Revised FORM – 1

By

'NRTdesh. ICON'

ANDHRA PRADESH NON-RESIDENT TELUGU SOCIETY

(Residential cum Office cum Retail Complex) Sy No. # 310, 311, 330, 331, 332 & 343, Rayapudi village, Tullur mandal , disrict,

Prepared by

Accreditation No. NABET / EIA / 1619 / RA 026

6-3-652 | Flat # 7-3 | Dhruvatara Apartments | Amrutha Estates | Erramanjil | Somajiguda | |Hyderabad- 500082|Phone: + 91-40-23314270 / 71| E mail: [email protected] |www.pioneerenvirolabs.com | PEOPLE | SAVE ENVIRONMENT | 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex APPENDIX I (See paragraph – 6) FORM – 1 S. No (I) Basic Information 1 Name of the project ‘NRT ICON’ Andhra Pradesh Non-Resident Telugu Society (Residential cum Office cum Retail Complex) 2 S. No. in the schedule 8(a) 3 Proposed capacity / area / length / Total Built up area – 1,16,064.45 Sq.m tonnage to be handled / command (which includes building with 2 basements + area / lease area/number of wells to ground floor + 33 upper floors + terrace) be drilled 4 New / Expansion / Modernization New 5 Existing capacity/Area etc. No 6 Category of project i.e. ‘A’ or ‘B’. B 7 Does it attract the general condition? If No yes, please specify. 8 Does it attract the specific condition? If No yes, please specify. 9 Location Plot/Survey / Khasra No. 310, 311, 330, 331, 332 & 343 Village Rayapudi Village Tehsil / Mandal Tullur mandal, District Guntur State Andhra Pradesh 10 Nearest railway station/airport along Nearest Railway station: Rayanapadu – 8.5 with distance in kms. Kms. Nearest Airport – Gannavaram airport – 32 Kms 11 Nearest Town, city, District Nearest town: Vijayawada Headquarters along with distance in District Head quarter: Vijayawada kms 12 Village Panchayats,Zilla Parishad, A. P. Capital Region Development Authority Municipal corporation, Local body(complete postal addresses with telephone no.s to be given) 13 Name of the applicant Andhra Pradesh Non-Resident Telugu Society 14 Registered Address APNRT Society, Infosight Building, 4th Floor, S.No.78/2, NH 16, Service Road, Near Pathuru Road Junction, Tadepalli, Guntur District,

1 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex S. No Andhra Pradesh, 522501 15. Address for correspondence: Name Dr. RAVI KUMAR P VEMURU Designation(owner/partner/CEO) President Address APNRT Society, Infosight Building, 4th Floor, S.No.78/2, NH # 16, Service Road, Near Pathuru Road Junction, Tadepalli, Guntur District, Andhra Pradesh, 522501 Pin code 522501 E-Mail [email protected] Telephone No. 0863-2340678 Fax No. Details of Alternative sites examined, if No alternate sites are considered 16. any. Location of these sites should be shown on a topo sheet

17. Interlinked Projects No 18. Whether separate application of No interlinked project has been submitted? 19. If yes, date of submission Not applicable 20. If no, reason Not applicable 21. Whether the proposal involves No approval/clearance under; if yes, details of the same and their status to be given. (a) The Forest (conservation)Act,1980 (b) The Wildlife(protection)Act,1972 (c) The C.R.Z Notification,1991? Whether there is any a government No 22. order/policy relevant/relating to the site? 23. Forest land involved(hectares) No 24. Whether there is any litigation pending No against the project and/or land in which the project is propose to be set up? (a)Name of the court (b)Case No. (c) Orders/directions of the court, if

2 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex S. No any and its relevance with the proposed project.

(II) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Details thereof (with approximate S.No. Information/Checklist Yes/No quantities /rates, wherever possible) confirmation with source of information data 1.1 Permanent or temporary change in Yes The site of the proposed project land use, land cover or topography falls under A. P. Capital Region including increase in intensity of Development Authority. As per the land use (with respect to local master plan issued by APCRDA the land use plan) site falls under mixed land use zone. Presently no activity is being carried out in the site premises. Greenbelt / greenery will be developed with in the premises as per the norms. Hence there will not be any adverse impact due to the change in land use pattern due to the proposed project. 1.2 Clearance of existing land, Yes Sparse vegetation consisting of vegetation and buildings? Thorny and shrubs exists in the site earmarked for the proposed project. However good Greenbelt / greenery will be developed with in the premises as per the norms. Hence there will not be any adverse impact due clearance of vegetation due to the proposed project. 1.3 Creation of new land uses? No No other land use other than commercial cum residential will be created in the site premises. 1.4 Pre-construction investigations e.g. No Investigations will be carried out for bore houses, soil testing? soil and water at the site. 1.5 Construction works? No No construction work will be taken- up without obtaining the Prior Environmental clearance from SEIAA and Consent For

3 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex Details thereof (with approximate S.No. Information/Checklist Yes/No quantities /rates, wherever possible) confirmation with source of information data Establishment from APPCB. 1.6 Demolition works? No Not applicable as there will not be demolition works in the proposed project. 1.7 Temporary sites used for Yes Construction workers will be from construction works or housing of local area only. Temporary housing construction workers? is proposed for construction workers. 1.8 Above ground buildings, structures Yes Most of the structures will be above or earthworks including linear the ground. However excavations structures, cut and fill or will be involved for foundations and excavations basements purpose. The excavation will be stacked properly at site. Part of the excavated soil will be used for backfilling, greenery and landscaping and balance quantity will be sent to the sites where land filling is required 1.9 Underground works including mining No No mining and tunneling will be or tunneling? involved in the proposed activity. 1.10 Reclamation works? No No reclamation works are envisaged in proposed project. 1.11 Dredging? No No dredging activity will be involved. 1.12 Offshore structures? No No offshore structures are envisaged in the proposed project. 1.13 Production and manufacturing No Not applicable as proposed project processes? involves construction of Residential cum Office cum retail complex. 1.14 Facilities for storage of goods or Yes Raw materials will be stored as per materials? norms. The raw materials like Cement, Sand, Bricks, Steel, Wood, Paint & aggregates will be stored at site only. Cement & Paint will be stored at indoors & remaining will be at outdoors. 1.15 Facilities for treatment or disposal of Yes Wastewater generated during the solid waste or liquid effluents? operation of the project will be treated in sewage treatment plant. Treated wastewater will be utilized for non-potable purposes like Toilet flushing, HVAC & Greenbelt

4 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex Details thereof (with approximate S.No. Information/Checklist Yes/No quantities /rates, wherever possible) confirmation with source of information data development. Treatment and disposal of wastewater & solid waste will be in accordance with the CPCB / APPCB norms. 1.16 Facilities for long term housing of No No permanent housing will be operational workers? provided for the construction workers. 1.17 New road, rail or sea traffic during Yes There will be a slight increase in construction or operation? traffic volume during construction and operation of the proposed project. The site of the proposed project is well connected by NH # 65 (earlier NH # 9). New roads will be laid by APCRDA from NH # 65. Hence there will not be any adverse impact on road traffic / rail traffic / sea traffic due to the proposed project. 1.18 New road, rail, air waterborne or Yes New roads will be laid by APCRDA other transport infrastructure from NH # 65 up to the project site. including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing Yes Closure or diversion of existing transport routes or infrastructure transport routes will be done by leading to changes in traffic APCRDA movements? 1.20 New or diverted transmission lines Yes Water required for the proposed or pipelines? project will be sourced from Municipal supply. 1.21 Impoundment, damming, culverting, Yes Culverting, realignment will be done realignment or other changes to the APCRDA. hydrology of watercourses or There will not be any changes to the aquifers? hydrology of watercourses or aquifers. 1.22 Stream crossings? No No stream crossing is involved 1.23 Abstraction or transfers of water Yes Water required for the proposed form ground or surface waters? project will be sourced from Municipal supply. 1.24 Changes in water bodies or the land No No changes in water bodies, surface affecting drainage or run- drainage and land surface are

5 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex Details thereof (with approximate S.No. Information/Checklist Yes/No quantities /rates, wherever possible) confirmation with source of information data off? anticipated as the site is more or less flat without many undulations. Separate storm water drains will be provided. 1.25 Transport of personnel or materials Yes There will be a slight increase in for construction, operation or traffic volume during construction decommissioning? and operation of the proposed project. The site of the proposed project is well connected by NH # 65. New roads will be laid by APCRDA from NH # 65. Hence there will not be any adverse impact on road traffic / rail traffic / sea traffic due to the proposed project. 1.26 Long-term dismantling or No No such works are envisaged decommissioning or restoration works? 1.27 Ongoing activity during No No such works are envisaged decommissioning which could have an impact on the environment? 1.28 Influx of people to the area either No Temporary labour required for the temporarily or permanently? construction activity will be met from the local places. 1.29 Introduction of alien species? No No such activity is envisaged 1.30 Loss of native species or genetic No As a part of greenbelt/greenery diversity? development plan native species that are suitable to that soil condition will be developed. 1.31 Any other actions? No Nil

6 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply)

Details thereof (with approximate S.No. Information/checklist Yes/No quantities /rates, wherever confirmation possible) with source of information data 2.1 Land especially undeveloped or Yes The site of the proposed project agricultural land (ha) falls under A. P. Capital Region Development Authority. As per the master plan issued by APCRDA the site falls under mixed land use zone. Presently no activity is being carried out in the site premises. Greenbelt / greenery will be developed with in the premises as per the norms. Total land acquired for proposed project is 5 acres (20,234.36 Sq.m). Water (expected source & Yes Water required for the proposed competing users) unit: KLD project will be sourced through 2.2 Municipal supply during operation of the Project and through Ground water during construction of the Project. Total water demand is about 10 KLD during Construction of complex & 227 KLD during operation of the project. 2.3 Minerals (MT) Yes Manufactured sand – 25,000 MT 2.4 Construction material – stone, Yes All construction materials such as aggregates, sand / soil (expected Ready mix Concrete, Cement, source – MT) Sand, Aggregate, Aerated Auto clave, Concrete Brick (nos.), Reinforcement Steel, Wood material, Painting material, Flooring Material, Sanitary Material, Electrical Material, Plumbing material are available locally. 2.5 Forests and timber (source – MT) No Wood material required for Windows & Doors of Imported Quality will be procured locally. 2.6 Energy including electricity and fuels Yes The total energy requirement for

7 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex Details thereof (with approximate S.No. Information/checklist Yes/No quantities /rates, wherever confirmation possible) with source of information data (source, competing users) Unit: fuel the proposed project is 7500 kVA (MT), energy (MW) (Maximum peak demand). It will be taken from APCPDCL. However 4 x 1500 KVA & 2 x 650 KVA DG sets will be provided for emergency Backup Power Supply. 2.7 Any other natural resources (use No Not applicable appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health

Details thereof (with approximate S.No. Information/Checklist Yes/No quantities/rates, wherever possible) confirmation with source of information data 3.1 Use of substances or materials, Yes The hazardous wastes like empty which are hazardous (as per containers of paints, petroleum MSIHC rules) to human health or products, thinners, adhesives will be the environment (flora, fauna, and given to authorized recyclers. All the water supplies) hazardous materials will be stored as per HWM rules. 3.2 Changes in occurrence of disease No Not Applicable or affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by No Not Applicable as the proposed changing living conditions? project will create direct / indirect employment opportunities in the area and thereby contributing in the improvement of socio-economic status of people in the area. Land prices will increase substantially. 3.4 Vulnerable groups of people who No  Approach roads to the complex could be affected by the project e.g. will be paved hospital patients, children, the  Speed of the vehicles will be elderly etc., reduced  Greenbelt will be developed By following the above the dust generation will be minimized. The Solid waste in the form of garbage will be segregated at each section distinguishing wet and dry waste. Dry waste will be taken away

8 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex Details thereof (with approximate S.No. Information/Checklist Yes/No quantities/rates, wherever possible) confirmation with source of information data by Municipal Corporation. Kitchen and food waste will be composted within the complex premises only. Wastewater generated from the complex will be treated in sewage treatment plant and treated waste water will be utilized for non-potable purposes like flushing, HVAC and Green belt development plan Hence there will not be any adverse impact on vulnerable groups. 3.5 Any other causes No Not Applicable

9 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Details thereof (with approximate S.No. Information/Checklist Yes/No quantities/rates, wherever possible) confirmation with source of information data 4.1 Spoil, overburden or mine wastes Yes The excavation will be stacked properly at site. Part of the excavated soil will be used for backfilling, greenery and landscaping and balance quantity will be sent to the site where land filling is required. 4.2 Municipal waste (domestic and or Yes Municipal solid waste generated Residential wastes) during construction phase of the project will be given to the Municipal Corporation. The Solid waste generated during operation phase will be mainly in the form of garbage, paper waste, plastic waste and e-waste from the complex. The garbage will be segregated at each section distinguishing wet and dry waste. Kitchen and food waste will be composted within the complex premises only. 4.3 Hazardous wastes (as per Yes Used batteries & Waste oil will be Hazardous Waste given to APPCB approved vendors Management Rules) 4.4 Other industrial process wastes No Not Applicable as there will not be any industrial operations in the Complex 4.5 Surplus product Yes Surplus raw materials after construction will be given to the suppliers. 4.6 Sewage sludge or other sludge Yes Sewage sludge generated will be from effluent treatment stored in HDPE bags and will be used as manure. 4.7 Construction or demolition wastes Yes At the time of construction of the proposed project, there will be some recyclable material like Steel, metal,

10 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex Details thereof (with approximate S.No. Information/Checklist Yes/No quantities/rates, wherever possible) confirmation with source of information data Plastic material, Wood etc., will be sent to reuse / recycle and other wastes like Bricks, cement waste will be used for leveling. The disturbed slopes shall be well stabilized before the onset of the monsoon. Demolition wastes if any will be recycled / disposed as per norms. 4.8 Redundant machinery or equipment No No redundant machinery will be kept in the premises after construction of the complex 4.9 Contaminated soils or other No During the construction phase of materials the Project, all precautionary measures will be taken to prevent the spillage of oil, paints on to the ground to prevent the contamination of soil. 4.10 Agricultural wastes No Not applicable 4.11 Other solid wastes Yes E-waste generated will be given Authorized recyclers approved by APPCB.

11 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Details thereof (with approximate S.No. Information/Checklist Yes/No quantities/rates, wherever possible) confirmation with source of information data 5.1 Emissions from combustion of Yes During the operation phase of the fossil fuels from stationary or complex, emissions will be mainly mobile sources PM, HC, CO and NOx due to vehicular traffic and from D.G. sets provided for Backup power supply.  All the roads leading to the complex and internal roads will be paved. Hence the dust emissions due to the vehicles will be very low  Good greenbelt will be developed in the complex premises which will further help in mitigating the emission levels.  Stack of adequate height will be provided for effective dispersion of gases into the atmosphere. Hence there will not be any much impact on surrounding environment due to the proposed complex. 5.2 Emissions from production No Not applicable. processes 5.3 Emissions from materials handling No Not applicable as there will not be including storage or transport any storage or transportation of raw materials 5.4 Emissions from construction Yes During construction phase, there activities including plant and will be dust emissions during raw equipment material handling and transportation of raw materials. To mitigate the dust emissions  Raw materials will be brought to the site through covered trucks / Trolleys.  Minimum water spraying will be done to mitigate the dust

12 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex Details thereof (with approximate S.No. Information/Checklist Yes/No quantities/rates, wherever possible) confirmation with source of information data emanation  All the materials will be properly covered to prevent the dust emissions during high winds  Due to the operation of cranes during raw material handling Hence there will not be any significant dust emissions due to raw material storage & transportation during construction phase of the project. 5.5 Dust or odours from handling of Yes Adequate precautionary measures materials including construction will be taken up to control the Odour materials, sewage and waste from the Construction materials like Paint material & Sewage. 5.6 Emissions from incineration of No Not applicable waste 5.7 Emissions from burning of waste in No There will not be any burning of open air (e.g. slash materials, waste in open air during construction debris) construction and operation of the complex. 5.8 Emissions from any other sources No Nil

13 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex

6.0 Generation of Noise and Vibration, and Emissions of Light and Heat:

Details thereof (with approximate S.No. Information/Checklist Yes/No quantities/rates, wherever possible) confirmation with source of information data with source of information data 6.1 From operation of equipment e.g. Yes Main source of Noise generation engines, ventilation plant, crushers will be DG sets and Motor pumps for supply of water. All the D.G. Sets & Motor pumps will be manufactured in accordance with the noise level standards stipulated by MoEF&CC vide notification dated 14-02-2000. Hence there will not be much increase in Noise levels in the surrounding areas. 6.2 From industrial or similar processes Yes The sources of noise generation in the proposed project will be DG sets & motor pumps. All machinery will be manufactured as per OSHA / MOEF&CC guidelines. Ambient noise levels will be in accordance with MOEF&CC notification dated 14-02-2000 i.e. noise levels will be <75 dBA during daytime and < 70 dBA during night time. 6.3 From construction or demolition Yes Construction equipment will cause some noise. Ear plugs will be provided to construction workers who work near the noise generating equipment. 6.4 From blasting or piling No No such operations are involved. 6.5 From construction or operational Yes There will be slight increase in traffic traffic noise during construction and operation of the proposed complex.  Speed of the vehicles will be reduced  Greenbelt will be developed By following above control measures noise levels will be minimized.

14 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex Details thereof (with approximate S.No. Information/Checklist Yes/No quantities/rates, wherever possible) confirmation with source of information data with source of information data 6.6 From lighting or cooling systems No Not applicable 6.7 From any other sources No Not applicable

15 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Information/Checklist Details thereof (with approximate S.No. confirmation Yes/No quantities/rates, wherever possible) with source of information data 7.1 From handling, storage, use or Yes Good housekeeping practices will spillage of hazardous materials be followed to prevent any spillage of hazardous materials. 7.2 From discharge of sewage or other No Wastewater generated during the effluents to water or the land operation of the complex will be (expected mode and place of treated in sewage treatment plant discharge) and treated wastewater will be utilized for non-potable purposes like Toilet flushing, HVAC & Greenbelt development. 7.3 By deposition of pollutants emitted No During construction phase, there to air into the land or into water will be dust emissions during raw material handling and transportation of raw materials. To mitigate the dust emissions  Raw materials will be brought to the site through covered trucks / Trolleys.  Minimum water spraying will be done to mitigate the dust emanation  All the materials will be properly covered to prevent the dust emissions during high winds  Due to the operation of cranes during raw material handling Hence there will not be any significant dust emissions due to raw material storage & transportation during construction phase of the project. During the operation phase of the complex, emissions will be mainly PM, NMHC, CO and NOx due to vehicular traffic and from D.G. sets provided for Backup power supply.  All the roads leading to the

16 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex Information/Checklist Details thereof (with approximate S.No. confirmation Yes/No quantities/rates, wherever possible) with source of information data complex and internal roads will be paved. Hence the dust emissions due to the vehicles will be very low  Good greenbelt will be developed in the complex premises which will further help in mitigating the emission levels.  Stack of adequate height will be provided for effective dispersion of gases into the atmosphere. Hence there will not be any much impact on surrounding environment due to the proposed complex. 7.4 From any other sources No Not applicable 7.5 Is there a risk of long term build up No Not applicable of pollutants in the environment from these sources?

17 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

Details thereof (with approximate S.No. Information/Checklist Yes/No quantities/rates, wherever possible) confirmation with source of information data 8.1 From explosions, spillages, fires etc Yes Good housekeeping practices will from storage, handling, use or be maintained during Construction production of hazardous and Operation phase of the substances complex. All precautionary measures will be taken to prevent the spillage of oil, paint etc. D.G sets will be operated during short supply of electricity. Hence storage of Diesel will be very low. Hence the occurrence of explosion due to the storage of Diesel will be low. All the rules and regulations as per the Fire & Safety Department, Andhra Pradesh will be followed strictly to prevent the Fire accidents in the complex 8.2 From any other causes Yes Earthquakes & Natural disasters 8.3 Could the project be affected by No Not applicable natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)?

18 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Details thereof (with approximate S. No. Information/Checklist Yes/No quantities/rates, wherever possible) confirmation with source of information data 9.1 Lead to development of supporting utilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: • Supporting infrastructure No No such activities are envisaged (roads, power supply, waste or waste water treatment, etc.) • housing development • extractive industries • supply industries • other 9.2 Lead to after-use of the site, which No Not applicable could have an impact on the environment 9.3 Set a precedent for later Yes With the improvement in the socio- developments economic status of the people in the area, later developments are expected. 9.4 Have cumulative effects due to No Not applicable proximity to other existing or planned projects with similar effects

19 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex

(III) Environmental Sensitivity

Name/ Aerial distance S.No. Areas Identity (within 15 km.) Proposed project location boundary 1 Areas protected under international Yes Kondapalli fort – 8 conventions, national or local legislation Kms for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for Yes Peddamdduru RF – 9 ecological reasons - Wetlands, kms watercourses or other water bodies, Karlapudi RF – 9.5 coastal zone, biospheres, mountains, Kms forests Kondapalli RF – 6.1 kms Navepotavaram RF – 10 Kms Kotturu RF - 9 Krishna river – 0.95 Kms and other tributary canals 3 Areas used by protected, important or No Nil within 15 Km sensitive species of flora or fauna for radius breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground Yes Underground water waters available at the site

5 State, National boundaries ---- No inter-state boundary, No international boundary. 6 Routes or facilities used by the public for Yes NH # 65 – 5.2 Kms access to recreation or other tourist, pilgrim areas 7 Defence installations No Nil within 15 Km radius 8 Densely populated or built-up area Yes Project proposed comes under A.P capital Region Development Authority 9 Areas occupied by sensitive man-made Yes Many schools & land uses (hospitals, schools, places of Hospitals exits worship, community facilities 10 Areas containing important, high quality or Yes Krishna river – 0.95 scarce resources Kms and other (ground water resources, surface tributary canals resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or --- Not applicable environmental damage. (those where existing legal environmental standards

20 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex Name/ Aerial distance S.No. Areas Identity (within 15 km.) Proposed project location boundary are exceeded) 12 Areas susceptible to natural hazard which --- Based on the could cause the project to present historical data, the environmental problems site is not likely to (earthquakes, subsidence, landslides, prone to erosion, flooding or extreme or adverse earthquakes, floods, climatic conditions) etc.

21 'NRT ICON' Andhra Pradesh Non-Resident Telugu Society Revised FORM –1 Residential cum Office cum Retail Complex (IV). PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

As the proposed project is a construction project with built up area is below 1,50,000 Sq.m. No terms of reference for EIA studies is proposed. However we are here with enclosing Environmental Management Plan for your kind reference. The EMP consists the following • Air emission management • Effluent treatment & disposal • Solid waste generation, storage & disposal • Greenbelt development plan • Rain water harvesting

“I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost.

Date: 11-09-2018 Place: Vijayawada

Yours faithfully,

Dr. RAVI KUMAR P VEMURU PRESIDENT, APNRT SOCIETY

22