INDEX OF SHEETS SHEET No. DESCRIPTION

OKLAHOMA TURNPIKE AUTHORITY

WILL ROGERS TURNPIKE PAVEMENT REHABILITATION Mile 298.2 to 302.4, Length 4.11 Miles CONTRACT NO. WR-MC-113B OTTAWA COUNTY LOCATION MAP

BEGIN PROJECT WR-MC-113B

MILE NO. 298.2 PREPARED BY CRAIG & KEITHLINE, INC. Consulting Engineers Tulsa,

OF ES S I R ON P A INDEX OF STANDARD DRAWINGS (Half Size Only) L D E E END PROJECT WR-MC-113B R N E KEVIN A. G

T

I N

ODOT ROADWAY ODOT TRAFFIC S

I KRIEWALL

MILE NO. 302.4 E

G

E

E

R R 14850 By Date Kevin A. Kriewall, P.E. O A K L A H O M Oklahoma Reg. No. 14850

Craig & Keithline, Inc. Oklahoma Certificate of Authorization No. 1216 Renewal Date - June 30, 2014

REVIEWED BY ODOT BRIDGE SAIC

By Consulting Engineer

DESIGN DATA ROADWAY LENGTH 21,160 FEET 4.01 MILES

BRIDGE LENGTH 540 FEET 0.10 MILES ACCEPTED BY TOTAL LENGTH 21,700 FEET 4.11 MILES Oklahoma Turnpike Authority

(NOTE: POSTED LENGTH EXCEEDS FIELD MEASURED LENGTH BY APPROXIMATELY 0.09 MILES)

By Chief Engineer Date S:\Projects\OTA\ Turnpike\WR-MC-113B\AcadDwgs\WR113B-01-title.dwg, 1/11/2013 3:33:06 PM 3:33:06 1/11/2013 Turnpike\WR-MC-113B\AcadDwgs\WR113B-01-title.dwg, Rogers S:\Projects\OTA\Will TYPICAL SECTION 1 - PHASES 1A, 1B (FULL DEPTH RECONSTRUCTION) (INCLUDES SLOPE EXTENSION & REMOVAL OF EXISTING EDGE DRAINS - NEAR TPO 59.99) WB AND EB MP 300.14 - 300.2 (WEST APPROACHES TO TPO 59.12) (300') WB AND EB MP 300.24 - 300.31 (EAST APPROACHES TO TPO 59.12) (375') WB AND EB MP 300.96 - 301.06 (WEST APPROACHES TO TPO 59.99) (500') WB AND EB MP 301.10 - 301.20 (EAST APPROACHES TO TPO 59.99) (453')

GUARDRAIL WIDENING DETAIL (APPLIES TO TYPICAL SECTION 1)

OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE

TYPICAL SECTION 2 - PHASES 1A, 1B TYPICAL SECTIONS SLOPE WIDENING DETAIL KEVIN A. (GUARDRAIL WIDENING & EDGE DRAINS NEAR TPO 59.99) KRIEWALL (APPLIES TO TYPICAL SECTIONS 1 & 2 WB AND EB MP 300.9 - 300.96 (350') 14850 NEAR TPO 59.99) CRAIG & KEITHLINE, INC. WB AND EB MP 301.2 - 301.3 (667') Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-02-sections.dwg, 1/11/2013 3:33:26 PM 3:33:26 1/11/2013 Turnpike\WR-MC-113B\AcadDwgs\WR113B-02-sections.dwg, Rogers S:\Projects\OTA\Will TYPICAL SECTION 3 EXIT / ENTRANCE RAMPS

PLAN VIEW - TYPICAL RAMP MILL AND INLAY W / ULTRA THIN BONDED WEARING COURSE OVERLAY

TYPICAL SECTION 4 MILL & INLAY DRIVING LANES w/ULTRA THIN BONDED WEARING COURSE EB & WB 298.20 - 300.14 (10,000') 300.31 - 300.96 (3,355') OKLAHOMA TURNPIKE AUTHORITY 301.20 - 302.40 (6,175') WILL ROGERS TURNPIKE

KEVIN A. TYPICAL SECTIONS KRIEWALL 14850 CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-03-sections.dwg, 1/11/2013 3:33:36 PM 3:33:36 1/11/2013 Turnpike\WR-MC-113B\AcadDwgs\WR113B-03-sections.dwg, Rogers S:\Projects\OTA\Will UNDERDRAIN INSTALLATION TYPICAL HALF-SECTION

OUTLET HEADWALL DETAIL

OUTLET HEADWALL DETAIL BAR B

UNDERDRAIN DETAIL

BAR C BAR A

OKLAHOMA TURNPIKE AUTHORITY OUTLET HEADWALL DETAIL WILL ROGERS TURNPIKE TYPICAL UNDERDRAIN OF ES S I R ON P A L D INSTALLATION E E

R N

E KEVIN A. G T SECTIONS & DETAILS I N S

I KRIEWALL

E

G

E

E R

TYPICAL UNDERDRAIN PLAN R 14850 CRAIG & KEITHLINE, INC. Tulsa, Oklahoma O A K LA H O M S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-04-underdrain.dwg, 1/11/2013 3:33:46 PM 3:33:46 1/11/2013 Turnpike\WR-MC-113B\AcadDwgs\WR113B-04-underdrain.dwg, Rogers S:\Projects\OTA\Will OKLAHOMA TURNPIKE AUTHORITY

OF ES S I R ON P A WILL ROGERS TURNPIKE L D E E

R N E KEVIN A. G

T I N

S

I KRIEWALL

E

G

E PAY QUANTITIES

E

R R 14850 AND NOTES

O A K LA H O M CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-05-pay quantities.dwg, 1/11/2013 3:34:01 PM 3:34:01 1/11/2013 quantities.dwg, Turnpike\WR-MC-113B\AcadDwgs\WR113B-05-pay Rogers S:\Projects\OTA\Will ³ ´

OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE

OF ES S I R ON P A L D E E TRAFFIC NOTES R N

E KEVIN A. G

T

I N S

I KRIEWALL

E

G

E

E

R R 14850 CRAIG & KEITHLINE, INC. Tulsa, Oklahoma O A K LAH O M S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-06-general notes.dwg, 1/11/2013 3:34:11 PM 3:34:11 1/11/2013 notes.dwg, Turnpike\WR-MC-113B\AcadDwgs\WR113B-06-general Rogers S:\Projects\OTA\Will ³ ´

³ ´

x

x

x

x

x

x

REFINISH MEDIAN BARRIER MP 298.2 TO 302.4 (including all BRIDGE PARAPETS)

OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE

OF ES S I R ON P A L D E E GENERAL CONSTRUCTION NOTES R N

E KEVIN A. G

T

I N

S & MEDIAN BARRIER DETAIL

I KRIEWALL

E

G

E

E

R R 14850 CRAIG & KEITHLINE, INC. O A K LAH O M Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-07-construction notes.dwg, 1/11/2013 3:34:21 PM 1/11/2013 notes.dwg, Turnpike\WR-MC-113B\AcadDwgs\WR113B-07-construction Rogers S:\Projects\OTA\Will OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE FES S I RO ON P A L D E E

R N

E KEVIN A. G SUMMARIES OF GUARDRAIL,

T

I N

S

I KRIEWALL

E

G

E DRAINAGE STRUCTURES

E R R 14850 AND EARTHWORK

O A K LA HO M CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-08-summaries guardrail.dwg, 1/11/2013 3:34:31 PM 3:34:31 1/11/2013 guardrail.dwg, Turnpike\WR-MC-113B\AcadDwgs\WR113B-08-summaries Rogers S:\Projects\OTA\Will OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE

OF ES S I R ON P A L D SUMMARIES OF REMOVAL, E E

R N E KEVIN A. G REPAIR AND SURFACING T

I N S

I KRIEWALL

E

G

E

E

R R 14850 CRAIG & KEITHLINE, INC. Tulsa, Oklahoma O A K LAH O M S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-09-summaries removal.dwg, 1/11/2013 3:34:41 PM 3:34:41 1/11/2013 removal.dwg, Turnpike\WR-MC-113B\AcadDwgs\WR113B-09-summaries Rogers S:\Projects\OTA\Will PLAN VIEW OF CURB AND STRUCTURE DETAIL AT BRIDGE 59.99

ELEVATION OF BROKEN BACK STRUCTURE

PAY QUANTITY NOTES

BRIDGE APPROACH DRAINAGE STRUCTURES 1 & 2

BRIDGE APPROACH SLAB FULL DEPTH REPAIR AREAS DETAIL AND SUMMARY

OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE

OF ES S I R ON P A L D SUMMARY OF BRIDGE APPROACH E E

R N E KEVIN A. G DETAILS AND SUMMARIES T

I N S

I KRIEWALL

E

G

E

E

R R 14850 CRAIG & KEITHLINE, INC. Tulsa, Oklahoma O A K LAH O M S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-10-summaries bridge.dwg, 1/11/2013 3:34:51 PM 3:34:51 1/11/2013 bridge.dwg, Turnpike\WR-MC-113B\AcadDwgs\WR113B-10-summaries Rogers S:\Projects\OTA\Will STRICTLY ENFORCED

FOOD

STRICTLY ENFORCED LODGING

OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE

OF ES S I R ON P A L D E E SUMMARIES OF SIGNING R N

E KEVIN A. G

T

I N S

I KRIEWALL

E

G

E

E

R R 14850 CRAIG & KEITHLINE, INC. Tulsa, Oklahoma O A K LAH O M S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-11-summaries signing.dwg, 1/11/2013 3:35:01 PM 1/11/2013 signing.dwg, Turnpike\WR-MC-113B\AcadDwgs\WR113B-11-summaries Rogers S:\Projects\OTA\Will S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-12-SWMP.dwg, 1/11/2013 3:35:11 PM GUARDRAIL BRIDGE CONNECTION - THRIE BEAM (31" SYSTEM) (STANDARD) AT TPU BRIDGE PIERS - ELEVATION TPU 57.3, TPU 58.2, TPU 59.3, TPU 60.4, TPU 61.0 NTS

GUARDRAIL BRIDGE CONNECTION - THRIE BEAM (31" SYSTEM) (STANDARD) AT TPU BRIDGE PIERS - PLAN NTS

END SECTION AT PIER FACE (TYPICAL)

OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE GUARDRAIL BRIDGE CONNECTION - THRIE BEAM (31" SYSTEM) (MODIFIED) AT EXISTING MAINLINE BRIDGE PARAPETS - ELEVATION GUARDRAIL BRIDGE CONNECTION FLARE RATE 30:1 APPROACH END AND PIER PROTECTION BARRIER 15:1 TRAILING END KEVIN A. KRIEWALL DETAILS TPO 59.12, TPO 59.99 14850 NTS CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-13-bridge barrier.dwg, 1/11/2013 3:35:21 PM 3:35:21 1/11/2013 barrier.dwg, Turnpike\WR-MC-113B\AcadDwgs\WR113B-13-bridge Rogers S:\Projects\OTA\Will GUARDRAIL WIDENING DETAIL (NON FULL-DEPTH REPAIR AREAS) (Distance from edge lane to face-of-rail 12' in tangent sections) NTS

TYPICAL TPO BRIDGE PARAPET PROTECTION WITH TRANSITION TPO 59.2, TP0 59.9 (ALL REFLECTORS WHITE) NTS

OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE

GUARDRAIL DETAILS KEVIN A. TYPICAL TPU PIER PROTECTION WITH TRANSITION KRIEWALL TPU 57.3, TPU 58.2, TPU 59.3, 14850 CRAIG & KEITHLINE, INC. TPU 60.4, TPU 61.0 Tulsa, Oklahoma (ALL REFLECTORS WHITE) NTS S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-14-guardrail.dwg, 1/11/2013 3:35:31 PM 3:35:31 1/11/2013 Turnpike\WR-MC-113B\AcadDwgs\WR113B-14-guardrail.dwg, Rogers S:\Projects\OTA\Will EMERGENCY VEHICLE TURNAROUND LOCATIONS

TYPICAL SECTION - SHOULDER WIDENING AT EXISTING TURNAROUNDS PLAN VIEW (IF REQUIRED) EMERGENCY VEHICLE TURNAROUND OVERLAY

EMERGENCY VEHICLE TURNAROUND PROTECTION - PHASE 1A & 1B

MEDIAN SECTION OKLAHOMA TURNPIKE AUTHORITY EMERGENCY VEHICLE TURNAROUND OVERLAY OF ES S I R ON P A WILL ROGERS TURNPIKE L D E E

R N

E KEVIN A. G

T I N

S

I KRIEWALL

E

G

E EMERGENCY VEHICLE

E R R 14850 TURNAROUND DETAILS

O A K LA H O M CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-15-turnaround.dwg, 1/11/2013 3:35:41 PM 3:35:41 1/11/2013 Turnpike\WR-MC-113B\AcadDwgs\WR113B-15-turnaround.dwg, Rogers S:\Projects\OTA\Will END LIMIT CONSTRUCTION SPEED MERGE NOW STATE LAW LEFT LANE CLOSED SPEED SPEED WORK ROAD PASS LIMIT LIMIT SPEED NOT LIMIT DO SPEED LIMIT

OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE

OF ES S I R ON P A OKLAHOMA 75 MPH LANE L D E E R N REDUCTION TO 55 MPH

E KEVIN A. G

T I N S

I KRIEWALL ADVANCE SIGNING E

G

E

E

R R 14850 CRAIG & KEITHLINE, INC. O A Tulsa, Oklahoma K LA H O M S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-16-75 mph Lane Reduction.dwg, 1/11/2013 3:35:56 PM 3:35:56 1/11/2013 Lane Reduction.dwg, mph Turnpike\WR-MC-113B\AcadDwgs\WR113B-16-75 Rogers S:\Projects\OTA\Will PHASE 1 (EB & WB)

PHASE 1

PHASE 2 (EB & WB)

OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE

FES S I RO ON P A SUGGESTED L D E E R N CONSTRUCTION SEQUENCE E KEVIN A. G

T I N

S I KRIEWALL

E PHASE 1 & 2

G

E

E R

PHASE 2 R 14850 CRAIG & KEITHLINE, INC. O A Tulsa, Oklahoma K LA H O M S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-17-sequencing Phase 1-2.dwg, 1/11/2013 3:36:11 PM 3:36:11 1/11/2013 1-2.dwg, Phase Turnpike\WR-MC-113B\AcadDwgs\WR113B-17-sequencing Rogers S:\Projects\OTA\Will PHASE 3

OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE OF ES S I R ON P A L D E E R N E KEVIN A. G SUGGESTED

T I N

S

I KRIEWALL

E

G

E CONSTRUCTION SEQUENCE

E

R R 14850 PHASE 3 - OUTSIDE LANE

O A K LA H O M CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-18-sequencing Phase 3 Outside.dwg, 1/11/2013 3:36:29 PM 3:36:29 1/11/2013 3 Outside.dwg, Phase Turnpike\WR-MC-113B\AcadDwgs\WR113B-18-sequencing Rogers S:\Projects\OTA\Will PHASE 3

OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE OF ES S I R ON P A L D E E R N E KEVIN A. G SUGGESTED

T I N

S

I KRIEWALL

E

G

E CONSTRUCTION SEQUENCE

E

R R 14850 PHASE 3 - INSIDE LANE

O A K LA H O M CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-19-sequencing Phase 3 Inside.dwg, 1/11/2013 3:36:47 PM 1/11/2013 3 Inside.dwg, Phase Turnpike\WR-MC-113B\AcadDwgs\WR113B-19-sequencing Rogers S:\Projects\OTA\Will OKLAHOMA TURNPIKE AUTHORITY

OFES SI R O N P A WILL ROGERS TURNPIKE L D E E

R N E KEVIN A. G

T

I N

S KRIEWALL I

E

G

E PAVEMENT REHABILITATION

E R R 14850 MILE POST 297.9 TO 298.4

O A K LA HO M CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-20-297.9-298.4.dwg, 1/11/2013 3:37:07 PM 3:37:07 1/11/2013 Turnpike\WR-MC-113B\AcadDwgs\WR113B-20-297.9-298.4.dwg, Rogers S:\Projects\OTA\Will OKLAHOMA TURNPIKE AUTHORITY

OFES SI R O N P A WILL ROGERS TURNPIKE L D E E

R N E KEVIN A. G

T

I N

S KRIEWALL I

E

G

E PAVEMENT REHABILITATION

E R R 14850 MILE POST 298.4 TO 298.9

O A K LA HO M CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-21-298.4-298.9.dwg, 1/11/2013 3:37:28 PM 3:37:28 1/11/2013 Turnpike\WR-MC-113B\AcadDwgs\WR113B-21-298.4-298.9.dwg, Rogers S:\Projects\OTA\Will OKLAHOMA TURNPIKE AUTHORITY

OFES SI R O N P A WILL ROGERS TURNPIKE L D E E

R N E KEVIN A. G

T

I N

S KRIEWALL I

E

G

E PAVEMENT REHABILITATION

E R R 14850 MILE POST 298.9 TO 299.4

O A K LA HO M CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-22-298.9-299.4.dwg, 1/11/2013 3:37:50 PM 3:37:50 1/11/2013 Turnpike\WR-MC-113B\AcadDwgs\WR113B-22-298.9-299.4.dwg, Rogers S:\Projects\OTA\Will OKLAHOMA TURNPIKE AUTHORITY

OFES SI R O N P A WILL ROGERS TURNPIKE L D E E

R N E KEVIN A. G

T

I N

S KRIEWALL I

E

G

E PAVEMENT REHABILITATION

E R R 14850 MILE POST 299.4 TO 299.9

O A K LA HO M CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-23-299.4-299.9.dwg, 1/11/2013 3:38:08 PM 3:38:08 1/11/2013 Turnpike\WR-MC-113B\AcadDwgs\WR113B-23-299.4-299.9.dwg, Rogers S:\Projects\OTA\Will OKLAHOMA TURNPIKE AUTHORITY

OFES SI R O N P A WILL ROGERS TURNPIKE L D E E

R N E KEVIN A. G

T

I N

S KRIEWALL I

E

G

E PAVEMENT REHABILITATION

E R R 14850 MILE POST 299.9 TO 300.4

O A K LA HO M CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-24-299.9-300.4.dwg, 1/11/2013 3:38:28 PM 3:38:28 1/11/2013 Turnpike\WR-MC-113B\AcadDwgs\WR113B-24-299.9-300.4.dwg, Rogers S:\Projects\OTA\Will OKLAHOMA TURNPIKE AUTHORITY

OFES SI R O N P A WILL ROGERS TURNPIKE L D E E

R N E KEVIN A. G

T

I N

S KRIEWALL I

E

G

E PAVEMENT REHABILITATION

E R R 14850 MILE POST 300.4 TO 301.0

O A K LA HO M CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-25-300.4-301.0.dwg, 1/11/2013 3:38:47 PM 3:38:47 1/11/2013 Turnpike\WR-MC-113B\AcadDwgs\WR113B-25-300.4-301.0.dwg, Rogers S:\Projects\OTA\Will OKLAHOMA TURNPIKE AUTHORITY

OFES SI R O N P A WILL ROGERS TURNPIKE L D E E

R N E KEVIN A. G

T

I N

S KRIEWALL I

E

G

E PAVEMENT REHABILITATION

E R R 14850 MILE POST 301.0 TO 301.5

O A K LA HO M CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-26-301.0-301.5.dwg, 1/11/2013 3:39:10 PM 3:39:10 1/11/2013 Turnpike\WR-MC-113B\AcadDwgs\WR113B-26-301.0-301.5.dwg, Rogers S:\Projects\OTA\Will OKLAHOMA TURNPIKE AUTHORITY

OFES SI R O N P A WILL ROGERS TURNPIKE L D E E

R N E KEVIN A. G

T

I N

S KRIEWALL I

E

G

E PAVEMENT REHABILITATION

E R R 14850 MILE POST 301.5 TO 302.1

O A K LA HO M CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-27-301.5-302.1.dwg, 1/11/2013 3:39:28 PM 3:39:28 1/11/2013 Turnpike\WR-MC-113B\AcadDwgs\WR113B-27-301.5-302.1.dwg, Rogers S:\Projects\OTA\Will OKLAHOMA TURNPIKE AUTHORITY

OFES SI R O N P A WILL ROGERS TURNPIKE L D E E

R N E KEVIN A. G

T

I N

S KRIEWALL I

E

G

E PAVEMENT REHABILITATION

E R R 14850 MILE POST 302.1 TO 302.5

O A K LA HO M CRAIG & KEITHLINE, INC. Tulsa, Oklahoma S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-28-302.1-302.5.dwg, 1/11/2013 3:39:48 PM 3:39:48 1/11/2013 Turnpike\WR-MC-113B\AcadDwgs\WR113B-28-302.1-302.5.dwg, Rogers S:\Projects\OTA\Will S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-29-pp 10-18.dwg, 1/11/2013 3:40:03 PM S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-30-pp 18-27.dwg, 1/11/2013 3:40:18 PM S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-31-pp 27-36.dwg, 1/11/2013 3:40:33 PM S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-32-Afton exit ramp.dwg, 1/11/2013 3:40:46 PM WB ENTRANCE RAMP A

TYPICAL STRIPE DIMENSIONS (SHOULDER MEASURED FROM BASE OF MEDIAN BARRIER) (SEE TYP. SECTIONS FOR ADD'L. DETAILS)

EB EXIT RAMP B

NOTE: For Gore / Chevron Details See Std. PM4-1-01

EB ENTRANCE RAMP C

OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE

OF ES S I R ON WB EXIT RAMP D P A L D E E PAVEMENT MARKING PLAN R N

E KEVIN A. G

T

I N S

I KRIEWALL

E

G

E

E

R R 14850 CRAIG & KEITHLINE, INC. Tulsa, Oklahoma O A K LAH O M S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-33-pavement marking.dwg, 1/11/2013 3:40:56 PM 1/11/2013 marking.dwg, Turnpike\WR-MC-113B\AcadDwgs\WR113B-33-pavement Rogers S:\Projects\OTA\Will S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-X1-X7.dwg, 1/11/2013 3:41:06 PM S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-X1-X7.dwg, 1/11/2013 3:41:14 PM S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-X1-X7.dwg, 1/11/2013 3:41:24 PM S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-X1-X7.dwg, 1/11/2013 3:41:34 PM S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-X1-X7.dwg, 1/11/2013 3:41:44 PM S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-X1-X7.dwg, 1/11/2013 3:41:55 PM S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-X1-X7.dwg, 1/11/2013 3:42:04 PM