Interstate System Toll Roads in the United States
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
May Construction Report Kansas Avenue Bridge
May Construction Report This report is intended to provide motorists with information on three active construction projects on the Kansas Turnpike. Each update is listed below. Completion dates listed are weather permitting. I also encourage travelers to drive with caution in work zones and to check for construction updates at http://www.kandrive.org, follow the Kansas Turnpike on Twitter, and watch for information on the KTA’s digital message boards. ~ David Jacobson, P.E., KTA Director of Engineering Kansas Avenue Bridge (Leavenworth County, MP 221) Scheduled completion: late November 2015, weather permitting Project Manager: Shannon Moore, P.E. The Contractor has completed construction of the foundation elements for the new bridge. Over the next few weeks, the contractor will be constructing bridge piers (bents). Construction for the median pier will require periodic lane drops for both directions of travel. Motorists should expect construction vehicles and concrete trucks to be entering and exiting the roadway at various times over the next few weeks. Concrete patching on ramps and roadway near east Topeka interchange (MP182-183) Scheduled completion: early June 2015, weather permitting Project Manager: Luke Coltrane, P.E. Since this project began on April 20th, the contractor has completed patching on the four ramps and loop connecting the Turnpike to K-4 and I-70 at milepost 182. Concrete patching is now taking place on I-70 near the east Topeka toll plaza at milepost 183. 9401 E Kellogg Drive l Wichita, Kansas 67207-1804 O: (316) 682-4537 l F: (316) 682-1201 l www.ksturnpike.com Painting bridges in Butler County (MP 71-92) Scheduled completion: July 2015, weather permitting Project Manager: Mark Roberts, E.T. -
Inside the 2013 Session of the Kansas Legislature Is Churning Towards the April 5, First Adjournment
Kansas Motor Carriers Association Affiliated with The American Trucking Associations DISPATCH March 2013 Legislature Update inside The 2013 Session of the Kansas Legislature is churning towards the April 5, first adjournment. The focus now is on continuation of the individual income Highway Layout taxes that begin in 2012 and the balancing of the State’s budget to make Trucking Issues up for the reduction in revenue. In 2010 the Legislature approved a 1% increase in the Kansas sales tax to help to budget shortfall created by the In Memoriam: economic downturn. Unlike Washington, Kansas is constitutionally required Helen M. Graves to produce a balanced budget. .6% of the sales tax increase was scheduled to expire on June 30, 2013. .4% of the sales tax increase is scheduled to be WHG PAC Truck Golf transferred to the State Highway Fund to provide a revenue stream for the Classic Forms T-Works Transportation Plan. The House Taxation Committee produced and income tax reduction plan which would have redirected the .4% to the State General Fund for the next two years, thus reducing the size of the T-Works Much More! by $348 million. The full House during debate on the tax bill restored the .4% to the T-Works Program. The Kansas Senate, which has passed an income tax reduction bill, also retained the .6% sales tax increase for the State General Fund to avoid draconian budget cuts to schools and allow for further reductions in Kansas income tax. By April 5, the House and Senate must Notice of Meeting reconcile their difference. -
Sb1098 Int.Pdf
STATE OF OKLAHOMA 2nd Session of the 47th Legislature (2000) SENATE BILL 1098 By: Helton AS INTRODUCED An Act relating to roads, bridges and ferries; amending 69 O.S. 1991, Section 1705, as last amended by Section 414, Chapter 5, 1st Extraordinary Session, O.S.L. 1999 (69 O.S. Supp. 1999, Section 1705), which relates to the Oklahoma Turnpike Authority; requiring the Oklahoma Turnpike Authority to construct an off ramp on the H.E. Bailey Turnpike at Fletcher, Oklahoma in the vicinity of the Interstate 44 and State Highway 277 intersection; prohibiting the removal and requiring maintenance of certain on or off ramp; and providing an effective date. BE IT ENACTED BY THE PEOPLE OF THE STATE OF OKLAHOMA: SECTION 1. AMENDATORY 69 O.S. 1991, Section 1705, as last amended by Section 414, Chapter 5, 1st Extraordinary Session, O.S.L. 1999 (69 O.S. Supp. 1999, Section 1705), is amended to read as follows: Section 1705. The Oklahoma Turnpike Authority is hereby authorized and empowered: (a) To adopt bylaws for the regulation of its affairs and conduct of its business. (b) To adopt an official seal and alter the same at pleasure. (c) To maintain an office at such place or places within the state as it may designate. (d) To sue and be sued in contract, reverse condemnation, equity, mandamus and similar actions in its own name, plead and be impleaded; provided, that any and all actions at law or in equity against the Authority shall be brought in the county in which the principal office of the Authority shall be located, or in the county of the residence of the plaintiff, or the county where the cause of action arose. -
CAFR for Fiscal Year 2019
KANSAS TURNPIKE AUTHORITY (A COMPONENT UNIT OF THE STATE OF KANSAS) FINANCIAL STATEMENTS FOR THE YEARS ENDED JUNE 30, 2019 AND 2018 WITH INDEPENDENT AUDITOR’S REPORT KANSAS TURNPIKE AUTHORITY (A COMPONENT UNIT OF THE STATE OF KANSAS) FINANCIAL STATEMENTS FOR THE YEARS ENDED JUNE 30, 2019 AND 2018 WITH INDEPENDENT AUDITOR’S REPORT KANSAS TURNPIKE AUTHORITY (A COMPONENT UNIT OF THE STATE OF KANSAS) FINANCIAL STATEMENTS For the Years Ended June 30, 2019 and 2018 TABLE OF CONTENTS Page Independent Auditor’s Report .............................................................................................. 1 - 2 Management’s Discussion and Analysis ............................................................................. 3 - 8 Basic Financial Statements: Balance Sheets ............................................................................................................... 9 Statements of Revenues, Expenses and Changes in Net Position ................................ 10 Statements of Cash Flows .............................................................................................. 11 Notes to Financial Statements ........................................................................................ 12 - 36 Required Supplementary Information .................................................................................. 37 - 44 Supplementary Information: Combining Balance Sheet .............................................................................................. 45 Combining Statement of Revenues, Expenses and -
Driving Instructions to NSU's Broken Arrow Campus
A – Administrative Services B – Business and Technology C – Education D – Science and Health Professions E – Library G – Liberal Arts M – Maintenance NSU Campus Trail Driving Instructions to NSU’s Broken Arrow Campus 3100 E. New Orleans, Broken Arrow, OK AdministrativeFrom Northwest Services - Business Affairs, Oklahoma Business and Technology - Business, Student Affairs, Bookstore, Enrollment Mathematics, Marketing, Computer Labs, Education - Psychology, Education Management, From the Office Cimarron of the Dean ,Turnpike, Continuing Ed., connect to StudyHighway Areas, Faculty 51 Officesnear , downtownCampus Tulsa (Broken Arrow Expressway). Take Humanthe BAResources, Expressway Sodexo, Sip ‘n through Surf, Banquet Tulsa and BrokenPolice Arrow to the “Creek Turnpike West” exit (just past the Highway Hall,51 Annex, “Coweta” Auditorium exit). The “Creek Turnpike West” exit will actually take you south to the NSU-Broken Arrow campus. You will see the campus on the right as you approach 101st Street (also called New Orleans Street). Take the 101st/New Orleans Street exit, which will lead you directly to the main campus entrance. From West or Central Oklahoma College From of Sciencethe Turner and Health Turnpike, Professions take the “CreekLibrary Turnpike East” exit, which is just past Collegethe Sapulpa of Liberal exits.Arts - ROTC This will take you through south Tulsa. After passing the Memorial Street exit, make sure you are in the right lane to remain on the Creek Turnpike through south Broken Arrow (rather than going north on Highway 169). Continue on the Creek Turnpike until it curves north (approximately 6 miles) and you will see the campus directly in front on you. As you approach 101 st Street (also called New Orleans Street), the road veers to the right around the campus. -
K-TAG Retail Center Opens in Lawrence
FOR IMMEDIATE RELEASE January 29, 2016 K-TAG Retail Center opens in Lawrence LAWRENCE, Kan.— As a way to improve customer service and efficiency, the Kansas Turnpike Authority opened a second K-TAG Retail Center, this one at their Lawrence toll plaza, exit 202. Grand opening festivities took place Thursday, January 28, 2016 at 4:30 p.m. The first K-TAG Retail Center location was opened last April in east Wichita. At the K-TAG Retail Center customers will be able to get new or replacement K-TAGs, learn how a K-TAG can save them on time and tolls when traveling on the Turnpike and make changes or a payment to their account. “Opening this K-TAG Retail Center aligns with our company values of making improvements and providing great customer service,” said Steve Hewitt, KTA’s CEO. “A retail center in Lawrence is another way we can do that for our customers in the busy northeast part of Kansas.” The K-TAG Retail Center is open Monday through Friday from 8 a.m. to 5 p.m. K-TAGs can also be order online at www.myktag.com and by calling 1-800-USE-KTAG (1-800-873-5824). ### Editor’s Note: Photos available at bit.ly/1NFIaYh. About KTA: The Kansas Turnpike Authority (KTA) maintains 236 miles of user-fee supported roadway from the Oklahoma border to Kansas City. The KTA doesn’t receive state or federal tax funds. KTA's mission is to provide safe, economical, high-quality highway transportation service to our customers. 2016 is KTA’s 60th anniversary celebrating “236 Miles of Possibility” for its users. -
JOHNSON 3 3 R 14 COUNTY 16 E 167TH ST 14 Clare IV RS 1638 RS L INDUSTRIA 16 Ek 16 15 17 14 13 Re R 4 2 22 38°50' 18 1 7 Four AIRPORT C 3 2 3 6 3 14 13 13 56 6 N Em
LEGEND ROADS AND ROADWAY FEATURES Controlled Access (With Interchange) - Interstate CONSERVATION AND RECREATION Kansas Turnpike (KTA) (With Interchange) US Route - Controlled Access (With Interchange) Public Recreation US Route - Divided Scenic, Tourist, or Historical Site US Route - Undivided Trailer Park State Route - Controlled Access (With Interchange) Hotel or Motel State Route - Divided Camp or Lodge (Permanent Site with Building) State Route - Undivided Small Park ( SP - State Park, CP - County Park, RS Route - Divided MP = Municipal Park, SR - Safety Rest Area) RS Route - Paved Fish Hatchery RS Route - Unpaved Game Farm ' 0 Minor Road - Paved Game Preserve or Bird Sanctuary 5 ° 4 Minor Road - Stone or Gravel Rifle Club (Public) 9 Minor Road - Soil Golf Course or Country Club T Side Road or Street in Unincorporated Area Riding Academy, Saddle Club, or Stables 4 O I 30 29 3 - J 5 7 C Race Course or Speedway Ch/Cem. 6 0 T 0 ROAD SYSTEM DESIGNATION 25 14 . KUMP . 2 16 . 2 2 2 W 3 16 5 AVE. T Marina . O S . 4 30 RS T . Rural Secondary System . T O . S S W ' Y S K T . T D 3 T Rodeo Grounds . A O H 3 K V . S 2 0 . OA GRO E RD I 32 H N . E T 0 5 E H E C 2 E E 0 5 2. S C B T 1 1 2 T 2 . 3 s T 4 A 3 D 1 T N J H t P 7 7 3 S 0 8 . C 3 S . t 6 C N 3 F 4 4 8 Y 4 O D V . -
State Authority Status Bay Area Toll Authority Express Lane Tolls on Bay
Toll Authority Updates as of 11/23/2020 Tolling agencies are beginning to resume normal operations however some walk-in customer service centers remain closed or are by appointment only. State Authority Status California Express lane tolls on Bay Area freeways will resumed on June 1, 2020. Cash is not being collected at Bay Area bridges as of 3/21/20. This is to protect toll-paying customers and toll collectors from the risk of exposure to Bay Area Toll Authority the coronavirus during the current public health emergency. You can use FasTrak to pay your toll. If you do not have FasTrak, you will receive a bill in the mail for just the amount of your toll. If you have FasTrak, this change does not apply to you. All-Electronic Toll Road, no changes implemented to date. Violation notices The Toll Roads will be mailed to the registered address of the vehicle. All-Electronic Toll Road, no changes implemented to date. Violation notices Los Angeles Metro Transit will be mailed to the registered address of the vehicle. The Orange County All-Electronic Toll Road, no changes implemented to date. Violation notices Transportation Authority will be mailed to the registered address of the vehicle. All-Electronic Toll Road, no changes implemented to date. Violation notices South Bay Expressway will be mailed to the registered address of the vehicle. Colorado All-Electronic Toll Road, no changes implemented to date. Violation notices ExpressToll Way will be mailed to the registered address of the vehicle. All-Electronic Toll Road, no changes implemented to date. -
69 Acres - Craig County, Ok
Buyers, Sellers & Land Connected 69 ACRES - CRAIG COUNTY, OK PRICE: $307,050 ACRES: 69 COUNTY: CR AIG STATE: OKLAHOMA KEVIN WILLIAMS, Land Agent 918.559.8960 | [email protected] | www.MidwestLandGroup.com This property is being offered by Midwest Land Group, LLC. 913.674.8010. All information provided by Midwest Land Group, LLC. or their agents was acquired from sources deemed accurate and reliable, however we do not warrant its accuracy or completeness, Midwest Land Group, LLC assumes no liability for error, omission, or investment results. Midwest Land Group, LLC. Bryhn Craft and Steve Mott, Brokers. Licensed in Arkansas, Illinois, Iowa, Kansas, Missouri, Nebraska, Oklahoma, South Dakota, and Wisconsin. Buyers, Sellers & Land Connected 69 ACRES - CRAIG COUNTY, OK 69 +/- Acre Multi-Use Craig County Property A beautiful, mostly level and cleared 69 +/- acres of highly productive native Bluestem, fescue, and Bermuda mix hay meadow is located in Craig County, Oklahoma. This property has paved road frontage with multiple gated entrances on the north and a Craig County maintained road on the west. The seller is currently utilizing the pasture for grazing and hay production. This tract of land is located on East 330 Road, less than 1 mile west of Highway 69 in Big Cabin, Oklahoma. Will Rogers Turnpike frontage is located to the northwest of the property. This parcel is fully fenced and cross-fenced with five-and-six-strand barbed wire to allow for rotational grazing of your livestock. The property contains two ponds, a hay barn, and multiple potential home sites, making this a great family property or investment for the possibility of future development, hay production, or livestock grazing. -
102Nd Annual Kansas Transportation Engineering Conference April 14
102nd Annual Kansas Transportation Engineering Conference April 14 and 15, 2020 K-State Student Union Carl R. Ice College of Engineering Building Manhattan, Kansas https://conferences.k-state.edu/transportation/ Sponsored by Kansas Department of Transportation (KDOT) Kansas County Highway Association (KCHA) Kansas Chapter, American Public Works Association (APWA) Kansas Association for Uniform Traffic Control (KAUTC) Federal Highway Administration (FHWA) University of Kansas Transportation Center (KUTC) Page 1 of 7 Tuesday, April 14 7:00-8:00 Exhibitor Move-In Main/West Ballroom, Second Floor 8:00-8:50 Registration and Refreshments, Coffee Second Floor Concourse (Registration), Main/West Ballroom (Refreshments), Courtyard Lobby (Coffee) Lanyards sponsored by Bartlett and West Koozies sponsored by Alfred Benesch and Company Coffee sponsored by TranSystems and HDR Engineering 8:00-12:00 Trade Show Hours Main/West Ballroom, Second Floor Session I Forum Hall Burt Morey, P.E., Deputy Secretary and State Transportation Engineer, Kansas Department of Transportation, Topeka, KS presiding 8:50-9:00 Welcome to Guests Gary Clark, P.E., Interim Dean of Engineering, Kansas State University, Manhattan, KS 9:00-9:30 KDOT Update Lindsey Douglas, Deputy Secretary, Kansas Department of Transportation, Manhattan, KS Maggie Doll, Deputy Secretary, Kansas Department of Transportation, Manhattan, KS 9:30-10:00 FHWA Update 10:00-10:40 Break with Exhibitors Main/West Ballroom, Second Floor Session II-A Forum Hall Ron Seitz, P.E., Director of Engineering and -
WILL ROGERS TURNPIKE PAVEMENT REHABILITATION Mile 298.2 to 302.4, Length 4.11 Miles CONTRACT NO
INDEX OF SHEETS SHEET No. DESCRIPTION OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE PAVEMENT REHABILITATION Mile 298.2 to 302.4, Length 4.11 Miles CONTRACT NO. WR-MC-113B OTTAWA COUNTY LOCATION MAP BEGIN PROJECT WR-MC-113B MILE NO. 298.2 PREPARED BY CRAIG & KEITHLINE, INC. Consulting Engineers Tulsa, Oklahoma OF ES S I R ON P A INDEX OF STANDARD DRAWINGS (Half Size Only) L D E E END PROJECT WR-MC-113B R N E KEVIN A. G T I N ODOT ROADWAY ODOT TRAFFIC S I KRIEWALL MILE NO. 302.4 E G E E R R 14850 By Date Kevin A. Kriewall, P.E. O A K L A H O M Oklahoma Reg. No. 14850 Craig & Keithline, Inc. Oklahoma Certificate of Authorization No. 1216 Renewal Date - June 30, 2014 REVIEWED BY ODOT BRIDGE SAIC By Consulting Engineer DESIGN DATA ROADWAY LENGTH 21,160 FEET 4.01 MILES BRIDGE LENGTH 540 FEET 0.10 MILES ACCEPTED BY TOTAL LENGTH 21,700 FEET 4.11 MILES Oklahoma Turnpike Authority (NOTE: POSTED LENGTH EXCEEDS FIELD MEASURED LENGTH BY APPROXIMATELY 0.09 MILES) By Chief Engineer Date S:\Projects\OTA\Will Rogers Turnpike\WR-MC-113B\AcadDwgs\WR113B-01-title.dwg, 1/11/2013 3:33:06 PM TYPICAL SECTION 1 - PHASES 1A, 1B (FULL DEPTH RECONSTRUCTION) (INCLUDES SLOPE EXTENSION & REMOVAL OF EXISTING EDGE DRAINS - NEAR TPO 59.99) WB AND EB MP 300.14 - 300.2 (WEST APPROACHES TO TPO 59.12) (300') WB AND EB MP 300.24 - 300.31 (EAST APPROACHES TO TPO 59.12) (375') WB AND EB MP 300.96 - 301.06 (WEST APPROACHES TO TPO 59.99) (500') WB AND EB MP 301.10 - 301.20 (EAST APPROACHES TO TPO 59.99) (453') GUARDRAIL WIDENING DETAIL (APPLIES TO TYPICAL SECTION 1) OKLAHOMA TURNPIKE AUTHORITY WILL ROGERS TURNPIKE TYPICAL SECTION 2 - PHASES 1A, 1B TYPICAL SECTIONS SLOPE WIDENING DETAIL KEVIN A. -
Toll Facilities in the United States
TOLL FACILITIES US Department IN THE UNITED of Transportation Federal Highway STATES Administration BRIDGES-ROADS-TUNNELS-FERRIES February 1995 Publication No. FHWA-PL-95-034 TOLL FACILITIES US Department of Transporation Federal Highway IN THE UNITED STATES Administration Bridges - Roads - Tunnels - Ferries February 1995 Publication No: FHWA-PL-95-034 PREFACE This report contains selected information on toll facilities in the United States. The information is based on a survey of facilities in operation, financed, or under construction as of January 1, 1995. Beginning with this issue, Tables T-1 and T-2 include, where known: -- The direction of toll collection. -- The type of electronic toll collection system, if available. -- Whether the facility is part of the proposed National Highway System (NHS). A description of each table included in the report follows: Table T-1 contains information such as the name, financing or operating authority, location and termini, feature crossed, length, and road system for toll roads, bridges, tunnels, and ferries that connect highways. -- Parts 1 and 3 include the Interstate System route numbers for toll facilities located on the Dwight D. Eisenhower National System of Interstate and Defense Highways. -- Parts 2 and 4 include a functional system identification code for non-Interstate System toll bridges, roads, and tunnels. -- Part 5 includes vehicular toll ferries. Table T-2 contains a list of those projects under serious consideration as toll facilities, awaiting completion of financing arrangements, or proposed as new toll facilities that are being studied for financial and operational feasibility. Table T-3 contains data on receipts of toll facilities.