Grade a Logistics Space Available to Lease
Total Page:16
File Type:pdf, Size:1020Kb
Grade A logistics space available to lease Units from 5,000 sq m - 26,000 sq m www.iparkcopenhagen.com Flexible logistics space north of Copenhagen Verdion iPark Copenhagen is the Located in Allerød Kommune, the site is within 25 minutes of central Copenhagen as only zoned and developable land well as being close to Northern Zealand’s north of Copenhagen capable of pharmaceutical sector and other industries. delivering warehouse buildings New occupiers at Verdion iPark Copenhagen of over 5,000 sq m. will join DHL, which has taken a new 12,000 sq m state-of-the-art facility to support its contract with one of the world’s largest healthcare companies. The site is zoned for logistics and industrial use, and the infrastructure to support development is already in place. 26,000 sq m available for new logistics space adjacent to DHL’s facility in Allerød DHL’s facility at Verdion iPark Copenhagen Why Allerød? • Fast journey time (25 mins) to central Copenhagen UNEEG medical A / S • Good public transport connections Vassingerødvej and strong local workforce • Low tax and occupational costs • Nearby occupiers: DHL, Widex, Missionpharma, Cederroth, Gosh Farremosen Cosmetics, Fritz Hansen and Reconor Bus Stop DHL Project Highlights • 26,000 sq m of modern warehouse and ancillary office space • Unit sizes from 5,000 sq m • Located directly on Highway 16, Junction 11 Allerød S Nymøllevej • Road infrastructure, utilities and zoning in place • Highly specified energy efficient design as standard • Flexible building layout and specification options • Excellent value, flexible lease options available • Delivery in 8-12 months (depending on specification) 16 Hillerødmotorvejen N Aalborg Gothenburg E4 E20 Ljungby E45 Halmstad 25 Kalmar Sweden Holstebro E4 Herning Aarhus Karlskrona 15 E22 Excellent connections Helsingborg Kristianstad 18 13 Verdion iPark Copenhagen is located 19 E20 21 Denmark Copenhagen on Highway 16, just 13km north of the Fredericia Malmö Esbjerg city’s outer ring road and 26km from 11 Slagelse E65 its centre, offering fast and immediate Kolding E20Odense E20 road connections south, as well as to Næstved 9 Hillerød and Helsingør to the north. E45 Svendborg Flensburg Lolland Gdynia City Distance Travel Time (km) (minutes) Gdañsk 7 Gedser E28 Hillerød 13 14 Rendsburg E7 Koszalin Copenhagen (centre) 26 25 E47 Rostock Helsingør 33 29 23 20 11 E75 Copenhagen Airport 45 30 Lübeck Szczecinek 20 19 Gilleleje 20 Malmö 77 57 Germany E65 Bremerhaven Schwerin Poland Hamburg Neubrandenburg Swiecie Malmö Airport 97 1h 1 Emden Szczecin Tisvilde 111 13 Fredericia 228 2h 29 HELSINGBORG E6 Copenhagen Helsingør 109 Helsinge Gothenburg 264 3h 31 Liseleje 6 23 Hamburg 351 4h 40 110 Hundested Fredensborg 19 16 108 13 Hillerød Navigation Address: 11 E20 16 Rail Station Hillerød 19 Farremosen 4, 3450 Allerød 17 17 23 LANDSKRONA 110 17 E47 Port Frederikssund 108 E6 104 16 13 6 16 104 Klampenborg E22 53 Lyngby Copenhagen Gentofte 108 Ballerup Port 17 E47 11 6 13 53 04 03 Glostrup Copenhagen 21 E22 11 Taastrup Copenhagen 11 Roskilde 21 Airport Saltholm 16 E20 E20 Kastrup Lejre Malmö Dragør E20 108 13 14 E20 E6 Malmö Airport E65 E65 Borup E6 Køge 108 Masterplan N Warehouse and distribution facilities are Sta Parking Area 76no. spaces available on-site from 5,000 sq m upwards, Technical Disabled EV Oices Room with capacity for buildings up to 26,000 sq m. Cycles Level Access This masterplan shows one option for configuring Door the space but there is flexibility to tailor units Future Parking 8no. Dock further and accommodate alternative layouts to Levellers Unit 1 suit occupiers’ needs. Future Parking Level Access Base Building Specification Door 8no. Dock • 12m internal clear height Levellers Unit 2 Future Parking Lorry Parking Bays • 42m yard depth (from warehouse façade) • Up to 49,623 pallet positions (wide aisle racking) Oices Level • ESFR sprinkler system Access Door • 50 kN/sq m floor loading, 90 kN per leg footplate Infiltration / Retention Pond 8no. Dock Unit 3 Levellers • Floor flatness in accordance with DIN 18 202, Table 3, Line 4 Technical Room • 200 lux LED lighting in warehouse storage area, 250 lux LED in handling areas Future Parking Nymøllevej • Heating to 12ºC in warehouse, 21ºC in offices • Fitted offices and social areas provided • Highly energy efficient building design • Flexibility on dock positions, HGV and car parking numbers and arrangement Warehousing Unit Warehouse Office Technical Room Offices • Many further optional specification items sq m sq m sq m available on request Masterplan not to scale. For indicative purposes only. 1 8,334 334 189 2 8,275 – 332 3 8,334 180 Total 24,943 666 369 About Verdion Verdion is a real estate investor, developer, asset and Our excellent relationships with major e-tailers, retailers, 3PLs Since 2013 Verdion has created a €1.5 billion pan-European investment manager specialising in the industrial and and manufacturers is strengthened by a deep understanding of investment portfolio, most of which we continue to manage on logistics sector and operating across Europe. their requirements and a track record of delivery. behalf of our investor partners following completion, thereby maintaining our customer relationships for the long term. From Central London headquarters and offices in Düsseldorf, Verdion’s ability to execute is underpinned by market-leading Frankfurt and Malmö, we develop high specification facilities technical expertise, meaning that our team can deliver the most Verdion’s core values are founded on sustainable business for major retail, manufacturing and third-party logistics clients complex projects and most demanding requirements. practices, working with professionalism and respect for the and acquire strategic development land as well as existing environment and the needs of our occupiers, local communities built assets with potential for added value through technical and our long term investor partners. innovation and development expertise. iPort, Doncaster DHL, Copenhagen Verdion has developed and is It is served by a reach stacker operation and Verdion has developed two Grade A In 2018 we completed this second facility, successfully operating a major has capacity for 1,500 TEUs on-site. In its first logistics facilities near Copenhagen the first building to be developed at Verdion multimodal freight terminal in year alone iPort Rail took more than 22,520 for DHL. iPark Copenhagen. The 12,000 sq m Doncaster, northern England. long-distance HGVs off the roads, reducing state-of-the-art building was developed carbon and other noxious emissions while The first was completed in 2014 – over specifically to support DHL’s storage and Formally opened by HRH The Princess Royal in fulfilling customer supply chain requirements. 15,000 sq m on a 4-ha strategic site in Greve, distribution contract with one of the September 2018, iPort Rail is a central part of south of the city. world’s largest healthcare companies. our 324-ha state-of-the-art iPort logistics hub. In order to make the site a success, Verdion It was the first inland rail freight development worked in close cooperation with the town of to become open and operational in the UK for Doncaster, local municipalities, landowners over a decade and is now running successfully, and businesses, including Doncaster Sheffield with capacity for future growth. Airport. Bringing forward a €70m access road was an important part of the plans. Verdion first identified the potential of this site for a large-scale logistics development in the Construction started in 2014 with the first early 2000s. It was a strategic location at the warehouses completed in 2015. Since then heart of the UK, close to major road and rail Amazon, LIDL, CEVA, Fellowes, Kingsbury connections with a strong local workforce. Press and Maritime Transport have all taken space at the site and Verdion has received a iPort Rail now operates six services a day to number of awards for its work. ports across the country. The 30-acre terminal, which includes an 800m reception siding and €300m has been invested to date and is two 400m handling sidings, is designed to meet expected to exceed €600m by completion BMW, Malmö Channel Tunnel (SACTFF) approved secure during which time over 5,000 new jobs for local Verdion Logistics Park Malmö is located facility standards for international movements. people are expected to have been created. In its first Swedish project, Verdion developed a new 27,000 sq m Grade A just outside Malmö city on the edge of logistics facility for BMW at Verdion the town of Staffanstorp. Positioned at a Logistics Park Malmö. junction of Highway 11, the site has a direct connection to Malmö and Copenhagen, The €20 million new built-to-suit, Grade A as well as other European cities. logistics facility on an 8ha site is used to store and distribute car and motorcycle parts. John Clements 76 Cannon Street London EC4N 6AE United Kingdom T. +44 20 7193 9557 E. [email protected] For all enquiries and commercial terms subject to tenants’ requirements please contact: Jacob Widahl T. +45 4021 9575 E. [email protected] Helle Andersen T. +45 6115 4628 E. [email protected] Verdion for themselves and for the lessors of this property whose agents they are give notice that, (1) The particulars are set out as a general outline only for the guidance of the intending lessee and do not constitute, nor constitute part of, an offer or contract. (2) All descriptions, dimensions, or references to condition and necessary permissions for use and occupation, and other details are given in good faith and are believed to be correct, but any intending purchasers or tenants should not rely on them as statements or representations of facts but satisfy themselves by inspection or otherwise as to the correctness of them.