Watawala Carolina Tea Factory

Total Page:16

File Type:pdf, Size:1020Kb

Watawala Carolina Tea Factory Watawala MAP OF WATAWALA AND AROUND Carolina Tea Factory - Watawala TP - 94 (0) 11 4702400 . Carolina Tea Company of Ceylon Ltd. Incorporated in 1892 is one of the pioneer tea companies in the country, set up primarily to plant tea. It consisted of a group of plantations situated in Lower Dickoya. They were Agarawatte, Carolina, Kandawella, Mount Jean, Wigton, Udeapola Group, Trafalgar, Goarfell and St.Margaret Estates.The Management of this group that was originally with Leechman and Company changed to Mackwoods Estates & Agencies Ltd. at a later date. According to the times of Ceylon Green Book of 1939, this group had over 1,000 hectares in tea, 245 hectares in rubber, a few hundred coconut trees, and 726 hectares uncultivated, comprising a total extent at the stage was considered a substantial area for administration. The Carolina tea factory was one of the original "central factories" constructed by the river that ran by the estate, to avail themselves of water power. It was indeed an improvement to some of other factories of the day, with no mud floors and cadjan roofs. The building was of wood assembled firmly on stone pillars. It had three floors going up to the height of 42 feet from ground to ridge. Provision had been made for further expansion, but there was sufficient space to accommodate all the leaf not only from that group, but from many other adjoining plantations who were satisfied with a return of 9 cents (about 2p) per pound. The novelty was that very often than not, the green leaf arrived by train. Aberdeen, Seven Vigrins, Luxapana, Maskeliya Trail Aberdeen Waterfall Aberdeen Falls is a picturesque 98 m (322 ft) high waterfall on the Kehelgamu Oya near Ginigathena, in the Nuwara Eliya District of Sri Lanka. Aberdeen is named after the place Aberdeen, the third largest city in Scotland and the capital of Aberdeenshire. Kehelgamu Oya is a major tributary of the Kelani River. From Ginigathena town, proceed along Ambatale Road up to the Buddha statue at the end. Then park your vehicles and walk about 1.2 km along the little bit worse road. Keep in mind that viper, snakes are in this nature. This waterfall is very beautiful and it is covered with a big stone complex behind. The waterfall is ranked as the 18th highest on the Island. 10 min, 8.2 km from Greendale. From Diyagala Junction, it will be 5 in, 4.1 km DIRECTIONS : 1. Diyagala Junction - Head north on Avissawella-Hatton- Nuwara Eliya Hwy toward Carolina - Norton - Wanarajah Rd/B71 - 37 m 2. Turn left onto Carolina - Norton - Wanarajah Rd/B71 Pass by Giyagala Tamil School (on the left in 350 m) - 4.0 km Norton Bridge Dam The dam creates the relatively small Norton Reservoir, which is sustained by water from the Kehelgamu Oya, and water discharged from the Wimalasurendra Hydroelectric Power Station, which is located at the site of the reservoir. Water from the Norton Reservoir is further channelled through a penstock to the Old Laxapana Hydroelectric Power Station, located 3.8 km (2.4 mi) downstream, 1.5 km (0.9 mi) northwest of Kiriwan Eliya. The power station consists of five hydroelectric generators, three of which are rated at 8.33 MW, and two of which are 12.50 MW. The first three and last two units were commissioned in December 1950 and December 1958, respectively. DIRECTIONS : 11 min, 9km 1. Diyagala Junction - Head north on Avissawella-Hatton-Nuwara Eliya Hwy toward Carolina - Norton - Wanarajah Rd/B71 - 37 m 2. Turn left onto Carolina - Norton - Wanarajah Rd/B71 Pass by Rathanayaka Hardware (on the right in 4.4 km) - 8.9 km O Mile Post After passing Laxapana power station we come to ‘Double cut junction’ where you can see the ‘Zero’ mile post. Luxapana Falls Laxapana Falls is 126m high and the 8th highest waterfall in Sri Lanka and 625th highest waterfall in the world. It is situated in Maskeliya area in Nuwara Eliya District, about 16 Kilometers from Maskeliya town on Maskeliya-Norton Bridge road, in a village called Kiriwan Eliya. It's formed by Maskeliya Oya near the confluence of Kehelgamu Oya and Maskeliya Oya which forms Kelani River. The Falls gives its name to twin Hydroelectricity Power stations, Laxapana which generates 50MW of electricity and New Laxapana which generates 100MW. Relates to Polpitiya Hydro Power Station. (We can see the polpitiya river on this route) DIRECTIONS : 1. GREENDALE, 63rd Mile Post - Head west on Avissawella-Hatton-Nuwara Eliya Hwy/A7. Continue to follow A7. Pass by CHANDRA AGENCY (on the left in 350 m) - 4.2 km 2. Turn left onto Carolina - Norton - Wanarajah Rd/B71. Pass by Rathanayaka Hardware (on the right in 4.4 km) - 8.6 km 3. Turn right at Norton Bridge onto Norton - Maskeliya Rd/B328 - 6.4 km 4. Slight right - 1.0 km 5. Turn right - 1.3 km Article : http://trips.lakdasun.org/ravana-gala-laxapana-king-ravana-other-airport.htm Seven Virgins Mountain Range (Saptha Kanya) This mountain range is mostly famous because of the plane crash happened in 1974. It is also known as a hard- to-climb mountain. About the Plane Crash : The deadly plane crash on the Saptha Kanya range (Anjimale or the Seven Virgin Hills) in Maskeliya - Nuwara Eliya on December 4, 1974 has presented mysteries hitherto unresolved. The air crash generates a complete enigma as to what caused Dutch Pilot Hendrik Lamme to fly the plane at a lower height of two-thousand feet when the top of the Saptha Kanya range was at about four thousand and three hundred feet The plane crashed on the 5th mountain, as the picture shows. Martinair Flight 138 was a chartered flight from Surabaya, Indonesia to Colombo, Sri Lanka. The aircraft was operated on behalf of Garuda Indonesia. On 4 December 1974, the aircraft, a McDonnell Douglas DC-8-55CF crashed into a mountain shortly before landing, killing all 191 people aboard – 182 Indonesian hajj pilgrims bound for Mecca, and 9 crew members DIRECTIONS : 30 mins, 21.4 km from Greendale 1. Head west on Avissawella-Hatton-Nuwara Eliya Hwy/A7. Continue to follow A7. Pass by CHANDRA AGENCY (on the left in 350 m) - 4.2 km 2. Turn left onto Carolina - Norton - Wanarajah Rd/B71. Pass by Rathanayaka Hardware (on the right in 4.4 km) - 8.6 km 3. Turn right at Norton Bridge onto Norton - Maskeliya Rd/B328 - 6.4 km 4. Slight right - 1.0 km. Turn right - 1.3 km Canyon Reservoir and Power Station The Canyon Dam is a large arch-gravity dam built across the Maskeliya Oya, 4.5 km (2.8 mi) upstream of the iconic Laxapana Falls, in the Central Province of Sri Lanka. The associated power station plays a major role in the national power grid, due to its significant output.[1]The dam creates the relatively small Canyon Reservoir, measuring at 450 m (1,480 ft) and 350 m (1,150 ft) in its longest length and width, respectively. The reservoir's primary source of water is the Maskeliya Oya, with additional water discharged from the Canyon Hydroelectric Power Station, located at the same site. Water from the Canyon Reservoir is further transferred through a penstock to the New Laxapana Hydroelectric Power Station, located 7 km (4.3 mi) downstream, at 06°55′05″N 80°29′31″E, 1.5 km (0.9 mi) northwest of Kiriwan Eliya. The power station consists of two hydroelectric generators of 50 MW each, both of which were commissioned in February 1974. Maskeliya Reservoir The Maskeliya Dam (also known as the Maussakelle Dam) is a large gravity dam at Maskeliya, in the Central Province of Sri Lanka. Along with the Castlereigh Dam, the dams are the highest point and beginning of the Laxapana Hydropower Complex, involving a number of dams, penstocks, and hydroelectric power stations. The dam creates the Maskeliya Reservoir over the route of Maskeliya Oya, a major tributary of the Kelani River, which is the 4th longest in the country. Power Station - A 4.2 km (2.6 mi) penstock from the Maskeliya Reservoir, measuring 3 m (10 ft) in diameter, transfers water directly to the Canyon Hydroelectric Power Station, located further downstream. The 60- megawatt power station consists of two 30-megawatt units, commissioned in March 1983 and May 1988, respectively. Water from the Canyon Power Station is discharged into the Canyon Reservoir, located at the same site Two waterfalls come and join the reservoir. Moray Falls : 40m height. Moray Fall is located on the Moray estate on on the shadows of Samanala Range. The waterfall is fed by a stream originating from the Samanala Mountain Range and ends up at the Muskeliya Reservoir at the bottom of the fall. This fall cascades in 3 segments before finally hitting the bottom. Sri Pada Falls / Adam’s Peak Falls / Gartmore Falls – ශ්‍රී පාද ඇල 25m - Another fall, Sri Pada Falls (also known s Adam’s Peak Falls / Gartmore Falls) lies only few hundred meters away falling on the Maskeliya reservoir in similar fashion. Due to the close proximity of these two falls, some confuse the names of these waterfalls and the Moray Falls is sometimes identified as the Sri Pada Falls. DIRECTIONS : 48 min, 36.8 km from Diyagala junction 1. Diyagala Junction - Head north on Avissawella-Hatton- Nuwara Eliya Hwy toward Carolina - Norton - Wanarajah Rd/B71 - 37 m 2. Turn left onto Carolina - Norton - Wanarajah Rd/B71. Pass by Rathanayaka Hardware (on the right in 4.4 km) - 8.6 km 3. Turn right at Norton Bridge onto Norton - Maskeliya Rd/B328.
Recommended publications
  • World Bank Document
    DAM SAFETY AND WATER RESOURCES PLANNING PROJECT PROCUREMENT PLAN FOR CONSULTING SERVICES (Subject to Prior Review/Post Review) IDA Credit Number : 4406-CE Project ID: 093132 Revised on 13th November 2009 Description of services ame of of ame emarks (date) (date) eferance eferance finalished Date)** inalised project project (date)** (date)** (date)** Contract) Number inal RFP RFP inal ( f N objection by by objection the bank R Technical Technical Serial No Serial f method of R ationality & & ationality e ervice to be be to ervice ( (EOI) date t (Technical/ to the bank selection @ selection Package no Package Consultant/ Consultant/ roposal to be roposal to (us$million) short listing RFP Issued Issued RFP o World Bank Bank World b No objection S Date (US$M) Date eceived by the the by eceived RFP final draft N from bank for for bank from XP. Incurred to estimated cost contract/Final uthorities (date) P alue and Currency alue TOR/ shortlist/ Advertising for Advertising for Combined/Draft Combined/Draft r N to be forwarded to Contract Number, contract) (Date) contract) Evaluation to be to Evaluation Zip code, ifUSA completed (date) TOR/ shortlist to # E /#Combined/Draf V # A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 Component -1 PP 1-Jan-06 1-Mar-06 21-Mar-06 23-Mar-06 24-Mar-06 5-Oct-06 7-Jun-06 7-Aug-06 SMEC 15-Feb-07 0.43 Design of NAWAM project and preparation of project report and project DSWRPP/CS/QBS/ Public Disclosure Authorized Public Disclosure Authorized 1 DSWRPP/CS/QBS/01 0.720 QBS Completed International (pty) R implementation plan for world Bank Appraisal 01 A 1-Jan-06 1-Mar-06 22-Mar-06 7-Apr-06 7-Apr-06 19-May-06 19-Jul-06 21-Jul-06 ltd.
    [Show full text]
  • Study of Hydropower Optimization in Sri Lanka
    JAPAN INTERNATIONAL COOPERATION AGENCY CEYLON ELECTRICITY BOARD(CEB) DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA STUDY OF HYDROPOWER OPTIMIZATION IN SRI LANKA FINAL REPORT SUMMARY FEBRUARY 2004 ELECTRIC POWER DEVELOPMENT CO., LTD. NIPPON KOEI CO., LTD. TOKYO, JAPAN The Main Dam Site (looking downstream) The Kehelgamu Oya Weir Site (looking upstream) The Powerhouse Site (looking from the right bank) The Study of Hydropower Optimization in Sri Lanka CONTENTS CONCLUSION AND RECOMMENDATION .............................................................. CR - 1 Conclusion .................................................................................................................. CR - 1 Recommendation ......................................................................................................... CR - 5 PART I GENERAL 1. INTRODUCTION .................................................................................................... 1 - 1 2. GENERAL FEATURES OF SRI LANKA ............................................................... 2 - 1 2.1 Topography ....................................................................................................... 2 - 1 2.2 Climate ............................................................................................................. 2 - 1 2.3 Government ....................................................................................................... 2 - 2 3. SOCIO-ECONOMY ................................................................................................. 3 - 1
    [Show full text]
  • CEB Long Term Generating Expansion Plan 2015-2034
    CEYLON ELECTRICITY BOARD LONG TERM GENERATION EXPANSION PLAN 2015-2034 Transmission and Generation Planning Branch Transmission Division Ceylon Electricity Board Sri Lanka July 2015 CEYLON ELECTRICITY BOARD LONG TERM GENERATION EXPANSION PLAN 2015-2034 Transmission and Generation Planning Branch Transmission Division Ceylon Electricity Board Sri Lanka July 2015 Long Term Generation Expansion Planning Studies 2015- 2034 Compiled and prepared by The Generation Planning Unit Transmission and Generation Planning Branch Ceylon Electricity Board, Sri Lanka Long-term generation expansion planning studies are carried out every two years by the Transmission & Generation Planning Branch of the Ceylon Electricity Board, Sri Lanka and this report is a bi- annual publication based on the results of the latest expansion planning studies. The data used in this study and the results of the study, which are published in this report, are intended purely for this purpose. Price Rs. 3000.00 © Ceylon Electricity Board, Sri Lanka, 2015 Note: Extracts from this book should not be reproduced without the approval of General Manager – CEB Foreword The ‘Report on Long Term Generation Expansion Planning Studies 2015-2034’, presents the results of the latest expansion planning studies conducted by the Transmission and Generation Planning Branch of the Ceylon Electricity Board for the planning period 2015- 2034, and replaces the last of these reports prepared in April 2014. This report, gives a comprehensive view of the existing generating system, future electricity demand and future power generation options in addition to the expansion study results. The latest available data were used in the study. The Planning Team wishes to express their gratitude to all those who have assisted in preparing the report.
    [Show full text]
  • Natural Resource Profile of the Kelani River Basin January 2016
    Medium to Long-term Multi-Stakeholder Strategy and Action Plan for Management and Conservation of the Kelani River Basin 2016-2020 Natural Resource Profile of the Kelani River Basin January 2016 This natural resource profile is developed to support the formulation of the “Medium to Long-term Multi-Stakeholder Strategy and Action Plan for Management and Conservation of the Kelani River Basin” developed by the Central Environment Authority (CEA) and International Union for the Conservation of Nature (IUCN) Sri Lanka Country Office, with the participation of a large number of stakeholder groups and technical inputs from the Ministry of City Planning and Water Supply and the United Nations Children’s Fund (UNICEF). Natural Resource Profile of the Kelani River Basin Acknowledgement: Ms. Chandani Edussuriya, Research and Development Division, CEA, Ms. Sandamali Pathirage and Ms. Darshani Wijesinghe, IUCN Sri Lanka provided the maps and data for the natural resource profile. Ms. Kushani de Silva supported in coordination of the compilation of information. Ms. Dinithi Samarathunga and Ms. Padmi Meegoda supported in edits. Mr. Suranga De Silva, UNICEF Sri Lanka and Mr. Ajith Rodrigo, CEA supported in the project management. Compilation: Mr. Sampath de A Goonatilake Mr. Naalin Perera Mr. Gyan De Silva Prof. Devaka Weerakoon Dr. Ananda Mallawatantri Editor: Dr. Ananda Mallawatantri, IUCN ISBN: 978-955-0205-41-7 Citation: Goonatilake, S. de A., N. Perera, G.D. Silva, D. Weerakoon and A. Mallawatantri. 2016. Natural Resource Profile of the Kelani
    [Show full text]
  • Democratic Socialist Republic of Sri Lanka Power Subsector Review
    Report No 5713- DemocraticSocialist Republic of SriLanka PowerSubsector Review Public Disclosure Authorized July25, 1986 ProjectsDepartment SouthAsia RegionalOffice FOR OFFICIAL USE ONLY Public Disclosure Authorized Public Disclosure Authorized Document of the 'VorId Bank Public Disclosure Authorized This documenthas a restricteddistribution and may be used by recipients only in the performanceof their official duties.Its contents may not otherwiise bedisdosed without WorldBank authorization. SRI LANKA POWER SUBSECTOR REVIEW Currency Equivalents Mid-1983 US$1.00 = SL Rs 23.53 SL Rs 1.00 = US$0.043 Mid-1984 US$1.00 = SL Rs 25.44 SL Rs 1.00 = US$0.039 End-1984 US$1.00 = SL Rs 26.20 SL Rs 1.00 = US$0.038 End-1985 USR1.00 = SL Rs 27.20 SL Rs 1_nn = US$0.037 WEIGHTS AND MEASURES . kilometer (km) = 0.621 mile I ton = 1.102 short ton (sh ton) 0.984 long ton (Ig ton) 1 kilowatt (kW) = 1,000 watts (W) 3 1 megawatt (MW) = 1,000 kilowatts (10 kWa 3. gigawatt = 1,000,000 kiiowatts (10 kW) I kilowatt-hour (W h)= 1,000 watt-hours 3 1 megawatt-hour (MWh) = 1,000 kilowatt-hours (10i kWh) I. gigawatt-hour (GWh) = 1,000,000 kilow3att-hours (106 kWh) 1 kilovolt (kV) = 1,000 volts (10 V) I kilovolt-ampereb(kVA) = 1,000 volt-amperes (VA) 1 megavolt-ampere (MVA) = 1,000 kilovolt-amperes (103 kVA) ABBREVIAIIONS AND ACRONYMS ADB - Asian Oevelopment Bank AMP - Accelerited Mahaweli Program CEB - Ceylon Electricity Board CPC - Ceylon Petroleum Corporation DGEU - Department of Government Electrical Undertakings ECT - Energy Coordinating Team GOSL - Government of Sri Lanka GTZ - German Agency for Technical Cooperation HV - High Voltage LV - Low Voltage LECO - Lanka Electric (Private) Company LRAIC - Long-Run Average Incremental Cost LRMC - Long-Run Marginal Cost MASL - Mahaweli Authority of Sri Lanka MMD - Ministry of Mahaweli Development MPE - Ministry of Power and Energy MV - Medium Voltage WMP - Water Management Panel CEB's Fiscal Year is the calendar year FOR OFFICAL USE ONLY This report was prepared by N.C.
    [Show full text]
  • Green Power Development and Energy Efficiency Improvement Investment Program – Tranche 2 (Transmission Infrastructure Enhancement)
    Initial Environmental Examination Document Stage: Draft Project Number: P47037-005(SRI) July 2016 SRI: Green Power Development and Energy Efficiency Improvement Investment Program – Tranche 2 (Transmission Infrastructure Enhancement) Prepared by Ceylon Electricity Board, Ministry of Power and Renewable Energy, Democratic Socialist Republic of Sri Lanka for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 22 July 2016) Currency unit – Sri Lanka rupee/s (SLRe/SLRs) SLRe1.00 = $0.00684 $1.00 = SLRs146.03 ABBREVIATIONS ADB – Asian Development Bank CCD – Coast Conservation Department CEA – Central Environment Authority CEB – Ceylon Electricity Board DC or D/C – Double Circuit DPR – Detailed Project Report DSD – Divisional Secretariat Divisions EA – Executing Agency EARF – Environmental Assessment and Review Framework EIA – Environmental Impact Assessment EMoP – Environmental Monitoring Plan EMP – Environmental Management Plan EHV – Extra High Voltage GHG – Green House Gas GND – Gram Niladhari Divisions GoSL – Government of Sri Lanka GRC – Grievance Redress Committee GRM – Grievance Redress Mechanism GSS – Grid Sub Station IA – Implementing Agency IEE – Initial Environmental Examination LILO – Line – in- Line- out MFF – Multi-tranche Financing Facility MPRE – Ministry of Power and Renewable Energy PAA – Project Approving Authority PCB – Poly Chlorinated Biphenyl PMU – Project Management Unit GSS – Power Sub Station REA – Rapid Environment Assessment ROW – Right of Way RP – Resettlement Plan SC or S/C – Single Circuit SF6 – Sulphur Hexafluoride SPS – Safeguard Policy Statement WEIGHTS AND MEASURES ha (hectare) – Unit of area km (kilometer) – 1,000 meters kV – kilovolt (1,000 volts) kW – kilowatt (1,000 watts) MW – Mega Watt NOTE{S} In this report, "$" refers to US dollars. “SLRs” refers to Sri Lankan rupees This Initial Environmental Examination is a document of the borrower.
    [Show full text]
  • Study of Hydropower Optimization in Sri Lanka
    JAPAN INTERNATIONAL COOPERATION AGENCY CEYLON ELECTRICITY BOARD(CEB) DEMOCRATIC SOCIALIST REPUBLIC OF SRI LANKA STUDY OF HYDROPOWER OPTIMIZATION IN SRI LANKA FINAL REPORT Vol. II APPENDIX-I FEBRUARY 2004 ELECTRIC POWER DEVELOPMENT CO., LTD. NIPPON KOEI CO., LTD. TOKYO, JAPAN CONTENTS I-A Hydrological Analysis I-B Project Design Document for Broadlands Hydropower Project I-C Improvement of Frequency Control System I-A HYDROLOGICAL ANALYSIS HYDROLOGICAL ANALYSIS INDEX 1. Objectives of Hydrological Analysis .................................................................... 1 2. Data Collection and Hydrological Analysis ......................................................... 1 2.1 Major Types of Hydrological Data and Their Use ......................................... 1 2.2 Hydrological Data Collection ....................................................................... 2 2.3 Rainfall Data Analysis ................................................................................. 2 2.4 Runoff Data Analysis for Economic Operation of Existing Hydropower Stations ...................... 6 2.5 Runoff Data Analysis for the Broadlands Hydropower Project Site ............... 7 3. Low Flow Runoff Analysis ................................................................................... 8 3.1 Estimation of Runoff Data for Economic Operation Study for Existing Hydropower Stations ........... 8 3.2 Low Flow Runoff Analysis for Broadlands Hydropower Project ................... 14 4. Flood Analysis for Broadlands Hydropower Project .........................................
    [Show full text]
  • Homoptera: Fulgoroidea Delphacidae from Ceylon1
    Homoptera: Fulgoroidea Delphacidae from Ceylon1 By R. G. FENN AH Commonwealth Institute of Entomology, c/o British Museum (Nat. Hist.), London, SW7 5BD Abstract In a collection of Delphacid Fulgoroidea made widespread in SE Asia; the remainder are known by the Lund University Expedition to Ceylon only from Sri Lanka. Nine new genera, twenty­ (1962), 69 species were found to be represented. five new species and one new subspecies are erect­ These are listed with their provincial distribution. ed, sixteen names are .re-combined and new synon­ Most of them occur also in south India, or are ymies are established. This report is concerned with a collection were described or recorded by Kirby, 1891 of Delphacidae made in Sri Lanka in 1962 by (2 spp.), Kirkaldy, 1901 (1 sp.), Melichar, members of the Lund University Ceylon Ex­ 1903 (13 spp.), Distant, 19061 19161 (15 spp.) pedition, and made available to the writer for and Muir, ( l sp.). Species not represented (or study. For this privilege he is most deeply in­ not recognised) in the present collection, and debted to Dr. Per Brinck. unknown to the writer, include Delphax mar­ The collection comprised about 3000 speci­ ginalis Motsch., D. unistrigosus Motsch., Del­ mens, and consisted in great part of species phacodes kahavalu Kirk., Liburnia unistrigosa that are widespread in the Indian sub-continent Mel. (not Motsch.) and L. flavida Mel. The or in South-east Asia. The remaining material last-mentioned may well be a Sogata. comprised examples of species known only The provincial distribution of the species from Sri Larika and of twenty-five others that recognised is tabulated below, but the records are described below as new.
    [Show full text]
  • The Follow-Up Study on the Rehabilitation of Hydropower Stations in the Kelani River Basin for Hydropower Optimization in Sri La
    No. THE FOLLOW-UP STUDY ON THE REHABILITATION OF HYDROPOWER STATIONS IN THE KELANI RIVER BASIN FOR HYDROPOWER OPTIMIZATION IN SRI LANKA FINAL REPORT Vol. I MAIN REPORT JULY 2005 JAPAN INTERNATIONAL COOPERATION AGENCY ECONOMIC DEVELOPMENT DEPARTMENT ED JR 05 - 053 PREFACE In response to a request from Government of the Democratic Socialist Republic of Sri Lanka, the Government of Japan decided to conduct the Follow-up Study on the Rehabilitation of Hydropower Stations on the Kelani River Basin for the Study on Hydropower Optimization in Sri Lanka and entrusted the study to the Japan International Cooperation Agency (JICA). JICA sent a study team led by Mr. Tsuyoshi Nakahata and organized by Electric Power Development Co., Ltd. to Sri Lanka five times from July 2004 to May 2005. The study team held discussions with the officials concerned of the Government of Sri Lanka, and conducted field studies in Sri Lanka. After its return to Japan, the team conducted further studies and compiled the results in this report. I hope this report will contribute to the promotion of rehabilitation of hydropower stations in the Kelani River basin and to the enhancement of friendly relations between our two countries. I wish to express my sincere appreciation to the persons concerned for their close cooperation throughout the study. July 2005 Tadashi Izawa Vice-President Japan International Cooperation Agency July, 2005 Mr. Tadashi Izawa Vice-President Japan International Cooperation Agency Tokyo, Japan Dear Mr. IZAWA, Letter of Transmittal We are pleased to submit our report on the Follow-up Study on the Rehabilitation of Hydropower Stations in the Kelani River Basin for the Study on Hydropower Optimization in Sri Lanka.
    [Show full text]
  • Final Report
    Final Report Medium to Long-term Multi-stakeholder Strategy and Action Plan for Management and Conservation of the Kelani River Basin Kelani River Basin Multi-Stakeholder Partnership Medium to Long-term Multi-Stakeholder Strategy and Action Plan for Management and Conservation of the Kelani River Basin 2016-2020 January 2016 Medium to Long-term Multi-Stakeholder Strategy and Action Plan for Management and Conservation of the Kelani River Basin was developed by the Central Environment Authority (CEA) and International Union for the Conservation of Nature (IUCN) Sri Lanka Country Office with the participation of a large number of stakeholder groups. Scope of this publication has been enriched as a model for managing catchments and river basins in support of Water Safety under the National Pavithra Ganga (Clean River) programme of the Ministry of Mahaweli Development and Environment with the technical inputs from the Ministry of City Planning and Water Supply, and United Nations Children’s Fund (UNICEF). Kelani River Basin Multi-Stakeholder Partnership Medium to Long-term Multi-Stakeholder Strategy and Action Plan for Management and Conservation of the Kelani River Basin, 2016-2020 ISBN: 978-955-0205-39-4 First Edition: January, 2016 © Editors: Dr. Ananda Mallawatantri Mr. Ajith Rodrigo Ms. Kushani De Silva Citation: Mallawatantri, A., A. Rodrigo and K. De Silva. 2016. Medium to Long-term Multi-Stakeholder Strategy and Action Plan for Management and Conservation of Kelani River Basin. Central Environment Authority and International Union for the Conservation of Nature Sri Lanka Country Office, Colombo. 153 pp. This is an open access publication by Central Environment Authority (CEA) and International Union for Conservation of Nature (IUCN) in Sri Lanka.
    [Show full text]
  • Capable Programme Final Report
    CAPaBLE Programme Final Report Project Reference Number: CBA2015-06NSY-Silva Escalating Small Hydropower Development and Aquatic Biodiversity of Mountain Streams in Sri Lanka Water Resources Science & Technology, Sri Lanka, [email protected] 0 Project Reference Number: CBA2015-06NSY-Silva “Escalating Small Hydropower Development and Aquatic Biodiversity of Mountain Streams in Sri Lanka” Final Report submitted to APN ©Asia-Pacific Network for Global Change Research 1 OVERVIEW OF PROJECT WORK AND OUTCOMES Preliminary studies revealed that negative impacts of poorly designed small hydropower plants are very diverse; primarily effect on aquatic biota in terms of population decline and eventual species extinction including fish species endemic to Sri Lanka (Silva & Davies, 1986; Silva, 1993; Silva et al., 2013; 2014; 2015). At present, in Sri Lanka, about 600 stream sites have been identified as potential sites and about 150 plants have already been in operation in various river basins. Further, 1-2 km stream stretch had been notably affected at each small hydropower plant. In most cases, the developers do not maintain ecological flows, which is a requirement according to the Environmental Act of Sri Lanka. The negligence of the developers and poor understanding of the relevant authorities have led a devastating damage to the mountain stream ecosystems in terms of aquatic biodiversity and goods and services provided to the riparian communities. Therefore, Water Resources Science and Technology (WRST), a non-profit making company registered under guaranteed sought financial assistance from Asia-Pacific Network for Climate Change Research (APN)under CAPaBLE programme to carry out project with a view to build up the awareness of different categories of stakeholders in small hydropower generation sector, namely, small hydropower developers, consultants to developers, environmental officers, and relevant policy makers on the importance of correct design and operation of environmentally sustainable small hydropower plants.
    [Show full text]
  • Project Design Document (Pdd)
    UNFCCC/CCNUCC CDM – Executive Board Page 1 PROJECT DESIGN DOCUMENT FORM FOR CDM PROJECT ACTIVITIES (F-CDM-PDD) Version 04.1 PROJECT DESIGN DOCUMENT (PDD) Title of the project activity Broadlands Hydropower Project Version number of the PDD 03 Completion date of the PDD 2012/11/29 Project participant(s) Ceylon Electricity Board & Ecoeye Co. Ltd. Host Party(ies) Sri Lanka Sectoral scope and selected methodology(ies) Sectoral Scope 01: Energy Industries (Renewable Sources) Methodology: ACM0002 – Consolidated baseline methodology for grid-connect electricity generation from renewable sources (Version 13.0.0) Estimated amount of annual average GHG 83,075 tCO2e emission reductions UNFCCC/CCNUCC CDM – Executive Board Page 2 SECTION A. Description of project activity A.1. Purpose and general description of project activity >> The main purpose of the project is to generate electricity from the renewable energy resources, secure energy security and be energy independent in some extent and to contribute sustainable development of the country. The Broadlands Hydropower Project is located on the middle reach of the Keleni River, which originates in the Central Highlands in southern central Sri Lanka and flows into the Indian Ocean through the vicinity of Colombo City, and 95km east of Colombo. The project is located near the confluence of the Maskeliya Oya and the Kehelgamu Oya, which are the two main tributaries of upstream of the Kelani River. The Kelani River Basin is entirely within a heavy-rain area. The annual precipitation upstream of the basin, where existing power stations are located, exceeds 4,000mm and that at the most upstream point exceeds 5,000mm.
    [Show full text]