Corps 10 and 404 Public Notice

Total Page:16

File Type:pdf, Size:1020Kb

Corps 10 and 404 Public Notice Public Notice U.S. Anny Corps of Engineers, Norfolk September 24, 2019 CENAO-WR-R NAO-1994-1166 FEDERAL PUBLIC NOTICE The District Commander has received a joint application for Federal and State permits as described below: APPLICANT Hampton Roads Connector Partners Joint Venture c/o Jose Martin Dragados USA Inc., 810 7th Avenue Floor 9 New York, New York 10019 WATERWAY AND LOCATION OF THE PROPOSED WORK: The project is located in the lower James River/ Hampton Roads, and in several of its tributaries including Oastes Creek, Mason Creek, and Willoughby Bay. The James River/ Hampton Roads is a tributary to the Chesapeake Bay. The proposed Hampton Roads Bridge Tunnel (HRBT) expansion project is located on Interstate 64 (I-64) in the cities of Hampton and Norfolk, between the Settlers Landing Road Interchange in Hampton and I-564 Interchange in Norfolk. The coordinates for the approximate center of the project are latitude 36.990⁰ and longitude -76.310⁰ in Norfolk, Virginia. PROPOSED WORK AND PURPOSE: In order to relieve congestion at the Interstate 64 Hampton Roads Bridge-Tunnel (HRBT) and to improve accessibility, transit, emergency evacuation, and military and goods movement along the primary transportation corridors in the Hampton Roads region, including I-64, I-664, I-564, and the Western Freeway (Virginia Route 164), the Hampton Roads Connector Partners (HRCP) proposes to widen Interstate 64, from Settlers Landing Road in Hampton to the Interstate 564 interchange in Norfolk, to create an eight-lane facility with six consistent- use lanes. The total length of the HRBT expansion is approximately 9.9 miles, and the tunnel segment of the project is approximately 1.8 miles, including the tunnel islands. New bridges will be constructed connecting the tunnels to the Hampton and Norfolk shorelines, and the existing highway from Settlers Landing Road to I-564 will be reconstructed. The expanded interstate will include four general purpose lanes, two new high-occupancy toll (HOT) lanes, and two new drivable shoulders to be used at HOT lanes during peak usage. The existing bridge-tunnel facility is a four-lane roadway with bridges, trestles, man-made tunnel islands, and tunnels under the main Hampton Roads shipping channel. The proposed project includes the construction of two new two-lane tunnels; expansion of the existing tunnel islands; full replacement of the existing trestle bridges at the HRBT as well as the Willoughby Bay trestle bridge; sound barrier walls; reconstruction of the existing roadway; new stormwater management features, and dredging of approximately 7.90 acres of subaqueous bottom in Hampton Roads/ James River. Once the project is completed, there will be a total of four tunnels, two new ones and the two existing tunnels; two of the four tunnels will be used for eastbound traffic and two will be used for westbound traffic. A complete bridge replacement is being proposed for the Mallory Street interchange. The two new tunnels will be installed using bored tunnel methods. The project also includes the construction and maintenance of two outfalls which will discharge treated construction water from the tunnel boring operations and the jet grout and slurry wall construction activities. These discharges into the James River/ Hampton Roads will be authorized by the Virginia Department of Environmental Quality (DEQ) through its Virginia Pollutant Discharge Elimination System (VPDES) program. Discharge volumes are expected to be less than 500,000 gallons per day. The proposed location for each of the outfalls is based on hydraulic modeling of the tidal flow around each of the islands. The greatest flow rates occur on the North Island at the southwest corner of the island, and on the northwest corner of the South Island. These locations are closest to the main channel which contains the greatest volume of flow during the tidal cycles, and the applicant states that these outfall locations will allow for the greatest amount of mixing. As proposed, the project will permanently impact 18.92 acres of subaqueous bottom (14.83 acres for the North Island expansion, 3.71 acres for the South Island expansion, and 0.38 acres for piles, culverts, and grading throughout the project); 0.40 acres of submerged aquatic vegetation (SAV); 3.75 acres of tidal wetlands (0.70 acres of estuarine intertidal rocky shore, 0.69 acres of estuarine intertidal sandy unconsolidated shore, 2.17 acres of estuarine emergent wetlands, and 0.19 acres of estuarine scrub- shrub wetlands) and 0.86 acres of nontidal wetlands (0.11 acres of unconsolidated bottom, 0.27 acres of palustrine emergent wetlands, 0.36 acres of palustrine scrub- shrub wetlands, and 0.12 acres of palustrine forested wetlands). Temporary impacts include 26.53 acres of subaqueous bottom, 0.52 acres of SAV, 7.73 acres of tidal wetlands, and 0.70 acres of nontidal wetlands, and 27 linear feet of riverine lower perennial stream. The temporary subaqueous bottom impacts are primarily due to the trestle deck areas extending over the Hampton Roads river bottom, plus 20-foot work areas around the trestles and fills, and 40-foot work areas in Oastes and Mason Creeks for potential pile rehabilitation. HRCP proposes to compensate for permanent impacts to nontidal wetlands, tidal wetlands, SAV, and subaqueous bottom through the purchase of credits from approved mitigation banks and in lieu fee funds. Aquatic resource impacts have been minimized through the use of pile-supported trestles, shifting the limits of disturbance (LOD) in several locations to avoid wetland impacts, reducing fill slopes where possible, and by using the bored tunnel approach instead of the immersed tube tunnel construction method. The applicant’s use of the bored tunnel versus an immersed tube tunnel will considerably reduce navigation impacts and subaqueous impacts to the Hampton Roads/ James River bottom. The bored tunnel construction avoids approximately 60 acres of dredging that would have been required if the immersed tunnel tube construction was used. Through tunnel island and roadway design, island expansion footprints were reduced from 20 acres to approximately 18.72 acres. For the landward roadway improvements, moving the construction limits closer to the existing road avoided impacts to 1.8 acres of nontidal wetlands and 1.3 acres of tidal wetlands. In addition to the required Department of the Army permit, the applicant must obtain a Virginia Water Protection Permit/401 certification from the DEQ assuring that applicable laws and regulations pertaining to water quality are not violated and a permit from the Norfolk and Hampton Wetlands Boards. Project drawings are attached. AUTHORITY: Permits are required pursuant to Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403), Sections 401 and 404 of the Clean Water Act (Public Law 95-217) and Title 62.1 of the Code of Virginia. FEDERAL EVALUATION OF APPLICATION: The decision whether to issue a permit will be based on an evaluation of the probable impacts including cumulative impacts of the proposed activity on the public interest. The decision will reflect the national concern for both protection and utilization of important resources. The benefits which reasonably may be expected from the proposal must be balanced against its reasonably foreseeable detriments. All of the proposal's relevant factors will be considered, including conservation, economics, aesthetics, general environmental concerns, wetlands, cultural values, fish and wildlife values, flood hazards, flood plain values, land use, navigation, shoreline erosion and accretion, recreation, water supply and conservation, water quality, energy needs, safety, food and fiber production, mineral needs, consideration of property ownership and, in general, the needs and welfare of the people. The Environmental Protection Agency's "Guidelines for Specification of Disposal Sites for Dredged or Fill Material" will also be applied (Section 404(b)(1) of the Clean Water Act). The Corps of Engineers is soliciting comments from the public; Federal, state, and local agencies and officials; Indian Tribes; and other interested parties in order to consider and evaluate the direct, indirect, and cumulative impacts of this proposed activity. Any comments received will be considered by the Corps of Engineers to determine whether to issue, modify, condition or deny a permit for this proposal. To make this decision, comments are used to assess impacts on endangered species, historic properties, water quality, general environmental effects, and the other public interest factors listed above. Comments are used in the preparation of an Environmental Assessment and/or an Environmental Impact Statement pursuant to the National Environmental Policy Act. Comments are also used to determine the need for a public hearing and to determine the overall public interest of the proposed activity. Anyone may request a public hearing to consider this permit application by writing to the District Commander within 30 days of the date of this notice, stating specific reasons for holding the public hearing. The District Commander will then decide if a hearing should be held. Preliminary review indicates that: (1) A Supplemental Environmental Impact Statement (SEIS) for the Hampton Roads Crossing Study was signed on April 25, 2017, and an Environmental Assessment Re-evaluation was completed and signed on June 7, 2018; and (2) after conducting the preliminary Norfolk District Endangered Species Act (ESA) Project Review Process, the following listed/proposed/candidate species and/or designated/proposed critical habitat under the ESA of 1973 (16 U.S.C. 1531-1544, 87 Stat. 884), as amended) may be affected: Northern long-eared bat, Northeastern beach tiger beetle, fin whale, North Atlantic right whale, piping plover, red knot, Atlantic sturgeon, shortnose sturgeon, Kemp’s ridley sea turtle, loggerhead sea turtle, leatherback sea turtle, and green sea turtle. Based on this “may effect” determination, the Official Species List and Species Conclusion Table is attached is attached for review and comment by Fish and Wildlife Service.
Recommended publications
  • & International Trade Guide
    2017 HAMPTON ROADS MARITIME & International Trade Guide INSIDE: A caffeine buzz in Suffolk The future of offshore wind Newport News Shipbuilding to hire 3,000 more workers A new classPort prepares for bigger ships and more cargo Permit No. 516 No. Permit Richmond, VA Richmond, PAID US Postage US PRSRT STD PRSRT Change Service Requested Service Change 23219 VA Richmond, 100, Suite Street, Main E. 1207 Get your message to the people who matter most! 2017 Hampton Roads Statistical Digest Place your advertising message in our annual Hampton Roads Statistical Digest. The Digest has a long history as a valuable resource having been published by Virginia Business for over 35 years! Contact: Susan Horton [email protected] 757.625.4233 Get your message to the people who matter WAREHOUSING, TRANSPORTATION, LOGISTICS & FOREIGN TRADE ZONE most! Givens offers a Weekly Summary Entry Program that saves our Foreign Trade Zone 2017 Hampton Roads customers thousands of dollars per year in Statistical Digest entry and merchandise processing fees. Under Weekly Summary Entry procedures, the zone user files only one Customs Entry per week, rather than filing one Customs Entry per shipment. Customs no longer has to process an entry for each and every shipment being imported into the zone, and the Givens Foreign Trade Place your advertising message in Zone customer no longer has to pay for the our annual Hampton Roads processing of each and every entry. Statistical Digest. The Digest has a long history as a valuable We welcome the opportunity to show you resource having been published by Virginia Business for over how this program can also be a source of 35 years! significant new savings for you.
    [Show full text]
  • Traffic Study Technical
    TECHNICAL MEMORANDUM To: Olga Beltsar, P.E. From: Emily Moser, P.E., PTOE Whitney DiGiantommaso, P.E. Kimley-Horn and Associates, Inc. Date: June 21, 2021 Subject: Granby Street Bike Lanes Traffic Study – Admiral Taussig Boulevard to Willow Wood Drive Introduction Granby Street was identified as a high priority corridor for implementation of bicycle facilities in the City of Norfolk’s Bicycle and Pedestrian Strategic Plan, which was adopted in 2015. The Strategic Plan for Segment 1 of Granby Street—from Admiral Taussig Boulevard to Willow Wood Drive—calls for repurposing one automobile lane in each direction to dedicated, buffered bicycle lanes, with the proposed typical lane configuration shown in Figure 1. This is the starting design concept for the Granby Street Bike Lanes project, which will be further developed as the project moves forward. Figure 1. Proposed Typical Lane Configuration from Strategic Plan The City later prepared an application for SMART Scale funding to implement improvements in this key segment, and they were notified by the Virginia Department of Transportation (VDOT) that the kimley-horn.com 4525 Main Street, Suite 1000, Virginia Beach, VA 23462 757 213 8600 Page 2 project was selected for funding. Before formally accepting the state funding, the City desires to further evaluate the feasibility of the proposed lane repurposing with respect to traffic operations. This traffic study was performed to evaluate potential traffic flow impacts resulting from the proposed lane repurposing and to provide information that could be used to refine the project design concept. This report provides a summary of the traffic study results.
    [Show full text]
  • INTRODUCTION BACKGROUND the Hampton Roads Planning District
    INTRODUCTION BACKGROUND The Hampton Roads Planning District Commission staff has performed a comprehensive regional travel time study approximately every five years since the first travel time study for South Hampton Roads was produced in 1983. The first regional travel time study for the Peninsula was published in 1992. Data collection for the travel time studies prior to 2000 was performed using vehicle equipped with a portable computer and a calibrated distance-measuring instrument. The 2000 and 2005 updates to the travel time study series used global positioning system (GPS) technology for data collection and geographic information system (GIS) technology for data analysis. For this study, travel time data was collected on approximately 1,300 miles of roadway, including all of the thoroughfares that make up the Congestion Management System for Hampton Roads. Hampton Roads Regional Travel Time has traditionally been distributed in multiple reports. The Trip Profile Summaries report contains travel time summary profiles for approximately 1,300 miles of roadway in Hampton Roads, as generated by the GPS/GIS system. This report is distributed electronically, in the form of a CD-ROM, and will also be made available on the HRPDC website. Other reports in the Regional Travel Time series include trip profile summaries for previous study years, travel time contour maps for selected activity centers, and analyses of the travel time data and trends. For the purposes of this study the travel time roadway network was divided into 336 segments of varying lengths. One data collection run was made in each direction during the morning and afternoon peak hours for each segment.
    [Show full text]
  • Annual Report to the Joint Commission on Transportation Accountability Relating to the Hampton Roads Transportation Fund
    Fiscal Year 2020 Annual Report to the Joint Commission on Transportation Accountability Relating to the Hampton Roads Transportation Fund Hampton Roads Transportation Accountability Commission 723 Woodlake Drive Chesapeake, Virginia 23320 www.hrtac.org Fiscal Year 2020 Annual Report to the Joint Commission on Transportation Accountability Relating to the Hampton Roads Transportation Fund | 2 Executive Summary Item 1.o. of Chapter 1289 of the 2020 Session of the General Assembly included the requirement that the Joint Commission on Transportation Accountability shall regularly review, and provide oversight of the usage of funding generated pursuant to the provisions of House Bill 2313, 2013 Session of the General Assembly. To this end, The Joint Commission on Transportation Accountability shall regularly review, and provide oversight of the usage of funding generated pursuant to the provisions of House Bill 2313, 2013 Session of the General Assembly. To this end, by November 15 the Secretary of Transportation, the Northern Virginia Transportation Authority and the Hampton Roads Transportation Accountability Commission shall each prepare a report on the uses of the Intercity Passenger Rail Operating and Capital Funds, the Northern Virginia Transportation Authority Fund, and the Hampton Roads Transportation Fund, respectively, each year to be presented to the Joint Commission on Transportation Accountability. During FY2020 During FY2020, the Hampton Roads Transportation Accountability Commission (‘HRTAC’) took actions and executed project agreements or project amendments with the Virginia Department of Transportation (‘VDOT’) to advance project readiness and to provide financing and project delivery. During the fiscal year, HRTAC issued its FY2021 through FY2026 Funding Plan Update and its Long‐Range Funding Plan through FY2045, and further advanced project development and construction of over $5.29 billion total value projects with VDOT.
    [Show full text]
  • 9110-04-P DEPARTMENT of HOMELAND SECURITY Coast
    This document is scheduled to be published in the Federal Register on 08/05/2021 and available online at federalregister.gov/d/2021-16198, and on govinfo.gov 9110-04-P DEPARTMENT OF HOMELAND SECURITY Coast Guard 33 CFR Part 165 [Docket Number USCG-2020-0117] RIN 1625-AA00 Safety Zones; Hampton Roads Bridge-Tunnel Expansion Project, Hampton/Norfolk, VA AGENCY: Coast Guard, Homeland Security (DHS). ACTION: Notice of proposed rulemaking. SUMMARY: The Coast Guard is proposing to establish safety zones for certain waters of the Hampton Flats, Willoughby Bay, a defined area between Phoebus Channel and the North Trestle Bridge, and 3 zones around the North Trestle Bridge including the North Island, the South Trestle Bridge including the South Island, and the north and south side of the Willoughby Bay Bridge. This action is necessary to provide for the safety of life on these navigable waters in support of the Hampton Roads Bridge-Tunnel Expansion Project that will take place from 2021 through 2025. This proposed rulemaking would prohibit persons and vessels from being in the safety zones unless authorized by the Captain of the Port Sector Virginia or a designated representative or under conditions specified in this rulemaking. We invite your comments on this proposed rulemaking. DATES: Comments and related material must be received by the Coast Guard on or before [INSERT DATE 30 DAYS AFTER DATE OF PUBLICATION IN THE FEDERAL REGISTER]. ADDRESSES: You may submit comments identified by docket number USCG-2020- 0117 using the Federal eRulemaking Portal at https://www.regulations.gov. See the “Public Participation and Request for Comments” portion of the SUPPLEMENTARY INFORMATION section for further instructions on submitting comments.
    [Show full text]
  • Commonwealth Transportation Board Shannon Valentine 1401 East Broad Street (804) 786-2701 Chairperson Richmond, Virginia 23219 Fax: (804) 786-2940
    Commonwealth Transportation Board Shannon Valentine 1401 East Broad Street (804) 786-2701 Chairperson Richmond, Virginia 23219 Fax: (804) 786-2940 Agenda item # 9 RESOLUTION OF THE COMMONWEALTH TRANSPORTATION BOARD April 18, 2018 MOTION Made By: Mr. Malbon, Seconded By: Mr. Williams Action: Motion Carried, Unanimously Title: Advance Toll Facilities Revolving Funds to Support Analysis of an Express Lanes Network in Hampton Roads WHEREAS, on October 19, 2016, pursuant to §§ 33.2-502 and 33.2-309 of the Code of Virginia and 23 USC §166 (a)(4), the Commonwealth Transportation Board (“CTB”) designated the existing Interstate 64 HOV-2 reversible lanes from Interstate 564 to Interstate 264 as HOT-2 and authorized dynamic tolling of vehicles utilizing the HOV reversible lanes on Interstate 64 from Interstate 564 to Interstate 264, during the Westbound AM peak period of 5:00 a.m. to 9:00 a.m. on weekdays and during the Eastbound PM peak period of 2:00 p.m. to 6:00 p.m. on weekdays for vehicles carrying less than two occupants (collectively, HOT Lanes-2 designation), to be implemented at such time that the infrastructure and improvements necessary to commence tolling on said portion of I-64 are determined by the Commissioner of Highways to be completed and ready for operation; and WHEREAS, on September 20, 2017, pursuant to § 33.2-502 and § 33.2-309 of the Code of Virginia and 23 USC §§ 129 and 166, the CTB designated a vehicle occupancy requirement of 2 and authorized dynamic tolling of vehicles carrying less than two occupants for vehicles utilizing the new lanes constructed on I-64 beginning in the vicinity of the I-464 Interchange in Chesapeake and extending to the I-664/I-264 Interchange at Bowers Hill pursuant to the Interstate 64 Southside Widening and High Rise Bridge Project, 24 hours - 7 days a week (collectively, HOT Lanes-2 designation), to be implemented for each phase of the Project at such time that the new lanes for the phase on said portion of I-64 are determined by the Commissioner of Highways to be completed and ready to open for traffic/operation.
    [Show full text]
  • PART 3 Comprehensive Agreement Between Department and Design
    Request for Proposals Draft Part 3 May 22, 2018 Comprehensive Agreement PART 3 Comprehensive Agreement Between Department and Design-Builder This COMPREHENSIVE AGREEMENT for the I-64 Hampton Roads Bridge-Tunnel Project (the “Agreement”) is made as of [●], 2019 (the “Agreement Date”), by and between the VIRGINIA DEPARTMENT OF TRANSPORTATION (“Department”), an agency of the Commonwealth of Virginia and [●] (“Design-Builder), a [●], for services in connection with the Project. Commonwealth of Virginia Virginia Department of Transportation Page 1 of 26 Request for Proposals Draft Part 3 May 22, 2018 Comprehensive Agreement Table of Contents Article 1: Scope of Work ..................................................................................................4 Article 2: Contract Documents..........................................................................................5 Article 3: Interpretation and Intent ....................................................................................5 Article 4: Ownership of Work Product .............................................................................6 Article 5: Contract Time ...................................................................................................7 Article 6: Contract Price....................................................................................................10 Article 7: Procedure for Payment ......................................................................................11 Article 8: Termination for Convenience ...........................................................................12
    [Show full text]
  • Thoroughfare List June 2006: Final Report
    Thoroughfare List June 2006: Final Report THOROUGHFARE LIST THOROUGHFARE FROM TO JURISDICTION 4th View St Interstate 64 Ocean View Ave NO 21st St Hampton Blvd Monticello Ave NO 25th St (One-Way) Huntington Ave 26th St NN 25th St 26th St Pear Ave NN 26th St (One-Way) 25th St Huntington Ave NN 26th St (One-Way) Hampton Blvd 27th St NO 27th St (One-Way) 26th St Hampton Blvd NO 38th St Hampton Blvd Granby St NO 39th St Huntington Ave Chestnut Ave NN Aberdeen Rd/ Buxton Ave Todds Ln 25th St HA/NN Admiral Taussig Blvd Hampton Blvd Interstate 564 NO Airline Blvd Jolliff Rd High St CH/PR Armistead Ave Commander Shepard Blvd Settlers Landing Rd HA Atlantic Ave Campostella Rd (S) Campostella Rd (N) CH Atlantic Ave Shore Dr 5th St VB Azalea Garden Rd Virginia Beach Blvd Little Creek Rd NO Bainbridge Blvd Dominion Blvd Main St CH/NO Ballentine Blvd Interstate 264 Chesapeake Blvd NO Barhamsville Rd Interstate 64 RT 60 JC Battery Park Rd S Church St Country Way IW Battlefield Blvd NC State Line Hillwell Rd CH Battlefield Blvd Hillwell Rd Johnstown Rd CH Battlefield Blvd Johnstown Rd Great Bridge Blvd CH Battlefield Blvd Great Bridge Blvd Campostella Rd CH Baxter Rd Princess Anne Rd Independence Blvd VB Bay Ave First View St Interstate 64 NO Bay Ave (One-Way) Interstate 64 Granby St NO Bayview Blvd Granby St Chesapeake Blvd NO Belroi Rd Hickory Fork Rd RT 17 GC Benefit Rd Johnstown Rd Centerville Tnpk CH Bennetts Pasture Rd Kings Hwy RT 17 (Bridge Rd) SU Berkley Ave Interstate 464 Marsh St NO Berkley Ave Ext Berkley Ave Campostella Rd NO Big Bethel Rd
    [Show full text]
  • Finding of No Significant Impact (FONSI) for the Hampton Roads Crossing Study (HRCS) Environmental Assessment (EA) Re-Evaluation
    Rationale for Finding of No Significant Impact Hampton Roads Crossing Study Cities of Hampton and Norfolk Introduction FHWA has reviewed VDOT’s August 10, 2018 submittal of their Request for a Finding of No Significant Impact (FONSI) for the Hampton Roads Crossing Study (HRCS) Environmental Assessment (EA) Re-evaluation. VDOT’s request included a summary of substantive comments received on the EA and VDOT’s responses. The EA was prepared in accordance with 23 CFR 771.130 to address changes being proposed by VDOT to the Selected Action, which was documented in FHWA’s Record of Decision (ROD) in June 2017. The purpose of the EA was to determine if the impacts resulting from the proposed changes or any other new information or circumstances relevant to environmental concerns would result in significant environmental impacts not previously considered. The EA does not open up for consideration other aspects of the previous environmental studies like purpose and need and alternatives carried forward for consideration. Likewise, the EA does not address resources in any detail where it has been determined the impacts to those resources will not substantially change or will be reduced. Based upon our review and the information that follows, FHWA has determined that NEPA and all other applicable environmental requirements have been adequately addressed and have concluded that the proposed changes to the project will not have a significant impact on the environment requiring the HRCS Supplemental Environmental Impact Statement (SEIS) be supplemented. Background: FHWA issued a Final EIS and ROD in 2001 for the original HRCS. In the ensuing years, VDOT tried to advance the project as a P3 but cancelled the effort in 2006.
    [Show full text]
  • Item #17: for Your Information 17A. Transportation
    HRTPO Board Meeting │ January 17, 2013 │ Agenda ITEM #17: FOR YOUR INFORMATION 17A. TRANSPORTATION IMPROVEMENT PROGRAM: QUARTERLY SNAPSHOT The HRTPO staff monitors the status of all projects in the Transportation Improvement Program (TIP). On a quarterly basis, staff updates expenditure information on TIP projects and identifies CMAQ and RSTP projects for which progress appears to have stalled. The review is summarized in the attached Quarterly Snapshot, which may also be accessed via www.hrtpotip.org. Attachment 17-A 17B. RECORD OF DECISION ISSUED FOR THE RICHMOND TO HAMPTON ROADS PASSENGER RAIL STUDY In a December 14, 2012 press release (attached), the Virginia Department of Rail and Public Transportation (DRPT) announced the Federal Railroad Administration (FRA) had signed a Record of Decision (ROD) for the Richmond to Hampton Roads Passenger Rail Study, satisfying the requirements of the National Environmental Policy Act (NEPA) for a Tier I Environmental Impact Statement (EIS) that considered alternatives for improving rail service between the Richmond and Hampton Roads regions. The issuance of the ROD makes DRPT and FRA eligible to initiate the Tier II NEPA process, which will develop, evaluate, and recommend specific improvements within the corridor that are consistent with the ROD and will achieve the purpose and need of the Tier I level study. To review the Tier I Final EIS, go to: http://rich2hrrail.info/pages/mp_reports.html#Tier. Attachment 17-B 17C. GOVERNOR’S 2012 STATEWIDE CONFERENCE SUMMARY During Governor McDonnell’s annual transportation conference, the Governor addressed Virginia’s transportation challenges and announced a transportation funding package for the upcoming 2013 General Assembly session.
    [Show full text]
  • Design-Build Lump Sum Agreement Template
    Request for Proposals I-64 Hampton Roads Bridge-Tunnel Expansion Project Part 3 November 28, 2018 Comprehensive Agreement Addendum No. 1 PART 3 Comprehensive Agreement Between Department and Design-Builder This COMPREHENSIVE AGREEMENT for the I-64 Hampton Roads Bridge-Tunnel Expansion Project (the “Agreement”) is made as of [●], 2019 (the “Agreement Date”), by and between the VIRGINIA DEPARTMENT OF TRANSPORTATION (“Department”), an agency of the Commonwealth of Virginia and [●] (“Design-Builder), a [●], for services in connection with the Project. Commonwealth of Virginia Virginia Department of Transportation Page 1 of 30 Request for Proposals I-64 Hampton Roads Bridge-Tunnel Expansion Project Part 3 November 28, 2018 Comprehensive Agreement Addendum No. 1 Table of Contents Article 1: Scope of Work ...............................................................................................................5 Article 2: Contract Documents.......................................................................................................5 Article 3: Interpretation and Intent .................................................................................................5 Article 4: Ownership of Work Product ..........................................................................................7 Article 5: Contract Time ................................................................................................................8 Article 6: Contract Price...............................................................................................................12
    [Show full text]
  • APPENDIX – E PROJECT DESCRIPTION I-64 Hampton Roads Bridge-Tunnel Expansion Project Hampton Roads Connector Partners 240 Corporate Blvd
    APPENDIX – E PROJECT DESCRIPTION I-64 Hampton Roads Bridge-Tunnel Expansion Project Hampton Roads Connector Partners 240 Corporate Blvd. 4th floor Norfolk, VA 23502 Hampton-Norfolk, Virginia August 30, 2019 TABLE OF CONTENTS Project Description.......................................................................................................................... 1 E.1 Project Overview...................................................................................................................... 1 E.2 Purpose and Need ................................................................................................................... 5 E.3 Project History ......................................................................................................................... 6 E.4 Project Schedule.................................................................................................................... 11 E.5 Project Location ..................................................................................................................... 11 E.6 Design Overview.................................................................................................................... 11 E.6.1 Design Segments ........................................................................................................... 11 E.6.2 Island Expansions .......................................................................................................... 14 E.6.2.1 North Island ............................................................................................................
    [Show full text]