Dpr – Chapora River (25.00Km) Nw-25
Total Page:16
File Type:pdf, Size:1020Kb
Comments: Subject: Project: Client: [email protected] 86 85 469 124 +91 fax - 00 85 469 124 +91 tel. Gurgaon 122 002 (Haryana) – INDIA 37, Institutional Area, Sector 44 Intec House Ltd. Pvt. ENGINEERING TRACTEBEL CIN: U74899DL2000PTC104134 CIN: TRACTEBEL ENGINEERING pvt. ltd. - Registered office: A-3 (2nd Floor), Neeti Bagh - New Delhi - 110049 - INDIA tractebel-engie.com REV. 01 YY/MM/DD 19/05/13 DETAILED PROJECT REPORT – CHAPORA RIVER (25 KM) NW-25 KM) (25 RIVER CHAPORA – REPORT PROJECT DETAILED WATERWAYS CONSULTANCY SERVICES FORPREPARATION OF SECONDSTAGEOF DPR CLUSTER – 7 OF NATIONAL INLAND WATERWAYS AUTHORITYINDIA OF Revision No. Imputation: P.010257 TS: Our ref.: 01 STAT. Active P.010257-W-10305-01 WRITTEN SARIKA KUMARI 2019 05 13 Date Bidhan Chandra JHA VERIFIED Prepared / Revision By ARUN KUMAR APPROVED Final Submission DPR N SIVARAMAN N – CHAPORA RIVER CHAPORA (25.00KM) NW Description VALIDATED RESTRICTED B.C.JHA - 25 This document is the property of Tractebel Engineering pvt. ltd. Any duplication or transmission to third parties is forbidden without prior written approval Member, Technical & Sr Consultant); Vice Admiral (Retd.) S. K. Jha (Sr. Advisor); Mr. S. V. K. V. S. Mr. Advisor); from time to (Sr. time to make thisJha report success.K. S. (Retd.) Admiral Vice Reddy (Chief Engineer) and Mr Rajeev SinghalConsultant); (AHS)Sr who& provided their valuable guidanceTechnical Member, The consultants are grateful to Mr. S. K. Gangwar, Member (Technical), Mr. R. P. Khare (Ex. access to information and advice rendered by IWAI. The consultant would like toput on record their deep appreciation of cooperation and ready study. present the in compiled been has result the and assignment this for out carried been has study of Second Stage Detailed Project Report (DPR) of Cluster – 7of NationalWaterways”. The InlandWaterways Authority of India (IWAI) assigned the Consultancy Services for “Preparation ACKNOWLEDGEMENTS P.010257-W-10305-001 Tractebel Engineering Pvt Ltd Rev. 01 Rev. 3 / 386 (B.C. JHA) RESTRICTED This document is the property of Tractebel Engineering pvt. ltd. Any duplication or transmission to third parties is forbidden without prior written approval Government or Government of India. analysis, change in requirement of the Government (or) Change in policy either of State This Report can be updated at a later stage, when required byconsidering the fresh cargo information. information andany claim arising thereof, cost and consequence will be ontheparty misusing the to be used for the mentioned purpose/project as only, permitted by IWAI. In case of misuse of (IWAI)”, Ministryof Shipping, Government of India. The information contained in this DPR is intended Proprietary rights of the information contained herein belong to “InlandWaterways Authority of India Laboratory Tests have been carried out on the collected samples. subsequently and to27/05/2017 from 24/05/2017 out carried was Borehole Geotechnical 28/04/2017. outon carried was Survey Land Terminal Traffic Survey was carried out, as detailed and summarized in Annexure 4.2. to05/01/2017. 22/12/2016 Detailed Hydrographic Survey along with the Topographical Survey was carried out from based on the findings of the following field studies / investigations. study on NW – 25–Chapora River has been carried out for this assignment / analysed /compiled Cluster – 7 of National Waterways” by Inland Waterways Authority of India (IWAI). Accordingly,Consultancy the Services for the “Preparation of Second Stage Detailed Project Report (DPR) of M/s Tractebel Engineering Pvt., Ltd., (M/s TEPL), Gurgaon has been assigned with the RIGHTS /PROPREITORY DISCLAIMER P.010257-W-10305-001 Rev. 01 Rev. 4 / 386 Tractebel Engineering Pvt Ltd RESTRICTED (B.C. JHA) This document is the property of Tractebel Engineering pvt. ltd. Any duplication or transmission to third parties is forbidden without prior written approval CHAPTER 1: ......................................................................................................... 22 SUMMARY EXECUTIVE ............................................................................................................. 19 FEATURES SALIENT ..................................................................................................... 18 LIST OF ABBREVIATIONS 16 FIGURES.................................................................................................................. OF LIST .................................................................................................................... 13 LIST OF TABLES 4 RIGHTS.................................................................................. / PROPREITORY DISCLAIMER 3 ......................................................................................................... ACKNOWLEDGEMENTS TABLE OF CONTENTS DPR –CHAPORARIVER (25.00KM) NW-25 WATERWAYS NATIONAL OF OF CLUSTER-7 DPR STAGE SECOND OF PREPARATION FOR SERVICES CONSULTANCY P.010257-W-10305-001 CHAPTER 2: 2.1. 1.4. 1.3. 1.2. 1.1. 2.2. 1.2.5. 1.2.4. 1.2.3. 1.2.2. 1.2.1. 29 ............................................... statement Compliance and Work of Scope Brief 27 ...................................... Study Previous of Summary and Background Project 2.2.1. ............................................................................. 48 Structures Existing Waterway 2.1.3. 2.1.2. 2.1.1. ........................................................................................... 34 Survey Hydrographic ............................................................ 31 Area: ofStudy / Details Location Project 30 &Approach:.......................................................................... Methodology Brief Bridges48 ................................................................. 45 Datum / Sounding Datum Chart .............................. 45 levels Reference / Topographical Hydrological Existing 34 ................. Characteristics Hydro-morphological and inGeneral Waterway ............................. 34 SURVEY HYDROGRAPHIC / DETAILED WATERWAY ...................................................................................... 30 Analysis Financial .................................................................................. 30 Requirement Vessel ............................................................................... 30 Terminal Development 29 Confirmations.................................................................................. Traffic ................................................................................ 29 Development Fairway ....................................................................................... 27 INTRODUCTION Rev. 01 Rev. 5 / 386 RESTRICTED This document is the property of Tractebel Engineering pvt. ltd. Any duplication or transmission to third parties is forbidden without prior written approval CHAPTER 3: P.010257-W-10305-001 CHAPTER 4: 4.2. 4.1. 3.9. 3.8. 3.7. 3.6. 3.5. 3.4. 3.3. 3.2. 3.1. 2.6. 2.5. 2.4. 2.3. 4.3. 2.2.4. 2.2.3. 2.2.2. 3.9.2. 3.9.1. ................................................................................................... 66 Fairway Costing .................................................................................................. 66 Land Acquisition 65 ........................... depth toimprove /Weirs /Locks / Barrages Dams Proposed ................................................................................ 65 / / Weirs Aqueducts Anicuts Modification Requirement in existing Bridges / / Cables Dams /Barrages /Locks/ ............................................................... 64 Aids / Navigation Markings Navigation 63 .................................................. Strengthening / Embankment Protection Bank 3.3.3. 3.3.2. 3.3.1. ....................................................................... 58 Activities Conservancy Proposed 57 .............. works) development proposed and Width (Length, ofShoals Details 56 ................................................................... Waterway /Typeof Class Proposed 55 ................................................... Results and analysis Samples andSoil Water .......................................................................................... 51 description Waterway 51 ........................................................................... Details Discharge and Velocity ................................................................................................................... 50 Bends 4.3.2. 4.3.1. 100 Composition................................................................................... Commodity 4.2.4. 4.2.3. 4.2.2. 4.2.1. 69 ................................................................... Analysis / Hinterland area Influence ................................................................................................................. 67 General Dams / Barrages / Locks / Weirs / Anicuts / Aqueducts .............................. 50 .............................. Aqueducts / / Anicuts Weirs / /Locks Barrages / Dams .................................................................................... 50 / Pipe Lines Cables ......................................................... 49 Lines / Lines Communication Electric Iron Ore Iron 101 Mineral 101 90 ......................................................... Ports Major &Non Major from Traffic 88 .................................................................. Industries & Proposed Existing 72 ...........................................................................