List of Institute for Which Recognition of Ministry of Power, Govt. of India Has Expired As on 01.07.2020 Field of Recognition up S.No

Total Page:16

File Type:pdf, Size:1020Kb

List of Institute for Which Recognition of Ministry of Power, Govt. of India Has Expired As on 01.07.2020 Field of Recognition up S.No List of Institute for which recognition of Ministry of Power, Govt. of India has expired as on 01.07.2020 Field of Recognition Up S.No. Name of Institute Address Organization Remarks Training to Central Training Director, WBPDC, HRD, Vidyut Bhawan, 5th Floor, D Block, 1 WBPDC Thermal June, 2008 Institute(CTI), Bandel Sector-II, Vidhan Nagar, Kolkata (W.B.) -700 091 Dy GM Misa Sub-Station Veluguri, Kathiatoli, Nagason 2 EDC, Nagason, Near Tejpur PGCIL T&D Oct, 2009 (Assam)-782 427 EDC, NTPC, Raibareli, General manager, Feroz Gandhi Ucchahar Thermal Power 3 NTPC Ltd. Thermal Dec, 2009 Unchahar project, NTPC Limited Unchahar, Raibareli (UP) - 229 406 Director (Fuel Efficiency & Training), Guru Govind Singh Thermal Training Institute, 4 Super Thermal Plant, Thermal Training Institute, GGSSTPS, PSGCL Thermal June, 2012 GGSSTPS, PSEB, Ropar PSGCL, P.O. - Ghanuli, Ropar (Punjab) - 140 113 Lineman Training Centre, Lineman Training Centre, Vidyut Bhawan, HPSEB Ltd., Recognition under 5 HPSEB Ltd. T&D July, 2013 HPSEB Ltd. Solan Shimla (H.P.)- 170 004 process EDC, Singrauli STPS, EDC, Singrauli STPS, NTPC, Singrauli, P.O- Shakti Nagar, 6 NTPC Ltd. Thermal August, 2013 Singrauli Sonbhadra ( UP) -231 222 Director General, Central Power Research Institute, Prof. Sir Thermal, Hydro, Central Power Research 7 CV Raman Road, Sadashiv Nagar, P.B. NO. 8066, CPRI T&D, Power July, 2014 Institute Bangalore(Karnatka) -560 080 management Officers Training Institute, Addl. CE (IT & Trg.) RRVPNL, Vidyut Bhawan, Janpath, 8 RVPNL T&D October, 2014 Jaipur Jaipur (Rajasthan) -302 005 Electricity Training Institute, Director, Electricity Training Institute, U.P. Power Corporation U.P.Power 9 U.P. Power Corporation Ltd, T&D Feb, 2015 Ltd, Lucknow (U.P.)- 226 008 Corporation Ltd. Lucknow EDC, 800/400/220 KV, EDC,PGCIL, 800/400/220 KV, Kishenpur Sub-station, 10 PGCIL T&D March, 2015 Kishenpur Sub-station Kishenpur, Manwal Via Dansal, Jammu (J&K) - 181 224 Transmission and Sub- station Training & CMD, TNGDCL,NPKRR Maaligai, 144, Annasalai, Chennai 11 TNEB Ltd. T&D June, 2015 Development Institute, Distt. (T.N)- 600 002 Madurai Hydro Training Centre, GM, Tanakpur Power Station, Hydro Training Centre, NHPC, 12 Tanakpur Power Station, Tanakpur Power Station, Banbassa, Champawat NHPC Ltd. Hydro December, 2015 Champawat (Uttrakhand)- 262 310 EDC, 400 KV Itarsi Sub- Manager, EDC, PGCIL, 400/220KV substation, Pathrota, 13 PGCIL T&D January, 2016 station, Itarsi Itarsi(MP)- 461 111 Vice President, Power Training Centre, Indian School of Power Training Centre, Thermal, Hydro, Petroleum and Energy, Bidholi Campus office, Energy Acres, 14 Indian School of Petroleum ISPE T&D, Power March, 2016 Po- Bidholi, Via prem Nagar, Dehradun (Uttarakhand) - 285 and Energy, Dehradun management 006 Synergem Training Institute, Principal Director, JD College of Engineer, Khandala, PO- 15 Synergem Thermal June, 2016 Nagpur Valni, Katol Road, Nagpur (Maharashtra)- 441501 OMS Power Training Principal, OMS Power Training Institute, N2/172, IRC Village, Recognition under 16 O&M Solutions Thermal February, 2017 Institute, Bhubaneswar Nayapalli, Bhubaneswar (Odisha)- 751 015, process Head of the Institute, Employee Development Centre, 21st Transmission, Employee Development KM Hosur, Krishnagiri Highway (NH-7), Shoolagiri Post, 17 PGCIL Power February, 2017 Centre, Krishnagiri Hosur (T.N.) - 635 117 Management Thermal, Hydro, Infrastucture Construction & Principal Director, Infrastucture Construction & Operations Transmission, Sunil Hitech 18 Operations Management Management (ICOM), Sai Rudra, Plot No-39, Panchal Distribution and August, 2017 Engineers Ltd (ICOM) Nagpur Layout, Hingna Road, Nagpur (Maharashtra) - 440 013 Power Management Hydro Training CMD, TNGDCL,NPKRR Maaligai, 144, Annasalai, Chennai 19 TNEB Ltd. Hydro August, 2017 Institute,TNEB Ltd. (T.N.) -600 002 Distribution, Letter sent to institute Power Distribution Training Director, Power Distribution Training Centre, Diksha Parisar, 20 MPMKVVCL Power January, 2018 for complaince on Centre, Govindpura, Bhopal Bhopal (M.P) Management 17.05.2019 List of Institute for which recognition of Ministry of Power, Govt. of India has expired as on 01.07.2020 Field of Recognition Up S.No. Name of Institute Address Organization Remarks Training to Thermal Training Institute, Letter sent to institute MD, UP Rajya Vidyut Utpadan Nigam Ltd, Shakti Bhawan, 21 Obra Thermal Power UPRVUNL Thermal March,2018 for complaince on 14 Ashok Marg, Lucknow (U.P) - 226 001 Station,Obra, Sonebhadra 06.01.2020 Thermal,Hydro, Power Engineer’s Training & CMD, KSEBL, Vidyuti Bhavanam, Pattom, Power Engineer’s Transmission, Recognition under 22 Research Centre, Training & Research Centre, Thiruvantpuram (Kerala)- 695 KSEB Distribution, November, 2018 process Moolamattom, Idukki 004 Power Management Renewal application O&M Training Institute, Dircetor (HR), O&M Training Institute, CESC Ltd., P-18, returned due to non Power 23 CESC Ltd.,Taratala Road, Taratala Road, Kolkata (West Bengal) - 700 088 CESC December, 2018 fulfillment of mandatory Management Kolkata conditions on 18.12.2019 Plant Training Centre, Plant Training Centre, Titagarh Generating Station (TGS), Titagarh Generating Station B.T. Road, Titagarh, 24- Parganas, Kolkata, (West Bengal) - 24 CESC Thermal December, 2018 (TGS), B.T. Road, Titagarh, 700 119 Kolkata Renewal application Plant Training Centre, Plant Training Centre, Southern Generating Station (SGS), returned due to non Southern Generating Station 25 28,Graden Reach Road, Kolkata (West Bengal) - 700 024 CESC Thermal December, 2018 fulfillment of mandatory (SGS), Graden Reach Road, conditions on Kolkata 18.12.2019 LANCO, Training and Sr, General Manager, LANCO Power limited, Pathadi. Po- 26 LANCO Thermal April,2019 Development Center, Korba Tilkeji, Korba (Chhatisgarh) - 495 674 Thermal and EDC, National Capital Power EDC, NTPC, Dadri, Vidyut Nagar, National Capital Power 27 NTPC Ltd. Power May, 2019 Station, Dadri Station, Dadri (U.P.) - 201 008 Management Adani Electricity Generation AEMI, Adani Electricity Mumbai Ltd., J-V Link Road, Opp. Management Adani Electricity (Thermal/ Hydo), 28 SEEPZ, North GateNo.-3, Aarey Colony Road, Goregaon, May, 2019 Institute(AEMI), Goregaon, Mumbai Ltd. T&D, Power Mumbai (Maharashtra) - 400 065 Mumbai Management Generation DVC Training Institute Director, DVC, Training Institute, Chandrapura TPS, Distt.- (Thermal/ Hydo), Recognition under 29 Chandrapura TPS, Distt.- DVC May,2019 Bokaro (Jharkhand) - 828 403 T&D, Power process Bokaro Management Thermal,Hydro, Transmission, AGM, EDC, Korba STPS, Jamni[palli, Korba (Chattisgarh) - 30 EDC, Korba STPS, Korba NTPC Ltd. Distribution and June, 2019 495 450 Power Management Dy General Manager, Badarpur Thermal Power Station, 31 EDC, Badarpur NTPC Ltd. Thermal July, 2019 Badarpur (Delhi)-110 044 EDC, Tanda,Vidyutnagar, Dy General Manager, EDC, NTPC, Tanda, Distt.- Ambedkar 32 NTPC Ltd. Thermal July, 2019 Ambedkarnagar Nagar (U.P) -224 238 Plant Training Centre, Plant Training Centre, Budge Budge Generating Station Budge Budge Generating (BBGS), Pujali, 24 Parganas, Kolkata (West Bengal)-700 Recognition under 33 CESC Ltd. Thermal August, 2019 Station (BBGS), CESC Ltd., 138 process Pujali, Kolkata Transmission & EDC, 400KV Sub-station, DGM, PGCIL,EDC, 400KV Sub-station , Ghatkesar, RR - Recognition under 34 PGCIL Power October, 2019 PGCIL, Hyderabad Distt.,Hyderabad (Telangana) - 501 301 process Management OPTCL Power Training Centre, 220/132/33/kV Grid Director (HRD), OPTCL Power Training Centre, 35 Subsation, Chandaka, 220/132/33/kV Grid Subsation, Chandaka, Bhubaneshwar, OPTCL T&D December, 2019 Bhubaneshwar (Orissa)-751 024, Renewal application Hydro Power Training General Manager, NHPC Ltd., Hydro Power Training returned on 07.01.2020 36 Institute, Chamera Power Institute, Chamera Power Station -I, P.O- Kheri, Chamba NHPC Ltd. Hydro January, 2020 due to non fulfillment of Station -I, Chamba (H.P.) - 176 325 mandatory conditions List of Institute for which recognition of Ministry of Power, Govt. of India has expired as on 01.07.2020 Field of Recognition Up S.No. Name of Institute Address Organization Remarks Training to Renewal application OHPC Training Centre, Plot Director (HRD), OHPC Training Centre, Plot No08, returned on 02.03.2020 No08, Chandaka Industrial Chandaka Industrial Area, P.O KIIT, Bhubaneswar (Orissa) - due to non fulfillment of 37 OHPCL Hydro February, 2020 Area, P.O KIIT, 751 024 mandatory conditions Bhubaneswar and non compliance of previous observations JSW Energy Centre of Deputy General Manager, JSW Energy Centre of Excellence, Excellence, OPJ Centre, OPJ Centre, Toranagallu Post, Distt.-Bellary (Karnataka) - Recognition under 38 JSWEL Thermal January, 2020 Toranagallu Post, Distt.- 583 123 process Bellary Head (Joint general manager), L&T Power Training Institute, L&T Power Training IPM/ PTI Building, KC Residency (behind knowledge Recognition under 39 Institute, Vadodra L&T Thermal January, 2020 city),National Highway (NH)-8, Between Ajwa & Waghodia process Crossing, Vadodara,(Gujarat) - 390017 EDC, Vindhyachal EDC, NTPC Vindhyachal STPS, VindhyaNagar, Distt.- Sidhi Recognition under 40 STPS,VindhyaNagar, NTPC Ltd. Thermal March,2020 (MP) - 486 885 process Distt.Sidhi Training Centre, Sabarmati Sabarmati Generating Station Training Centre, Sabarmati Recognition under 41 Generating Station, Torrent Power Thermal March,2020 PS, Torrent Power AEC, Ahmedabad (Gujarat)- 380 005 process Ahmedabad Thermal & Thermal Training Institute, Thermal
Recommended publications
  • 1 in the High Court of Judicature at Madras Dated
    1 In the High Court of Judicature at Madras Dated: 09.10.2013 Coram The Honourable Mrs.JUSTICE CHITRA VENKATARAMAN and The Honourable Mr.JUSTICE T.S.SIVAGNANAM Tax Case (Appeal) Nos.2206 to 2208, 2629 and 2630 of 2006, 56 to 64 of 2013, 598 to 601 of 2013 & M.P.Nos.1, 2, 2, 1 and 2 of 2006, 1, 1 and 1 of 2008 T.C.(A)Nos.2206 to 2208 of 2006: M/s.Poompuhar Shipping Corporation Ltd., 692, Anna Salai, MHU Complex, Nandanam, Chennai – 600 035. .... Appellant Vs. The Income Tax Officer, International Taxation – II, Chennai. .... Respondent APPEALs under Section 260A of the Income Tax Act against the order dated 23rd June 2006 in I.T.A.Nos.2841,1191 and 2842 /Mds/05 on the file of the Income Tax Appellate Tribunal, "B" Bench, Chennai, for the assessment years 2002-03, 2003-04 and 2004-05. T.C.(A)Nos.2629 & 2630 of 2006: West Asia Maritime Limited Buhari Towers, 4, Moores Road, Chennai – 6. .... Appellant Vs. http://www.itatonline.org 2 The Income Tax Officer, International Taxation – II, Chennai. .... Respondent APPEALs under Section 260A of the Income Tax Act against the order dated 19th May 2006 in I.T.A.Nos.2376 & 2377/Mds/2005 on the file of the Income Tax Appellate Tribunal, "B" Bench, Chennai, for the assessment years 2003-04 and 2004-05. T.C.(A)Nos.56 to 64 of 2013: The Assistant Director of Income Tax, International Taxation, Chennai. .... Appellant Vs. M/s.Poompuhar Shipping Corporation Ltd., C/o M/s.Subbaraya Aiyar Padmanabhan & Ramamani, Advocates, New No.75 A, Old No.105 A, Dr.Radhakrishnan Salai, Mylapore, Chennai – 4.
    [Show full text]
  • Acos Fintech Solution
    ACOS FINTECH SOLUTION Creating Technology With Unique & Innovative Idea ISO 9001 : 2015 MCA REGISTER GOVT. APPROVED COMPANY Venture Of ACOS ECOMSHOP TECHNOLOGY PVT.LTD Powered By ACOS GROUP Since 2009 W E L C O M E MESSAGE FROM Rohit CEO, ACOS ECOMSHOP TECHNOLOGY PVT.LTD The aim of our business is start your own “Multi Online Business“ with “Acos Multi Services” in very low investment & time ! Acos committed to excellent support to his registered members. With a strong customer support and best services in Industry we claim to be No.1 Fintech & Software App Development Company in India. About Us ACOS is the foremost ISO certified 9001: 2015 MCA Government Approved Company and highly experienced IT service provider, which has marked its flagship in 10+ cities with 1900+ projects successfully accomplished. Reliable Solutions Experience Affordable ACOS Web is known for its We endeavor to offer you best We are pioneer in lambasting We have provided best quality development. We solutions in order to acquire your problems like web or software plus affordable web believe in building and maximum satisfaction. We are development etc. development services to maintaining long term the masters in offering effective Our experts handle your numerous large as well as relationships with all our software development solutions. assigned projects prudently. medium entrepreneurs. clients. O U R S E R V I C E S Software Game Web Design Development Development Android & MLM IOS App ERP & CRM Software Development Development E-Commerce B2B & B2C App & Web API
    [Show full text]
  • Private & Confidential Not for Circulation
    Private & Confidential Not For Cir cu lati on (This do cument is neither a “Prospectus” nor a “Statement in Lieu of Prospectus”. This is a Disclosure Document prepared in con formity with Securities and Exchang e Board of India (Issue and Listing of Debt Securities) Regu lation s, 2008 issued vide circular no. LAD-NRO/GN/2008 /13 /127878 dated June 06, 2008). And Issue and listing of Debt Securities (amendment) Regulations, 2012 TAMILNADU POWER FINANCE & INFRASTRUCTURE DEVELOPMENT CORPORATION LTD. (A Government of Tamil Nadu Enterprise) Regd.Office: Tufidco - Powerfin Tower, 490 / 3-4, Anna salai, Nandanam, Chenn ai - 600 035. Tel: 044 - 2432 9945 / 24329946; Fax: 044 24329914; E-Mail : powerfin@Md3. vsnl.net.in Website: www .tnpo werfinance.com DISCLOSURE DOCUMENT OF PRIVATE PLACEMENT FOR POWERFIN BONDS -3/2012-13 AGGREGATING Rs.250 CRORES WITH AN OPTION TO RETAIN OVERSUBSCRIPTION UPTO Rs. 250 CRORES. GENERAL RISK Investment in debt instruments involves a degree of risk and investors should invest any funds in the iss ue only after reading the risk factors in the Information Memorandum carefully including the risk involved. The Securities have not been recommended or approved by Securities and Exchange Board of India (SEBI) nor does SEBI guarantee the accuracy or adequacy of this document. ISSUER’S ABSOLUTE RESPONSIBILITY The issuer, having made all reasonable inquiries, accepts responsibili ty for and confirms that this offer document contains all information with regard to the issuer and the issue, which is material in the context of the issue, that the information contained in the Information Memorandum is true and correct in all material aspects and is not misleading in any material respect, that the opinions and intention s expressed herein are honestly held and that there are no other facts, the omission of which make this document as a whole or any of such information or the expression of any such opinions or intentions misleading in any material respect.
    [Show full text]
  • JSW Energy Presentation
    JSW Energy Limited Investor Presentation January 2017 Agenda Overview Value Proposition Business Appendix Environment 2 JSW Group – overview USD 11 billion group with presence across the core sectors JSW Steel*: India’s leading integrated steel JSW Energy*: Engaged across the value producer (Steel making capacity: 18MTPA) chain of power business (Operational plants’ capacity: 4,531MW – proposed increase to 6,031 MW^) JSW Infrastructure: Engaged in development JSW Cement: Manufacturer of PSC, OPC and operations of ports (Operational and GGBS cement (Operational plants’ capacity: 45MTPA) capacity: 6.4MTPA) Group market cap ($7,258 mn**) JSW Energy 1,469 JSW Steel 5,789 As on Dec 30, 2016 * Listed company. ** USD/ ` = 67.9547 (RBI reference rate as on Dec 30, 2016) 3 ^ Capacity would increase to 6,031 MW upon completion of 500MW Bina thermal power project from JPVL and 1,000MW Tamnar thermal power project from JSPL JSW Energy – Presence across the value chain . Currently operational . Operational transmission line – JV with capacity: 4,531MW MSETCL: two 400KV transmission lines Power Power generation transmission . JV with Toshiba, Japan for Equipment . Rajasthan (lignite): Kapurdi manufacturing of super- Mining (operational with capacity of critical steam turbines and manufacturing 7MTPA) and Jalipa (under generators development) mines; mineable reserves of 441mn tonnes Power trading . Engaged in power trading since June 2006 . Handled trading volume of ~9 bn units in FY16 4 Established energy company with 4,531 MW operational capacity… proposed increase to 6,031 MW^ Barmer: 1,080MW Baspa II (300MW) & Karcham Wangtoo (1,091MW) . Configuration: 8 X 135MW . Units operating: Baspa II since 2003 and Karcham Wangtoo .
    [Show full text]
  • India CCS Scoping Study: Final Report
    January 2013 Project Code 2011BE02 India CCS Scoping Study: Final Report Prepared for The Global CCS Institute © The Energy and Resources Institute 2013 Suggested format for citation T E R I. 2013 India CCS Scoping Study:Final Report New Delhi: The Energy and Resources Institute. 42pp. [Project Report No. 2011BE02] For more information Project Monitoring Cell T E R I Tel. 2468 2100 or 2468 2111 Darbari Seth Block E-mail [email protected] IHC Complex, Lodhi Road Fax 2468 2144 or 2468 2145 New Delhi – 110 003 Web www.teriin.org India India +91 • Delhi (0)11 ii Table of Contents 1. INTRODUCTION ..................................................................................................................... 1 2. COUNTRY BACKGROUND ...................................................................................................... 1 3. CO2 SOURCES ......................................................................................................................... 7 4. CURRENT CCS ACTIVITY IN INDIA ..................................................................................... 15 5. ECONOMIC ANALYSIS .......................................................................................................... 19 6. POLICY & LEGISLATION REVIEW ......................................................................................... 26 7. CAPACITY ASSESSMENT ...................................................................................................... 27 8. BARRIERS TO CCS IMPLEMENTATION IN INDIA ...............................................................
    [Show full text]
  • Steel Leads India Inc's Capacity Expansion
    Steel leads India Inc’s capacity expansion DEV CHATTERJEE, ADITI DIVEKAR & ISHITA AYAN DUTT TOP PERFORMERS IN Mumbai/Kolkata, 27 June WHO IS MARCH QUARTER Reliance Industries is not the only firm planning EXPANDING? (sales growth YoY in %) massive investments in a new business and other Iron & steel 49.8 verticals. Several top companies, led by steel Auto* 49.4 majors ArcelorMittal Nippon Steel India (AM/NS Non-ferrous 46.8 India), JSW Steel, Tata Steel, as well as aluminium major Hindalco, are planning to Cement 31.4 expand capacity in the next few quarters as FMCG 30.8 demand from their customers rises. Refineries 17.7 AM/NS India, a joint venture between the | Reliance Industries | ArcelorMittal world’s leading steel maker ArcelorMittal and Nippon Steel India | JSW Steel/ Construction 14.2 Japan’s Nippon Steel, has plans of ramping up JSW Energy | Jindal Steel & Power Pharmaceutical 13.2 capacity to 30 million tonnes (mt) at an | Tata Steel | Hindalco/UltraTech *and auto ancillaries > investment of ~85,000 crore. Turn to Page 6 | Adani Enterprises Source: CARE Ratings the Department of Investment ~7,000 crore for debottleneck- Sajjan Jindal-led JSW Steel and Public Asset Management ing is underway. In addition, plans to spend ~47,457 crore (DIPAM) — Deloitte Touche AM/NS India has signed a towards capex in the next three Tohmatsu India and SBI memorandum of understand- years for adding 5 million Capital Markets — have ing for a new 12-mt integrated tonnes per annum (mtpa) steel- reached out to investors on plant in Odisha, at an invest- making capacity at Vijayanagar behalf of the government.
    [Show full text]
  • Indie - Energetický Profil
    Věc: Indie - energetický profil 1. Skladba energetického mixu 1.1. Celková nabídka primárních zdrojů energie – TPES Indický energetický sektor je velmi diverzifikovaný. Primárním zdrojem energie jsou jak konvenční zdroje (uhlí, lignit, zemní plyn, ropa, voda a jádro), tak i nekonvenční zdroje (vítr, slunce, zemědělský a komunální odpad). V roce 2015 bylo procentuální složení výroby elektrické energie následující: 69-70 % tepelné elektrárny, 15 % vodní elektrárny, 2 % jaderné elektrárny a 13 % obnovitelné zdroje. Indie je 5. největším výrobcem elektřiny na světě. Indie je zároveň 4. největším spotřebitelem energie na světě po Číně, USA a Rusku. Populace Indie se blíží počtu obyvatel Číny, ale energetická spotřeba Indie je pouhá jedna čtvrtina spotřeby Číny. V roce 2016 činí poptávka po elektřině cca 155 GW. Odhaduje se, že v letech 2021-22 to bude cca 217 GW. TIC, strana 1 1.2. Podíl jednotlivých zdrojů na celkové výrobě elektřiny Údaje jsou v gigawattech (GW), poslední sloupec udává procentuální zastoupení Rok 1997 2002 2007 2012 2015 2015 (%) uhlí 54,2 62,1 71,1 112,0 164,6 60,6% zemní plyn 6,6 11,1 13,7 18,4 23,1 8,5% diesel 0,3 1,1 1,2 1,2 1,2 0,4% hydro 21,7 26,1 36,4 42,6 41,3 15,2% malé hydro 3,4 3,8 1,4% jádro 2,2 2,7 3,9 4,8 5,8 2,1% vítr 0,4 0,8 4,1 16,5 24,2 8,9% solár 0,0 0,0 0,0 0,6 3,7 1,4% biomasa 0,5 0,9 1,9 3,8 4,1 1,5% Celkem 85,9 GW 104,9 GW 132,3 GW 203,3 GW 271,7 GW 100,0% 1.3.
    [Show full text]
  • Unpaid Dividend-16-17-I2 (PDF)
    Note: This sheet is applicable for uploading the particulars related to the unclaimed and unpaid amount pending with company. Make sure that the details are in accordance with the information already provided in e-form IEPF-2 CIN/BCIN L72200KA1999PLC025564 Prefill Company/Bank Name MINDTREE LIMITED Date Of AGM(DD-MON-YYYY) 17-JUL-2018 Sum of unpaid and unclaimed dividend 737532.00 Sum of interest on matured debentures 0.00 Sum of matured deposit 0.00 Sum of interest on matured deposit 0.00 Sum of matured debentures 0.00 Sum of interest on application money due for refund 0.00 Sum of application money due for refund 0.00 Redemption amount of preference shares 0.00 Sales proceed for fractional shares 0.00 Validate Clear Proposed Date of Investor First Investor Middle Investor Last Father/Husband Father/Husband Father/Husband Last DP Id-Client Id- Amount Address Country State District Pin Code Folio Number Investment Type transfer to IEPF Name Name Name First Name Middle Name Name Account Number transferred (DD-MON-YYYY) 49/2 4TH CROSS 5TH BLOCK MIND00000000AZ00 Amount for unclaimed and A ANAND NA KORAMANGALA BANGALORE INDIA Karnataka 560095 72.00 24-Feb-2024 2539 unpaid dividend KARNATAKA 69 I FLOOR SANJEEVAPPA LAYOUT MIND00000000AZ00 Amount for unclaimed and A ANTONY FELIX NA MEG COLONY JAIBHARATH NAGAR INDIA Karnataka 560033 72.00 24-Feb-2024 2646 unpaid dividend BANGALORE PLOT NO 10 AIYSSA GARDEN IN301637-41195970- Amount for unclaimed and A BALAN NA LAKSHMINAGAR MAELAMAIYUR INDIA Tamil Nadu 603002 400.00 24-Feb-2024 0000 unpaid dividend
    [Show full text]
  • 4. Statement of Reasons (30-10-2009)
    CENTRAL ELECTRICITY REGULATORY COMMISSION NEW DELHI Coram : 1. Dr. Pramod Deo, Chairperson. 2. Rakesh Nath, Member Ex-officio 3. R. Krishnamoorthy, Member 4. S. Jayaraman, Member 5. V.S. Verma, Member In the matter of Central Electricity Regulatory Commission (Grant Of Connectivity, Long-Term Access And Medium-Term Open Access To The Inter-State Transmission And Related Matters) Regulations, 2009 STATEMENT OF REASONS (Date of hearing 31.03.2009) In exercise of powers conferred under Section 178 of Electricity Act, 2003 (“the Act”), the Commission made draft regulations on grant of connectivity, long-term access and medium term open access to the inter-state transmission and related matters, and had invited suggestions and comments from the stakeholders on the draft regulations through a public notice dated 2.3.2009. Suggestions and comments have been received on the draft regulations from the stakeholders listed in the Annexure attached to this statement of reasons. Commission has also held a hearing on 31.02.2009. Our decisions on the suggestions and comments received and submissions made during hearing are discussed in the succeeding paragraphs. General Comments and Suggestions 1. The Power Grid Corporation of India Limited (PGCIL) has suggested that the ‘Connectivity to the grid’, ‘Grant of long-term access and medium term access’ may be dealt with separately and that, the issues like UI, limits on import/export, reliability participation, contingency plan, metering, scheduling and accounting jurisdiction of SLDC or RLDC etc may be addressed in a new regulation called ‘Criteria for Connectivity”. 1 2. With regard to the first suggestion of PGCIL, it may be appreciated that various aspects of grant of connectivity, medium term open access and long term access are dealt separately in these regulations.
    [Show full text]
  • Chengalpattu District
    DISTRICT DISASTER MANAGEMENT PLAN 2020 CHENGALPATTU DISTRICT District Disaster Management Authority Chengalpattu District, Tamil Nadu DISTRICT DISASTER MANAGEMENT PLAN 2020 DISTRICT DISASTER MANAGEMENT AUTHORITY CHENGALPATTU DISTRICT TAMIL NADU PREFACE Endowed with all the graces of nature’s beauty and abundance, the newly created district of Chengalpattu is a vibrant administrative entity on the North eastern part of the state of Tamil Nadu. In spite of the district’s top-notch status in terms of high educational, human development index and humungous industrial productivity, given its geography, climate and certain other socio-political attributes, the district administration and its people have to co-exist with the probabilities of hazards like floods, cyclone, Tsunami, drought, heat wave, lightning and chemical, biological, radiological and nuclear emergencies. The Disastrous events in the recent past like the Tsunami of 2004, the catastrophic floods of year 2015, the cyclone of year 2016 and most recently the COVID-19 pandemic, will serve as a testament to the district’s vulnerability to such hazards. How the society responds to such vagaries of nature decides the magnitude and intensity of the destruction that may entail hazardous events. It is against this back drop, the roll of the District Disaster Management Authority can be ideally understood. The change in perspective from a relief- based approach to a more holistic disaster management approach has already begun to gain currency among the policy makers due to its substantial success in efficient handling of recent disasters across the globe. The need of the hour, therefore, is a comprehensive disaster management plan which is participative and people-friendly with the component of inter- departmental co-ordination at its crux.
    [Show full text]
  • Unpaid Dividend-17-18-I3 (PDF)
    Note: This sheet is applicable for uploading the particulars related to the unclaimed and unpaid amount pending with company. Make sure that the details are in accordance with the information already provided in e-form IEPF-2 CIN/BCIN L72200KA1999PLC025564 Prefill Company/Bank Name MINDTREE LIMITED Date Of AGM(DD-MON-YYYY) 17-JUL-2018 Sum of unpaid and unclaimed dividend 696104.00 Sum of interest on matured debentures 0.00 Sum of matured deposit 0.00 Sum of interest on matured deposit 0.00 Sum of matured debentures 0.00 Sum of interest on application money due for refund 0.00 Sum of application money due for refund 0.00 Redemption amount of preference shares 0.00 Sales proceed for fractional shares 0.00 Validate Clear Proposed Date of Investor First Investor Middle Investor Last Father/Husband Father/Husband Father/Husband Last DP Id-Client Id- Amount Address Country State District Pin Code Folio Number Investment Type transfer to IEPF Name Name Name First Name Middle Name Name Account Number transferred (DD-MON-YYYY) 49/2 4TH CROSS 5TH BLOCK MIND00000000AZ00 Amount for unclaimed and A ANAND NA KORAMANGALA BANGALORE INDIA Karnataka 560095 54.00 23-May-2025 2539 unpaid dividend KARNATAKA 69 I FLOOR SANJEEVAPPA LAYOUT MIND00000000AZ00 Amount for unclaimed and A ANTONY FELIX NA MEG COLONY JAIBHARATH NAGAR INDIA Karnataka 560033 72.00 23-May-2025 2646 unpaid dividend BANGALORE ROOM NO 6 G 15 M L CAMP 12044700-01567454- Amount for unclaimed and A ARUNCHETTIYAR AKCHETTIYAR INDIA Maharashtra 400019 10.00 23-May-2025 MATUNGA MUMBAI MI00 unpaid
    [Show full text]
  • Sector Thematic Power
    Sector Thematic Power Reforms essential for rennaissance While the demand for power had been impacted by the pandemic in 1HFY21, its revival has been far exceeded everyone’s expectation. H2FY21 saw 7.5% yoy growth in both demand and generation, which curbed the FY21 decline in power demand to only 1%. We expect FY22 to witness 12% yoy growth in demand and generation, led by recovery across the economic activities and low FY21 base. However, the pandemic has further aggravated the ailing financial status of the discoms, resulting in a steep rise in discom dues towards the gencos (scaling a new peak of INR1.4tn in Jan’21) and eventually a sharp rise in its borrowings. While the proposed reform measures like the Draft Electricity Amendment Bill will act as a silver lining towards reviving the sector, its successful implementation remains a key trigger to watch out for. We initiate coverage on the sector with the hope that a revival would take place, given these reforms could improve the discoms efficiencies and financials. We initiate our positive stance on NTPC, PGCIL, CESC, Tata Power, Torrent Power and NHPC, based on their risk averse regulatory business models, growth opportunities, healthy balance sheets and attractive valuations (~0.7x FY23 BV). Anuj Upadhyay Power [email protected] +91-22-6171-7330 19 April 2021 Sector Thematic Indian Power Sector Reforms essential for rennaissance While the demand for power had been impacted by the pandemic in 1HFY21, its Upside Company Reco TP revival has been far exceeded everyone’s expectation. H2FY21 saw 7.5% yoy growth (%) in both demand and generation, which curbed the FY21 decline in power demand NTPC Buy 143 40% to only 1%.
    [Show full text]