Stage 2 Coarse Screening – Report

Total Page:16

File Type:pdf, Size:1020Kb

Stage 2 Coarse Screening – Report Cambridge Waste Water Treatment Plant Relocation Stage 2 - Coarse Screening Report 1 July 2020 Page intentionally blank for pagination when printed Mott MacDonald 22 Station Road Cambridge CB1 2JD United Kingdom T +44 (0)1223 463500 mottmac.com Anglian Water Services Ltd Lancaster House Ermine Business Park Cambridge Waste Water Lancaster Way Huntingdon Treatment Plant Relocation PE29 6XU Stage 2 - Coarse Screening Report 1 July 2020 Mott MacDonald Limited. Registered in England and Wales no. 1243967. Registered office: Mott MacDonald House, 8-10 Sydenham Road, Croydon CR0 2EE, United Kingdom Page intentionally blank for pagination when printed Mott MacDonald | Cambridge Waste Water Treatment Plant Relocation Stage 2 - Coarse Screening Report Document reference: 409071 | 03 | C.4 Information class: Standard This document is issued for the party which commissioned it and for specific purposes connected with the above- captioned project only. It should not be relied upon by any other party or used for any other purpose. We accept no responsibility for the consequences of this document being relied upon by any other party, or being used for any other purpose, or containing any error or omission which is due to an error or omission in data supplied to us by other parties. This document contains confidential information and proprietary intellectual property. It should not be shown to other parties without consent from us and from the party which commissioned it. This r epo rt h as b een pre par ed s olely fo r us e by the par ty which co mmissio ned i t (t he ‘Clien t’) in conn ectio n with t he c aptio ned pr oject. I t sho uld not b e us ed f or a ny o the r pu rpos e. No pe rson oth er t han the Clie nt o r a ny pa rty w ho h as ex pres sly ag ree d te rms of r elianc e with us (t he ‘Re cipien t(s)’ ) m ay r ely on the cont ent, i nfo rma tion or a ny views exp resse d in t he rep ort. W e acc ept no d uty o f ca re, resp onsibility or lia bility to any oth er recipie nt of this docu men t. T his r epo rt is c onfid ential and cont ains p rop riet ary in tellect ual p rop erty . 409071 | 03 | C.4 | | 1 July 2020 Mott MacDonald | Cambridge Waste Water Treatment Plant Relocation Stage 2 - Coarse Screening Report Contents Executive summary 1 1 Introduction 3 2 Stage 2 – Coarse Screening criteria 5 2.1 Red Amber Green (RAG) Assessment 5 2.2 Shape of Site Area 6 2.3 Ease of site access during construction and operation 7 2.4 Waste water transfer infrastructure 8 2.5 Contaminated land 11 2.6 Groundwater 12 2.7 Surface water 12 2.8 Nature conservation and biodiversity (including locally designated nature sites) 13 2.9 Historic environment 14 2.10 Landscape and visual amenity 15 2.11 Agricultural Land Classification 17 2.12 Development constraints 17 2.13 Impacts on local communities 19 3 Stage 2 – Coarse Screening results 21 3.1 RAG assessments 21 3.2 Discussion of results 23 4 Conclusion and Next Steps 29 4.1 Conclusions 29 4.2 Next Steps 29 5 References 30 Appendices 31 A. Drawings 32 B. RAG assessments 33 B.1 Shape of land parcel 33 B.2 Ease of site access during construction and operation 34 B.4 Waste water transfer infrastructure 35 B.5 Contaminated Land 36 B.6 Groundwater 37 409071 | 03 | C.4 | | 1 July 2020 Mott MacDonald | Cambridge Waste Water Treatment Plant Relocation Stage 2 - Coarse Screening Report B.8 Surface Water 38 B.9 Nature Conservation and Biodiversity 39 B.10 Historic Environment 49 B.11 Landscape and Visual Amenity 50 Agricultural Land Classification 52 B.12 Development constraints 53 B.13 Impacts on local communities 54 Tables Table 2.1: Assessment Criteria Adopted at Stage 2 6 Table 2.2: Definitions for establishing heritage value 14 Table 3.1: RAG assessment summary 22 Table 3.2: Rejection Register 26 Table 3.3: Shortlist of site areas 28 Figures Figure 1.1: Longlisted site areas 4 409071 | 03 | C.4 | | 1 July 2020 Mott MacDonald | Cambridge Waste Water Treatment Plant Relocation 1 Stage 2 - Coarse Screening Report Executive summary S.1. A site selection process, comprising a number of detailed appraisal steps was developed to identify sites that may be suitable for the relocation of the waste water treatment plant to replace the existing Cambridge WWTP. S.2. The first step was an Initial Options Appraisal, which examined the strategic issues to be considered in investigating relocation options, and also identified the most appropriate area in which to search for new WWTP sites (the Study Area). S.3. The Initial Options Appraisal concluded that the preferred solution for the relocation of the Cambridge WWTP would comprise a single new WWTP, within a Study Area covering the existing Cambridge and Waterbeach drainage catchment areas. S.4. The next step in the process was Stage 1 – Initial Site Selection, which comprised mapping constraints within the Study Area to identify a longlist of potential site areas to be taken forward for further site selection. The initial site selection identified 14 potential areas that could be utilised for the relocation of Cambridge WWTP based on the baseline constraints. S.5. After the initial site selection stage, Stage 2 – Coarse Screening of the longlist of site areas is required to identify a shortlist of the best performing site areas, which would then be taken forward for further screening. This stage is the subject of this report. S.6. The objective of the Stage 2 coarse screening was to identify preferred site areas based on their cumulative performance against a range of criteria. Each site area was evaluated against 16 criteria using a red, amber and green (RAG) assessment which highlighted the potential significance of the different assessment criteria for each site area. The results for each site area were compared with one another on a qualitative basis to identify the best performing site areas to be included in the shortlist. S.7. The following conclusions have been drawn from this study. ● Although the results have been reviewed holistically, certain criteria were considered to be of greater importance in the context of the WWTP relocation. In order of importance these were: – Impacts on local communities – Shape of land parcel and construction complexity – Green Belt policy and site allocation – Carbon emissions ● Where, based on the RAG assessment and option comparison, site areas were clearly disadvantaged, compared with the other site areas, these were removed from further assessment. Site areas D, E, F, G, K, M and N were removed on this basis. ● The remaining seven site areas fell into two distinct groups: – Site areas A, B and C – Site areas that are outside of the Green Belt and have higher tunnelling impacts and risk (due to longer tunnels and greater impact on the Lower Greensand aquifer). – Site areas H, I, J and L – Site areas that are within the Green Belt and have lower tunnelling impacts and risk (due to shorter tunnels and reduced impact on the Lower Greensand and Grey Chalk aquifers). 409071 | 03 | C.4 | | 1 July 2020 Mott MacDonald | Cambridge Waste Water Treatment Plant Relocation 2 Stage 2 - Coarse Screening Report ● It was not considered possible to differentiate between the two groups, to remove one or the other from further assessment at this stage of the site selection process. It was also not possible to differentiate between the individual site areas within the groups at this stage. ● Development within Green Belt may be acceptable if certain ‘very special circumstances’ exist including, for example, there being no feasible alternatives. Therefore, further investigation is needed to confirm whether site areas outside of the Green Belt are feasible or not. S.8. The seven shortlisted site areas should be taken forward to Stage 3 – Fine Screening, in order to differentiate between the site areas and identify those that are considered to be more suitable. The fine screening stage would include the following assessments: ● Development of the waste water transfer infrastructure requirements for each of the shortlisted site areas ● Cost and carbon emissions estimates for development of a WWTP at each shortlisted site area including tunnelling, and ● Further assessment of the planning and environmental constraints at each of the site areas and whether they can be mitigated. 409071 | 03 | C.4 | | 1 July 2020 Mott MacDonald | Cambridge Waste Water Treatment Plant Relocation 3 Stage 2 - Coarse Screening Report 1 Introduction This section provides an introduction to Stage 2 – Coarse Screening (this report).Background 1.1.1 A site selection process, comprising a number of detailed appraisal steps was developed to identify sites that may be suitable for the relocation of the waste water treatment plant to replace the existing Cambridge WWTP. 1.1.2 The first step was an Initial Options Appraisal, which examined the strategic issues to be considered in investigating relocation options, and also identified the most appropriate area in which to search for new WWTP sites (the Study Area). 1.1.1 The Initial Options Appraisal concluded that the preferred solution for the relocation of the Cambridge WWTP would comprise a single new WWTP, within a Study Area covering the existing Cambridge and Waterbeach drainage catchment areas (Mott MacDonald Ltd, Cambridge Waste Water Treatment Plant Relocation - Initial Options Appraisal, 2020a). 1.1.2 The next step in the process was Stage 1 – Initial Site Selection, which comprised mapping constraints within the Study Area to identify a longlist of potential site areas to be taken forward for further site selection.
Recommended publications
  • Cambridge Nature Network Final Report
    Cambridge Nature Network Final Report FOREWORD I’m delighted to introduce this important report. For years, now, we have known we need to ensure nature’s recovery, and for years that has been an all-too-elusive ambition. In fact, we are still overseeing nature’s decline. It’s a ship that simply must be turned around. Now we have a clear way forward. This report, building on the ambition to double nature in Cambridgeshire, tells us precisely how and where we can do it. Working from the ground up, looking at real places and the actual state of nature, it offers for the first time a tangible plan for the revitalisation of nature in the 10km around the city of Cambridge, based on what is already there and how it can be brought back to life. And there’s more. Fully integrated with the vision for nature recovery is one for the enhancement and creation of green spaces for public recreation and refreshment – vital needs, as we have come to understand fully during the covid-19 crisis. The risk with nature recovery is that in our enthusiasm we may do the wrong thing in the wrong place: plant trees on peat or valuable grassland, or put hedgerows in where the landscape should be open. This report will ensure we do the right thing in the right place. It provides a place-based analysis of where existing nature sites can be enhanced, what kind of nature-friendly farming to encourage, how to create stepping-stones to create new, linked nature networks, and how, overall, the ambition for doubling nature can be met.
    [Show full text]
  • CPCA Affordable Housing Programme
    CPCA Affordable Housing Programme May 2019 Alex Francis, Programme Manager Affordable Housing £100m Affordable Housing Programme • 2000 Starts on Site by March 2022 • £6m grant and £30.9m loan allocated to date to deliver 756 new affordable homes • Can fund all types and tenures provided supported by planning – legislation to enable CPCA to fund Affordable Rent in force April 2019 • Will assist with viability to increase affordable homes • Will fund on or off-site infrastructure, subject to State Aids • Keen to support MMoC / off-site manufacture, SME builder/developers and community-led development Housing Strategy – The Toolkit The Shade, Soham East Cambridgeshire • £120,000 CPCA grant allocated to deliver 8 affordable homes • Delivered by Palace Green Homes as part of Thrift Soham’s Community Land Trust scheme • Started on Site July 2017, Completed August 2018 • Further information https://bit.ly/2PEPwYY Poppy Close, Littleport, East Cambridgeshire • £97,500 CPCA grant allocated to deliver 5 shared ownership homes, alongside 9 for Affordable Rent funded through Homes England • Delivered by Cambridge Housing Society • Started on Site August 2017, Completed October 2018 West End Gardens, Haddenham East Cambridgeshire • £6.5 million loan facility to East Cambs Trading Company (ECTC) • 54 homes to be delivered by Palace Green Homes as part of Community Land Trust scheme, of which 19 will be affordable • Starting on Site late Spring 2019 Ely MOD Housing, East Cambridgeshire • £24.4 million loan facility to East Cambs Trading Company (ECTC)
    [Show full text]
  • APCM Booklet 090317 Bright 3.Pmd
    The Parish of Saint Andrew with Saint Etheldreda, Histon There are varieties of activities, but it is the same God who activates all of them in everyone. REPORTS ON CHURCH LIFE Annual Parochial Church Meeting 2017 Credits Front cover, clockwise from top left: Table Talk, after church, Julie Whitbread making a cappuccino (David Wilson), Factory Rock Holiday Club (Tim Blake), Stepping Stones Playgroup (Tim Blake), flower arranging (Jo Roach) Back cover, clockwise from top left: SJ Club (Tim Blake), coffee after church, The Saint Andrew’s Centre (David Wilson), care home service (Elaine Ife), parish horizon (Peter Oakes), Open the Book (Tim Blake) Inside pages: Tim Blake (credits page; 21–23), Rachel Carr (14), Jonathan Chatfield (12), Olivia Coles (13, 15), Chris Cox (28), CPAS (31), Paul and Penny Glass (16), Paul and Janey Hames (30), Elaine Ife (11), Jo Roach (9, 18, 19), Barry Starling (2), David Wilson (3), Lorna Wood (24, 25, 29, 32), Peter Wood (33), Ruari Wood (26) Bible references on the cover: 1Corinthians 12: 6, 25 (NRSV) Print-Out are thanked for their invaluable help and advice in the production of this booklet. The purpose of this booklet is threefold: to raise awareness of the great range of activities in our church; to enable us to encourage one another; and to provide an impetus for prayer over the coming months. The prayer points in the margin give a quick reference to more detail within the text to enliven one’s prayers. The booklet opens with reports required by law to be presented at the APCM and then emphasises the central place of prayer.
    [Show full text]
  • Fulbourn Site Assessment Proforma
    South Cambridgeshire Strategic Housing Land Availability Assessment (SHLAA) Report August 2013 Appendix 7i: Assessment of 2011 'Call for Sites' SHLAA sites Index of Fulbourn Site Assessment Proforma Site Site Address Site Capacity Page Number Land at Fulbourn Old Drift (south of Site 037 Cambridge Road and north of Shelford 921 dwellings 766 Road), Fulbourn Site 038 Land north of Cambridge Road, Fulbourn 166 dwellings 775 Site 074 Land off Station Road, Fulbourn 186 dwellings 783 Site 108 Land south of Hinton Road, Fulbourn 52 dwellings 794 Land to the South of Fulbourn Old Drift & Site 109 78 dwellings 802 Hinton Road, Fulbourn Site 136 Land at Balsham Road, Fulbourn 62 dwellings 810 Land between Teversham Road and Cow Site 162 92 dwellings 818 Lane, Fulbourn Land at east of Court Meadows House, Site 213 166 dwellings 829 Balsham Road, Fulbourn Site 214 Land off Home End, Fulbourn 14 dwellings 837 Site 245 Bird Farm Field, Cambridge Road, Fulbourn 85 dwellings 845 SHLAA (August 2013) Appendix 7i – Assessment of 2011 ‘Call for Sites’ SHLAA sites Minor Rural Centre Fulbourn Page 765 South Cambridgeshire Local Development Framework Strategic Housing Land Availability Assessment (SHLAA) Site Assessment Proforma Proforma July 2012 Created Proforma Last July 2013 Updated Location Fulbourn Site name / Land at Fulbourn Old Drift (south of Cambridge Road and north of address Shelford Road), Fulbourn Category of A village extension i.e. a development adjoining the existing village site: development framework boundary Description of promoter’s 3,050 dwellings with public open space proposal Site area 76.78 ha. (hectares) Site Number 037 The site lies to the south of Cambridge Road and north of Shelford Road on the south western edge of Fulbourn.
    [Show full text]
  • Biodiversity Assessment June 2020
    North East Cambridge – A Biodiversity Assessment June 2020 MKA ECOLOGY North East Cambridge A Biodiversity Assessment June 2020 1 North East Cambridge – A Biodiversity Assessment June 2020 Site North East Cambridge Contents Project number 85919 1. INTRODUCTION ........................................................................................................... 3 Client name / Address Cambridge City Council 1.1. Aims and objectives ....................................................................................................... 3 1.2. Site description and context........................................................................................... 3 Version 1.3. Legislation and policy .................................................................................................... 4 Date of issue Revisions number 2. NORTH EAST CAMBRIDGE ........................................................................................ 6 004 15 June 2020 Amendments to text and document accessibility 2.1. The geological setting .................................................................................................... 6 2.2. The ecological setting .................................................................................................... 6 003 02 April 2020 Updates regarding terrapins 2.3. The focus area ............................................................................................................. 10 002 20 February 2020 Updates to maps and text throughout 3. CONSTRAINTS ..........................................................................................................
    [Show full text]
  • Northstowe Phase 3A Resident Response FAQ Final V8 22-1-2021
    Northstowe Phase 3A Planning Application Summary of Responses to Public Consultation Introduction The planning application for Northstowe Phase 3A was validated on 18th May 2020. 83 comments were received from members of the public. These comments have been reviewed in detail by both Homes England as applicant and South Cambridgeshire District Council as local planning authority to identify where additional information is required to amend or supplement the information originally submitted with the planning the application. The public comments have been catalogued and sorted into categories. The following table summarises the comments received, provides a brief response and identifies where more detailed information can be found within the original application materials or within the package of information submitted in January 2021 in response to consultee comments (the Planning Consultation Response Pack). This table has been provided to make it easier to find the information that addresses public comments. Please see the submitted covering letter for further details regarding the scope and contents of the Planning Consultation Response Pack. Topic Summary Response References Green Separation A total of 39 public comments related to the green separation between Northstowe and Oakington. The key points can be summarised as follows: This open space has been provided to respect the Concern over the width of the green separation Phase 3A Planning Consultation Response Pack individual character and setting of Oakington, and (60m is too narrow) and loss of the identify of 1. Revised Design and Access Statement to assist in retaining the setting to Oakington Oakington. 2. Open Space Parameter Plan Conservation Area. The area comprises a wide 3.
    [Show full text]
  • Greater Cambridge Planning Policy Update
    Greater Cambridge Planning Policy Update (Last updated 1 February 2020) This monthly update covers the Greater Cambridge area. The planning departments for South Cambridgeshire District Council and Cambridge City Council have been combined to form the Greater Cambridge Shared Planning service which serve this area. This update gives information on: • Live planning related consultations in Greater Cambridge, comprising South Cambridgeshire and Cambridge, to help you have your say. • Forthcoming planning related consultations in Greater Cambridge. • Other key planning news at local, county and national levels. Information on any consultations that may affect people living or working in Greater Cambridge can be viewed on the South Cambridgeshire District Council consultations webpage and / or the Cambridge City Council consultations webpage as relevant to the consultation concerned. Current Consultations by the Councils Greater Cambridge Local Plan Consultation on the Greater Cambridge Local Plan – The First Conversation runs until 24 February 2020. For more information on this consultation see the Local Plan section of this update below. Current Consultations by others Waterbeach Neighbourhood Plan Waterbeach Parish Council has started the pre-submission consultation on its neighbourhood plan. Comments should be sent to the parish council. For more information on this consultation visit the dedicated website for the Waterbeach Neighbourhood Plan. The deadline for comments is 24 February 2020. Network Rail consultation on new railway station for Cambridge South Network Rail launched a public consultation on proposals for a new railway station for Cambridge South. Public consultation began on 20 January 2020 and will close on 2 March 2020. Madingley Road cycling and walking improvements The Greater Cambridge Partnership has begun a seven-week consultation for people to give their opinions on two options to significantly upgrade walking and cycling journeys along the Madingley Road.
    [Show full text]
  • Final Recommendations - Eastern Region
    Final recommendations - Eastern region Contents 1. Initial proposals overview p1 6. Sub-region 1: Bedfordshire p10, recommendations p11 2. Number of representations received p3 7. Sub-region 2: Cambridgeshire, Hertfordshire and Norfolk Cambridgeshire p12, recommendations p13 Hertfordshire p14, recommendations p15 Norfolk p15, recommendations p16 3. Campaigns p4 8. Sub-region 3: Essex p17, recommendations p18 4. Major issues p5 9. Sub-region 4: Suffolk p19, recommendations p20 5. Final proposals recommendations p7 Appendix A Initial/revised proposals overview 1. The Eastern region was allocated 57 constituencies under the initial and revised proposals, a reduction of one from the existing allocation. In formulating the initial and revised proposals the Commission decided to construct constituencies using the following sub-regions: Table 1A - Constituency allocation Sub-region Existing allocation Allocation under initial Allocation under revised proposals proposals Bedfordshire 6 6 6 Cambridgeshire, 27 27 27 Hertfordshire and Norfolk Essex 18 17 17 Suffolk 7 7 7 2. Under the initial proposals six of the existing 58 constituencies were completely unchanged. The revised proposals continued to retain six of the existing constituencies unchanged. Under both sets of proposals it was proposed to have two constituencies that crossed county boundaries - one between Cambridgeshire and Norfolk, and one between Cambridgeshire and Hertfordshire. In Suffolk, Bedfordshire and Essex it was possible to allocate a whole number of constituencies to each county. 1 3. In response to the consultation on the initial proposals and secondary consultation the Commission received over 2,000 representations regarding the Eastern region. These representations commented on most parts of the region, with the main issues being: ● The proposed constituency of North East Hertfordshire.
    [Show full text]
  • Cambridge Local Plan and South Cambridgeshire Local Plan
    Cambridge Local Plan and South Cambridgeshire Local Plan Statement of Consultation to the Main Modifications Consultation March 2018 Published by Cambridge City Council & South Cambridgeshire District Council © March 2018 Contents Page Number 1 Introduction 1 2 Summary of consultation undertaken on the 1 Post-Hearing Main Modifications 3 Number of representations received 2 4 Summary of the main issues made to the 4 Post Hearing Main Modifications consultation 5 What happens next? 9 Appendices A Advert placed in the Cambridge News on 5 11 January 2018 B Cambridge Local Plan Modifications - 13 Summary of Representations C South Cambridgeshire Local Plan 37 Modifications - Summary of Representations Statement of Consultation – March 2018 Page i Page ii Statement of Consultation – March 2018 1 Introduction 1.1 As part of the ongoing examination of the Cambridge and South Cambridgeshire Local Plans, the Inspectors asked that consultation be carried out on Main Modifications they consider may be necessary in order for the Local Plans to be found ‘sound’. 1.2 The main modifications have been proposed to ensure the Local Plans comply with the soundness tests set out in the National Planning Policy Framework. The consultation provided an opportunity for local residents and other key stakeholders to comment on the proposed main modifications. The consultation provided the opportunity to comment only on the specific changes identified. 1.3 Consultation took place from 5 January to 16 February 2018 on: Cambridge and South Cambridgeshire Main Modifications Consultation Report (RD/MM/010) Sustainability Appraisal of Main Modifications (RD/MM/020) 1.4 This consultation statement provides an overview of the consultation undertaken and the key issues raised by the representations to each Plan.
    [Show full text]
  • Strategic Environmental Assessment Screening Determination Statement
    Histon & Impington Neighbourhood Plan Strategic Environmental Assessment (SEA) Screening Determination Statement October 2018 Executive Summary This statement sets out the reasons for the determination that the draft Histon & Impington Neighbourhood Plan is unlikely to result in significant environmental effects and therefore does not require a Strategic Environmental Assessment. In addition this statement determines that the making of the Histon & Impington Neighbourhood Plan is not likely to have a significant effect on a European site. This determination statement is intended to demonstrate that the Histon & Impington Neighbourhood Plan is compatible with certain European Union obligations as required by the basic conditions, namely: • Directive 2001/42/EC of the European Parliament and of the Council of 27 June 2001 on the assessment of the effects of certain plans and programmes on the environment; and • Article 6(3) and (4) of the EU Habitats Directive and with Regulation 61 of the Conservation of Habitats and Species Regulations 2010 (as amended). Histon & Impington Parish Council and South Cambridgeshire District Council will publish this determination statement in accordance with the regulatory requirements. Determination Statement This statement has been produced to ensure the Neighbourhood Plan will, when examined, comply with the Neighbourhood Planning (General) Regulations 2012 (as amended) in particular Regulation 32 and Regulation 15(1)e(ii) of the Neighbourhood Planning (General) (Amendment) Regulations 2015. A neighbourhood plan is required to meet a number of basic conditions (which are set out in the Town and Country Planning Act 1990), one of which being it must not breach and must be otherwise compatible with EU and Human Rights obligations.
    [Show full text]
  • East Cambridgeshire District County Wildlife Sites Supplementary
    East Cambridgeshire District County Wildlife Sites Supplementary Planning Document June 2010 © THE WILDLIFE TRUST FOR BEDFORDSHIRE, CAMBRIDGESHIRE, NORTHAMPTONSHIRE & PETERBOROUGH LTD and EAST CAMBRIDGESHIRE DISTRICT COUNCIL All rights reserved. No part of the text of this publication may be reproduced, stored in any type of retrieval system or transmitted in any form or by any means (electronic, photocopying, mechanical, recording or otherwise) without the permission of the copyright owners All mapping is based upon Ordnance Survey material with the permission of Ordnance Survey on behalf of the Controller of Her Majesty’s Stationery Office © Crown copyright. Unauthorised reproduction infringes Crown copyright and may lead to prosecution or civil proceedings. Cambridgeshire County Council 100023205 (2005). EAST CAMBRIDGESHIRE DISTRICT COUNTY WILDLIFE STIES REGISTER CONTENTS 1 INTRODUCTION 1 2 METHODOLOGY 2 2.1 Field Survey 2 2.2 Assessment of Sites 3 2.3 Output Format 3 3 RESULTS 4 3.1 Statistics 4 COUNTY WILDLIFE SITES REGISTER ANNEXE Criteria for the Selection of County Wildlife Sites Version 5 (2009). CONTENTS PAGE EAST CAMBRIDGESHIRE DISTRICT COUNCIL COUNTY WILDLIFE SITES SPD 1 Introduction 1.1 The East Cambridgeshire District Council (ECDC) County Wildlife Sites Supplementary Planning Document has been produced to update the East Cambridgeshire District County Wildlife Sites Register 2005 so that it can be adopted as a Supplementary Planning Document (SPD) to the East Cambridgeshire Local Development Framework (LDF). 1.2 On the 20th October 2009 East Cambridgeshire District Council adopted its Core Strategy Development Plan Document as part of its LDF. The adoption of the Core Strategy means that most of the policies in the East Cambridgeshire District Local Plan 2000 have been superceded.
    [Show full text]
  • WALK 9 DULLINGHAM to FULBOURN
    ROUTE FINDING WALK Key to landscape features You will need a basic understanding of maps and the ability to follow them. The walks can be followed in either direction, but if you go in the same way as the arrows, you won’t have Marpa to turn the map around to fit the landscape. STATION TO STATION WALKS 9 TIME DULLINGHAM to FULBOURN Allow about 6-7 hours, but add on time for refreshments, visit- 12½ miles - 6-7 hours ing nature reserves and churches. MAPS OS Explorer sheets 210 Newmarket and Haverhill and 209 Cambridge. REFRESHMENTS Pubs in Dullingham, Burrough Green, Brinkley (just off route) and Fulbourn, where there are also shops. USEFUL INFORMATION National Rail Enquiries www.nationalrail.co.uk 08457 48 49 50 Traveline www.traveline.info 0871 200 22 33 Fulbourn Fen www.wildlifebcnp.org/reserves/ WALKS IN THIS SERIES 1 Ipswich to Needham Market 2 Needham Market to Stowmarket MUTLOW HILL TUMULUS 3 Stowmarket to Elmswell 4 Elmswell to Thurston Closure of intermediate stations at Six Mile Bottom 5 Thurston to Bury St Edmunds and Fulbourn has left a long trek for walkers heading 6 Kennett to Bury St Edmunds for Cambridge, but use can be made of bus Citi 1 7 Kennett to Newmarket (every 20 mins Mon-Sat.) to break the walk at Ful- 8 Newmarket to Dullingham bourn. 9 Dullingham to Fulbourn Much of this walk follows part of the Icknield Way 10 Fulbourn to Cambridge 11 Newmarket to Soham Path, a recreational long distance route linking the PLEASE FOLLOW THE 12 Soham to Ely Ridgeway national trail at Ivinghoe Beacon with the COUNTRYSIDE CODE: 13 Dullingham to Kennett Peddars Way national trail through Norfolk.
    [Show full text]