WILL ROGERS TURNPIKE PAVEMENT REHABILITATION Mile 298.2 to 302.4, Length 4.11 Miles CONTRACT NO
Total Page:16
File Type:pdf, Size:1020Kb
INDEX OF SHEETS SHEET No. DESCRIPTION OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE PAVEMENT REHABILITATION Mile 298.2 to 302.4, Length 4.11 Miles CONTRACT NO. WR-MC-113B OTTAWA COUNTY LOCATION MAP BEGIN PROJECT WR-MC-113B MILE NO. 298.2 PREPARED BY CRAIG & KEITHLINE, INC. Consulting Engineers Tulsa, Oklahoma OF ES S I R ON P A INDEX OF STANDARD DRAWINGS (Half Size Only) L D E E END PROJECT WR-MC-113B R N E KEVIN A. G T I N ODOT ROADWAY ODOT TRAFFIC S I KRIEWALL MILE NO. 302.4 E G E E R R 14850 By Date Kevin A. Kriewall, P.E. O A K L A H O M Oklahoma Reg. No. 14850 Craig & Keithline, Inc. Oklahoma Certificate of Authorization No. 1216 Renewal Date - June 30, 2014 REVIEWED BY ODOT BRIDGE SAIC By Consulting Engineer DESIGN DATA ROADWAY LENGTH 21,160 FEET 4.01 MILES BRIDGE LENGTH 540 FEET 0.10 MILES ACCEPTED BY TOTAL LENGTH 21,700 FEET 4.11 MILES Oklahoma Turnpike Authority (NOTE: POSTED LENGTH EXCEEDS FIELD MEASURED LENGTH BY APPROXIMATELY 0.09 MILES) By Chief Engineer Date S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-01-title.dwg, 1/11/2013 3:33:06 PM TYPICAL SECTION 1 - PHASES 1A, 1B (FULL DEPTH RECONSTRUCTION) (INCLUDES SLOPE EXTENSION & REMOVAL OF EXISTING EDGE DRAINS - NEAR TPO 59.99) WB AND EB MP 300.14 - 300.2 (WEST APPROACHES TO TPO 59.12) (300') WB AND EB MP 300.24 - 300.31 (EAST APPROACHES TO TPO 59.12) (375') WB AND EB MP 300.96 - 301.06 (WEST APPROACHES TO TPO 59.99) (500') WB AND EB MP 301.10 - 301.20 (EAST APPROACHES TO TPO 59.99) (453') GUARDRAIL WIDENING DETAIL (APPLIES TO TYPICAL SECTION 1) OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE TYPICAL SECTION 2 - PHASES 1A, 1B TYPICAL SECTIONS SLOPE WIDENING DETAIL KEVIN A. (GUARDRAIL WIDENING & EDGE DRAINS NEAR TPO 59.99) KRIEWALL (APPLIES TO TYPICAL SECTIONS 1 & 2 WB AND EB MP 300.9 - 300.96 (350') 14850 NEAR TPO 59.99) CRAIG & KEITHLINE, INC. WB AND EB MP 301.2 - 301.3 (667') Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-02-sections.dwg, 1/11/2013 3:33:26 PM TYPICAL SECTION 3 EXIT / ENTRANCE RAMPS PLAN VIEW - TYPICAL RAMP MILL AND INLAY W / ULTRA THIN BONDED WEARING COURSE OVERLAY TYPICAL SECTION 4 MILL & INLAY DRIVING LANES w/ULTRA THIN BONDED WEARING COURSE EB & WB 298.20 - 300.14 (10,000') 300.31 - 300.96 (3,355') OKLAHOMA TURNPIKE AUTHORITY 301.20 - 302.40 (6,175') WILL ROGERS TURNPIKE KEVIN A. TYPICAL SECTIONS KRIEWALL 14850 CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-03-sections.dwg, 1/11/2013 3:33:36 PM UNDERDRAIN INSTALLATION TYPICAL HALF-SECTION OUTLET HEADWALL DETAIL OUTLET HEADWALL DETAIL BAR B UNDERDRAIN DETAIL BAR C BAR A OKLAHOMA TURNPIKE AUTHORITY OUTLET HEADWALL DETAIL WILL ROGERS TURNPIKE TYPICAL UNDERDRAIN OF ES S I R ON P A L D INSTALLATION E E R N E KEVIN A. G T SECTIONS & DETAILS I N S I KRIEWALL E G E E R TYPICAL UNDERDRAIN PLAN R 14850 CRAIG & KEITHLINE, INC. Tulsa, Oklahoma O A K LA H O M S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-04-underdrain.dwg, 1/11/2013 3:33:46 PM OKLAHOMA TURNPIKE AUTHORITY OF ES S I R ON P A WILL ROGERS TURNPIKE L D E E R N E KEVIN A. G T I N S I KRIEWALL E G E PAY QUANTITIES E R R 14850 AND NOTES O A K LA H O M CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-05-pay quantities.dwg, 1/11/2013 3:34:01 PM ³ ´ OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE OF ES S I R ON P A L D E E TRAFFIC NOTES R N E KEVIN A. G T I N S I KRIEWALL E G E E R R 14850 CRAIG & KEITHLINE, INC. Tulsa, Oklahoma O A K LAH O M S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-06-general notes.dwg, 1/11/2013 3:34:11 PM ³ ´ ³ ´ x x x x x x REFINISH MEDIAN BARRIER MP 298.2 TO 302.4 (including all BRIDGE PARAPETS) OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE OF ES S I R ON P A L D E E GENERAL CONSTRUCTION NOTES R N E KEVIN A. G T I N S & MEDIAN BARRIER DETAIL I KRIEWALL E G E E R R 14850 CRAIG & KEITHLINE, INC. O A K LAH O M Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-07-construction notes.dwg, 1/11/2013 3:34:21 PM OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE FES S I RO ON P A L D E E R N E KEVIN A. G SUMMARIES OF GUARDRAIL, T I N S I KRIEWALL E G E DRAINAGE STRUCTURES E R R 14850 AND EARTHWORK O A K LA HO M CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-08-summaries guardrail.dwg, 1/11/2013 3:34:31 PM OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE OF ES S I R ON P A L D SUMMARIES OF REMOVAL, E E R N E KEVIN A. G REPAIR AND SURFACING T I N S I KRIEWALL E G E E R R 14850 CRAIG & KEITHLINE, INC. Tulsa, Oklahoma O A K LAH O M S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-09-summaries removal.dwg, 1/11/2013 3:34:41 PM PLAN VIEW OF CURB AND STRUCTURE DETAIL AT BRIDGE 59.99 ELEVATION OF BROKEN BACK STRUCTURE PAY QUANTITY NOTES BRIDGE APPROACH DRAINAGE STRUCTURES 1 & 2 BRIDGE APPROACH SLAB FULL DEPTH REPAIR AREAS DETAIL AND SUMMARY OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE OF ES S I R ON P A L D SUMMARY OF BRIDGE APPROACH E E R N E KEVIN A. G DETAILS AND SUMMARIES T I N S I KRIEWALL E G E E R R 14850 CRAIG & KEITHLINE, INC. Tulsa, Oklahoma O A K LAH O M S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-10-summaries bridge.dwg, 1/11/2013 3:34:51 PM STRICTLY ENFORCED FOOD STRICTLY ENFORCED LODGING OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE OF ES S I R ON P A L D E E SUMMARIES OF SIGNING R N E KEVIN A. G T I N S I KRIEWALL E G E E R R 14850 CRAIG & KEITHLINE, INC. Tulsa, Oklahoma O A K LAH O M S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-11-summaries signing.dwg, 1/11/2013 3:35:01 PM S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-12-SWMP.dwg, 1/11/2013 3:35:11 PM GUARDRAIL BRIDGE CONNECTION - THRIE BEAM (31" SYSTEM) (STANDARD) AT TPU BRIDGE PIERS - ELEVATION TPU 57.3, TPU 58.2, TPU 59.3, TPU 60.4, TPU 61.0 NTS GUARDRAIL BRIDGE CONNECTION - THRIE BEAM (31" SYSTEM) (STANDARD) AT TPU BRIDGE PIERS - PLAN NTS END SECTION AT PIER FACE (TYPICAL) OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE GUARDRAIL BRIDGE CONNECTION - THRIE BEAM (31" SYSTEM) (MODIFIED) AT EXISTING MAINLINE BRIDGE PARAPETS - ELEVATION GUARDRAIL BRIDGE CONNECTION FLARE RATE 30:1 APPROACH END AND PIER PROTECTION BARRIER 15:1 TRAILING END KEVIN A. KRIEWALL DETAILS TPO 59.12, TPO 59.99 14850 NTS CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-13-bridge barrier.dwg, 1/11/2013 3:35:21 PM GUARDRAIL WIDENING DETAIL (NON FULL-DEPTH REPAIR AREAS) (Distance from edge lane to face-of-rail 12' in tangent sections) NTS TYPICAL TPO BRIDGE PARAPET PROTECTION WITH TRANSITION TPO 59.2, TP0 59.9 (ALL REFLECTORS WHITE) NTS OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE GUARDRAIL DETAILS KEVIN A. TYPICAL TPU PIER PROTECTION WITH TRANSITION KRIEWALL TPU 57.3, TPU 58.2, TPU 59.3, 14850 CRAIG & KEITHLINE, INC. TPU 60.4, TPU 61.0 Tulsa, Oklahoma (ALL REFLECTORS WHITE) NTS S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-14-guardrail.dwg, 1/11/2013 3:35:31 PM EMERGENCY VEHICLE TURNAROUND LOCATIONS TYPICAL SECTION - SHOULDER WIDENING AT EXISTING TURNAROUNDS PLAN VIEW (IF REQUIRED) EMERGENCY VEHICLE TURNAROUND OVERLAY EMERGENCY VEHICLE TURNAROUND PROTECTION - PHASE 1A & 1B MEDIAN SECTION OKLAHOMA TURNPIKE AUTHORITY EMERGENCY VEHICLE TURNAROUND OVERLAY OF ES S I R ON P A WILL ROGERS TURNPIKE L D E E R N E KEVIN A. G T I N S I KRIEWALL E G E EMERGENCY VEHICLE E R R 14850 TURNAROUND DETAILS O A K LA H O M CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-15-turnaround.dwg, 1/11/2013 3:35:41 PM CONSTRUCTION END Tulsa, Oklahoma ADVANCE SIGNING REDUCTION TO 55 MPH OKLAHOMA 75 MPH LANE LIMIT CRAIG & KEITHLINE, INC. SPEED WILL ROGERS TURNPIKE OKLAHOMA TURNPIKE AUTHORITY SPEED LIMIT G IN EE EN R L A N A O I M S O S H E A F L O 14850 K R KEVIN A. P KRIEWALL O D E R R E E G T S I STATE LAW MERGE NOW SPEED LIMIT LEFT LANE CLOSED DO NOT PASS SPEED LIMIT SPEED LIMIT ROAD WORK S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-16-75 mph Lane Reduction.dwg, 1/11/2013 3:35:56 PM 3:35:56 1/11/2013 Reduction.dwg, Lane mph Turnpike\WR-MC-113B\AcadDwgs\WR113B-16-75 Rogers S:\Projects\OTA\Will PHASE 1 (EB & WB) PHASE 1 PHASE 2 (EB & WB) OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE FES S I RO ON P A SUGGESTED L D E E R N CONSTRUCTION SEQUENCE E KEVIN A.