Siphon Fish Ladder

Total Page:16

File Type:pdf, Size:1020Kb

Siphon Fish Ladder Siphon fish ladder The FishFlow siphon fish ladder is an innovative Principle and cost-effective fish way, which can be applied The FishFlow siphon fish ladder consists of a at dams, weirs, sluices and pumping stations to conventional fish ladder that is placed inside a facilitate fish migration. Many waterworks closed box. Partitioning walls have been placed in obstruct the migration of fish by blocking or the box to create a series of compartments. In the restricting the connectivity between adjacent siphon fish ladder a vacuum pump raises the water water bodies. The siphon fish ladder can be applied until it spills over the partitioning wall between the to restore fish migration routes and contributes to the development of more natural fish stocks. The upper compartments in the fish way and water starts fish way can therefore be used to effectively flowing through the fish way. The vacuum pump will improve ecological conditions and can contribute subsequently control the volume of air that is present to the achievement of the goals set in the in the system. The volume of the air bubble defines European water framework directive. the water flow over the fish ladder. FishFlow Innovations Dissel 4 1671 NG Medemblik, the Netherlands telephone 0031 227 570 020 fax 0031 227 547 356 www.fishflowinnovations.nl Siphon fish ladder Advantages Monitoring results Key characteristics of the FishFlow siphon fish ladder The first FishFlow siphon fish ladder was installed on are: a weir in the river Hertogswetering in the Low water consumption. Local water availability Netherlands in 2006. Upstream migration through is used as a guideline for dimensioning a fish the fish ladder has been monitored during one year. ladder. The siphon fish ladder can function star For this purpose a fyke net was attached to the ting at a flow rate of several liters per second upstream end of the fish ladder. Adjustable flow rate. The flow rate can be adjusted to suit existing needs Over 88 days a total of 612 fishes representing 11 fish Low energy requirement. In the siphon species were caught. Perch, roach and gudgeon were construction there is no need for water pumps, most abundant in the total catch. Species with lower which results in a low energy requirement swimming abilities (spined loach and gudgeon), Flexible positioning. The fish ladder is a crayfish and tadpoles were also found to have prefabricated system that can be placed in any successfully passed the fish way. The length of the position (near, on top, above or inside) in a caught fish varied from 4 to 67 cm. The length migration barrier or in a levee frequency distribution that was found was similar to Low maintenance. The system is easy to the distribution found during a fish stock assessment maintain and is fitted with shutters in the in same river in 2003. Fish passage outside the partitioning wall that allow flushing of the fish typical seasons for fish migration showed that fish ladder to prevent the accumulation of sediment easily migrate through the fish ladder and no longer and debris consider the weir a migration barrier. Flexible design. The design of the FishFlow siphon fish ladder can be adjusted for integration species total catch percentage length in the landscape or to suit decorative or of catch range educational purposes. Additions such as the bleak 8 1 % 4-14 installation of a viewing window or a fish counter european perch 163 27 % 6-17 are optional bream 48 8 % 9-42 Cost effective. In comparison to conventional roach 153 25 % 5-15 fish ladders the costs of the construction of the FishFlow siphon fish ladder are estimated spined loach 35 6 % 4-10 to be at least 50 % lower river gudgeon 168 28 % 4-16 Provides passage to a large variety of fish pikeperch 1 0 % 32 species, including bottom-dwelling species. pike 1 0 % 12 white bream 1 0 % 5 tench 1 0 % 5 european eel 33 5 % 20-67 total 612 4-67 FishFlow Innovations Dissel 4 1671 NG Medemblik, the Netherlands telephone 0031 227 570 020 fax 0031 227 547 356 www.fishflowinnovations.nl Siphon fish ladder FishFlow Innovations FishFlow Innovations develops and produces innovative products to facilitate fish passage and fish deflection. In addition to strobe lights, FishFlow Innovations produces: Airlift (to prevent cyanobacteria) Eel ladders Siphon fish ladders Fish-way for pumping stations Fish-friendly pumps and hydro turbines Rotary drum screen for cooling water intake Bypass-systems For more information on the strobe lights or our other products, please contact us via [email protected] or visit our website www.fishflowinnovations.nl/en FishFlow Innovations Dissel 4 1671 NG Medemblik, the Netherlands telephone 0031 227 570 020 fax 0031 227 547 356 www.fishflowinnovations.nl .
Recommended publications
  • Fishway Ladder
    FREQUENTLY ASKED QUESTIONS A. Fishway B. Riverwalk C. DNR Compliance with NR 333 D. Dam Removal E. Property Issues F. Fish and Aquatic Life G. Wildlife H. Recreational Use A. Fishway 1. What is the estimated cost to build a fishway at Bridge Street dam? The engineering consultant, Bonestroo, has estimated the cost at $1.3 million per the NOAA grant. 2. If the fishway is constructed next year, will it have to be rebuilt when the dam needs to be removed and replaced? Essentially no. Most of the fishway is a separate upstream structure and will not be impacted by demolition and construction of a new dam. The fishway entrance area may need to be modified if a new dam is installed or if the dam abutments are altered. 3. Why is the fishway being constructed on the west bank of the river? The west bank allows land owned by the Village of Grafton to be used for a portion of the channel alignment. Furthermore, the heaviest construction will likely be in the area currently owned by the Village (penetration of the west dam abutment). Other advantages include the appeal to tourists able to view fish entering and ascending the fishway from the riverwalk, and the known presence of shallow bedrock helping assure good foundation characteristics. Furthermore, the historic mill race crosses the area, and a portion of the mill race alignment may assist with fishway construction. 4. How long will it take to complete the construction of the fishway? The fishway will be completed by late fall of 2010.
    [Show full text]
  • Fish Passage Engineering Design Criteria 2019
    FISH PASSAGE ENGINEERING DESIGN CRITERIA 2019 37.2’ U.S. Fish and Wildlife Service Northeast Region June 2019 Fish and Aquatic Conservation, Fish Passage Engineering Ecological Services, Conservation Planning Assistance United States Fish and Wildlife Service Region 5 FISH PASSAGE ENGINEERING DESIGN CRITERIA June 2019 This manual replaces all previous editions of the Fish Passage Engineering Design Criteria issued by the U.S. Fish and Wildlife Service Region 5 Suggested citation: USFWS (U.S. Fish and Wildlife Service). 2019. Fish Passage Engineering Design Criteria. USFWS, Northeast Region R5, Hadley, Massachusetts. USFWS R5 Fish Passage Engineering Design Criteria June 2019 USFWS R5 Fish Passage Engineering Design Criteria June 2019 Contents List of Figures ................................................................................................................................ ix List of Tables .................................................................................................................................. x List of Equations ............................................................................................................................ xi List of Appendices ........................................................................................................................ xii 1 Scope of this Document ....................................................................................................... 1-1 1.1 Role of the USFWS Region 5 Fish Passage Engineering ............................................
    [Show full text]
  • Fish Passage Profiles Evaluation Report
    Potter Valley Project Ad Hoc Committee Fish Passage Profiles Evaluation Report December 2019 Developed by the Fish Passage Working Group Fish Passage Working Group Report Contributors Scenarios and Options Subgroup Scoring Subgroup Craig Addley (Consultant to PG&E) Craig Addley (Consultant to PG&E) Joshua Fuller (NMFS) Joshua Fuller (NMFS) Paul Kubicek (PG&E) Damon Goodman (USFWS) Jon Mann (CDFW) Paul Kubicek (PG&E) David Manning (Sonoma Water) Jon Mann (CDFW) Scott McBain (Consultant to RVIT) David Manning (Sonoma Water) Darren Mierau (CalTrout) Scott McBain (Consultant to RVIT) Steve Thomas (NMFS) Darren Mierau (CalTrout) Allen Renger (CDFW) Steve Thomas (NMFS) Larry Wise (PG&E) The scenarios subgroup developed the conceptual passage scenarios and options. The scoring subgroup developed and used a passage scoring matrix to evaluate the passage options. Facilitation Team Facilitators Gina Bartlett and Stephanie Horii of Consensus Building Institute assisted the subgroups to document the process and compile results into this final report. 2 Executive Summary Background and Purpose The Potter Valley Project on the Eel River is a set of hydroelectric facilities that includes two large dams (Scott and Cape Horn), water-diversion facilities, and a powerhouse. The project involves an inter-basin transfer that stores winter runoff from the upper Eel River and diverts much of that water to the Russian River to generate hydroelectric power and meet contract water demands. Scott Dam, which creates Lake Pillsbury, is a complete barrier to native fish species, preventing access to high value habitat for federally Endangered Species Act (ESA)-listed anadromous salmonids. To balance diverse Potter Valley Project interests, Congressman Jared Huffman established an Ad Hoc Committee comprised of representative stakeholder groups across four counties, who have agreed to work collaboratively towards a two-basin solution.
    [Show full text]
  • Open House Summary Report
    Nimbus Hatchery Fish Passage Project Environmental Impact Statement and Environmental Impact Report Open House Summary Report Rancho Cordova, California US Department of the Interior Bureau of Reclamation California Department of Fish and Game February 2011 Contents Page 1. Introduction ............................................................................................................1 1.1 Overview of the Public Involvement Process ..............................................1 1.2 Description of the Public Involvement Process to Date ..............................2 2. Meeting Overview ..................................................................................................5 3. Comment Summary ...............................................................................................7 4. Future Steps ............................................................................................................9 4.1 Summary of Future Steps and Public Participation Opportunities ..............9 4.2 Contact Information .....................................................................................9 Table Page 3-1 Summary of Comments ...........................................................................................8 Appendix Draft EIS/EIR Public Involvement Materials Nimbus Hatchery Fish Passage Project EIS/EIR February 2011 Open House Summary Report i Acronyms Acronym Full Phrase CCAO Central California Area Office CCR California Code of Regulations CDFG California Department of Fish and Game CEQA California
    [Show full text]
  • Fish Passage at Dams Strategic Analysis
    Fish Passage at Dams Strategic Analysis Wisconsin Department of Natural Resources February 5, 2018 Nature-like Fishway at Thiensville Dam on Milwaukee River in Ozaukee County, WI Table of Contents Foreword ....................................................................................................................................................... 4 Executive Summary ....................................................................................................................................... 5 1 History of Fish Passage at Dams Policy in Wisconsin ............................................................................ 7 2 Regulatory Framework and Department Procedures and Guidelines ................................................ 11 3 Types of Fish Passage .......................................................................................................................... 19 3.1 Overview ..................................................................................................................................... 19 3.2 Upstream Fish Passage Technologies ......................................................................................... 19 3.2.1 Fishways (Passive) ............................................................................................................... 20 3.2.2 Fish Lifts and Locks (Active) ................................................................................................ 26 3.2.3 Collection and Transport (Active) ......................................................................................
    [Show full text]
  • 8 Chittenden Locks 47
    Seattle’s Aquatic Environments: Hiram M. Chittenden Locks Hiram M. Chittenden Locks The following write-up relies heavily on the Hiram M. Chittenden Locks/Salmon Bay Subarea Chapter by Fred Goetz in the Draft Reconnaissance Assessment – Habitat Factors that Contribute to the Decline of Salmonids by the Greater Lake Washington Technical Committee (2001). Overview The Hiram M. Chittenden Locks (Locks) were Operation of the navigational locks involves constructed by the U.S. Army Corps of Engineers raising or lowering the water level within either (the Corps) in 1916 and commissioned in 1917. the large or small lock chamber so that vessels may The Locks were built as a navigation project to pass between the two waterbodies. The filling and allow boats to travel from the marine waters of emptying of the large lock chamber is achieved by Puget Sound to the protected freshwaters of Lake use of a system of two large conduits that can Union and Lake Washington. The Locks are either fill the entire lock or half of the lock. This comprised of two navigational lock chambers: a is achieved by using a miter gate that divides the large lock that accommodates both large and small large lock chamber into two sections. Water is vessels and a small lock used by smaller vessels. In taken into the conduits via two culvert intakes addition to the lock chambers, the Locks include a located immediately upstream of the structure. dam, 6 spillway bays, and a fish ladder. Water is conveyed through each conduit and is The Locks form a dam at the outlet of the Lake discharged into the lock chamber through outlet Washington and Lake Union/Ship Canal system culverts on each side of the chamber.
    [Show full text]
  • The Efficiency of a Fish Ladder for Salmonid Upstream Migration in a Swedish Stream Potential Impact of a Hydropower Station on Connectivity and Recruitment
    The Efficiency of a Fish Ladder for Salmonid Upstream Migration in a Swedish Stream Potential Impact of a Hydropower Station on Connectivity and Recruitment Anton Larsson Degree project for Master of Science in Biology Animal Ecology, 30 hec, AT 2016 Department of Biological and Environmental Sciences University of Gothenburg Supervisors: Johan Höjesjö, Lars-Olof Ramnelid, Daniel Johansson Examiner: Charlotta Kvarnemo Abstract Assessments of the function of fish passages are typically rare, although the approach is frequently implemented to mitigate adverse effects of hydropower plants. In this study 249 electro fishing samples from 1979-2015, were used to assess the efficiency of a fish ladder to allow upstream migration of salmonids past a hydropower station in Örekilsälven, Sweden. Densities of brown trout (both young of the year, 0+, and older juveniles, >0+) did not increase in the area upstream the hydropower station after construction of the fish passage; neither did the densities of salmon 0+. >0+ salmon had a higher density upstream the hydropower station after completion of the fish ladder, however this is most likely explained by extensive fish translocations. 0+ salmon were only found in 5 % of the sampling occasions upstream the power station when translocations were removed, whereas 0+ brown trout were found in 44.3 %. No effect of discharge for ascension was found in the study. The efficiency of the passage was determined low and non-satisfactory for Atlantic salmon and brown trout, although the evaluation is more difficult for brown trout as a consequence of resident forms. Smolt models indicate that contemporary smolt escapement of both salmon and brown trout almost exclusively originate from the downstream areas.
    [Show full text]
  • Download Poster of AUBURN RAVINE FISH LADDER PROJECT Overview
    ENHANCING OUR REGIONAL ECOSYSTEM : AUBURN RAVINE FISH LADDER PROJECT nto s e uc m k ra e ttonwo c r o o a c d s Why Build a Fish Ladder ? Fish such as salmon and steelhead are anadromous, meaning they are born in freshwater streams and rivers, migrate downstream to the ocean where Plantings Fish they spend a few years maturing, then return to Sierra streams to spawn. Fish To improve ecosystem function and diversity, ladders are designed to provide migrating fish with support to pass around The fish in Auburn Ravine include Chinook native vegetation species were planted salmon (Oncorhynchus tshawytscha), a particular obstruction like this gauging station. The streambed in Auburn within the bed and along banks of the steelhead trout (Oncorhynchus mykiss), Ravine has gravel areas that make suitable spawning habitat for anadromous Auburn Ravine fish ladder. Site specific plants were chosen to promote Sacramento pikeminnow (Ptychocheilus salmonids like fall and late fall-run Chinook salmon and steelhead trout. grandis), Sacramento sucker natural nutrient filtration, water quality, By installing this fish ladder on Auburn Ravine, a partial barrier to upstream (Catostomus occidentalis), Lamprey WHEN DO sediment trapping functions, and s (Entosphenus tridentatus) and Speckled te habitats has been removed making it easier for salmon and steelhead to erosion and bank stabilization controls. Dace (Rhinichthys osculus). Salmon, elhead reach these upstream spawning areas. THE FISH RUN? These vegetation species include steelhead and lamprey all use Auburn native sedge and rush grasses, willow, l a Ravine for spawning while the remaining alder and cottonwood. This restored fish are year-round residents.
    [Show full text]
  • Wiswall Falls Fish Ladder Construction Multi-Media Center Maps Background: News in 2011-2012, the Fish Ladder at Wiswall Falls in Durham Was Constructed
    Home About Us Related Sites Parks Contact Us SEARCH Enter your request here... Join us! ABOUT THE RIVER EDUCATION & OUTREACH FOR FUN MULTI-MEDIA CENTER RECREATION Like the Packers Falls Bridge, the LRAC seeks to connect people to the river. Photo by Ecophotography MULTI-MEDIA CENTER > Slide Shows > Wiswall Falls Fish Ladder Wiswall Falls Fish Ladder Construction Multi-Media Center Maps Background: News In 2011-2012, the fish ladder at Wiswall Falls in Durham was constructed. This project began as a job to address Brochures safety issues with the Wiswall Dam. Dam work is expensive and complicated, but the Town of Durham saw an opportunity to repair the dam and construct a badly needed fish ladder at the same time under the same permitting Videos cycle. The Natural Resources Conservation Service (NRCS) provided a grant to fund about half of the $1.9 million Slide Shows price tag. Lamprey River Research Lamprey River Art The New Hampshire Department of Fish and Game was consulted and engineering plans were drawn up for the dam NH Legislature Tracking repair and fish ladder. The process was looking good and moving forward. Because Wiswall Falls is listed on the Register of Historic Places both in New Hampshire and federally, personnel from the NH Bureau of Historic Resources were invited to review the plans and do a site visit. This visit was when the original plan met its first major obstacle. The planned fish ladder would have permanently obscured and obliterated the historic sawmill foundation along the river. This was deemed unacceptable and the plan was rejected.
    [Show full text]
  • The Nimbus Fish Passage Project
    incorporating whitewater boating in: The Nimbus Fish Passage Project Alex Koutzoukis 2012 Senior Project Accepted and approved by: __________________ Heath Schenker Professor & Senior Project Advisor, Program of Landscape Architecture, University of California Davis __________________ Claire Napawan Associate Professor, Program of Landscape Architecture, University of California Davis __________________ Andrew Fulks, Committee Member Manager, Putah Creek Riparian Reserve, Office of Resource Management and Planning, University of California Davis __________________ Josh Galt, Committee Member River Director, Primal Quest Adventure Racing Abstract This project focuses on a half mile stretch of the Lower American River directly below Nimbus Dam in Rancho Cordova, California. It explores the possibility of incorporating recreational whitewater features in a river restoration project. Currently, the United States Bureau of Reclamation is obligated to make improvements to the fish collecting system at the Nimbus Fish Hatchery. As part of Alternative 1 in the Nimbus Fish Passage Environmental Impact Report, it is possible to construct recreational whitewater features with the removal of an old, damaged weir that spans the river. This project aims to evaluate the structures that are used in whitewater park design and how they can be conducive to salmonid spawning habitat. The design of the site includes the surrounding landscape which will serve to provide interpretive and educational opportunities for learning about salmonid species and the importance of protecting the American River Watershed. This project demonstrates how fish passage, stream restoration, and recreational whitewater boating can coexist for multiple benefits. INTRODUCTION About the Author I am fascinated with the interaction between humans and nature. Being an avid whitewater enthusiast, this project was a perfect platform to combine my interests in Landscape Architecture, Ecological Restoration, and Outdoor Recreation.
    [Show full text]
  • Appendix A: Fish
    Appendix A: Fish Alewife Alosa pseudoharengus Federal Listing State Listing SC Global Rank G5 State Rank S5 High Regional Status Photo by NHFG Justification (Reason for Concern in NH) Alewife numbers have declined significantly throughout their range. Commercial landings of river herring, a collective term for alewives and blueback herring, have declined by 93% since 1985 (ASMFC 2009). Dams severely limit accessible anadromous fish spawning habitat, and alewives must use fish ladders for access to most spawning habitat in New Hampshire during spring spawning runs. River herring are a key component of freshwater, estuarine, and marine food webs (Bigelow and Schroeder 1953). They are an important source of prey for many predators, and they contribute nutrients to freshwater ecosystems (Macavoy et al. 2000). Distribution The alewife is found in Atlantic coastal rivers from Newfoundland to North Carolina. It has been introduced into a number of inland waterbodies (Scott and Crossman 1973). In New Hampshire, alewives migrate into the Merrimack River and the seacoast drainages (Scarola 1987). Habitat Adult alewives migrate from the ocean into freshwater spawning habitats with slow moving water, including riverine oxbows, lakes, ponds, and mid‐river sites (Scott and Crossman 1973). Juveniles remain in freshwater until late summer and early fall when they migrate downstream into estuaries and eventually to the ocean. There is little information available on alewife movement and habitat use in the ocean. New Hampshire Wildlife Action Plan Appendix A Fish-21 Appendix A: Fish NH Wildlife Action Plan Habitats ● Large Warmwater Rivers ● Warmwater Lakes and Ponds ● Warmwater Rivers and Streams Distribution Map Current Species and Habitat Condition in New Hampshire Coastal Watersheds: Alewife populations in the coastal watersheds are generally stable or increasing in recent years at fish ladders where river herring and other diadromous species have been monitored since 1979.
    [Show full text]
  • Design for Fish Passage at Roadway-Stream Crossings: Synthesis Report
    U.S. Department Publication No. FHWA-HIF-07-033 of Transportation June 2007 Federal Highway Administration DESIGN FOR FISH PASSAGE AT ROADWAY-STREAM CROSSINGS: SYNTHESIS REPORT Federal Highway Administration Office of Infrastructure Research and Development Turner-Fairbank Highway Research Center 6300 Georgetown Pike McLean, Virginia 22101 Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. FHWA-HIF-07-033 June 2007 4. Title and Subtitle 5. Report Date June 2007 DESIGN FOR FISH PASSAGE AT ROADWAY-STREAM CROSSINGS: 6. Performing Organization Code SYNTHESIS REPORT 7. Author(s) Rollin H. Hotchkiss and Christopher M. Frei 8. Performing Organization Report No. 9. Performance Organization Name and Address 10. Work Unit No. (TRAIS) Washington State University Pullman, WA 11. Contract or Grant No. Brigham Young University Provo, UT 13. Type of Report and Period Covered 12. Sponsoring Agency and Address Final Report September 2004 – June 2007 Office of Infrastructure Research and Development Federal Highway Administration 14. Sponsoring Agency Code 6300 Georgetown Pike McLean, VA 22101 15. Supplementary Notes Contracting Officer’s Technical Representative: Bart Bergendahl 16. Abstract Cataloging and synthesizing existing methods for the design of roadway-stream crossings for fish passage began in January 2005 with an extensive literature review covering the topics of culvert design and assessment to facilitate fish passage. A survey was posted online to gather input from design professionals across the country, and a Culvert Summit Meeting was held in Denver Colorado from February 15-16, 2006, to allow presentation and discussion of state-of-practice design and assessment techniques. Following the Summit meeting, a Technical Advisory Committee was developed with individuals specifically knowledgeable in the topics of interest.
    [Show full text]