1 May 2020 Works Report AP Review

Total Page:16

File Type:pdf, Size:1020Kb

1 May 2020 Works Report AP Review NARROMINE SHIRE COUNCIL ORDINARY MEETING BUSINESS PAPER – 6 MAY 2020 REPORTS TO COUNCIL – INFRASTRUCTURE AND ENGINEERING SERVICES 1. WORKS REPORT Author Director Infrastructure and Engineering Services Responsible Officer Director Infrastructure and Engineering Services Link to Strategic Plans CSP – 4.3.4 Ensure Council’s property assets are monitored and well managed Executive Summary This report provides information regarding works undertaken for the given period in regards to both operational and capital works. Report The Works Report (Attachment No. 1) for the period 4 April 2020 to 29 April 2020 is presented to Council for information. Financial Implications Council has provision for these services in its 19/20 Operational Budget. Legal and Regulatory Compliance Local Government Act 1993 Roads Act 1993 Risk Management Issues Nil Internal/External Consultation Nil Attachments 1. Works Report RECOMMENDATION That the information be noted. André Pretorius Director Infrastructure and Engineering Services Page No 1 Attachment No. 1 MONTHLY WORKS REPORT Infrastructure and Engineering Services Narromine Shire Council Tel: 02 6889 9999 Wednesday, 30 April 2020 Fax: 02 6889 9998 [email protected] Road and Park users are to proceed with caution at all work sites and observe work signs to ensure safety. Speed zones are enforceable with possible short delays. For all enquiries, please contact Council’s Infrastructure and Engineering Services Department on 6889 9999. URBAN ROADS – Narromine, Trangie, Tomingley Maintenance: Various Streets (Narromine) Routine Maintenance Program such as patching and street sweeping, etc. Maintenance: Various Streets (Trangie) Routine Maintenance Program such as patching and street sweeping, etc. Maintenance: Various Streets (Tomingley) Routine Maintenance Program. UNSEALED ROADS NETWORK Maintenance: Map No. 1 Tyrie Road – Maintenance grade Wyanga Road - Maintenance grade Mungery Hall Road – Maintenance grade Browns Lane - Maintenance grade Pineview Road – Spot grade Euromedah Road – Spot grade Various Unsealed Roads Foremans Lane – Spot grade Mumble Peg Road – Grade due to storm/flood damage Merrits Lane - Grade due to storm/flood damage Lincoln Lane - Grade due to storm/ flood damage Capital: Map No. 2 Strathallyn Lane – 2.28km Gravel resheet commenced SEALED ROADS NETWORK Maintenance: Eumungerie Road – Shoulder repair due to storm/flood damage Trangie Collie Road – Spot and shoulder grade due to storm/flood damage Burroway Road – Spot grade due to storm/flood damage Capital: Various Sealed Roads In progress or completed; Trangie Dandaloo Road extension of 880m new rehabilitation has commenced. Slashing completed by Council Trangie Dandaloo Road Tyrie and Tyrie North Road Newhaven Road Trangie Collie Road Ellengerah Road Page 1 Attachment No. 1 MONTHLY WORKS REPORT Infrastructure and Engineering Services Narromine Shire Council Tel: 02 6889 9999 Wednesday, 30 April 2020 Fax: 02 6889 9998 [email protected] SEALED ROADS NETWORK CONT. Slashing Completed by Council cont. Wambianna Road Jefferies Road Tomingley Road Gundong Road Pinedene Road Tullamore Road Raeburn Lane Slashing Completed by Contractor Warren Road Burroway Road SWIMMING POOLS Closed for the winter season and due to COVID-19 Public Health Order. Narromine Pool Community survey is complete and responses being assessed. Closed for the winter season COVID-19 Public Health Order. Trangie Pool Community survey is complete and responses being reviewed. PARKS AND OPEN SPACE NETWORK CBD Gardens, Parks, Ovals, Villages (outdoor playgrounds, BBQs and skateparks are closed due to COVID-19) Tree pruning has commenced. Vegetation mowing continuing. Dead tree removal to continue and some replacement Narromine CBD trees have been planted. Weed spraying program of streets, lanes and culverts continuing. General maintenance, mowing and weed control. Hand watering of some locations without irrigation Narromine Parks and Reserves system continues as per water restriction exemption, where required. General maintenance, spraying and mowing. All sportsgrounds have been sprayed for weeds. Narromine Sports Grounds Sporting clubs programs are all currently on hold due to COVID-19, however maintenance will continue for public use. Hand watering by water exemption continues, where Narromine Streets required. General maintenance and weed control ongoing. Trangie CBD Vegetation mowing and slashing continuing. Trangie Parks General maintenance and mowing. General maintenance continuing. Trangie Sports Grounds Top ties of chain-wire perimeter fence around Burns Oval replaced. Page 2 Attachment No. 1 MONTHLY WORKS REPORT Infrastructure and Engineering Services Narromine Shire Council Tel: 02 6889 9999 Wednesday, 30 April 2020 Fax: 02 6889 9998 [email protected] PARKS AND OPEN SPACE NETWORK CBD Gardens, Parks, Ovals, Villages (outdoor playgrounds, BBQs and skateparks are closed due to COVID-19) CONT. Sporting clubs’ programs are all currently on hold due Trangie Sports Grounds cont. to COVID-19, however maintenance will continue for public use. General maintenance. Street sweeping weekly on Trangie Streets Tuesday. Town maintenance services contract have been Tomingley Village extended for a further 6 months, to September 2020. AERODROME Tree trimming, slashing and weed control continue Narromine Aerodrome Construction of the Skypark and Hangar Developments progressing. Roads at Skypark have been sealed. BUILDING MAINTENANCE All Buildings General maintenance as required. Vandalism Vandalism at Council facilities still continues. Narromine Medical Centre General maintenance as required. Council Administration Upgrades to the toilets on hold until 30 June 2020. Buildings PUBLIC CONVENIENCES Rotary Park (Narromine) Public Toilet facilities cleaned daily. Toilets Burraway Street Public Toilets Toilet facilities cleaned daily. (adjacent to Pool) Argonauts Park (Trangie) Toilet facilities cleaned every Tuesday, Thursday and Public Toilets (Goan Saturday. Waterhole) Dandaloo Street Trangie Toilet facilities cleaned every Monday, Wednesday (adjacent to Bakery) and Friday. Narromine and Trangie Truck Waiting for outcome of land acquisition process for the Wash Trangie Truck wash. Adjustments to layout of ponds were made due to Wetlands water treatment plant site requirements. Toilet block secured and cleaned daily. CEMETERIES Irrigation –Further lines have been completed for new headstones. Narromine Cemetery New bollards to be installed at lawn section. General maintenance continues. Page 3 Attachment No. 1 MONTHLY WORKS REPORT Infrastructure and Engineering Services Narromine Shire Council Tel: 02 6889 9999 Wednesday, 30 April 2020 Fax: 02 6889 9998 [email protected] CEMETERIES CONT. General maintenance, mowing and weed spraying. Topping up of subsiding graves continues. Trangie Cemetery Dead trees are noted and renewal/replacement plan will be put in place when water availability improves. WATER AND SEWER Continued regular system maintenance at the water Tomingley treatment plant. Staff have continued reticulation system maintenance. Staff continue to deal with sewer pump station blockages and mains chokes due to non- Trangie biodegradable materials being used in the sewer systems. Specialist contractors have carried out a dive inspection and cleaning of the water reservoir floor. Contractors have commenced construction of the Iron and Manganese removal plant at the town bore 6 site. Dry Commissioning will commence Tuesday 5 May 2020 with Wet Commissioning to follow. Batch testing is scheduled for the 14 May 2020 immediately followed by proving, which will run for around 5 weeks. Specialist contractors have carried out a dive inspection and cleaning of the reservoir floors in both Duffy and Nymagee Streets drinking water reservoirs to remove deposits. Staff carried out systematic reticulation flushing to remove deposits and ensure continued water quality. Narromine Staff have commenced mains replacement in Meryula Street between Meringo and Culling Streets. Regular Drinking Water Quality sampling and analysis continues, along with extra sampling involved with new bore connections and system upgrading activities. Sewer pump station maintenance is ongoing and has increased in frequency due to problems with non- biodegradable materials being used by consumers as a substitute for toilet paper. Staff have continued sewer collection system maintenance with an increase in blockage frequency being noted. Page 4 Map No. 1 Trangie Narromine Tomingley Narromine Shire Council Council Report - Maintenance Council Report - Capital April NovMeamrcbher July March OcFtoebberurary February SepDtecmebmebrer / January January/December AuNguosvtember Note - thNeo rvoeadms bheigrhlighted are visual purpoOsecst oobnleyr and may not be the exact location of work October September September August August July July January April Culvert Replacement Sewerage_Manholes_MGA 201920 Quarries - 100719 ACTON ANNING BARBERS BARLING localrds localrds BROWNS localrds localrds COBBOCO localrds localrds COLLYBURL Google Satellite COOKS CORAMBIE FAIRVIEW GOONALARA HILLSIDE KYALITE Google Satellite McCUTCHEONS MERRYLANDS MEWBURNS MONTGOMERY PUGHS BAKER Council Report Council Report - Capital localrds localrds localrds localrds localrds Map No. 2 Trangie Narromine Tomingley Narromine Shire Council Council Report - Capital localrds localrds April Novemberlocalrds localrds July March Octoberlocalrds localrds February GoogleSeptember Satellite December / January August Note - theNovember roads highlighted are visual purposes only and may not be the exact location of work Return to reportOctober September August Google Satellite July Culvert Replacement Sewerage_Manholes_MGA 201920 Quarries - 100719 ACTON ANNING BARBERS Council Report - Maintenance BARLING April BROWNS March COBBOCO February COLLYBURL COOKS November CORAMBIE October FAIRVIEW September GOONALARA August HILLSIDE July KYALITE McCUTCHEONS MERRYLANDS MEWBURNS MONTGOMERY PUGHS January BAKER Council Report Council Report - Capital localrds localrds localrds localrds localrds.
Recommended publications
  • SAG Reel 357 0357
    JOINT COPY PROJECT Uniting Church Archives of NSW & ACT Marriage Registers of the Presbyterian Church Society of Australian Genealogists – Sydney National Library of Australia - Canberra Mitchell Library – Sydney SAG Reel 357 0357 PLACE includes - OTHER START DATE END DATE Register PLACES References Narrandera Whitton; Darlington 3 March 1908 13 January 1914 120 1 Point; Gillenbah; Leeton; [dates differ to title page sheet] Narrandera Corobimilla; Grong 25 March 1924 10 April 1929 120 2 Grong; Narrandera 20 April 1929 31 March 1934 120 3 Narrandera Mount Crystal; Grong 3 April 1934 1 September 1937 120 5 Grong; Corobimilla; Narrandera Grong Grong; Wagga 8 September 1937 10 March 1945 120 5 Wagga; Leeton; Narrandera Leeton; Grong Grong; 10 October 1945 25 February 1950 120 6 Methodist Ganmain; Narrandera Grong Grong; Boree 3 March 1950 16 April 1958 120 7 Creek; Urana; Narrandera 19 April 1958 19 December 1959 120 8 Narromine Timbrebongie; 1 June 1910 14 December 1911 121 1 Narromine Lockhart; Manilla; 20 July 1912 5 January 1916 121 2 Narromine Wyanga; Nyngan; 21 January 1913 7 January 1914 121 3 Trangie; Burwood; Warren; Dandaloo; Narromine 15 July 1918 28 March 1923 121 5 Narromine Peak Hill Methodist; 11 August 1944 13 April 1954 121 2 Narromine, Trangie Condobolin; Dubbo; Scots 15 March 1955 17 October 1959 121 4 College Chapel‐Sydney; The original records are held by Uniting Church Archives of NSW/ACT at North Parramatta and permission was granted for their microfilming to be undertaken by W & F Pascoe Pty Ltd in 2009. This microfilm is supplied for information and research purposes only.
    [Show full text]
  • Mitchell Cluster
    THE CENTRE Australia’sOF NSW Wool & Cotton Capital A History of Bourke...................................................................................3 A History of Brewarrina...........................................................................5 A History of Cobar .....................................................................................6 A History of Narromine ............................................................................7 A History of Nyngan..................................................................................9 A History of Tottenham .........................................................................10 A History of Trangie................................................................................11 A History of Tullamore...........................................................................12 A History of Wanaaring..........................................................................13 A History of Warren.................................................................................14 Things you need to know ......................................................................15 Things you need to know ......................................................................15 All that The Centre of NSW has to Offer ..........................................18 Cultural Services..........................................................................................18 Communications..........................................................................................20
    [Show full text]
  • Farming Systems in the Pastoral Zone of NSW: an Economic Analysis
    Farming Systems in the Pastoral Zone of NSW: An Economic Analysis Salahadin A. Khairo John D. Mullen Ronald B. Hacker Dean A. Patton Economic Research Report No. 31 Farming Systems in the Pastoral Zone of NSW: An Economic Analysis Salahadin Khairo Economist, Pastures and Rangelands NSW DPI, Trangie John Mullen Research Leader, Economics Research NSW DPI, Orange Ron Hacker Research Leader, Pastures and Rangelands NSW DPI, Trangie Dean Patton Manager Condobolin Agricultural Research Centre March 2008 Economic Research Report No. 31 ii © NSW DPI 2008 This publication is copyright. Except as permitted under the Copyright Act 1968, no part of this publication may be reproduced by any process, electronic or otherwise, without the specific written permission of the copyright owner. Neither may information be stored electronically in any way whatever without such permission. ABSTRACT A ‘broad brush’ picture of farming in the pastoral zone of NSW is presented in this report. The pastoral zone of NSW is characterised by wide variations in climatic conditions, soil type and vegetation species. Hence representative faming system analysis was conducted for three sub-regions - the Upper Darling, the Murray-Darling and Far West. The regions were defined and described in terms of their resources, climate and the nature of agriculture. The main enterprises that farmers choose between were described and whole farm budgets and statements of assets and liabilities for the representative farms were developed. The representative farm models were used to compare traditional Merino based sheep enterprises with alternative sheep enterprises where meat was an important source of income. We found that the farming systems that have evolved in these areas are well suited to their respective environments and that the economic incentives to switch to more meat focussed sheep enterprises were not strong.
    [Show full text]
  • 570 Bus Time Schedule & Line Route
    570 bus time schedule & line map 570 Nyngan to Lithgow View In Website Mode The 570 bus line Nyngan to Lithgow has one route. For regular weekdays, their operation hours are: (1) Lithgow: 6:10 AM Use the Moovit App to ƒnd the closest 570 bus station near you and ƒnd out when is the next 570 bus arriving. Direction: Lithgow 570 bus Time Schedule 14 stops Lithgow Route Timetable: VIEW LINE SCHEDULE Sunday 6:10 AM Monday Not Operational Nyngan Coach Stop, Pangee St 92 Pangee Street, Nyngan Tuesday 6:10 AM Warren Coach Stop, Burton St Wednesday Not Operational 13A Burton Street, Warren Thursday 6:10 AM Nevertire Coach Stop, Mitchell Hwy Friday 6:10 AM 14 Clyde Street, Nevertire Saturday Not Operational Trangie Coach Stop, Dandaloo St 8 Dandaloo Street, Trangie Narromine Coach Stop 105 Dandaloo Street, Narromine 570 bus Info Direction: Lithgow Dubbo Station, Coach Bay 1 Stops: 14 148 Talbragar Street, Dubbo Trip Duration: 405 min Line Summary: Nyngan Coach Stop, Pangee St, Geurie Coach Stop, Mitchell Hwy Warren Coach Stop, Burton St, Nevertire Coach Stop, 47-49 Buckenbah Street, Geurie Mitchell Hwy, Trangie Coach Stop, Dandaloo St, Narromine Coach Stop, Dubbo Station, Coach Bay 1, Wellington Station, Coach Stop Geurie Coach Stop, Mitchell Hwy, Wellington Station, Coach Stop, Molong Coach Stop, Orange Station, Molong Coach Stop Coach Bay 1, Lucknow Coach Stop, Mitchell Hwy, Bathurst Station, Mount Lambie Coach Stop, Great Orange Station, Coach Bay 1 Western Hwy, Lithgow Station, Railway Pde, Bay 1 Lucknow Coach Stop, Mitchell Hwy 4601 Mitchell Highway, Lucknow (Nsw) Bathurst Station Mount Lambie Coach Stop, Great Western Hwy Lithgow Station, Railway Pde, Bay 1 55 Railway Parade, Lithgow 570 bus time schedules and route maps are available in an o«ine PDF at moovitapp.com.
    [Show full text]
  • Carved Trees Or Dendroglyphs
    BURIAL TREES BEING THE FIRST OF A SERIES ON THE ABORIGINAL CUSTOMS OF THE DARLING VALLEY AND CENTRAL NEW SOUTH WALES BY LINDSAY BLACK .\tmber of the A tlthropoloyical SocidJ/ of .\'.S. n'.: Fidd J.\'afura[isfs' Club of Victoria .. CJw.irmu" of the Uil'f',.;ua Ilra"rh, ROJ/al A UHt ralaRia" Uruitlw(oui ..tts' U "io" ./' 1941 MELBOURNE ROBERTSON & MULLENS LTD. It61 'I";) ']'''lI'lORTU'\: '"15 3:-4'1008 3'1' Oft "OL' '..\J,d XOSS:HIl'.:\' 'HOIS.I 'X.\\O}lO .HI \'n\'s!1'" XI 0.-I.'l:11I,1 o.'.;v ,1:1 1. ..:1':'> .\.'1'1011.\\ "000 \' SV 1,50,1 :uu. lI"lOOHIIL XOISSII\:SXY)fl. HO.:l '3101,10llTU\ "0',,") :1111. l.V o::nf3:1.SI3'l1 F20651 I _ - 7 JAN fq4? ITRODUCTIO 1\. S. }(EXYON7 :\1.1.E.Amt.. :\t.Anlh . .I\.J\mcr., 1.,\lIlh.Soc.\"ict. C THE proper study oi maukind is man,' so \\"rote .\1exander Pope in his F,ssa.\' Oil J/all just t\\"o centuries ago: and that study. as iudeed do all serious il1\'estigatious. i 11\'01 ves research iuto origius, ' lu A ust ralia. \\"e ha \'e. not only the nearest approach to primiti \'e man-man as he began when le;l\'iug the brute world-but a mau \\"ho has remained untouched-oue had almost \\"ritteu uncont;u11i11­ atl'd-si11ce the begi11ni11g. by outside c11lture contacts and who has retained up to the prcseut time the most simple iso-agglutiuin blood groupiug, E\'ery uen'e should be strained to take iull advantage oi this unique opportunity: an opportunity which has beeu missed by the British aud Europcan anthropologists.
    [Show full text]
  • Macquarie-Bogan Lachlan Namoi Castlereagh Gwydir Condamine
    ER MEHI RIV MEHI RIVER MEMHEIMH RIE IRVHIEMIV REIHRVIE RIVER M E R HI E RIVER V I R IE R IR R B E V RI A Condamine-Culgoa Warrego O G L U Gwydir C RW BA ON RIVE IVER R RLING R A IVER D R AN WALGETT OG LITTLE B ! R ! E V BOURKE I Barwon-Darling R G B OG N I A NA N MOI RIVER L ! RIV R ER A WEE WAA D NARRABRI ! ! PILLIGA KP 50 KP 100 KP 0 Namoi KP 150 Macquarie Marshes COONAMBLE ! KP 200 Castlereagh COONABARABRAN ! !? COBAR ! KP 250 C ! A NYNGAN S T L E R E A G ! WARREN H ! R IV GILGANDRA ER KP 300 M AC QU AR Macquarie-Bogan IE R IV E TRANGIE R ! R RIVE GAR KP 350 RA LB TA NARROMINE LBUR RIVER ! OU N ! ! G DUBBO TOTTENHAM Hunter KP 400 KP 450 C U D G (! E G Bundure O NG R I R VER LI E T V TL I E R R L L I E V B E R CONDOBOLIN TUR ! ON Lachlan RIVER ! PARKES R E ORANGE V I ! R R N E A CHLAN LA V L R I IV H E BATHURST R C R ! S X A L O F I C LA R SH BU I RIV ER LU VE BE R AREA OF DETAIL: PROJECT: WESTERN SLOPES PIPELINE LEGEND TITLE: Watercourses and Catchments ! Populated Place SUBTITLE: Attachment 3 KP point DATE: 02/03/2017 (! MSP Mainline Valve DATA SOURCE: !? Marebone Weir Service Layer Credits: Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the WSP Preliminary Alignment GIS User Community Moomba Sydney Pipeline Central West Pipeline DOCUMENT NUMBER: 560-MAP-P-014 Central Ranges Pipeline ³ Major Rivers APA Group does not guarantee the accuracy or completeness of the map and does not make any warranty about the data.
    [Show full text]
  • Trangie-Nevertire Renewal (Max
    WatSave — Nomination Form WATSAVE AWARDS Nomination Form1 1. Information on Innovation Innovations / Title Trangie-Nevertire Renewal (max. 10 words) An Irrigation Infrastructure Modernisation Success Story. First introduced:(Year) Completed November 2014 Area covered: Ha 100 000 Water saved: 29889 ML 2 Award category Technology ❑ Management (P please check one) Young Professional3 ❑ Farmer ❑ 2. Nominee Information4 Nominee (1) James Winter Position Chairman Organization Trangie-Nevertire Co-operative Ltd Postal Address “Carlisle” Mitchell Highway Trangie NSW 2823 Australia Telephone 02 68887689 Fax 02 68887040 Email [email protected] Date of birth 22/06/1962 Citizen of Australia Mobile +61428 651334 Nominee (2) Tony Quigley Position Treasurer Organization Trangie-Nevertire Co-operative Ltd Postal Address “Muntham” 282 Quigley Carroll Rd Trangie NSW 2823 Australia Telephone 02 68476338 Fax 02 68476214 Email [email protected] Date of birth 09/04/1961 Citizen of Australia Mobile +61419 297047 1 One nomination per National Committee for each award category 2 MCM = Million Cubic Meters; BCM = Billion Cubic Meters 3 Young Professional award does not require wide-spread implementation but must have been pilot tested in the field. 4 Please add additional names and addresses as required. 1 WatSave — Nomination Form 3. Nominee Statement of about 1500 Words (in the following format) (a) Describe the innovation (essential) This modernisation /renewal project involved the transfer/sale of water to the Australian Government in return for funding to totally modernize the irrigation infrastructure of the Trangie-Nevertire Co-operative Ltd both off-farm and on-farm. Channel conveyance losses have reduced from in excess of 50% to 7%.
    [Show full text]
  • Narromine Shire Council
    28 Narromine Shire Council SNAPSHOTSNAPSHOT PROFILE The Narromine Shire is ideally situated in the heart of the rich Macquarie Name: Narromine Shire Population: 6,523 Valley. Narromine, on the banks of the Macquarie River, offers a quality Size of Shire: 5,242km+ rural lifestyle and yet is just 39 kms away from the regional city of Dubbo. Towns and Villages: Narromine, Trangie, Tomingley Climate: Mean daily temperature (min – max) Summer 18°C – 32.43°C Winter 5°C – 15°C Mean yearly rainfall 500mm Elevation: 236.5 metres (Narromine) Main Industry: Agriculture – wheat, cotton, fat lambs, summer crops, citrus orchards Industry No. Employed 1. Agriculture, forestry, fishing 842 2. Retail trade 255 3. Wholesale trade 168 The largest commercial lime orchard in Australia, 4. Education 168 5. Health and community services 166 Industry Today raw form is encouraging for 6. Construction 140 Crops such as wheat, barley, future value adding 7. Property and business services 118 oats, canola, soy bean, lucerne, opportunities. 8. Transport and storage 105 and both dryland and irrigated 9. Manufacturing 104 cotton contribute significantly The Narromine 10. Government administration and defence 93 to agricultural output. Other Advantage farm enterprises include stone Narromine offers numerous Labour Force No. of People fruit, citrus fruit, the largest opportunities to potential Total employed: 2542 commercial lime orchard in investors and the pro-active Total labour force: 2884 Australia, pecan nuts, olive trees Shire Council will assist Not in labour force: 1828 and market gardens. The Shire wherever possible. The planned Labour force participation rate: 61.2% also produces prime lambs, future direction of the Shire is to cattle and poultry, and a piggery encourage industrial Employment by Occupation (%) and crayfish farm add diversity.
    [Show full text]
  • Macquarie Community Profile: Irrigation Region
    Macquarie community profile Irrigation region Key issues for the region 1. Region’s population: The Macquarie irrigation region comprises an area of some 13,000km2 in central west New South Wales covering three council areas,- Dubbo City and the shires of Narromine and Warren. The area has a total population of 47,000 people, of whom 37,000 live in the City of Dubbo. Outside Dubbo, the region is highly reliant on agriculture for employment and wealth creation, with most employment in the irrigation districts especially in cotton. The region is also a centre for cereal cropping and is famous for its Merino studs. Agriculture supports a wide range of services in the public and private sectors. 2. Water entitlements • Surface Water Long-term Cap — The Water Sharing Plan for the Macquarie and Cudgegong Regulated Rivers Water Source took effect on 1 July 2004. This limits average annual extractions to 391,900 ML. • Water entitlements for the Macquarie region are as follows: High Security (15,038 ML); General Security (611,271 ML); Environmental Water Allowance (160,000 ML); Supplementary Water (48,505 ML); Domestic and Stock water (4,826 ML); Local Water Utility (16,205 ML); Groundwater entitlements (65,524 ML). These figures refer solely to the entitlements available from the Macquarie River serviced out of Burrendong Dam. They ignore entitlements available from the Cudgegong supplied out of Lake Windamere. 3. Major enterprises — Cotton has been a major employer across the region since the 1980s, both in primary production and in processing, with five gins located at strategic points across the region.
    [Show full text]
  • Level Crossing Strategy Council Yearly Report 2017-18
    Level Crossing Strategy Council Yearly Report 2017-18 September 2018 Front cover: Level crossing awareness and enforcement campaigns are central to the task of making level crossings safer and an important part of Towards Zero Contents Glossary 4 Executive Summary 5 1 Year in review: 2017-18 5 1.1 Agency level crossing initiatives 6 2 Level crossings in New South Wales 8 2.1 Level Crossing Strategy Council 8 2.2 Level Crossing Improvement Program 8 2.3 National Level Crossing Safety Committee 9 2.4 Interconnected level crossings 9 2.5 Level crossing closures 10 2.6 Level crossing incident data 10 Level Crossing Improvement Program 2017-18 13 3 Infrastructure works 13 3.1 Major works completed 13 3.2 Development work undertaken 16 3.3 Minor works 16 4 Education and awareness 20 4.1 Level crossing safety education campaigns 20 4.2 Level crossing awareness and enforcement campaigns 22 5 ALCAM development and data collection 24 5.1 National ALCAM Committee 24 5.2 NSW ALCAM data collection 24 6 New technology and research 25 6.1 Australasian Centre for Rail Innovation 25 Safety initiatives 26 7 Agency safer level crossings initiatives 26 7.1 ARTC level crossing safety initiatives 26 7.2 CRN level crossing safety initiatives 26 7.3 Sydney Trains level crossing safety initiatives 27 8 Interface agreements 28 Funding 29 9 Funding for level crossings in NSW 29 Appendix A: Total LCIP 2017-18 work completed 31 Appendix B: Expenditure on level crossing upgrades in NSW funded through the LCIP and by RIMs and road managers 2011-12 to 2017-18 32 Level
    [Show full text]
  • Peak Hill Railway Station Anything Interesting About Peak Hill Station?
    PEAK HILL RAILWAY STATION ANYTHING INTERESTING ABOUT PEAK HILL STATION? Yes, there is, provided the reader has an interest in the history of railway station buildings. Peak Hill station was the only location on the New South Wales railway system to possess two platform buildings with the same alpha-numerical code “A”. The first building located on the platform in 1910 with the “A” classification was a primitive timber structure with a single-pitched or skillion roof. The second building with the “A” classification, which was located on the platform in 1934, was a slightly less primitive structure with a double-pitched roof. How come the two buildings could be of different designs with the same alpha- numerical “A” coding? The answer is that the New South Wales Railway Department issued standard plans on two occasions – 1899 and 1913. The Department change the design of the buildings in 1913 but retained the original alpha-numerical code. Peak Hill station became the only location where two “A” style buildings displaying the different styles were provided, based on both plans displaying the “A” classification.1 THE FIRST PLATFORM BUILDING There were rumours about the nature of the platform buildings to be erected by Railway Department over a year before the opening of the line from Narromine to Peak Hill. One press report stated that: “the Department intends putting up a substantial station here, also a nice Station Master's residence. A goods-shed and a 20-ton weighbridge are to be erected. The station will be on the western side, and the goods-shed on this side”.2 By 1909, there were very few large towns in rural New South Wales without a railway connection to Sydney.
    [Show full text]
  • The Economic Geography of the Gwydir and Macquarie River Catchment Towns
    The Economic Geography of the Gwydir and Macquarie River Catchment Towns: Current Features, Future Prospects and Challenges Dr Neil Argent, Dr Fran Rolley and Assoc. Prof. Tony Sorensen Division of Geography and Planning University of New England ARMIDALE N.S.W. 2351 Disclaimer This report was prepared for Department of Environment, Climate Change and Water NSW (DECCW) by Dr Neil Argent, Dr Fran Rolley and Assoc. Prof. Tony Sorensen, Division of Geography and Planning, University of New England. The views expressed in this report do not necessarily represent the views of DECCW, and DECCW make no representation as to the accuracy, completeness or suitability of the content for any particular purpose. Readers should seek appropriate advice as to the suitability of the information for their particular needs. 1 Executive Summary This report identifies the economic, social and demographic linkages between the various towns within two economically important catchment regions in central and northern New South Wales – the Macquarie-Bogan and Gwydir river catchments. This is seen as an important preliminary step to identifying the likely economic, demographic and social impacts upon rural towns of any long-term restricted access to irrigation water for agricultural production. As stipulated by the Department of Environment and Climate Change, the contents and findings of this report are the result of secondary data analysis and literature review only. Our findings are the result of detailed analyses of the most current and reliable data sources available. Although the Gwydir catchment encompasses a wide variety of farming enterprise types, broadacre cropping and grazing dominates agriculture land use by area.
    [Show full text]