSAL (Final Recommendations) I. FINANCIAL AND SOCIAL BENEFITS WITH SPECIAL EMPHASIS ON THE BENEFIT TO THE LOCAL PEOPLE INCLUDING, IF ANY, IN THE AREA. The mining project has prospered been creating local employment to the villagers. Further royalty has been paid to the Govt., which will create revenue generation for the Govt. Further project proponent has prospered been carried out socio-economic work Schooling, facility, medical facility, telegram and post office facility are available in village Borkheda. .
Recommended publications
  • NAME DESIGNATION DEPARTMENT EMAIL ADDRESS Mdez Jbp
    NAME DESIGNATION DEPARTMENT EMAIL ADDRESS mdez jbp Managing Director MD EZ Office [email protected] CHIEF GENERAL MANAGER ADB- Shiv Yadav DIRECTORTECHNICAL RGGVY [email protected] Prakash Kawade C.E. C.E. SAGAR REGION [email protected] Praveen Sinha C.E. C.E. JABALPUR REGION [email protected] Santosh Tandan C.E. C.E. REWA REGION [email protected] CHIEF GENERAL MANAGER FEEDER Abhay Bishnoi C.G.M SEPARATION [email protected] CHIEF GENERAL MANAGER ADB- Ashok Dhurway C.G.M RGGVY [email protected] Amar Bahadur Singh C.G.M. HR&A CHIEF GENERAL MANAGER HR&A [email protected] CEJR jabalpur CE mpez [email protected] CErr Rewa CE mpez [email protected] CEsr Sagar CE mpez [email protected] cfo mpez cfo mpez [email protected] cgm ddugjy CGM mpez [email protected] CHIEF GENERAL MANAGER Ajay Sharma CGM RAPDRP [email protected] cgm adb cgmADB mpez [email protected] ed comm cgmcomm mpez [email protected] cgm fs cgmfs mpez [email protected] cgm hr cgmhr mpez [email protected] ed purchase Cgmpurchase mpez [email protected] cgm rapdrp cgmrapdrp mpez [email protected] Vivek Chandra G.M.& Head-IT G.M Head IT [email protected] cgmenfo ENFORCEMENT edenfo mpez [email protected] gm works EDWORKS mpez [email protected] Vipin Dhagat Chief CS&A CHIEF C.S.&A.
    [Show full text]
  • Proposed Action Plan for Juvenation of River Wainganga at Chhapara District
    PROPOSED ACTION PLAN FOR REJUVENATION OF RIVER WAINGANGA AT CHHAPARA DISTRICT SEONI Submitted by REGIONAL OFFICE M.P. POLLUTION CONTROL BOARD JABALPUR PROPOSED ACTION PLAN FOR REJUVENATION OF WAINGANGA RIVER AT CHHAPARA DISTRICT SEONI 1.0 BACKGROUND 1.1 NGT Case No. 673/2018 : Hon'ble National Green Tribunal Central Zonal Bench New Delhi, in the matter of original application no. 673/2018 (News Item Published in the "Hindu" authored by Shri Jacob Koshy titled “More river stretches are now critically polluted: CPCB") passed an order on 20/09/2018. The para 48, 49 and 50.3 of this order are relevant to comply. The para 48 states that "it is absolutely necessary that Action Plans are prepared to restore the polluted river stretches to the prescribed standards", Para 49 states that "Model Action Plan for Hindon River, already provided by CPCB may also be taken into account" In para 50(i, ii, iii) Hon'ble National Green Tribunal has issued following directions:- i. All States and Union Territories are directed to prepare action plans within two months for bringing all the polluted river stretches to be fit at least for bathing purposes (i.e. BOD < 3 mg/L and TC <500 MPN/100 ml) within six months from the date of finalization of the action plans. ii. The action plans may be prepared by four-member Committee comprising, Director, Environment, Director Urban Development, Director Industries, Member Secretary State Pollution Control Board of concerned state. This Committee will also be the monitoring Committee for execution of the action plan. The Committee may be called "River Rejuvenation Committee" (RRC).
    [Show full text]
  • Brief Industrial Profile of Balaghat District Madhya Pradesh
    lR;eso t;rs Government of India Ministry of MSME Brief Industrial Profile of Balaghat District Madhya Pradesh Carried out by Br. MSME-Development Institute (Ministry of MSME, Govt. of India,) Udyog Vihar, Chorhatta, Rewa(MP) Phone : 07662-220948 1 Contents S. No. Topic Page No. 1. General Characteristics of the District 03 1.1 Location & Geographical Area 03 1.2 Topography 03 1.3 Availability of Minerals. 04 1.4 Forest 04 1.5 Administrative set up 04 2. District at a glance 05-06 2.1 Existing Status of Industrial Area in the District Balaghat 07 3. Industrial Scenario Of Balaghat district 07 3.1 Industry at a Glance 07 3.2 Year Wise Trend Of Units Registered 08 3.3 Details Of Existing Micro & Small Enterprises & Artisan Units 09 In The District 3.4 Large Scale Industries / Public Sector undertakings 09 3.5 Major Exportable Item 10 3.6 Growth Trend 10 3.7 Vendorisation / Ancillarisation of the Industry 10 3.8 Medium Scale Enterprises 10 3.8.1 List of the units in Balaghat & near by Area 10 3.8.2 Major Exportable Item 10 3.9 Service Enterprises 10 3.9.1 Potentials areas for service industry 10 3.10 Potential for new MSMEs 10 4. Existing Clusters of Micro & Small Enterprise 11 5. General issues raised by industry association during the course of 11 meeting 6. Steps to set up MSMEs 12 2 BRIEF INDUSTRIAL PROFILE OF BALAGHAT DISTRICT 1. General Characteristics of the District Balaghat District was constituted during the years1967-73 by amalgamation of parts of the Bhandara, Mandla and Seoni districts.
    [Show full text]
  • District Census Handbook, Balaghat, Part XIII-A, Series-11
    I t I I \ I 1 '"If XIII- if) • • iii. m. Ii, "''ftfM smnr~1II "':att Mft ""'PlAt "'!1m .981 CENSUS-PUBLICATION PI..AN e19l11 C."",.. Publicatlo1ll. S"les 11 In All India S~rle. will be published .111 1M followl"g pQ.n,) GOVERNMENT OF INDIA PUBLICATIONS Part I-A Administration Repo rt· Enumeration Part I-D Administration Report-Tabulation Part II-A General Population Tables Part II-B Primary Census Abstract Part II. General Economic Tables Part IV Social aod Cultural Tables Part V Migration Tables Part VI Fertility Tables Part VII Tables on Houses and Disabled Population Part VIII Household Tables Part IX Special Tables on Scheduled Castes and. Scheduled Tribes part X-A Town Directory Part X-B Survey Reports on selected Towns Part X-C Survey Reports aD iWtc4 Village., Part lKr Ethnographic Notcs and special studies on Scheduled Castes and Scheduled Tribes Part XII • Census Atlas Paper 1 of 1982 Primary Census Abstract for Scheduled Castes and [Scheduled Tribes Paper 1 of 1984 Househ01d Population by Religion of Head of Household STATE GOVERNMENT PUBLICATIONS Part XllI-I-..&B District Census Handbook for each of the 45 districts in the State.. (Village and Town Directory and Primary Census Abstract) Foreword i-iy . 2 SlEC'f (ClII' Preface 3 fQ;fiT ififm District Map vii 4 q~ai.~ Important Statistics 5 f"~""R"1Il fa'tq'" Analytical Note.- 1!'fR1.fTi'Wfi fa'cq-lJit J lR1~f'lf(l' "I'rrn 'q'~ "l~f~(J Notes & BXplanations; List of Scheduled ;ril';;rrnr Ifi" ~1 (uwnr;:r).
    [Show full text]
  • LIST of MEMBERS of the INDIAN FOREST SERVICE, BORNE on MADHYA PRADESH CADRE (As on 01-09-2019)
    LIST OF MEMBERS OF THE INDIAN FOREST SERVICE, BORNE ON MADHYA PRADESH CADRE (As on 01-09-2019) S.No. Name of the Officer Educational Year of Allotment Present Rank & New Photo Date of Birth Qualification Recruitment Mode Post Held Home District/ State Date of Apptt. to Date of Apptt. to Officer Code No. IFS Present Post Date of Conf. in IFS (1) (2) (3) (4) (5) 1. J.K. Mohanti M.Sc.(Chem.) 1983 P.C.C.F. & HoFF, 22-09-59 RR Madhya Pradesh, Cuttack/Orissa 23-05-83 Bhopal MP/189 23-05-86 10-01-19 2. Dr. U. Prakasham Ph.D. 1983 P.C.C.F. 01-06-60 (Natural Resource RR (Wildlife) W. Godawari/A.P. Management) 09-05-83 H.O. Bhopal MP/194 09-05-86 03-01-19 3. Saibal Dasgupta M.Sc.(Bot) 1984 PCCF/ Addl. Director 15-09-59 RR General, (Forest Silliguri/W.B. 21-05-84 Conservation) MP/196 21-05-87 GoI, MoEFCC, New Delhi (on CDR) 11-05-18 4. Rajesh Srivastava M.Sc.(Geo) 1984 P.C.C.F. 04-04-61 RR (Research & Lucknow/U.P. 21-05-84 Extension) MP/208 21-05-87 H.Q. Bhopal 23-07-19 5. S.P. Rayal B.Sc. 1984 P.C.C.F. 03-04-60 RR (Production) Garhwal/Uttarakhand 21-05-84 H.Q. Bhopal MP/205 21-05-87 06-03-19 6. S.K. Mandal B.Sc. 1984 P.C.C.F. / M.D. 19-07-60 RR M.P. State Balasore/Orissa 04-06-84 MFP.
    [Show full text]
  • INDIAN BUREAU of MINES Jabalpur Regional Office
    INDIAN BUREAU OF MINES MINERALS DEVELOPMEMT AND REGULATION DIVISION Mining Plan Modification REPORT Jabalpur regional office Mine file No : MP/BGT/CU-1/NGP Mine code : 14MPR01001 (i) Name of the Inspecting : K006() NARESH KUMAR KATARIYA Officer and ID No. (ii) Designation : Deputy Controller Mines (iii) Accompaning mine : S/Sh N Shenoy(DGM,Mines) K Hansda (Mine Manager), P.D Official with Designation (iv) Date of Inspection : 09-DEC-19 (v) Prev.inspection date : PART-I : GENERAL INFORMATION 1. (a) Mine Name : MALANJKHAND (b) Registration NO. : 14MPR01001 (c) Category : A Fully Mechanised (d) Type of Working : Underground (e) Postal address State : MADHYA PRADESH District : BALAGHAT Village : KARAMSARA Taluka : BAIHAR Post office : MALAJKHAND Pin Code : 481116 FAX No. : 07637-257038 E-mail : [email protected] Phone : 257032 (f) Police Station : malanjkhand (g) First opening date : 01-JAN-78 (h) Weekly day of rest : SUN 2. Address for : Malanj Khand copper project correspondance Teh: Birsa Dist: Balaghat State: MP 3. (a) Lease Number : MPR0781 (b) Lease area : 480.1 (c) Period of lease : (d) Date of Expiry : 31-MAR-20 4. Mineral worked : COPPER ORE Main PAGE : 2 5. Name and Address of the Lessee : M/S HINDUSTAN COPPER LIMITED MALANJKHAND COPPER PROJECT DISTT BALAGHAT MP BALAGHAT MADHYA PRADESH Phone: FAX : Owner : SK Bhattacharya BALAGHAT MADHYA PRADESH Phone: FAX : Agent : V.K singh BALAGHAT MADHYA PRADESH Phone: FAX : Mining Engineer Name : P.D.BOHRA,Full Time Qualification : BE MINING Appointment/ : Termination date Geologist Name : Dr Bhakat,Full Time Qualification : MSc Geology Appointment/ : 01-JAN-19 Termination date 6. Date of approval of Mining : Renewal under rule 24 MCR1960 23-AUG-12 Plan/Scheme of Mining MP modif under 17(3) MCR 2016 20-FEB-16 MP modif under 17(3) MCR 2016 20-FEB-18 PAGE : 3 PART - II : OBSERVATION/COMMENTS OF INSPECTING OFFICERS Exploration : Sl.No.
    [Show full text]
  • Regional Daily Weather Report Monday, 09 July 2018 Issue Time : 13:00 Hrs
    ादेिशक मौसम पूवानुमान के Regional Weather Forecasting Centre ादेिशक मौसम के Regional Meteorological Centre भारत मौसम िवान िवभाग India Meteorological Department नागपुर Nagpur Regional Daily Weather Report Monday, 09 July 2018 Issue Time : 13:00 Hrs. IST Monsoon was active over Vidarbha and Chhattisgarh. Heavy rainfall occurred at isolated places over Vidarbha East Madhya Pradesh and Chhattisgarh. Thunderstorm observed at isolated places over Vidarbha, Madhya Pradesh & Chhattisgarh. Very light to moderate rainfall occurred at most places over Vidarbha and Chhattisgarh and at few places over Madhya Pradesh. Chief Amount of Rainfall In Centimeters are EAST MP : Balaghat-aws (dist Balaghat) 7, Paraswad (dist Balaghat) 7, Malanjkhand (dist Balaghat) 6, Keolari (dist Seoni) 5, Seoni-aws (dist Seoni) 5, Waraseoni (dist Balaghat) 5, Nainpur (dist Mandla) 4, Katangi (dist Balaghat) 3, Umaria-aws (dist Umaria) 2, Mandla-aws (dist Mandla) 2, Chindwara-aws (dist Chindwara) 1, Jaithari (dist Anuppur) 1, Bichhia (dist Mandla) 1, Lanji (dist Balaghat) 1, Amarwara (dist Chindwara) 1, Gadarwara (dist Narsinghpur) 1, WEST MP : Khaknar (dist Burhanpur) 4, Nepanagar (dist Burhanpur) 3, Sarangpur (dist Rajgarh) 3, Neemuch-aws (dist Neemuch) 2, Hoshangbad-aws (dist Hoshangabad) 2, Mandsaur-aws (dist Mandsaur) 1, Burhanpur (dist Burhanpur) 1, Garoth (dist Mandsaur) 1, Rajgarh (dist Rajgarh) 1, Pandhana (dist Khandwa) 1, Bhopal-aws-arg (dist Bhopal) 1, Khandwa-aws (dist Khandwa) 1, VIDARBHA :Korpana (dist Chandrapur) 11, Gondia Ap (dist Gondia) 11, Gondia (dist
    [Show full text]
  • College of Agriculture Balaghat
    CollegeofAgriculture Balaghat -AProfile JawaharlalNehruKrishiVishwaVidyalaya,Jabalpur JawaharlalNehruKrishiVishwaVidyalaya,Jabalpur CollegeofAgriculture,Balaghat MurjhadFarm,Waraseoni,District-Balaghat(M.P.)481331 2012 CollegeofAgriculture,Balaghat PREAMBLE Looking to the specific need of the Chhattisgarh Agro-climatic Zone of Madhya Pradesh, the College of Agriculture, Balaghat was started by the Jawaharlal Nehru Krishi Vishva Vidyalaya, Jabalpur on 12th September, 2012 in the Regional Agriculture Research Station (RARS), Waraseoni. The College is about 4 Kilometres away from Waraseoni on Waraseoni-Lalburra Road. As the location of RARS is very near to the village Murjhad, the farm is popularly known as "Murjhad Farm". Geographically, its altitude, Longitude and Latitude is 301.5M, 80°50'E and 21°45'N, respectively. The Murjhad Farm where the College is located was established during the British rule (1917-18) and after independence, in 1965, it came under the aegis of JNKVV, Jabalpur and was subsequently rechristened as Regional Agriculture Research Station, Murjhad Farm. The primary objective of the farm was to supply high quality pure seeds of recommended paddy varieties to the farmers of the Balaghat region. Later, because of inclusion of Balaghat district in the Chhattisgarh plain agro-climatic zone, the RARS was attached to the then newly established Indira Gandhi Krishi Vishwa Vidyalya, Raipur in 1987-88. However, with the formation of Chhattisgarh as a new state in year 2000, RARS, Waraseoni was again transferred back to JNKVV, Jabalpur on 6th November 2000. Since, then the RARS Murjhad Farm is an inherent part of JNKVV, Jabalpur. In the year 2019, College of Agriculture, Balaghat was accreditated by the ICAR peer review committee with a prestigious score of 3.01.
    [Show full text]
  • Widening & Improvement of Existing 2 Lane to 4 Lane of NH – 7 And
    Brief Summary of Project Four laning of Balaghat - Gondia Section of NH 543 from km 0.000 to km 48.070 (Package-1A & Package-1B) under Bharatmala Pariyojana in the State of Madhya Pradesh and Maharashtra Brief Summary of Project 1. MoRTH, Government of India has declared new National Highway (NH-543) vide Gazette Notification dated 3rd January 2017. NH-543 starts from the junction with NH-43 Shahdol connecting Dindori, Mandla, Nainpur, Lamta, Balghat in the state of Madhya Pradesh connecting Rajegaon, Dhamangaon, Rawandi, Gondia, Amgaon, Deori, Korchi, Kurkheda, Wadsa (Desaiganj) and terminating at its junction with NH-353D near Bramhapuri in the state of Maharashtra. 2. The Proposed project road is part of the newly declared NH-543, Balaghat to Gondia Section of NH-543 from km 0.000 to km 48.070 in the State of Madhya Pradesh and Maharashtra. 3. Total length of the existing stretch is about 41.55 Km and length of proposed project road is 48.070 km. Out of 48.070 km stretch, 29.700 km stretch is in the State of Madhya Pradesh (Package-1A) and 18.370 km is in the State of Maharashtra (Package-1B) 4. 4 lane with paved shoulder configuration has been proposed for the entire stretch. 5. The proposed alignment is passing through 4 Tehsils (Lalbarra, Waraseoni, Balaghat & Kirnapur) of Balaghat district in the State of Madhya Pradesh and 1 Tehsil (Gondia) of Gondia district in the State of Maharashtra. 6. The proposed alignment is passing through 34 villages (21 villages in Balaghat District in the State of Madhya Pradesh and 13 villages in Gondia District in the State of Maharashtra).
    [Show full text]
  • City Base Map
    78°34'45"E 78°35'0"E 78°35'15"E 78°35'30"E 78°35'45"E 78°36'0"E 78°36'15"E 78°36'30"E 78°36'45"E 78°37'0"E 78°37'15"E 78°37'30"E ! Nagar Palika,Junnardeo-Jamai ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! District - Chhindwara (M.P.) ! ! ! ! ! ! ! ! Map Title ! ! u ! o ! o T lm ! a ! h ! ! k i i ! h ! C m City Base Map a ! w ! N a o " ! d T 0 ! r 3 ' o 2 n ! ! 1 ! n ° 2 u J ! 2 ! ! ! ! ! ! ! ! ! ! N ! ! " ! ! ! 0 Legend ! ! 3 ! ! ' 2 ! ! ! ! ! 1 ! ! ! ° ! ! ! ! ! ! ! ! ! 2 ! ! ! ! ! ! 2 ! ! ! ! Municipal Boundary Overhead Tank ! ! ! ! ! ! ! ! ! ! ! ! ! ! Railway Line ! ! ! ! ! ! ! ! ! ! ! ! ! ! State Highway ! ! ! ! ! d ! a ! ! o ! ! ! ! R Major Road ! ! T n o ! ! o SWA. BABULAL ! J i u ! ! n t GUPTA WARD ! ! ! n a ! ! ! t # o ! ! ! r S ! Other Road B ! i y ! ! ! a ! ! ! ú w l ! ! i ! Bridge a ! ! R ! ! ! ! ! ! ! N ! " ! ! Culvert 5 1 ! ! ' ! ! 2 ! 1 ! ° ! ! ! 2 Playground 2 ! ! N ! ! " ! 5 ! 1 ' ! ! ! 2 Drainage 1 ! ! ° ! 2 ! CHIKHALMOU 2 ! ! ! CHORAHA ! ! ! ! Waterbody #BUS STOP ! ! ! ! ! # ! ! ! ! ! ! ! ! ! ! ! ! ! Important Landmark ! ! ! ! ! ! ! ! ! ! ! ! ! ! SAKKRO BAI ! ! ! ! River ! ! ! UIKEY ! ! ! ! HOUSE ! ! ! ! # ! ! ! ! d ! ! ! a ! ! MAHAVIR ! ! ! o ! ! SWAMI ! R WARD ! ! ! # n VIVEKANANDA ! ! ! o ! i SCHOOL ! t ! ! # ! ti ! ut a h ! ! G ti t t ! o u ! T h S ! G ! SADAR ! To ! ! y ! ! ! ! a BHAGATSINGH EKLAVYA MODEL ! ! ! ! ! ! w WARD l SCHOOL, JUNNARDEO i # ! ! ! a ! ! N CHINNWADA ! " R ! # ! 0 ! ' ! ! 2 ! ! 1 ! ! ® ° ! ! 2 ! 2 ! ! ! ! ! ! N ! ! " ! ! 0 ! ! ! ' ! ! ! ! ! 2 1 ! ! ! ° ! ! ! 2 SCALE 1:4000 ! ! ! ! 2 ! ! ! ! ! ! 0 95 190 380 570 760 ! ! ! ! ! ! Meters ! ! SUBHASH CHANDRA ! ! BOSE WARD ! # ! T ! a m JAG MOHAN ! ! DAS SCHOOL i # y a ! ! B y ! p ! ! ! T ! a o PT.NEHRU ! s ! ! Ju WARD Railwa s y ! ! Index Map n R # ! ! ! n S o o taion ! a ! r ! d ! B ! Ro ! ! i ad ! ! ! T ! ! ! o Tehsil Road PT.
    [Show full text]
  • HWC-SHC Allotment List for CCCH
    1 LINE LISTING OF SHCs FOR HWCs Sr. Name of District Block Name Name of SHC A B C D 1 Agar Malwa Susner SHC Chapariya 2 Agar Malwa Susner SHC Palda 3 Agar Malwa Susner SHC-Dongargove 4 Agar Malwa Badod SHC-Gangapur 5 Agar Malwa Badod SHC-Khajuri Barod 6 Agar Malwa Badod SHC-Madkota 7 Agar Malwa Nalkheda SHC-Manasa 8 Agar Malwa Susner SHC-Modi 9 Agar Malwa Agar SHC-Piplonkalan 10 Agar Malwa Badod SHC-Sudwas 11 Agar Malwa Agar SHC-Tanodiya 12 Agar Malwa Nalkheda SHC-Tikona 13 Alirajpur Katthiwada SHC-Andharkanch 14 Alirajpur Ambua SHC-Badi 15 Alirajpur Udaigarh SHC-Badi Juwari 16 Alirajpur Bhabhra SHC-Behdwa 17 Alirajpur Katthiwada SHC-Chandpur 18 Alirajpur Ambua SHC-Chota Undwa 19 Alirajpur Jobat SHC-Danbari 20 Alirajpur Bhabhra SHC-Dewali 21 Alirajpur Sondwa SHC-Jetpur 22 Alirajpur Bhabhra SHC-Kalyawaw 23 Alirajpur Jobat SHC-Kanwada 24 Alirajpur Udaigarh SHC-Temachi 25 Alirajpur Jobat SHC-Undari 26 Alirajpur Sondwa SHC-Walpur 27 Anuppur Pushprajgarh SHC Alhawar 28 Anuppur Pushprajgarh SHC Amdri 29 Anuppur Pushprajgarh SHC Amgawa 30 Anuppur Kotma SHC Badra 31 Anuppur Anuppur SHC Barbaspur 32 Anuppur Anuppur SHC Bargawa Page 1 of 41 2 LINE LISTING OF SHCs FOR HWCs Sr. Name of District Block Name Name of SHC 33 Anuppur Jaithari SHC Beend 34 Anuppur Kotma SHC Beiharbandh 35 Anuppur Pushprajgarh SHC Bilaspur 36 Anuppur Kotma SHC Chaka 37 Anuppur Jaithari SHC Choi 38 Anuppur Jaithari SHC Chorbhdhi 39 Anuppur Jaithari SHC Chulha 40 Anuppur Kotma SHC Dhangawa 41 Anuppur Pushprajgarh SHC Gonda 42 Anuppur Jaithari SHC Gorshi 43 Anuppur Anuppur
    [Show full text]
  • Madhya Pradesh.Xlsx
    Madhya Pradesh S.No. District Name of the Address Major Activity Broad NIC Owner Emplo Code Establishment Description Activity ship yment Code Code Class Interval 130MPPGCL (POWER SARNI DISTT POWER 07 351 4 >=500 HOUSE) BETUL(M.P.) DISTT GENERATION PLANT BETUL (M.P.) 460447 222FORCE MOTORS ARCADY, PUNE VEHICAL 10 453 2 >=500 LTD. MAHARASHTRA PRODUCTION 340MOIL BALAGHAT OFFICER COLONEY MAINING WORK 05 089 4 >=500 481102 423MARAL YARN KHALBUJURG A.B. CLOTH 06 131 2 >=500 FACTORY ROAD MANUFACTRING 522SHRI AOVRBINDO BHOURASALA HOSPITAL 21 861 3 >=500 MEDICAL HOSPITAL SANWER ROAD 453551 630Tawa mines pathakheda sarni COOL MINING WORK 05 051 1 >=500 DISTT BETUL (M.P.) 460447 725BHARAT MATA HIGH BAJRANG THREAD 06 131 1 >=500 SCHOOL MANDAWAR MOHHALLA 465685 PRODUCTION WORK 822S.T.I INDIA LTD. PITHAMPUR RING MAKING OF 06 141 2 >=500 ROAD 453332 READYMADE CLOTHS 921rosi blue india pvt.ltd sector no.1 454775 DAYMAND 06 239 3 >=500 COTIND&POLISING 10 30 SHOBHAPUR MINSE PATHAKERA DISTT COL MININING 05 051 4 >=500 BETUL (M.P.) 440001 11 38 LAND COLMINCE LINE 0 480442 KOLMINCE LAND 05 089 1 >=500 OFFICE,MOARI INK SCAPE WORK 12 44 OFFICE COAL MINES Bijuri OFFICE COAL COAL MINES 05 051 1 >=500 SECL BILASPUR MINES SECL BILASPUR Korja Coliery Bijuri 484440 13 38 W.C.L. Dist. Chhindwara COL MINING 05 051 4 >=500 480559 14 22 SHIWALIK BETRIES PANCHDERIYA TARCH FACTORY 06 259 2 >=500 PVT. LTD. 453551 15 33 S.S.E.C.N. WEST Katni S.S.E.C.N. RIPERING OF 10 454 1 >=500 RAILWAY KATNI WEST RAILWAY MALGADI DEEBBE KATNI Nill 483501 16 44 Jhiriya U.G.Koyla Dumarkachar Jhiriya CAOL SUPPLY WORK 06 239 4 >=500 khadan U.G.Koyla khadan Dumarkachar 484446 17 23 CENTURY YARN SATRATI 451228 CENTURY YARN 06 141 4 >=500 18 21 ret spean pithampur 454775 DHAGA PRODUCTS 06 131 4 >=500 19 21 hdfe FEBRICATION PITHAMPUR 454775 FEBRICATION 06 141 2 >=500 20 29 INSUTATOR ILE.
    [Show full text]