South Capitol Street Corridor, Frederick Douglass Memorial Bridge

Total Page:16

File Type:pdf, Size:1020Kb

South Capitol Street Corridor, Frederick Douglass Memorial Bridge SOUTH CAPITOL STREET CORRIDOR, (ICE) FREDERICK DOUGLASS MEMORIAL BRIDGE ENGINEER CHECKING CHECKING WASHINGTON, DC INDEPENDENT INDEPENDENT DDOT - District Department of Transportation Department - District DDOT Rendering/Photo credit: Rendering/Photo credit: SYSTRA IBT’s role was that of Independent Checking Engineer or ICE. In that role, SYSTRA IBT performed a completely independent analysis of the arch bridge structure based on the design plans and reports provided by the designers. This included independent modeling of the structure, structural verification of all elements from the foundations to the South Capitol Street Corridor Segment 1 main structure arches, and compliance reviews to ensure that the elements is the Frederick Douglass Memorial Bridge, a three-span arch conformed with contractual requirements. bridge over the Anacostia River. The total length is 1445’ Structural checks were performed on a pass/fail basis in (440.6m), with a main span of 540’ (164.6m) and side spans of order to maintain complete independence from the designer’s 452’-6” (138m). The deck carries eight lanes (three lanes with calculations and assumptions. Specialized analyses included one future additional lane in each direction) with a footpath on deep foundations, arch instabilities (both global and local), each side of the deck. The typical deck width is 122’-6” (37.3m) and construction sequencing and stability for both the arch and reached 166’ (50.6m) at pier location where there is a ribs and the composite deck. In the role of ICE, SYSTRA IBT was pedestrian overlook. The arches are longitudinally stiffened also involved in reviewing structurally significant changes or steel box shapes and are laterally unsupported (no transverse defects that arose during construction. bracing between arches). The steel arches are supported on post-tensioned concrete substructures and steel pipe pile ESSENTIALS: foundations. Interior piers have a V-shape. The composite deck comprises precast panels on built-up I-shaped edge girders Client/Owner: DDOT - District Prime Engineer: AECOM Department of Transportation and floor beams. The deck is suspended from the steel arches SYSTRA IBT’s Role: Contractor: South Capitol Independent Checking with vertical hangers. Bridgebuilders, a joint venture Engineer of the arch bridge between Archer Western structure. Construction LLC (Walsh Group) WWW.SYSTRAIBT.COM and Granite Construction Co..
Recommended publications
  • District of Columbia Inventory of Historic Sites Street Address Index
    DISTRICT OF COLUMBIA INVENTORY OF HISTORIC SITES STREET ADDRESS INDEX UPDATED TO OCTOBER 31, 2014 NUMBERED STREETS Half Street, SW 1360 ........................................................................................ Syphax School 1st Street, NE between East Capitol Street and Maryland Avenue ................ Supreme Court 100 block ................................................................................. Capitol Hill HD between Constitution Avenue and C Street, west side ............ Senate Office Building and M Street, southeast corner ................................................ Woodward & Lothrop Warehouse 1st Street, NW 320 .......................................................................................... Federal Home Loan Bank Board 2122 ........................................................................................ Samuel Gompers House 2400 ........................................................................................ Fire Alarm Headquarters between Bryant Street and Michigan Avenue ......................... McMillan Park Reservoir 1st Street, SE between East Capitol Street and Independence Avenue .......... Library of Congress between Independence Avenue and C Street, west side .......... House Office Building 300 block, even numbers ......................................................... Capitol Hill HD 400 through 500 blocks ........................................................... Capitol Hill HD 1st Street, SW 734 .........................................................................................
    [Show full text]
  • CASE STUDY | TN 516 Aeroaggregates UL-FGA G15 Ultra-Lightweight Foamed Glass Aggregate PROJECT INFORMATION
    CASE STUDY | TN 516 AeroAggregates UL-FGA G15 Ultra-Lightweight Foamed Glass Aggregate PROJECT INFORMATION PROJECT South Capitol Street OWNER District Department of Transportation (DDOT) LOCATION Washington, DC CONTRACTOR South Capitol Bridgebuilders, JV between Archer Western Construction LLC (Walsh Group) and Granite Construction Co. DATE September 2019 VOLUME 11,000 CY HIGHLY FRICTIONAL • NON-LEACHING • ROT-RESISTANT • NON-FLAMMABLE • DURABLE • SAFE • The new South Capitol Bridge, also known as the Frederick Douglass Memorial Bridge, is a key link for Washington DC over the Anacostia River as it handles commuter traffic travelling between the city and Prince George’s County, Maryland, and from Southern Maryland. • The $441 million USD design-build contract is the biggest infrastructure project handled by DDOT to date. Also included in the project is the rebuilding and reconfiguring of the Suitland Parkway/I-295 interchange, as well as two new interchanges at either end of the bridge. • Two large, old sewer lines (over 9 ft wide) near the south interchange were a design challenge that was addressed using UL- FGA. The utility company considers these old and fragile sewers critical pieces of infrastructure. • UL-FGA was used to raise the grade for the new interchange to minimizing surcharge on the critical sewers and the surrounding soft soils. UL-FGA® — 25+ Years of Proven Performance AeroAggregates of North America, LLC The information contained herein is believed to be accurate and reliable. AeroAggregates 1500 Chester Pike | Eddystone, PA 19022 of North America, LLC accepts no responsibility for the results obtained through (833) 261-8499 | www.aeroaggregates.com application of this product.
    [Show full text]
  • Served May 27, 1965 Applications Nos. 317, 318, 319, 320 Temporary
    BEFORE THE WASHINGTON METROPOLITAN AREA TRANSIT COMMISSION WASHINGTON, D. C. ORDER NO. 485 IN THE MATTER OF: Served May 27, 1965 Applications of D. C . Transit Applications Nos. 317, 318, System , Inc., for Ninety Day ) 319, 320 Temporary Authority to Estab- lish Routes A-7, B-7, C-7 and Docket No. 86 D-7. ) APPEARANCES: JOHN R. SI) . JR. and GORDON A PHILLIPS , attorneys for D. C. Transit System , Inc., applicant. STANLEY H. KAMBROW , attorney for WMA Transit Company, protestant. On April 19 , 1965, D. C. Transit System , Inc. ("Transit"), filed Applications Nos. 317, 318, 319, and 320, for ninety (90) day temporary authority to establish Routes A-7, B-7, C-7, and D-7, re- apectivea.y, to serve the Fairland Data Center in Montgomery County, Maryland , in the following manner: NEW HAMPSHIRE AVENUE C &.P LIVE , ROUTE A-7 Out Quad - From the terminal on 13th Street, N. W., south of Pennsylvania Avenue , continue northerly on 13th Street , Logan Circle , Vermont Avenue, Florida Avenue , Sherman Avenue and New Hampshire Avenue, thence northeasterly on U. S. 29, to the terminal at the Fairland Data Center. Inbound - From the Fairland Data Center , continue southwest on U. S. 29, southerly on New Hampshire Avenue, Sherman Avenue , Florida Avenue, Vermont Avenue, Logan.Circ:le afid 13th Street to the terminal south of Pennsylvania Avenue. LIMITED OPERATION - Within the District of Co lumbia: Boarding outbound and alighting inbound at designated stops only. 16TH STREET - C &P LINE ROUTE B-7 Outbound - From the terminal on 13th Street, N. W., south of Pennsylvania Avenue, continue north on 13th Street, west on L Street , north on 14th Street, around Thomas Circle, west on Massachusetts Avenue, around Scott Circle, north on 16th Street, northeast on Alaska Avenue, north on Georgia Avenue, east on Wayne Avenue and Pershing Drive, north on Fenton Street , northeasterly on Coles- ville Road , Columbia Pike and Lockwood Drive, north on New Hampshire Avenue, thence northeasterly on U.
    [Show full text]
  • District of Columbia Inventory of Historic Sites Street Address Index
    DISTRICT OF COLUMBIA INVENTORY OF HISTORIC SITES STREET ADDRESS INDEX UPDATED TO JANUARY 31, 2015 NUMBERED STREETS Half Street, SW 1360 ........................................................................................ Syphax School 1st Street, NE between East Capitol Street and Maryland Avenue ................ Supreme Court 100 block ................................................................................. Capitol Hill HD between Constitution Avenue and C Street, west side ............ Senate Office Building and M Street, southeast corner ................................................ Woodward & Lothrop Warehouse 1st Street, NW 320 .......................................................................................... Federal Home Loan Bank Board 2122 ........................................................................................ Samuel Gompers House 2400 ........................................................................................ Fire Alarm Headquarters between Bryant Street and Michigan Avenue ......................... McMillan Park Reservoir 1st Street, SE between East Capitol Street and Independence Avenue .......... Library of Congress between Independence Avenue and C Street, west side .......... House Office Building 300 block, even numbers ......................................................... Capitol Hill HD 400 through 500 blocks ........................................................... Capitol Hill HD 1st Street, SW 734 .........................................................................................
    [Show full text]
  • South Capitol Street Urban Design Study
    South Capitol Street Urban Design Study The National Capital Planning Commission The District of Columbia Office of Planning January 2003 2 South Capitol Street Urban Design Study The National Capital Planning Commission The District of Columbia Office of Planning Chan Krieger & Associates Architecture & Urban Design Economic Research Associates (ERA) Economic Development January 2003 South Capitol Street Urban Design Study 1 2 Dear Friends and Colleagues: Great city streets are the very measure of urbanity. They are the stage for city life, the place of public contact, and the intersection where com- mercial enterprise and civic aspiration combine. The Champs Elysees in Paris, Commonwealth Avenue in Boston, and Unter den Linden in Berlin all demonstrate how cohesive and dynamic streets define and animate the life of their cities. South Capitol Street can be such a place. This one-mile stretch from the U.S. Capitol to a magnificent waterfront terminus on the Anacostia River has all the potential to rival the great urban boulevards of the world. With bold vision and creative leadership, South Capitol can be reborn as a vibrant city street for Washington residents and as a National Capital destination for all Americans. We envision the Corridor as a bustling mix of shops, offices, hotels, apartments, civic art, and open space. Where the street meets the river could be the site of a major civic feature such as a museum or memorial and offer additional attractions such as restau- rants, concerts, marinas and waterfront entertainment. This South Capitol Street and Urban Design Study was a cooperative effort between the District’s Office of Planning and the National Capital Planning Commission.
    [Show full text]
  • South Capitol Street Bridge
    PRELIMINARY GEOTECHNICAL SERVICES SOUTH CAPITOL STREET BRIDGE WASHINGTON, D. C. - Prepared for - HNTB, Inc. Arlington, Virginia - Prepared by - MACTEC ENGINEERING AND CONSULTING, Inc. 22455 DAVIS DRIVE, SUITE 100 STERLING, VIRGINIA 20164 MACTEC Project Number 3551-05-0587 May 25, 2005 South Capitol Street Bridge May 25, 2005 Washington, DC, SE MACTEC Project No. 3551-05-0587 TABLE OF CONTENTS Section Page 1.0 PROJECT INFORMATION......................................................................................................1 1.1 Project Overview ....................................................................................................................1 1.2 Information Provided.............................................................................................................2 1.3 Scope of Work .......................................................................................................................2 1.4 Authorization .........................................................................................................................2 2.0 SITE CHARACTERIZATION.................................................................................................3 2.1 General...................................................................................................................................3 2.2 Site Conditions.......................................................................................................................3 2.1.1 West Approach..........................................................................................................3
    [Show full text]
  • Consumer Financial Protection Bureau Washington, Dc
    CONSUMER FINANCIAL PROTECTION BUREAU WASHINGTON, DC NCPC PROJECT PLANS PRELIMINARY SUBMISSION PART E: APPENDIX REVISED JAN 3, 2014 Consumer Financial Protection Bureau PART E: APPENDIX A. ENVIRONMENTAL ASSESSMENT REPORT ENVIRONMENTAL ASSESSMENT Contents FOR THE RENOVATION OF THE List of Tables ................................................................................................................................. iv CONSUMER FINANCIAL PROTECTION BUREAU HEADQUARTERS' BUILDING List of Figures ................................................................................................................................ iv LOCATED ON 1700 G STREET, NW, WASHINGTON, DC, 20552 ACRONYMS AND ABBREVIATIONS ....................................................................................... v EXECUTIVE SUMMARY ............................................................................................................ 1 1.0 PURPOSE AND NEED OF PROJECT .................................................................................... 3 1.1 Project Description ................................................................................................................ 3 Location and Physiography..................................................................................................... 4 Building History...................................................................................................................... 4 Exterior Wall ..........................................................................................................................
    [Show full text]
  • Washington DC Emerging Corridors + Opportunity Zones
    EMERGING CORRIDORS + OPPORTUNITY ZONES 2020 EDITION In Public-Private Partnership with IMAGE COURTESY OF REDBRICK COURTESY IMAGE The Washington DC Economic Partnership would like to acknowledge our public and private sector board members whose continued financial support and guidance has made the 2020 Emerging Corridors + Opportunity Zones publication possible. PUBLIC SECTOR PARTNERS OFFICE OF THE CHIEF TECHNOLOGY OFFICER PRIVATE SECTOR PARTNERS BOARD MEMBERS EXECUTIVE COMMITTEE Raj Aggarwal Jennifer Eugene Chase W. Rynd Board Chairman, Think Local First Manager, Engineered Sales, Executive Director, John Falcicchio / Co-Chair Anitra Androh Washington Gas National Building Museum Interim Deputy Mayor, Partner, Nelson Mullins Riley & Scarborough Angie Gates Tara Scanlon Office of the Deputy Mayor for Director, OCTFME Partner, Holland & Knight Planning and Economic Development Joseph Askew Vice President, Government Relations, Emmauel Irono Shawn Seaman Richard Lake / Co-Chair Verizon Founder & CEO, Motir Services President, Hoffman & Associates Managing Principal, Steven Boyle Stan Jackson Annie Senatore Roadside Development Managing Director, President & CEO, AEDC CEO and Lead Event Designer, Donna Cooper / Co-Chair Elect EDENS Caroline Kenney Design Foundry Region President, Pepco Jean-Luc Brami Managing Director of Joseph Torraca Vice President, Gelberg Signs Public/Private Development, Vice President of Business Development, Omar McIntosh / Vice Chair Urban Atlantic RCN Senior Vice President, Ernest Chrappah Smoot Construction Director, DCRA Susan Lacz Andrew Trueblood Brunson Cooper Principal & CEO, Director, DC Office of Planning Kenneth Brewer / Secretary Corenic Construction Group, Ridgewells Catering Executive Director, H Street CDC Donna Rattley Washington Corenic Construction Lisa Mallory Regional Vice President of Timothy F. Veith / Treasurer Anita Butani D’Souza CEO, DCBIA Government Affairs, Comcast President, United Bank Division Head, HGRM Corporation Thomas A.
    [Show full text]
  • November 9, 2015 Held at 200 I St. SE, Washington DC 20003 Roger Moffatt, Chair
    Advisory Neighborhood Commission 6D Minutes of Business Meeting – November 9, 2015 Held at 200 I St. SE, Washington DC 20003 Roger Moffatt, Chair *These minutes were approved at the following business meeting, December 14th, 2015. Before the meeting, Craig Stouffer of the DC United reported on the team’s 2015 season, community engagement (the United’s afterschool program has merged with DC Scores, unifying the soccer curriculum for Amidon and Jefferson), and plans to update the community at a future meeting about progress on construction of the new stadium. CM Litsky asked when the team will take title to the land, and Mr. Stouffer’s understanding is that Pepco lines on the site limit how much excavation can occur. There will be an update at the December ANC meeting. CMs Litsky and Lightman also encouraged the United to provide transportation for fans between the Metro and the stadium, and CM Moffat urged the team to locate parking for fans. Also before the meeting, Tracy Harrison, VP of Clinical Administration at Unity Health Care, presented on plans to renovate the Southwest health center. They are planning a small remodel of the site. It is an interior renovation only. They cannot afford to replace the elevator in the building since they only rent it from the District, so they are moving all patient services to the first floor. This includes the WIC center and patient scheduling. They will make room for this by removing paper records now that they use electronic records. They will also discontinue dental services; current dental patients can go to Brentwood or Parkside, which have enough capacity to accommodate the patients.
    [Show full text]
  • Emerging Corridors + Opportunity Zones 2019 Edition
    EMERGING CORRIDORS + OPPORTUNITY ZONES 2019 EDITION In Public-Private Partnership with IMAGE COURTESY OF MENKITI GROUP COURTESY IMAGE The Washington DC Economic Partnership would like to acknowledge our public and private sector board members whose continued financial support and guidance has made the 2019 Emerging Corridors + Opportunity Zones publication possible. PUBLIC SECTOR PARTNERS OFFICE OF THE CHIEF TECHNOLOGY OFFICER PRIVATE SECTOR PARTNERS BOARD MEMBERS EXECUTIVE COMMITTEE Raj Aggarwal Timothy Duggan Lindsey Parker Board Chairman, Think Local First Senior Vice President and Commercial Acting Chief Technology Officer, Brian Kenner / Co-Chair Joseph Askew Regional Group Manager, OCTO Deputy Mayor, Vice President, Government Relations, TD Bank William Rich Office of Planning and Verizon Daniel Duke President, Delta Associates Economic Development Kristina Bouweiri Prinicipal Mid-Atlantic Region, Jennifer Rudy Richard Lake / Co-Chair President & CEO, Reston Limo Bohler Engineering Director, U.S. Office of Civic Innovation, Managing Principal, Steven Boyle Josh Etter Microsoft Roadside Development Managing Director, Director, Development, Chase W. Rynd Foulger Pratt Omar McIntosh / Vice Chair EDENS Executive Director, Senior Vice President, Jean-Luc Brami Angie Gates National Building Museum Smoot Construction Vice President, Gelberg Signs Director, OCTFME Tara Scanlon Stan Jackson Partner, Holland & Knight Jennifer Eugene / Secretary Kenneth Brewer President & CEO, AEDC Manager, Engineered Sales Executive Director, H Street CDC
    [Show full text]
  • Washington DC New Construction & Proposed Multifamily Projects 2Q20
    Washington DC New Construction & Proposed Multifamily Projects 2Q20 ID PROPERTY UNITS 1 The Axiom at Cabin Branch 272 10 Main Street 70 17 The Elms at Century 300 319 20 Willow Manor at Fairland 121 Total Lease Up 763 314 44 The Upton Phase II 400 57 Atelier 254 58 Black Hills Germantown 1,618 318 1 311 Total Under Construction 2,272 132 124 Ambassador Redevelopment 60 58 125 Metro Plaza at Wheaton 552 17 128 Twinbrook Metro Place Block A 407 131 Westside at Shady Grove Metro Phase II 267 310 132 Poplar Grove 540 133 Aventon Crown 386 316 309 149 2424 Reedie Drive 204 150 Forest Glen Redevelopment 189 363 155 Privacy World at Glenmont 260 Metrocentre Redevelopment 308 159 159 Kentlands 365 160 Kentlands Market Square 160 313 Phase I - Block F 245 315 317 131 Total Planned 3,475 312 133 268 268 100 Main Street 200 288 269 Konterra Town Center 300 44 270 269 361 270 Viva White Oak 5,000 10 20 271 White Oak Town Center 275 277 57 277 Fortune Terrace 413 351 128 285 Park Potomac 100 155 288 Research Boulevard 350 316 Kingsview Station 61 285 271 308 Residences at Olde Towne 191 317 Rio Washingtonian Center 1,145 124 149 309 The Azalea 100 318 Elms at Clarksburg Village Phase III 300 125 310 Fairchild 212 319 St. Annes 76 311 Comsat Property 500 350 Holly Hill Redevelopment 500 350 150 312 Copley at Crown 120 351 Potomac Woods 500 313 Crown Farm 600 361 Rockville Metro Plaza 240 314 Frederick Road Townhouses 357 363 Emory Grove Village Redevelopment 50 315 Kentlands Market Square Phase II 1,000 Total Prospective 12,590 1 mi Source: Yardi Matrix
    [Show full text]
  • South Capitol Street Corridor and Frederick Douglass Memorial Bridge
    Executive Director’s Recommendation Commission Meeting: April 5, 2018 PROJECT NCPC FILE NUMBER South Capitol Street Corridor and 7529 Frederick Douglass Memorial Bridge Southwest and Southeast Quadrants of the NCPC MAP FILE NUMBER District of Columbia from I-295 Suitland 75.00.01(38.00)44722 Parkway Interchange to P Street APPLICANT’S REQUEST Washington, DC Approval of comments on concept SUBMITTED BY design for the South Capitol Street District of Columbia Department of Corridor and approval of preliminary Transportation and final design for the Frederick Douglass Memorial Bridge REVIEW AUTHORITY PROPOSED ACTION District Projects Outside the Central Area Approve comments on concept per 40 USC § 8722(b)(1) design for the South Capitol Street Corridor and approve preliminary and final design for the Frederick Douglass Memorial Bridge ACTION ITEM TYPE Staff Presentation PROJECT SUMMARY The District Department of Transportation (DDOT) has submitted a $441 million, multi-phased project to revitalize the South Capitol Street Corridor, replace the Frederick Douglass Memorial Bridge, rehabilitate several parks along with the I-295 Interchange, and develop two new open spaces (“the ovals”) that will serve as gateways on both sides of the bridge. This proposal will include the construction of a 1,445-foot-long, triple-arched, steel bridge with two v-piers in the water to replace the deteriorating Frederick Douglass Memorial Bridge. The new triple-arched Frederick Douglass Memorial Bridge will include six travel lanes for vehicles, a dedicated bike path, a pedestrian path, and four overlooks. The east and west ovals will connect to esplanades on both sides of the Anacostia River via pedestrian and bicycle paths.
    [Show full text]