I) Basic Information S. No. Item Details 1 Name of the Project/S M/S. Unnati Buildtech. Residential Complex 2 S. No. in The
Total Page:16
File Type:pdf, Size:1020Kb
I) Basic information S. No. Item Details 1 Name of the project/s M/s. Unnati BuildTech. Residential Complex 2 S. No. in the schedule Project Activity – 8a Category B(B2) 3 Proposed capacity /area/ length/ tonnage to be Block No. of No .of Area handled/command area/lease Details Floors Flats (Sq.Mts) Ground area/ No of the well to be drilled 39 2,411.71 floor 1st floor 39 2,411.71 2nd floor 39 2,552.41 Block 1 rd 3 floor 46 2,982.34 4th floor 50 3,344.26 5th floor 50 3,344.26 6th floor 50 3,344.26 7th floor 50 3,344.26 8th floor 50 3,344.26 9th floor 50 3,344.26 10th floor 50 3,344.26 11th floor 50 3,344.26 12th floor 50 3,344.26 13th floor 50 3,344.26 th 14 floor 50 3,344.26 15th floor 50 3,344.26 16th floor 50 3,344.26 17th floor 50 3,344.26 18th floor 50 3,344.26 19th floor 50 3,344.26 20th floor 50 3,344.26 21st floor 50 3,344.26 Amenities - 2,949.83 Block G+2 TOTAL 1063 73,504.68 Parking: Parking Area (Sq. Mtrs) Cellar 1 9,214.43 Cellar 2 9,214.43 Cellar 3 9,214.43 Total Parking 27,643.29 Area Multi Storied Building M/s Unnati BuildTech,Sy.No 326/Part, Nizampet (v),Qutubullapur(M),Rangareddy(D), Telangana State. ( In Square Meters) Total Area of the residential flats& amenities : 73,504.68 Total Parking Area : 27,643.29 Total Built-up area : 1,01,147.97 4 New/Expansion /Modernization New Project. 5 Existing capacity/Area etc… NA 6 Category of project A or B Category B ( ‘B2’) As Area is less than 1,50,000 Square Meters, the proposed project comes under category B2 7 Does it attract the general No condition? If yes please specify 8 Does it attract the specific No condition? If yes please specify 9 Location Plot/ survey /Khasra no Sy. No. 326/part, Village Nizampet (V), Tehsil/Mandal Qutubullapur(M), District Ranga Reddy District State Telangna 10 Nearest Railway station/Air port Rajiv Gandhi International Air port – 39.1 KM along with the distance in kms 11 Nearest Town, City, District This is Part of Hyderabad City Headquarters along with distances in kms. 12 Village Panchayats Zilla Parishad Greater Hyderabad Municipal Corporation Municipal Corporation, Local body (complete postal Address with telephone no. to be given 13 Name of the applicant Naveen Kumar Goel (Managing Partner) 14 Registered address Plot No.101, Road No.12, MLA Colony, Banjarahills, PRIDHVI ENVIROTECH (P) LIMITED Page 1 Multi Storied Building M/s Unnati BuildTech,Sy.No 326/Part, Nizampet (v),Qutubullapur(M),Rangareddy(D), Telangana State. Hyderabad 15 Address of the correspondence Naveen Kumar Goel Name Managing Partner Designation /owner/partner/CEO Plot No.101, Road No.12, MLA Colony, Address Banjarahills, Hyderabad Pin code 500034 E-mail [email protected] Telephone no Ph: +91 40 40179770 Fax no 16 Details of Alternative Sites No examined if any. Location of these sites Should be shown on a Topo sheet. 17 Interlinked Projects No 18 Whether separate application of Not Applicable interlinked projects has been submitted 19 If yes, date of submission Not Applicable 20 If no reason Not Applicable 21 Whether the proposal involves approval / clearances under: if yes, details of the same and their status to be given. (a) The Forest (conservation) Act, 1980? No (b) The Wild life (protection)Act, 1972? No (c) The C.R.Z notification, 1991? No PRIDHVI ENVIROTECH (P) LIMITED Page 2 Multi Storied Building M/s Unnati BuildTech,Sy.No 326/Part, Nizampet (v),Qutubullapur(M),Rangareddy(D), Telangana State. 22 Whether there is any Government No order/policy relevant/relating to the site? 23 Forest land involved (Hectares) No 24 Whether there is any litigation No pending against the project and/or land in which the project is propose to be set up? (a)Name of the court (b)Case no. (c) Orders/directions of the court, if any and its relevance with the proposed project. (II) Activity 1.0 Construction, operation or decommissioning of the Project involving actions, which will cause Physical Changes in the locality (topography, land use, changes in water bodies, etc.). S.No. Information /Checklist Yes Details thereof (with approximate confirmation quantities /rates, wherever possible ) /No with sources of information data 1.1 Permanent or temporary change Yes The proposed project activity is in land use, land cover or construction of Residential Complex. topography including increase in The site area is located in GHMC area. intensity of land use (with respect This area is earmarked as residential to local land use plan) zone as per the Master plan of Hyderabad Urban Development Authority. 1.2 Clearance of existing land, No There is no vegetation in the project site vegetation and buildings? requiring clearance. 1.3 Creation of new land uses? Yes The purpose of proposed project is construction of Residential Complex hence there will not be any change in land use 1.4 Pre-construction investigations Yes Soil bearing tests were conducted PRIDHVI ENVIROTECH (P) LIMITED Page 3 Multi Storied Building M/s Unnati BuildTech,Sy.No 326/Part, Nizampet (v),Qutubullapur(M),Rangareddy(D), Telangana State. e.g. bore holes, soil testing? before construction 1.5 Construction works? Yes The project is residential complex. 1.6 Demolition Works? No There are no structures in the proposed area; hence there are no demolition works. 1.7 Temporary sites used for No Temporary shelters for construction construction works or housing of workers are not required as labor will be construction works? hired from the surrounding locations 1.8 Above ground buildings, No The proposed development is structures or earthworks including Construction of Residential Complex. linear structures, cut and fill or Cut and fill activity will be there for excavations basement and foundations 1.9 Underground works including No Not Applicable as this is a Construction mining or tunneling? of Residential Complex. 1.10 Reclamation Works? No Not Applicable 1.11 Dredging? No Not Applicable as this is a Construction of Residential Complex. 1.12 Offshore structures? No Not Applicable as this is a Construction of Residential Complex. 1.13 Production and manufacturing No No manufacturing activity. processes? Activity is Construction of Residential Complex. 1.14 Facilities for storage of goods or Yes Storage space of building materials will materials? be earmarked onsite. 1.15 Facilities for treatment or disposal Yes Solid waste generated from the of solid waste or liquid effluents? construction includes rubble, used up cement, broken bricks etc, which will be used for filling up low lying areas during developmental stage. Treated liquid effluents from domestic waste water will be used for flushing and gardening and rest would be sent to municipal drains. PRIDHVI ENVIROTECH (P) LIMITED Page 4 Multi Storied Building M/s Unnati BuildTech,Sy.No 326/Part, Nizampet (v),Qutubullapur(M),Rangareddy(D), Telangana State. STP Sludge will be used as manure in green belt development 1.16 Facilities for long term housing of No Manpower requirement of operational operational workers? workers is nominal and will be recruited from surroundings therefore no long term housing facilities are envisaged. 1.17 New road, rail or sea traffic during No Existing facilities will be used for the construction or operation? proposed project. 1.18 New road, rail, air waterborne or No Not envisaged other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not envisaged transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines No No diversions or pipelines? 1.21 Impoundment, damming, No The proposed development will not culverting, realignment or other disturb the natural terrain of the area changes to the hydrology of and will not disturb the water courses in watercourses or aquifers? any ways i.e. no drain flows through the site. Rain Water Harvesting system is proposed to recharge the GWL 1.22 Stream crossings? No There are no stream crossings the proposed site. 1.23 Abstraction or transfers of water Yes Water requirement of the project will be from ground or surface waters? met from Bore well and Municipal Supply 1.24 Changes in water bodies or the No The development will be carried out land surface affecting drainage with no disturbance to major water or or run-off? the land surface, affecting drainage or runoff. 1.25 Transport of personnel or Yes Transportation of personnel or material materials for construction, will be by trucks on road PRIDHVI ENVIROTECH (P) LIMITED Page 5 Multi Storied Building M/s Unnati BuildTech,Sy.No 326/Part, Nizampet (v),Qutubullapur(M),Rangareddy(D), Telangana State. operation or decommissioning? 1.26 Long-term dismantling or No Not envisaged decommissioning which could have an impact on the environment? 1.27 Ongoing activity during No Not envisaged decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in Yes Total of 1,063 flats are proposed. The either temporarily or local area is developing at a faster permanently? pace due to development in the surrounding areas. 1.29 Introduction of alien species? No Not envisaged 1.30 Loss of native species or genetic No Not envisaged diversity? 1.31 Any other actions? No Nil 2.0 USE OF NATURAL RESOURCES for construction or operation of the Project (Such as land, water, materials or energy, especially any resources which are non- renewable or in short supply): S.No.