List of Premises Where Lifts Are Erected (January 2013 to December 2013)

Total Page:16

File Type:pdf, Size:1020Kb

List of Premises Where Lifts Are Erected (January 2013 to December 2013) List of Premises Where Lifts are Erected (January 2013 to December 2013) Nos. of Registration Sr. No. Name and Address of Premises Type of Lift Lifts No. M/s Unitech Reality & Projects Ltd. At Infospace, GO 4671- SEZ, Sector-21, Vill. Dundahera, GGN 4672/L-13 & 4676-4677 & 4823-4824 & 1 15 PASSENGER 4878-4880 & 5019-5021 & 5048-5049 & 5641 M/s Unitech Reality & Projects Ltd. At Infopark-II 4673-4674 & SEZ, Sector-48, GGN 4779-4780 & 4872-4873 & 5022-5023 & 2 18 5075-5076 & PASSENGER 5464-5465 & 5511-5512 & 5542-5543 & 5643 & 5782 M/s Prerna CGHS Ltd. Plot No. GH-22, Sector-02, 3 HSIIDC, Bawal 1 4675 PASSENGER M/s Omaxe Construction Ltd. At Omaxe City 4 Centre Mall , Sohna Road, GGN 6 4678-7683 (E) PASSENGER M/s Omaxe Construction Ltd. At Omaxe Palza 4684-4691 PASSENGER 5 (Omax Gurgaon Mall), Sohna Road, GGN 8 (L-2, E-6) M/s Volkswagen Group Sale Pvt. Ltd. Vill. 6 Sultanpur, F/Nagar, GGN 1 4692 PASSENGER M/s Gutermaan India Pvt. Ltd., Sector-06, Indl. 7 Growth Centre Bawal, Rewari 1 4693 PASSENGER M/s Pioneer Urban Land & Infrastructure Ltd. At 8 Commercial Building, Sector-62, GGN 4 4694-4697 PASSENGER M/s Ucal Fuel System Ltd., Bawal, Rewari 9 2 4698-4699 PASSENGER M/s Dwarkadhish Projects Pvt. Ltd. At Aravali 4700-4705 & 4874-4877 & Height, Sector-24, Dharuhera, Rewari PASSENGER 10 24 5224-5233 & 5396-5399 M/s EDPL Comm. Integrated, N.H-8, IMT Manesar, 11 GGN 8 4706-4713 PASSENGER M/s Clarion Properties Ltd. At The Legend, Sector- 4714-4720 & PASSENGER 12 57, GGN 10 5209-5211 M/s ALPS Hotel Pvt. Ltd., Sector-29, GGN 13 4 4721-4724 PASSENGER M/s Capital Clubs Pvt. Ltd. At Chancellor Club, 14 Palam Vihar, GGN 1 4725 PASSENGER M/s Orient Bestech Business Tower, Sector-34, 15 GGN 1 4726 PASSENGER M/s Ameya Commercial Project Pvt. Ltd. At The 16 Spire One Project, Sector-42, GGN 1 4727 PASSENGER M/s Hero Moto Corp. Ltd. Delhi-Jaipur Highway, 17 Dharuhera 1 4728 PASSENGER M/s Ajay Sahany, S-13/25, Phase-III, DLF City, 18 GGN 1 4729 PASSENGER M/s Subhash Chawla, L-27/18, Phase-I, DLF City, 19 GGN 1 4730 PASSENGER M/s ASF Insignia SEZ Pvt. Ltd. Vill. Gwal Pahari, 20 GGN 1 4731 PASSENGER M/s Passar Bharti, Sector-44, GGN 21 1 4732 PASSENGER M/s Grand Collection Pvt. Ltd. Sector-07, IMT 22 Manesar, GGN 1 4733 PASSENGER M/s Lab India Instrument Pvt. Ltd. Phase-II, Udyog 23 Vihar, GGN 1 4734 PASSENGER M/s N. C Data System Pvt. Ltd., Sector-44, GGN 24 1 4735 PASSENGER M/s New Wave Buildcon Pvt. Ltd., Sector-44, GGN 25 1 4736 PASSENGER M/s Manoj Bhardwaj, 1885, Sector-04, GGN 26 1 4737 PASSENGER M/s Saluja Const. Pvt. Ltd., At The Verandas, 4738-4739 & PASSENGER 27 Sector-54, GGN 4 5027-5028 M/s Sandeep Lahiya, A-539, Sushant Lok-B, GGN 28 1 4740 PASSENGER M/s Excelsior American School, Sushant Lok-I, 29 GGN 1 4741 PASSENGER M/s Arvind Kumar Jain, D-12/24, Phase-V, DLF 30 City, GGN 1 4742 PASSENGER M/s Mahindra Life Space Developers Ltd., 31 Residential Colony “AURA”, Sector-110 A, GGN 6 4743-4748 PASSENGER M/s VSR Infrastructure Pvt. Ltd., Sector-44, GGN 32 3 4749-4751 PASSENGER M/s Fortune IT Park Pvt. Ltd. Phase-V, Udyog 33 Vihar, GGN 1 4752 PASSENGER M/s Bestech India Pvt. Ltd., At City Centre Mall, 34 Sector-05, Dharuhera 2 4753-4754 PASSENGER M/s Sofed Retailer Pvt. Ltd.At Cyber Walk, Sector- 4755-4757 & 4763 & 5260- 35 08, IMT Manesar, GGN 11 PASSENGER 5263 & 5514- 5516 M/s Neel Metal Products Ltd., Sector-44, GGN 36 1 4758 PASSENGER M/s Sweta Estate Pvt. Ltd. At Central Park-II, 4759-4762 & Sector-48, GGN 5093 & 5247 & 5323-5324 & 37 17 5486-5487 & PASSENGER 5583-5584 & 5653-5655 & 5737, 5763 M/s Archana Gera, 3906, Phase-IV, DLF City, 38 GGN 1 4764 PASSENGER M/s Sanjiv Bisla, 11, Friends Colony, GGN 39 1 4765 PASSENGER M/s Rapid Metro Rail Project, Phase-III, DLF City, 4766/L & 40 GGN 11 4882-4889/E & PASSENGER 5369-5370/L M/s Gupta Developers At Sun City Trade Tower, 41 Old Delhi-Gurgaon Road, GGN 3 4767-4769 PASSENGER M/s Dynamic Fashion Pvt. Ltd., Sector-18, GGN 42 1 4770 PASSENGER M/s Vinod Dewan, 46, Malibu Town, GGN 43 1 4771 PASSENGER M/s Shri Ram, 1468, Palam Vihar, GGN 44 1 4772 PASSENGER M/s Knaup Management Service Pvt. Ltd., Sector- GOODS/PASS 4773-4775 45 32, GGN 3 ENGER M/s Gaurav Deewan, C-177 A, Sushant Lok-I, GGN 46 1 4776 PASSENGER M/s L & T Ltd. At M3M, Golf Estate Project, Sector- 4777-4778 & PASSENGER 47 65, GGN 3 5556 M/s Bestech India Pvt. Ltd. At Park View SPA, 4781-4782 & 4870-4871 & 48 Sector-47, GGN 7 PASSENGER 5483 & 5544- 5545 M/s Shiv Shankar CGHS Ltd., P.No. GH-06, Sector- 49 51, GGN 1 4783 PASSENGER M/s Suman Sarees, Sadar Bazar, GGN 50 1 4784 PASSENGER M/s Hamdard Laboratories India Ltd. Sector-07, 51 IMT Manesar, GGN 2 4785-4786 PASSENGER M/s Nestle R & D Centre India Ltd. Sector-08, IMT 52 Manesar, GGN 2 4787-4788 PASSENGER M/s The Abhinav CGHS Ltd., GH-04, Sector-09, 53 GGN 2 4789-4790 PASSENGER M/s Sant Ram Sharma, 570, Civil Lines, GGN 54 1 4791 PASSENGER M/s Parveen Kumar Gupta, 138-P, 139-P, Sector-31- 55 32A, GGN 1 4792 PASSENGER M/s MGF Developer Ltd. At The Villa, Akashmeen 4793-4800 & PASSENGER 56 Mark, DLF City-I, GGN 14 5087-5092 M/s Trehan Promoters & Builders Pvt. Ltd., At IRIS 57 Tech Park, Sector-48, Sohna Road, GGN 1 4801 PASSENGER M/s A.N Buildwell Pvt. Ltd.. At Spire Edge, Sector- 58 08, IMT Manesar, GGN 11 4802-4812 PASSENGER M/s Neo Milk Products Pvt. Ltd., 292, Sector-06, 59 IMT Manesar, GGN 1 4813 PASSENGER M/s PAN Intellecom Ltd., 569, Phase-V, Udyog 60 Vihar, GGN 1 4814 PASSENGER M/s Conran Estate Pvt. Ltd., B2/7, Phase-I, DLF 61 1 4815 PASSENGER City, GGN M/s DLF Ltd., At Belvedere Park Tower, 62 6 4816-4821 PASSENGER Phase-II, DLF City, GGN 63 M/s Lumax Ancillary Ltd., Sec-18, GGN 1 4822 PASSENGER 4825-4826 & 4925-4926 & 64 M/s Vipul Ltd., At Vipul Garden, Dharuhera 10 5077-5078 & PASSENGER 5373-7374 & 5646-5647 M/s Bharti Reality Pvt. Ltd. At Cyberium, IMT 4827 & 4929- 65 12 PASSENGER Manesar, GGN 2938 66 M/s Narkanda CGHS Ltd., Sec-31, GGN 2 4828-4829 PASSENGER 67 M/s Roop Ram Educare Pvt. Ltd., Sector-53, GGN 2 4830-4831 PASSENGER M/s ASK Automotives, Plot No. 28, Sector-04, IMT 68 1 4832 FRIGHT Manesar, GGN M/s North Star Apartment Pvt. Ltd. At The Hibiscus 4833-4838 & 69 12 5118-5121 & PASSENGER Sector-50, GGN 5536-5537 70 M/s Surinder Singh Marwaha, Phase-II, U/V, GGN 1 4939 PASSENGER M/s DLF Cyber City Developers Ltd., At Building 71 8 4840-4847 PASSENGER No. 14-D, Phase-II, DLF City, GGN M/s NCUBATE Services Pvt. Ltd., Phase-I, U/V, 72 1 4848 PASSENGER GGN 73 M/s Atara Hospitality, DLF Phase-I, GGN 1 4849 PASSENGER 74 M/s Jindal Saw Ltd., Sec-32, GGN 8 4850-4857 PASSENGER 75 M/s ZI Medicity Pvt. Ltd., Sector-38, GGN 1 4858 PASSENGER 76 M/s Veena Chandlok, 31, Sector-18, GGN 1 4859 PASSENGER 77 M/s Yash Pal Vinaik, DLF Phase-IV, GGN 1 4860 PASSENGER 78 M/s I.C Sharma, Sushant Lok-II, GGN 1 4861 PASSENGER 4862-4869 & M/s Bestech India Pvt. Ltd. At Park View Next, 4986-4987 & 79 20 5083-5086 & PASSENGER Sector-67, GGN 5316 & 5476- 5479 & 5541 M/s Dhan Pal, Plot No. B-76 A, Sushant Lok-III, 80 1 4881 PASSENGER GGN M/s Ascent Air Pvt. Ltd., P. No. 142, Phase-IV, 81 1 4890 PASSENGER U/V, GGN M/s Ascent Air Pvt. Ltd., P. No. 189, Phase-IV, 82 1 4891 PASSENGER U/V, GGN M/s DLF Home Developers Ltd., At New Town 83 20 4892-4911 PASSENGER Height, Sec-91, GGN M/s Orris Infrastructure Pvt. Ltd., At Carnation 84 8 4912-4919 PASSENGER Project, Sec-85, GGN 85 M/s Surjeet Singh, Sector-51, GGN 1 4920 PASSENGER M/s Orris Infrastructure Pvt. Ltd., At Floreal Tower, 4921-4922 & 86 14 5558-5564 & PASSENGER Sec-83, GGN 5626-5630 87 M/s Fortis Hospotel Ltd. Sector-44, GGN 2 4923-4924 PASSENGER 88 M/s Polar Estate Pvt. Ltd. Sector-32, GGN 1 4927 PASSENGER M/s Gupta Promoters Pvt. Ltd. At Eden Height, 4939-4950 & 89 18 PASSENGER Sector-70, GGN 5524-5529 M/s Ansal Buildwell At Florence Club, Sector-56, 90 1 4951 PASSENGER GGN M/s Unitech Ltd., At Gurgaon Central, M.G Road, 91 8 4952-4959 PASSENGER GGN M/s Rapid Metro Rail Project, Phase-II, DLF City, 92 2 4960-4961 PASSENGER GGN 93 M/s Easter Inds. Ltd., Sector-33-34, Infocity, GGN 2 4962-4963 PASSENGER 4964 & 4974- M/s L & T Ltd. C/o IREO, The Grand Arch Project, 4976 & 5149- 94 16 5151 5366- PASSENGER Sector-58, GG N 5367 & 5754- 5760 M/s Suksham Kapoor Plot No.
Recommended publications
  • Camp Site for Antigen Testing ( 01-01-2021 to 10-01-2020 )
    NAME OF UPHC NAME OF MEDICAL NAME OF Sr.No. CAMP SITE FOR ANTIGEN CAMP DATE OF CAMP /PHC OFFICER SUPERVISOR 1 valley view estate gwal pahari 02/01/21 Wzirabad Dr.Anjul Rao 2 community center Kanhai 05/01/21 1 VPO Birhera 02/01/21 2 CHC farrukhnagar 04/01/21 Farrukhnagar Dr.Kanika 3 Anganwadi KHera 05/01/21 4 Subcenter Majri 06/01/21 1 Baluda Chaupal 02/01/21 2 Damdma cahupal 04/01/21 Ghangola 3 Rani Ka Singola krishna AWC 05/01/21 Dr.Vikas swami 4 Chamanpura Anita AWC 07/01/21 5 Harchandpur Asian Public School 08/01/21 1 1. Vpo kasan United bank Near puranmal mandir dated 01/01/21 Kasan 2 2. Sector 79 Godrej Aria society dated 02/01/21 Dr.Sandeep 3 3. Sec83 Saphire mall dated 04/01/21 1 SUBCENTRE KAKROLA 01/01/21 2 SUNITA KI ANGANWADI KHERKHERI 02/01/21 3 ANITA KI ANGANWADI BABRA 03/01/21 4 SIDHARTHA SOCIETY SECT 95 04/01/21 5 GURGAON ONE SOCIETY SECTOR 84 05/01/21 Bhangrola Dr. Shalu 6 PHC BHANGROLA 06/01/21 7 SKY COURT SECT86 07/01/21 8 HIGH RISE SARE HOME SECT 92 08/01/21 9 KULDEEP KI BETHAK KHAWASPUR 09/01/21 Bhangrola Dr. Shalu 10 SANI MANDIR BASSHARIYA 10/01/21 1 sc Noorgarh 01/01/21 2 AWC Mandpura 04/01/21 Mandpura 3 AWCnanukhurd 05/01/21 Dr. Vipin 4 AWC balewa 07/01/21 5 PHC Mandpura 09/01/21 1 Ambedkar bhawan shiv colony 03/01/21 2 Arya smaj school ,Lohiwada 06/01/21 Sohna 3 Ravi das mandir ward 18 08/01/21 Dr.
    [Show full text]
  • Route Chart Gurgaon for 2019-20 Route - G-01 Route Stop S
    PROPOSED AC BUS ROUTE CHART GURGAON FOR 2019-20 ROUTE - G-01 ROUTE STOP S. N. BOARDING AREA STOP NAME STOP CODE CODE TIME 1 BADSHAHPUR OPP. MAMTA RESTAURANT G-002 G-01 6:25 AM 2 SOHNA ROAD VATIKA G-103 G-01 6:35 AM 3 SHEESHPAL VIHAR BEFORE T-POINT G-005 G-01 6:37 AM 4 SHEESHPAL VIHAR GATE NO.-2 G-105 G-01 6:39 AM 5 SOHNA ROAD VIPUL GREEN G-004 G-01 6:41 AM SOUTH CITY-II, BEFORE TRAFFIC LIGHT ON 6 G-003 G-01 6:43 AM SOHNA ROAD TURN TO OMAX PLAZA 7 SOHNA ROAD PARK HOSPITAL G-103 G-01 6:45 AM 8 SOHNA ROAD SOUTH CITY - B-II G-104 G-01 6:47 AM 9 SOUTH CITY-2 BLOCK-A (BUS STOP) G-106 G-01 6:49 AM 10 SOUTH CITY-2 BLOCK-B (T-POINT) G-094 G-01 6:51 AM 11 SECTOR-51 RED LIGHT (BEFORE MRIS) G-009 G-01 6:47 AM 12 SECTOR-46 NEAR HUDA MARKET G-107 G-01 6:50 AM 13 SECTOR-46 NEAR MATA MANDIR G-096 G-01 6:55 AM 14 SUBHASH CHOWK AIRFORCE SOCIETY G-102 G-03 6:58 AM BAKTAWAR GOL CHAKKAR 15 SECTOR-47 G-010 G-01 6:59 AM BUS STAND 16 SECTOR-47 CYBER PARK G-097 G-01 7:00 AM 17 SECTOR-47 OPP. D P S MAIN GATE G-011 G-01 7:02 AM AUTHORITY/ HOSPITAL / 18 SECTOR-52 SPG0043 G-01 7:05 AM BEFORE TRAFFIC LIGHT 19 SECTOR-52 AARDEE CITY-OPP.
    [Show full text]
  • Integrated Mobility Plan for Gurgaon Manesar Urban Complex
    December 2010 Department of Town and Country Planning (DTCP), Government of Haryana Integrated Mobility Plan for Gurgaon Manesar Urban Complex Support Document 5th Floor ‘A’ Wing, IFCI Tower Nehru Place New Delhi 110019 www.umtc.co.in Integrated Mobility Plan for Gurgaon- Manesar Urban Complex TABLE OF CONTENTS 1 PRIMARY DATA COLLECTED ............................................................................. 2 1.1 Traffic Surveys Conducted .............................................................................. 2 1.2 Survey Schedule .......................................................................................... 2 1.3 Road Network Inventory ................................................................................. 6 1.4 Screen - line Volume Counts ............................................................................ 7 1.5 Cordon Volume Counts & RSI Surveys .................................................................. 9 1.6 Road Side Interview Surveys ........................................................................... 13 1.7 Occupancy ................................................................................................ 15 1.8 Intersection Classified Volume Counts ............................................................... 17 1.9 Speed and Delay Surveys ............................................................................... 31 1.10 On- street Parking Surveys ............................................................................. 34 1.11 Off - Street Parking Surveys
    [Show full text]
  • Risk Assessment & Hazard Management
    Expansion cum modification of IT park at Village - Ghatta, Sector -61, Gurugram, Haryana M/s Active Promoters Pvt. Ltd. & Others. Report of Functional Area Expert For “Risk Assessment & Hazard Management” (RH) Prepared and submitted by FAE- Mrs. Anuradha Sharma Study Period: Nov,2017 – Jan, 2018 Prepared by : Anuradha Sharma FAE-RH Cat “A” Page 1 Expansion cum modification of IT park at Village - Ghatta, Sector -61, Gurugram, Haryana M/s Active Promoters Pvt. Ltd. & Others. 1.0 INTRODUCTION Project Proponent: M/S Active Promoters Pvt Ltd & Others 1.1 Name of the Project: Expansion Cum Modification of IT Park 1.2 Location: At Village- Ghatta, Sector-61, Gurugram, Haryana 1.3 Project Category as per EIA Notification: 8 (b) Cat “b” 2.0 Project Identification Table 1.1: Project Description S. No. Items Details Name of the Project Expansion cum modification of IT Park by M/s Active 1 Promoters Pvt. Ltd. & Others. Serial No. in schedule 8(b) “Building & Construction Projects” as per MoEF 2 notification 14/9/2006 Proposed capacity/area/length/tonnage to Total area = 50,342.94 m2 be handled/command area/lease Total Built-up area = 2,48,179.10 m2 area/number of wells to be drilled 2 3 Permissible Ground Coverage @ 40% : 21,345.1 m Proposed Ground Coverage @35.50%: 15,308.66 m2 Permissible FAR: 1,47,620.32 m2 Achieved FAR : 1,46,944.40 m2 4 New/Expansion/Modernization Modification cum Expansion 5 Existing capacity/area etc. Existing Built up area- 2,13,417.52 m2 6 Category of project B 7 Does it attract the general condition? If No Yes, please specify 8 Does it attract the specific condition? If No Yes, please specify 9 i) Location of unit Village – Ghatta, Sector-61, Gurugram, Haryana ii) Khasra No.
    [Show full text]
  • Energy News December-2019
    ENERGY NEWS DECEMBER-2019 Petroleum Conservation Research Association Sanrakshan Bhawan 10, Bhikaji Cama Place New Delhi 110066 INDEX S. NO. SUBJECT PAGE 1 TRANSPORT 1.1 -E-Vehicles (EV) 1-25 25-28 1.2 -Oil & Gas run vehicles 2 ENVIRONMENT 2.1 - Air, Water & Sound pollution 28-41 2.2 -Health 41-42 3 ENERGY CONSERVATION 3.1 -Oil & Gas 43-51 4 RENEWABLE ENERGY 4.1 -Electricity 52-55 4.2 -Wind 56-62 4.3 -Solar 62-70 5 OTHERS 70 This Energy News contains excerpts of articles picked up from selected daily newspapers & magazines. AAP Govt. Unveils Sops, Targets 25% New EVs in Delhi by 2024 The Aam Aadmi Party-led Delhi government on Monday announced incentives on purchase of battery operated two-wheelers by up to ₹10,000 and electric autos by ₹30,000 in its electric vehicle policy that aims at curbing vehicular pollution by adding five lakh new electric vehicles in five years. The Delhi Electric Vehicle Policy 2019 approved by the state cabinet on Monday focuses on electric twowheelers, shared transport vehicles and goods carriers or freight vehicles, since they contribute to majority of the vehicular pollution, an official statement said. “The primary goal is to improve Delhi’s air quality by bringing down emissions from the transport sector. To do so, this policy will seek to drive rapid adoption of Battery Electric Vehicles (BEVs) such that they contribute to 25% of all new vehicle registrations by 2024,” the statement said. The Delhi government is targeting induction of 35,000 electric two, three and four wheelers and buses, 1,000 electric vehicles for last mile deliveries and 250 public charging and battery swapping stations.
    [Show full text]
  • Real Insight Q1 2021 V5
    RESEARCH REAL INSIGHT RESIDENTIAL January – March 2021 PROPTIGER RESEARCH Dhruv Agarwala FOREWORD CEO–Elara Group Housing.com | PropTiger.com | Makaan.com The year 2020 was marred due to the economic and social The overall improving economic scenario and consumer repercussions of the COVID-19 pandemic and the subsequent sentiments also underpinned the residential demand that has worldwide lockdowns. However, the beginning of 2021 was nearly bounced back to the pre-COVID levels. A host of marked by a silver lining with the roll out of the much-awaited factors such as low home loan rates, stamp duty cuts in few vaccine. The availability of vaccines has only reinforced states, such as Maharashtra and Karnataka, developer's confidence in the growth outlook providing stronger tailwinds schemes and pent-up demand have definitely improved the for the recovery of the global economy. After all, the sentiments in the first quarter of 2021. Moreover, a slew of International Monetary Fund (IMF) has forecasted the world measures such as increasing the safe harbour limit, tax economy to expand by 6 percent in 2021, after a 3.5 percent exemptions for investments in REITs, reduced interest for contraction in the previous year. Countries such as the US, the aordable housing and many more have been announced by UK, Canada, Australia, China, Japan and India, which were in a the central government for FY 2022, to provide impetus to the recession for most of the previous year, are estimated to show real estate sector in India. positive growth in 2021. While the key indicators and availability of vaccines did set a Among these major economies, India is expected to grow the stage for recovery of the real estate sector in the first quarter, fastest clocking a double-digit growth in 2021.
    [Show full text]
  • Minutes of the 218Th Meeting of the State Expert Appraisal Committee
    Minutes of the 218th Meeting of the State Expert Appraisal Committee (SEAC), Haryana constituted for considering Environmental Clearance of Projects (B Category) under Government of India Notification dated 14.09.2006 held on 29.07.2021 and 30.07.2021 under the Chairmanship of Sh. V. K. Gupta, Chairman, SEAC, through Video Conferencing (VC). At the outset the Chairman, SEAC welcomed the Members of the SEAC and advised the Secretary to give brief background of this meeting. The minutes of the 217th Meeting were discussed and approved without any modification. In the meeting 19 no. of projects received from SEIAA, were taken up for scoping, appraisal and grading as per agenda circulated. In the wake of recent crises of COVID-19, lockdown situation, Committee took a decision to scope and appraises the EC cases as per the guidelines issued by MoEF& CC from time to time by video conferencing. It was decided that before the commencement of online video conferencing the agenda is required to be mailed beforehand. Accordingly the agenda of the present meeting was mailed to SEAC members in advance and a video conference meeting was organized in this regard on 29.07.2021 &30.07.2021. The 218th meeting of SEAC Haryana was held online by video conferencing on 29.07.2021&30.07.2021 and following members joined the meeting: Sr. No. Name Designation 1. Shri PrabhakarVerma Member 2. Dr. S. N. Mishra Member 3. Dr.Vivek Saxena Member 4. Shri Raj Kumar Sapra Member 5. Dr.Mehar Chand Member 6. Ar. Hitender Singh Member 7.
    [Show full text]
  • Ministry of Urban Development Annual
    S 3 \ E \ 763UD (E) ANNUAL REPORT \ PAGINATED VERSION \ 763UD (CONTENTS).P65 MINISTRY OF URBAN DEVELOPMENT ANNUAL REPORT 2013-14 http://moud.gov.in S 3 \ E \ 763UD (E) ANNUAL REPORT \ PAGINATED VERSION \ 763UD (CONTENTS).P65 Index of Chapters in Annual Report 2013-2014 Chapter No Chapter Title Pages 1 Introduction 01-06 2 Administration and Organisation 07-20 3 Vigilance Activities 21-22 SCHEMES AND PROGRAMMES 4 Urban Development 23-43 5 Urban Water Supply and Sanitation 44-49 6 Delhi, and Miscellaneous Initiatives in Urban sector 50-55 7 Urban Transport 56-67 8 Urban Development in the North Eastern Region 68-71 ATTACHED OFFICES 9 Central Public Works Department 72-99 10 Directorate of Printing 100-103 11 Directorate of Estates 104-115 12 Land and Development Office 116-119 SUBORDINATE OFFICES 13 Town and Country Planning Organisation 120-131 14 Government of India Stationery Office and Department of Publication 132-137 PUBLIC SECTOR UNDERTAKING 15 National Buildings Constructions Corporations Ltd. 138-190 16 Autonomous and Statutory Bodies 191-212 17 Census and Urbanisation 213-223 18 Training and Capacity Building 224 19 Workshops 225-227 20 Awards 228-234 21 Publications of Ministry of Urban Development - Some Glimpses 235-238 22 Results Framework Document for Ministry of Urban Development 239-255 S 3 \ E \ 763UD (E) ANNUAL REPORT \ PAGINATED VERSION \ 763UD (CONTENTS).P65 Chapter No Chapter Title Pages APPENDICES Appendix I Organization Chart of the Ministry 259 Appendix II Subjects allocated to the Ministry 260-262 Appendix III Attached
    [Show full text]
  • Analysing Pollution Levels in Delhi NCR During the COVID-19 Lockdown
    Analysing Pollution Levels in Delhi NCR During the COVID-19 Lockdown Anmol Dureha, Bhairevi Aiyer, Gursehaj Aneja, Pranav Suri 1 INTRODUCTION Pollution levels in the cities of the Delhi NCR region are known to be some of the world's worst1 . However, with the imposed lockdowns2 to tackle the COVID-19 outbreak, a significant reduction in pollution levels was observed in multiple cities across India, including New Delhi. Delhi and the regions around it have high population density, many industries, and very high traffic and movement. With heavy regulation in terms of permitting various economic activities in the different phases of the lockdowns, it would be interesting to note how these activities impact air quality. Besides, these insights can be used to critique or propose actionable steps to take in the post-COVID world to keep a check on the pollution levels. In this paper, we aim to understand the impact of the lockdown (implying a change in the economic activities) on the air pollution levels in Delhi NCR. The question we answer in this study is "how do various sources of pollution in Delhi NCR contribute to the air quality in the region?" This study has been commissioned for the use of proactive air pollution activists: Namita Gupta, founder of AirVeda and Manas Fuloria, co-founder of Nagarro. 2 INVESTIGATION METHODOLOGY This section outlines the methodology, assumptions and standards that were used to conduct this study. The described procedure remained consistent throughout the investigation unless mentioned otherwise. 2.1 Data Collection Before collecting data from a reliable resource, the metric to measure air quality had to be established.
    [Show full text]
  • Haryana Government Town and Country Planning Department Notification
    HARYANA GOVERNMENT TOWN AND COUNTRY PLANNING DEPARTMENT NOTIFICATION The 5th February, 2007 No. CCP (NCR) FDP (G) /2007/359 .-In exercise of the powers conferred by sub-section (7) of section 5 of the Punjab Scheduled Roads and Controlled Areas Restriction of Unregulated Development Act, 1963 (41 of 1963) and with reference to Haryana Government, Town and Country Planning Department, Notification No. CCP(NCR) DDP(G)/ 2006 /1697, dated the 11th July, 2006 and in supersession of all other notifications issued in this behalf from time to time, the Governor of Haryana hereby publishes the final development plan 2021 AD for Gurgaon-Manesar Urban Complex, along with restrictions and conditions as given in Annexures A and B proposed to be made applicable to the controlled areas specified in Annexure B. Drawings 1. Gurgaon-Manesar Urban Complex Existing Land Use Plan Drawing No. DTP(G)1405/05, dated the 22nd July, 2005. (already published vide Haryana Government, Town and Country Planning Department, Notification No. CCP(NCR) DDP(G)/ 2006 /1697, dated the 11th July, 2006). 2. Gurgaon -Manesar Urban Complex Final Development Plan-2021 Drawing No. DTP(G)1520/06, dated the 14th November, 2006. Annexure 'A' EXPLANATORY NOTE ON THE FINAL DEVELOPMENT PLAN 2021 A.D. FOR THE CONTROLLED AREA OF GURGAON-MANESAR URBAN COMPLEX. Introduction: The Gurgaon-Manesar Urban Complex which is known for Automobile Industries, Modern Commercial Malls, Towers of Cyber Parks and Software Development is situated on prime location on National Highway No. 8, only at a distance of 4 kilometers from the Indira-Gandhi International Air Port and is well linked with all capitals of the world through airways.
    [Show full text]
  • Clean Air Action in Delhi-Ncr: What Next?
    CAPITAL GAINS CLEAN AIR ACTION IN DELHI-NCR: WHAT NEXT? CAPITAL GAINS CLEAN AIR ACTION IN DELHI-NCR: WHAT NEXT? Authors: Anumita Roychowdhury, Atin Biswas, Avikal Somvanshi, Shambhavi Shukla, Shantanu Gupta, Shobhit Srivastava, Soundaram Ramanathan, Vivek Chattopadhyay, Sayan Roy and Anannya Das Editor: Akshat Jain Design: Ajit Bajaj Cover photo: Vikas Choudhary Layout: Kirpal Singh Production: Rakesh Shrivastava and Gundhar Das This report was made possible because of: The opinions expressed do not necessarily reflect the views of the supporters and funders, nor should they be attributed to them. The views/analysis expressed in this report/document do not necessarily reflect the views of Shakti Sustainable Energy Foundation. The Foundation also does not guarantee the accuracy of any data included in this publication nor does it accept any responsibility for the consequences of its use. © 2021 Centre for Science and Environment Material from this publication can be used, but with acknowledgement. Maps are not to scale. Citation: Anumita Roychowdhury et al 2021. Capital Gains: Clean Air Action in Delhi-NCR: What next?, Centre for Science and Environment, New Delhi Published by Centre for Science and Environment 41, Tughlakabad Institutional Area New Delhi 110 062 Phone: 91-11-40616000 Fax: 91-11-29955879 E-mail: [email protected] Website: www.cseindia.org 4 CONTENTS Clean air in Delhi-NCR: Action so far. What next? 7 SECTION 1: Air quality targets and assessment 27 SECTION 2: Industry 50 SECTION 3: Power plants 71 SECTION 4: Vehicles and fuels 83 SECTION 5: Mobility 105 SECTION 6: Waste 128 SECTION 7: Crop fires 141 SECTION 8: Clean household energy 149 Way forward 151 References 153 5 Clean air in Delhi- NCR: Action so far.
    [Show full text]
  • Paras Trade Center - Gwal Pahari, Gurgaon Commercial Office Complex Paras Trade Center Is a Commercial Project of Paras Buildtech India Ltd
    https://www.propertywala.com/paras-trade-center-gurgaon Paras Trade Center - Gwal Pahari, Gurgaon Commercial Office Complex Paras Trade Center is a commercial project of Paras Buildtech India Ltd. It is among the completed projects of Paras Buildtech Group. Project ID : J304278119 Builder: Paras Buildtech India Pvt Ltd. Properties: Shops, Office Spaces Location: Paras Trade Center, Gwal Pahari, Gurgaon - 122001 (Haryana) Completion Date: Feb, 2011 Status: Completed Description Paras Buildtech India Pvt. Ltd. - ISO 9001:2000 certified, a real estate consulting company is built on rich values and ideologies that match the futuristic demands of the corporate sector, residential sphere and the booming retail industry. With our business verticals spanning across homes, offices, shopping malls and the commercial sector, we are poised to conceptualize perfect lifestyle avenues, designed exclusively for you. Paras Trade Center is a commercial project of Paras Buildtech India Ltd. It is among the completed projects of Paras Buildtech Group, they are highly successful in delivering projects all over the world.Paras Trade Center is located at Gwal Pahari, Gurgaon. Amenities & Specifications: LANDSCAPE Richly landscaped central plaza with paving And decorative features. Pedestrian plaza designed with seating areas And food kiosks. Dedicated drop-off zone and entrance for Office On-site parking areas with lush canopy trees And landscape features. RETAIL SHOPS Retail Floors-Ground, first & Second. Large storefronts and glazing areas for Retail Units Arcade along all Retail units Dedicated signage areas for all units as per design DIESEL GENERATORS 100% automatic backup provided for Lighting, Power, and AC Provided with PLC based auto load manager.
    [Show full text]