Integrated Public Cleaning Central North Subject: Drain Schedule Dear
Total Page:16
File Type:pdf, Size:1020Kb
Integrated Public Cleaning Central North Subject: Drain Schedule Dear residents, Below is a summary of drain types within Central North region maintained by Sembcorp: INTEGRATED PUBLIC CLEANING CENTRAL NORTH – DRAINS Submerged Outlet Drains Non- Submerged Outlet Drains Anti-Malaria (AM)/ Earth Drains Conduit Drains Open Roadside Drains Closed Roadside Drains You may click on the above link for each drain type or refer to the full list on these subsequent pages. If you have any enquires on our cleaning schedules, please feel free to contact us at our hotline 1800 898 1920 or email us at [email protected]. Page 1 of 33 Integrated Public Cleaning Central North Subject: Submerged Outlet Drain Cleaning Schedule Dear residents, The submerged outlet drains within Central North region will be cleaned as per the schedule below: Flotsam S/N Submerged Outlet Drain Schedule Outlet drain at Seletar Club Road from Seletar Country Club to Lower 1 Daily Seletar Reservoir Sungei Pinang (Drain 5 and 5A) (from Hougang Avenue 10 to Upp 2 Daily Serangoon Road) 3 From Gerald Drive to Ang Mo Kio Ave 12 Daily 4 From Gerald Drive to Gerald Crescent Daily 5 Near Ang Mo Kio Avenue 12 Daily 6 From Lorong Buangkok to Sg Tongkang Daily 7 From Sengkang West Avenue to Sg Punggol Daily 8 Sg Punggol - Seletar Spring Condo to Punggol Dam Daily 9 Sg Serangoon - Opp Blk 321 Hougang Avenue 7 to Serangoon Dam Daily All other floating materials including the use of watercraft in Sg Punggol 10 Daily (from Serangoon North Ave 6 towards Downstream); 11 Seletar Link, Trapezoidal Drain, Near TPE 11.5km Daily Outlet drain from Soon Wing Road end of cul-de-sac to Pelton Canal 12 Daily between Kallang Way 2 and 3 at PCM/3 Pelton Canal from the inlet of culvert across Aljunied Road to inlet of 13 Daily culvert across Jalan Kolam Ayer Drainage Reserve of Kallang River from Braddell Road to Potong Pasir 14 Daily Avenue 1 Drainage Reserve of Kallang River from Potong Pasir Avenue 1 to Jalan Toa 15 Daily Payoh 16 Kallang River Daily If you have any enquires on our cleaning schedules, please feel free to contact us at our hotline 1800 898 1920 or email us at [email protected]. Page 2 of 33 Integrated Public Cleaning Central North Subject: Non-submerged Drain Cleaning Schedule Dear residents, The non-submerged outlet drains within Central North region will be desilted and flushed as per the schedule below: S/N Non - Submerged Outlet Drain (Desilting & Flushing) Schedule 1.2m wide outlet drain from within the Philips Factory compound at Toa Payoh West running across and along Toa Payoh West and inside the HDB Estate to 1 Once in 3 Months Whitley Road to BTFAS Phase 2A at Jalan Toa Payoh including the composite C7 channels drain from Philips TP2 carpark to the main drain. X= 2.0m Y= 2.0m 2.5m wide roadside drain from the inlet of the culvert across Lorong 1 Toa Payoh opposite Blk 157 running beside Blk 158, 160 & 161 to Whitley 2 Once in 3 Months Road to BTFAS Phase 2A at Jalan Toa Payoh opp Blk 105 Jalan Dusun. X= 1.5m Y= 1.0m 1.2m wide drain from the junction of Toa Payoh Central running along Lorong 4 3 & Lorong 8 Toa Payoh and side of the swimming pool to BTFAS Phase 2A at Once in 3 Months Jalan Toa Payoh. X= 1.0m Y= 1.5m Outlet drain from the outlet of the culvert across Ang Mo Kio Avenue 1 near 4 Once in 3 Months Lamp Post 141 to Sungei Kallang 5 Outlet drain beside Blk 401 Ang Mo Kio Avenue 10 to SK/18 Once in 3 Months Sungei Kallang from the outlet of the culvert across Bishan Road to 3rd 6 Once in 3 Months pedestrian bridge near Braddell Road. Covered drain from the inlet of the culvert across Bishan St 14 running along 7 Once in 3 Months Bishan St 13 to Sungei Kallang B/S the school. Covered drain from the inlet of the culvert across Bishan St 13 running along 8 Once in 3 Months Bishan St 11 to Sungei Kallang Outlet drain from Peminpin Drive running across Jalan Peminpin, Clover Avenue, Crescent Way and Binchang Rise to the outlet of the culvert across 9 Once in 3 Months Bishan St 21 (including one subsidiary drain from F/O No 3, M/s Lip Hing Industrial Building) Page 3 of 33 Box drain from the outlet of the culvert across Bishan St 21 running along 10 Once in 3 Months Bishan Road and across Braddell Road to Sungei Kallang Subsidiary Drain. Box drain from the driveway in front of Blk 112, Bishan St 12 running across 11 Once in 3 Months Braddell Road beside SPH Building to Sungei Kallang Subsidiary 12 Closed Outlet drain from Hse.96 Jalan Perminpin to Bishan St 24 Once in 3 Months 13 Closed Outlet drain from Hse.15E Jalan Berjaya toBishan St 22 Once in 3 Months Sungei Kallang from 3rd pedestrian bridge to the outlet of the culvert across 14 Once in 3 Months Braddell Road 15 Outlet drain from end of Bright Hill Drive running long Bright Hill Drive to SK/7 Once in 3 Months Covered drain from the culvert across Ang Mo Kio Avenue 1 near Blk 310 to 16 Once in 3 Months Sungei Kallang at Bishan Park. Covered drain from the culvert across Ang Mo Kio Avenue 1 near Blk 331 to 17 Once in 3 Months Sungei Kallang at Bishan Park. Sungei Kallang from the outlet of the culvert across Marymount Road to the 18 Once in 3 Months culvert across Bishan Road 19 Covered drain from Bishan St 23 near Lamp Post 5 to Sungei Kallang Once in 3 Months 20 Covered drain from Jalan Insaf running along Bishan Road to Sungei Kallang Once in 3 Months Covered drain from Bishan St 22 running along Bishan St 22 and Marymount 21 Once in 3 Months Road to Sungei Kallang. 22 Outlet drains at Sin Ming Industrial Estate Once in 3 Months Covered drain from the end of Jalan Sembilan running parallel to Jalan 23 Once in 3 Months Sembilang and along Jalan Keli to SKS/3 Outlet drain from the twin culverts across Sin Ming Road opposite Blk 25 24 Once in 3 Months running along Jalan Terubok to the outlet of the culvert across Jalan Ikan Merah Outlet drain near Chinese Temple at Kim Keat Link running across Jalan Toa 25 Once in 3 Months Payoh to Bukit Timah Flood Alleviation Scheme Phase 2A Closed Outlet drain from the inlet of the culvert at Lorong 5 Toa Payoh running 26 along Lorong 4 , 6 and across Lorong 6, running beside Toa Payoh Stadium to Once in 3 Months Bukit Timah Flood Alleviation Scheme Phase 2A Page 4 of 33 Outlet drain from inlet of culvert at Lorong 8 Toa Payoh to Bukit Timah Flood 27 Alleviation Phase 2A (including one subsidiary drain from Toa Payoh East Once in 3 Months starting from the junction of Kim Keat Avenue) Outlet drain from the inlet of the culvert across Ang Mo Kio Ave 1/3 junction to 28 Once in 3 Months Sungei Kallang Covered drain from the inlet of the culvert across Ang Mo Kio Avenue 1 beside 29 Once in 3 Months Lamp Post 28 to Sungei Kallang Outlet drain from the inlet of the culvert across Ang Mo Kio Avenue 1 beside 30 Once in 3 Months Avenue 6, running along Marymount Road to Sungei Kallang Sungei Kallang from the inlet of the culvert across Upper Thomson Road to the 31 Once in 3 Months culvert across Marymount Road Covered drain from Bright Hill Drive running along Sin Ming Avenue to Sungei 32 Once in 3 Months Kallang 33 U-drain from Street 54 to downstream at Industrial Park 2 Once in 3 Months Covered and opened drain from the rear of H/No 30Island Gardens Walk 34 Once in 3 Months running parallel to Sin MingAvenue to SK/7. 35 Non-submerged outlet drain at Seletar North Link (LP 173S1 towards SEA) Once in 3 Months Outlet drain near Blk 5 Lorong 7 Toa Payoh to Sungei Kallang Subsidairy drain 36 Once in 3 Months (SKS/14) 37 Sungei Kallang Subsidiary drain near Blk 203 Toa Payoh North to Kallang River Once in 3 Months Outlet drain from the outlet of the culvert across Lorong 8 Toa Payoh to Kallang 38 Once in 3 Months River 39 Outlet drain beside SBS Depot at CTE to Kallang River Once in 3 Months Outlet drain from s/o Blk 3 Kallang Sector and running along Jalan Kolam Ayer 40 Once in 3 Months to KR/12 Outlet drain from Singapore Power Electrical Sub-station running along Tannery 41 Once in 3 Months Lane to PL/24 Outlet drain from inlet of culvert across Kallang Way running across Kallang 42 Once in 3 Months Sector to Jalan Kolam Ayer to PL/32 43 Outlet drain from LP570 running along Jalan Kolam Ayer to Pelton Canal Once in 3 Months Outlet drain commencing from side of House/No 44 Wan Tho Avenue running 44 Once in 3 Months parallel to Kee Choe Avenue and along MacPherson Road to KR/12 45 Covered drain beside Blk 112 Potong Pasir Avenue 1 to Kallang River Once in 3 Months Page 5 of 33 Wan Tho Avenue - from rear of Cedar Girl's School to side of St Johm Home for 46 Once in 3 Months the Aged Outlet drain from the inlet of culvert beside Blk 35 at Sector C running along Sin 47 Once in 3 Months Ming Drive to Sungei Kallang Covered drain in front of H/No 21 Upper Thomson Road running along Upper 48 Once in 3 Months Thomson Road to Sungei Kallang 49 Outlet drain from the rear of H/No 108 Gardenia Road to Upper Thomson Road Once in 3 Months Outlet drain from Blk 15 Venus Road running along Upper Thomson Road to the 50 Once in 3 Months inlet of the culvert across Soo Chow Gardens (including all the culverts) Outlet drain from the inlet of the culvert across Soo Chow Gardens running 51 along and across Thomson Road to the outlet of the culvert across Jalan Todak Once in 3 Months (including culvert across Jalan Keli) Outlet drain from the outlet of the culvert across Jalan Todak running parallel to 52 Once in 3 Months Upper Thomson Road to the outlet of the culvert across Marymount Lane Outlet drain from the outlet of the culvert across Marymount Lane to the outlet 53 Once in 3 Months of culvert across Braddell Road (including the culvert across Marymount Road) Outlet drain from the outlet of the culvert across Braddell Road running parallel 54 Once in 3 Months to Braddell Road to the inlet of the culvert across Toa Payoh North B/S Blk 203 Outlet drain from the inlet of the culvert acrossLorong 1 Toa Payoh.