(R&B) Department Kashmir
Total Page:16
File Type:pdf, Size:1020Kb
Finanical details of State Sector Roads (Projectization) during 2015-16 (R&B) Department Kashmir (Rs in lakhs) Physical Progressive Year of Target Expdt Cost of Date of Progress of expdt to the Payment S.No. Name of the Project/ Work Commenc Year of during the work sanction work in end of the pending edment completion year Percentage year 1 2 3 4 5 6 7 8 9 10 DISTRICT PULWAMA Awantipora town roads including Kanjinar 454 502.00 2009-10 2013-14 2022-23 35% 23.00 178.01 323.99 Rajpora Road Pampore town roads including Maij Konibal 455 876.00 2009-10 2013-14 2025-26 25% 7.00 223.00 653.00 road Roads at Khrew Shar/Mandakpal incl. road to 456 450.00 2010-11 2013-14 2024-25 11% 6.00 48.64 401.36 shrine of Wahab sahib 457 Marvel Nihama road 70.00 2013-14 2013-14 com 100% 12.00 70.00 0.00 458 Kakapora Town roads incld. Naman link 95.00 2013-14 2013-14 2019-20 31% 17.78 29.78 65.22 Shar Shooting Lodge to Shrine of Wahab 459 30.00 2014-15 2014-15 2017-18 67% 10.00 20.00 10.00 Sahib via Badedalow (CMs commitment) 460 Tral town roads 407.00 2009-10 2009-10 2020-21 57% 14.00 230.50 176.50 461 Awantipora Tral via Nowdal. 486.00 2009-10 2009-10 2022-23 38% 41.00 186.08 299.92 Widening of Tral Nowdal road 460.00 2009-10 2009-10 2023-24 11% 50.00 50.00 410.00 462 Awantipora Tral road via Dadsar 360.00 2010-11 2010-11 2021-22 31% 28.00 113.00 247.00 463 Tra Aripal l Satoora road 510.00 2010-11 2010-11 2022-23 37% 17.00 189.50 320.50 464 Tral Mandoora road 540.00 2011-12 2011-12 2023-24 8% 11.00 43.00 497.00 465 Khankah Medoora Batagund Pastuna road 510.00 2008-09 2008-09 2021-22 49% 18.50 249.50 260.50 Hari Kaigam link road Awantipora incl. 466 144.00 2008-09 2008-09 2018-19 41% 11.00 58.90 85.10 Batipora link 467 Const of Kahlil Tral Nagabal road 250.00 2010-11 2010-11 2020-21 24% 24.65 59.65 190.35 468 Diver Chatrigam link road 62.50 2007-08 2007-08 2018-19 31% 8.00 19.30 43.20 Interior roads of Tral Constituency incl Pirnar 469 450.00 2007-08 2007-08 2022-23 13% 5.00 57.30 392.70 Allegund road 470 Tral Shikargah Buchoo road 208.00 2013-14 2013-14 2021-22 10% 6.00 20.00 188.00 489 Midora - Khankah road and Harikeegam road 50.00 2014-15 2014-15 2018-19 40% 20.00 20.00 30.00 491 Syedabad Khrew Road 750.00 2014-15 2014-15 2025-26 3% 25.00 25.00 725.00 471 Pulwama Town roads 1051.00 2013-14 2013-14 2025-26 38% 72.00 401.81 649.19 472 Pulwama Circular (Bypass) road 2827.00 2012-13 2012-13 2026-27 49% 25.00 1397.00 1430.00 473 Pampore Shopian road 1100.00 2013-14 2013-14 2024-25 36% 53.00 392.00 708.00 474 Tahab Naina road via Chakoora 560.00 2013-14 2013-14 2023-24 38% 14.00 211.00 349.00 475 Pulwama Awantipora road 700.00 2013-14 2013-14 2024-25 22% 55.00 155.00 545.00 476 Interior roads of Beighpora 151.00 2013-14 2013-14 2021-22 26% 16.00 40.00 111.00 477 Ziyarat Sharief Honipora road 91.60 2013-14 2013-14 2018-19 44% 19.00 40.11 51.49 478 Interior roads at Parigam Urwan & Katibug 198.00 2013-14 2013-14 2019-20 45% 39.70 88.40 109.60 479 Interior roads at Litter 96.90 2013-14 2013-14 2018-19 48% 14.00 46.10 50.80 480 Gulzarpora road 117.80 2013-14 2013-14 2019-20 18% 5.00 21.00 96.80 494 Koil Ranzipora 100.00 2015 - 16 2015 - 16 2019-20 20% 20.00 20.00 80.00 Upgrd of road at Mohalla Harpora, 481 Awantipora Pulwama from H/o Gh 30.00 2013-14 2013-14 2018-19 27% 5.00 8.00 22.00 Mohammad Bhat to Gh Rasool Bhat 482 Kakpora Newa Rohmu Pakherpora road 750.00 2013-14 2013-14 2024-25 23% 10.00 170.00 580.00 483 Tahab town including Hajampora link 240.00 2013-14 2013-14 2019-20 34% 15.00 81.00 159.00 Impvt of Rajpora Below/ Drubgam roads 484 285.00 2013-14 2013-14 2018-19 80% 40.00 228.05 56.95 including Rajpora Dompora road Constr of link road from Rest House Tahab to 485 199.00 2013-14 2013-14 2019-20 36% 22.00 71.00 128.00 Koil Canal 486 Link road at Check-i-Below Pulwama 25.00 2013-14 2013-14 2016-17 89% 15.00 22.25 2.75 487 Pulwama Tahab Naina via Watchi road 880.00 2013-14 2013-14 2024-25 37% 40.00 324.50 555.50 488 Pulwama Rohmu road 150.00 2013-14 2013-14 2019-20 36% 10.00 54.00 96.00 490 Shadimarg Qasbiyar 100.00 2015 - 16 2015 - 16 2018-19 35% 35.00 35.00 65.00 Macadamization of road from Lassipora to 493 100.00 2015 - 16 2015 - 16 2019-20 15% 15.00 15.00 85.00 Achan TOTAL DISTRICT PUL'MA ( 38 SCHEMES) 16962.80 34% 894.63 5712.38 11250.42 Page 1 of 2 Finanical details of State Sector Roads (Projectization) during 2015-16 (R&B) Department Kashmir Revised cost if any/date of revision 11 502.00 876.00 450.00 70.00 95.00 30.00 407.00 486.00 460.00 360.00 510.00 540.00 510.00 144.00 250.00 62.50 450.00 208.00 50.00 750.00 1051.00 2827.00 1100.00 560.00 700.00 151.00 91.60 198.00 96.90 117.80 100.00 30.00 750.00 240.00 285.00 199.00 25.00 880.00 150.00 100.00 100.00 16962.80 Page 2 of 2.