<<

City of Leander RFQ #S21-052 Pre-Qualification for Engineering Services Pool - Land Surveying

Bid Info: City of Leander

Pre-Qualification for Engineering Services Pool - Land Surveying

Solicitation No. S20-052

Opening: 9/3/2020

EVALUATION CRITERIA Max Points

Relevant Qualifications and Availability 20 20 20 20 20 20 20 20 20 20 20 20 20 20

Legal Name: Acklam, Inc. Legal name of firm: KCI Technologies, 5910 Courtyard Dr. STE 300 Inc. , TX 78731 KCI’s TBPE firm registration number is Legal Name of Firm: Haynie LEGAL NAME OF FIRM: KFW Legal business description: Legal name of firm LEGAL NAME OF FIRM: Cobb, Fendley & 10573 and the firm’s TBPLS number is Consulting, Inc. Management LLC, dba KFW Corporation Legal Name: LNV, LLC Legal Name of Firm: Burgess & Niple, Doucet & Associates, Inc. Associates, Inc. 10194365. Registered Engineering Firm# F- Engineers & Surveying Texas Board of Professional Engineers TBPE Firm No.: F-366 Inc. Legal Name of Firm TBPE firm registration number TEXAS ENGINEERING BOARD: TBPELS Location of office that shall conduct 2411 TEXAS ENGINEERING BOARD FIRM and Land Surveyors firm registration Location: Austin, Texas Engineering Firm No. 274 Name of Firm: Legal name of firm: Civil & Legal Business Description: Established 2012; Firm Name: Gessner Engineering, LLC F-3937 work: Cedar Park office. Support Texas Licensed Surveying Firm # REGISTRATION NUMBER: TBPE Firm number Contact Person: Marcus Naiser, PE - LOCATION OF OFFICE CONDUCTING WORK M&S Engineering, LLC Environmental Consultants, Inc. Corporation Mendez Engineering, PLLC Texas Engineering Board firm Location of Corporate Office staff are in Houston and Dallas. 10025000 #9513 • Legal name of firm; Texas Firm #10194171 Group 505 E. Huntland Drive, Suite 100 Firm License: F-1394 Texas Engineering Board firm Location of Office Conducting Work: MWM DesignGroup (MWM) Firm License: F-14070 registration number 7401 B Hwy 71 West, Suite 160 512.834.9798 p | 512.834.7727 f List of services the firm offers: KCI’s Location of Office: 1010 Provident LOCATION OF OFFICE THAT SHALL Texas Board of Professional Engineers Leader Legal Business registration number: F-38 4029 S Capital of Texas Hwy Suite 305 E. Huntland Drive, Suite 200 Physical Address: • Texas Engineering Board firm registration #7451 Austin, Texas 78735 CONTACT PERSON: JULIE HASTINGS, PE, professional staff of engineers, Lane, Round Rock, Texas 78664 CONDUCT WORK and Land Surveyors, Surveyor of Record P: (512) 381-8332 Description: Corporation Location of office that shall conduct 220 Austin, TX 78752 12950 Country Parkway, Ste 120 number; Location of Office That Shall Conduct Location of Williamson County Office LGPP planners, scientists, surveyors, and Contact Person(s): Tim Haynie KFW Management, LLC dba KFW Douglas W. Chinn, RPLS No. 5367 A: 7500 Rialto Blvd., Building 1, STE PROJECT MANAGER Physical Address: work: Austin, TX Austin, TX 78704 TBPE F-1416 | TBAE 1452 | TBPLS San Antonio TX 78216 • Location of office that shall conduct work Work 10800 Pecan Park Blvd construction managers offer a broad Legal Business Description: Engineers & Surveying will be SERVICES ACKLAM OFFERS 240, Austin, TX 78735 Direct: 512.646.4323 376 Landa Street; New Contact persons: James Massaro - Contact Person: 10065600 Phone: (210) 802-0808 • Contact persons; Georgetown, Texas (3200 University) Suite 140, range of engineering services, including Corporation performing all work from its second • TSPS Land Title Surveys and Legal Business Description: Limited Mobile: 512.585.7408 Braunfels, Texas 78130 [email protected] Kellen Hurst, PE, LEED AP MWM Service Groups: Year Established: 2012 • Legal business description; (Individual, Legal Business Description (Individual, Austin, TX 78750 Email: [email protected] wireless/communications infrastructure, List of Services the Firm Offers: location at 162 W. Mill Street, New Standard Land Surveys Liability Corporation Primary Contact: Legal business description: Texas Engineering Board Firm CIVIL ENGINEERING Primary Contact: Partnership, Corporation, Joint Venture, Main Point of Contact LEGAL BUSINESS DESCRIPTION: Texas civil, structural, transportation, We specialize in civil engineering Braunfels, Texas and it’s headquarters Partnership, Corporation, Joint Venture, etc.) • Topographic and Existing Condition Design Services Offered by Firm: Jerod Mott, PE, CFM Corporation Registration Number: SURVEYING Ray Méndez, PE, CFM, RGDP etc.) POC: C.L. “Roy” Mynier, PE, PMP, Corporation environmental, hazardous waste, design, land surveying services and located at 3421 Paesanos Parkway, • List of services the firm offers Surveys Drainage/Stormwater, Water, LIST OF SERVICES: traffic engineering, roadway E: [email protected] Services Offered by CEC; AIR F-10834 ARCHITECTURE [email protected] Corporation PTOE Phone: 512.953.7645 Email: mechanical, electrical, construction observation for commercial San Antonio, Texas. • Land and Subdivisions Wastewater, Traffic Engineering design, water and wastewater design, drainage P: (830) 228-4155 QUALITY, CIVIL ENGINEERING, OFFER THE FOLLOWING SERVICES LANDSCAPE (210) 802-0808 List of Services the Firm Offers [email protected] telecommunications, and soils. site development and residential CONTACT PERSONS: Chris Otto, PE, • ALTA/NSPS Land Title Surveys Services, Roadway systems design and analysis, land surveying, and Services: civil, structural, Mechanical- ENVIRONMENTAL ENGINEERING UTILITY INFRASTRUCTURE PERMITTING As a local Individual Minority/Disabled- Survey Civil Engineering Geotechnical Legal business description other general engineering services for multi- Engineering is not all we do. We also engineering, including street and CFM & Burt Wellmann, PE. • Property Exhibits Architecture, Structural, Environmental, Electrical-Plumbing (MEP), and AND SCIENCES, WATER ENVIRONMENTAL Veteran Owned Small Business Engineering Structural Engineering S Corporation disciplinary projects in Central Texas, supported provide cultural and environmental drainage, water and wastewater utilities LEGAL BUSINESS DESCRIPTION: • GIS and Mapping Services Surveying, Facility Management electrical engineering RESOURCES, SURVEYING ARCHITECTURE currently operating with fifteen (15) Construction Materials Testing Provide Services: transportation/traffic by our comprehensive, in-house utility resource management services, land design and relocations, and Limited Liability Corporation • 3D Laser Scanning (3DLS Planning, Construction Management, coordination, right-of-way (ROW) acquisition, TRANSPORTATION employees. engineering, water, wastewater and planning and landscape architecture, City/County/State permitting for both LIST OF SERVICES: Civil Engineering, • Close Range Aerial Photogrammetry Commissioning, Safety Training. geographic information system (GIS), and LAND DEVELOPMENT various public works projects. geology, hydrology, ecology, surveying, municipalities and private land Land Surveying, GIS Services, utilizing Small Unmanned Aircraft subsurface utility engineering (SUE) services. and development. Geological & Environmental Services Systems (sUAS) construction management and • Construction Staking and As-Built inspection. Surveys

Doucet & Associates, Inc. is a firm of 80 employees established in Austin, Texas The Gessner Engineering principals in 1992. Manages our current and Project Manager, Ms. Julie Hastings, Our project manager, Jerod Mott, PE, CEC regularly reviews workload by office The project will be managed and B&N staff will be available to work on and assigned professionals are projected workload and staffing needs PE, LGPP is available to serve on this KCI has land surveying staff in Dallas CFM will prepare a staffing plan based and by Practice through a series of delivered by LNV’s Austin office with this project with support staff available over 79 years of responsible available, interested, and committed to by performing weekly staff meetings and project assignment immediately and and Houston. With our proximity and on the scope of work, manpower regularly scheduled meetings/reviews. support from the San Antonio and for peak workload periods or if the professional experience, the success of projects awarded under monthly division manager meetings. We move the City’s projects forward. Staff many resources, we are committed to requirements, and project schedule. Each office holds a weekly meeting to Our firm has worked in Leander, by way Corpus Christi offices. Our proximity to project schedule requires additional staff providing project management, aerial this contract with City of Leander. The are committed to maintaining projects redundancy to fill in should schedules delivering quality This plan will identify specific staff review new and upcoming proposal of commercial, surveying, and Leander will allow us to provide a support. The City can expect to have mapping using unmanned aircraft professionals included in this statement on schedule and on budget and will be expedited or unforeseen personnel and responsive surveys for our clients. members who will be working on the activity and reports shared opportunities. environmental services. We have Austin-based corporation providing Firm contacts shall be: Ray Méndez, prompt response and to be on site Haynie Consulting, Inc. is a professional the best B&N has to offer in client systems (UAS), civil survey, 3D of qualifications have experience with actively prevent any issues from changes be required. working with our Survey crews are led by experienced project and when. This plan is used to Additional practice meetings/ reviews completed projects such as numerous a comprehensive multi-disciplined PE, CFM, RGDP and Roy J. Akiona, within a couple hours of a phone call to civil engineering and land surveying firm service and technical expertise at its laser scanning (3DLS), mapping and multiple IDIQ contracts and have occurring that would affect our ability to clients to meet special requests and party chiefs and outfitted with state-of- lock in our staff commitments, making are held to review workload, schedule Leander Storage Facilities, numerous approach to public infrastructure PE, CFM. Rene Arredondo, PE, PTOE resolve any significant issues or attend committed to meeting the needs of its disposal for the life of the project. With design related services. ACKLAM and created a system to adjust schedules deliver the highest-quality, on-time tight deadlines. the-art equipment. them available to meet the City’s needs. manpower and anticipate schedule Family Dollar locations, a Whataburger projects. MWM’s project managers will (AC Group, LLC , Office location: San Provide a statement on the availability, interest, an important meeting. LNV will report to clients in a way that is accurate and B&N, you will receive a personalized its personnel’s experience is and teams’ assignments for immediate products and services. will provide Ms. Hastings will be available for regular These crews are experienced in Currently operating at approximately 60- changes. CEC regularly monitors our location, a pre-school opening this fall - serve as the primary interface Antonio) will be our Teams Traffic and commitment of the firm, its principal(s) and the City staff when requested to address timely. The key personnel will approach to every task to benefit you based in the civil survey/mapping and deployment upon notification of an updates to the City with a project status. progress and coordination meetings, as surveying simple to complex projects 70% of capacity, which is normal for our workload and backlog against staff The Learning Experience. Project between the project team and the City Engineer assigned professionals to undertake the project, issues or formulate solutions for field communicate with the City of Leander's and your community. The B&N team is design and residential/commercial site awarded project. The status reports will provide the City well as emergency meetings as nationwide. Survey crews have company. Over the next year, our availability and adds personnel, as Manager, Mr. Wellmann, will be Project Manager. MWM operates who has 20 years of experience. challenges. Additionally, when Project Manager via calls, emails, virtual prepared and available to commit reporting responsibilities and how the firm will development. In the We are committed to responsive with up-to-date information. Each report required. It is our custom to have responded immediately to urgent backlog of work is expected to decline, necessary, to meet client and project available to provide project direction and under a company-wide responsiveness Registration necessary, team members will attend meetings and face to face meetings as personnel, resources and expertise interface with the City of Leander’s Project performance of land surveying we also communication with the City of will contain the following items: meetings when they are necessary to tasks and provided ample support to thus staff availability will increase. Our requirements deadlines to our consultant teams/task initiative, and individual project Professional Engineer City Council meetings to present allowed, as well as making site visits as throughout the contract's longevity. Manager. support; ROW easement and land Leander’s Project Manager and will • Meeting Minutes from any prior accomplish project objectives. We will fast-tracked projects. Our field crews are current projections show M&S CEC will appoint Mr. Adam Mehevec, leads who will report to him regularly. managers will respond to any Texas No. 91678 recommendations or progress reports needed and required by the City of acquisition, and route assign Sarah Korpita to serve as the meetings provide meeting agendas and minutes. supported by expert office staff. KCI’s Engineering has adequate capacity to PE as Project Principal for assignments Each task leader is then responsible for communication within a day. Professional Traffic and will be available, for as long as Leander to move the projects forward Project Manager (PM), Kellen Hurst, development/selection. We at ACKLAM client experience liason to coordinate • Current status of design/construction Will provide weekly or bi-weekly project survey team serve the City on this 3-year contract. on this rotation list. Mr. Mehevec is a the production of plans, specifications, We are confident that our extensive Operations Engineer needed, to stay at the project site to and with precision. prides himself on the management understand the needs of our clients and client interaction. Once a project is • Anticipated future milestone dates progress updates to keep the City evaluates each project to determine the Our staffing approach is developed Texas-licensed Professional Engineer and estimates in his/her field and will experience managing and Certification No. 1586 give direction on emergency situations. principle of "no surprises." He will the depth of our kicked off, the designated project (30%, 60% completion, etc) informed on project progress, upcoming most innovative, cost-effective based on over two decades of providing with more than 20 years of experience oversee a team of designers who, in Further, we affirm that each member of ensure an open line of communication collective experience offers a well- manager will correspond with project • Any additional needs to complete planned activities, needs from the client, solution––an approach that builds trust engineering services to our clients. performing and managing complex turn, are responsible for individual tasks. the project team is registered or between the B&N project team and the rounded service offering. schedule and deliverables until project project (additional survey, owner and outstanding issues. Zoom or and enhances These proven steps are essential in civil engineering and environmental licensed, is employed by the prime firm City of Leander and its Project Manager. close. provided information, etc) Microsoft Teams opportunities for growth. responding to the City of Leander’s projects in Texas. and is in good standing. • Projected date of final drawings or needs in a timely manner. construction

Proposed Staff 30 30 30 30 30 30 30 30 30 30 30 30 30 30

Chris Otto, PE, CFM Principal in Charge Project Manager PE: Texas, No. 113172 Response states availability for work. James Sassin, PE Jerod Mott, PE, CFM CFM: Texas, No. 0752-05N Ray Mndez, PE, CFM, RGDP Project Manager Teresa A. Seidel, RPLS Project Principal, QA/QC; Roy J. Project Manager C.L. “Roy” Mynier, PE, Marcus Naiser, PE PROJECT PRINCIPAL: Dan Warth, PE Roadway Design Jeremy Peters Principal In Charge Project ManagerRPLS: Texas, No. 5672 Akiona, PE, CFM PMP, PTOE Austin, TX Principal-in-Charge * Cody Condron, RPLS, CP, CMS* Craig Wilson, PE (New Braunfels) PROJECT PRINCIPAL College Station, TX Principal-in-Charge: Dr. Steve Sanders, Rick Gray, PE, CFM Project Manager, Drainage Engineer; • Names and roles of key personnel proposed to • Mike Brown, Party Chief – 0.5 FTE QA/QC Manager Davood Salek, P.E. Derek Naiser, PE, CFM Austin | 35% Availability Project Manager 25% Houston, TX Julia Harrod, PE, F.NSPE Sarah Korpita Client Experience Liason Greg Lewis, PE PE Asst. Project Manager Marcus G. Cantu, PE work on this effort and their office locations. • Curt Acklam, Project Surveyor – 0.5 Austin, TX QA/QC Project Manager: Julie Hastings, PE, James Gellenthin, PLS* Principal-in- Drainage System Design and Analysis Timothy E. Haynie, P.E., R.P.L.S. - Georgetown, TX Vice President QA/QC Project Manager: Kellen Hurst, PE, Burt Wellmann, PE Utility Coordinator; Jose J. Calvillo, EIT, • Include resumes for all key personnel and FTE Project Principal Keith Young, P.E. ROADWAY DESIGN LGPP * Charge 5% Raleigh, NC Jerod Mott, PE, CFM (New Braunfels) President QA + QC Daniel Davis QA/QC San Antonio, TX LEED AP Project Manager CFM indicate any individuals who have had previous • Douglas W. Chinn, RPLS, PLS – Austin, TX Byron Sanderfer, PE, CFM Austin | 55% Availability Ciro Di Napoli* Designer 25% Houston, Patrick Yglesias, R.P.L.S. - Survey Brian Wells, PE Mike Evans Survey Department Head James Massaro, PE Water/ Wastewater Staff: Billy PE: Texas, No. 75617 Development Engineer; Christina Cruz experience on similar projects. Manager of Surveying and Sr. Project Bryan Spina, PE, CFM QUALITY ASSURANCE MANAGER: TX Bridge/Structural Engineering Manager College Station, TX Point of Contact Wendland, PE, Dan DeGroot, PE, CFM: Texas, No. 2245-12N Project Engineer; Henry Kuehlem, RPLS • Provide staffing size by areas of expertise. Manager – 0.25 FTE Registered Civil Engineers 22 Joseph Arteritano, PE Larissa Prince, PE * Matthew Koss* Survey Technician 10% Amy Stone, PE (New Braunfels) Kevin Mercer, S.I.T. -Project Design PROJECT MANAGEMENT Kyle Lutz Survey Project Manager Project Manager Bernard D'Souza, PE, James Busby, PE: Texas, No. 100256 Land Surveyor; Rene Arredondo, PE, • David Hoofnagle, Survey Technician – Surveying Staff 21 Jay Campbell, PE, CFM, CPESC Austin | 45% Availability Raleigh, NC Manager, Engineering and Surveying Tony Buonodono, PE, PMP • Provide staff availability to perform services. College Station, TX Jennifer Garcia, PE PE, Amanda Frazier, EIT, Sam Ryan Oxenreiter, CFM, EIT PTOE 0.5 FTE Drafting Technicians 17 Robert Viera, PE, RPLS. LNV’s staff is LEAD ENGINEER : Alfonso Casio, PE * James Walden Field Technician 4 25% Water-Wastewater Design Utility Tim Haynie, P .E. - Engineering Steve Zobal, PE Provide the proposed Project Manager’s Matt Noble Survey Project Manager Principal QA/QC Swanson, PE, Christie Ruffner, PE, Engineer - H&H Traffic Engineer; No org chart provided. • R. Wayne Chinn, CAD Drafting Additional Personnel 24 currently operating at roughly 75-80 Austin | 50% Availability Houston, TX Coordination Manager and Project Manager Rajan Devkota, PE, CFM experience with similar size/types of tasks. College Station, TX CDT Nick Reynolds, PE, CFM On Call Traffic Engineering Contract, Manager – 0.25 FTE Certified Floodplain Managers 8 percent of its capacity and has a SUPPORT: Matt Adams, PE, LGPP * Jose Licona Field Technician 3 25% Brady Kosub, PE (New Braunfels) Anali Gonzales, EIT Jacob Novosad Survey Project Manager Engineer - Water & Streets City of San Antonio; Theo Malone workload free from constraints to Pearland | 30% Availability Houston, TX San Antonio, TX EIT: Texas No. 54857 Corridor‐ Improvements, COSA 2012 complete 17 Support Engineers and Designers Site Design/ Construction Inspection CFM: Texas No. 3290-17N Bond Program (LNV); Baker‐ Hughes projects in a timely manner. Blake Allison, PE (New Braunfels) PE: Texas, No. 111666 Joint Facility Intersection Improvements, Sandy Garza (New Braunfels) CFM: Texas No. 3290-17N Bexar County (MTR Engineers‐ ). Kara Lara Lead GIS Analyst

Project Experience 30 20 20 30 20 20 20 20 20 30 20 20 20 20

Water Wastewater Design N. EAST STREET IMPROVEMENTS | GRAYTOWN ROAD IMPROVEMENTS District 5-Pedestrian Mobility Theo and Malone Avenue Corridors| CITY OF LEANDER | SAN ANTONIO, TEXAS Improvements; Civil Engineering-Street Bar W: Bar W Ranch, in the City of San Antonio, Texas History of Meeting Schedule: Design ROLE IN PROJECT: Civil Engineer and Maintenance Program; Slick Ranch Leander, Texas Role of Firm: Prime met project schedule. Surveyor, Prime Consultant Creek Drainage Project; Westover Lift Station Design Date of Completion/ Project Status: Planned Budget vs. Actual: Project met PROJECT STATUS: Completed Valley Channel Improvements; Upper a. Provide an overview and brief history of the firm. 2019 established budget. January 2020 Drainage Project City of Austin, Austin Bergstrom Wastewater Treatment Plant b. Provide verifiable examples of at least three (3) ENGINEERING SERVICES Total Cost: $14.5M STEIN FALLS WASTEWATER Construction Cost: $3.9M TOTAL COST: $239,769 ; Dollarhide Drainage Project; Broadway International Airport (ABIA) Airport City of Austin Commons Ford Ranch Bagdad Road ROW Swap | Renovation and Expansion projects in each category of experience completed in City of Spring Valley Village | Spring SYSTEM IMPROVEMENTS | Survey for Roadway for US 75, 3A; Ava Maria Outfall; Rochelle Alamo Terminal and Apron Expansion, Metro Park Intersection of Bagdad Road and San CITY OF Kyle | Kyle, Texas the last five (5) years by the prime firm, including: Valley Village, TX Candlewood Subdivision, Phase I | GUADALUPE-BLANCO RIVER Dallas and Collin County, TX RIVERY BOULEVARD T.I.A. Martin Luther King Blvd. TOD Phase Farmstead; Griggs – Acquia Pass to UNITED POWER ON-CALL SURVEY Water Line Relocation / 2016 / CEC investigated the existing septic Gabriel Parkway, Leander, Texas • Project name and location; San Antonio, Texas AUTHORITY (GBRA) | GUADALUPE IMPROVEMENTS | CITY OF EVANS ROAD & WORTHAM OAKS 1 Fig, Total Reconstruction; Bernadine – SERVICES, COLORADO (2015- $275,000,000 (total) system, water system, and associated TM-2 Sanitary Sewer Relief • Services provided; RELLIS CAMPUS INFRASTRUCTURE Role of Firm: Prime COUNTY, TEXAS SH 136 Amarillo to Fritch - Survey GEORGETOWN BOULEVARD | CONVERSE, TEXAS city of austin | austin, texas WW White to Odessa, Reclamation; Present) permit history. CR267 Water Tower PUE | Interceptor • Information whether the respondent was the prime Texas A&M University System | Bryan, Date of Completion/ Project Status: for Roadway and subsurface utility History of Meeting Schedule: Design ROLE IN PROJECT: Civil Engineer and Cottonwood Wastewater Interceptor Wycliff – Dellcrest to Diane CITY OF BRIGHTON, COLORADO ON- 3rd Street Reconstruction from Intersection of CR267 and Kauffman TRINITY RIVER AUTHORITY OF professional or a subconsultant; Texas September 2018/ Construction WEISS LANE WATER engineering, met project schedule. Surveyor, Prime Consultant Phase C2 Reclamation; Oleander-Carson to CALL SURVEY SERVICES (2020) Nueces Street to Trinity Street (9 National Guard-Camp Mabry Loop, Leander, Texas TEXAS (TRA) | Dallas County, Texas • Project status; Complete TRANSMISSION MAIN | CITY OF Amarillo, TX Planned Budget vs. Actual: Project PROJECT STATUS: Project completed city of cedar park | cedar park, texas Mason Reclamation; Projects CITY OF FORT LUPTON, COLORADO City Blocks) Building 75 Renovation • Total cost; WATER & SEWER MAINTENANCE Total Cost: $4,031,941.75 PFLUGERVILLE, TEXAS came in under established budget. in 2018 Hills of Hays Completed under the 2014 CoSA On- (2017) / 2015 / $1,360,000 Civil & Environmental Consultants, Inc. Palmera P.U.E.s; Lot 3, Block L, Water Distribution and Wastewater • Client name and contact person; FACILITY PARKING LOT MASTER Highview Drainage Improvements, Final Construction Cost: $578K TOTAL COST: $151,340 city of san marcos | san marcos, texas Call; Contract;TCI Write “Drainage (CEC) provided civil engineering Palmera Ridge Section 9 | Adjacent to Collection System • History of meeting schedules; and PLAN SH 21 and FM 1966 Intersection VARIOUS UTILITY RELOCATIONS | San Antonio, TX Design Criteria Manual; Port SA 36th St Rio Grande Street, MLK to 29th services, Azul Lagoon Drive, Leander, Texas. Modeling • History of accomplishing services within established City of Killeen | Killeen, Texas Traffic Study and Design | Hays WILLIAMSON COUNTY, TEXAS ALVES LANE IMPROVEMENTS | Subface Utility Engineering; COSA Street and Utility Improvements coordinated survey and geotechnical CITY OF Kyle | Kyle, Texas budget, including planned vs. actual. County, Texas CITY OF NEW BRAUNFELS CITY OF NEW BRAUNFELS Parks & Rec Commanche Park; TCI / 2017 / $1.7 M efforts, prepared civil engineering Role of Firm: Prime History of Meeting Schedule: Design GOODWIN LANE IMPROVEMENTS | Olmos Dam Gate Operation Plan; TCI / design drawings Date of Completion/ Project Status: met project schedule. NEW BRAUNFELS, TEXAS DSD Silent Sunrise Subdivision Plat; and construction specifications, and 2019 Planned Budget vs. Actual: Project met ROLE IN PROJECT: Civil Engineer and TCI Bangor-36th Street Intersection oversaw the construction of the civil Total Cost: $600,000 established budget. Surveyor, Prime Consultant Improvement; CoSA Solid Waste Tool improvements Construction Cost: $8.6M PROJECT STATUS: Ongoing Yard Parking Expansion; CoSA Solid for this renovation work. TOTAL COST: $1,800,000 Waste Bitters-Brush Yard Site Ramp

Methodology and Approach 20 20 20 20 20 20 20 20 20 20 20 20 20 20

Explain how the proposed team will approach, Acceptable. Acceptable. Acceptable. Acceptable. Acceptable. Acceptable. Acceptable. Acceptable. Acceptable. Acceptable. Acceptable. Acceptable. Acceptable. develop, and manage the project

TOTAL: 100 90 90 100 90 90 90 90 90 100 90 90 90 90 AWARD AWARD