600 Roadside Design

Total Page:16

File Type:pdf, Size:1020Kb

600 Roadside Design 600 Roadside Design 600.1 Introduction..........................................................................................................................1 600.2 Clear Zone.............................................................................................................................1 600.2.1 Parallel Embankment Slopes & Ditches ................................................................................................... 2 600.2.2 Urban Lateral Offsets ............................................................................................................................... 2 600.2.3 Operational Offsets on Urban Streets...................................................................................................... 3 601 Warrants .................................................................................................................................. 3 601.1 Roadside Barrier Warrants ....................................................................................................3 601.1.1 Obstacles .................................................................................................................................................. 4 601.1.2 Slopes ....................................................................................................................................................... 4 601.1.3 Protection of Others ................................................................................................................................. 4 601.1.4 Protection on Low Speed Roadways ........................................................................................................ 4 601.1.5 Protection on Low-Volume Collectors and Local Roads (ADT ≤ 2000) .................................................... 5 601.1.6 Preservation of Safety Grading ................................................................................................................ 5 601.2 Median Barrier Warrants.......................................................................................................5 601.2.1 Safety Studies ........................................................................................................................................... 5 601.3 NHS Criteria ..........................................................................................................................6 601.4 Design Considerations for Large Trucks ..................................................................................6 602 Site Considerations .................................................................................................................. 7 602.1 Roadside Protection ..............................................................................................................7 602.1.1 Location/Offset......................................................................................................................................... 7 602.1.2 Length of Need on Tangent Alignments................................................................................................... 7 602.1.3 Length of Need on Curved Alignments .................................................................................................... 8 602.1.4 Grading for Barriers & End Treatments ................................................................................................... 8 602.1.5 Guardrail with Curbs ................................................................................................................................ 9 602.1.5.1 On High Speed Roadways ................................................................................................................. 9 602.1.5.2 On Low Speed Roadways .................................................................................................................. 9 602.1.5.3 End Treatments and Impact Attenuators in Curbed Sections ........................................................ 10 602.2 Median Protection .............................................................................................................. 10 602.2.1 Shielding of Fixed Objects in the Median............................................................................................... 10 602.2.1.1 Narrow Median Barrier Installations .............................................................................................. 10 602.2.1.2 Wide Median Barrier Installations .................................................................................................. 10 602.2.1.3 Greatest Offset Method to Shield Center Median Piers ................................................................ 10 602.2.2 Mitigation of Cross Median Crashes (CMC) ........................................................................................... 10 602.2.2.1 Barrier Selection.............................................................................................................................. 10 602.2.2.2 Cable Barrier Placement in the Median.......................................................................................... 11 602.2.2.3 Cable Anchors ................................................................................................................................. 11 602.2.2.4 Cable Barrier as the Primary Barrier System .................................................................................. 11 602.3 Gore Area Protection .......................................................................................................... 11 602.4 Protection at Drives and Side Roads .................................................................................... 11 602.5 Protection at Bridges and Fixed Objects ............................................................................... 12 602.5.1 Guardrail at Bridges & Large Culverts .................................................................................................... 12 602.6 Protection at Drainage Structures ........................................................................................ 12 July 2021 Location and Design Volume 1 600 Roadside Design 602.6.1 Transverse Drainage ............................................................................................................................... 12 602.6.2 Intersecting Embankments & Parallel Drainage .................................................................................... 13 602.6.3 Special End Treatments .......................................................................................................................... 14 602.7 Sight Distance Considerations.............................................................................................. 14 603 Roadside Safety Devices........................................................................................................ 14 603.1 Longitudinal Barriers ........................................................................................................... 14 603.1.1 Flexible Cable Systems ........................................................................................................................... 14 603.1.1.1 Generic Low Tension Cable ............................................................................................................. 14 603.1.1.2 Proprietary High Tension Cable Systems ........................................................................................ 14 603.1.2 Semi Rigid Barriers ................................................................................................................................. 15 603.1.2.1 Type MGS Guardrail ........................................................................................................................ 15 603.1.2.3 Barrier Design Guardrail ................................................................................................................. 16 603.1.2.5 Long Span Guardrail ........................................................................................................................ 16 603.1.4 Rigid Concrete Barrier ............................................................................................................................ 16 603.1.4.1 Single Slope Barrier ......................................................................................................................... 16 603.1.4.2 Types B & B1 ................................................................................................................................... 17 603.1.4.3 Type C & C1 ..................................................................................................................................... 17 603.1.4.4 Type D ............................................................................................................................................. 17 603.1.4.5 New Jersey Shape ........................................................................................................................... 17 603.1.4.6 Portable Concrete Barrier ............................................................................................................... 17 603.1.4.7 Zone of Influence ............................................................................................................................ 18 603.2 Characteristics of Anchor Assemblies & Impact Attenuators ................................................. 18 603.2.1 Energy Absorbing ..................................................................................................................................
Recommended publications
  • Temporary Barrier Guidance Manual December 2018 Temporary Barrier Guidance
    Temporary Barrier Guidance Manual December 2018 Temporary Barrier Guidance Contents 1. Introduction .......................................................................................................................3 1.1 Temporary Barrier Use Applications ..................................................................................... 3 1.2 Definitions ............................................................................................................................. 3 2. Work Zone Clear Zone and Roadside Safety .........................................................................4 2.1 Fixed Objects ......................................................................................................................... 4 2.2 Longitudinal Drop-offs .......................................................................................................... 5 3. Temporary Barrier for Hazard Protection - Placement and Deflection Distance Guidance ......5 3.1 Protection from Fixed Objects .............................................................................................. 5 3.2 Protection from Longitudinal Drop-offs ................................................................................ 5 3.3 Length of Need Calculation ................................................................................................... 6 3.3.1 Length of Need Procedure ................................................................................................. 7 3.3.2 Length of Need Procedure for Barrier Flare .....................................................................
    [Show full text]
  • Subdivision Street Standards Manual
    TOWN OF MARANA Subdivision Street Standards Manual May 2013 TABLE OF CONTENTS CHAPTER & SECTION 1.0 INTRODUCTION AND PURPOSE………………………………………………. 1 1.1 Introduction………………………………………………………………… 1 1.2 Purpose……………………………………………………………………... 1 1.3 Applicability……………………………………………………………….. 2 2.0 FUNCTIONAL CLASSIFICATION AND REGULATIONS…………………….. 2 2.1 Functional Classification………………………………………….………... 2 2.2 Incorporated Regulations Adopted by Reference…………………………... 3 3.0 TRAFFIC STUDIES………………………………………………………………. 3 4.0 STREET LAYOUT AND GEOMETRIC DESIGN………………………………... 4 4.1 Street Layout………………………………………………………………… 4 4.2 Cul-de-sacs………………………………………………………………….. 5 4.3 Design Speed………………………………………………………………... 6 4.4 Design Vehicle…………………………………………………….………… 6 4.5 Horizontal Alignment……………………………………………………….. 7 4.6 Vertical Alignment………………………………………………………….. 7 4.7 Intersection Alignment…………………………………………….………… 8 4.8 Intersection Sight Distance…………………………………………………. 9 4.9 Residential and Commercial Drive Entrances………………………………. 10 4.10 Roadway Superelevation…………………………………………………….. 11 4.11 Roadway Drainage Crossings……………………………………………….. 11 4.12 Mountainous Terrain………………………………………………………… 11 4.13 Environmentally Sensitive Roadways………………………………………. 12 4.14 Alternative Access…………………………………………………………… 12 5.0 RIGHT OF WAY……………………………………………………………………. 13 6.0 ELEMENTS IN THE CROSS SECTION…………………………………………... 14 6.1 Travel Lanes……………………………………………………….………… 14 6.2 Curbing……………………………………………………………………… 14 6.3 Sidewalks………………………………………………………….………… 15 6.4 Shoulders………………………………………………………….………… 16 6.5 Roadside
    [Show full text]
  • Temporary Traffic Control Manual First Edition
    Temporary Traffic Control Manual First Edition Temporary Traffic Control Manual • • • Engineering Judgement The 2009 MUTCD (Arizona Supplement) states in Section 1A.13 (64), “Engineering Judgement – the evaluation of available pertinent information, and the application of appropriate principles, provisions, and practices as contained in this Manual and other sources, for the purpose of deciding upon the applicability, design, operation, or installation of a traffic control device. Engineering judgement shall be exercised by an engineer, or by an individual working under the supervision of an engineer, through the application of procedures and criteria established by the engineer. Documentation of engineering judgement is not required.” No single publication would be able to cover all diverse conditions and circumstances a Temporary Traffic Control practitioner may encounter in governing traffic on city streets. Engineering judgment is essential in applying the principles and practices contained in this 2017 Temporary Traffic Control Manual (TTCM). Variations from the requirements and typical illustrations in this manual may be needed based on analysis and engineering judgment of a specific situation. The City Traffic Engineer shall have the final authority with respect to such variations. Acknowledgements The City of Mesa Transportation Department sincerely appreciates and would like to acknowledge the following organizations for their contributions in the completion of this Temporary Traffic Control Supplement: • American Traffic Safety Services Association (ATSSA), National • American Traffic Safety Services Association (ATSSA), Arizona Chapter • City of Mesa Engineering and Traffic Operations Departments • City of Mesa Police Department Engineering Judgement 1 Temporary Traffic Control Manual • • • Introduction Temporary traffic control planning is important as it minimizes impact on the traveling public.
    [Show full text]
  • Chapter 2 Design Geometrics and Criteria
    Topic #625-000-007 Plans Preparation Manual, Volume 1 January 1, 2017 Chapter 2 Design Geometrics and Criteria 2.0 General ...................................................................................... 2-1 2.0.1 Railroad-Highway Grade Crossing Near or Within Project Limits ............................................................. 2-3 2.1 Lanes ......................................................................................... 2-4 2.1.1 Travel Lanes and Auxiliary Lanes............................... 2-4 2.1.2 Other Lane Widths ..................................................... 2-5 2.1.3 Ramp Traveled Way Widths ....................................... 2-6 2.1.4 Pedestrian, Bicycle and Public Transit Facilities ......... 2-6 2.1.4.1 Pedestrian Facilities ................................... 2-6 2.1.4.2 Bicycle Facilities ......................................... 2-7 2.1.4.3 Public Transit Facilities ............................... 2-7 2.1.5 Cross Slopes .............................................................. 2-7 2.1.5.1 Hydroplaning Risk Analysis ........................ 2-8 2.1.6 Roadway Pavement ................................................. 2-11 2.1.6.1 Alternative Roadway Paving Treatments ............................................... 2-11 2.1.6.2 Maintenance Memorandum of Agreement Requirements for Patterned Pavement ................................. 2-13 2.1.7 Transitions of Pavement Widths ............................... 2-15 2.1.8 Number of Lanes on the State Highway System ...... 2-15 2.2 Medians ..................................................................................
    [Show full text]
  • Cast-In-Place Concrete Barriers
    rev. May 14, 2018 Cast-In-Place Concrete Barriers April 23, 2013 NOTE: Reinforcing steel in each of these barrier may vary and have been omitted from the drawings for clarity, only the Ontario Tall Wall was successfully crash tested as a unreinforced section. TEST LEVEL NAME/MANUFACTURER ILLUSTRATION PROFILE GEOMETRIC DIMENSIONS CHARACTERISTICS AASHTO NCHRP 350 MASH New Jersey Safety-Shape Barrier TL-3 TL-3 32" Tall 32" Tall The New Jersey Barrier was the most widely used safety shape concrete barrier prior to the introduction of the F-shape. As shown, the "break-point" between the 55 deg and 84 deg slope is 13 inches above the pavement, including the 3 inch vertical reveal. The flatter lower slope is intended to lift the vehicle which TL-4 TL-4 http://tf13.org/Guides/hardwareGuide/index.php?a absorbs some energy, and allows vehicles impacting at shallow angles to be 32" Tall 36" Tall X ction=view&hardware=111 redirected with little sheet metal damage; however, it can cause significant instability to vehicles impacting at high speeds and angles. Elligibility Letter TL-5 TL-5 B-64 - Feb 14, 2000 (NCHRP 350) 42" Tall 42" Tall NCHRP Project 22-14(03)(MASH TL3) NCHRP 20-07(395) (MASH TL4 & TL5) F-shape Barrier TL-3 TL-3 The F-shape has the same basic geometry as the New Jersey barrier, but the http://tf13.org/Guides/hardwareGuide/index.php?a 32" Tall 32" Tall "break-point" between the lower and upper slopes is 10 inches above the ction=view&hardware=109 pavement.
    [Show full text]
  • FDM 11-20-1 Modernization Dimensions and Design Classes May 17, 2021
    Facilities Development Manual Wisconsin Department of Transportation Chapter 11 Design Section 20 Cross Section Elements for Modernization of Urban Highways FDM 11-20-1 Modernization Dimensions and Design Classes May 17, 2021 1.0 General Modernization design criteria for various urban highway systems are given in this procedure. Attachment 1.1 and Attachment 1.5 contain modernization design criteria for urban highways. New Construction projects cannot use the Safety Certification Process (SCP) because no existing cross sectional or geometric features or crash histories exist in which to analyze safety performance, however predictive safety benefit/cost analyses in conjunction with environmental process evaluations can be used to compare alternatives. New Construction projects will use the S-3 Application as described in FDM 11-15-1.3.2. See FDM 11-15-1, FDM 11-1-20, FDM 11-4-10.4 and FDM 11-38 for further information on the S-2/S-3 Applications, Design Study Report (DSR), Design Justifications (DJs), and the SCP for use on Modernization projects. DJ approvals in the DSR are also available to use when needed to justify the preservation of existing features or the application of new cross sectional or geometric feature values outside of FDM design criteria values which are not initially recommended by the Safety Certification Process Document (SCD) or other safety analyses. See FDM 11-1-20 and FDM 11-4- 10.4 for information and guidance on the use of DSR DJs. 1.1 Cross Slopes The pavements of urban roadways typically have crowns in the middle and slope downward towards both edges.
    [Show full text]
  • Sha's Policy for the Use Of
    MARYLAND STATE HIGHWAY ADMINISTRATION POLICY FOR THE USE OF TEMPORARY TRAFFIC BARRIER IN WORK ZONES 1. POLICY STATEMENT It is the policy of the Maryland State Highway Administration (SHA) that temporary traffic barrier protection is required for all work on high speed facilities where (1) the operation occurs on the roadway or shoulder, or is within 10’ feet of the edge of a travel lane open to traffic, and the duration of work is expected to be at least two (2) weeks and the limits of the work area remain unchanged for that duration. OR (2) there is no means of escape for workers from motorized traffic (e.g., tunnels, bridges, etc.), and the duration of work is expected to be at least two (2) weeks and the limits of the work area remain unchanged for that duration. If an engineering study determines that temporary traffic barrier protection is not feasible, a waiver justifying the reasons why it is not feasible shall be prepared and approved by the Senior Manager of the lead office. For work zones that do not meet the aforementioned criteria, the need for positive protection devices should still be considered. Refer to Section 4, Barrier Evaluation Process, for additional information on the process and criteria to determine the need for temporary traffic barrier. This policy supplements existing standards and practices, including, but not limited to: Book of Standards for Highways and Incidental Structures Maryland Standard Sign Book Maryland Manual on Uniform Traffic Control Devices (MdMUTCD) AASHTO Roadside Design Guide 2. DEFINITIONS High Speed Facility: All roadways with an existing posted speed 45 mph.
    [Show full text]
  • Traffic Control Devices and Lighting Section
    801.02 SECTION 800 – TRAFFIC CONTROL DEVICES AND LIGHTING SECTION 801 – TRAFFIC CONTROLS FOR CONSTRUCTION AND MAINTENANCE OPERATIONS 801.01 Description This work shall consist of furnishing, placing, and maintaining signs, barricades, temporary pavement markings, and other traffic control devices at construction and maintenance operations in accordance with 105.03. MATERIALS 10 801.02 Materials Materials shall be in accordance with the following: Coarse Aggregate, Class D or Higher, Size No. 73............. 904 Construction Warning Lights .............................................. 923.03 Delineator Posts................................................................... 910.15 Delineators........................................................................... 926.02 Field Paint........................................................................... 909.04 Flashing Arrow Sign............................................................ 923.04 20 Flexible Delineator Posts..................................................... 926.01 Pavement Marking Materials............................................... 921 Steel Posts........................................................................... 910.14 Temporary Barrier Delineator ............................................. 926.02(d) Temporary Highway Illumination Materials....................... 807 Temporary Panel Signs........................................................ 919.01 Temporary Pavement Marking Tape................................... 923.01 Temporary Raised Pavement
    [Show full text]
  • Positive Protection May 2019 6
    For Work Zone Designers Technical Report Documentation Page 1. Report No. 2. Government Accession No. 3. Recipient’s Catalog No. 4. Title and Subtitle 5. Report Date Guidelines for Work Zone Designers – Positive Protection May 2019 6. Performing Organization Code 7. Author(s) 8. Performing Organization Report No. William Bremer, John W. Shaw, Madhav V. Chitturi, Andrea Bill, and David A. Noyce 9. Performing Organization Name and Address 10. Work Unit No. (TRAIS) Traffic Operations & Safety Laboratory University of Wisconsin – Madison 1415 Engineering Drive #2205 11. Contract or Grant No. Madison WI 53706 DTHF6114H00011 12. Sponsoring Organization Name and Address 13. Type of Report and Period Covered Federal Highway Administration Guidebook Office of Operations 1200 New Jersey Avenue SE 14. Sponsoring Agency Code Washington DC 20590 15. Supplementary Notes This material is based on work supported by the Federal Highway Administration. This publication does not constitute a national standard, specification or regulation. 16. Abstract Most State and many other transportation departments in the U.S. maintain roadway and/or work zone design manuals containing State specific regulations, policies, and design guidance for their designers and consultants to use. However, those manuals vary widely in the depth of coverage and the work zone design topics offered. National work zone design guidelines are lacking. This series of guidelines for work zone designers covers various work zone safety design topics for states, design manual decision makers, editors, and subject matter experts to develop or enhance their own guidance materials. “ Guidelines for Work Zone Designers – Positive Protection” provides guidance covering the topic of positive protection in work zones and is not intended to be a stand-alone document for designing work zone traffic control plans.
    [Show full text]
  • Managed Lanes and Ramp Metering Manual
    MMaannaaggeedd LLaanneess aanndd RRaammpp MMeetteerriinngg MMaannuuaall PPaarrtt 11:: IInnttrroodduuccttiioonn aanndd PPoolliicciieess PPrreeppaarreedd fffoorr::: NNeevvaaddaa DDeeppaarrttmmeenntt ooff TTrraannssppoorrttaattiioonn DDeecceemmbbeerr 22001133 Jacobs Engineering Group Inc. 319 E. Warm Springs Road, Suite 200 Las Vegas, NV 89119 TEL: 702.938.5400 FAX: 702.938.5454 Table of Contents 1.0. PURPOSE ....................................................................................................................... 1-1 1.1. Manual Overview ......................................................................................................... 1-1 2.0. BACKGROUND AND NEED .......................................................................................... 2-1 2.1. Legislative Background and Project Application .................................................. 2-2 3.0. DEFINITIONS ................................................................................................................. 3-1 3.1. Managed Lanes ........................................................................................................... 3-1 3.2. Ramp Metering ............................................................................................................. 3-2 4.0. THE PRIMARY AGENCY PARTNERS .............................................................................. 4-1 4.1. Nevada Department of Transportation (NDOT) ..................................................... 4-1 4.2. MPOs and Transit Providers ........................................................................................
    [Show full text]
  • Work Zone Management Strategies I
    Work Zone Management Strategies I. Temporary Traffic Control (TTC) A. Control Strategies B. Traffic Control Devices C. Project Coordination, Contracting, and Innovative Construction Strategies IA1. Construction phasing/staging IB1. Temporary signs IC1. Project coordination IA2. Full roadway closures • Warning • Coordination with other projects • Regulatory • Utilities coordination IA3. Lane shifts or closures • Guide/ information • Right-of-way coordination • Coordination with other transportation • Reduced lane widths to maintain IB2. Changeable message signs (CMS) infrastructure number of lanes (constriction) • Lane closures to provide worker safety IB3. Arrow panels IC2. Contracting strategies • Reduced shoulder width to maintain number of lanes IB4. Channelizing devices • Design-build • Shoulder closures to provide worker • A+B bidding safety IB5. Temporary pavement markings • Incentive/disincentive clauses • Lane shift to shoulder/median to • Lane rental maintain number of lanes IB6. Flaggers and uniformed traffic control officers IA4. One-lane, two-way operation IC3. Innovative construction techniques (precast members, rapid cure materials) IB7. Temporary traffic signals IA5. Two-way traffic on one side of divided facility (crossover) IB8. Lighting devices IA6. Reversible lanes IA7. Ramp closures/relocation IA8. Freeway-to-freeway interchange closures IA9. Night work IA10. Weekend work IA11. Work hour restrictions for peak travel IA12. Pedestrian/bicycle access improvements IA13. Business access improvements IA14. Off-site detours/use of alternate routes Attachment “B” page 1 of 3 Work Zone Management Strategies II. Public Information (PI) A. Public Awareness Strategies B. Motorist Information Strategies IIA1. Brochures and mailers IIB1. Traffic radio IIA2. Press releases/media alerts IIB2. Changeable message signs (CMS) IIA3. Paid advertisements IIB3. Temporary motorist information signs IIA4.
    [Show full text]
  • Design Manual Chapter 1610 Traffic Barriers
    Chapter 1610 Traffic Barriers 1610.01 Introduction Exhibit 1610-6 Barrier Length of Need 1610.02 Barrier Impacts Exhibit 1610-7 Barrier Length of Need on Curves 1610.03 General Barrier Design Considerations Exhibit 1610-8 Beam Guardrail Trailing End Placement for 1610.04 Beam Guardrail Divided Highways 1610.05 High-Tension Cable Barrier Exhibit 1610-9 Beam Guardrail Post Installation 1610.06 Concrete Barrier Exhibit 1610-10 Guardrail Connections 1610.07 Bridge Traffic Barriers Exhibit 1610-11 Transitions and Connections 1610.08 Other Barriers Exhibit 1610-12 Median Cable Barrier Placement 1610.09 References Exhibit 1610-13 Roadside Cable Barrier Placement Exhibit 1610-14 Cable Barrier Placement: Overlap on Divided Highways Exhibit 1610-1 Concrete Barrier Placement Guidance: Assessing Impacts to Wildlife Exhibit 1610-15 Cable Barrier Placement: Cable Barrier Termination/Overlap with Beam Guardrail Exhibit 1610-2 Traffic Barrier Locations on Slopes Exhibit 1610-16 Concrete Barrier Shapes Exhibit 1610-3 Longitudinal Barrier Deflection Exhibit 1610-17 Type 7 Bridge Rail Upgrade Criteria Exhibit 1610-4 Longitudinal Barrier Flare Rates Exhibit 1610-18 Thrie Beam Rail Retrofit Criteria Exhibit 1610-5 Barrier Length of Need on Tangent Sections Chapter Organization: The first sections (Introduction and Barrier Impacts) present information to consider when deciding whether to install a barrier. The next section (General Barrier Design Considerations) contains guidance common to ALL barrier types, such as deflection distance, length of need and sight distance. The remaining sections present design information organized by specific barrier type (beam guardrail, cable barrier, etc.). Refer to the Glossary for many of the terms used in this chapter.
    [Show full text]