uMNGENI LOCAL MUNICIPALITY

INTEGRATED DEVELOPMENT PLAN TO INFORM THE 2012/13 TO 2016/17 FINANCIAL YEARS: FINAL REPORT

MAY 2012 uMNGENI IDP 2012/13 TO 2016/17

TABLE OF CONTENTS

MAYOR’S SUMMARY REPORT ...... a 1. BACKGROUND TO THE INTEGRATED DEVELOPMENT PLAN AND THE COMMUNITY BASED PLANNING APPROACH ...... 1 1.1 WHAT IS AN INTEGRATED DEVELOPMENT PLAN (IDP)?...... 1 1.2 APPROACH TO THE THIRD GENERATION IDP’S ...... 1 1.3 WHAT IS COMMUNITY BASED PLANNING (CBP)? ...... 2 1.4 HOW THE PLAN WAS PREPARED ...... 3 2. STATUS QUO ANALYSIS ...... 4 2.1 LOCALITY ...... 4 2.2 URBAN RURAL AND MAIN WARD CHARACTERISTICS ...... 6 2.3 POPULATION STATISTICS ...... 7 2.4 SOCIO-ECONOMIC TRENDS ...... 9 2.5 TRANSPORT INFRASTRUCTURE ...... 13 2.6 AGRICULTURE POTENTIAL ...... 13 2.7 ENVIRONMENTAL CONSIDERATIONS ...... 13 2.8 WATER RESOURCES ...... 14 2.9 TOURISM ...... 14 2.10 WHAT IS CURRENTLY IN EACH WARD...... 16 2.11 SERVICES BACKLOG ...... 20 2.12 FINANCIAL VIABILITY OF THE MUNICIPALITY ...... 22 3. ADVANTAGES ...... 24 3.1 SWOT ANALYSIS ...... 24 3.2 WARD PRIORITIES ...... 31 4. STRATEGIC ANALYSIS ...... 34 4.1 BACKGROUND ...... 34 4.2 STATE OF THE NATION ADDRESS ...... 34 4.3 STATE OF THE PROVINCE ADDRESS ...... 34 4.4 STRATEGIC GOALS OF THE KWAZULU-NATAL (KZN) PROVINCIAL GROWTH AND DEVELOPMENT STRATEGY (PGDS) ...... 35 4.5 NATIONAL AND PROVINCIAL PRIORITIES ...... 36 4.6 UNITED NATIONS MILLENIUM DEVELOPMENT GOALS ...... 36 4.7 12 OUTCOMES OF GOVERNMENT ...... 37 4.8 STRATEGIC FRAMEWORK OF THE uMNGENI COUNCIL ...... 37 4.9 STRATEGIC OBJECTIVES BY KPA WITH KPI’s AND TARGETS ...... 39 5. 5 YEAR IMPLEMENTATION PLAN ...... 47 5.1 BUDGET ...... 47

i uMNGENI IDP 2012/13 TO 2016/17

5.2 PROJECTS ...... 50

ANNEXURES ...... 56 1 PROJECT TABLES 2 LIST OF ALL POLICIES AND SECTOR PLANS IN uMNGENI 3 SUMMARY OF CONSULTATION INPUT ON ISSSUES BY WARD 4 STRATEGIC PLANNING ALIGNMENT NATIONAL AND PROVINCIAL GOALS AND PGDS GOALS 5. PERFORMANCE MANAGEMENT SYSTEM ORGANISATIONAL SCORE CARD 6 ECONOMIC OVERVIEW 7 SPATIAL DEVELOPMENT FRAMEWORK REPORT

MAPPING MAP 1: UMNGENI SPATIAL DEVELOPMENT FRAMEWORK 2012/2013 MAP 2a: LAND CAPABILITY MAP 2b: AGRICULTURAL POTENTIAL MAP 3a: MINSET MAP 3b: ENVIRONMENTAL FEATURES MAP 3c: ENVIRONMENTAL PRIORITY AREAS MAP 4: LAND SUBSIVISIONAL PATTERN AND TOURISM FACILITIES MAP 5a: LAND COVER MAP 5b: LAND USE MUNICIPAL WATER SUPPLY NEEDS OVERVIEW MUNICIPAL SANITATION NEEDS OVERVIEW WARD MAPS (EXISTING FACILITIES, COMMERCIAL AND INDUSTRIAL AREAS)

ii uMNGENI IDP 2012/13 TO 2016/17

MAYOR’S SUMMARY REPORT

SPEECH BY THE MAYOR OF uMNGENI MUNICIPALITY

CLLR M.P. MYENI PRESENTED TO THE MUNICIPAL COUNCIL ON THE OCCASION OF THE TABLING OF THE 2012/2013, 2013/2014, 2014/2015 DRAFT BUDGET AND INTEGRATED DEVELOPMENT PLAN IN THE COUNCIL CHAMBERS, HOWICK,

ON WEDNESDAY 28 MARCH 2012

Madam Speaker,

Executive Committee Members,

Councillors,

Acting Municipal Manager,

General Managers,

Chief Financial Officer,

Staff,

Members of the media and Public,

Ladies and Gentlemen.

It is a great honour to present to you the multi-year budget for uMngeni Municipality in respect of the 2012/13, 2013/14 and 2014/15 financial years.

Madam Speaker and members of Council, this multi-year budget is tabled in terms of the Municipal Finance Management Act (MFMA), No 56 of 2003 and in terms of the Municipal Budget & Reporting Regulations. The MFMA requires that the budget be tabled ninety (90) days before the start of the financial year and we are fully complying with this requirement. It is the intention to have this budget finally approved on 30 May 2012 which will be in compliance of the requirements of the MFMA.

Inflation is forecast to remain within the target range of 5.7 to 5.9 percent, edging towards the upper end of the range in 2014 as the economy strengthens. This was taken into account when the budget was compiled.

Cognisance should be taken that the SALGA Salary Wage Collective Agreement has come to an end and National Treasury has advised to make provision for an increase of 5% for the 2012/2013 financial year. As part of Government's aim to create jobs, provision has been made to fill vacancies in respect of 50 General Workers with effect from 1 January 2013.

Furthermore, the increase in the electricity tariffs as approved by the National Electricity Regulator of will result in a 13% in the bulk purchases for 2012/13 financial year. This increase is way above the headline inflation forecasts. The guideline increase for municipalities to pass on to their consumers is only 1 I%.

a uMNGENI IDP 2012/13 TO 2016/17

Madam Speaker, you are aware of the huge electricity losses experienced by uMngeni Municipality through technical losses, tampering, illegal connections and theft. I am however, please to announce that we have entered into an agreement with IDT through the Department of Energy to conduct an assessment of the entire Electricity Service and also to implement the findings to address these losses. This amounts to millions of rand with no contribution from uMngeni Municipality.

Although the Municipal Property Rates Act makes provision for the rating of roads, but upon discussion with National Departments they are of the view that it is against national economic activities to rate roads. For this reason no provision has been made to rate provincial and national roads in the 2012/13 financial year. This will result in a decrease of R1 1 million in the rates income for the 2012/13 financial year.

Madam Speaker, the uMgungundlovu District Municipality will take over the Environmental Health Function from 1 July 2012 which will result in a saving of R1.6 million per annum. Furthermore the primary health care (clinics) will also be transferred to the Provincial Department of Health with an estimated annual saving of R3 million.

Madam Speaker, this Council's Third Generation Integrated Development Plan (IDP) to inform the 2012/13 financial year's budget was also tabled to Council today. I am pleased to announce that this draft budget is aligned to the draft revised IDP. Due to the current financial situation of uMngeni Municipality we can only fund capital projects through the Municipal Infrastructure Grant which amounts to R16.2 million.

Governance

The Internal Audit Activity stills operate under a Shared Internal Audit Services which has been running for almost 4 years this is an indication of a commitment in promoting the intergovernmental relations between the participating Municipalities. Internal Audit Activity has formed a working relationship with the Provincial Internal Audit Unit and National Treasury Risk and Internal Audit Support Unit for skills and resources sharing and to strengthen the Internal Audit Activities operations. As a result both the National and Provincial Treasuries engaged itself in coordinating the Risk Assessment Exercises within the Municipalities participating in the shared service. A risk based audit plan has been developed and systems of internal control were tested to effectively monitor the vulnerability of operations within the municipality. Through the Shared Service contribution an audit working paper tool has been sourced and is being rolled out to fast track effectiveness of audit sampling and this will also help internal audit to identify areas with high risk to be able to advise management of areas that needs urgent and immediate attention.

UMngeni Municipality Youth Advisory Centre is still standing and continues to service the youth who are seeking advice on careers, receiving vouchers for small businesses, life skills, and basic computer skills. Madam Speaker, we pride ourselves in services offered by the Youth Advisory Centre include, and includes accomplishment such as:

The Youth Advisory Centre will re-launch the Local Youth Committee, whereby one member from all the 11 wards will be a representative. The primary objective of this structure is to monitor and evaluate the youth development processes.

b uMNGENI IDP 2012/13 TO 2016/17

Madam Speaker, one cannot over emphasise an outstanding responsibility of the municipality towards caring for children and recognising their rights as enshrined in Act 338 of 2005 which is nested in uMngeni Local Advisory Council for Council. The uMngeni Municipality continues to forge and establish relations with various stakeholders in ensuring that Children's Rights and welfare is well taken care of. Surrounding stakeholders the municipality engages with, include Dart, Children's Right Centre, Inkanyiso Day Care centre. Advocacy and awareness campaigns

Health

The HIV Counselling and Testing (HCT) programme is the key intervention towards the realisation for HIV/AIDS National Strategy Plan for 2007-2011. Behavioural change campaigns include the Male Medical Circumcision campaign. The MEC for Health is currently leading an intensive circumcision campaign which is aimed at reducing the chances of HIV/AIDS transmission. Currently the uMngeni Municipality in conjunction with other stakeholders promotes this initiative. We recently hosted an HIV/AIDS awareness campaign, held on 08 and 09 December 2011, where 37 young men were screened for HCT and 16 males were circumcised.

Housing

Madam Speaker, we have over twelve (12) housing projects within the uMngeni Municipality. To date, 6217 low income houses have been constructed. These include areas such as phase 3, Emandleni, Siphumelele, to name a few. Furthermore, there are projects that are in the planning and packaging stage, while construction has commenced for the Khayelisha area - which will in turn produce 500 houses.

Crime

Madam Speaker, crime affects everyone, and our area within uMngeni Municipality is also affected by various crimes. These include general theft, especially copper wire, in the farming areas - which consequently affects various essential services. Residential burglary has slightly decreased and stabilised., while business burglary in the and Howick area has also slightly decreased. Also motor vehicle theft has stabilised. Murder rate has increased especially domestic cases in Howick area. Gang related crimes in Mpophomeni area continue to contribute to the murder statistics. Rape continues to fluctuate. We are pleased to report that the Family Child and Sexual Offence Unit (FCS) has been introduced. ATM fraud has tremendously decreased.

Drugs still continue to plaque our community, especially the youth. UMngeni Municipality, together with the South African Police Service (SAPS) and the Community Policing Forum (CPF) and other stakeholders, have put crime prevention strategies in place. These include awareness campaigns at schools on drugs abuse, domestic abuse, etc.

The Cluster Crime Combating Forum - it consists of police stations within the uMngeni jurisdiction - primarily monitors, implements strategies in combating crimes within this jurisdiction.

Economic Development

In our endeavour to fulfill our constitutional mandate of promoting economic development in the 2010/2011 Financial Year, we managed to fully package the first phase of the Nelson Mandela Capture Site Upgrade project. The project is positively progressing, and we are positive that we will meet our deadline to launch and commemorate the 50'h anniversary of the site in August 2012.

c uMNGENI IDP 2012/13 TO 2016/17

To promote regional economic growth and development and to drive the implementation of catalytic LED projects within the KwaZulu-Natal Midlands. The Industrial Development Corporation approved R1.12 million for the establishment of the Midlands Economic Development Agency. Considerable amount of preparatory work dealing with the formulation of an appropriate institutional mandate and policy framework for the shared municipal ownership of the agency has been achieved. Last year October saw the appointment of the board by formal resolution of the councils involved, i.e. uMngeni, uMtshezi and Mpofana.

Madam Speaker, in ensuring that tourism development is as inclusive as possible and that the previously disadvantaged individuals and communities are brought into the mainstream of tourism development. The construction of the Mpophomeni Tourism Gateway Complex in Mpophomeni Township is 97% complete and envisaged to be launched mid June 2012.

Madam Speaker, currently we are applying for additional funding of R2.8 million from the IDC - to be tabled at their April Funding Committee Meeting. The success of the application is conditional upon the completion of pre-establishment tasks, which include:

Initiation of a process to appoint a CEO by the Agency Board of Directors; Receipt and or Payment of all outstanding reciprocal contributions by each partner municipality, and The implementation of a Due Diligence Audit by the IDC (to assess current grant expenditure and performance in terms of agreed grant conditions)

Madam Speaker, we will continue to put more focus on economic development by continuing to implement projects such as the Upgrade of the Nelson Mandela Capture Site; and the Howick Falls Precinct Development through the Midlands Development Agency

Infrastructure Development

Although the financial climate has had an impact on service delivery within our municipality, we are looking forward to improvements.

In this regard we have achieved in the following areas in 2010/2011:

ENERGY

Delivered approximately 650 new electricity connections through the innovation of providing electricity in Eskom license area and have moved to electrify rural communities. Significant strengthening of existing electricity infrastructure in Howick. System design for the electricity consumer loss audit is well advanced and will result in the reduction in electricity losses. Those vandalizing municipal infrastructure and stealing electricity must be cautioned that stern action will be taken. Free Basic Electricity of 100 kwh per month for all consumers on pre-paid meters.

Madam Speaker, cognisance should be taken that for the period 1 July 2012 to 30 June 2013, Eskom will increase the municipal tariff rates for bulk electricity purchases by 16%. Municipalities are, however only allowed to increase the electricity selling price by 1 I%. Provision has been made for this 1 1 % increase in the electricity tariffs. This is however still subject to the approval of the National Energy Regulator of South Africa.

d uMNGENI IDP 2012/13 TO 2016/17

INFRA-STRUCTURE

The construction of the P390 from Mpophomeni to Msunduzi municipal boundary will have economic benefits to all. Constructed and commissioned roads and stormwater infrastructure in excess of 6.5km of new roads. The construction and improvements to the main street this calendar year will reduce traffic congestion from prospect road to the uMngeni River. Construction and improvements on the P142 from the N3 towards the railway underpass will improve traffic flow and safety in this area.

RATES & PROPERTY

The new general valuation roll came into effect on 1 July 2011 and the process of objections/appeals is still ongoing and the result is not yet known. The Rates Policy has been amended to make provision for the new categories of properties and categories of owners. Free Basic Refuse Removal Service for all properties with a value of R200 000 or less. Properties with a value of more than R200 000 will pay a refuse charge of R48.20 per month with effect from 1 July 2012. There will be rates exemption up to R100 000 of the valuation for residential properties in 2012/13. Further exemptions will be considered for the outer years when next year's budget is compiled. All residential properties will receive a 30% rebate and retirement villages like Amberglen, Amberfield and Golden Pond will receive an additional 20% rebate. Pensioners with a monthly income of up to R9 000 will still receive a further rebate of 30%. Agricultural Properties, Public Service Infrastructure Properties and Public Benefit Organisation Properties must be rated in terms of a 1:0.25 ratio from 1 July 2010 as per Government Gazette No 33016 dated 12 March 2010. This has been taken into account when the draft budget was compiled. Incentives to commercial & industrial consumers/ratepayers are still applicable.

Madam Speaker with all the incentives explained above it is necessary to increase the rate randage by 6% for the 2012/13 financial year. The proposed rate randage will be 1.29 cents in the Rand.

I must mention Madam Speaker, that after this meeting, the municipality will have a combined public participation process with the uMgungundlovu District Municipality to showcase the IDP and Budget and to share with our people different views on what I am about to table to this Council.

I THANK YOU

e uMNGENI IDP 2012/13 TO 2016/17

uMNGENI MUNICIPALITY: INTEGRATED DEVELOPMENT PLAN TO INFORM THE 2012/13 TO 2016/17 FINANCIAL YEARS: FINAL REPORT MAY 2012

1. BACKGROUND TO THE INTEGRATED DEVELOPMENT PLAN AND THE COMMUNITY BASED PLANNING APPROACH

1.1 WHAT IS AN INTEGRATED DEVELOPMENT PLAN (IDP)?

Integrated Development Planning is a process through which municipalities prepare a strategic development plan, for a five year period. The Integrated Development Plan (IDP) is a product of the process.

The IDP is the principle strategic planning document which guides all planning, budgeting, management and decision-making in a municipality.

Integrated Development Planning is therefore one of the key tools for local government to fulfill its new developmental role.

In terms of Chapter 5 of the Municipal Systems Act, 2000 all municipalities are required to prepare and adopt Integrated Development Plans. The first uMngeni IDP was adopted in 2002.

The IDP has a five year lifespan which is in accordance with the term of office of the Council. At the end of the five year period, the new council has the option of either adopting the IDP of its predecessor, to bring forward aspects that are still relevant or to develop a new plan altogether.

This IDP will be a third generation IDP as two 5 year cycles have been completed.

1.2 APPROACH TO THE THIRD GENERATION OF IDP’s

The Provincial Department of Co-operative Governance and Traditional Affairs held an “IDP Indaba” on 22 September 2011 to discuss the 3rd generation IDP’s. The draft Provincial Growth and Development Strategy 2011 (PGDS) has also been circulated and discussed. The main aspects highlighted from these discussions in relation to the IDP are:

1 uMNGENI IDP 2012/13 TO 2016/17

The IDP is to be drafted for a 5 year period;

There will be 4 subsequent revisions thereafter;

There is a need to simplify and repackage the IDP’s;

In its Strategic approach, the IDP to be drafted to take into account the Strategic Goals set out in the PGDS, the KZN Provincial Priorities and the United Nations Millennium Development Goals.

The IDP is to take a Community Based Planning approach.

To fully align with National Key Performance Areas, IDP information is analysed under the following headings:

Municipal Transformation and Institutional Development

Basic Service Delivery and Infrastructure Investment

Local Economic Development

Good Governance and Public Participation

Financial Viability and Financial Management

Community and Social Development Services

1.3 WHAT IS COMMUNITY BASED PLANNING (CBP)?

According to the IDP examples provided, community-based planning (CBP) has been advocated at provincial level as a methodology for use in preparation of the Integrated Development Plan. It is a specific form of planning focusing at ward level which has been designed to promote community action and make the Integrated Development Plan (IDP) of a municipal area more people-centered.

The CBP has been developed and tested in South Africa, Uganda, Zimbabwe and Ghana for use by municipalities and communities in South Africa.

2 uMNGENI IDP 2012/13 TO 2016/17

Community-based planning has been developed in order to enhance public participation in the IDP, and at the same time address the wishes of people and government for a deepened democracy.

The 4 objectives for CBP as sited in the IDP examples are:

To improve the quality of the IDP;

To improve the quality of services;

To improve the community’s control over development;

To increase community action and reduce dependency.

The following Principles are given for CBP:

To ensure that all groups in the community, including the disadvantaged can participate in the planning process;

Planning must be of the ward, and supported by the ward committee;

Planning should not be once off, but should be part of a longer process, with implementation, monitoring and annual evaluations and reviews;

The plan must focus on the people in the ward, so the plan is based around the livelihood of different groups;

The planning process must build the capacity within the community to understand their situation, plan how to improve it, and then implement this. In the process the community produces their own plan with support from ward and municipal facilitators;

To build on strengths and opportunities in the area and not problems, which makes us more likely to succeed and not to be paralysed by the problems;

Planning should cover all aspects of people’s lives;

Planning should promote mutual accountability between the community and officials;

There must be commitment by Councillors and officials to both plan and implement the plan.

3

uMNGENI IDP 2012/13 TO 2016/17

It will be necessary, as far as timing and funding permits to hold Ward level meetings. The Status Quo analysis will need to cover existing information at Ward level, and key priorities and projects will need to be listed at Ward level.

1.4 HOW THE PLAN WAS PREPARED

The Action Plan as extracted from the Process Plan is presented below:

TASKS/MILESTONES MILESTONE DUE DATE

1. Draft Process Plan submitted to Technical Committee 1st TC Meeting: (TC) and Council for consideration and adoption. July 2011 Advertising of Process Plan and notification of first Forum Council Meeting: Meeting. 27 July 2011 Advertised: V.T. 3 August 2011 2. Second Technical Committee (TC), and first Forum 2nd TC Meeting: meeting to discuss the IDP review process, identify 23 August 2011 information gaps for preparation of a Background 1st Forum Meeting &Status Quo Report. 26 August 2011

3. Address as far as possible, information gaps. Preparation of a Background & Status Quo report for Council’s January 2012 strategic workshops. Prepare Project’s List to be confirmed and/or revised by the TC and linked to the budget. Identify KPI’s and Targets to link to PMS. 4. Technical Committee Meeting & Council IDP Strategic 3rd TC Meeting: Workshops. 6 February 2012 Preparation of 1st Draft IDP Report and identification of Council Strategic Workshops information gaps. 13 & 23 February 2012 5. District Alignment Workshop & 2nd Draft IDP Review District Alignment Workshop Report with projects as well as relevant Project Proposals 8-9 March 2012 and Financial Plan linked to the budget. 6. Present Draft IDP Report to Exco and Council. Council for Exco/Council Meeting: notification of Public Scrutiny. Submission of 2nd Draft IDP 30 March 2012 Report for Provincial Review.

4

uMNGENI IDP 2012/13 TO 2016/17

7. Consultation including Joint Coordinating Committee uMngeni Joint Coordinating which includes Traditional Leaders, Ward Committees, Committee Public Participation Meeting being a joint public 12 April 2012 participation meeting with the District. Closing date for Ward Committee Meeting written comments 30 April 2012. Strategic Planning 14 April 2012 Workshop. Public Participation Meeting* 22 April 2012 Strategic Planning Workshop 7-8 May 2012 *Advertised V.T. 18 April 2012 8. Amend Report to reflect additional information received May 2012 through consultation 9. Final Adoption IDP by Council and submission to the MEC Adoption Date & Forum to be notified of adoption 6 June 2012

2. STATUS QUO ANALYSIS

2.1 LOCALITY

uMngeni Municipality is located within the uMgungundlovu District which is regarded as the heart of the KwaZulu Natal Midlands. Map 1 shows the location of the District within the KwaZulu-Natal Province. Map 2 shows the 7 Local Municipalities that fall within the District.

uMngeni is situated centrally within the uMgungundlovu District, and shares a boundary with the Local Municipality to the south west, to the north and north west is the Mpofana Local Municipality which is closely tied to the uMngeni Municipality in terms of potential tourism (Midlands Meander), and to the south east The Msunduzi Local Municipality which is the capital of the province and economic hub of the District. To the east of uMngeni is the uMshwathi Local Municipality. To the west are the former District Management Areas of the Drakensberg that fall under the Transfrontier Development Initiative related to the World Heritage Site.

The extent of the uMngeni Municipality is 1564 km². It lies about 20 km north of and is strategically located on the N3 National Route. The N3, being of national and regional importance provides a direct linkage to the primary economic nodes of Durban and Gauteng allowing for ease of trade, industrial and transportation activity (Urban Econ 2011).

5 uMNGENI IDP 2012/13 TO 2016/17

6 uMNGENI IDP 2012/13 TO 2016/17

2.2 URBAN/RURAL AND MAIN WARD CHARACTERISTICS

The urban areas of Howick, Merrivale, Mphophomeni, Hilton and Worlds View together with intervening areas including Cedara and Midmar Dam are considered as the Primary Urban Node of uMngeni. Secondary Urban Nodes are and Nottingham Road. The extent of the urban nodes is 236km2 representing 15% of the municipality (uMngeni SDF 2011).

There are settlement areas run in a Traditional Authority manner directly to the south west of Mphophomeni (KwaNxamala/Inadi). These have been incorporated into the Primary Node. 7 uMNGENI IDP 2012/13 TO 2016/17

The remaining 85% of the municipality is rural farmland with a strong tourism industry based on the Midlands Meander.

There are 12 Wards within the municipality. Wards 1, 2, 7, 8, 10, 11 and 12 cover the majority of Howick, Merrivale, Mpophomeni, Hilton and Worlds View and are substantially urban in nature. The remaining Wards include some urban components but are mainly rural. The characteristic of each Ward is discussed in more detail under Section 2.10

2.3 POPULATION STATISTICS

Population estimates for uMngeni for 2005 to 2010 is set out in Table 1 below. These are based on information sourced by Urban Econ from Quantec 2010. The National, Provincial and District figures are provided by way of comparison.

South Africa Kwazulu-Natal uMgungundlovu uMngeni

2005 47289967 10100577 978226 81397 2006 47827370 10219357 988725 83059

8

uMNGENI IDP 2012/13 TO 2016/17

2007 48363339 10332642 998775 84761 2008 48911245 10442747 1008681 86404 2009 49463775 10548996 1018894 87458 2010 49991472 10645508 1028563 88243 Ave Annual 1.12 1.06 1.01 1.63 % Growth Table 1 – Population figures from 2005 – 2010 (Source: Quantec and Urban Econ)

It can be seen that uMngeni has experienced a higher growth rate over the past 5 years than that of the National, Provincial or District. With reference to Table 2 below, the uMngeni growth rate has slowed to 0.9% between 2009 and 2010.

uMngeni Local Population Compound Average population Year Municipality Growth rate growth rate (2005– 2010) 2005 81397 2006 83059 2.0% 2007 84761 2.0% 2008 86404 1.9% 2009 87458 1.2% 2010 88243 0.9% 1.63% Table 2 – Table showing population growth rates (Source: Urban-Econ and Quantec)

The estimated population of uMngeni in 2010 was 88 243 people. The number of households in 2010 was 22305 giving an average household size of 4 persons.

Based on the 1.63% growth rate per annum, population projections for the Municipality up to 2021 are illustrated in Table 3 below. By 2016 the population is anticipated to increase by some 8979 persons (2 245 households), to 97222 persons (24 305 Households).

Population uMngeni LM 2005 2010 compound growth rate 2016 2021 81 397 88 243 1.63% 97 222 105 398 Table 3 – Population Projection (source: Quantec and Urban-Econ

The graph below depicts the population size according to age and gender in 2010. The majority of the population fall within the age group 15 years – 65 years also defined as the working age population, and the least in the above 65 yeas age group. Within the working age population age group there are slightly more females than males, and in the age group defined 0-14 years there are more males than females. Urban-Econ indicates that a possible reason for more females in the working age population in uMngeni Municipality is the out migration of men to larger urban areas in search of employment opportunities.

9 uMNGENI IDP 2012/13 TO 2016/17

Figure 1- Gender according to age Group (Source: Urban-Econ and Quantec)

The 2010 percentage breakdown between the 3 age groups is 0-14years:26%, 15 -64years: 67%, >65years: 7%. Urban Econ also looked at the population size according to age and gender for 2006, and the percentage breakdown between age groups was similar to that of 2010, as were the Stats SA 2007 Community Survey and the 2001 and 1996 Census Data. The age group structure has remained stable in uMngeni.

The overall male to female ratio for 2010 was 50% each (44017 males and 44226 females).

2.4 SOCIO-ECONOMIC TRENDS

The Provincial IDP Guidelines indicate that the following Socio-Economic trends need to be examined:

Occupation group analysis % of professionals: The percentage of highly skilled and skilled persons increased marginally between 2006 and 2010, but this was only in the tertiary sector (2%) with tourism being the likely prime area of growth. Age Groups: Distribution across age groups has remained stable in comparison to 2001 in the Municipality Unemployment rate: The overall unemployment rate (ratio of employed to unemployed) in uMngeni decreased from 19% in 2005 to 17% in 2009. The employment growth was, however, only in the informal sector and there was a decline in the number of actual persons employed. Poverty: The economic profile report does not contain recent statistics regarding the levels of poverty in uMngeni. The outcome of the 2011 Census will hopefully address this. The levels of poverty are said to have decreased in uMngeni by 14% between 1996 and 2004. In 2001, 43% of the households were living on less than R800 per month. Apart from Msunduzi and uMngeni, poverty has increased in all Municipalities in the District. Employability: The economic report indicates there is a shortage of skilled and highly skilled labour in the economic sectors. Labour absorption: The potential in the formal sector for labour absorption is poor.

10 uMNGENI IDP 2012/13 TO 2016/17

Wages and Sectors: The Sector that employs mainly semi-skilled and unskilled labour is the Primary Sector which is dominated by Agriculture. Employment levels are, however, low compared to other sectors. The Tertiary Sector has the highest level of employment (67%) dominated by Wholesale and retail, catering and accommodation where wage levels are higher.

The graph below presents the Gross Value Added (GVA) output at constant 2005 prices per economic sector1 over a five year period (2006-2010). The graph shows that the tertiary economic sector has been performing the best of the three sectors and has grown from R1 937million in 2006 to R2 266million in 2010 at an annual growth rate of 4 %, and the primary sector performing the worst and has declined from R 489 million in 2006 to R 484 million in 2010 at an average annual growth rate of -0.2 %. The secondary sector has seen an increase from 2006 at R 765 million to 2008 at R 843 million, and a decrease from in 2009 to R 777 million, thereafter an increase to R 812 million in 2010 and has grown in production value at an average annual growth rate of 1.5 %. The GVA and growth rates are summarized in Table 4, and broken down further into the Economic Industries.

Figure 2- Gross Value added per economic sector at basic prices for 2006 - 2010 (Source: Urban-Econ and Quantec)

Gross Value Added (Rmill) at 2005 Prices Average Annual Growth Rate (2006 Economic Industry 2006 2007 2008 2009 2010 – 2010)

1 Primary sector is made up of Agriculture, Fishing and Forestry and Mining and Quarrying, the Secondary Sector is made up of manufacturing and Construction, electricity, gas and water and the tertiary sector is made up of Wholesale and retail trade, catering and accommodation, Transport, storage and communication Finance, insurance, real estate and business services, Community, social and personal services, General government. 11 uMNGENI IDP 2012/13 TO 2016/17

Primary Sector 489 491 534 482 484 -0.2% Agriculture, forestry and fishing 477 479 522 468 471 -0.4% Mining and quarrying 12 12 11 14 13 3.1% Secondary Sector 765 814 843 777 812 1.5% Manufacturing 622 659 677 609 641 1.1% Electricity, gas and water 59 54 48 41 41 -11.4% Construction 84 102 118 128 129 15.5% Tertiary Sector 1937 2078 2183 2219 2266 4% Wholesale and retail trade, catering and accommodation 436 473 489 493 504 4.9% Transport, storage and communication 281 304 317 320 327 5.2% Finance, insurance, real estate and business services 569 612 651 654 665 5.4% Community, social and personal services 271 288 302 304 307 4.4% General government 380 400 425 449 462 6.7% Table 4 – GVA and Average Annual Growth Rate from 2006 – 2010 per industry (Source: Urban-Econ and Quantec)

Although agriculture in terms of magnitude is an important economic sector relative to all other sectors (and will probably remain so), its contribution to the local economy is declining. Growth sectors are wholesale and retail trade, catering and accommodation (which includes tourism); manufacturing, which has remained constant; finance, insurance, real estate and business services as well as community, social and business services, both of which are reflected in the office development that has occurred during the past few years and construction, which has grown rapidly. The latter is due to the magnitude of recent housing developments, the positive effects of which are probably still being absorbed into the local economy.

The graph below shows the employment for uMngeni per industry per economic sector over the five year period from 2005 - 2010. Employment in agriculture has decreased the most at an average annual growth rate of -21.3% from 9135 in 2005 to 3496 in 2010. The employment in the manufacturing industry has decreased from 3543 in 2005 to 3179 in 2010 at an average annual growth rate of -2.7 %. The wholesale and retail, catering and accommodation industry accounts for the most employment in 2010, increasing from 5664 people in 2005 to 5913 people in 2010. This is followed by community, social and personal services and general government having increased from 2781 people in 2005 to 3498 people in 2010. The construction industry has increased at an average annual growth rate of 4.6 % at 2117 people in 2005 to 2536 people in 2010 which corresponds with the GVA produced for that sector which has increased substantially at an average annual growth rate of 15.5 %.

12 uMNGENI IDP 2012/13 TO 2016/17

Figure 3 – Industry specific formal and informal employment in uMngeni Local Municipality (Source: Urban-Econ and Quantec)

Table 5 below indicates the employment profile for the Age Group 15 to 64 years in uMngeni for 2005 and 2009:

LABOUR FORCE 2005 2009 Employed 32021 60% 29606 50% Unemployed 7724 14% 6022 11%

Not Economically Active 13826 26% 22803 39% Total Population of Working 53571 100% 58431 100% Age Unemployment Rate 19% 17% Table 5 – Employment and unemployment for 2005 and 2009 (Source: Urban-Econ and Quantec)

The issues here are the overall decline in employment, some of which has probably been absorbed in the informal sector or which have alternatively become not economically active (this category includes unemployed people who have stopped looking for work), and the alarming decline in employment in the agricultural sector, which is of a much greater magnitude than its decline in output.

The implications of all of the above are that:

Although productive agricultural land should continue to be protected, compatible but secondary activities should be supported in agricultural areas to provide farmers with additional sources of income. 13 uMNGENI IDP 2012/13 TO 2016/17

Office decentralization from Msunduzi seems to be increasing.

uMngeni is becoming a sought-after residential area.

Basic infrastructure should be provided in strategic locations (i.e. at the priority N3 interchanges and along the Merrivale/Boston corridor) to stimulate appropriate mixed use development with an emphasis on manufacturing.

2.5 TRANSPORT INFRASTRUCTURE

uMngeni Municipality is located on the N3 National Route which has been identified in the Provincial Spatial Economic Development Strategy (PSEDS) as one of the primary corridors in the Province. It provides access to major markets.

uMngeni is well served by Provincial Roads. A problem area is the volume of heavy traffic on the which undermines the rural character of the Midlands Meander which needs to be protected as a major tourism route.

The upgrade of tourism routes identified at District Level is an important area of focus impacting on uMngeni.

2.6 AGRICULTURE POTENTIAL

Agriculture plays a significant role in the economy of uMngeni as a generator of income, as well as an employment provider.

According to the Provincial Department of Agriculture, only 4% of the agricultural land in the country can be classified as having high production potential. The District SDF report highlights that there is increasing pressure on good quality agricultural land, and given the national importance of food security, the correct management of this increasingly scarce resource becomes a key issue in spatial planning, both at a district and a local level.

The uMngeni Spatial Development Framework has identified areas for Agricultural Development Only. A plan of agricultural potential forms an integral part of the SDF and is used to assess development applications.

In terms of land use management the following equally important but seemingly conflicting objectives will need to be balanced:

The protection of high potential agricultural land;

The release of land for future urban expansion;

The facilitation of tourism development;

The conservation of areas of conservation and water production significance.

2.7 ENVIRONMENTAL CONSIDERATIONS

In terms of the C-Plan and MINSET assessments undertaken by KZN Wildlife, uMngeni contains extensive areas of conservation significance.

14 uMNGENI IDP 2012/13 TO 2016/17

These assessments are at a very broad level, and a more detailed assessment has been undertaken at a local level taking current land use and slope into account. This has been updated in 2011 and takes into account the latest KZN Wildlife information and current land use. The plan of environmental priority forms an integral part of the uMngeni SDF and is used to assess development applications.

A 2011 study covering the sensitivity of landscapes to tourism confirms the suitability of the Midlands Meander area for tourism. Limited areas to the west in close proximity to the Drakensberg are highlighted due to the high sensitivity of the landscape. A worrying aspect is that these areas are in private ownership. Also highlighted is the sensitivity of the Karkloof Nature Reserve. The study has identified further areas to the north of Howick as having high capacity for tourism. The high agricultural potential of these areas has not, however, been taken into account.

Recently there has been private Nature Reserves gazetted, for example, on portion of the Hilton College estate. A further Private Nature reserve has been proposed at Michael House. Within the Howick Urban area, there are areas set aside for Conservation purposes that include Howick Falls, portions of the Umngeni River Valley and Beacon Hill Ingongoni Mistbelt Reserve.

The 2011 COP17 Conference held in Durban at the end of 2011 has highlighted the need for focus on green issues and to strive for sustainable development practices.

2.8 WATER RESOURCES

Rivers occurring within uMngeni Municipality include the major river for the Durban- Pietermaritzburg region via the Mgeni River as well as the Lions, Mpofana, Karkloof, Dargle, Gudu, uMthinzima, KwaGqishi, Nguku, Kusane, Gwens Spruit and Elands with the forming a portion of boundary between the uMngeni and Mpofana Municipalities. The headwaters of the Mgeni River straddle the boundary between the uMngeni and Impendle Municipalities. The major storage dam for the regional economy viz. Midmar Dam is located in uMngeni Municipality as well as a portion of the Dam, which also plays an important role in the assurance of bulk water supply for the region. Midmar Dam is a critical storage dam with good water quality that needs to be retained to avoid a drastic increase in water treatment costs. Therefore the majority of uMngeni Municipality occurs within the strategic quaternary catchment for water supply for the Durban-Pietermaritzburg economy. The Spring Grove Dam, on the Mooi River which is required to augment the existing water supply for the region, is under construction and fallS in both the uMngeni and Mpofana Municipalities.

2.9 TOURISM

One of the main elements of the District Tourism Strategy is that the district as a whole should be promoted and marketed as a destination, expanding the eco-tourism and cultural heritage themes that have proven so successful in the Midlands Meander across the whole District. It further recommends that stronger linkages be established with the Drakensberg.

15 uMNGENI IDP 2012/13 TO 2016/17

The Midlands Meander is primarily based in uMngeni. Other primary attractions include:

Howick Falls Midmar Dam The Karkloof The Zulu Mpophomeni Tourism Experience The Nelson Mandela Capture Site Worlds View Albert Falls Dam

A Tourism Plan has been prepared for the municipality. Flowing from this project master plans have been formulated for the Howick Falls area, Midmar Dam, Karkloof Falls and Worlds View.

16

uMNGENI IDP 2012/13 TO 2016/17

2.10 WHAT IS CURRENTLY IN EACH WARD

Below in Table 6 is a summary of what is in each Ward based on uMngeni GIS Facilities Mapping.

WARD MAPPING Ward Description Facilities Ward 1  Crèche X1 Portion of Howick West formal residential,  Howick West Secondary School Siphomelele formal residential, Shiyabazali  Howick West Community Hall Informal Settlement, Howick East Industrial,  Howick West Clinic Shopping Centre, local shops, Portion  Umgeni Hospital for the mentally Umgeni River Conservation Reserve challenged  Howick West Library  Howick Sewerage Works  Valley of Rest Cemetery  Howick West Combi-Court  Multi-purpose Sports Facility  Sarmcol Football Field  Howick Golf Course  Mgeni River Conservation Area  Anglo Boer War Monument Ward 2  Crèche X4 Central Howick formal residential, main  Mount Carmel Christian School portions of Howick CBD  Howick Preparatory School  Miller Street Cemetery  Magistrates Office  Howick Fire Station  S A Red Cross HIV/AIDS Clinic  Howick Clinic  KwaMevana Pension Payout Point  Howick Police Station  Howick Sports Field  Howick Public Swimming Pool  Methodist Church (National Monument) Ward 3  Nottingham Road Combined School Nottingham Road Village and surrounding (Actually situated in adjacent rural farmlands, substantial rural areas to Mpofana Municipality) the west and south of Nottingham Road  Dargle Primary School Village  Umkonka Primary Farm School  Wamacor Primary School  Sarden Primary School  Silindele Primary School  Invermooi Primary  Michaelhouse High School  Isiphethu Semfundo Primary  Asithuthuke Combined School  Clifton Preparatory Primary School

17

uMNGENI IDP 2012/13 TO 2016/17

 Nottingham Road Primary School  Kings Primary School  Esiphethwini Sendiza Combined  Midlands Community College  Nottingham Road Hall  Nottingham Road Library  Balgowan Clinic  Nottingham Road Pension Payout Point  Nottingham Road Police Station  Airfield near Michael House  Fort Nottingham Bush reserve  Fort Nottingham Museum  St John Gowrie Presbyterian Church Nottingham Road (National Monument)  Gowrie Golf Course Ward 4  Crèche X3 Lidgetton Village and surrounding rural  Indezi Primary School farmlands. Includes substantial rural areas to  Crystal Spring Primary the north across the N3 to cover portions of  Primary School the Karkloof  Allerton Farm Primary School  Khazimula Primary School  Jabula Combined School  Curry’s Post Primary  Lidgetton Community Hall  Lidgetton Water Works Ward 5  Crèche X4 Howick North and Greenedale formal  Howick High School residential areas, northern and eastern  Triandra Farm Primary School edges of Howick CBD, Howick Falls Tourist  Yarrow Primary School site, extensive rural areas to the north  Howick Private Hospital extending to the Karkloof Reserve  Howick Library  Eridene Road Reservoir  Beacon Hill Ingongoni Mistbelt Reserve  Karkloof Reserve  Main Tourist Site Howick Falls  Howick Museum  St Lukes Church National Monument  Old agricultural Hall National Monument  Fairfell Farm National Monument Ward 6  Crèche X 3 Hilton Central Commercial Area, northern  St Annes Diocesan School portions of Hilton formal residential areas,  Hilton College High School Hilton Gardens residential area, Hilton  Laddsworth Primary School College Road extending northwards to  Grace College High School include substantial rural farmlands including  Sibongumbomvu Combined School Karkloof Falls, Karkloof Valley reserve and  Hilton Intermediate Albert Falls Dam to the east. School/Umgenvane Secondary

18

uMNGENI IDP 2012/13 TO 2016/17

School  Dunimarie Primary School  Hawkstone Primary School  Hilton Hall  Hilton Library  Hilton Garden of Remembrance  Umgeni Water Reservoir  Karkloof Valley Reserve  Karkloof Falls  Albert Falls Dam Ward 7  Crèche X 4 Southern Hilton, Worlds View,  Cedara Primary School Winterskloof/Sweetwaters formal residential  Cowan House Primary School areas, Cedara Agricultural College and  Cedara College Khanya Village, Merrivale Heights formal  Khanya Village Hall residential area and Birnamwood  Singisi Community Hall Smallholdings, Khayelisha Housing Project  Cedara Pension Payout Point  Hilton Police Station  Howick West Reservoir  Mpophomeni Reservoir  Winterskloof Reservoir  Howick Airfield  Sakabula Golf Course  Hilton Tennis and squash clubs  Doreen Clark Nature Reserve  Cedara College Old Hostel Building Monument Ward 8  Crèche X4 Eastern portions of Mpophomeni formal  Mpophomeni Islamic School residential areas, land around Mpophomeni  Nhlanhleni Higher Primary with some traditional settlement  Isibongo Lower Primary  Nxamalala Tribal Authority Office  Mpophomeni Cemetery  Mpophomeni Sewerage Works  KwaHaza Soccer Field  Table Top Soccer Field  Mpophomeni Stadium Ward 9  Haza Primary School Limited western portion Mpophomeni  Ashley Farm Primary School formal residential, Lions River Housing and  Umthombo Senior Secondary School Industrial uses around the Lions  Corry Lynn Primary School River/Tweedie Interchange, Traditional  Ilanda Primary School Settlement area to south of Mpophomeni,  Lions River Cemetery Midmar Dam, smallholdings and some larger  KwaNxamalala Community Hall farms  Lions River Pension Payout Point  Lions River Stadium  Mandela Capture Site Monument  Owthorne House Monument  Tweedie Hall Monument  SAPPI Research Centre Monument

19

uMNGENI IDP 2012/13 TO 2016/17

Ward 10  Crèche X3 Eastern central Mpophomeni formal housing  Mpophomeni High School and limited commercial  Mpophomeni Clinic  Mpophomeni Pension Payout Point  Mpophomeni Community Hall  Mpophomeni Library  Soccer and Netball field  Mpophomeni Theatre Ward 11  Sifiso Oesihle Lower Primary School Western central Mpophomeni formal  Quamukile Lower Primary School housing  Zamuthule Higher Primary  Asibemunye High School  Mpophomeni Police Station Ward 12  Crèche X5 Merrivale formal residential and adjacent  Howick South Community Hall smallholdings, Limited Industrial and  Cosmo Primary School Commercial areas adjacent to the Freeway in  Howick West Primary School Merrivale, portion Howick West and Howick  Nogqaza Primary School South formal residential, Tumbleweed  Injonoba High School Housing, northeastern corner of Midmar  KwaMevana Soccer Field and Combi Dam and surrounds, Riverview residential Court estate and surrounding smallholdings,  Midmar Water Works southern formal residential area of central  Prospect Road Cemetery Howick, KwaMevana formal residential area. Table 6 – Description of Wards and listing of Facilities (Source: uMngeni GIS Department 2011)

Population information by Ward has been estimated by uMngeni GIS based on the number of properties per Ward, as applied to the Quantec 2010 population figures and is presented in Table 7 below. Population densities are highest in Wards 10 and 11 covering Mpophomeni, followed by Howick Wards 2 and 12. Low rural densities occur in Ward 3.

WARD POPULA AREA POPULATION LOCATION TION (KM2) DENSITY (PERSONS PER KM2) Ward 1 5 312 14 379 Howick/Howick West Ward 2 2 425 1.5 1616 Howick Central Ward 3 5 665 648 9 Rural/Nottingham Rd Ward 4 5 839 288 20 Rural/Lidgetton Ward 5 6 539 198 33 Rural/Howick North Ward 6 7 792 181 43 Rural/Hilton Ward 7 9 755 75 130 Greater Hilton/Merrivale Heights Ward 8 13 591 16 849 Mpophomeni & surrounds Ward 9 4 920 135 36 Rural/Mpophomeni surrounds Ward 10 5 580 0.7 7971 Mpophomeni Ward 11 7 891 2 3945 Mpophomeni Ward 12 12 935 9 1437 Howick/Howick West/Merrivale

20

uMNGENI IDP 2012/13 TO 2016/17

TOTAL 88 243 1568.2 56 Table 7 – Population Estimate by Ward 2010, Ward Extent and Population Density by Ward (Source: uMngeni GIS using Quantec 2010 Population as provided by Urban Econ)

2.11 SERVICES BACKLOG

The number of households indicating they were without access to piped water in 2001 was 1573 (8 %), and the 2007 figure was 1163 (5%); those without access to electricity in 2001 stood at 5274 (26 %) and the 2007 figure was 6130 (28%); those without access to at least a VIP (ventilated improved pit latrine) in 2001 was 4296 (21%) and the 2007 figure stood at 3317 (15%); and those without access to municipal waste removal in 2001 was 8871 (43%), the 2007 figure stood at 7992 (37%).

National Targets are to reach a 100% access to potable water, sanitation to at least VIP level, access to legal electricity, and weekly refuse removal in terms of Vision 2014.

Water is supplied by the uMgungundlovu District Municipality. The 2010 District Water Plan provides the information on Communities without or largely without a water supply, and those with an inadequate water supply which requires expansion or upgrade. These have been sorted according to Wards and are set out in Table 8below.

Communities without or largely without a water supply WARD AREA NO. OF HOUSEHOLDS Ward 1 Shiyabazali 191 Ward 5 Triandra 37 Ward 8 Mashingeni 147 Ward 8 Enguga 80 Ward 8/9 Kwa Chief 333 Ward 12 Thokoza 53 Total 841 Communities with a inadequate water supply which requires expansion or upgrade Ward 4 Lutchmans Farm 83 Ward 9 Kwa-Haza 644 Total 727 Over All Total 1 568 Table 8 – Key Communities in terms of Water Supply Backlog (Source: uMgungundlovu Water Services Plan 2010)

The primary areas identified in the District Municipality’s 2010 Water Services Plan which require reticulation are Hhaza, KwaChief in Ward 9, and Mashingeni in Ward 8. Budget had been set to cover these in 2011/2012 at a cost of R 40 Million.

Further Water Projects are upgrades in nature and are summarized in Table 9 below: PROJECT BUDGET Howick, Greendales, Merrivale, Hilton, Mpophomeni (upgrade & R 12,5 Million new works) Howick Central, West, Shiyabazali, Thokoza, Thandabisi, Eagle R205,3 Million Ridge, Merrivale Heights, Hilton, Mpophomeni, Zuzokhule (water refurbishment) Fort Nottingham, Senzani, Lidgetton, Lutchmans Farm Triandra, R 6,0 Million

21

uMNGENI IDP 2012/13 TO 2016/17

Kwahaza (water refurbishment) Howick, Shiyabazalli, Thokaza, Mpophomeni, Zuzubuhle (water R 68,5 Million upgrade & Refurbishment) Table 9 – Future Water projects needed in uMngeni (Source uMgungundlovu Water Services Plan 2010)

Sanitation is covered by the District. The 2010 District Water Plan provides the information on Communities without or largely without sanitation, and those with an inadequate water supply which requires expansion or upgrade. These have been sorted according to Wards and are set out in Table 10 below.

Communities without or largely without sanitation WARD AREA NO. OF HOUSEHOLDS Ward 1 Shiyabazali 191 Ward 4 Lutchmans Farm 83 Ward 5 Triandra 37 Ward 8 Mashingeni 147 Ward 8 Enguga 80 Ward 8/9 Kwa Chief 333 Ward 9 Kwa Haza 644 Total 1 515 Communities with an inadequate sanitation which requires expansion or upgrade Ward 3 Senzani 90 Ward 4 Lidgetton 626 Ward 7 Shayamsimbi 109 Ward 9 Lions River 204 Total 1 029 Over All Total 2 544 Table 10 – Key Communities in terms of Sanitation Backlog (Source: uMgungundlovu Water Services Plan 2010)

MIG funding for Hhaza Ward 9 Sanitation Project was to roll out over a 5 year period for basic sanitation with a total budget of R21 Million, however, the District is considering waterborne sewage disposal. The re-establishment of the Mpophomeni Waste Water Works was seen as a priority project in terms of the Districts Turnaround Strategy.

Electricity is provided by uMngeni Municipality in the Howick area, Msunduzi in the Hilton area and the rest of the area is served directly by Eskom. The Msunduzi has budgeted for increased electricity provision in Hilton which is scheduled for completion in November 2012.

Waste Removal is the responsibility of the uMngeni Municipality and is restricted to urban areas.

Housing is funded by the Provincial Department of Human Settlements but housing projects are coordinated by uMngeni Municipality. The projects presently underway are summarized in Table 11 below:

WARD PROJECT 2011/2012 2012/2013 2013/2014 Ward 3 Gowrie 3 114 680 - - Ward 3 Hillside 1 946 020 3 570 600 2 785 300

22

uMNGENI IDP 2012/13 TO 2016/17

Ward 4 Lutchmans Farm 3 017 040 293 040 3 352 400 Ward 6 St Joseph - 1 971 900 2 785 300 Ward 7 Cedara 3 887 600 8 892 700 6 684 472 Ward 7 Khayelisha 6 349 840 8 449 620 10 422 856 Ward 9 KwaNxmalala 6 986 832 7 282 400 6 684 472 Ward 9 Lions River Phase 2 - 670 328 4 079 760 Table 11 – Housing Projects Presently Underway (Source: uMngeni IDP 2011)

Local Roads are primarily the responsibility of uMngeni, while the Provincial Department of Transport is responsible for Provincial Roads and SANRAL for the N3 National Road. The uMngeni Capital Budget consists mainly of Roads and Stormwater projects with an annual budget of R17 Million Rand. This relates to upgrading of roads. A maintenance budget forms part of the Operational Budget.

2.12 FINANCIAL VIABILITY OF THE MUNICIPALITY

The uMngeni Municipality has recently experienced negative media coverage regarding its finances. Ina Cronje, the MEC for Finance, stated the following in an article published in the Witness on Monday 24 October 2011:

“There is a fundamental difference between a municipality’s financial viability and its state of finances. A municipality is considered to be financially viable when it has the means and management capacity to deliver on its constitutional mandate.

uMngeni Municipality has an operating budget revenue base in excess of R200 million per annum of which only 17% is derived from grants. What this means is that over 80% of its revenue is generated from ratesand service charges which provide a sustainable revenue base to enable the municipality to continue to deliver services. The municipality is therefore financially viable.

The current state of finances, however, reveals that the municipality is incurring operating deficits. The reasons behind this are twofold:

The operating expenditure is excessive and needs to be trimmed to be lower than its revenue streams.

The tariffs associated with the distribution of electricity do not reflect the cost associated with provision of the service and need to be reviewed.

These factors were identified by the Provincial Treasury in the course of its support to the municipality, and steps were put in place and recommendations made to the municipality to address the problem in a sustainable manner over the medium term.

There is no denying that uMngeni Municipality’s finances are in a poor state particularly around cash flow and cash management. Consequent to Treasury’s limited support programme, the municipality has shown some improvement in reducing its net available cash position from an overdrawn R25 million at the start of the 2010/11 financial year to an overdrawn R20 million at the end of the financial year. The pace of this improvement is,

23 uMNGENI IDP 2012/13 TO 2016/17

however, slow. This may be due to municipal officials not enforcing the rigorous conditions of financial management recommended by Treasury. The turning around of the finances of a municipality on a ten cent coin is not feasible. It takes time, discipline and effort on the part of the stakeholders to address the problems in a sustainable manner.

Treasury believes that the current administration at the municipality must take ownership of the problems and have the commitment to address them immediately with discipline. Under the Municipal Support Programme, Treasury will continue to support the municipality in improving its financial standing as we have done for some time.

I am convinced that the uMngeni Municipality has the potential to be one of the leading municipalities in the province, provided that it manages its finances with care and diligence.”

The municipality is committed to continue with its turnaround strategy over the next 5 years.

24

uMNGENI IDP 2012/13 TO 2016/17

3. ADVANTAGES

3.1 SWOT ANALYSIS

BACKGROUND

This SWOT analysis has been derived by Council in terms of a Strategic Planning Workshop held on 23 February 2012. For ease of reference, the issues raised have been grouped under the 6 KPA’s of the Five Year Local Government Strategic Agenda namely:

Municipal Transformation and Institutional Development

Basic Service Delivery and Infrastructure Investment

Local Economic Development

Good Governance and Community Participation

Financial Viability and Financial Management

Community and Social Development Services.

In order to understand the SWOT analysis, it is relevant to discuss the concepts of the external and internal environments of the municipality. The external environment refers to features and processes which occur outside the municipality, while the internal environment refers to the characteristics and the processes which occur within the municipal boundaries. In the analysis Strengths, Weaknesses, Opportunities and Threats should be seen from the perspectives of both the external and internal environments. Strengths and Weaknesses refer to the current situation, while Opportunities and Threats should be seen as both the present and the future situation as it may apply to the municipality.

Definitions

Strength: A strength is a feature of the municipality or its location which gives a competitive advantage. It is a feature which should not be lost or

25

uMNGENI IDP 2012/13 TO 2016/17

degraded

Weakness: A weakness in this context is a characteristic of the municipality or a process which could prohibit or hinder the attainment of a desirable

future situation.

Opportunity: An opportunity is a situation or set of circumstances which, if dealt with appropriately, could assist significantly in moving the municipality towards achieving desirable improvements.

Threat: A threat is a set of circumstances or a trend or process which could result in reduced levels of well-being.

26 uMNGENI IDP 2012/13 TO 2016/17

STRENGTHS

Municipal Transformation and Institutional Development

(a) All Departments required for service delivery are in place

(b) Strategies have been evolved to address institutional development and capacity building.

(c) Strategies have been evolved to cover gender issues and the needs of the disabled.

(d) A Poverty Reduction and Gender Equity Programme is ongoing in consultation with the District Municipality.

Basic Service Delivery and Infrastructure

(a) In terms of delivery of basic services, uMngeni is one of the better performing municipalities, well above the District and Provincial levels.

(b) Sufficient rainfall ensures good ground water supply. This means springs and boreholes operate well.

(c) An efficient road system exists in the urban areas.

(d) The area is well served by National and Provincial Roads.

(e) A sewerage works is operational in Howick.

(f) Waterborne sewage disposal serves the main areas of high population density.

(g) Low residential densities and favorable soil characteristics allow for effective use of septic tanks in areas such as Nottingham Road and parts of Hilton.

(h) Household, industrial and business refuse removal services available in urban areas.

(i) The provision of housing is being effectively promoted at a local level.

Local Economic Development

(a) Location on the N3 for access to Gauteng, eThekwini and International markets.

(b) Existence of successful Midlands Meander Tourist Route.

27 uMNGENI IDP 2012/13 TO 2016/17

(c) Existing industrial base.

(d) Existing local business base (retail and services).

(e) Abundant Labour force.

(f) Existing commuter services.

(g) Existing Agricultural Sector.

(h) Existing Tourism Sector.

(i) Good quality schools, both government and private.

(j) Cedara College provides tertiary education in the agricultural field and agricultural research.

(k) Midlands Economic Development Agency has been established.

Good Governance and Public Participation

(a) The Municipality’s IDP (including SDF) was reviewed on an annual basis.

(b) Community participation at a Ward level has been a feature of the IDP Reviews, as well as the required regular IDP representative forum meetings.

(c) An Internal Audit Committee is in place

(d) Annual Reports are prepared and submitted as required

(e) The following strategies and plans have been evolved:

A Crime Prevention Strategy.

Disaster Management Plan.

Traffic Control Strategy.

28 uMNGENI IDP 2012/13 TO 2016/17

Industrial Development Strategy.

Industrial Incentive Programme.

Tourism Management Plan.

HIV/AIDS Strategy

Fraud Prevention Strategy.

Financial Viability and Financial Management

(a) Municipal Turn Around Strategy in place and being implemented.

Community and Social Development Services

(a) Community facilities are provided at a relatively high level, especially in urban areas. These include hallsX11, librariesX5, crèchesX31, sports facilitiesX12, and a theatre.

(b) Emergency services are available.

(c) Primary health clinics are available within the municipality.

(d) An HIV/AIDs Prevention Programme has been formulated and is being implemented.

(e) Four operating police stations in the municipality.

(f) Education facilities X60. Good quality education facilities available throughout the municipality.

(f) Traffic Management, learner and motor licensing facilities are provided.

Conclusion

The above Strengths highlight the positive attributes in the Municipality. These features will provide a base on which to identify opportunities.

29 uMNGENI IDP 2012/13 TO 2016/17

WEAKNESSES

Municipal Transformation and Institutional Development

(a) Lack of inter-departmental Co-ordination.

(b) Lack of supervision (staff).

(c) Financial restrictions limit the number of staff that can be employed.

(d) Staff capacity lacking.

Basic Service Delivery and Infrastructure

(a) Sustainable Electricity provision uncertain.

(b) Howick Sewerage Works close to capacity with upgrading needed. Mpophomeni works need to be re-commissioned.

(c) Access can be improved in certain rural locations.

(d) Ageing infrastructure and road network and capacity to maintain repair.

Local Economic Development

(a) No clear local economic development strategy

(b) Local unemployment situation not improving.

(c) Some Tourist attractions are in need of upgrading e.g. Howick Falls, Worlds View, Karkloof and Mpophomeni Museum.

(d) No serviced industrial land.

Good Governance and Public Participation

30 uMNGENI IDP 2012/13 TO 2016/17

(a) Difficulty in prioritising community needsin relation to budget constraints.

(b) Ward Committee capacity and resources lacking.

Financial Viability and Financial Management

(a) Non-payment of rates and services.

(b) External financing needs to be constantly sourced for capital projects.

(c) Electricity losses and tariff structure unstable

Community and Social Development Services

(a) Health Services of a 24 hour nature required.

(b) No Government Hospital.

(c) Early Childhood Development programme needed.

(d) Lack of community level sports facilities.

(e) Lack of capacity in museums.

(f) Unacceptable level of facilities at some schools.

(g) Public transport , particularly for rural children needs improvement

(h) Vehicle testing ground not available.

Conclusion

The Weaknesses identified need to be recognized and addressed.

OPPORTUNITIES

Municipal Transformation and Institutional Development

(a) Possible departmental restructuring.

(b) Implementation of the skills improvement programme. 31 uMNGENI IDP 2012/13 TO 2016/17

(c) Implementation of the employment equity plan.

Basic Service Delivery and Infrastructure

(a) Improved provision of services, roads, rail, and traffic control could be achieved through promoting development in appropriate locations in a controlled and coordinated manner. For example, the N3 corridor up to Howick is being promoted at Provincial level for economic development.

(b) Options for residential development(s) have been identified in Council’s Spatial Development Framework, and can be promoted.

(c) Protection and Maintenance of water resources would ensure that water continues to be available.

(d) Alternative power sources need to be promoted in the municipal context through applicable legislation.

(e) Road linkage between uMngeni and Impendle needs to be improved.

(f) Municipal Infrastructure Grant funding is available for the provision of services.

Local Economic Development

(a) To protect natural resources, and promote these as part of the overall tourist and leisure attractions.

(b) To optimise natural ambience of the area.

(c) To facilitate Tourism, Industrial and other economic development potentials of the municipality.

(d) To optimize the municipality’s strategic location along the N3.

(e) To optimize the receation and tourism potential of Midmar, Springrove and Albert Falls Dams.

(f) To improve stakeholder liaison with regard to job creation.

(g) Translation and alignment of National and Provincial objectives into local economic development

32 uMNGENI IDP 2012/13 TO 2016/17

Good Governance and Public Participation

(a) Continue to strengthen the Ward Committee concept.

(b) Ensure that the principles of good governance are adhered to.

(c) Ensure that new Government policies relevant to local government are communicated and implemented.

Financial Viability and Financial Management

(a) To extend the rates base, through the facilitation of appropriate development.

(b) To ensure that funding is set aside for maintenance of services and facilities.

(c) Constantly review fee structures.

Community and Social Development Services

(a) Promotion of education as a means of uplifting the community.

(b) To improve road safety and traffic management.

(c) To promote partnerships between Traditional leadership and the municipality.

Conclusion

Opportunities exist, which if taken seriously, will promote the municipal area.

THREATS

Municipal Transformation and Institutional Development

33 uMNGENI IDP 2012/13 TO 2016/17

(a) Loss of skilled staff.

(b) General staff health

(c) Vacancy rate

(d) Low staff morale and absenteeism.

(e) Instability of higher management level.

(f) Lack of supervision at all levels.

(g) Political interference.

Basic Service Delivery and Infrastructure

(a) Non-payment of services could reduce the willingness of service providers to extend and maintain services.

(b) Inability of the municipality to meet expectations of certain sectors of the community.

(c) Non-availability of bulk services supply and capacity.

(d) Identification and planning of landfill sites

(e) Electricity theft/losses and impact on services.

(f) Increase energy cost.

(g) Copper cable theft.

Local Economic Development

(a) Declining employment in agricultural sector.

(b) Ongoing loss of agricultural land.

(c) Uncertainty in service provision could affect future investment in the municipal area.

(d) Insufficient services to accommodate development in strategic locations.

(e) Contamination of services.

(f) Declining state of tourism attractions.

34 uMNGENI IDP 2012/13 TO 2016/17

(g) Inability to provide bulk services to attract development

(h) No serviced industrial land.

(i) Environmental pollution.

Good Governance and Public Participation

(a) Low levels of participation by certain stakeholders in the IDP process.

(b) Low levels of participation in development and governance.

(c) Insufficient levels of engagement with communities and the general public.

(d) Abuse of Ward Committee objectives, structures and procedures.

(e) Non-optimal use of community organisations and NGO’s.

(f) Inability to effectively combat corruption.

(g) Non-identification of operational risks and lack of implementation.

Financial Viability and Financial Management

(a) Non-payment of rates and service charges.

(b) Cash flow fluctuations.

(c) Withholding of Grant Funding.

(d) Negative credit rating.

(e) Disparity in tariffs.

(f) Inappropriate management of conditional grants.

(g) Non-sustainability of cost of services.

Community and Social Development Services

(a) Maintenance of existing community and recreational facilities.

35

uMNGENI IDP 2012/13 TO 2016/17

(b) Maintenance of Tourism facilities.

(c) Unrealistic community expectations regarding facilities.

(d) Unfunded Mandates.

Conclusion

Where possible, plans and strategies need to be put in place to address, or lessen the impact of the potential threats to the municipality.

3.2 WARD PRIORITIES

Potential Ward Priorities have been evolved through written input following the Ward Committee and Public Meetings, the existing situation described in Chapter 2 and uMngeni GIS Facilities Mapping. It is acknowledged that this is merely a starting point, and Community Based Plans for each Ward need to be created.

Ward POTENTIAL PRIORITIES 1 2 3 4 Other 1 Addressing Control and Monitoring Resurfacing -Support of Shiyabazali Monitoring of and Midmar and existing industrial Informal Howick Prevention of Valley Roads and commercial Settlement Sewerage pollution to enterprises and Works Mgeni River development of SMME employment -Community Hall renovation - Traffic Lights Intersection Prospect Rd & Main Rd -Additional lighting in areas if high pedestrian traffic -support for pensioners in the Howick area

36

uMNGENI IDP 2012/13 TO 2016/17

Ward POTENTIAL PRIORITIES 1 2 3 4 Other 2 Maintenance Widening of Upgrade of Support of of Services the Bridge the main existing and Roads in over the access roads commercial this densely Mgeni River between enterprises populated Howick High and and highly School and development trafficked Primary of SMME Howick School employment central area 3 Senzani Housing Support of/ Maintenance Clinic Village projects sponsoring of of Rural upgrade the (Gowrie & land and Roads and provision of Hillside) agrarian those in services & reform Nottingham condition of Road Village community facilities

4 Lutchmans Lidgetton Support of/ Maintenance Clinic Farm upgrade the sponsoring of of Rural Housing provision of land and Roads and Project & services & agrarian those in related condition of reform LIdgetton service community Village provision facilities 5 Promotion Triandra Support of/ Maintenance and Water and sponsoring of of Rural maintenance Sanitation land and Roads and of key provision agrarian those in tourism reform Greendale features in Ward 5 6 Promotion Upgrading of Support of/ Maintenance -Support of and services, sponsoring of of Rural existing maintenance particularly land and Roads and commercial of key electricity agrarian those in enterprises and tourism reform Hilton development of features in SMME Ward 6 employment - Sourcing of funding for Hilton N3 Corridor Initatitives 7 Khayelisha & Upgrading of Sourcing of Maintenance Development of Cedara services, funding for of roads SMME Housing particularly servicing of employment

37

uMNGENI IDP 2012/13 TO 2016/17

Ward POTENTIAL PRIORITIES 1 2 3 4 Other Projects & electricity Merrivale N3 related Corridor service initiatives provision 8 Road names Support to Re- Provision and Development of Community establishment upgrade of SMME Based of the services& employment Organisations Mpophomeni roads to assist in Sewerage addressing works social issues such as HIV/AIDS and Poverty 9 KwaNxmalala Promotion & Provision of Provision and -Clinic and Lions maintenance funding to upgrade of -Support of/ River Phase 2 of key tourism support N3 services & sponsoring of Housing features in Corridor roads land and agrarian Project Ward 9 e.g. Projects reform & 1 house &service Mpophomeni Tweedie 1 garden provision Gateway Interchange 10 Provision and Promotion Maintenance Development Support of upgrade of and & Upgrading and existing roads maintenance of Community promotion of commercial of tourism & Recreation Mpophomeni enterprises and features in Facilities in Commercial/ development of Ward 10 Ward 10 Tourism SMME Node employment 11 Provision and Upgrade of Maintenance Development upgrade of Mpophomeni and Upgrading of SMME roads Police Station of Community employment Facilities (Schools) 12 Sourcing of Provision and Support of Maintenance funding for upgrade of existing & Upgrading Promotion of services & industrial and of Merrivale& roads in commercial Community Midmar KwaMevana, enterprises & Recreation Interchange Tumbleweed and Facilities in Node N3 & other development Ward 12 Corridor residential of SMME initiatives areas employment

38 uMNGENI IDP 2012/13 TO 2016/17

4. STRATEGIC ANALYSIS

4.1 BACKGROUND

In its Strategic approach as discussed at the Strategic Planning Workshops held on 23 February 2012, Counciltook into account:

The Municipal Status Quo and SWOT analysis;

State of the Nation address;

State of the Province address;

The Strategic Goals of the KZN Provincial Growth and Development Strategy;

The National and Provincial Priorities;

The United Nations Millennium Development Goals;

The Strategic Framework from the previous IDP; and

The existing projects list.

4.2 STATE OF THE NATION ADDRESS

The relevant State of the Nation address themes were:

Strategic Infrastructure Development and Job Creation.

Poverty Alleviation.

Improved Education System.

Five major geographically focused programmes which includes the movement of goods and economic integration through a Durban-Free Sate-Gauteng logistics and industrial corridor (N3 Corridor).

4.3 STATE OF THE PROVINCE ADDRESS

The relevant State of the Province address themes were:

Working together for growth, development, and a better future for all.

Infrastructure upgrade programme:

39 uMNGENI IDP 2012/13 TO 2016/17

- Refurbishment of Durban and Richards Bay ports;

- Dube Trade Port expansion;

- Road and rail upgrade.

Boost to Maritime Industry.

Revitalise the agricultural sector through;

- Partnerships;

- Training aimed at farming and entrepreneurial skills;

- Unlocking the potential of the Ingonyama Trust land;

- One Home One Garden Programme.

Special Economic Development Zones.

Small Town and Rural Development programme.

Heritage to be commemorated through statues, museums and memorials.

International Tourism promotion for KZN.

Environmental sustainability and job creation through:

- Community based greening activities;

- Revenue from Conservation services to benefit rural communities.

Education to be promoted through:

- Early childhood development;

- Parental involvement in school governance;

- Bursaries at Provincial level.

Health to be promoted through:

- Communication between district health offices and municipalities;

- Community caregivers and ward-based community nurses are to be employed;

- National Health Insurance to be piloted in two Districts in KZN which have yet to be announced.

Social Development to be promoted through:

40 uMNGENI IDP 2012/13 TO 2016/17

- Operation Sukuma Sakhe where community caregivers and youth ambassadors assist families in distress, also promotes sport and recreation;

- NGO’s to support and partner Government to address social ills;

- Community to partner with Government on programmes.

4.4 STRATEGIC GOALS OF THE KWAZULU-NATAL (KZN) PROVINCIAL GROWTH AND DEVELOPMENT STRATEGY (PGDS)

KZN has had a PGDS since 1996 with 2 review processes since then. In February 2011 the KZN Cabinet adopted the PGDS Review Framework.

The purpose of the 2011 PGDS is to:

Develop a clear long term vision and plan for the growth and development of the Province by building on the strengths and opportunities while addressing weaknesses and threats;

Mobilize all development partners to achieve pre-determined development objectives and targets;

Promote vertical, horizontal and spatial alignment;

Spatially contextualize and prioritise (not just what also when and where) so as to achieve spatial equity;

Guide the activities and resource allocation of Provincial Government and other spheres of government, business sectors, organized labour and other role players from civil society that can contribute to the development of the Province;

Develop clean institutional arrangements to secure by-in and ownership, through structured consultation processes with all sector and development parties;

Define clear cut goals and indicators

Direct commitment to the allocation of resources to manage and implement this PGDS;

Build a strong centre and decisive outcomes and ensuring that the PGDS is afforded the status as the primary plan of the Province.

The PGDS report covers National and Provincial Policy Context; Current Status and Strategic Analysis; Vision, Goals, objectives and potential developmental interventions; and the Provincial Spatial and Development Framework.

A further phase is envisaged being the Provincial Growth and Development Plan which will focus on the implementation framework, namely, the institutional arrangements, activities and targets in respect of each intervention, monitoring, evaluation, reporting and reviewing

41 uMNGENI IDP 2012/13 TO 2016/17

mechanisms crucial to delivery of the strategy as well as some catalytic interventions and major projects.

The 7 Strategic Goals of the PGDS are:

1. Job Creation

2. Human Resource Development

3. Human and Community Development

4. Strategic Infrastructure

5. Environmental Sustainability and Response to Climate Change

6. Governance and Policy

7. Spatial Equity.

The PGDS contains the Provincial Spatial Development Framework. The majority of uMngeni is designated as an “Economic Support Area”. “Priority Conservation Areas” occur to the north along the Mooi and Karkloof Rivers, and the Mgeni River Valley is indicated as a “Biodiversity Priority Area”.

The areas of economic support occur in a number of regions in the Province. The PGDS describes these areas as follows: “Due to the fact that these areas represent a larger distribution across the entire province than the core areas of economic value adding, these zones are considered important areas of Economic Support. Typical interventions in these areas would include economic prioritization of development, labour force interventions (e.g. skills development), key economic infrastructure investment and area promotion.”

4.5 NATIONAL AND PROVINCIAL PRIORITIES

The five National and Six Provincial Priorities include the following:

1. Job Creation (Decent Work and Economic Growth)

2. Education

3. Health

4. Rural Development, Food Security and Land Reform

5. Fighting Crime and Corruption

6. Nation Building and Good Governance.

4.6 UNITED NATIONS MILLENNIUM DEVELOPMENT GOALS

The United Nations Millennium Development Goals are to:

1. Eradicate extreme poverty and hunger

42 uMNGENI IDP 2012/13 TO 2016/17

2. Achieve universal primary education

3. Promote gender equality and empower women

4. Reduce child mortality

5. Improve maternal health

6. Combat HIV/Aids, malaria and other diseases

7. Ensure environmental sustainability

8. Develop a global partnership for development.

4.7 12 OUTCOMES OF GOVERNMENT

The 12 Outcomes of Government adopted by Cabinet in January 2010 are as follows:

1. Improve the quality of basic education 2. Improve health and life expectancy 3. All people in South Africa protected and feel safe 4. Decent employment through inclusive economic growth 5. A skilled and capable workforce to support inclusive growth 6. An efficient, competitive and responsive economic infrastructure network 7. Vibrant, equitable and sustainable rural communities and food security 8. Sustainable human settlements and improved quality of household life 9. A responsive and accountable, effective and efficient local government system 10. Protection and enhancement of environmental assets and natural resources 11. A better South Africa, a better and safer Africa and world 12. A Development-orientated public service and inclusive citizenship.

4.8 STRATEGIC FRAMEWORK OF THE uMNGENI COUNCIL

The above Outcomes were brought through into the uMngeni IDP Strategic Framework. The Strategic Framework was debated at a Strategic Workshop held on 7 and 8 May 2012.

The Vision and Mission Statement of the uMngeni Municipality are as follows:

Vision

uMngeni is to develop as a people focused, efficient and cost effective municipality providing quality services and addressing unemployment and poverty through the promotion of agricultural, commercial and industrial productivity, education, tourism and conservation.

Mission Statement

43 uMNGENI IDP 2012/13 TO 2016/17

The Strategic Framework is set out on the next page. A further two Tables have been included as Annexure 4 to illustrate alignment with National and Provincial Goals set out in 4.5 above, and then alignment with the PGDS Goals.

44 uMNGENI IDP 2012/13 TO 2016/17

uMNGENI VISION “uMngeni is to develop as a people focused, efficient and cost effective municipality providing quality services and addressing unemployment and poverty through the promotion of agricultural, commercial and industrial productivity, education, tourism and conservation” uMNGENI MISSION “The uMngeni Municipality will ensure community participation in all projects; improve the skills of the municipal staff; strive for financial viability; provide sustainable services and promote local economic development.” NATIONAL OUTCOMES A skilled and capable workforce to support Improve the quality of basic Decent employment through A responsive and accountable, A responsive and accountable, Improve health and life expectancy inclusive growth education inclusive economic growth effective and efficient local effective and efficient local All people in South Africa protected and feel A responsive and accountable, effective Improve health and life A skilled and capable workforce government system government system safe and efficient local government system expectancy to support inclusive growth A better South Africa, a better and A better South Africa, a better and A skilled and capable workforce to support Protection and enhancement of An efficient, competitive and An efficient, competitive and safer Africa and world safer Africa and world inclusive growth environmental assets and natural responsive economic responsive economic A Development-orientated public A Development-orientated public Sustainable human settlements and improved resources infrastructure network infrastructure network service and inclusive citizenship service and inclusive citizenship quality of household life A better South Africa, a better and safer Sustainable human settlements Vibrant, equitable and Africa and world and improved quality of household sustainable rural communities A Development-orientated public service life and food security and inclusive citizenship A better South Africa, a better and safer Africa and world NATIONAL KPA A. MUNICIPAL TRANSFORMATION & B. BASIC SERVICE DELIVERY & C. LOCAL ECONOMIC D. GOOD GOVERNANCE & PUBLIC E. FINANCIAL VIABILITY & FINANCIAL F. COMMUNITY AND SOCIAL DEVELOPMENT INSTITUTIONAL DEVELOPMENT INFRASTRUCTURE INVESTMENT DEVELOPMENT PARTICIPATION MANAGEMENT SERVICES uMNGENI IDP GOALS To maintain service excellence through To address backlogs in To create an enabling To ensure good corporate To ensure economic, efficient, To encourage community development for municipal transformation and institutional infrastructure services and environment for economic governance effective and transparent utilization sustainable livelihoods arrangements maintenance of existing transformation and growth Enhancing public participation to of financial resources infrastructure through broad based black deepen democracy To implement a 5 year plan and economic empowerment, To strengthen inter-governmental programme to address backlogs investment promotion, local relations business support, manufacturing, agricultural development and tourism uMNGENI STRATEGIC OBJECTIVES

A1 To provide effective and efficient Human B1To provide access to Water, C1To stimulate economic growth D1To implement Public Participation E1 To ensure that all revenue of the F1To manage health Issues Resources Management Services Sanitation, Electricity, Solid C2To enhance tourism Programmes municipality is accounted for F2To contribute towards a safe and secure A2To provide protection Services to the Waste, Roads development D2To ensure alignment between E2To ensure compliance with all environment Honourable Mayor B2To construct new Community And C3To provide support to local National, Provincial, Local financial management requirements F3To ensure all communities have access to basic A3To ensure effective administration Public Facilities and maintaining business and emerging black Government and Public Entities E3To ensure preparation and community facilities and social services support services existing structures entrepreneurs D3To formulate, implement and review implementation of budgeting and F4To improve literacy A4To encourage good labour relations B3To reduce the number of C4To pursue special projects that policies, procedures and bylaws reporting requirements F5 To ensure safe and healthy environment in all within the institution individuals living in informal will act as catalysts for D4To ensure functional Internal Audit E4To ensure that all expenditure is communities A5To contribute meaningfully to the settlements development Activity and Audit Committee managed in terms of all financial F6To facilitate the provision of formal housing wellness of employees B4To avoid deterioration of existing C5To facilitate and co-ordinate D5To implement an effective Anti- legislation F7To manage learner licences and motor licensing A6To provide efficient secretariat support infrastructure network agricultural development Corruption Strategy E5To ensure compliance with all Supply F8To provide integrated public transport facilities services D6To ensure that strategic and Chain Management Regulations, F9To improve road safety and traffic management A7To conform to the Batho Pele Principles operation risks are identified and Policies, PPPFA, BBBEE F10To facilitate the development of sports A8 To ensure integrated development and monitored on a continuous basis requirements F11To facilitate synergistic partnership between environmental planning E6To ensure that all revenue due to the Traditional Leadership and the Municipality A9.To implement an effective organisational municipality is collected F12To facilitate the alignment and integration of and individual performance management special programmes system A10To develop and implement the Municipal Turn Around Strategy A11To provide effective information communication technology solutions

45 uMNGENI IDP 2012/13 TO 2016/17

4.9 STRATEGIC OBJECTIVES BY KPA WITH KPI’s AND TARGETS

KPI’s are set out below based on the Strategic Framework and projects. The Performance Management System Organisational Scorecard is included as Annexure 5.

National Key Performance Area A: Municipal Transformation and Institutional Development

Strategic Objective A1: To provide effective and efficient Human Resources Management Services

KPI A1.1: Annual Employment Equity Plan preparation/review and quarterly analysis (Corporate Services) KPI A1.2: Annual Workplace Skills Development Plan preparation and quarterly analysis (Corporate Services) KPI A1.3: Quarterly analysis of efficiency and effectiveness of internal decision making processes

Strategic Objective A2: To provide a protection service to the Honourable Mayor

KPI A2.1: VIP Service, quarterly analysis of hours (Operations)

Strategic Objective A3: To ensure effective administrative support services

KPI A3.1: Annual document management system analysis (Corporate Services) KPI A3.2: Annual utilization and maintenance of municipal fleet analysis (Corporate /Technical Services)

Strategic Objective A4: To encourage good labour relations within the institution

KPI A4.1: Quarterly analysis of disciplinary cases (Corporate Services)

Strategic Objective A5: To contribute meaningfully to the wellness of employees

KPI A5.1: EAP programmes annual impact report (Corporate Services)

Strategic Objective A6: To provide effective secretariat support services

KPI A6.1: Quarterly analysis of Council, Committees and Manco secretariat service (Operations)

Strategic Objective A7: To conform to the Patho Pele Principles

KPI A7.1 At least one Annual survey to be conducted (Operations/Corporate Services/All)

46

uMNGENI IDP 2012/13 TO 2016/17

Strategic Objective A8: To ensure integrated development and environmental planning

KPI A8.1 Annual IDP Review (Planning & Development/All) KPI A8.2 Annual Spatial Development Framework Review (Planning & Development) KPI A8.3 Annual Disaster Management Plan Review (Community Services) KPI A8.4 Mid-Term Expenditure Framework Preparation (Financial Services) KPI A8.5: Preparation of Environmental Management Plan (Planning and Development) KPI A8.6: Quarterly analysis of building control (Planning & Development) KPI A8.7: Establishment of the Development Planning Shared Services Unit (Planning & Development) KPI A8.8: Preparation of Land Use Management System (Planning & Development)

Strategic Objective A9: To implement an effective organisational and individual performance management system

KPI A9.1: Annual Preparation/Review of the Performance Management System (Operations/All) KPI A9.2: Section 45 Performance Agreements (Office of MM/ Corporate Services/All) KPI A9.3: Preparation of Annual Report (Office of MM/ Operations) KPI A9.4: Annual Performance Report (Office of MM)

Strategic Objective A10: To develop and implement the Municipal Turn Around Strategy

KPI A10.1 Prepare and implement Turnaround Strategy (Office MM/All)

Strategic Objective A11: To provide effective information communication technology solutions

KPIA11.1 Communication Strategy preparation and implementation(Operations) KPIA11.2: IT Strategy (MSP) preparation and annual review of systems (Operations/All)

National Key Performance Area B: Basic Service Delivery and Infrastructure Development

Strategic Objective B1: To provide access to Water, Sanitation, Electricity, Solid Waste, Roads

KPI B1.1: Annual analysis of Basic Service Delivery (Technical Services/District) KPI B1.2 Electricity provision (Technical Services) KPI B1.3 Road construction (Technical Services) KPI B1.4: Stormwater systems (Technical Services) KPI B1.5: Road maintenance (Technical Services) KPI B1.6: Management of land fill site (Technical Services) KPI B1.7 Refuse collection (Technical Services)

47

uMNGENI IDP 2012/13 TO 2016/17

Strategic Objective B2: To construct new Community and Public Facilities and maintaining existing structures

KPI B2.1: Annual analysis of facilities provided and upgraded (Technical Services) KPI B2.2: Maintenance of verges and public open spaces and monitoring performance in this regard (Technical Services) KPI B2.3: Maintenance and administration of cemeteries (Technical Services) KPI B2.4: Quarterly analysis of graves excavated and number of grave sites still available (Technical Services)

Strategic Objective B3: To reduce the number of individuals in informal settlements

KPI B3.1 Quarterly analysis of new low income houses constructed (Technical Services/Department of Housing)

Strategic Objective B4: To avoid deterioration of existing infrastructure network

KPI B4.1: Quarterly analysis of maintenance budget (Technical Services).

National Key Performance Area C: Local Economic Development

Strategic Objective C1: To stimulate economic growth

KPI C1.1: Annual analysis of jobs created through municipal projects and infrastructure spending (Financial Services/Economic Development and Growth/Technical Services) KPI C1.2: Annual analysis of the implementation of the Industrial Development Strategy/ Industrial Incentive Scheme (Economic Development and Growth) KPI C1.3: Establishment of the Midlands Development Agency (Economic Development and Growth) KPI C1.4: Annual analysis of the implementation of the Business Retention and Expansion Strategy (Economic Development and Growth)

Strategic Objective C2: To enhance tourism development

KPI C2.1: Tourism Strategy preparation (Planning and Development)

Strategic Objective C3: To provide support to local business and emerging black entrepreneurs

KPI C3.1: Capacity building initiatives and annual analysis thereof (Planning and Development)

48

uMNGENI IDP 2012/13 TO 2016/17

Strategic Objective C4: To pursue special projects that will act as catalysts for development

KPI C4.1: Mpophomeni Nodal Study Implementation (Technical Services/ Economic Development and Growth) KPI C4.2: Construction Mpophomeni Gateway Complex (Technical Services/Economic Development and Growth) KPI C4.3: Implementation N3 Corridor Management Plan (Economic Development and Growth/ Planning and Development/ Technical Services) KPI C4.4: Construction of Howick Falls Business Plan projects (Economic Development and Growth/Technical Services) KPI C4.5: Source funding for Development of Business Incubator Programme/ Business Plan (Economic Development and Growth/Corporate Services) KPI C4.6: Undertake procedures to obtain Expression of Interest proposals for the Nelson Mandela Capture Site (Economic Development and Growth)

Strategic Objective C5: To facilitate and co-ordinate agricultural development

KPI C5.1: Implementation of the Agricultural Development Strategy in accordance with milestones set and annual analysis of achievements (Economic Development and Growth)

National Key Performance Area D: Good Governance, Community Participation and Ward Committee Systems

Strategic Objective D1: To implement Public Participation Programmes

KPI D1.1: Undertake and annual analysis of Road Shows/Imbizo’s (IDP & Budget) at Ward level (Operations/All) KPI D1.2: Conduct at least two Community Outreach Programmes per year (Corporate Services/All) KPI D1.3: Conduct Quarterly Ward Committee meetings and prepare a response plan to issues raised (Operations/All)

Strategic Objective D2: To ensure alignment between National, Provincial, Local Government and Public Entities

KPI D2.1: Conduct at least 2 IDP Forum Meetings per year (Planning and Development) KPI D2.2: Attend monthly District Cluster Forum Meetings (Office MM/All) KPI D2.3: Hold monthly Mayoral Stakeholders Forum Meetings (Office of the Mayor/Operations) KPI D2.4: Attend quarterly Provincial Liaison Forum meetings (Operations/All)

49

uMNGENI IDP 2012/13 TO 2016/17

Strategic Objective D3: To formulate, implement and review Policies, Procedures and Bylaws

KPI D3.1: Develop new policies, procedures and bylaws where necessary (All) KPI D3.2: Review existing policies, procedures and bylaws (All) KPI D3.3: Implementation of all legal prescripts, policies, procedures and bylaws (All)

Strategic Objective D4: To ensure functional Internal Audit Activity and Audit Committee

KPI D4.1: Preparation of Annual Audit Plan and analysis of achievement of such Plan (Internal Audit) KPI D4.2: Preparation and approval of a risk profile (Financial Services) KPI D4.3 Quarterly Reports on risk management strategy (Financial Services/All) KPI D4.4: Ensuring functional Audit Committee and holding quarterly meetings (Internal Audit) KPI D4.5: Ensuring functional Performance Audit Committee and holding of quarterly meetings (Internal Audit)

Strategic Objective D5: To implement an effective Anti-Corruption Strategy

KPI D5.1: Preparation of Anti-Corruption Strategy/Fraud Prevention Plan and ensure awareness within the municipality (Internal Audit)

National Key Performance Area E: Financial Viability and Financial Management (Financial Services)

Strategic Objective E1: To ensure that all revenue of the municipality is accounted for

KPI E1.1: Invoicing and billing of customers of services rendered and analysis on an annual basis KPI E1.2: Collection of cash from customers, striving for collection within 90 days, and analysis on a quarterly basis KPI E1.3: Determination of debt coverage ratio, outstanding services debtors to revenue, cost coverage ratio KPI E1.4: Maintenance of valuation roll and analysis of objections/appeals

Strategic Objective E2: To ensure compliance with all financial management requirements

KPI E2.1: Ensure loan repayments KPI E2.2: Keep records of revenue received from grants and subsidies as per DORA KPI E2.3: Keep records grants and subsidies expenditure and report quarterly KPI E2.4 Ensure audit opinion obtained and strive for unqualified audit

50

uMNGENI IDP 2012/13 TO 2016/17

Strategic Objective E3: To ensure preparation and implementation of budgeting and reporting requirements

KPI E3.1 Recording of operating budget expenditure and quarterly analysis KPI E3.2: Analysis of salaries and wages expenditure on quarterly basis KPI E3.3: Recording and analysis of own revenue in relation to the total budget on a quarterly basis KPI E3.4: Assessing quarterly compliance with MFMA requirements

Strategic Objective E4: To ensure that all expenditure is managed in terms of all financial legislation

KPI E4.1: Fixed Asset Register reconciled with ledger on quarterly basis KPI E4.2: Compliance with GRAP analysed on a quarterly basis KPI E4.3: Creditors invoices to be checked and strive for payment within 30 days, quarterly analysis of payment of creditors KPI E4.4: Analysis of variance of actual expenditure vs budget on a quarterly basis

Strategic Objective E5: To ensure compliance with all supply chain Management Regulations, Policies, PPPFA, BBBEE requirements

KPI E5.1: Undertake Procurement Planning by June. KPI E5.2: Monthly SCM Reporting KPI E5.3: Ensuring functional Bid Committees set up and strive for decisions to be taken within 30 days, quarterly analysis KPI E5.4: Assess compliance with SCM Regulations on a quarterly basis

Strategic Objective E6: To ensure that all revenue due to the municipality is collected

KPI E6.1: Ensure disconnection for arrears on electricity and report on a quarterly basis KPI E6.2: Pursue debt recovery and report quarterly

National Key Performance Area F: Community and Social Development Services

Strategic Objective F1: To manage health Issues

KPI F1.1: Assessment of number of individuals infected and affected by HIV/AIDS on quarterly basis (Community Services/All)

Strategic Objective F2: To contribute to a safe and secure environment

KPI F2.1: Ensure functioning Community Safety Forum to meet and report on a quarterly basis (Community Services) KPI F2.2: Implementation of Crime Prevention Strategy and report annually on % reduction in specified crime categories (Community Services)

51

uMNGENI IDP 2012/13 TO 2016/17

Strategic Objective F3: To ensure all communities have access to basic community facilities and social services

KPI F3.1: Calculate number of residents within 5km of a library, 2km of a clinic, 1km of sports facilities, 2km from Community halls, report annually (Community Services) KPI F3.2: Ensure at least one museum is operating in the municipality (Community Services)

Strategic Objective F4: To improve literacy

KPI F4.1: Undertake at least two outreach programmes per year (Community Services) KPI F4.2: Ensure effective management of libraries and strive for a 5% increase in patrons, patron numbers to be reported quarterly (Community Services)

Strategic Objective F5: To ensure safe and healthy environment in all communities

KPI F5.1: Strive to attend to complaints within 7 days, report on a quarterly basis (Community Services) KPI F5.2: To analyse compliance with legal prescripts on a quarterly basis (Community Services) KPI F5.3: To strive to undertake 6 public awareness programmes within each year, and to report on a quarterly basis (Community Services)

Strategic Objective F6: To facilitate the provision of formal housing

KPI F6.1: To strive for full compliance with the National Housing Act, and to analyse compliance on a quarterly basis (Community Services)

KPI F6.2: Strive to reduce the number of people living in informal structures and report on a quarterly basis (Community Services/Technical Services)

Strategic Objective F7: To manage learner licenses and motor licensing

KPI F7.1: To manage learner license testing and strive for less than 6 months between booking and testing, to monitor on a quarterly basis (Community Services)

KPI F7.2: To process motor licenses effectively, and strive to achieve the issue of at least 6 500 licenses per quarter, to monitor on a quarterly basis (Community Services)

Strategic Objective F8: To provide integrated public transport facilities

KPI F8.1: To prepare an integrated plan for the provision and maintenance of public transport ranks by December 2012 52

uMNGENI IDP 2012/13 TO 2016/17

Strategic Objective F9: To improve road safety and traffic management

KPI F9.1: To undertake law enforcement and strive for the issue of R375 000 worth of fines per quarter to be reported on a quarterly basis (Community Services)

Strategic Objective F10: To facilitate the development of sport

KPI F10.1: To strive to cover 14 sports codes per annum, monitoring progress on a quarterly basis (Community Services)

Strategic Objective F11: To facilitate synergetic partnership between Traditional Leadership and the Municipality

KPI F11.1: Implement the Business Plan and report achievement on a quarterly basis (Operations)

Strategic Objective F12: To facilitate alignment and integration of special programmes

KPI F12.1: Undertake youth programmes and report on a quarterly basis (Operations) KPI F12.2: Maintain the youth advisory centre and strive for 1 500 visitors per quarter, visitor number to be monitored on a quarterly basis (Operations) KPI F12.3: Updating and implementation of a Gender Equity Plan, and monitor on a quarterly basis (Corporate Services) KPI F12.4: Undertake disability programmes and report on a quarterly basis (Operations) KPI F12.5: Rights of a child programme to be complied with and reporting undertaken on a quarterly basis (Operations)

53

uMNGENI IDP 2012/13 TO 2016/17

5. 5 YEAR IMPLEMENTATION PLAN

5.1 BUDGET

Below is the Operating Budget Estimate for a five year period 01 July 2012 to 30 June 2017.

Table 12: Operating Budget Estimate 2012/13 to 2016/2017:

Revenue by source Budget Budget Budget Budget Budget 2012 2013 2014 2015 2016 2013 2014 2015 2016 2017 Income: R000 R000 R000 R000 R000 Property Rates 94238 99515 104889 110000 116000 Property Rates-penalties 3419 3611 3806 4000 4300 User Charges for Services 58561 65432 72825 81000 93000 Rent of Facilities & 1002 1058 1115 1200 1300 Equipment Interest Earned- External 300 300 300 400 400 Investments Interest Earned- Outstanding 1009 1066 1123 1150 1200 Debtors Fines 6263 6612 6971 7100 7300 Licenses & Permits 1879 1984 2091 2200 2300 Operating Grants & Subsidies 39707 44008 47793 5000 54000 Other Income 13121 13440 13761 14000 14500 Internal Recoveries Total Budget Income 219499 236935 254675 271050 294300

Expenditure by source Budget Budget Budget Budget Budget 2012 2013 2014 2015 2016 2013 2014 2015 2016 2017 Expenditure: R000 R000 R000 R000 R000 Employee Related Costs- 73437 77550 81738 85000 88000 Salaries & Wages Debt Impairment 3000 2500 2500 2500 2300 Depreciation& Asset 9704 10248 10801 11000 11300 Impairment Finance Charges 4209 3981 3744 3400 3200 Bulk Purchases 58865 67989 77507 86000 95000 Contracted services 5000 5280 5565 6000 6400

54

uMNGENI IDP 2012/13 TO 2016/17

Other Expenditure 59850 63640 66766 75100 83800 Total Budget Expenditure 219491 236917 254660 269000 290000

Table 13: Capital Budget Estimates – Funding by source – 2012:2017

2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 R000 R000 R000 R000 R000 Capital Funding by Source: National Government 16190 17078 18065 19000 20000 Provincial Government 0 0 0 0 0 uMgungundlovu District 0 0 0 0 0 Mun (DORA Allocations) Accumulated Surplus 0 0 0 0 0 External Loans 0 0 0 0 0 Total Funding of Capital 16190 17078 18065 19000 20000 Expenditure

Table 14: Capital Budget Estimate – Funding by Department 2012/13 to 2016/17

2012/2013 2013/2014 2014/2015 2015/2016 2016/2017 R000 R000 R000 R000 R000 Property Services Library Museum Community Halls Cemetery Housing Traffic Police Disaster Management Sports and Recreation Sewerage Public Conveniences Parks & Gardens Roads & Stormwater 16190 17078 18065 19000 20000 Refuse Removal Land Fill Traffic Engineering Electricity Municipal Offices LED

55

uMNGENI IDP 2012/13 TO 2016/17

DORA Allocations (District) TOTAL CAPITAL REQUIRED 16190 17078 18065 19000 20000 5.2 PROJECTS

5.2.1 Background to Projects

A comprehensive list of projects is included asAnnexure 1.The following criteria were used for the prioritization of projects:

Capital projects that have already been initiated. Projects that will provide communities with basic need. Projects which, if not attended to, could lead to deterioration in public health conditions. Projects which need to be undertaken to avoid serious deterioration of existing infrastructure. Projects which will make a major contribution towards poverty alleviation and which will have a positive impact on local economic development. Projects which will encourage capital investment by public or private sector and substantially improve job opportunities. Projects which would be to the benefit of a significant proportion of the residents of an area. Projects which will make significant contribution towards an effective improvement in safety and security.

The project list is divided into projects that have been completed, projects that are in progress, projects for which uMngeni is the funding source and projects for which other agencies are the funding source. Should funding become available that had not been foreseen, the projects in this list could then be implemented.

The projects will be reviewed once the Ward and Community level meetings have been held in April 2012.

5.2.2 uMngeni Budget Capital Projects

The following capital budget has been set by the uMngeni Municipality for the 2012/2013 – 2013/2014 – 2014/2015 financial years:

ITEM PROJECT DESCRIPTION FUNDING 2012/2013 2013/2014 2014/2015 SOURCE

1 TOTAL ALLOCATIONS PER FINANCIAL YEAR Dept. of 0 0 0 Energy MIG R16190000 R17078000 R18065000 Accumulated 0 0 0 Surplus

56

uMNGENI IDP 2012/13 TO 2016/17

Other TOTAL R16190000 R17078000 R18065000

2 VOTE: ROADS AND STORMWATER

2.1 Mpophomeni Roads and Stormwater MIG R4000000 R6000000 R6000000 Accumulated 0 0 0 Surplus SUB TOTAL R4000000 R6000000 R6000000

2.2 Midlands Roads and Stormwater MIG R1000000 R1000000 R1500000 Accumulated 0 0 0 Surplus SUB TOTAL R1000000 R1000000 R1500000

2.3 Khayelisha Roads and Stormwater MIG R5500000 R6578000 R8565000 Accumulated 0 0 0 Surplus SUB TOTAL R5500000 R6578000 R8565000

2.4 Main Street Upgrade MIG R5690000 R3500000 R2000000 Accumulated 0 0 0 Surplus SUB TOTAL R5690000 R3500000 R2000000 Table 15: uMngeni Budget Capital Projects 2012/13– 2013/2014 – 2014/2015

5.2.3 uMgungundlovu (uMDM) District Capital Projects relating to Service Delivery and Infrastructure in uMngeni

The following information was available at the time of writing but will need verification:

Water

In the March 2012 draft IDP, a total District water budget of R266 Million was proposed for the 2012/ 2013 financial year, and 225million for the following two financial years. The proposed projects within uMngeni are theKwaHhaza, KwaChief, Mashingeni, KwaNxamalala, Enguga Water Supply Scheme and AC Pipe Replacement in Howick. No budget had been allocated at that stage.

In regard to the Hilton N3 Corridor Development it is indicated that the Department of Water Affairs has approved 4,25 Million for a project feasibility phase and the MIG registration of the project is being processed.

Potential future water projects for uMngeni have been proposed in the Districts Water Services Plan, and are as follows:

PROJECT BUDGET Howick, Greendales, Merrivale, Hilton, Mpophomeni (upgrade & new works) R 12,5 Million Howick Central, West, Shiyabazali, Thokaza, Thandabisi, Eagle Ridge, Merrivale R205,3 Million Heights, Hilton, Mpohomeni, Zuzokhule (water refurbishment) Fort Nottingham, Senzani, Lidgetton, Lutchmans Farm Triandra, Kwahaza (water R 6,0 Million refurbishment) Howick, Shiya bazali, Thokaza, Mpophomeni, Zuzubuhle (water upgrade & R 68,5 Million

57

uMNGENI IDP 2012/13 TO 2016/17

Refurbishment) Table 16: uMgungundlovu Potential Future Water Projects

Sanitation

In March 2012 a total District sanitation budget of R146 Million was proposed for the 2012/2013 financial year. MIG funding for Hhaza Ward 9 Sanitation Project was proposed to roll out over a 5 year period for basic sanitation with a total budget of R21 Million. However, this is being reviewed to consider a waterborne system. R110 Million is proposed for upgrading of the Mpophomeni Waste Water Works in 2012/2013, and 116 Million each in 2013/2014, and 2014/2015.

HIV/AIDS Support, Orphans and Vulnerable Children Projects

Through the Umgungundlovu District Aids Council a teenage pregnancy, the People Living with HIV/AIDS Support and the Orphans and vulnerable children projects are to be conducted in all the seven local municipalities.

5.2.4 Eskom 2012 Information relating to Electricity In uMngeni

No Eskom electrification capital funding was identified for uMngeni for the 2012/2013 Financial Year presentation given at the March 2012 Sector alignment meeting.

5.2.5 Umgeni Water 2012 information relating to Bulk Water in uMngeni

The Greater Mpofana Bulk Water Supply will be of benefit to Wards 3 and 4 of uMngeni and the Mpofana Municipality. This is anticipated to commence once construction of the Spring Grove Dam has been completed. Phase 1 will include a water treatment works and infrastructure that will serve Nottingham Road. The Spring Grove Dam is a Department of Water Affairs project anticipated to be in operation (commissioned) in November 2013.

The Midmar Dam Water Treatment Plant upgrade commenced in 2012/2013 with a design phase, and is anticipated to be completed in 2017/2018. This will be of benefit to the whole PMB/Durban Region with an anticipated cost of R230 million.

An upgrade of the Raw Water Pipeline from Midmar Dam to the Water Treatment works is anticipated to begin in 2014/2015 and completed in 2017/2018 at a cost of R110 Million. This will benefit Ward 12 in uMngeni in particular, but the entire PMB-Durban region benefits.

Upgrade of the Howick North Reservoir is in expected to commence in 2012/2013 and to be completed in 2014/2015. This will be of benefit to Ward 5 in uMngeni at an anticipated project cost of R12 Million.

A detailed feasibility study has been undertaken for an upgrade of the Howick West Reservoir. This is located in Ward 7 but also serves Ward 12. The anticipated cost is R16 Million. 58

uMNGENI IDP 2012/13 TO 2016/17

Upgrading of the Groenekloof Reservoir is in the planning phase. Beneficiaries are in Wards 6 and 7 of uMngeni but it will also serve areas in Msunduzi. The anticipated cost is R12 Million.

5.2.6 Department of Human Settlements information from presentation at the March 2012 Sector Alignment Meeting for the Umgungundlovu District relating to Housing Projects in uMngeni

PROJECT 2011/2012 2012/2013 2013/2014 Cedara 3 887 600 8 892 700 6 684 472 Khayelisha 6 349 840 8 449 620 10 422 856 KwaNxmalala 6 986 832 7 282 400 6 684 472 St Joseph - 1 971 900 2 785 300 Lions River Phase 2 - 670 328 4 079 760 Lutchmans Farm 3 017 040 293 040 3 352 400 Gowrie 3 114 680 - - Hillside 1 946 020 3 570 600 2 785 300 Table 18: Housing Projects in uMngeni

5.2.7 Provincial Department of Transport (DOT) Information from Presentation at the March 2012 Sector Alignment Meeting for the uMgungundlovu District relating to Roads in uMngeni

uMngeni falls within the Vulindlela DOT area which covers 4 local municipalities. The area office is situated in Merrivale. Budget allocations cover Construction of Local Roads, Re- gravelling of Main and District Roads, Safety Maintenance and Routine Maintenance. The maintenance budgets will not be included in the IDP.

Local Roads and Re-gravelling projects for 2012/2013 in uMngeni are set as follows:

Local Roads Budget Km Gamlethu Road Phase 1 R 800 000 2.50 Regravelling D2078 (0-2.5km) R 690 000 2.50 D183 R 900 000 4.00 D2079 (0-3km) R 450 000 1.47 D293 (4-14km) R2 700 000 9.65 P144 (7-12km) R1 200 000 4.01 P367 R 800 000 2.00 D1129 (0-2km) R 600 000 1.97 P165 (24-35km) R2 800 000 10.00 Table 19: Provincial Department of Transport Local Roads 7 Re-gravelling Projects in uMngeni 2012/2013

59

uMNGENI IDP 2012/13 TO 2016/17

5.2.8 Department of Arts and Culture information from presentation at the March 2012 sector alignment meeting for the uMgungundlovu District relating to Library and Museum services in uMngeni

PROJECT 2012/2013 2013/2014 2014/2015 Internet@your Library uMngeni R207 000 R217 000 R228 000 Wards 1 &10 *Phasing in of staffing costs at R1 411 000 R2 963 000 R3 126 000 Municipal Libraries *Museum support R134 000 R143 000 R151 000

*Source Provincial Gazette 10 March 2012 Table 20: Department of Arts and Culture Projects in uMngeni 2012/2013 – 2014/15

5.3 Agricultural projects Department of Agriculture and Environmental Affairs from presentation at the March 2012 sector alignment meeting.

A layer project with a budget of R300 000 in both 2012/13 and 2013/14 is proposed in uMngeni.

The uMngeni municipality has been able to assist some support groups and some community based organizations with the Empowerment for Food Security Projects. The projects are seven in total and among the seven two are HIV/AIDS related; one is a support group and the other is a community based organization doing HIV/AIDS work. This has been done working with the department of Agriculture and Environmental Affairs whereby they appointed LiMA as an implementing agent to work with these stakeholders. The organizations have been given technical training on vegetable production and equipment such as fencing and jojo tanks have been bought.

5.4 Department of Co-Operative Governance and Traditional Affairs information on Special Initiatives Current Activities

SPECIAL INITIATIVES CURRENT ACTIVITIES uMNGENI MUNICIPALITYCORRIDOR DEVELOPMENT PROJECT NAME PROJECT DESCRIPTION & DELIVERABLES BUDGET EXPECTED ALLOCATION COMPLETION DATE Mpophomeni This is a community based and driven project which is R5,000,000.00 30 June 2012 Tourism spear-headed by the Zulu Mpophomeni Tourism Gateway Experience Association. The Gateway Complex will be the tourists’ gateway centre to the Mpophomeni area and the Midlands region at large. The complex

60

uMNGENI IDP 2012/13 TO 2016/17

PROJECT NAME PROJECT DESCRIPTION & DELIVERABLES BUDGET EXPECTED ALLOCATION COMPLETION DATE will also be used to house 80 local Crafters. The Complex will feature the following facilities: •Tourist Information Centre •Conference or meeting venue •African Cuisine Restaurant •Craft Retail outlet •Exhibition Centre •Administration building The objective is to construct a physical Structure that will be used as the Information Centre for the visiting tourists and also be used by the local crafters to sell and promote their products. This project will complement the proposed Midmar Dam tourism development initiative and is part of the famous Midlands Meander and Boston-Bulwer Beat Tourism Routes.

Nelson The Nelson Mandela Capture site is registered with R8,000,000.00 31-Oct-12 Mandela Amafa .It has become increasingly necessary to make Capture Site the site more appealing to the tourists by providing a more appealing monument, an interpretation centre and recreational facilities on the site to attract more visitors and increase their time spent. The development will entail the construction of the interpretation centre, picnic sites, adequate parking cultural village and traditional restaurant.

Tweedie/Main Project entails upgrading of P142 which require road R3,500,000.00 Road 142 widening to accommodate turning lanes and as well as Improvement access improvements to current developments.

Prospect to This entails the linking of the Northern Suburb of R7,800,000.00 30-Nov-12 Winston Road Howick to Midmar N3 Interchange to reduce traffic Linkage congestion at the Umgeni River Bridge in the CBD. This will open up economic opportunities in the area.

Table 21: COGTA Special Initiatives Corridor Projects in uMngeni

61

uMNGENI IDP 2012/13 TO 2016/17

LOCAL ECONOMIC DEVELOPMENT

PROJECT NAME PROJECT DESCRIPTION & DELIVERABLES BUDGET EXPECTED ALLOCATION COMPLETION DATE

LED Strategy Review of the current LED plan R 400,000.00 (developed in 2003). The LED should integrate other plans e.g. Business Retention and Expansion Plan; Tourism Plan and Agricultural Plan.

Table 22: COGTA Special Initiatives Local Economic Development Projects in uMngeni

62

uMNGENI IDP 2012/13 TO 2016/17

ANNEXURE 1

EXISTING PROJECTS TABLES

63

uMNGENI IDP 2012/13 TO 2016/17

uMNGENI MUNICIPALITY

INTEGRATED DEVELOPMENT PLAN

PROJECT LISTS

SCHEDULE 1:PROJECTS THAT HAVE BEEN COMPLETED ...... 1

SCHEDULE 2: PROJECTS THAT ARE IN PROGRESS ...... 8

SCHEDULE 3: PROJECTS FOR WHICH uMNGENI MUNICIPALITY IS

THE FUNDING AGENCY ...... 14

SCHEDULE 4: PROJECTS FOR WHICH OTHER AGENCIES ARE

THE FUNDING SOURCE ...... 22

uMNGENI IDP 2012/13 TO 2016/17

SCHEDULE 1: PROJECTS THAT HAVE BEEN COMPLETED

1

uMNGENI IDP 2012/13 TO 2016/17

PROJECT PROJECT DESCRIPTION APPROXIMATE WARD RESPONSIBLE FUNDING PROGRESS / NO. SOURCE COMMENTS COST AUTHORITY A. MUNICIPAL TRANFORMATION AND INSTITUTIONAL DEVELOPMENT Strategic Objective A8: To ensure integrated development and environmental planning

A8.3 Formulation of a Disaster Management MUN uMngeni Municipality uMngeni Plan Completed, being Plan Municipality implemented

Create a comprehensive land database R500 000 MUN uMngeni Municipality COGTA(Map) Completed but A8.8.1 of all areas presently not rated to enable maintained on an expansion of Valuation Roll. District Municipality uMngeni ongoing basis Municipality A8.8.2 Completion of Land Data Base for R250 000 MUN uMngeni Municipality uMngeni Completed but Urban Component. Municipality maintained on an ongoing basis Strategic Objective A10: To develop and implement the Municipal Turn Around Strategy

A10.1 Develop a municipal turn-around In-house MUN uMngeni Municipality uMngeni Completed strategy Municipality

B. BASIC SERVICE DELIVERY AND INFRASTRUCTURE INVESTMENT Strategic Objective B1: To provide access to Water, Sanitation, Electricity, Solid Waste, Roads

B1.1.1 Replace community standpipes with R60 000 4 uMngeni Municipality uMngeni Completed individual connections in Lions River. Municipality

B1.1.2 Conversion of community standpipes to R250 000 4 uMngeni Municipality uMngeni Completed individual connections in Lidgetton Municipality

2

uMNGENI IDP 2012/13 TO 2016/17

PROJECT PROJECT DESCRIPTION APPROXIMATE WARD RESPONSIBLE FUNDING PROGRESS / NO. SOURCE COMMENTS COST AUTHORITY B1.2.1 Street lighting for KwaMevana Main R25 000 2, 4 uMngeni Municipality uMngeni Completed Road and Lidgetton Municipality

B1.2.2 Street lighting for Mpophomeni at the R10 000 8 uMngeni Municipality uMngeni Completed Roman Catholic Church intersection and Municipality Hyperama and Japan area.

Installation of traffic signals at: Amber Avenue and Mainstreet Completed B1.3.1 Curry’s Post Road and Main Street 2, 4, 5, uMngeni Municipality uMngeni Zeederberg Road and Boston Road 6, 8, Municipality Karkloof Road and Main Street 10, 11 In Mpophomeni Upgrade Zeederberg road. R1,7 million uMngeni Municipality DBSA Completed B1.3.2 6 uMngeni Municipality Dump site upgrade Curry’s Post Site R1,5 million 4, 7 uMngeni Municipality uMngeni Completed B1.6.1 Hilton dump site closure Municipality

Strategic Objective B2: To construct new Community and Public Facilities and maintaining existing structures Provision of a multi-purpose sports R1.5 M uMngeni Municipality uMngeni Completed B2.1.1 centre in Lion’s River. 4 District Municipality Municipality

District Municipality Upgrade the existing Mpophomeni R400 000 10 uMngeni Municipality uMngeni Completed B2.1.2 Community Hall. Municipality

3

uMNGENI IDP 2012/13 TO 2016/17

PROJECT PROJECT DESCRIPTION APPROXIMATE WARD RESPONSIBLE FUNDING PROGRESS / NO. SOURCE COMMENTS COST AUTHORITY B2.1.3 Community Hall for Lidgetton R1,1 m 4 uMngeni Municipality uMngeni Completed Municipality

B2.1.4 Upgrading of sports facilities in 2 uMngeni Municipality Dept. of Sports & Completed KwaMevane. Recreation

B2.1.5 Provision of Lidgetton Municipal Offices R2,000 000 4 uMngeni Municipality uMngeni Completed Municipality

Strategic Objective B3: To reduce the number of individuals in informal settlements

B3.1.1 Housing Projects: uMngeni Municipality Dept of Housing Completed Emandleni 6 Howick Erven 33 and 34 6 KwaMevane Siphumelele 2 Lions River (Phase I) 1 Lidgetton 4

4

C. LOCAL ECONOMIC DEVELOPMENT Strategic Objective C1: To stimulate economic growth

Formulate industrial development R150 000 MUN uMngeni Municipality DBSA Completed C1.2.1 strategy including the identification of industrial / commercial development nodes. Undertake feasibility study into an R100 000 MUN uMngeni Municipality DBSA Completed and to be C1.4.1 incentive programme for business and implemented.

4

uMNGENI IDP 2012/13 TO 2016/17

PROJECT PROJECT DESCRIPTION APPROXIMATE WARD RESPONSIBLE FUNDING PROGRESS / NO. SOURCE COMMENTS COST AUTHORITY industry. Strategic Objective C2: To enhance tourism development

C2.1 Formulate a Municipal tourism R250 000 MUN uMngeni Municipality DBSA Completed development plan which should address all tourism related strategies identified in District Municipality the IDP, and include a tourism assets uMngeni Tourism data base and a marketing plan. Association

Dept. of Economic Affair & Tourism Strategic Objective C4: To pursue special projects that will act as catalysts for development

C4.1 Mpophomeni Nodal Study Completed

C4.3 Formulation of N3 Corridor Management R500 000 MUN uMngeni Municipality Provincial Completed Plan. Administration

Formulate Master Plans for the following uMngeni Municipality uMngeni Master Plans areas: Municipality completed. C4.4.1 (i) Midmar Dam area R320 000 MUN Dept. of (ii) World’s View Transport (iii) Howick Falls COGTA (iv) Karkloof C4.7 Formulate a local area plan including R250 000 7 uMngeni Municipality uMngeni Completed and to be traffic requirements for the Hilton central Municipality implemented area from the Hilton Hotel to Crossways.

5

uMNGENI IDP 2012/13 TO 2016/17

PROJECT PROJECT DESCRIPTION APPROXIMATE WARD RESPONSIBLE FUNDING PROGRESS / NO. SOURCE COMMENTS COST AUTHORITY D. GOOD GOVERNANCE AND PUBLIC PARTICIPATION Strategic Objective D1: To implement Public Participation Programmes

D1.1.1 Formulate a communication plan, R100 000 MUN uMngeni Municipality uMngeni Plan completed being addressing both internal and external Municipality implemented. communications.

D1.2.1 Customer Satisfaction Survey to inform In House MUN uMngeni Municipality uMngeni Completed Key Performance Indicators. Municipality

Strategic Objective D3: To formulate, implement and review Policies, Procedures and Bylaws

R140 000 MUN uMngeni Municipality Municipal Code Review municipal policies and bylaws. COGTA / MAP D3.1 completed policy uMngeni review ongoing. Municipality E FINANCIAL VIABILITY AND FINANCIAL MANAGEMENT F COMMUNITY AND SOCIAL SERVICES DEVELOPMENT Strategic Objective F3: To ensure all communities have access to basic community facilities and social services

Undertake audit of existing community R100 000 MUN uMngeni Municipality uMngeni Completed and being F3.1 facilities and then determine the Municipality maintained. desirability and location for additional social facilities in different areas following an audit of existing facilities.

6

uMNGENI IDP 2012/13 TO 2016/17

PROJECT PROJECT DESCRIPTION APPROXIMATE WARD RESPONSIBLE FUNDING PROGRESS / NO. SOURCE COMMENTS COST AUTHORITY Strategic Objective F6: To facilitate the provision of formal housing

F6.2.1 Formulation of a Social Housing In House MUN uMngeni Municipality uMngeni Plan Completed, being Programme in consultation with the Municipality implemented Department of Housing

Strategic Objective F9:To improve road safety and traffic management

Formulate a traffic control strategy to R100 000.00 uMngeni Municipality DBSA Strategy complete, F9.1.1 improve traffic management in the MUN implementation ongoing municipality as a whole. Dept. of Transport,

District Municipality Strategic Objective F12: To facilitate alignment and integration of special programmes

F12.2 Establishment of Youth Advisory Centre In House MUN uMngeni Municipality / Advisory Centre up and Umsobombu Youth Fund running

7 uMNGENI IDP 2012/13 TO 2016/17

SCHEDULE 2: PROJECTS THAT ARE IN PROGRESS

8

uMNGENI IDP 2012/13 TO 2016/17

PROJECT PROJECT DESCRIPTION ESTIMATED WARD RESPONSIBLE NO. COST AUTHORITY / FUNDING SOURCE A. MUNICIPAL TRANFORMATION AND INSTITUTIONAL DEVELOPMENT Strategic Objective A1: To provide effective and efficient Human Resources Management Services Undertake strategic assessment of existing and required skills for Municipal In House A1.2.1 staff, and formulate Skills Development Programme MUN uMngeni Municipality Strategic Objective A8: To ensure integrated development and environmental planning

Review and amalgamation of existing Town Planning Schemes and the MUN A8.1.1 formulation of a Land Use Management System for the entire Municipality. R300 000 uMngeni Municipality / COGTA

A8.3.1 Implementation of Disaster Management Plan R250’000.00 MUN uMngeni Municipality / District/ Province/ MIG

A8.5.1 Undertake a Strategic Environmental Assessment (SEA) to form the base of R335 000 MUN uMngeni Municipality / DAEARD / an Environmental Management Plan (EMP) for the entire municipal area. DBSA Ongoing implementation of an effective alien invasive species control In House MUN KZN Wildlife / A8.5.2 programme uMngeni Municipality / DWAF / Umgeni Water

Strategic Objective A9: To implement an effective organisational and individual performance management system

A9.1 Develop and implement an organisational performance management system

KEY : MUN = Municipal Wide 9

uMNGENI IDP 2012/13 TO 2016/17

PROJECT PROJECT DESCRIPTION ESTIMATED WARD RESPONSIBLE NO. COST AUTHORITY / FUNDING SOURCE A10.1 Develop and implement a municipal turn-around strategy In-house MUN uMngeni Municipality

B. BASIC SERVICE DELIVERY AND INFRASTRUCTURE INVESTMENT Strategic Objective B1: To provide access to Water, Sanitation, Electricity, Solid Waste, Roads B1.2.3 Increase electricity supply to Howick R2 million 2 uMngeni Municipality / DBSA/ Own Funding B1.2.4 Extension of electricity supply and conversion to pre-paid system for No fixed amount MUN uMngeni Municipality/ domestic purposes. Eskom

To provide street lighting on a phased basis in line with the budget, taking R200 000.00 MUN uMngeni Municipality B1.2.5 into account the requests raised through the public consultation process.

B1.3.3 Traffic Signage R40 000 1, 2 uMngeni Municipality

B1.3.4 Heavy vehicle control in Howick R15 000 1, 2 uMngeni Municipality

Upgrade existing bridge (over uMngeni River) in Howick R1 M 2 uMngeni Municipality / Dept. of B1.3.5 Transport - Pedestrian Guard Rail

- Assess exact extent of possible upgrade or re- construction

KEY : MUN = Municipal Wide 10

uMNGENI IDP 2012/13 TO 2016/17

PROJECT PROJECT DESCRIPTION ESTIMATED WARD RESPONSIBLE NO. COST AUTHORITY / FUNDING SOURCE - Widening of bridge Maintenance and rehabilitation of municipal roads throughout the R1, 5 million. MUN uMngeni Municipality B1.5.1 Municipality, taking into account the requests raised through the public consultation process. C. LOCAL ECONOMIC DEVELOPMENT Strategic Objective C1: To stimulate economic growth Review and assess all existing LED strategies and projects. In House MUN uMngeni Municipality C1.1.1 C1.3 Midlands Development Agency R350’000.00 MUN

Implementation of feasibility study into an incentive programme for business In House MUN uMngeni Municipality C1.4.2 and industry. Strategic Objective C3: To provide support to local business and emerging black entrepreneurs

Skills training programmes in consultation with Department of Labour, as MUN Dept. of Labour C3.1.1 well as providing a database of local Service Providers R150 000 uMngeni Municipality / (SETA)

Strategic Objective C4: To pursue special projects that will act as catalysts for development

C4.1 Implementation of Mpophomeni Nodal Development Project including 17m 10 COGTA / National Treasury support infrastructure

C4.2 Mpophomeni Tourism Gateway Complex R300’000.00 10

KEY : MUN = Municipal Wide 11

uMNGENI IDP 2012/13 TO 2016/17

PROJECT PROJECT DESCRIPTION ESTIMATED WARD RESPONSIBLE NO. COST AUTHORITY / FUNDING SOURCE Implementation of Master Plans for the following areas: To be determined uMngeni Municipality / COGTA / C4.4.2 MUN Dept. of Transport (ii) Midmar Dam area (iii) Howick Falls

Strategic Objective C5: To facilitate and co-ordinate agricultural development

C5.1 Agricultural Development Strategy for the Municipality taking into account In House MUN uMngeni Municipality input from community consultation.

D. GOOD GOVERNANCE AND PUBLIC PARTICIPATION Strategic Objective D1: To implement Public Participation Programmes D1.1.2 Implementation of a communication plan, addressing both internal and In House MUN uMngeni Municipality external communications. E FINANCIAL VIABILITY AND FINANCIAL MANAGEMENT Strategic Objective E1: To ensure that all revenue of the municipality is accounted for E1.1.1 Implement effective debt collection and credit control system. In House MUN uMngeni Municipality / MSIG / Project Consolidate

KEY : MUN = Municipal Wide 12

uMNGENI IDP 2012/13 TO 2016/17

PROJECT PROJECT DESCRIPTION ESTIMATED WARD RESPONSIBLE NO. COST AUTHORITY / FUNDING SOURCE F COMMUNITY AND SOCIAL SERVICES DEVELOPMENT

Strategic Objective F2: To contribute to a safe and secure environment

Prepare and implement a strategy on crime prevention which should Implementation costs S.A.P.S F2.2.1 include: to be determined MUN uMngeni Municipality / DBSA An audit of crime prevention initiatives An audit of crime prevention resources Liaison mechanisms Extension of public policing forums to rural areas Enhanced and expanded security and policing measures including the possibility of municipal protection services/ traffic services Increased number of satellite police stations.

Strategic Objective F3: To ensure all communities have access to basic community facilities and social services Formulate programme for the disposal of unused Council owned property. In House uMngeni Municipality F3.3.1 MUN F3.4 Restoration of Montrose House for Eco and Cultural Heritage Museum R500’000.00

Strategic Objective F8: To provide integrated public transport facilities

F8.1 Prepare and implement a plan for the provision of commuter facilities in R60 000 MUN Dept. of Transport appropriate locations, taking into account the requests raised through the public consultation process. uMngeni Municipality

KEY : MUN = Municipal Wide 13 uMNGENI IDP 2012/13 TO 2016/17

SCHEDULE 3: PROJECTS FOR WHICH uMNGENI MUNICIPALITY IS THE FUNDING AGENCY

14

uMNGENI IDP 2012/13 TO 2016/17

PROJECT NO. PROJECT DESCRIPTION ESTIMATED PRIORITY RATING RESPONSIBLE COST / WARD AUTHORITY / FUNDING SOURCE A. MUNICIPAL TRANFORMATION AND INSTITUTIONAL DEVELOPMENT Strategic Objective A3: To ensure effective administrative support services A3.3 Provision of Administration facilities in Nottingham Road. R200 000 3 3 uMngeni Municipality Strategic Objective A8: To ensure integrated development and environmental planning A8.11 Master Plans for: To be determined 2 MUN uMngeni Municipality / Spring Grove Dam COGTA Albert Falls Dam R500 000 Main road from Merrivale Interchange to Tweedie Interchange Strategic Objective A10: To develop and implement the Municipal Turn Around Strategy A10.1.1 Ward Level Community Based Plans To be determined 2 MUN uMngeni Municipality / COGTA B. BASIC SERVICE DELIVERY AND INFRASTRUCTURE INVESTMENT Strategic Objective B1: To provide access to Water, Sanitation, Electricity, Solid Waste, Roads B1.1.3 Formulation of a Bulk Water Supply Plan for Municipality To be determined 2 MUN uMngeni Municipality, (including Spring Grove Dam) uMgungundlovu District Municipality, DWAF, Umgeni Water B1.2.6 Floodlighting behind crèche at KwaMevana. R78 000.00 1 2 uMngeni Municipality

Installation of traffic calming measures where required R300 000 2 MUN Dept. of Transport B1.3.6 throughout municipality, especially in residential areas in uMngeni Municipality proximity to schools

KEY : MUN = Municipal Wide 15

uMNGENI IDP 2012/13 TO 2016/17

PROJECT NO. PROJECT DESCRIPTION ESTIMATED PRIORITY RATING RESPONSIBLE COST / WARD AUTHORITY / FUNDING SOURCE Upgrade stormwater network and all roads that need R14,1 M 1 8, 10, 11 uMngeni Municipality/ MIG B1.3.7 tarring in Mpophomeni Construction of new roads and stormwater measures in the 1 MUN uMngeni Municipality/MIG following areas: B1.3.8 - Midlands Roads R3,7M - D390 - Cedara - N3 corridor link over uMngeni - N3 corridor Tweedie Interchange - Siphomelele - Lions River - Lidgetton West - Zenzani - Hiltonian Society - Mpophomeni Tourism Gateway Project - Nelson Mandela Monument - Nottingham Road - Emandleni - Link Road from Baron Road to D292 - N3 Corridor Masterplan Roads further requirements - Other requests raised through the public participation process B1.3.9 Extension of Symonds Street. R1, 000 000 3 2 uMngeni Municipality

B1.3.10 Extension of Buchanan Road. R500 000 3 2 uMngeni Municipality

KEY : MUN = Municipal Wide 16

uMNGENI IDP 2012/13 TO 2016/17

PROJECT NO. PROJECT DESCRIPTION ESTIMATED PRIORITY RATING RESPONSIBLE COST / WARD AUTHORITY / FUNDING SOURCE B1.3.11 Sidewalks to accommodate school children at St. Josephs To be determined 2 9 DoT

B1.3.12 Investigate feasibility of link roads between: To be determined 2 9 uMngeni Municipality

- Ward 9 and Sweetwaters

- Boston Bulwer Road to Midmar Interchange - Prospect to Winston Roads B1.6.1 New Landfill Site (Curry’s Post Rd) To be determined 1 MUN uMngeni Municipality, uMgungundlovu District Municipality

Strategic Objective B2: To construct new Community and Public Facilities and maintaining existing structures

B2.1.6 Upgrade of Municipal Swimming Pool R600 000 2 MUN uMngeni Municipality

B2.1.7 Community Hall for Nottingham Road R1 000 000 3 4 uMngeni Municipality

B2.1.8 Establishment of an AIDS Orphanage Centre. To be determined 2 MUN uMngeni Municipality / Dept. of Health

B2.2.1 Establish an open space system and link to tree planting & R100 000 (plan) MUN landscaping programme and the creation/ upgrading of 2 uMngeni Municipality parks B2.2.2 Establish a landscaping programme in areas such as the Supplied by DAEA 2 MUN uMngeni Municipality / tourism nodes and CBD’s. Undertake a tree planting DAEARD programme throughout the municipality.

B2.3.1 Establishment of Crematorium and Cemetery To be determined 2 5 uMngeni Municipality

KEY : MUN = Municipal Wide 17

uMNGENI IDP 2012/13 TO 2016/17

PROJECT NO. PROJECT DESCRIPTION ESTIMATED PRIORITY RATING RESPONSIBLE COST / WARD AUTHORITY / FUNDING SOURCE C. LOCAL ECONOMIC DEVELOPMENT

Strategic Objective C1: To stimulate economic growth

Investigate the feasibility of employment creation through To be determined 1 MUN uMngeni Municipality C1.1.2 the following types of projects: construction and Dept. of Labour maintenance of public buildings, alien plant eradication, market gardening and fresh produce markets, environmental conservation projects, tourist support services, medicinal herbs.

In consultation with the DM, prepare a poverty To be determined 1 MUN uMngeni Municipality / DLA * C1.5 alleviation plan. / DAEARD Compiling a data base of poverty alleviation activities Identifying and promoting the establishment of self- help projects and co-operatives aimed specifically at poverty alleviation Promoting household food security and nutrition, through agricultural projects and by assisting in the implementation of LRAD (Department of Agriculture). Strategic Objective C2: To enhance tourism development

Provision of improved facilities at tourist points e.g. To be determined 1 MUN Provincial / uMngeni C2.1.1 Karkloof Falls, World’s View, Howick Falls, Mandela Municipality Capture site. (See C1.3: Schedule 2)

* Currently being undertaken by the DM

KEY : MUN = Municipal Wide 18

uMNGENI IDP 2012/13 TO 2016/17

PROJECT NO. PROJECT DESCRIPTION ESTIMATED PRIORITY RATING RESPONSIBLE COST / WARD AUTHORITY / FUNDING SOURCE Strategic Objective C3: To provide support to local business and emerging black entrepreneurs

C3.2 Investigate feasibility of local business support centres for To be determined 2 MUN uMngeni Municipality each Ward

Strategic Objective C4: To pursue special projects that will act as catalysts for development

C4.3 Implementation of N3 Corridor Masterplan To be determined 1 MUN uMngeni Municipality / COGTA Purchase of Merrivale Road Servitude R128 000.00

C4.7 Implementation of the local area plan including the Hilton To be determined 2 7 uMngeni Municipality central area from the Hilton Hotel to Crossways.

Establish a mixed use area along the Boston Road / To be determined 2 8 uMngeni Municipality C4.8 Mpophomeni Corridor (Airfield site). Dept. of Public Works / COGTA

C4.9 Review of LED & Tourism Strategies R360’000.00 2 COGTA

D. GOOD GOVERNANCE AND PUBLIC PARTICIPATION

KEY : MUN = Municipal Wide 19

uMNGENI IDP 2012/13 TO 2016/17

PROJECT NO. PROJECT DESCRIPTION ESTIMATED PRIORITY RATING RESPONSIBLE COST / WARD AUTHORITY / FUNDING SOURCE F COMMUNITY AND SOCIAL SERVICES DEVELOPMENT Strategic Objective F3: To ensure all communities have access to basic community facilities and social services

F3.5 Howick Museum Meeting and Activity Room R400’000.00 2

Initiate an anti-litter and litter awareness and education In House 1 MUN uMngeni Municipality/DUCT F5.3.1 campaign. F5.3.2 Water Awareness Campaign To be determined 2 MUN uMngeni Municipality/Umgeni Water

Strategic Objective F8: To provide integrated public transport facilities

F8.1.1 Nottingham Road To be determined 2 3 uMngeni Municipality Taxi Rank F8.1.2 Shelter at Taxi Rank (Ward 10) R500 000 1 10 uMngeni Municipality (Phase 1)

F8.1.3 Purchase Erf 416 Howick/ Taxi Rank Upgrade (Ward 1 R400 000 1 1 uMngeni Municipality Harvard)

Strategic Objective F10: To facilitate the development of sport

Initiate a community based programme to provide and / or R50 000 2 MUN uMngeni Municipality F10.2 upgrade sports fields for all communities,taking into consideration the requests raised through the public District Municipality

KEY : MUN = Municipal Wide 20

uMNGENI IDP 2012/13 TO 2016/17

PROJECT NO. PROJECT DESCRIPTION ESTIMATED PRIORITY RATING RESPONSIBLE COST / WARD AUTHORITY / FUNDING SOURCE consultation process. Strategic Objective F12: To facilitate alignment and integration of special programmes F12.6 Implementation of National policy on gender and the 1 MUN uMngeni Municipality disabled with regard to development programmes, In House Municipal facilities and procurement.

KEY : MUN = Municipal Wide 21 uMNGENI IDP 2012/13 TO 2016/17

SCHEDULE 4: PROJECTS FOR WHICH OTHER AGENCIES ARE THE FUNDING SOURCE

22 uMNGENI IDP 2012/13 TO 2016/17

ORIGINAL PROJECT DESCRIPTION ESTIMATED PRIORITY RESPONSIBLE FUNDING PROGRESS / PROJECT RATING / SOURCE COMMENTS NO. COST WARD AUTHORITY A. MUNICIPAL TRANFORMATION AND INSTITUTIONAL DEVELOPMENT Strategic Objective A8: To ensure integrated development and environmental planning A8.9 Development of a Catchment Management Plan for the To be 1 MUN DAEARD / DAEARD / To be initiated upper Umgeni catchment determined DWA DWA

A8.10 Development of an Integrated Water Resource To be 1 5 DAEARD / DWA DAEARD / To be initiated Management Plan for Midmar Dam determined DWA

B BASIC SERVICE DELIVERY AND INFRASTRUCTURE INVESTMENT Strategic Objective B1: To provide access to Water, Sanitation, Electricity, Solid Waste, Roads

Include the municipal priorities for the installations of water R5m MUN District District Ongoing B1.1.4 points and extension and upgrading of the local water and 1 Municipality Municipality sanitation reticulation systems in the District Municipality’s Water Services Development Plan and Sanitation programme. Extend and upgrade bulk water throughout the municipal To be 1 MUN District MIG/ Umgeni Ongoing B1.1.5 area, including: determined Municipality Water - Supply of raw water for package plant & storage uMngeni (Nottingham Road) Municipality - Bulk Water Supply from Groenekloof to Hilton Gardens (phase 1) - Improve bulk water supply to support N3 Corridor Development - External bulk pipeline from Eridene Reservoir to proposed new reservoir at Currys Post Road and bulk pipeline to Tweedie

KEY : MUN = Municipal Wide 23 uMNGENI IDP 2012/13 TO 2016/17

ORIGINAL PROJECT DESCRIPTION ESTIMATED PRIORITY RESPONSIBLE FUNDING PROGRESS / PROJECT RATING / SOURCE COMMENTS NO. COST WARD AUTHORITY - Bulk water pipeline from Howick South Reservoir to Mpophomeni (Khayelisha) - Bulk water from Springgrove Dam to Nottingham Road, Zenzani, Lidgetton & Lions River - Bulk water supply and storage KwaNxamalala/Inadi - Installation of boreholes or springwater supply to rural communities (Perusstroom, Corrie Lynn, Currys Post, Mount West, Lutchman, Lidgetton and others) - Upgrade potable water supply & storage Lidgetton West - Bulk Water supply Cedara Improve Water Supply for the following communities: R6m MUN District District Ongoing B1.1.6 1 Municipality Municipality S Hilton College Community S Cedara Community uMngeni MIG S Triandra Community (Borehole) S Hawkstone Community (Borehole) Municipality S Dunmarie Primary School Community (Borehole) S Curries Post Community (Borehole) S Hilton S Hilton Central Area S Lidgetton (and storage) S Khayelisha S Emandleni (Deeside) S Nottingham Road S Lions River S Yarrow (Borehole) S St Josephs S Zenzani

KEY : MUN = Municipal Wide 24 uMNGENI IDP 2012/13 TO 2016/17

ORIGINAL PROJECT DESCRIPTION ESTIMATED PRIORITY RESPONSIBLE FUNDING PROGRESS / PROJECT RATING / SOURCE COMMENTS NO. COST WARD AUTHORITY S Sherwood (Borehole) S Nxamalala (Borehole) S Lutchman (Borehole) S KwaNxamalala/Inadi S Lemonwood (Borehole) S Colbourne (Borehole)

Areas for which sewerage systems are required: To be 2 MUN District MIG Ongoing B1.1.7 S Hilton College Community determined Municipality S Cedara Community District S Triandra Community Municipality S Hawkstone Community S Dunmarie Primary School Community S Curries Post Community S Hilton S Hilton Central Area S Lidgetton S Khayelisha S Emandleni (Deeside) S Nottingham Road S Lions River S Yarrow S St Josephs S Zenzani S Sherwood S Nxamalala S Lutchman S KwaNxamalala/Inadi S Lemonwood S Colbourne S Reconstruction of Mpophomeni Treatment Works

KEY : MUN = Municipal Wide 25 uMNGENI IDP 2012/13 TO 2016/17

ORIGINAL PROJECT DESCRIPTION ESTIMATED PRIORITY RESPONSIBLE FUNDING PROGRESS / PROJECT RATING / SOURCE COMMENTS NO. COST WARD AUTHORITY and bulk effluent pipeline to N3 S Construction of Pump Station Khayelisha S Construction of package plant Nottingham Road S Upgrade Howick Treatment Works S Upgrade Cedara Treatment Works To initiate discussion with the electricity service provider to R2.4M Ongoing B1.1.8 pursue the extension of electricity to the following areas: (Phased over 1 Eskom, NER / ESKOM MUN 3 years) DME S Hawkstone Community S Community in vicinity of Dunmarie Primary School S Curry’s Post Community S Triandra Community S Karkloof Community S Zenzani S Sherwood S Nxamalala S Lutchman S KwaNxamalala/Inadi S Lemonwood S Colbourne S Nottingham Road S St. Josephs S Hilton Society Project S Khayelisha S Cedara B1.1.9 Midmar Water Treatment Plant Upgrade R130.3 M MUN Umgeni Water Umgeni Water Design and Implementation

1 Phase

In consultation with the Department of Transport and the MUN Dept. of Dept. of Funds to be Transport/

KEY : MUN = Municipal Wide 26 uMNGENI IDP 2012/13 TO 2016/17

ORIGINAL PROJECT DESCRIPTION ESTIMATED PRIORITY RESPONSIBLE FUNDING PROGRESS / PROJECT RATING / SOURCE COMMENTS NO. COST WARD AUTHORITY B1.3.14 District Council prepare a roads and stormwater upgrading R250 000 1 Transport, uMngeni accessed from and maintenance plan. (phasing to be Municipality appropriate District authority. costed) Municipality,

uMngeni Municipality. Formulate in consultation with Dept. of Transport on an To be MUN Dept. of Dept. of In progress B1.3.15 upgrade and maintenance programme for the district road determined 1 Transport Transport network servicing the Midlands Meander. uMngeni Municipality

B1.3.16 Formulation of Transport Plan as required in terms of KZN R400 000 1 MUN District District Draft Plan Provincial Roads Act, 2001, to include a feasibility study of Municipality Municipality completed a Public Transport system especially to serve schools in Dept. of rural areas. Transport

Tar the roads from Fort Nottingham to Dargle, from Dargle R20 m MUN Municipality B1.3.17 to Impendle and between Curry’s Post and Mount West. 1 Dept. of Dept. of engaging Dept. of Transport Transport Transport B1.3.18 Tar Birnamwood Road To be 1 7 Dept. of Dept. of To be investigated determined Transport Transport

Provide pedestrian bridge over uMngeni River linking R1,4 m 1 1, 2 uMngeni CMIP Awaiting Appeal B1.3.19 Howick West and KwaMevana. Municipality decision from uMngeni MEC Municipality B1.3.20 Upgrade of Tweedie Interchange To be 1 MUN SANRAL/DoT/ SANRAL/DoT/ To be initiated

KEY : MUN = Municipal Wide 27 uMNGENI IDP 2012/13 TO 2016/17

ORIGINAL PROJECT DESCRIPTION ESTIMATED PRIORITY RESPONSIBLE FUNDING PROGRESS / PROJECT RATING / SOURCE COMMENTS NO. COST WARD AUTHORITY determined uMngeni Mun. uMngeni Mun.

B1.3.21 Signalisation of N3 off-ramp, Hilton Gardens To be 1 6, 7 SANRAL/DoT/ SANRAL/DoT/ To be initiated determined uMngeni Mun. uMngeni Mun.

Set up and implement a labour-intensive community based road MUN Dept. of Transport Dept. of Ongoing B1.5.5 maintenance programme for regional roads and district roads in To be 2 District Transport the rural areas in consultation with Department of Transport and Municipality determined District Council. uMngeni Municipality Formulate a solid waste management strategy, which R300 000 MUN District DWA should include: B1.6.2 1 Municipality Overall planning The identification of areas to which the municipal MIG ongoing waste disposal service needs to be extended; A feasibility assessment of the possible outsourcing of uMngeni the solid waste disposal service; Municipality The identification of alternative waste disposal sites; District The identification and establishment of accessible Municipality garden refuse disposal sites. Facilitation of easy Recycling Strategic Objective B3: To reduce the number of individuals in informal settlements

B3.1.2 Housing Projects: To be 1 MUN Department of Department of See Chapter 5 Note: All projects include provision or upgrading of bulk determined Housing Housing where Department water, bulk sanitation, treatment works, bulk roads and of Housing stormwater, bulk electricity, as required, as well as internal 2011/2012 budget servicing and infrastructure. allocations are set out Hiltonian Society Housing – Howick West

KEY : MUN = Municipal Wide 28 uMNGENI IDP 2012/13 TO 2016/17

ORIGINAL PROJECT DESCRIPTION ESTIMATED PRIORITY RESPONSIBLE FUNDING PROGRESS / PROJECT RATING / SOURCE COMMENTS NO. COST WARD AUTHORITY Cedara Khayelisha Zenzane Nottingham Road/Hillside Gowrie Fourdone Karkloof Farm Yarrow St Josephs Kwa Nxamalala/Inadi Lions River Phases II and III Colbourne Dargle (Land still to be identified) Lutchnman/Sookan Kwa Mevana C LOCAL ECONOMIC DEVELOPMENT Strategic Objective C3: To provide support to local business and emerging black entrepreneurs

Determine location for Business Support Centres R75 000 MUN uMngeni Department of Under C3.2.1 1 Municipality Economic Affairs Investigation & Tourism

F COMMUNITY AND SOCIAL DEVELOPMENT SERVICES

KEY : MUN = Municipal Wide 29 uMNGENI IDP 2012/13 TO 2016/17

ORIGINAL PROJECT DESCRIPTION ESTIMATED PRIORITY RESPONSIBLE FUNDING PROGRESS / PROJECT RATING / SOURCE COMMENTS NO. COST WARD AUTHORITY Strategic Objective F1: To manage health Issues

To initiate discussions with the Provincial Department of 1 MUN F1.2 Health to either provide clinic services or to increase the In House Dept. of Health Dept. of Health Discussions are

frequency of mobile clinic visits across the municipality. ongoing. Strategic Objective F2: To contribute to a safe and secure environment

F2.3 Pursue the upgrading and/or relocation of the Police To be 8, 9, Dept. Public Dept. of Public Mun. to liaise with Station at Mpophomeni. determined 1 10 Works/SAPS Works SAPS.

Strategic Objective F3: To ensure all communities have access to basic community facilities and social services

F3.6 - Clinics (Wards 3, 4 and 9) To be 1 3, 4 Dept. of Health Dept. of Health To be negotiated - Full time clinic for Nottingham Road Village determined with District Health. - Howick Clinic to be operational 24 Hours F3.7 Pension Payout points: Safe pension payout centre to be To be 3 provided in Nottingham Road determined

KEY : MUN = Municipal Wide 30 uMNGENI IDP 2012/13 TO 2016/17

ANNEXURE 2

LIST OF ALL POLICIES AND SECTOR PLAN IN uMNGENI

uMNGENI IDP 2012/13 TO 2016/17

INVENTORY OF SECTOR PLANS

INVENTORY OF SECTOR PLANS AND ADDITIONAL PLANS RELEVANT OR LINKED TO THE IDP

PLAN YES NO COMMENT

Current Reality √ Revised in 2012

Vision and Mission Statement √ Revised in 2012

Strategic Framework √ Revised in 2012

Projects Lists √ Revised annually

Monitoring and Performance √ Funding available for updating Management System

Spatial Development √ Revised annually Framework

5 Year Financial Plan √ Revised annually

Institutional Framework √ Needs to be updated

Disaster Management Plan √ Adopted by Council

Local Economic Development √ Plans developed cover Tourism and Industrial Development Strategy. See also projects list for additional action in regard to LED.

Environmental Programme √ SEA / EMP under preparation

Transport Plan √ District function has been prepared.

Infrastructure Programme √ Projects cover both Local and District level issues

Housing Plan √ Housing Plan has been prepared in- house

Social Housing Policy √ Prepared during 2008/09 Review

uMNGENI IDP 2012/13 TO 2016/17

PLAN YES NO COMMENT

HIV / AIDS Prevention √ Adopted by Council. Programme

Poverty Reduction √ Ongoing in consultation with District Municipality and other Sector Operation Sukuma Sakhe Departments.

Tourism Management Plan √ Completed

- Midmar Dam Master Plan

- Karkloof Falls Master Plan

- Worlds View Master Plan

- Howick Falls Master Plan

Industrial Incentive √ Completed and Under Review. Programme

Industrial Retention and √ DTI funded to be initiated. Expansion Strategy

Traffic Control Strategy √ Completed

Employment Equity Plan √ Reviewed Annually

Workspace Skills Development √ Reviewed Annually Plan

uMNGENI IDP 2012/13 TO 2016/17

ANNEXURE 3

SUMMARY OF CONSULTATION INPUT ON ISSUES BY WARD

uMNGENI IDP 2012/13 TO 2016/17

UMNGENI IDP: SUMMARY OF INPUTS RECEIVED ON ISSUES RAISED THROUGH THE IDP CONSULATION (IMBIZO AND WRITTEN RESPONSES) BY WARD

BACKGROUND

Following the 2012/2013 IDP & Budget Imbizo a substantial number of written inputs have been received. The following is a summary of the issues raised by Ward, both from the meeting notes and the written input. It should be noted that where possible, issues raised relating to facilities in other Wards have been placed under the Wards where the facility occurs. A call has been made from most respondents for the community to be informed of projects and for feedback to be given as to what has happened since the last Imbizo.

WARD 1

1.1 Issues raised relating to the Shiyabazali Informal Settlement:

There are no services (Water/Electricity/Toilets)

The residents are advised by the Councillor not to build shacks and asked to wait for RDP houses

The area they live in is adjacent to unhygienic water (Sewerage polluted), and this water is consumed by neighbourhood children

1.2 Other issues raised in the Ward cover:

1.2.1 Cracked and flooded houses – houses are of substandard including the toilets 1.2.2 Stormwater and road flooding needs attention – clear drains and kerb and channeling on a regular basis 1.2.3 The area is filthy 1.2.4 There is a need for vegetation maintenance 1.2.5 There is an urgent need for additional housing 1.2.6 There is a need for electricity 1.2.7 The provision of communal taps is not enough 1.2.8 Assistance is needed with community projects such as the provision of seeds – community volunteers could be employed on a stipend to assist the community with projects and other community needs such as caring for the elderly & those with HIV& AIDS 1.2.9 Accreditation of the computer courses provided at the library 1.2.10 High crime rate & drug abuse – there is a need for a satellite Police Station to serve Wards 1 & 12 1.2.11 Refurbishment of Howick West Clinic, and an extended clinic service is needed 1.2.12 Refurbishment of Howick West Community Hall which is used by the whole uMngeni community 1.2.13 Pot Holes throughout the road system 1.2.14 Develop recreation facilities and play areas in open spaces 1.2.15 Straying animals to be impounded

uMNGENI IDP 2012/13 TO 2016/17

1.2.16 High unemployment 1.2.17 Provision of high mast lighting for night time burials at the Valley of Rest Cemetery 1.2.18 Extension of this Cemetery at the entrance proposed as it is filling up fast 1.2.19 Street Lights are needed on high pedestrian traffic accesses 1.2.20 The Howick Sewerage Plant is overloaded with pollution gravitating to the Mgeni River 1.2.21 Resurfacing of main roads such as Midmar & Valley Roads 1.2.22 Traffic Lights are needed at the intersection of Prospect Road and Main Road

WARD 2

2.1 24 Hour Clinic, redevelopment of the Howick Clinic 2.2 Limit the number of taverns 2.3 Bell Street Sports Ground is in a total state of disrepair & needs to be refurbished 2.4 HIV/AIDS Strategy & Budget need to be communicated to the community 2.5 Problem with refuse collection and meter reading 2.6 Unclogging of drains especially at the taxi rank to prevent flooding 2.7 Repair of potholes – Fraser St, Sparks Rd, Patterson Rd, Northumberland Rd, Bell St, Andrew Street, Reyland Rd, Devonshire Ave, Ludgate Hill, Market St 2.8 Potholes at Bus Rank joining Morling St to Harvard St 2.9 Resurfacing Miller St from Clarendon to Philpot/York Street; Bell Street between Main & Park Streets; Ridge Rd, Berea Rd, Clarendon all have sections that need resurfacing 2.10 Upgrade of main access between the Howick High School & Primary School 2.11 Control of Grass & Weeds 2.12 Schools in Howick West and KwaMevane are overcrowded and classes are too large – proposed use of Howick Preparatory & Howick High School to assist 2.13 Road tarring, kerb creation and tree removal needed to serve After Care Service (Angel’s Cove) 2.14 Playground on land opposite Angel’s Cove 2.15 New Taxi Rank - what is happening – this seems to be a white elephant

WARD 3

3.1 Water & Electricity are needed 3.2 Housing is needed 3.3 Taxi Shelters, litter bins in Nottingham Road Village 3.4 Upgrade of Nottingham Road Village community Sports Field 3.5 Refuse Collection Depot at Nottingham Road Depot 3.5 Budget allocation & Staff provision requested for maintenance of Nottingham Road Village and Fort Nottingham Village

WARD 4

WARD 5

uMNGENI IDP 2012/13 TO 2016/17

5.1 Meeting Hall, Job Facilitation & Sports Facilities for the Karkloof Community 5.2 Pedestrian Walkway from Amberfield to Main Street 5.3 Resurfacing of Mare Sreet 5.4 The sidewalk in Harvard Street/Falls Drive from St Lukes Church to the Howick Falls needs repair 5.5 Services are needed 5.6 The electrification project is incomplete as some households have not received electricity - what is the criteria in order to have access to electricity? 5.7 There is a water pump near the Triandra Farm Primary School where clarity on ownership is sought 5.8 Also ownership of the electrical meter near the school 5.9 Need for accelerated housing delivery for the Municipality as a whole. Each new dwelling to have a rainwater(JOJO) tank, vegetable garden, fruit trees and solar water heaters 5.10 uMngeni Extension Officer to assist with emerging farmer needs 5.11 Curry’s Post waste disposal site to be fully compliant with Permit 5.12 Re-establishment of the Howick Falls Caravan Park/Campsite would create employment 5.13 Support of/sponsoring of land & agrarian reform

WARD 6

6.1 Mobile Clinic only comes once a month to the rural area 6.2 Tarred Roads 6.3 Urban Development 6.4 Skills Development of the youth and the rest of the Community

WARD 7

7.1 It should be noted that the Hilton Ratepayers Association raised objections to the budget but did not raise IDP issues

WARD 8

8.1 Road names are needed in Ward 8 8.2 Community Based Organizations such as the Zenzeleni Community Centre in Ward 8 should be given a Grant in Aid 8.3 Need for revived discussions regarding HIV/AIDS

WARD 9

9.1 There are no basic services (electricity, water, tarred roads, sports grounds are all needed) 9.2 They want toilets to be built like in Mafakatini 9.3 The budget should include expenditure in the rural area and the IDP should take into account farm dwellings

uMNGENI IDP 2012/13 TO 2016/17

9.4 Lions River Soccer field ownership & management by Howick & Districts land Owners Association 9.5 Refuse Collection Depot needed at Lions River

WARD 10 10.1 The water and other projects that are undertaken need to include employment of community members 10.2 Access Roads 10.3 Youth Recreation Centres are needed

WARD 11

WARD 12 12.1 More classrooms at Cosmo Primary at Tumbleweed a major priority, as well as toilets 12.2 Walkway for school children 12.3 Streetlights need to be repaired 12.4 Access Roads are needed 12.5 Public transport is too limited 12.6 There is need for a further school 12.7 Water & Sanitation needs

uMNGENI IDP 2012/13 TO 2016/17

ANNEXURE 4

STRATEGIC PLANNING ALIGNMENT NATIONAL AND PROVINCIAL GOALS AND PGDS GOALS

uMNGENI IDP 2012/13 TO 2016/17

uMNGENI VISION “The uMngen Municipality is to develop as a people focused, efficient and cost effective municipality providing quality services and sustainable socio-economic development.” uMNGENI MISSION “The uMngeni Municipality will ensure community participation in all projects; improve the skills of the municipal staff; ensure sound financial governance; address infrastructure needs and sustainable service and enhance economic development.” NATIONAL AND PROVINCIAL PRIORITIES Education Job Creation Job Creation Education Education Job Creation (decent Work Health (decent Work and (decent Work and Fighting Crime & Fighting Crime & and Economic Growth) Nation Building and Economic Growth) Economic Growth) Corruption Corruption Education Good Governance Health Education Nation Building and Nation Building and Health Rural Development, Rural Good Governance Good Governance Fighting Crime & Corruption Food Security and Development, Land Reform Food Security and Land Reform

NATIONAL KPA A. MUNICIPAL B. BASIC SERVICE C. LOCAL D. GOOD E. FINANCIAL F. COMMUNITY AND SOCIAL TRANSFORMATION & DELIVERY & ECONOMIC GOVERNANCE & VIABILITY & DEVELOPMENT SERVICES INSTITUTIONAL INFRASTRUCTURE DEVELOPMENT PUBLIC FINANCIAL DEVELOPMENT INVESTMENT PARTICIPATION MANAGEMENT uMNGENI IDP GOALS To maintain service To address To create an To ensure good To ensure economic, To encourage community excellence through backlogs in enabling corporate efficient, effective development for sustainable municipal transformation infrastructure environment for governance and transparent livelihoods and institutional services and economic Enhancing public utilization of financial arrangements maintenance of transformation and participation to resources existing growth through deepen democracy infrastructure broad based black To strengthen inter- To implement a 5 economic governmental year plan and empowerment, relations programme to investment address backlogs promotion, local business support, manufacturing, agricultural development and tourism uMNGENI STRATEGIC OBJECTIVES

A1 To provide effective B1To provide access C1To stimulate D1To implement Public E1 To ensure that all F1To manage health Issues and efficient Human to Water, economic growth Participation revenue of the F2To contribute towards a safe Resources Management Sanitation, Electricity, C2To enhance Programmes municipality is accounted and secure environment Services Solid tourism D2To ensure alignment for F3To ensure all communities A2To provide protection Waste, Roads development between E2To ensure compliance have access to basic Services B2To construct new C3To provide support National, Provincial, with all financial community facilities and social A3To ensure effective Community And to local Local Government management services administration Public Facilities and business and and Public Entities requirements F4To improve literacy support services maintaining emerging black D3To formulate, E3To ensure preparation F5 To ensure safe and healthy A4To encourage good existing structures entrepreneurs implement and and environment in all labour relations B3To reduce the C4To pursue special review implementation of communities within the institution number of projects that policies, procedures and budgeting and F6To facilitate the provision of A5To contribute individuals living in will act as catalysts bylaws reporting requirements formal housing meaningfully to the informal for D4To ensure functional E4To ensure that all F7To manage learner licences wellness of employees settlements development Internal Audit expenditure is and motor licensing A6To provide efficient B4To avoid C5To facilitate and Activity and Audit managed in terms of all F8To provide integrated public secretariat support deterioration of co-ordinate Committee financial legislation transport facilities services existing agricultural D5To implement an E5To ensure compliance F9To improve road safety and A7To conform to the Batho infrastructure network development effective Anti- with all Supply traffic management Pele Principles Corruption Strategy Chain Management F10To facilitate the A8 To ensure integrated D6To ensure that Regulations, development of sports development and strategic and Policies, PPPFA, BBBEE F11To facilitate synergistic environmental planning operation risks are requirements partnership between A9.To implement an identified and E6To ensure that all Traditional Leadership and the effective organisational monitored on a revenue due to the Municipality and individual performance continuous basis municipality is collected F12To facilitate the alignment management and integration of system special programmes A10To develop and implement the Municipal Turn Around Strategy A11To provide effective information communication technology solutions

uMNGENI IDP 2012/13 TO 2016/17

uMNGENI VISION “The uMngen Municipality is to develop as a people focused, efficient and cost effective municipality providing quality services and sustainable socio-economic development.” uMNGENI MISSION “The uMngeni Municipality will ensure community participation in all projects; improve the skills of the municipal staff; ensure sound financial governance; address infrastructure needs and sustainable service and enhance economic development.” PROVINCIAL GROWTH & DEVELOPMENT STRATEGY GOALS Human Resource Job Creation Job Creation Human Resource Governance & Policy Job Creation Development Human & Human Resource Development Human Resource Environmental Community Development Governance & Development Sustainability Development Strategic Policy Human & Community Governance & Policy Strategic Infrastructure Development Spatial Equity Infrastructure

NATIONAL KPA A. MUNICIPAL B. BASIC SERVICE C. LOCAL D. GOOD E. FINANCIAL F. COMMUNITY AND SOCIAL TRANSFORMATION & DELIVERY & ECONOMIC GOVERNANCE & VIABILITY & DEVELOPMENT SERVICES INSTITUTIONAL INFRASTRUCTURE DEVELOPMENT PUBLIC FINANCIAL DEVELOPMENT INVESTMENT PARTICIPATION MANAGEMENT uMNGENI IDP GOALS To maintain service To address To create an To ensure good To ensure economic, To encourage community excellence through backlogs in enabling corporate efficient, effective development for sustainable municipal transformation infrastructure environment for governance and transparent livelihoods and institutional services and economic Enhancing public utilization of financial arrangements maintenance of transformation and participation to resources existing growth through deepen democracy infrastructure broad based black To strengthen inter- To implement a 5 economic governmental year plan and empowerment, relations programme to investment address backlogs promotion, local business support, manufacturing, agricultural development and tourism uMNGENI STRATEGIC OBJECTIVES

A1 To provide effective B1To provide access C1To stimulate D1To implement Public E1 To ensure that all F1To manage health Issues and efficient Human to Water, economic growth Participation revenue of the F2To contribute towards a safe Resources Management Sanitation, Electricity, C2To enhance Programmes municipality is accounted and secure environment Services Solid tourism D2To ensure alignment for F3To ensure all communities A2To provide protection Waste, Roads development between E2To ensure compliance have access to basic Services B2To construct new C3To provide support National, Provincial, with all financial community facilities and social A3To ensure effective Community And to local Local Government management services administration Public Facilities and business and and Public Entities requirements F4To improve literacy support services maintaining emerging black D3To formulate, E3To ensure preparation F5 To ensure safe and healthy A4To encourage good existing structures entrepreneurs implement and and environment in all labour relations B3To reduce the C4To pursue special review implementation of communities within the institution number of projects that policies, procedures and budgeting and F6To facilitate the provision of A5To contribute individuals living in will act as catalysts bylaws reporting requirements formal housing meaningfully to the informal for D4To ensure functional E4To ensure that all F7To manage learner licences wellness of employees settlements development Internal Audit expenditure is and motor licensing A6To provide efficient B4To avoid C5To facilitate and Activity and Audit managed in terms of all F8To provide integrated public secretariat support deterioration of co-ordinate Committee financial legislation transport facilities services existing agricultural D5To implement an E5To ensure compliance F9To improve road safety and A7To conform to the Batho infrastructure network development effective Anti- with all Supply traffic management Pele Principles Corruption Strategy Chain Management F10To facilitate the A8 To ensure integrated D6To ensure that Regulations, development of sports development and strategic and Policies, PPPFA, BBBEE F11To facilitate synergistic environmental planning operation risks are requirements partnership between A9.To implement an identified and E6To ensure that all Traditional Leadership and the effective organisational monitored on a revenue due to the Municipality and individual performance continuous basis municipality is collected F12To facilitate the alignment management and integration of system special programmes A10To develop and implement the Municipal Turn Around Strategy A11To provide effective information communication technology solutions

uMNGENI IDP 2012/13 TO 2016/17

ANNEXURE 5

PERFORMANCE MANAGEMENT SYSTEM

ORGANISATIONAL SCORECARD

uMNGENI IDP 2012/13 TO 2016/17

ANNEXURE 6

ECONOMIC OVERVIEW

uMNGENI IDP 2012/13 TO 2016/17

ANNEXURE 7

SPATIAL DEVELOPMENT FRAMEWORK REPORT

uMNGENI IDP 2012/13 TO 2016/17

MAPS

MAP 1: UMNGENI SPATIAL DEVELOPMENT FRAMEWORK 2012/2013 MAP 2a: LAND CAPABILITY MAP 2b: AGRICULTURAL POTENTIAL MAP 3a: MINSET MAP 3b: ENVIRONMENTAL FEATURES MAP 3c: ENVIRONMENTAL PRIORITY AREAS MAP 4: LAND SUBSIVISIONAL PATTERN AND TOURISM FACILITIES MAP 5a: LAND COVER MAP 5b: LAND USE MUNICIPAL WATER SUPPLY NEEDS OVERVIEW MUNICIPAL SANITATION NEEDS OVERVIEW WARD MAPS (EXISTING FACILITIES, COMMERCIAL AND INDUSTRIAL AREAS)