Ehlanzeni District Municipality

Total Page:16

File Type:pdf, Size:1020Kb

Ehlanzeni District Municipality INFRASTRUCTURE READINESS STUDY EHLANZENI DISTRICT MUNICIPALITY Project No. : EDM / 03 / 2011-12 Project Name : Sibange Regional Bulk Water Supply Scheme Date : April 2015 Prepared By: Prepared For: Lubisi Consulting Engineers Ehlanzeni District Municipality 20 Branders Street 8 van Niekerk Street P O Box 12393 PO Box 3333 Nelspruit Nelspruit 1200 1200 Tel: 013 752 6416 Tel: 013 759 8500 Fax: 013 752 6418 Fax: 013 755 8539 E-mail: [email protected] Contact: Mr C T Pagiwa Contact: Mr P Du Toit Sibange Bulk Water Scheme IRS Lubisi Consulting Engineers SIBANGE BULK WATER SUPPLY SCHEME AND FUTURE EXTENSIONS NKOMAZI LOCAL MUNICIPALITY INFRASTRUCTURE READINESS STUDY Approval Sibange Bulk Water Supply Scheme And Future Extensions - Infrastructure Title Readiness Study EDM Report No. EDM 03 / 2011-12 Consultant Lubisi Consulting Engineers Report Status Date April 2015 Study Team - Lubisi Consulting ........................................................................ ..................................................................... Mr C T Pagiwa Pr Eng Mr SP Tshuma Director Engineer Project Manager Study Leader Ehlanzeni District Municipality Team ........................................................................ ........................................................................ Adv M Mbatha Mr P Du Toit Municipal Manager Deputy Manager Water & Sanitation Ehlanzeni District Municipality Ehlanzeni District Municipality Executive Summary Sibange Bulk Water Scheme serves several villages of Nkomazi Local Municipality. The scheme is located in the South-East of the Ehlanzeni District Municipality (EDM). The supply area is predominantly rural with yard stand pipes and ventilation improved pit (VIP) toilets. Current and projected population of the study area is as presented below: Table 1: Executive Summary: Population Projection 2014 2017 2022 2027 2032 2037 Settlement Name Pop Pop Pop Pop Pop Pop Sibange 3 650 3 817 4 112 4 430 4 772 5 141 Sibange A 1 214 1 270 1 368 1 473 1 587 1 710 Madadeni 8 317 8 697 9 369 10 093 10 873 11 714 Sikhwahlane 3 709 3 879 4 178 4 501 4 849 5 224 Ntunda 5 478 5 728 6 171 6 648 7 162 7 715 Phakama 4 920 5 145 5 542 5 971 6 432 6 929 Mgobode 12 398 12 964 13 966 15 046 16 209 17 461 Magudu 4 920 5 145 5 542 5 971 6 432 6 929 Total 44 607 46 644 50 249 54 133 58 316 62 823 From the inception and scoping studies, indications are that the water demand in the study area has exceeded supply and existing system capacity. The study area receives its water from different schemes which are overloaded due to high demand. Calculated summer peak demand for 2017 is 8Ml/d and projected demand for 2037 is 11Ml/d. Existing Water Treatment facilities within the scheme area have a total capacity of 5.3Ml/d, which is less than the current calculated demand for the entire scheme. There is a need to increase water supply into the Sibange scheme so as to meet the demand and to stop the water rationing which is currently being implemented. Nkomazi Local Municipality is authorised to draw 5,820,800m3/a from the Komati River for the Masibekela WTW, this abstraction volume is as a result of combining the different licenses for areas covered by the Sibange Bulk Water Scheme. Nkomazi LM will have to apply for one license for the Sibange Bulk Water Scheme which will combine all available licences into a single one. Below is a summary of the projected water demand for the twenty year study period: Table 2: Executive Summary: Demand Projection Year Population AADD – Ml/d GAADD – Ml/d SPD – Ml/d 2017 46 731 4.39 5.56 8.34 2027 54 133 4.99 6.31 9.46 2037 62 940 5.89 7.45 11.18 The above allocation (5,820,800m3/a) allows for an abstraction of 15.95Ml/d. The allocation when compared with the Masibekela WTW's 2037 GAADD (14Ml/d) shows that the above licenses will be adequate for the proposed full development. However, there will be a need for Nkomazi Local Municipality to apply for one license which combines the available licenses into a single one. LCE is to assist Nkomazi Local Municipality with the application for combining the available licenses into one. Below is the phasing for the proposed works: i | P a g e Sibange Bulk Water Scheme IRS Lubisi Consulting Engineers Table 3: Executive Summary: Project Phasing Phase Description 1 - Construction of 7Ml/d WTW 2 - Construction of Pipelines and Booster Pump Stations 3 - Construction and Upgrade of Reservoirs 4 - Construction and Upgrade of Elevated Storage Tanks The preliminary designs were prepared encompassing the regional scheme concept and viability. This report covers the implementation readiness state of the project. Upgrading of the bulk water supply infrastructure consisting of Masibekela Water Treatment Works, bulk pipelines, pump-stations and storage reservoirs will be implemented in phases as presented above, over the 20 year period aligned to the projected demand patterns. The estimated cost for the entire project is R105 886 805, 18 (VAT Inclusive). Below is the “Implementation Readiness Study Check List” referenced for this report: ITEM CRITERIA REF 1 STRATEGIC & PLANNING ISSUES 1.1 In line with Water Service Development Plan and Integrated Development Plan? 1.1 1.2 In line with Provincial Growth & Development Strategy? 1.2 1.3 Are other parts of the water/sanitation supply chain in place 1.3 1.4 Strategic importance, delivery targets 1.4 1.5 Do all parties agree to the need and technical proposal 1.5 1.6 Level of service 1.6 1.7 Economic growth requirements 1.7 1.8 Water scarcity, etc. 1.8 1.9 Functional criticality of total scheme & specific components 1.9 1.10 Extent of cost 1.10 1.11 Available co-funding 1.11 2 SOCIAL CRITERIA 2.1 Number of households & people to be uplifted to basic & higher service levels 2.1 2.2 Number of poor households to be served & the social cost (capital & operation) 2.2 2.3 Number of jobs to be created (temporary & permanent, by gender & age category) 2.3 2.4 Affordability of proposed water tariffs ( per service level & community) 2.4 2.5 Contribution towards poverty eradication, social upliftment & health improvement 2.5 2.6 Number of associated services benefiting (e.g. schools, clinics, communal facilities) 2.6 Socio-political support for the proposed development options (per development 2.7 2.7 option) 3 ECONOMIC CRITERIA Number of current businesses & industries to be served(by type & water use 3.1 3.1 category) Expected economic value to be generated by the new businesses(GDP before & 3.2 3.2 after) as result of the project Number of SMMEs & BEE enterprises to benefit (by type & monetary value/benefit) 3.3 3.3 during project & as an indirect result of the project Regional economic benefit from the proposed water users and their value chain 3.4 integrated development objectives (socio-economic benefits, provincial growth & 3.4 development objectives, IDPs & associated sector programmes like housing) 4 TECHNICAL CRITERIA 4.1 Is the project part of a Master Plan proposal 4.1 4.2 Appropriateness and acceptability of solution 4.2 Appropriate water resource choice & adequate water allocation (confirmed/approved 4.3 4.3 by DWS, WRM re choice, water license – volume, assurance & quality) Compliance to water demand / water conservation objectives (acceptable water 4.4 losses and appropriate plans to reduce/control water demand). Is a WDM/WC 4.4 strategy/Plan in place? Optimal choice of bulk distribution networks (pipeline routes, pump stations and bulk 4.5 storage) Considering full life-cycle cost(capital, financing, operating & maintenance 4.5 cost) 4.6 Proof of best suited technology (pro’s and con’s per option) 4.6 iii | P a g e Sibange Bulk Water Scheme IRS Lubisi Consulting Engineers 5 INSTITUTIONAL CRITERIA 5.1 Indicate who will own the infrastructure 5.1 5.2 Confidence in the capacity of the institution to implement 5.2 5.3 Agreements on the infrastructure ownership (per scheme component) 5.3 5.4 Agreement on implementation responsibility (per scheme component) 5.4 5.5 Proof implementation capacity (e.g. capital expenditure over last 3years) 5.5 5.6 History on past implementation quality & performance (e.g. functionality audits) 5.6 5.7 Agreement on operating responsibilities (per scheme component) 5.7 5.8 Proof adequate staff numbers & skills levels (per scheme component) 5.8 5.9 History on water services interruptions (annual interruptions in household-days) 5.9 5.10 Commitments of above Institutional leadership (e.g. Municipal Mayor and Council 5.10 5.11 Cooperation agreements between key Stakeholders 5.11 5.12 Approval of Institutional arrangements 5.12 5.13 Cost recovery system (including policy on free basic water and non-payment) 5.13 5.14 Water Conservation and Demand performance by institution 5.14 5.15 Responsibilities and Accountability 5.15 6 FINANCIAL CRITERIA 6.1 Available funding (grant, loan & investment) 6.1 6.2 Funding conditions (repayment period, interest) 6.2 6.3 Financial analysis of cost projections (cash flows) 6.3 6.4 Financial modelling of projected income taking into account affordability 6.4 6.5 Proposed tariff adjustments to reconcile cost and projected income 6.5 6.6 Financial viability and expected return on investment over expected useful life 6.6 Financial status, performance and creditworthiness of municipality and implementing 6.7 6.7 agents 7 LEGAL CRITERIA 7.1 Has a water license with adequate allocation for all uses been approved 7.1 Has an environment authorization been granted for the construction of the scheme 7.2 (based on accepted environmental impact assessment and public participation 7.2 process) Have all land and property rights issues been addressed (land acquisition and 7.3 7.3 servitudes) 8 SUSTAINABILITY CRITERIA: 8.1 Financial viability 8.1 8.2 Operating and management capacity, performance & commitment 8.2 8.3 Environmental and social acceptability and impact 8.3 Page | iv Contents Overview........................................................................................................................................................................
Recommended publications
  • The Financial Sustainability and Socio-Economic Contribution of Small-Scale Sugar-Cane Growers in Mpumalanga Province
    The financial sustainability and socio-economic contribution of small-scale sugar-cane growers in Mpumalanga Province by RIEKIE CLOETE Submitted in partial fulfilment of the requirements for the degree of MCom (Agricultural Economics) in the Department of Agricultural Economics, Extension and Rural Development Faculty of Economic and Management Sciences University of Pretoria Pretoria May 2013 © University of Pretoria DECLARATION I, Riekie Cloete, declare that the dissertation, which I hereby submit for the degree MCom (Agricultural Economics) at the University of Pretoria, is my own work and has not previously been submitted by me for a degree at this or any other tertiary institution. SIGNATURE: RIEKIE CLOETE DATE: 18 MAY 2013 ii ACKNOWLEDGEMENTS This study would not have been possible without the contribution of many people and institutions. A particular word of thanks goes to my study leader, Prof Johann Kirsten, for prompt and knowledgeable assistance. I really appreciate his guidance and patience. Dr Ferdinand Meyer gave valuable guidance during the initial stages of the study. Thank you to Dr Stuart Ferrer and Mr Tshepo Pilusa (SA Canegrowers) in assisting with data where possible. Also, to Mr Justin Murray (Mpumalanga Canegrowers), Mr Roger Armitage (Akwandze Agricultural Finance), Mr Martin Slabbert (Tsb Sugar-cane Supply), Mr Herman le Roux (Tsb Sugar-cane Control) and Mr Stephan Schoeman (Agriwiz). A special word of thanks must be given to Mrs Florence Mavimbela of Tsb Sugar Extension Services and also to Mr Johan Cronje, a contractor who was willing to offer me an insight into the daily challenges of the SSGs. This study could not have been completed without his help.
    [Show full text]
  • Ehlanzeni District Municipality 2016/17
    The best performing district of the 21st century EHLANZENI DISTRICT MUNICIPALITY FINAL IDP AND BUDGET REVIEW 2016/17 1 The best performing district of the 21st century Contents EHLANZENI STRATEGIC DIRECTION FOR 2012-16 .................................................................................................................. 11 VISION ....................................................................................................................................................................................................... 11 MISSION .................................................................................................................................................................................................... 11 CORE VALUES ........................................................................................................................................................................................ 11 DISTRICT STRATEGIC GOALS ......................................................................................................................................................... 11 Chapter 1 ....................................................................................................................................................................................................... 15 INTRODUCTION .................................................................................................................................................................................... 15 1.1 EXECUTIVE
    [Show full text]
  • A Farm Survey of Small-Scale Sugarcane Growers in Nkomazi, Mpumalanga Province, South Africa
    Global A farm survey of Development small-scale Institute sugarcane growers in Nkomazi, Working Paper Series Mpumalanga 2017-018 province, South December 2017 Africa 1 Philip Woodhouse 1 Professor of Environment and Development, Global Development Institute, The University of Manchester, United Kingdom. Email: [email protected] Paul James2 2 Global Development Institute, The University of Manchester, United Kingdom. ISBN: 978-1-909336-41-4 Cite this paper as: Woodhouse, Phil and James, Paul (2017). A farm survey of small-scale sugarcane growers in Nkomazi, Mpumalanga province, South Africa. GDI Working Paper 2017- 018. Manchester: The University of Manchester. www.gdi.manchester.ac.uk This paper is part of a research project “Farm scale and viability: an assessment of black economic empowerment in sugar production in Mpumalanga Province, South Africa”, funded by the UK government ESRC-DFID Joint Programme on Poverty Alleviation. Grant no. ES/1034242/1 Abstract Against a context of declining sugar output in South Africa as a whole, the sugar industry in the Nkomazi Municipality of Mpumalanga Province has increased its share of the South African market. It has achieved this despite the transfer of at least 25 per cent of land growing sugarcane into black community ownership through South Africa’s land reform programme. The industry now claims that the majority of land used for sugar cane in Nkomazi is owned by the beneficiaries of land reform. This paper describes a survey of small-scale sugar-cane growers. It presents quantitative data that shows, on the one hand, a process of land concentration and ‘accumulation from below’, visible in the emergence of medium-scale growers, and, on the other hand, a move by the sugar milling company to take more direct control of sugarcane growing through rental agreements with small-scale land-owners.
    [Show full text]
  • Mpumalanga No Fee Schools 2017
    MPUMALANGA NO FEE SCHOOLS 2017 NATIONAL NAME OF SCHOOL SCHOOL PHASE ADDRESS OF SCHOOL EDUCATION DISTRICT QUINTILE LEARNER EMIS 2017 NUMBERS NUMBER 2017 800035522 ACORN - OAKS COMPREHENSIVE HIGH SCHOOL Secondary BOHLABELA 1 476 800034879 ALFRED MATSHINE COMMERCIAL SCHOOL Secondary STAND 7B CASTEEL TRUST BUSHBUCKRIDGE BOHLABELA 1 673 800030445 AMADLELO ALUHLAZA SECONDARY SCHOOL Secondary PHILA MYENI AVENUE ETHANDAKUKHANYA PIET RETIEF GERT SIBANDE 1 1386 800005058 AMALUMGELO PRIMARY SCHOOL Primary DWARS IN DIE WEG MORGENZON GERT SIBANDE 1 9 800000158 AMANZAMAHLE PRIMARY SCHOOL Primary PO BOX 1822 ERMELO ERMELO GERT SIBANDE 1 66 800000166 AMANZI PRIMARY SCHOOL Primary VYGEBOOM DAM BADPLAAS BADPLAAS GERT SIBANDE 1 104 800035381 AMON NKOSI PRIMARY SCHOOL Primary STAND NO. 6099 EXTENTION 12 BARBERTON EHLANZENI 1 727 800000240 ANDISA PRIMARY SCHOOL Primary STAND NO 3050 MABUYENI SIYABUSWA NKANGALA 1 286 800034906 ANDOVER PRIMARY SCHOOL Primary OKKERNOOTBOOM TRUST ACORNHOEK ACORNHOEK BOHLABELA 1 259 800034851 APLOS CHILOANE PRIMARY SCHOOL Primary KAZITHA TRUST ARTHURSEAT ACORNHOEK BOHLABELA 1 325 VLAKVARKFONTEIN 800000307 ARBOR PRIMARY SCHOOL Primary ARBOR DELMAS NKANGALA 1 351 FARM 800034852 ARTHURSEAT PRIMARY SCHOOL Primary ARTHURSEAT I ACORNHOEK ACORNHOEK BOHLABELA 1 236 800000406 BAADJIESBULT PRIMARY SCHOOL Combined APPELDOORN FARM CAROLINA CAROLINA GERT SIBANDE 1 184 800035179 BABATI PRIMARY SCHOOL Primary JUSTICIA TRUST JUSTICIA TRUST XIMHUNGWE BOHLABELA 1 500 800034907 BABINATAU SENIOR SECONDARY SCHOOL Secondary DINGLEDALE "B" ACORNHOEK
    [Show full text]
  • IDP 2020-2021 First Draft
    NKOMAZI LOCAL MUNICIPALITY DRAFT INTEGRATED DEVELOPMENT PLAN (2017-2021) REVIEW 2020/2021 1 TABLE OF CONTENTS Acronyms ................................................................................................................................ 9 Glossary ................................................................................................................................ 10 Message From The Executive Mayor ................................................................................... 11 Municipal Overview - Municipal Manager .......................................................................... 12 Legislations Underpinning Idp In South Africa .................................................................... 13 1.1. Development Principles For The For Planning, Drafting, Adopting And Review Of IDP 13 1.1.1. Section 26 Core Components Of The IDP .............................................................. 14 1.2. Municipal Background ............................................................................................... 16 1.2.1. Municipal Wards And Traditional Authority ......................................................... 17 1.3. How was the Plan developed? .................................................................................... 21 1.4. Communication Plan for Public Participation ............................................................ 21 1.4.1. Below is an advert placed on the advert ................................................................. 23 1.4.2. Other activities that
    [Show full text]
  • A Smallgrower's Challenge to 'Emerge'
    A Smallgrower’s Challenge to ‘Emerge’ Exploring the diversity of evapotranspiration, biomass, yield production and crop water productivity of sugar cane in the Lower Komati sub-catchment, South Africa M.Sc. Thesis by G.M. ten Napel March 2009 Irrigation and Water Engineering Group A Smallgrower’s Challenge to ‘Emerge’ Exploring the diversity of evapotranspiration, biomass, yield production and crop water productivity of sugar cane in the Lower Komati sub-catchment, South Africa Master thesis Irrigation and Water Engineering submitted in partial fulfillment of the degree of Master of Science in International Land and Water Management at Wageningen University, the Netherlands G.M. ten Napel March 2009 Supervisors: Dr. Ir. Flip Wester Dr. Ir. Richard Soppe Dr. Ir. Gerardo van Halsema Irrigation and Water Engineering Group WaterWatch Centre for Water and Climate Remote Sensing Services Wageningen University Wageningen The Netherlands The Netherlands http://www.iwe.wur.nl http://www.waterwatch.nl ABSTRACT The Inkomati catchment is one of 19 Water Management Areas (WMAs) in South Africa bordering Mozambique and Swaziland. Within the Inkomati WMA, the Lower Komati sub- catchment is an area of intensive sugarcane farming. Historically, the area was reserved for large scale ‘white’ commercial farming, but since Apartheid came to an end in 1994, the South African government is aiming to redress the racial and gender inequities of the past. In 1994, the Nkomazi Irrigation Expansion Programme (NIEP) was started with the objective to promote economic development for the ‘black’ people in the area. 9,800ha of previously under utilized land was transformed into 1500 irrigated sugarcane farming ventures.
    [Show full text]
  • Table of Content
    TABLE OF CONTENT Page 002 WELCOME NOTE Page 005 ORAL PROGRAMME Page 013 INVITED PLENARY SPEAKER BIOGRAPHIES & ABSTRACTS Page 038 ORAL ABSTRACTS Page 088 POSTER LIST Page 093 POSTER ABSTRACTS Page 158 LIST OF CONFERENCE PARTICIPANTS Page 166 CONFERENCE SPONSORS Page 168 CONFERENCE RELATED FUNCTIONS Page 1 of 170 WELCOME NOTE Page 2 of 170 Dear Delegate As the Director of the University of Pretoria Institute for Sustainable Malaria Control (UP ISMC), one of the South African Medical Research Council (MRC) Collaborating Centres for Malaria Research, I would like to personally welcome each of you to the 2nd South African Malaria Research Conference, 2016. The conference follows on the successful, first conference hosted by the MRC in Durban in 2015. This second national gathering of the malaria community will again provide researchers the opportunity to showcase novel findings, innovation, ground breaking research and ongoing collaborative efforts towards malaria elimination. With malaria elimination a foreseeable possibility in South Africa an urgent need exists for fundamental- and applied research and surveillance in malaria endemic areas to eliminate the disease through the use of an integrated management approach, including safer and sustainable alternative malaria control methods. A major hindrance in realising the goal of elimination in South Africa is the cross-border impact of malaria from our neighbouring countries. We are therefore very excited to welcome delegates from our neighbouring and other SADC countries as well as international guests doing research in these countries. The conference will be co-hosted by the UP ISMC and the MRC Office of Malaria Research (MOMR). Over the three day-long conference scheduled from 31 July to 2 August 2016 you can look forward to 61 oral presentations, of which 12 are plenary presentations, and 67 posters focusing on all facets of malaria.
    [Show full text]
  • Proposed Development of a Timeshare Resort Located on Portion 101 Tenbosch Near the Crocodile River, Mpumalanga Province
    Draft Basic Assessment Report Proposed Development Of A Timeshare Resort Located On Portion 101 Tenbosch Near The Crocodile River, Mpumalanga Province Prepared by: Contents Acronyms and abbreviations .................................................................................................................. iv GLOSSARY OF TERMS .......................................................................................................................... iv SECTION A: ACTIVITY INFORMATION .................................................................................................... 1 1. PROJECT DESCRIPTION ............................................................................................................ 1 2. FEASIBLE AND REASONABLE ALTERNATIVES ......................................................................... 2 3. SITE ACCESS............................................................................................................................. 5 4. LOCALITY MAP .......................................................................................................................... 5 5. LAYOUT/ ROUTE PLAN .............................................................................................................. 6 6. SENSITIVITY MAP ...................................................................................................................... 6 7. SITE PHOTOGRAPHS ................................................................................................................. 6 8. FACILITY ILLUSTRATION
    [Show full text]
  • Gert Sibande District
    SEPTEMBER 2018 OPEN VACANCY LIST: PROMOTIONAL EDUCATOR - AND SUPPORT POSTS IN SCHOOLS Note: Principal posts - All enquiries should be referred to the relevant Circuit Manager as indicated. GERT SIBANDE DISTRICT AMSTERDAM CIRCUIT DRIEPAN PRIMARY SCHOOL (200405) ISIZULU / ENGLISH MEDIUM ISWEPE AREA AMSTERDAM CIRCUIT, TEL: 017 801 5291/93/95 POST(S): POST REF: 62032-0001 DEPARTMENTAL HEAD: FOUNDATION PHASE SUBJECTS (1) LAERSKOOL AMSTERDAM (200413) AFRIKAANS / ENGLISH MEDIUM AMSTERDAM AREA, TEL: 0178469323 AMSTERDAM CIRCUIT, TEL: 017 801 5291/93/95 POST(S): POST REF: 62064-0002 PRINCIPAL P2: MANAGEMENT AND ADMINISTRATION (1) SIYEZA PRIMARY SCHOOL (200423) ISIZULU / ENGLISH MEDIUM ISWEPE AREA AMSTERDAM CIRCUIT, TEL: 017 801 5291/93/95 POST(S): POST REF: 70106-0003 ADMIN CLERK (1) SWELIHLE PRIMARY SCHOOL (200425) ISIZULU / ENGLISH MEDIUM SHEEPMOOR AREA AMSTERDAM CIRCUIT, TEL: 017 801 5291/93/95 POST(S): POST REF: 62064-0004 PRINCIPAL P2: MANAGEMENT AND ADMINISTRATION (1) POST REF: 70106-0005 ADMIN CLERK (1) UMLAMBO PRIMARY SCHOOL (200429) ISIZULU / ENGLISH MEDIUM AMSTERDAM AREA AMSTERDAM CIRCUIT, TEL: 017 801 5291/93/95 POST(S): POST REF: 62032-0006 DEPARTMENTAL HEAD: FOUNDATION PHASE SUBJECTS (1) BUHLEBUYEZA PRIMARY SCHOOL (200442) ISIZULU / ENGLISH MEDIUM AMSTERDAM AREA AMSTERDAM CIRCUIT, TEL: 017 801 5291/93/95 POST(S): POST REF: 62032-0007 DEPARTMENTAL HEAD: FOUNDATION PHASE SUBJECTS (1) NGANANA SECONDARY SCHOOL (200435) ENGLISH MEDIUM AMSTERDAM AREA, TEL: 0178469506 AMSTERDAM CIRCUIT, TEL: 017 801 5291/93/95 POST(S): POST REF: 62124-0008
    [Show full text]
  • Provincial Gazette Provinsiale Koerant EXTRAORDINARY • BUITENGEWOON
    THE PROVINCE OF MPUMALANGA DIE PROVINSIE MPUMALANGA Provincial Gazette Provinsiale Koerant EXTRAORDINARY • BUITENGEWOON (Registered as a newspaper) • (As ’n nuusblad geregistreer) NELSPRUIT Vol: 28 13 August 2021 No: 3288 13 Augustus 2021 N.B. The Government Printing Works will ISSN 1682-4512 not be held responsible for the quality of 03288 “Hard Copies” or “Electronic Files” submitted for publication purposes 9 771682 451008 2 No. 3288 PROVINCIAL GAZETTE, EXTRAORDINARY 13 AUGUST 2021 IMPORTANT NOTICE: THE GOVERNMENT PRINTING WORKS WILL NOT BE HELD RESPONSIBLE FOR ANY ERRORS THAT MIGHT OCCUR DUE TO THE SUBMISSION OF INCOMPLETE / INCORRECT / ILLEGIBLE COPY. NO FUTURE QUERIES WILL BE HANDLED IN CONNECTION WITH THE ABOVE. CONTENTS Page No. No. GENERAL NOTICES 45 Mpumalanga Liquor Licensing Act, 2006 (Act No. 5 of 2006) : Notice of applications for liquor licences in terms of section 35: . 3 EHLANZENI .......................................................................................................................................................................... 3 GERT SIBANDE .................................................................................................................................................................... 12 NKANGALA ........................................................................................................................................................................... 14 46 Mpumalanga Liquor Licensing Act, 2006 (Act No. 5 of 2006) : Notice of applications for transfer of liquor licences
    [Show full text]
  • Nkomazi Local Municipality Final Integrated Development Plan (2017-2021)
    NKOMAZI LOCAL MUNICIPALITY FINAL INTEGRATED DEVELOPMENT PLAN (2017-2021) REVIEW 2020/2021 4TH REVIEW 1 TABLFE OF CONTENTS Acronyms ................................................................................................................................ 9 Glossary ................................................................................................................................ 10 Message From The Executive Mayor ................................................................................... 11 Municipal Overview - Municipal Manager .......................................................................... 12 Legislations Underpinning IDP In South Africa .................................................................. 13 1.1. Development Principles For The For Planning, Drafting, Adopting And Review Of IDP 18 1.1.1. Section 26 Core Components Of The IDP .............................................................. 18 1.2. WHO ARE WE? Municipal Background ................................................................... 20 1.2.1. Municipal Wards And Traditional Authority ......................................................... 22 1.3. How was the Plan developed? .................................................................................... 26 1.4. Communication Plan for Public Participation ............................................................ 26 1.4.1. Below is an advert placed on the Municipal website .............................................. 28 1.4.2. Other activities that followed .................................................................................
    [Show full text]
  • Influence of Environmental Characteristics on the Habitat of and Behavioural
    Influence of environmental characteristics on the habitat of and behavioural interactions between Anopheles species in South Africa Craig Davies A dissertation submitted to the Faculty of Health Sciences, University of the Witwatersrand, South Africa in fulfilment of the requirements for the degree of Master of Science. 2016 i DECLARATION I declare that this Dissertation is my own, unaided work. It is being submitted for the Degree of Master of Science (MSc Med) at the University of the Witwatersrand, Johannesburg. It has not been submitted before for any degree or examination at any other University. _______________________________________ (Signature of candidate) ____________________day of _______________________20________________ ii Publications and presentations/ conferences arising from this study Publications Davies, C., Coetzee, M. and Lyons, C.L. (2016). Characteristics of larval breeding sites and insecticide resistance in the Anopheles gambiae complex in Mpumalanga, South Africa. African Entomology, 24(2) (In Press). Davies, C., Coetzee, M. and Lyons, C.L. (2016). Competitive behaviour and response of Anopheles arabiensis and An. quadriannulatus under different temperature treatments. Parasites and Vectors, (In Review). iii Poster presentations/ Conferences attended Davies, C., Coetzee, M. and Lyons, C.L. 2014. Insecticide resistance in the Anopheles gambiae complex from the Lowveld region of the eastern Mpumalanga Province. University of the Witwatersrand, Faculty of Health Sciences Research Day, Johannesburg, South Africa. Davies, C., Coetzee, M. and Lyons, C.L. 2015. Insecticide resistance in the Anopheles gambiae complex from the Lowveld region of the eastern Mpumalanga Province. 2nd Annual Pan-African Mosquito Control Association Conference, Dar es Salaam, Tanzania. iv ABSTRACT This project explored the ecological conditions of aquatic breeding sites of Anopheles gambiae sensu lato immatures in the Lowveld region of eastern Mpumalanga Province, South Africa.
    [Show full text]