RACHEL YUNGMAN FELLER ARCHITECT, SENIOR PARTNER, HEAD of STUDIO Qualifications Bachelor of Architecture from the Technion with Honors, 1986
Total Page:16
File Type:pdf, Size:1020Kb
RACHEL YUNGMAN FELLER ARCHITECT, SENIOR PARTNER, HEAD OF STUDIO Qualifications Bachelor of Architecture from the Technion with Honors, 1986 Key Data over a total area of 34,000 sq.m. The Metropolin, Tel Aviv, Israel Rachel joined Yasky Architects in 1988 compound includes another residential Partner in charge in charge of a and has been part of MYS Architects tower, a hotel, an apartment hotel and 38-stories, 70,000 sq.m ever since its establishment. She is a a public building set in a large park building combining residential partner and head of a studio where with a statue garden. and office space. she is responsible for the entire design and production process; from BSR in Borochov, Givatayim, Israel Haharash Compound, conceptual phases to construction Partner in charge of design of two Tel Aviv, Israel documents, urban planning work residential towers with 19 and 25 Partner in charge responsible for with the local and regional planning stories and a total of 156 housing design of a 30-stories office building boards. Rachel headed several units, above a magnificent lobby of 30,000 sq.m on the prominent design competitions and was that includes a gym and a tenant Ayalon freeway. club, over a total area of 41,000 responsible for some important break- West Hotel,Tel Aviv, Israel through design innovations. sq.m. The project is scheduled for completion in 2016. Associate Architect in charge of a 35,000 sq.m project including two Selected Projects Recital Building, Tel Aviv, Israel 13-stories towers and one 3 stories Or Bavli, Tel Aviv, Israel Partner in charge of design for low-rise with a connecting foyer facing Partner in charge of design of two a 22-stories, 22,000 sq.m office the beach. Phase I completed in 2009, luxury residential buildings (14 and building located at the northern Phase II to be complete in 2017. 22 stories), with 145 exceptionally arm of Tel Aviv’s CBD. Will Be large housing units over a total area of Completed in 2017. Amisragaz Center, Hertzlia, Israel 48,000 sq.m. The project is scheduled Partner in charge of a 54,000 sq.m for completion in 2016. Young TLV, Tel Aviv, Israel commercial development in Herzliya. Partner in charge of design and Love TLV, Tel Aviv, Israel development of two 40 and 46 stories Shderot Hahaskala, Tel Aviv, Israel Partner in charge of design phases towers with 500 apartments. These are Partner in charge for an office and of 47-stories residential towers located set above 6 floors containing office, commercial project on the corner of in the heart of Tel Aviv. commercial, spa and kindergartens, Hahaskala Boulevard and Kremnitzky for a total of 90,000 sq.m. Street. A system of aluminum cladding We Tower, Tel Aviv vertical elements between the Partner in charge of design of a Frishman 46, Tel Aviv, Israel windows covers the two main facades 38-stories building combining Partner in charge of a 30,000 sq.m facing the street. The vertical element residential and office space. The tower of 28 luxury residential stories angles variates along the façade, 70,000 s.q.m building will be set on lower floors containing a large creating a dynamic and constantly completed in 2018. spa, swimming pool and commercial changing appearance. spaces on Dizengoff Road. Sarona Hotel, Drom Hakirya, Jabotinsky 105, Ramat Gan, Israel Tel Aviv, Israel Nature Museum Competition, Two buildings: a 37-stories residential Partner in charge of design of an 880 Jerusalem, Israel tower above a lobby and a building room hotel and conference center. Partner in charge of the concept with four residential levels above a The project will be comprised of design for the museum which won commercial level. The compound offers 42-stories above 5 underground second place. a broad variety of housing units. levels, totaling 90,000 sq.m that will The typical tower floor has five small be completed in 2016. Savyoney Ramat Aviv, Tel Aviv housing units 3, 4 and 5 bedroom Partner in charge of a complex apartments facing north towards the Lagoon Tower 1 and 2, comprised of 10 residential buildings Netanya, Israel Ramat Gan Park located several blocks surrounding a large interior park and north of the project. Penthouses are Partner in charge of design of a spa of 115,000 sq.m. 34-stories tower with 153 luxury planned for the upper floor. housing units mostly facing the sea In the lower building, studio and 2 and 3 1/3 RACHEL YUNGMAN FELLER SENIOR PARTNER, HEAD OF STUDIO, ARCHITECT Qualifications Bachelor of Architecture from the Technion with Honors, 1986 bedroom apartments were built around Beit Hayarden, Airport City, Israel Yoo Towers, Tel Aviv, Israel an inner atrium above the commercial Partner in charge of an office building Associate Architect in charge of all structure. The buildings are located near the Ben Gurion International aspects of the project consisting of along Jabotinsky Street and connect Airport, over a total area of 20,000 37 and 41 stories towers that offer it with the northern HaMa’apil Street, sq.m of offices, commercial spaces/ a glimpse to the future of high-end which is 7m lower. This differential uses above ground, over six floors, residential buildings in Tel Aviv. The enabled the creation of a garden on a with three underground parking levels project was completed in 2009. mezzanine level, facing a synagogue over a total area of some 24,000 sq.m. and a café, from which pedestrians can G Center, Warsaw, Poland walk on down to HaMa’apil Street. Afi Tower, Tel Aviv, Israel This 150,000 sq.m multi-purpose The project is part of Jabotinsky Street Partner in charge of addition and complex includes retail, hotel and on which further residential towers original design of a 36,000 sq.m office leisure, residential and office zones. are planned to highlight the Tel Aviv tower in Tel Aviv. The G Center’s Hilton Hotel includes suburb’s main thoroughfare. 26 stories, the two residential towers Anador Project, Bucharest, Romania The garden planned between the are 22 stories high and a 40 stories Associate Architect in charge of a buildings, leading up to HaMa’apil office building is in planning stages. luxury residential project with 540 Street, will be connected in the future to Completed in 2007. housing units. The project includes a series of planned gardens extending three 27-stories towers over a total Akirov Towers, Tel Aviv, Israel to Ramat Gan’s National Park. The area of 100,000 sq.m, including a Associate Architect in charge of three garden combines leisure corners and lobby floor, spa, roofed swimming pool 32-stories luxury residential buildings rich vegetation. Total area: 56,000 sq.m. and health club. with some 350 housing units over Scheduled for completion in 2017. a total area of 109,000 sq.m, above Ianco-Nicolae Bucharest, Romania Dunitz Ganeyy Tikva, Israel a park, swimming pool and spa. Associate Architect for preliminary Partner in charge of two residential Completed in 2006. design of a complex of nine 7-stories buildings (22 and 23 stories). The residential buildings in 2009. Pisgat Zeev project is part of CBD Plan 5141, an Conceptual design of commercial and urban center at the northeast corner Genex, Belgrade, Serbia industrial park of 250,000 sq.m. of Ganey Tikva, south of Gat Rimon. A residential building of 57,000 sq.m Total project area 30,000 sq.m, over with mainly small housing units Rubinstein Office Building, Tel Aviv, two underground floors (10,500 sq.m) integrated between existing housing Israel totaling 172 residential units. blocks on a 2.8 hectare plot. Associate Architect of two mid-rise office buildings in the center of Tel Sails Towers, Ashdod, Israel Mall of Pancevo, Pancevo, Serbia Aviv, completed in 2005. Head of design team of two residential Master Planning and Architectural buildings located at the center of Design for a mixed use business Blue Marina, Ashdod, Israel Ashdod, CBD South, the city’s last centre in the city of Pancevo. The Associate Architect of residential units land reserve. Total project area 28,000 program called for a 35,000 sq.m in Ashdod Marina, consisting of sq.m. (8,500 sq.m underground) with shopping center and 60,000 sq.m of 425 apartments. 158 residential units altogether. The offices and apartments. building’s design is inspired by the Big Block, Tel Aviv, Israel sea, visible from all apartments, and Tzameret Tower, Tel Aviv, Israel Team Leader of “The Big Block” 35 characterized by white-aluminum Associate Architect in charge of a residential units in Tel Aviv coating. In planning the entrance 31-stories residential tower of 34,000 level, the site’s natural topography sq.m. Completed in 2010. Netanya Beach Urban was used to add a semi underground Planning, Israel parking level, which made it possible Manhattan Tower, Tel Aviv, Israel Associate architect and team leader to significantly expand the green Associate Architect in charge of a 30 for conceptual design of residential areas in the project. stories, 45,000 sq.m luxury residential hotels and public spaces. tower. Was completed in 2009. 2/3 RACHEL YUNGMAN FELLER SENIOR PARTNER, HEAD OF STUDIO, ARCHITECT Qualifications Bachelor of Architecture from the Technion with Honors, 1986 Harel Office Tower, Ramat Gan, Israel Associate Architect of a 20 stories office building that was completed in 2000. Platinum Tower, Tel Aviv, Israel Team Leader of 20 stories office tower above 21 commercial floors in Tel Aviv, consisting of 32,000 sq.m.